User Tools

Site Tools


teesworks_-_keywords_-_suspen

{include:Teesworks - keywords - menu}

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:17: the access land where public access may be temporarily suspended) to the extent

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:18:suspended) to the extent specified in column (3) of that Table 6.

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:72: TEMPORARILY SUSPENDED

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:72:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:26: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:26: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:51: Suspended: Not Supplied

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:51: Suspended: Not Supplied

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:51: Suspended: Not Supplied

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:27:3.2.633.2.62 The SAC is a large macro-tidal coastal plain estuary with high suspended

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:71: run-off, dispersion of suspended sediments and spillage risk in the

EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:11:appropriate, extinguish or suspend any rights in the Wilton Land if the authorised project can

EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:11:or suspension.

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-002178-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Clean).pdf:12: which it is proposed to extinguish or suspend easements, servitudes and other

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:13: remain in force until they are withdrawn or suspended by the SoS.1

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:45: suspended in the meantime. The relevant energy National Policy Statements,

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:82: Surface Water Quality – Suspended Fine Sediment

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:82: suspended sediment concentrations would result in a temporary increase in

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:83: element would occur due to suspended fine sediments, nor any non-

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:85:9.7.64 Increased suspended sediment concentrations from the construction works

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: Surface Water Quality – Suspended Fine Sediment

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: due to suspended fine sediments, nor any non-compliance with WFD

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:88: Surface Water Quality – Suspended Fine Sediment

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:88: anticipated due to suspended fine sediments, nor any non-compliance with

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134: marine input is washed in with the flood tide, and often causes resuspension

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134: suspended sediments and a variety of sources and sinks. Silts and muds are

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134: readily transported as suspended sediment load and can remain in

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134: suspension for extended periods through the tidal cycle, while coarser sands

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:134: carried as bedload. Suspended sediment concentrations between 1500 and

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:162:waterbodies based on its recorded salinity and suspended particulate matter concentration1. In this

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:162:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:175:point B gives an average suspended solids concentration of 8.5 mg/l.

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:175: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:4:Suspended sediment concentrations

EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:4:In order to assess the suspended sediment concentrations impacts, we require

EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:19:suspended sediments: where dredging and disposal is required, pre-construction

EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:20:increased Suspended Sediment Concentrations (SSC), smothering and toxicity

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:10: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:35: the impact upon the business plan. No GPR ability to sell assets, raise capital and suspend

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:256:transmission services in the UK. Measures such as the suspension of debt

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:22: of its assets in Russia, and gradually suspend its activities in Russia, while assuring its workforce's safety.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:22:today. TotalEnergies has thus initiated the gradual suspension of its activities in Russia, while assuring its teams’ safety. Similarly,

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:26:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:35:director made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:35:the board composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:192: temporarily suspended) 97

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:196:(2) Construction in Mozambique is currently suspended due to a case of force majeure (see the Africa section).

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:213: and 2019. Operations have been suspended since 2020 due to the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:214:previous Abu Dhabi Marine Areas Ltd. (ADMA) offshore concession. The suspended from January to October 2020 for reasons of safety and lack

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:214:onshore areas, production was suspended on several occasions Kurdistan, which is in production.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:226:2.3.9 Wells in the process of being drilled (including wells temporarily suspended)

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:257:EU economic sanctions were suspended(2). related to Iran carried out by TotalEnergies' companies in 2021.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:277: If the problem cannot be solved immediately, the work is suspended,

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:287: suspended in April 2021 (see below), as well as impact on fishers’ TEPMA1 formalized the learnings from these studies and its approach

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:287: Despite the aggravation of the security situation and the suspension of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:288: VPSHR incident resolution Despite the sanitary and security context and the suspension of the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:289:suspension or dismissal). (compared to 99% in 2020).

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:370: project in response to the Scotwind call for tender in Scotland – Decision of TotalEnergies and Chevron to suspend dividend

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:437: measures related to construction was temporarily suspended due to security

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:462: to subsidiaries in 101 countries with a response rate of 87%. This operations. These clauses continued to apply, despite the suspension of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:481:correspond to ‘contrats à durée indéterminée’ (CDI) and fixed-term persons who are under suspended contract (sabbatical, business

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:489: to maintain the final dividend for fiscal year 2019, as announced on 2020, it announced the suspension of share buybacks by the Corporation

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:489: shares. It was also decided to suspend the dividend growth policy for

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:578: was temporarily suspended due to security problems

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:49:A second possibility is the Russian government responding to Western sanctions by suspending the

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:49:to the Russian federal budget. However, if the Russian government were to suspend natural gas exports

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:49: OIES, November, and Yafimava and Fulwood (2021). German regulator’s decision to suspend Nord Stream 2 certification:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:126:are currently suspended), five of them with integrated dedicated geological storage

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:5: suspended gas injection at Gina Krog to export the gas.

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:34:Overview  Gas production from the Snøhvit field is suspended after

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:52: Gas production from the Snøhvit field is suspended after the

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:63:Energy Management (BOEM) manages federal OCS leasing fines and even licence suspension and/or cancellation in case of

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:65:by the temporary 2020-rules will be 100% deductible in the gas activities allowing suspension of the federal duties and

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:77:where drilling or completion has been suspended pending further evaluation. A dry well is a well found to be incapable of producing

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:253:Project which has finalized the development of 4 gas fields in central Algeria). Following suspension of activity after the terrorist attack at

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:253:Equinor has filed a motion for clarification which had the effect of temporarily suspending the unfavourable decision and is currently

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:39:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:39:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:48:suspended solids concentration of 8.5mg/l.

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:48: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:57: extinguish or suspend any rights in land where the authorised project can reasonably and

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:57: suspension.

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:36: between the works and nest(s) and suspending vegetation clearance

EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:43: between the works and nest(s) and suspending vegetation clearance

EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf:3: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline

EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf:3: without such acquisition, appropriation, extinguishment or suspension.

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:65: Suspended: Not Supplied

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:65: Suspended: Not Supplied

EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf:13: STDC note that the Applicant is seeking to temporarily suspend access to the “area hatched

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: Surface Water Quality – Suspended Fine Sediment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: the Tees Coastal water body. Increased suspended sediment concentrations

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: element would occur due to suspended fine sediments, nor any non-

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:73:9.7.52 Increased suspended sediment concentrations from the construction works

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:75: Surface Water Quality – Suspended Fine Sediment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:76: due to suspended fine sediments, nor any non-compliance with WFD

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:77: Surface Water Quality – Suspended Fine Sediment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:77: anticipated due to suspended fine sediments, nor any non-compliance with

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111: marine input is washed in with the flood tide, and often causes resuspension

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111: suspended sediments and a variety of sources and sinks. Silts and muds are

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111: readily transported as suspended sediment load and can remain in

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111: suspension for extended periods through the tidal cycle, while coarser sands

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:111: carried as bedload. Suspended sediment concentrations between 1500 and

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:130: Total Suspended Solids (TSS) mg/l Polycyclic Aromatic Hydrocarbons µg/l

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:133: Total Suspended Solids mg/l <10 18.4 26 12 24.8 13.2

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:143:Total Suspended Solids mg/l <10 <10 16 26 12 15 23 <10 <10 18.4 26 12 24.8 13.2

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:663: sever, prevent or curtail access to its apparatus and/or extinguish/suspend its

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:689: the existing Redcar British Steel railway station (currently suspended).” We will support OGCI

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:689: 16.2.16 of the Framework Travel Plan need to be updated to refer to the suspension of services

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:50: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-001972-North Tees CAH.pdf:2:8. If the Applicant seeks to acquire rights over the linkline Corridor and to extinguish or suspend

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 to 1734

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1235: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:42: British Steel railway station (currently suspended).

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 to 1734

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1267: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1699: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1700: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1701: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1702: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1703: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1704: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1705: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1706: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1707: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1708: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1709: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1710: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1711: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1712: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1713: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1714: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1715: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1716: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1717: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1718: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1719: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1720: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1721: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1722: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1723: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1724: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1725: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1726: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1727: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1728: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1729: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1730: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1731: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1732: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1733: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1734: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1735: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1736: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:1737: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:46: suspending vegetation clearance works within the area

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:49: Steel railway station (currently suspended).

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:75: between the works and nest(s) and suspending

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:50:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:50:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:59:suspended solids concentration of 8.5mg/l.

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:59: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:199:waterbodies based on its recorded salinity and suspended particulate matter concentration 1. In this

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:199:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:212:point B gives an average suspended solids concentration of 8.5 mg/l.

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:212: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of

EN010103-002651-SABIC Protective Provisions 1.pdf:10:appropriate, extinguish, suspend or override any rights of SABIC in the protected land if the

EN010103-002651-SABIC Protective Provisions 1.pdf:11:appropriation, extinguishment, suspension or override.

EN010103-002651-SABIC Protective Provisions 1.pdf:11:suspend or override any rights of SABIC in the protected land relating to the pipelines or access to

EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:37: seeking to temporarily suspend access to the “area hatched green hatching referred to in the STDC relevant representation was

EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:37: Coatham beach and sand dunes” however STDC believes that this access may be temporarily suspended) is now to beige

EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:3: be extinguished, suspended or interfered with under the Order.

EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:3: be extinguished, suspended or interfered with under the Order.

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:17: the access land where public access may be temporarily suspended) to the extent

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:18:suspended) to the extent specified in column (3) of that Table 6.

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:71: TEMPORARILY SUSPENDED

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:71:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-001505-Exolum-Seal-Sands-Ltd.pdf:1: any interference with, extinguishment or suspension of the land rights relating to its apparatus or

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:61: suspending vegetation clearance works on a localised basis within the

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:97: • Physical disturbance to habitats and species from increased suspended

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:5: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:6: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:7: 142 it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:9: Con it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:10: an it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:11: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:14: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:15: it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:16: 2.1m L Twr it is proposed to extinguish or suspend easements,

EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf:17: L Twr it is proposed to extinguish or suspend easements,

EN010103-001975-NZT DCO 4.16.4 - Water Connection Plan August 2022(D5).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:17: NTG is in breach or where there is a need to acquire or suspend third party rights.

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:18: may require the suspension or acquisition of such rights.

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:8: suspension, revocation and transfer of licence) of the Marine and Coastal Access Act

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:8: the entirety of the MMO’s powers to revoke, suspend, transfer or vary a licence

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:12: acquire or suspend third party rights. However, the Applicants consider that the draft

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:13: of land, compulsorily or by agreement, and the creation, suspension or

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:15: can be extinguished or suspended, so as to facilitate the

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:26: extinguish or suspend rights over land, and to temporarily use land for the

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:41: compulsorily or by agreement, and the creation, suspension or

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:45: extinguished or suspended, so as to facilitate the construction and

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:47: matters to be suspended, overridden or extinguished within the Order Land

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:90: suspension or extinguishment of private rights, is no more than is reasonably

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:90: covenants and the suspension or extinguishment of private rights is justified.

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:65: off, dispersion of suspended sediments and spillage risk in the

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:12: land, compulsorily or by agreement, and the creation, suspension or

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:14: can be extinguished or suspended, so as to facilitate the

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:25: extinguish or suspend rights over land, and to temporarily use land for the

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:40: land, compulsorily or by agreement, and the creation, suspension or

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:44: extinguished or suspended, so as to facilitate the construction and

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:46: matters to be suspended, overridden or extinguished within the Order Land

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:87: suspension or extinguishment of private rights, is no more than is reasonably

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:87: covenants and the suspension or extinguishment of private rights is justified.

EN010103-002734-Response from CATS North Sea Limited.pdf:3:extinguish, suspend or override any rights of CATS if the authorised development can reasonably and

EN010103-002734-Response from CATS North Sea Limited.pdf:3:practicably be carried out without such acquisition, appropriation, extinguishment, suspension or override.

EN010103-002734-Response from CATS North Sea Limited.pdf:3:land) and 23 (power to override easements and other rights) to acquire, appropriate, extinguish, suspend or

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:31: also suspends private rights where the private right is inconsistent with a right being

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:31: compulsorily acquired by the undertaker and also suspends private rights for as long as

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:31: Generating Station Order 2017. Sub-paragraph (4) limits the scope of the suspension of

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:33: for the suspension of rights of a statutory undertaker (for example where land is being

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:4: be extinguished, suspended or interfered with under the Order.

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:32: that the NPS should be reviewed under s.6 before the application is determined, he may suspend the examination of that

EN010103-002652-Huntsman Protective Provisions.pdf:10:appropriate, extinguish, suspend or override any rights of Huntsman in the protected land if the

EN010103-002652-Huntsman Protective Provisions.pdf:10:appropriation, extinguishment, suspension or override.

EN010103-002652-Huntsman Protective Provisions.pdf:10:suspend or override any rights of Huntsman in the protected land relating to the pipelines or access

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:31: exercised and compensation is provided for in respect of the loss or suspension of

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:34: to compensation for the extinguishment or suspension of a private right of way has

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:36: undertaker. The Article also suspends private rights where the private right is

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:36: suspends private rights for as long as the undertaker is in temporary possession of

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:39: amended to allow for the suspension of rights of a statutory undertaker (for example

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:57: Countryside and Rights of Way Act 2000 may be temporarily suspended. See

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:18: the access land where public access may be temporarily suspended) to the extent

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:19: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:19:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:19:suspended) to the extent specified in column (3) of that Table 6.

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:19: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:21:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:27:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:33: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:78: TEMPORARILY SUSPENDED

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:78:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:94: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:107: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:2: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:3: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:7: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:8: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:10: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:11: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:14: 2.1m it is proposed to extinguish or suspend easements,

EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf:15: L Twr it is proposed to extinguish or suspend easements,

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:71: Suspended: Not Supplied

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:72: Suspended: Not Supplied

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:72: Suspended: Not Supplied

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:72: Suspended: Not Supplied

EN010103-001718-Redcar Bulk Terminal Limited - Responses to the ExA’s ExQ1.pdf:9: relation to which it is proposed to extinguish or suspend easements, servitudes and

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:259:or completion of which, in the case of exploratory wells, has been suspended pending further drilling or evaluation. A dry well is one found to be

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:260:equity-accounted entities as of 31 December 2020. Suspended development wells and long-term suspended exploratory wells are also included in the

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:334:had suspended the Scrip Programme in respect of those quarterly performed in accordance with its terms.

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:10: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:2: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:3: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:4: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:7: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:8: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:10: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:11: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:12: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:13: it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:14: 2.1m it is proposed to extinguish or suspend easements,

EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf:15: L Twr it is proposed to extinguish or suspend easements,

EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline

EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:4: without such acquisition, appropriation, extinguishment or suspension.

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:12: suspension or extinguishment of, or interference with, interests in or rights over land,

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:13: private rights identified as affecting the land can be extinguished or suspended,

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:24: Application to acquire land, acquire or create rights over land, to extinguish or suspend

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:38: suspension or extinguishment of, or interference with, interests in or rights over land,

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:42: identified as affecting the land can be extinguished or suspended, so as to

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:44: addition, the Applicants require certain matters to be suspended, overridden or

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:84: overriding of interests, rights and restrictive covenants and the suspension or

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:84: interests, rights and restrictive covenants and the suspension or extinguishment of

EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf:148:prevailing on the dates of the transactions. At each reporting date, customers, in light of the suspension of debt collection activities and

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:68: off, dispersion of suspended sediments and spillage risk in the

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:12: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:14: and, in conjunction with the proposed powers to extinguish or suspend third party rights, would in

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:29:appropriate, extinguish or suspend any rights in the Wilton Land if the authorised project can

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:29:or suspension.

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:40: suspend the existing rights in it enjoyed by Sembcorp and its customers, it is incumbent upon them

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:46: suspending vegetation clearance works within the area

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:49: Steel railway station (currently suspended).

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:75: between the works and nest(s) and suspending

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:2: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:3: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:4: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:7: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:8: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:10: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:11: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:12: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:13: it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:14: 2.1m it is proposed to extinguish or suspend easements,

EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf:15: L Twr it is proposed to extinguish or suspend easements,

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:13: land, compulsorily or by agreement, and the creation, suspension or

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:15: can be extinguished or suspended, so as to facilitate the

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:26: extinguish or suspend rights over land, and to temporarily use land for the

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:40: compulsorily or by agreement, and the creation, suspension or

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:44: extinguished or suspended, so as to facilitate the construction and

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:46: matters to be suspended, overridden or extinguished within the Order Land

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:88: suspension or extinguishment of private rights, is no more than is reasonably

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:88: covenants and the suspension or extinguishment of private rights is justified.

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:15: of the access land where public access may be temporarily suspended) to the extent

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article is

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in Part

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:24:undertaker takes temporary possession under this Order are suspended and unenforceable for as long

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:64: TEMPORARILY SUSPENDED

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:64: In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:17: the access land where public access may be temporarily suspended) to the extent

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:18:suspended) to the extent specified in column (3) of that Table 6.

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:74: TEMPORARILY SUSPENDED

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:74:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:89: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:101: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:13: shellfish to increased SSC Suspended Sediment Concentrations and deposition

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:15: for preventing water pollution, spillage risk and the dispersion of suspended

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:18:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:18:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:18:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:19:Elevated concentrations of suspended sediment can have the following physical effects on

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:19: of particles, suspended sediment concentration, water velocity and gill dimensions

EN010103-002356-NZT ISH5 S2.pdf:7:suspend its operations until the issue is resolved. So there are a number of controls set within the

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:17: the access land where public access may be temporarily suspended) to the extent specified

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article is

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in Part 3

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:18:of Schedule 6 (those parts of the access land where public access may be temporarily suspended)

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:26:undertaker takes temporary possession under this Order are suspended and unenforceable for as long

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:76: TEMPORARILY SUSPENDED

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:76: In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:92: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:106: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:26: and Darlington. Northern Rail suspended all services to and from the station on 14th

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:25: acquisition rights where CNSL is in breach or where there is a need to acquire or suspend third party

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:30: i) The Applicant has referred to the current draft Requirements Schedule including a There are also penalties (including suspension of payments) where minimum capture rates are

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:30: neither of these provisions would require that the carbon dioxide captured from the generating or operation of the generating station in a way that would reduce or suspend a primary revenue

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:54: 5.4 Under Section 122(3) of the 2008 Act an order granting development consent may include as rights – in order to be able to do that, and which may require the suspension or acquisition of such

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:68: Infrastructure is vital to many of the manufacturing, distribution and industrial processes operating where NTG is in breach or where there is a need to acquire or suspend third party rights.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:77: proposed to extinguish or suspend easements, servitudes and other private rights”; as is indicated on the Land any part of the Authorised Development that may impact RBT’s operations. As noted above, this also

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:83: to be able to do that, and which may require the suspension or acquisition of such rights. The protective

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:91: majority of the investment land within Wilton) in a manner that has enabled the continued safe, require the suspension or acquisition of such rights. The protective provisions which the Applicant will

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:93: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is incumbent

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:2: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:3: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:4: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:7: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:8: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:10: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:11: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:12: it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:13: 2.1m it is proposed to extinguish or suspend easements,

EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf:14: L Twr it is proposed to extinguish or suspend easements,

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:64: Suspended: Not Supplied

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:65: Suspended: Not Supplied

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:65: Suspended: Not Supplied

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:65: Suspended: Not Supplied

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:35:7.3.7 Potential significant adverse effects to water quality from suspended fine

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:41: suspended sediment concentrations (i.e. turbidity) and deposition;

EN010103-002158-NZT DCO 4.16.3 - PCC Site Access Plan August 2022 (D6).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1229 to 1661

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1230: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:15: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:24:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:64: TEMPORARILY SUSPENDED

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:99: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:100: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:100: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:100: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:100: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:101: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:101: Suspended: Not Supplied

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:101: Suspended: Not Supplied

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:2: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:3: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:4: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:7: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:8: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:10: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:11: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:12: it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:13: 2.1m it is proposed to extinguish or suspend easements,

EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf:14: L Twr it is proposed to extinguish or suspend easements,

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:240: controlled waters. considered that some or most of the PAH must be attached to suspended solids in

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:31: exercised and compensation is provided for in respect of the loss or suspension of

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:34: to compensation for the extinguishment or suspension of a private right of way has

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:36: undertaker. The Article also suspends private rights where the private right is

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:36: suspends private rights for as long as the undertaker is in temporary possession of

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:39: amended to allow for the suspension of rights of a statutory undertaker (for example

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:56: Countryside and Rights of Way Act 2000 may be temporarily suspended. See

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:23: consent, and, furthermore, that any person who suffers loss by the suspension of

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:24: of the Access and Rights of Way Plans AS-150. The powers to suspend the rights of

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:56: powers to extinguish, suspend or interfere with CFL’s rights and their application in order to execute the development if an

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:61: 2.10 The proposed powers include the ability to extinguish, suspend 2.10 The Applicants are in negotiations with CFL’s legal

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:64: extinguish, suspend or interfere with CFL’s rights. Such rights include

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:69: take powers to extinguish, suspend or interfere with INEOS’ rights Permanent Rights to Temporary Possession. The area and plots are

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:71: 2.5 The proposed powers include the ability to extinguish, suspend 2.5 As noted above, the Applicants are in negotiations with INEOS

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:74: extinguish, suspend or interfere with the rights in the land. Such

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:96: success of the marine enhancement measures. Suspended sediment mixed. Impacts from this small amount of dredging are anticipated

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:96: concentrations In order to assess the suspended sediment to be localised and minor and no additional mitigation is proposed

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:97: Suspended sediment concentrations

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:122: and the dispersion of suspended sediments: where dredging and

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:122: from physical disturbance associated with increased Suspended

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:124: Suspended sediment concentrations Issue: Section 14.6.32 lists the

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:124: construction activities that have the potential to increase suspended

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:125: There is potential for dredging’s to be re-suspended as a result of

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:162: proposes to take powers to extinguish, suspend or interfere with Heads of Terms negotiations, the Applicants have proposed terms to

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:163: restrictions in such land to be suspended, unenforceable or where restrictions in such land to be suspended, unenforceable or where

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:214: temporarily suspend access to the “area hatched green on sheets 1 referred to in the STDC relevant representation was an error in the

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:214: and sand dunes” however STDC believes that this footpath will be suspended) is now to beige hatching on sheets 1 – 3 of ARoW plans

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:251: of fish and shellfish to increased SSC [Suspended Sediment away from other projects where cumulative effects are expected. The

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:255: pollution, spillage risk and the dispersion of suspended

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:270: Exolum therefore objects to any interference with, extinguishment or suspension of

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:273: suspend or interfere with EDF’s rights and impose new restrictions

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:11: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:40: • Work shall be suspended and rescheduled during periods of severe or inclement weather.

EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:15: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:10: Lucia Calvosa to market volatility, while the buy-back has been suspended.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:17: scenario, in order to adapt the dividend to market volatility; the share buy-back program is temporarily suspended.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:55:(b) Includes temporary suspended wells pending further evaluation.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:160:on the basis of internationally recognized principles and as- suspended on the Clough Creek-Tebidaba pipeline (52 km) due

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:163:TSP (Total Suspended Particulate) emissions 1.3 0.6 1.4 1.5

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:167:of circular economy models and/or sustainability initiatives; measures (attention status with clearance, suspension or rev-

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:176: PST: direct emissions of Total Suspended Particulates, finely divided solid or liquid material suspended in gaseous

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:204:reviewed to confirm that there is no indication that the (suspended exploration wells). If, at the end of this period,

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:206:suspended on the balance sheet. In any case, all such for safety or environmental reasons, although not directly

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:incurred in respect to the commitments being formalized to the costs of suspended exploration wells pending final

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:for mineral concessions (€439 million). suspended wells are reported below:

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:Costs for exploratory wells suspended - beginning of the year 1,246 1,101 1,263

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:Costs for exploratory wells suspended - end of the year 1,268 1,246 1,101

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:The following information relates to the stratification of the suspended wells pending final determination (ageing):

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:Costs capitalized and suspended for exploratory well

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:228:Costs capitalized for suspended wells

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:229:Suspended wells costs awaiting a final investment decision Congo, Egypt and Indonesia), none of which represented an

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:229:the project. The other suspended costs refer to several combinations or acquisition of individual properties. Unproved

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:232:the cost of unproved areas which are suspended pending a final The breakdown of exploration rights by type of asset was as

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:267: year prison, with a suspended sentence. Eni Rewind crimes date back to 1991. In the proceeding there

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:268: near the coastal area adjacent to the site due to the former officials of the same District with suspension

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:269: was suspended in order to allow the continuation of stated.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:273: of the State Courts. Following a suspension period warning with which it would have identified Eni Rewind

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:273: will remain suspended until a decision made on relation to the site remediation interventions, and has

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:273: of the defendants, granted a suspension of the to the provisions issued by the Province. Access to

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:276: five-year limitation term would have been suspended Prosecutor’s Office of Prato, commenced in regard

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:70: run-off, dispersion of suspended sediments and spillage risk in the

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:19:emissions, purposefully and profitably, in step with society. We are of employee resilience during 2020 when bonuses were suspended, the

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:30: loss or suspension of permits, loss of our licence to operate and loss of our ability to bid on mineral environmental damage. Our standards and governance

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:57: activities in Russia since 2014, we have suspended our support to an application of SPDC JV for renewal. While SPDC JV is challenging

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:57:Council Decision 2011/782/CFSP, Shell suspended all exploration that has one shallow-water licence (OML 144).

EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf:25: numbered area shown on the Works suspended.

EN010103-002003-NZT DCO 4.16.3 - PCC Site Access Plan August 2022(D5).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:17: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:17: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:17:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:17:suspended) to the extent specified in column (3) of that table.

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:17: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:19:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:67: TEMPORARILY SUSPENDED

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:67:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 7

EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in

EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf:7: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf:7:Supplamentary Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:19: extinguish or suspend any rights in

EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:20: extinguishment or suspension; and

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1048 to 1449

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1049: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1049: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1050: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1051: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1052: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1053: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1054: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1055: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1056: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1057: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1058: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1059: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1060: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1061: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1062: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1063: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1064: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1065: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1066: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1067: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1068: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1069: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1070: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1071: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1072: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1073: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1074: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1075: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1076: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1077: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1078: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1079: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1080: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1081: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1082: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1083: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1084: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1085: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1086: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1087: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1088: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1089: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1090: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1091: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1092: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1093: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1094: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1095: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1096: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1097: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1098: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1099: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1100: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1101: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1102: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1103: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1104: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1105: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1106: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1107: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1108: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1109: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1110: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1111: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1112: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1113: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1114: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1115: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1116: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1117: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1118: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1119: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1120: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1121: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1122: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1123: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1124: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1125: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1126: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1127: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1128: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1129: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1130: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1131: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1132: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1133: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1134: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1135: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1136: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1137: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1138: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1139: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1140: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1141: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1142: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1143: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1144: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1145: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1146: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1147: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1148: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1149: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1150: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1151: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1152: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1153: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1154: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1155: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1156: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1157: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1158: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1159: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1160: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1161: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1162: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1163: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1164: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1165: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1166: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1167: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1168: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1169: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1170: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1171: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1172: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1173: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1174: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1175: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1176: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1177: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1178: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1179: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1180: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1181: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1182: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1183: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1184: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1185: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1186: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1187: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1188: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1189: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1190: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1191: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1192: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1193: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1194: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1195: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1196: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1197: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1198: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1199: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1200: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1201: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1202: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1203: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1204: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1205: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1206: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1207: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1208: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1209: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1210: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1211: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1212: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1213: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1214: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1215: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1216: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1217: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1218: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1219: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1220: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1221: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1222: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1223: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1224: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1225: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1226: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1227: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1228: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1229: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1230: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1231: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1232: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1233: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1234: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1235: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1236: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1237: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1238: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1239: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1240: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1241: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1242: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1243: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1244: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1245: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1246: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1247: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1248: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1249: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1250: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1251: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1252: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1253: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1254: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1255: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1256: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1257: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1258: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1259: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1260: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1261: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1262: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1263: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1264: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1265: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1266: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1267: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1268: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1269: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1270: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1271: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1272: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1273: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1274: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1275: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1276: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1277: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1278: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1279: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1280: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1281: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1282: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1283: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1284: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1285: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1286: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1287: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1288: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1289: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1290: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1291: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1292: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1293: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1294: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1295: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1296: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1297: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1298: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1299: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1300: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1301: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1302: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1303: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1304: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1305: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1306: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1307: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1308: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1309: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1310: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1311: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1312: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1313: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1314: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1315: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1316: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1317: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1318: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1319: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1320: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1321: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1322: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1323: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1324: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1325: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1326: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1327: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1328: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1329: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1330: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1331: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1332: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1333: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1334: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1335: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1336: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1337: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1338: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1339: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1340: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1341: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1342: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1343: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1344: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1345: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1346: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1347: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1348: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1349: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1350: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1351: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1352: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1353: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1354: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1355: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1356: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1357: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1358: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1359: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1360: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1361: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1362: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1363: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1364: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1365: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1366: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1367: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1368: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1369: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1370: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1371: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1372: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1373: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1374: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1375: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1376: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1377: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1378: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1379: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1380: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1381: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1382: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1383: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1384: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1385: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1386: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1387: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1388: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1389: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1390: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1391: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1392: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1393: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1394: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1395: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1396: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1397: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1398: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1399: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1400: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1401: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1402: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1403: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1404: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1405: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1406: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1407: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1408: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1409: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1410: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1411: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1412: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1413: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1414: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1415: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1416: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1417: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1418: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1419: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1420: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1421: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1422: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1423: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1424: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1425: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1426: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1427: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1428: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1429: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1430: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1431: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1432: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1433: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1434: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1435: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1436: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1437: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1438: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1439: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1440: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1441: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1442: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1443: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1444: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1445: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1446: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1447: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1448: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1449: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:1450: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:66: run-off, dispersion of suspended sediments and spillage risk in the

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: BE TEMPORARILY SUSPENDED

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:183: (11) Sections 72(7) and (8) of the 2009 Act (variation, suspension, revocation and transfer) do

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:186: (6) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:187:access land) are suspended in relation to any access land specified in column (1) of Part 4 of

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:187: (3) The period of suspension under paragraph (2) lasts for the period of the temporary stopping

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:189:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:193:suspended and unenforceable or, where so notified by the undertaker, extinguished in so far as

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:193:the undertaker takes temporary possession under this Order are suspended and unenforceable, in

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:193: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:198:public right of navigation over that part of the Driffield Navigation is suspended and

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:198: (14) Any person who suffers loss as a result of the suspension of any private right of navigation

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:198: (15) Not later than 28 days prior to the proposed commencement of any suspension of the public

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:198: (16) A notice given under paragraph (15) must provide details of the proposed suspension

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:198:particulars of the suspension to which the notice relates, and that suspension will take effect on the

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:199:public right of navigation over that part of the Driffield Navigation is suspended and

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:199: (14) Any person who suffers loss as a result of the suspension of any private right of navigation

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:199: (15) Not later than 28 days prior to the proposed commencement of any suspension of the public

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:199: (16) A notice given under paragraph (15) must provide details of the proposed suspension

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:200:particulars of the suspension to which the notice relates, and that suspension will take effect on the

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:200: (b) extinguish or suspend the rights of, or restrictions for the benefit of, or remove, relocate

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:232: SUSPENDED

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:232:England Coastal Path Temporarily suspend access to the area shaded

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:333: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:358: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:44: simultaneously. to be dredged, this activity is considered highly unlikely to increase suspended

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:151: suspension.

EN010103-002179-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Tracked).pdf:12: suspend easements, servitudes and other private rights. In NTG’s view, there cannot

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:27: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:50: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:42: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:45: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:46: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:46: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:46: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:46: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:47: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:47: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:47: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:47: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:48: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:48: Suspended: Not Supplied

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:48: Suspended: Not Supplied

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:17: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:17: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:18:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:18:suspended) to the extent specified in column (3) of that table.

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:68: TEMPORARILY SUSPENDED

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:68:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:29: exercised and compensation is provided for in respect of the loss or suspension of

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:30:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:30: provides that the period of suspension lasts for the period of the temporary stopping

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:30:3.4.11 The powers to suspend the rights of the public in relation to access land are required

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:32: to compensation for the extinguishment or suspension of a private right of way has

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:35: undertaker. The Article also suspends private rights where the private right is

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:35: suspends private rights for as long as the undertaker is in temporary possession of

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:35: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:37: amended to allow for the suspension of rights of a statutory undertaker (for example

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:54: Way Act 2000 may be temporarily suspended.

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:511: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:515: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:515: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:515: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:516: total suspended matter in the sample.

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:517: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:517: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:517: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:517: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:518: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:519: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:10: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:40: that would not otherwise fall within the standard drafting and are not covered belonging to statutory undertakers, or to extinguish or suspend (or create

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:40: iii) What consideration should the ExA give to such matters relating to 2. the suspension of “private rights and restrictions” over the Order land

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:41: iii) The extinguishment and suspension of private rights must be taken into

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:41: The extinguishment and suspension of private rights relating to apparatus is

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:137: prevented or suspended for the long term or indefinitely. This will not include mitigating

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:140:OGA or relevant technical regulator may decide to permanently suspend injection or, the

EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline

EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf:4: without such acquisition, appropriation, extinguishment or suspension.

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:13: land, compulsorily or by agreement, and the creation, suspension or

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:15: can be extinguished or suspended, so as to facilitate the

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:26: extinguish or suspend rights over land, and to temporarily use land for the

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:41: compulsorily or by agreement, and the creation, suspension or

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:45: extinguished or suspended, so as to facilitate the construction and

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:47: matters to be suspended, overridden or extinguished within the Order Land

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:89: suspension or extinguishment of private rights, is no more than is reasonably

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:89: covenants and the suspension or extinguishment of private rights is justified.

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:68: off, dispersion of suspended sediments and spillage risk in the

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:34: that changes to suspended sediment, for example, were to be considered within the

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:65: off, dispersion of suspended sediments and spillage risk in the

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:2: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:3: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:5: 142a 142 it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:7: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:8: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:9: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:10: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:11: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:14: 2.1m it is proposed to extinguish or suspend easements,

EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf:15: L Twr it is proposed to extinguish or suspend easements,

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29:SSC Suspended Sediment Concentrations - the total value of both mineral

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29: and organic material carried in suspension by a river.

EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:38: between the works and nest(s) and suspending vegetation clearance

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:69: off, dispersion of suspended sediments and spillage risk in the

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:26: exercised and compensation is provided for in respect of the loss or suspension of any

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:29: suspension of a private right of way has been deleted as this is dealt with in Article 26

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:31: by the undertaker and also suspends private rights for as long as the undertaker is in

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:33: suspension of rights of a statutory undertaker (for example where land is being temporarily

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15.

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:16: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:25:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:64: TEMPORARILY SUSPENDED

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:64:In the District of Redcar and Access land at Coatham beach Temporarily suspend access to

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:65: off, dispersion of suspended sediments and spillage risk in the

EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline

EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:4: without such acquisition, appropriation, extinguishment or suspension.

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-001888-CATS North Sea Limited.pdf:2: where there is a need to acquire or suspend third party or the grid). The former

EN010103-001888-CATS North Sea Limited.pdf:3: acquire or suspend third party rights. that study work is essen

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:31: exercised and compensation is provided for in respect of the loss or suspension of

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:34: to compensation for the extinguishment or suspension of a private right of way has

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:36: undertaker. The Article also suspends private rights where the private right is

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:36: suspends private rights for as long as the undertaker is in temporary possession of

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:39: amended to allow for the suspension of rights of a statutory undertaker (for example

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:56: Countryside and Rights of Way Act 2000 may be temporarily suspended. See

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 124 to 1735

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1204: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002548-NZT DCO 4.16.2 - Parking Plan - Nov 2022 (D12).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 8

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1206: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:41: between the works and nest(s) and suspending vegetation clearance

EN010103-002157-NZT DCO 4.16.2 - Parking Plan August 2022 (D6).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:42:periods of suspended injection). Monitoring costs, which are a typically small fraction (<2 %) 6 of full-

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:12: Darlington. Northern Rail suspended all services to and from the station on

EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:10:  Establish onshore support requirements 4 Muster as necessary and suspend all work permits.  ERP

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:12: they are withdrawn or suspended by the SoS.1

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:43: confirmed that the current National Policy Statements were not being suspended in

EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:41:3.63 The closure of the steelworks marked the suspension and possible cessation of

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 845 to 1238

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:845: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:845: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:846: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:847: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:848: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:849: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:850: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:851: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:852: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:853: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:854: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:855: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:856: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:857: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:858: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:859: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:860: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:861: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:862: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:863: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:864: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:865: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:866: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:867: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:868: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:869: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:870: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:871: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:872: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:873: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:874: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:875: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:876: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:877: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:878: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:879: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:880: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:881: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:882: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:883: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:884: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:885: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:886: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:887: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:888: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:889: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:890: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:891: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:892: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:893: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:894: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:895: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:896: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:897: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:898: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:899: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:900: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:901: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:902: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:903: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:904: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:905: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:906: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:907: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:908: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:909: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:910: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:911: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:912: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:913: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:914: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:915: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:916: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:917: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:918: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:919: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:920: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:921: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:922: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:923: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:924: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:925: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:926: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:927: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:928: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:929: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:930: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:931: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:932: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:933: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:934: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:935: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:936: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:937: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:938: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:939: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:940: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:941: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:942: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:943: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:944: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:945: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:946: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:947: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:948: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:949: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:950: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:951: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:952: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:953: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:954: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:955: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:956: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:957: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:958: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:959: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:960: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:961: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:962: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:963: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:964: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:965: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:966: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:967: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:968: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:969: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:970: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:971: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:972: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:973: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:974: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:975: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:976: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:977: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:978: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:979: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:980: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:981: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:982: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:983: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:984: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:985: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:986: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:987: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:988: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:989: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:990: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:991: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:992: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:993: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:994: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:995: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:996: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:997: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:998: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:999: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1000: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1001: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1002: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1003: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1004: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1005: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1006: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1007: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1008: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1009: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1010: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1011: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1012: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1013: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1014: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1015: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1016: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1017: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1018: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1019: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1020: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1021: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1022: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1023: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1024: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1025: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1026: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1027: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1028: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1029: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1030: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1031: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1032: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1033: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1034: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1035: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1036: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1037: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1038: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1039: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1040: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1041: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1042: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1043: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1044: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1045: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1046: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1047: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1048: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1049: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1050: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1051: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1052: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1053: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1054: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1055: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1056: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1057: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1058: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1059: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1060: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1061: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1062: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1063: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1064: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1065: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1066: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1067: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1068: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1069: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1070: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1071: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1072: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1073: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1074: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1075: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1076: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1077: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1078: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1079: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1080: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1081: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1082: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1083: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1084: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1085: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1086: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1087: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1088: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1089: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1090: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1091: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1092: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1093: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1094: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1095: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1096: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1097: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1098: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1099: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1100: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1101: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1102: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1103: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1104: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1105: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1106: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1107: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1108: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1109: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1110: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1111: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1112: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1113: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1114: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1115: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1116: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1117: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1118: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1119: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1120: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1121: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1122: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1123: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1124: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1125: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1126: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1127: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1128: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1129: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1130: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1131: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1132: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1133: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1134: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1135: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1136: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1137: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1138: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1139: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1140: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1141: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1142: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1143: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1144: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1145: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1146: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1147: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1148: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1149: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1150: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1151: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1152: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1153: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1154: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1155: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1156: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1157: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1158: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1159: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1160: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1161: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1162: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1163: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1164: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1165: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1166: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1167: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1168: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1169: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1170: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1171: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1172: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1173: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1174: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1175: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1176: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1177: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1178: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1179: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1180: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1181: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1182: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1183: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1184: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1185: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1186: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1187: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1188: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1189: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1190: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1191: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1192: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1193: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1194: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1195: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1196: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1197: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1198: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1199: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1200: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1201: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1202: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1203: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1204: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1205: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1206: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1207: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1208: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1209: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1210: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1211: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1212: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1213: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1214: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1215: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1216: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1217: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1218: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1219: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1220: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1221: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1222: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1223: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1224: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1225: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1226: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1227: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1228: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1229: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1230: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1231: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1232: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1233: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1234: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1235: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1236: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1237: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:1238: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications:

EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:3: be extinguished, suspended or interfered with under the Order.

EN010103-002515-NZT DCO 8.30 - NTG SoCG (Clean) - Nov 2022 D12.pdf:13: sought could be removed in relation to which it is proposed to extinguish or suspend

EN010103-002635-NZT DCO 8.4 - MMO SoCG - Final (signed) - Nov 2022 (D13).pdf:10: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-002516-NZT DCO 8.30 - NTG SoCG (Tracked) - Nov 2022 D12.pdf:14: to which it is proposed to extinguish or suspend easements, servitudes and other

EN010103-001786-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Clean).pdf:12: in relation to which it is proposed to extinguish or suspend easements, servitudes

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:18: now resumed. In the US, the suspension of debt collection and customer

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:20:customers may have faced, suspending debt collection and customer of heat. While gas clearly has a role to play for many years to come, we

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:35: • finance: monitoring of cash flow levels, review and where necessary suspension of customer collection

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:36: Scenario 7 – The result of a ‘Hard Brexit’ in the UK. ability to sell assets, raise capital and suspend or reduce the payment of

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:138: retail customers, in light of the suspension of debt collection activities

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:235:RIPUC for approval of a long-term contract for output from an continued settlement negotiations and have been granted a suspension

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:237:operators for transmission services in the UK. The suspension of debt collection

EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:4: be extinguished, suspended or interfered with under the Order.

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:47: suspending vegetation clearance works within the area

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:50: Steel railway station (currently suspended).

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:76: between the works and nest(s) and suspending

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:36: nest(s) and suspending vegetation clearance works within the area until any young had

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:38: (currently suspended).

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:62: nest(s) and suspending vegetation clearance works within the area until any young had Requirement 16: Construction

EN010103-001719-Redcar Bulk Terminal Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:6: relation to which it is proposed to extinguish or suspend easements, servitudes and

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:68: Suspended: Not Supplied

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:69: Suspended: Not Supplied

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:69: Suspended: Not Supplied

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:69: Suspended: Not Supplied

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:41: not being suspended in the meantime. The relevant energy National Policy

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:15: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:64: TEMPORARILY SUSPENDED

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:5: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:6: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:7: 142 it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:9: Con it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:10: anH it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:11: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:14: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:15: it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:16: 2.1m L Twr it is proposed to extinguish or suspend easements,

EN010103-000883-NZT DCO 4.2 Land Plans.pdf:17: L Twr it is proposed to extinguish or suspend easements,

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:13: the creation, suspension or extinguishment of, or interference with, interests in or rights

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:14: private rights identified as affecting the land can be extinguished or suspended,

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:25: Application to acquire land, acquire or create rights over land, to extinguish or suspend

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:39: suspension or extinguishment of, or interference with, interests in or rights over land,

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:43: identified as affecting the land can be extinguished or suspended, so as to

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:44: addition, the Applicants require certain matters to be suspended, overridden or

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:85: overriding of interests, rights and restrictive covenants and the suspension or

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:85: interests, rights and restrictive covenants and the suspension or extinguishment of

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1200: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:3: be extinguished, suspended or interfered with under the Order.

EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:41: between the works and nest(s) and suspending vegetation clearance

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:17: the access land where public access may be temporarily suspended) to the extent

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:18:suspended) to the extent specified in column (3) of that Table 6.

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:70: TEMPORARILY SUSPENDED

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:70:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: Surface Water Quality – Suspended Fine Sediment

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: suspended sediment concentrations would result in a temporary increase in

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: element would occur due to suspended fine sediments, nor any non-

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:81:9.7.64 Increased suspended sediment concentrations from the construction works

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:83: Surface Water Quality – Suspended Fine Sediment

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:84: due to suspended fine sediments, nor any non-compliance with WFD

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:84: Surface Water Quality – Suspended Fine Sediment

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:85: anticipated due to suspended fine sediments, nor any non-compliance with

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128: marine input is washed in with the flood tide, and often causes resuspension

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128: suspended sediments and a variety of sources and sinks. Silts and muds are

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128: readily transported as suspended sediment load and can remain in

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128: suspension for extended periods through the tidal cycle, while coarser sands

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:128: carried as bedload. Suspended sediment concentrations between 1500 and

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:156:waterbodies based on its recorded salinity and suspended particulate matter concentration1. In this

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:156:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:169:point B gives an average suspended solids concentration of 8.5 mg/l.

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:169: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:4: it i6 proposed lo etrinoui6h or suspend eagements,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:5: it i6 propo6ed to efinguish or suspend ea6emenb.

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:6: o or suspend easements,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:8: or suspend easements,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:12: il is proposed lo exlinguish or suspend easoments,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:14: o it is proposed to €xlingui6h or suspend easem€nls,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:18: it is prcposed lo extinguish or suspend easements,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:20: 47 521 | | it is proposed to eninguish or suspend easenents,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:21: it is proposed to extinguish or suspend easement6,

EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf:22: il is prcposed lo exlinguish or suspend e€sements,

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:27:3.2.62 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:68: off, dispersion of suspended sediments and spillage risk in the

EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:26: and Darlington. Northern Rail suspended all services to and from the station on 14th

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:17: 6 (those parts of the access land where public access may be temporarily suspended) to

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:18: (5) Any person who suffers loss by the suspension of any private right of way under this article is

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:18:access land) are suspended in relation to the access land specified in column(2) of the table of

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:18:temporarily suspended) to the extent specified in column(3) of that tableTable 6.

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:26:undertaker takes temporary possession under this Order are suspended and unenforceable for as long

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:70: TEMPORARILY SUSPENDED

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:70: In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:21: of its assets in Russia, and gradually suspend its activities in Russia, while assuring its workforce's safety.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:21:today. TotalEnergies has thus initiated the gradual suspension of its activities in Russia, while assuring its teams’ safety. Similarly,

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:25:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:34:director made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:34:the board composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:191: temporarily suspended) 97

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:195:(2) Construction in Mozambique is currently suspended due to a case of force majeure (see the Africa section).

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:212: and 2019. Operations have been suspended since 2020 due to the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:213:previous Abu Dhabi Marine Areas Ltd. (ADMA) offshore concession. The suspended from January to October 2020 for reasons of safety and lack

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:213:onshore areas, production was suspended on several occasions Kurdistan, which is in production.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:225:2.3.9 Wells in the process of being drilled (including wells temporarily suspended)

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:256:EU economic sanctions were suspended(2). related to Iran carried out by TotalEnergies' companies in 2021.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:276: If the problem cannot be solved immediately, the work is suspended,

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:286: suspended in April 2021 (see below), as well as impact on fishers’ TEPMA1 formalized the learnings from these studies and its approach

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:286: Despite the aggravation of the security situation and the suspension of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:287: VPSHR incident resolution Despite the sanitary and security context and the suspension of the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:288:suspension or dismissal). (compared to 99% in 2020).

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:369: project in response to the Scotwind call for tender in Scotland – Decision of TotalEnergies and Chevron to suspend dividend

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:436: measures related to construction was temporarily suspended due to security

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:461: to subsidiaries in 101 countries with a response rate of 87%. This operations. These clauses continued to apply, despite the suspension of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:480:correspond to ‘contrats à durée indéterminée’ (CDI) and fixed-term persons who are under suspended contract (sabbatical, business

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:488: to maintain the final dividend for fiscal year 2019, as announced on 2020, it announced the suspension of share buybacks by the Corporation

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:488: shares. It was also decided to suspend the dividend growth policy for

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:577: was temporarily suspended due to security problems

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:17: the access land where public access may be temporarily suspended) to the extent

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:17: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:18:suspended) to the extent specified in column (3) of that Table 6.

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:20:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:76: TEMPORARILY SUSPENDED

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:77:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:92: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:104: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:17: changes in Suspended Sediment in the Final CEMP. For Surface Water, Flood Risk and Water Resources specifically, key

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:20: species from increased suspended sediment includes:

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:26: • increases in Suspended Sediment • the Environmental & Social Impact Assessment (ESIA) process will include a formal public

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:31: • Increase in Suspended Sediment Concentrations and associated

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:31: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:35: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:47: increased suspended sediment

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:58: injection of dense-phase CO2 into the from increased suspended soundscape, including the harbour

EN010103-002002-NZT DCO 4.16.2 - Parking Plan August 2022(D5).pdf:1: 295 it is proposed to extinguish or suspend easements,

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:28: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:146:Obligation: Suspension);

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:166:to the DPA or CCUS Programme DPAs (including the annulment, invalidation, suspension,

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:167: suspension or replacement of any prior decision pursuant to such rules);

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:174:“Suspension CO2 Capture Rate” means fifty per cent. (50%);

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:174:“Suspension CO2 Capture Rate Breach” has the meaning given to that term in Condition

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:174:22.9 (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension);

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:176: Suspension);

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:204:Suspension of Payments (Annual NDC Test Obligation breach)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:204: elect to suspend payment of any amounts which would otherwise be payable by the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:204: Annual NDC Test Obligation, provided that, prior to effecting any such suspension, the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:204: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:204: amounts; and (ii) the date from which it proposes to effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:205:7.9 Without prejudice to the DPA Counterparty's right to suspend payments pursuant to Condition

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:205: 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)), if the Generator fails to

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:206:Suspension of Payments (Annual NDC Test Access Right breach)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:206: Annual NDC Test Access Right, the DPA Counterparty may elect to suspend payment of any

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:206: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:206: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:206: effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: (i) Conditions 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: 7.13 (Suspension of Payments (Annual NDC Test Access Right breach)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: comply with Minimum CO2 Capture Rate Obligation: Suspension), Condition

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: Obligation: Suspension); or

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:231: (ii) Conditions 24.6 (Suspension of Payments), 24.9 (Suspension of Payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: (i) Conditions 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: 7.13 (Suspension of Payments (Annual NDC Test Access Right breach)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: to comply with Minimum CO2 Capture Rate Obligation: Suspension), Condition

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: Obligation: Suspension); or

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:235: (ii) Conditions 24.6 (Suspension of Payments), 24.9 (Suspension of Payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:250: elect to suspend payment of any amounts which would otherwise be payable by the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:250: Metering Schematic Obligation, provided that, prior to effecting any such suspension, the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:250: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:250: amounts; and (ii) the date from which it proposes to effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:251: Metering Access Right, the DPA Counterparty may elect to suspend payment of any amounts

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:251: such suspension, the DPA Counterparty shall notify the Generator of: (i) its intention to

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:251: suspend payment of any such amounts; and (ii) the date from which it proposes to effect such

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:251: suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:252: to suspend payment of any amounts which would otherwise be payable by the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:252: SCADA Systems Obligation, provided that, prior to effecting any such suspension, the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:252: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:252: amounts; and (ii) the date from which it proposes to effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254:Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: Capture Rate Average is less than the Suspension CO2 Capture Rate for either three (3)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: consecutive AP Billing Periods (a “Suspension CO2 Capture Rate Breach”), then the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: Counterparty may at any time following the occurrence of such breach, elect to suspend

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: that, prior to effecting any such suspension, the DPA Counterparty shall notify the Generator

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: of: (i) its intention to suspend payment of any such amounts; and (ii) the date from which it

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: proposes to effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:254: on the Availability of Capture that is achieved during the suspension period) but for the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:257:Suspension of Payments (Failure to provide Declaration Capacity Data)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:257: suspend payment of any amounts which would otherwise be payable by the DPA Counterparty

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:257: Obligation, provided that, prior to effecting any such suspension, the DPA Counterparty shall

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:257: notify the Generator of: (i) its intention to suspend payment of any such amounts; and (ii) the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:257: date from which it proposes to effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:258: Declaration Access Right, the DPA Counterparty may elect to suspend payment of any

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:258: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:258: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:258: effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263:Suspension of Payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: (A) suspend payment of any amount(s) which would otherwise be payable by the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: (B) notify the Generator of any suspension as soon as reasonably practicable.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: Interest)) has been repaid in full to the granter, any suspension under Condition 24.6 shall

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263:Suspension of Payments (Failure to Provide Information)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: (A) suspend payment of any amount(s) which would otherwise be payable by the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: (B) notify the Generator of any suspension as soon as reasonably practicable.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:263: requested pursuant to Condition 24.5(B)(ii), any suspension under Condition 24.9 shall cease

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:265: (C) subject to Condition 24.15, the suspension under Condition 24.6(A) shall cease and the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:288: or suspends payment pursuant to Conditions 20.2 (Failure to comply with compliance of

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:288: Obligations), 22.9 (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension),

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:288: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)) or 23.13

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:298: (B) provide either Party the right to suspend or terminate its obligations under the DPA,

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:305:Failure to comply with T&S Prolonged Unavailability Procedure Obligation: Suspension

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:306: the DPA Counterparty may elect to suspend payment of any amounts which would otherwise

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:306: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:306: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:306: effect such suspension.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:313: reduced by any payments which the DPA Counterparty has suspended in accordance with

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:313: Suspension) and not subsequently paid to the Generator in accordance with Condition 22.9

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:313: (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension).

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:381: (B) the suspension or withholding (as applicable) by the DPA Counterparty of payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:381: Obligation: Suspension), 23.6 (Suspension of Payments (Failure to provide Declaration

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:381: to comply with T&S Prolonged Unavailability Procedure Obligation: Suspension) of the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:386: shall not amend, waive or suspend the provisions of the Contract and the rights of the DPA

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:390:5.1 Suspension of Rights and Remedial Action

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:392: (ii) such breach would, save for the terms of Clause 5.1 (Suspension of Rights and

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:586: Suspension of payments _ 29

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:Suspension of payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:In the October 2021 update we set out that the DPA Counterparty may suspend Payments

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609: suspension. Where a Generator fails to lift the suspension and the DPA Counterparty

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609: terminates the DPA then all suspend payments shall be withheld (although the value of

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609: the suspended payments will be set off against the Termination Payment that the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:The DPA Counterparty may also suspend payments where the Generator:

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:In all cases, the payments that can be suspended must relate to the period of breach and the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:DPA Counterparty must notify the Generator of the intention to suspend payments before such

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:609:payment suspension takes effect. In all cases, a Generator has the opportunity to rectify the

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:616:suspend payments under the DPA Contract if the Generator’s Achieved and Declared CO₂

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:616:may be suspended. Further detail on these provisions is set out in condition 24 of the draft

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:618: (which, assuming that payments had not been suspended for any other reason, would

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:618: £15,500 (which, assuming that payments had not been suspended for any other reason,

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:625:then the DPA Counterparty may, after notifying the Generator, elect to suspend payments of

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:625:pay any amounts which were suspended, without interest, to the Generator.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:628:unpaid amounts which the DPA Counterparty has suspended.

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:629:the CfD AR4, has been adapted to take into account the additional suspension rights and

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:10: vary, suspend or revoke a marine licence if it appears that any of its provisions

EN010103-001785-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Tracked).pdf:12: in relation to which it is proposed to extinguish or suspend easements, servitudes

EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:3: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline

EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:3: without such acquisition, appropriation, extinguishment or suspension.

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:5: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:6: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:7: 142 it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:9: Con it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:10: an it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:11: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:14: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:15: it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:16: 2.1m L Twr it is proposed to extinguish or suspend easements,

EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf:17: L Twr it is proposed to extinguish or suspend easements,

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:70: run-off, dispersion of suspended sediments and spillage risk in the

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:15: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:24:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:64: TEMPORARILY SUSPENDED

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-002001-NZT DCO 4.16.1 - AIL Access Route Plan August 2022(D5).pdf:1: it is proposed to extinguish or suspend easements,

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:24:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:33:made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until the board

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:33:composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the management

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:83: TOTAL SE announced the suspension of its buyback programme. The Company had previously announced a $2 billion share buyback target for 2020 in a 60 $/b environment and

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:183: suspended) 73

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:187:2020, onshore construction work of the project has been suspended.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:188: Elk and Antelope fields located on Block PRL-15 before being suspended market. In 2020, these LNG trading activities represented a volume of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:199:Blocks were respectively reduced to 38% and 40% after government areas, production was suspended on several occasions between July

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:199: December 2019. Production at the Waha fields was suspended from

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:201:On the Azero exploration license (50%, operator), the drilling of the were suspended in 2019 (no well drilled in 2020 compared to three wells

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:213:2.3.9 Wells in the process of being drilled (including wells temporarily suspended)

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:216: start-up of the La Mède biorefinery mid-2019 completed the conversion was made early December 2020 to suspend operations at the loss-

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:238: and most EU economic sanctions were suspended(2).

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:255: If the problem cannot be solved immediately, the work is suspended, by the ISM (International Safety Management) code of the IMO

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:264: issues in the workplace organized in partnership with Convivencia include verbal reminders, written warnings, suspension or dismissal).

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:401:project to convert the site into a “zero-crude” platform as announced lockdown, TDR decided to suspend, for the second quarter of 2020,

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:410: i.e., persons who are under suspended contract (sabbatical, business

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:416:to suspend the dividend growth policy for 2020 and thus set the first shares in an amount of $0.55 billion in the first quarter of 2020, it

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:416:interim dividend for fiscal year 2020 at €0.66 per share, at the same level announced the suspension of share buybacks by the Company on

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:419: prices, TOTAL SE announced the suspension of its buyback program. The Company had previously announced a $2 billion share buyback target for 2020 in a $60/b environment

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:483: In the context of the COVID-19 pandemic and since the start of the lockdown, TDR decided to suspend, for the

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: ACCESS MAY BE TEMPORARILY SUSPENDED

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:16: parts of the access land where public access may be temporarily suspended) to the extent

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:16: (5) Any person who suffers loss by the suspension of any private right of way under this article

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:16:access land) are suspended in relation to the access land specified in column (2) of the table in

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:16:suspended) to the extent specified in column (3) of that table.

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:18:practicable from gravel, soil or other solid substance, oil or matter in suspension.

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:66: TEMPORARILY SUSPENDED

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:66:In the District of Redcar and Access land at South Gare Temporarily suspend access to

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:22: suspended floor slabs be adopted within sufficient clearance provided to

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:35: suspended fine-grained material transported by meltwater flowing into lakes

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:19:suspended within subsurface (Appendix 9C, ES Volume III,

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:19:of suspended contaminants, the

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:23: suspended solids, heavy metals and hydrocarbons). Only 50% efficiency

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42:9.4.27 Suspended sediment concentrations are generally low in Tees Bay and in the

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42: marine input is washed in with the flood tide, and often causes resuspension

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42: suspended sediments and a variety of sources and sinks. Silts and muds are

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42: readily transported as suspended sediment load and can remain in

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42: suspension for extended periods through the tidal cycle, while coarser sands

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:42: carried as bedload. Suspended sediment concentrations between 1500 and

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:74: levels of total suspended solids (e.g. iron corrosive products) and have the

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:79: Surface Water Quality – Suspended Fine Sediments

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:79: Tees Coastal waterbody. Increased suspended sediment concentrations

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:80: increased suspended solids and turbidity, which would remain in suspension

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:80:9.6.10 In light of this, the release of suspended sediment and subsequent deposition

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:81: suspended sediment in runoff would be negligible with the mitigation

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:85: suspended solids, metals and hydrocarbons) for the High Pollution Hazard

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:85: hydrocarbons but passes the assessment for total suspended solids and

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:86: Suspended Metals Hydrocarbons

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:99:suspended fine Coastal Waterbody (Tees (temporary) implementation of the

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:4: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:5: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:6: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:7: 142 it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:9: Con it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:10: an it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:11: 4.0m 4.3m it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:12: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:13: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:14: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:15: it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:16: 2.1m L Twr it is proposed to extinguish or suspend easements,

EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf:17: L Twr it is proposed to extinguish or suspend easements,

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:109: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:109: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:109: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:109: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:110: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:110: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:110: Suspended: Not Supplied

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:110: Suspended: Not Supplied

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:6: suspended gas injection at Gina Krog to export the gas.

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:35:Overview  Gas production from the Snøhvit field is suspended after

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:53: Gas production from the Snøhvit field is suspended after the

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:64:Energy Management (BOEM) manages federal OCS leasing fines and even licence suspension and/or cancellation in case of

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:66:by the temporary 2020-rules will be 100% deductible in the gas activities allowing suspension of the federal duties and

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:78:where drilling or completion has been suspended pending further evaluation. A dry well is a well found to be incapable of producing

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:254:Project which has finalized the development of 4 gas fields in central Algeria). Following suspension of activity after the terrorist attack at

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:254:Equinor has filed a motion for clarification which had the effect of temporarily suspending the unfavourable decision and is currently

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:45: runoff, spillage risk and the dispersion of suspended sediments are outlined

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:49:and Species from Increased Suspended

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:56: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:56: suspended sediment concentrations (SSC) (i.e. turbidity) and create a

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:57: turbidity, which would remain in suspension for longer than coarser substrates

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:57:14.6.40 In light of this, the release of suspended sediment and subsequent deposition

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:58: that exhibit low sensitivity to disturbance and increased suspended sediments

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:58: gravel, suspended particulate material will rapidly resettle to the seabed.

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:61: which filter-feeders sift suspended particles from the water) when exposed to

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:104: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:109: Increased Suspended Sediment Concentrations (i.e.

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:109: potential to increase suspended sediment concentrations (SSC) (i.e. turbidity)

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:110:14.10.19 An increase in SSC can cause increased deposition as suspended

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:110:14.10.20 In general, the release of suspended sediment and subsequent

EN010103-001418-Eversheds Sutherland on behalf of EDF.pdf:4: extinguish, suspend or interfere with EDF’s rights and impose new restrictions on such land.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:67: • physical disturbance to habitats and species from increased suspended

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:68: species from increased suspended

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:68: species from increased suspended

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:70: species from increased suspended

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:73: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition

EN010103-001126-NZT DCO 6.4.37 ES Vol III Appendix 16B Framework Construction Worker Travel Plan.pdf:6: Northern Rail suspended all services to and from the station on 14 December

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:67: off, dispersion of suspended sediments and spillage risk in the

EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:26:For medium and high threat structures, suspended ground floor slabs may be required to mitigate against heave

EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:30:combination with raft foundations and a suspended floor slab for medium threat structures. However, there may be

EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:47: Could be adopted with raft foundations and / or suspended floor slabs. Advancing stone columns through significant depths of made ground may be problematic. Pre-boring may mitigate risk of Adequate Design.

EN010103-001617-NZT DCO 4.4a - Additional Land Plan - May 2022.pdf:1: which it is proposed to extinguish or suspend easements,

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:45: suspending vegetation clearance works within the area

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:48: Steel railway station (currently suspended).

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:74: between the works and nest(s) and suspending

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 8

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1034: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1034: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1035: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1036: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1037: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1038: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1039: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1040: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1041: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1042: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1043: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1044: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1045: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1046: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1047: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1048: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1049: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1050: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1051: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1052: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1053: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1054: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1055: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1056: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1057: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1058: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1059: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1060: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1061: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1062: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1063: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1064: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1065: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1066: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1067: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1068: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1069: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1070: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1071: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1072: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1073: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1074: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1075: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1076: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1077: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1078: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1079: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1080: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1081: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1082: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1083: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1084: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1085: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1086: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1087: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1088: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1089: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1090: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1091: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1092: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1093: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1094: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1095: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1096: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1097: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1098: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1099: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1100: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1101: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1102: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1103: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1104: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1105: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1106: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1107: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1108: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1109: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1110: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1111: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1112: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1113: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1114: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1115: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1116: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1117: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1118: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1119: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1120: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1121: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1122: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1123: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1124: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1125: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1126: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1127: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1128: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1129: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1130: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1131: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1132: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:40:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:40:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:49:suspended solids concentration of 8.5mg/l.

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:49: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:189:waterbodies based on its recorded salinity and suspended particulate matter concentration 1. In this

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:189:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:202:point B gives an average suspended solids concentration of 8.5 mg/l.

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:202: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 124 to

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1258: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1699: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1700: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1701: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1702: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1703: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1704: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1705: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1706: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1707: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1708: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1709: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1710: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1711: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1712: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1713: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1714: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1715: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1716: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1717: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1718: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1719: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1720: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1721: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1722: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1723: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1724: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1725: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1726: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1727: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1728: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1729: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1730: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1731: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1732: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1733: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1734: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1735: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1736: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:1737: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)© of the Infrastructure Planning (Applications: Prescribed

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:31: Suspended: Not Supplied

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:34: off, dispersion of suspended sediments and spillage risk in the

EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:3: be extinguished, suspended or interfered with under the Order.

EN010103-002159-NZT DCO 4.16.4 - Water Connection Plan August 2022 (D6).pdf:1: 496 518 it is proposed to extinguish or suspend easements,

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:60: contamination must be suspended, additional investigation and assessment must be carried out, and a written

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:17:Contaminated land and be suspended if contaminated land or groundwater is encountered in

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:174:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:31: works and nest(s) and suspending works within the area until

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:43: (e.g. from paints), an increase in total suspended solids from sediment

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:48:soils (Made suspended load programme during

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:60: hydrocarbons or volatile organic compounds, an increase in total suspended

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:14:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000210-EN010082-6.3.20-ES Annex L-CEMP-Final-November 2017.pdf:12: suspending works within the area

EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:29: the works and nest(s) and suspending works within the

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:19:Contaminated land and suspended if contaminated land or groundwater is encountered in

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t

EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:30: works and nest(s) and suspending works within the area until

EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:32: and suspending works within the area until any young had

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:49: Suspended: Not Supplied

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:50: Suspended: Not Supplied

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:50: Suspended: Not Supplied

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:50: Suspended: Not Supplied

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:50: Suspended: Not Supplied

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:174:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:14:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000316-TEES - Final Rule 6 letter.pdf:26: suspended or interfered with. Given the existence of an easement,

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:14:suspended, additional investigation and assessment must be carried out, and a written scheme detailing how

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:18:Contaminated land and be suspended if contaminated land or groundwater is encountered in

EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:13: which it is proposed shall be extinguished, suspended or interfered with. Given the existence of an

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:20:Contaminated land and suspended if contaminated land or groundwater is encountered in

EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:31: works and nest(s) and suspending works within the area until

EN010082-000137-s51 advice to applicant following the withdrawal of application.pdf:4: proposed shall be extinguished, suspended or interfered with. Sembcorp confirms there are

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:17:Contaminated land and be suspended if contaminated land or groundwater is encountered in

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t

EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:15:contamination must be suspended, additional investigation and assessment must be carried out, and

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:30: works and nest(s) and suspending works within the area until

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:14:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:16:Contaminated land and to be suspended if contaminated land or groundwater is encountered

EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:30: works and nest(s) and suspending works within the area until

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:174:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:174:that contamination must be suspended, additional investigation and assessment must be carried

EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:15:contamination must be suspended, additional investigation and assessment must be carried out, and

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:15:that contamination must be suspended, additional investigation and assessment must be carried

TR030002-000828-Document 2.1F - YPL Land Plan Inset 3 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:19:2.6.5 Under the open quay structure, the quay and access bridge structures would be suspended deck

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:20: create the stable slope beneath the quay for the open suspended deck option. As part of the Phase 2

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:21: berth pocket and stable slope beneath the quay for the open suspended deck option. For the solid

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:87: on suspended sediment concentration in the water column during capital dredging, sediment deposition

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:87: Suspended sediment concentration in the water column during capital dredging

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:87:10.3.26 As illustrated within Figures 10.6 to 10.8, predicted mean concentration increases of suspended

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:87: simulations show that an area of elevated suspended sediment concentration, in the range of 10mg/l to

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:88: activity. The plume dispersion modelling predicted no average increase in suspended sediment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:89: Figure 10.6 Predicted mean increase in depth averaged suspended sediment concentrations above

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:89: suspended sediment concentrations within the water column.

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:90: Figure 10.7 Predicted mean increase in depth averaged suspended sediment concentrations above

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:91: Figure 10.8 Predicted mean increase in depth averaged suspended sediment concentrations above

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:100:10.4.8 The suspension and dispersion of sediment during capital dredging would temporarily affect water

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:100: modelling work undertaken has predicted that there would be no increase in suspended sediment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:100: that suspended sediment concentrations would not be impacted at the estuary mouth and, therefore,

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:100: suspension and dispersion of sediment during capital dredging. This would reduce the spatial extent of

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:127: Under such circumstances, the effect would be a greater increase in suspended sediment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:128:11.4.18 Increased suspended sediment concentrations have the potential to effect fish populations (which

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:128: movement away from the zone of increased suspended sediment concentration. However, the effect of

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:128: low potential for suspended sediment arising from maintenance dredging to interact with a sediment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:128:11.4.22 Mitigation measures to limit the suspension and subsequent deposition of sediment during capital

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:128: into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:9:  A suspended reinforced concrete deck of approximately 530m length, constructed on approximately

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:89: Suspended: Not Supplied

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:89: Suspended: Not Supplied

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:89: Suspended: Not Supplied

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:167: Suspended: Not Supplied

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:167: Suspended: Not Supplied

TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf:1: to temporarily suspend and/or interfere with easements and/or other private

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:8: required to create a stable slope beneath the quay for the open suspended deck option.

TR030002-000818-Document 2.1K - YPL Land Plan Inset 8 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:30: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:36: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:37:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:55: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:82: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:105:acquire appropriate, extinguish or suspend any rights or covenants in the pipeline corridor or

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:105:without such creation, acquisition, appropriation, extinguishment or suspension.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:108:acquire appropriate, extinguish or suspend any rights or covenants in respect of any protected asset

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:108:acquisition, appropriation, extinguishment or suspension.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:119: injurious matter in suspension or otherwise.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:132:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:136:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:150:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:2: Open form of berth construction (piled suspended deck) vessel movements due to movements associated with precast

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:14: operations would be suspended as required to allow the passage of river traffic as deemed necessary by

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:37: beam and plank units, e.g. failure of suspended deck) forms of construction indicates that the 5,000DWT coaster which will unload at the Contractors compound on

TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000460-Section 3 App 3.1 Waste management.pdf:21:4.1.3 Under the open quay structure option, the quay and access bridge structures would be suspended deck

TR030002-000460-Section 3 App 3.1 Waste management.pdf:22: create the stable slope beneath the quay for the open suspended deck option.

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:3:either piling techniques supporting an open suspended deck structure or construction of a combi-

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:3:to create the berthing area. For the suspended deck option, some dredging would also be

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:4:the stable slope beneath the quay for the open suspended deck option.

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:4:the berth pocket and stable slope beneath the quay for the open suspended deck option. For

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:7:(for the open suspended deck option), six vibrocores will be taken and two vibrocores will be

TR030002-000798-Document 2.1I - YPL Land Plan Inset 6 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000412-ExA Second Round Questions.pdf:17:nesting platforms could be provided beneath the suspended deck of the quay (if

TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:97:floors have a suspended ceiling and the building is in a poor state. Broken windows

TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000604-Doc 2.1N - YPL Land Plan Inset 11 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000801-Document 6.8B - Governance Tracker.pdf:7:11 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. Construction Environmental Management Plan

TR030002-000801-Document 6.8B - Governance Tracker.pdf:8: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed,

TR030002-000801-Document 6.8B - Governance Tracker.pdf:9: box would prevent significant release of suspended sediments during dewatering of placed dredged

TR030002-000788-Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:86:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:86:extinguishment, suspension or override.

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:86:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:90: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:90: appropriation, extinguishment or suspension; and

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:101: injurious matter in suspension or otherwise.

TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf:6: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of

TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf:6: overflowing and discharge of water containing suspended sediment into the estuary).

TR030002-000470-Section 6 App 6.4 CEMP.pdf:18:10 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels.

TR030002-000470-Section 6 App 6.4 CEMP.pdf:19: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing velocity and suction discharge,

TR030002-000470-Section 6 App 6.4 CEMP.pdf:19: significant release of suspended sediments during dewatering of placed dredged material.

TR030002-000598-Doc 2.1H - YPL Land Plan Inset 5 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000696-PD Teesport Limited 1.pdf:8: matter in suspension or otherwise.

TR030002-000459-ES Section 24 References.pdf:5:Land J and Bray R N, 1998, Acoustic measurement of suspended solids for monitoring of dredging and

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:16:2.28 The purpose of the MHF is to convert the mineral suspended in

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:18: suspended quay, or a continuous quay as described in Section 3.6

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:31: should the suspended deck structure for the quay be chosen, but

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:42: also the potential for the SoS to suspend consideration of an

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:93: environment and designated sites (water quality, suspended sediment concentration SSC)

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:12: scheme on the suspended sediment concentration in the water column during capital dredging,

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:12: Suspended sediment concentration in the water column during capital dredging

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:12: extent of sediment plume. Predicted mean concentration increases of suspended sediment outside the

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:12: an area of elevated suspended sediment concentration, in the range of 10mg/l to 50mg/l above

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:13: suspended sediment concentrations within the water column. However, the sediment transport

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:13: dredging activity. The plume dispersion modelling predicted no average increase in suspended

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:23:10.4.9 The suspension and dispersion of sediment during capital dredging would temporarily affect water

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:23: modelling work undertaken has predicted that there would be no increase in suspended sediment

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:23: that suspended sediment concentrations would not be affected at the estuary mouth and, therefore,

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:30: Under such circumstances, the effect would be a greater increase in suspended sediment

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31:11.3.11 Increased suspended sediment concentrations have the potential to effect fish populations (which

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31: movement away from the zone of increased suspended sediment concentration. However, the effect of

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31: but the short term and localised nature of peaks in suspended sediment arising during dredging would

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31: dredging be undertaken elsewhere in the Tees estuary, there is a low potential for suspended sediment

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31:11.3.16 Mitigation measures to limit the suspension and subsequent deposition of sediment during capital

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:31: into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:32:11.3.17 The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:32: due to either suspended sediments or habitat change. Consequently, no significant in combination

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:79:should be considered beneath the suspended deck of the quay (should an open quay structure be

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:97:platforms for shags beneath the suspended deck should be considered, along with the other

TR030002-000566-Doc 7.1 Planning Statement.pdf:5: construction comprising a suspended deck supported by piles and a

TR030002-000566-Doc 7.1 Planning Statement.pdf:36: construction comprising a suspended deck supported by piles and a

TR030002-000566-Doc 7.1 Planning Statement.pdf:66: terms of increases in total suspended solid concentrations of materials

TR030002-000566-Doc 7.1 Planning Statement.pdf:66: concentration of total suspended solids as a result of the dredging and

TR030002-000566-Doc 7.1 Planning Statement.pdf:72: suspended. This would be accessed via three approach bridges. This

TR030002-000566-Doc 7.1 Planning Statement.pdf:90: suspension of contaminants or due to accidental spills and leaks.

TR030002-000566-Doc 7.1 Planning Statement.pdf:104: Suspended deck structure comprising a reinforced concrete deck

TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf:1: to temporarily suspend and/or interfere with easements and/or other private

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:15:Reduce sediment resuspension

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:25:  There is a possibility that an increase in suspended solids in the water column

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:36:  Potential impacts on chemical concentrations of the water column associated with re-suspending

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:37: fish which may experience a temporary deterioration in water quality due to re-suspension of sediment

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:37: dredging, resulting in rapid dispersion of suspended sediment. The installation of the new quay will

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:41: release suspended solids which contain high back hoe dredging fitted with an enclosed grab. physico-chemical status of are already built into the

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:45:Potential The potential release of suspended solids In general, sediment plumes induced by dredging are Given that the potential changes are unlikely to be

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:45:suspended present a barrier to migratory fish. usually has the capacity to accommodate an to be compliant with the WFD requirements.

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:45:on biological suspended sediment are only expected on a short

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:45: conditions of high suspended sediment, as

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:3: through an increase in suspended sediments due to the

TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf:7: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of

TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf:7: overflowing and discharge of water containing suspended sediment into the estuary).

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:50: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:75:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:75:extinguishment or suspension.

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:86: injurious matter in suspension or otherwise.

TR030002-000599-Doc 2.1I - YPL Land Plan Inset 6 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000710-York Potash Limited (Document 6.8A).pdf:8:11 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. Construction Environmental Management Plan

TR030002-000710-York Potash Limited (Document 6.8A).pdf:9: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed,

TR030002-000710-York Potash Limited (Document 6.8A).pdf:10: box would prevent significant release of suspended sediments during dewatering of placed dredged

TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:12: appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:12: extinguishment, suspension or override.

TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:12: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to pipes

TR030002-000597-Doc 2.1G - YPL Land Plan Inset 4 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000600-Doc 2.1J - YPL Land Plan Inset 7 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000591-Doc 2.1A - YPL Land Plan Sheet 1 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000725-York Potash Limited (Document 6.10).pdf:19:5 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels.

TR030002-000453-ES Section 18 Infrastructure.pdf:15: water quality by temporarily increasing total suspended solid concentrations within the water column.

TR030002-000453-ES Section 18 Infrastructure.pdf:15: increase in total suspended solid concentrations within the water abstracted from the estuary could

TR030002-000453-ES Section 18 Infrastructure.pdf:15: would remain unrestricted, with peaks in total suspended solid concentrations expected on a short term

TR030002-000453-ES Section 18 Infrastructure.pdf:15: discussed within Section 5, show that mean increases in the concentration of total suspended solids

TR030002-000453-ES Section 18 Infrastructure.pdf:15: that is suspended during capital dredging using a CSD or backhoe. Furthermore, it is proposed that an

TR030002-000453-ES Section 18 Infrastructure.pdf:16: increases in the concentration of total suspended sediment (in the region of 10mg/l to 20mg/l above

TR030002-000453-ES Section 18 Infrastructure.pdf:16: due to increased suspended sediment would be temporary in nature. Based on the above, the

TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:15:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:15:appropriation, extinguishment, suspension or override.

TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:15:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:20:appropriation, extinguishment, suspension or override.

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:53:appropriation, extinguishment, suspension or override.

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000830-Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000769-York Potash Ltd (2).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000769-York Potash Ltd (2).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000769-York Potash Ltd (2).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000769-York Potash Ltd (2).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000769-York Potash Ltd (2).pdf:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000769-York Potash Ltd (2).pdf:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development

TR030002-000769-York Potash Ltd (2).pdf:72:extinguishment or suspension.

TR030002-000769-York Potash Ltd (2).pdf:75:appropriate, extinguished or suspend any rights over a protected asset if the authorised development

TR030002-000769-York Potash Ltd (2).pdf:75:extinguishment or suspension.

TR030002-000769-York Potash Ltd (2).pdf:82: injurious matter in suspension or otherwise.

TR030002-000797-Document 2.1H - YPL Land Plan Inset 5 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:20:appropriation, extinguishment, suspension or override.

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:53:appropriation, extinguishment, suspension or override.

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000689-York Potash Ltd (4).pdf:25:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the

TR030002-000689-York Potash Ltd (4).pdf:25:appropriation, extinguishment, suspension or override.

TR030002-000689-York Potash Ltd (4).pdf:25:to acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to

TR030002-000689-York Potash Ltd (4).pdf:38:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000689-York Potash Ltd (4).pdf:38:extinguishment, suspension or override.

TR030002-000689-York Potash Ltd (4).pdf:38:to acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to

TR030002-000689-York Potash Ltd (4).pdf:43: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000689-York Potash Ltd (4).pdf:43: without such creation, acquisition, appropriation, extinguishment or suspension.; and

TR030002-000689-York Potash Ltd (4).pdf:49: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000689-York Potash Ltd (4).pdf:49: without such creation, acquisition, appropriation, extinguishment or suspension; and

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:4: of the River Tees or (b) of open construction comprising a suspended

TR030002-000461-Section 3 App 3.2 Option study report.pdf:49: Figure A3.11 Option E was inspired by suspension bridges and consisted of one A frame on

TR030002-000422-Doc 5.1 Statement of Reasons.pdf:5: will be interfered with/suspended/extinguished, the land over which

TR030002-000422-Doc 5.1 Statement of Reasons.pdf:38: b. An open quay comprising suspended deck structures

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:5:The increase in suspended sediment should be assessed in terms of the potential barrier to fish migration and behavioural Section 11

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:24: be re-suspended into the water column. Hence, the construction phase would result in temporary

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:24: below therefore relates to the potential impact associated with the resuspension of non-contaminated

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:24:11.5.4 The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:25: minimise the resuspension of sediment into the water column (assuming best operational practice is

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:25: anticipated to rapidly dilute and disperse temporarily increased suspended sediment concentrations.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:25:11.5.12 Limiting re-suspension of sediment during TSHD can be achieved through the following measures:

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:26:11.5.14 The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed,

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:47:Effects on fish High Low Minor adverse Limiting resuspension during TSHD can be ac

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:5:“dredging” means using any device to move material (whether or not suspended in water)

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:11: (10) Section 72(7) and (8) (variation, suspension, revocation and transfer) of the 2009 Act does

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:12: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:13:as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:28: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:43: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:74:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:74:appropriation, extinguishment, suspension or override.

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:75:appropriate, extinguish, suspend or override any rights in the protected land relating to the

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:79: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:79: acquisition, appropriation, extinguishment or suspension; or

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:88: injurious matter in suspension or otherwise.

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:3: through an increase in suspended sediments due to the

TR030002-000564-Doc 6.8 Governance Tracker.pdf:8:10 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. CEMP Requirement 6

TR030002-000564-Doc 6.8 Governance Tracker.pdf:9: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed,

TR030002-000564-Doc 6.8 Governance Tracker.pdf:10: box would prevent significant release of suspended sediments during dewatering of placed dredged

TR030002-000722-York Potash Limited 4.pdf:10:  re-suspension of sediment during capital dredging and piling;

TR030002-000722-York Potash Limited 4.pdf:11:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved

TR030002-000722-York Potash Limited 4.pdf:11:  resuspension of sediment during cutter suction dredging can be reduced through

TR030002-000722-York Potash Limited 4.pdf:11:5.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:20:appropriation, extinguishment, suspension or override.

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:53:appropriation, extinguishment, suspension or override.

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000738-York Potash Limited 3.pdf:9:  re-suspension of sediment during capital dredging and piling;

TR030002-000738-York Potash Limited 3.pdf:10:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved

TR030002-000738-York Potash Limited 3.pdf:10:  resuspension of sediment during cutter suction dredging can be reduced through

TR030002-000738-York Potash Limited 3.pdf:10:4.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended

TR030002-000806-Document 2.1E - YPL Land Plan Inset 2 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000817-Document 2.1D - YPL Land Plan Inset 1 - Rev v4.pdf:1: 1 to suspend and/or interfere with easements and/or other private rights and

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:13: This would be a suspended structure located

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:34:2014 apply to the High Court for the suspension or quashing of the has not been complied with, may, within 6 weeks of 11 September IF THE ORDER IS MADE, the stopping up will be authorised only in

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:34:Order or of any provision included. 2014 apply to the High Court for the suspension or quashing of the order to enable development as permitted by Coventry City Council

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:34:2014 apply to the High Court for the suspension or quashing of the ANY PERSON MAY OBJECT to the making of the proposed order REGULATION 4 INFRASTRUCTURE PLANNING (APPLICATIONS:

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:34:2014 apply to the High Court for the suspension or quashing of the commencing on 11 September 2014, and may be obtained, free of

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:41: calibration, validation, increase in suspended sediment data.

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:41: The MMO agrees that increasing the suspended sediment concentrations by 10-50mg/l would be temporary in nature and

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:41: short lived, however the increase in suspended sediment should be assessed in terms of the potential barrier to fish

TR030002-000410-ExA First Round Questions.pdf:37:suspended deck of the quay (if the open quay structure is proposed). This design

TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:15:• Work shall be suspended and rescheduled during periods of severe or inclement weather.

TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:21:than suspended by rigging which is inherently less stable

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:5:“dredging” means using any device to move material (whether or not suspended in water)

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:10: (10) Section 72(7) and (8) (variation, suspension, revocation and transfer) of the 2009 Act does

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:12: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:13:as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:27: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:43: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:77:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:77:appropriation, extinguishment, suspension or override.

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:77:appropriate, extinguish, suspend or override any rights in the protected land relating to the

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:82: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:82: acquisition, appropriation, extinguishment or suspension; or

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:91: injurious matter in suspension or otherwise.

TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:15: Complex are symbiotic and suspension in production of the Cracker (for example)

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:84:extinguishment, suspension or override.

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:88: appropriation, extinguishment or suspension; and

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:97: injurious matter in suspension or otherwise.

TR030002-001856-Examining Authority’s Recommendation Report.pdf:62: considered. This would be likely to increase temporary suspended

TR030002-001856-Examining Authority’s Recommendation Report.pdf:96: include suspended sediment concentration in the water column during

TR030002-001856-Examining Authority’s Recommendation Report.pdf:97:6.6.19 To avoid contamination as a result of suspended sediment, the silts

TR030002-001856-Examining Authority’s Recommendation Report.pdf:97: nesting platforms for shags could be provided beneath the suspended

TR030002-001856-Examining Authority’s Recommendation Report.pdf:105: Plans show land over which rights would be interfered with, suspended

TR030002-001856-Examining Authority’s Recommendation Report.pdf:129: Steel-making at the Redcar site was subsequently suspended and SSI

TR030002-001856-Examining Authority’s Recommendation Report.pdf:221:“dredging” means using any device to move material (whether or not suspended in water)

TR030002-001856-Examining Authority’s Recommendation Report.pdf:228: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-001856-Examining Authority’s Recommendation Report.pdf:229:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-001856-Examining Authority’s Recommendation Report.pdf:244: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-001856-Examining Authority’s Recommendation Report.pdf:261: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-001856-Examining Authority’s Recommendation Report.pdf:295:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-001856-Examining Authority’s Recommendation Report.pdf:295:appropriation, extinguishment, suspension or override.

TR030002-001856-Examining Authority’s Recommendation Report.pdf:295:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-001856-Examining Authority’s Recommendation Report.pdf:299: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of

TR030002-001856-Examining Authority’s Recommendation Report.pdf:299: acquisition, appropriation, extinguishment or suspension; and

TR030002-001856-Examining Authority’s Recommendation Report.pdf:309: injurious matter in suspension or otherwise.

TR030002-000726-York Potash Limited (Document 6.11).pdf:6: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of

TR030002-000726-York Potash Limited (Document 6.11).pdf:7: overflowing and discharge of water containing suspended sediment into the estuary).

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:14: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:15:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:30: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:52: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:85:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:85:appropriation, extinguishment, suspension or override.

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:85:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:89: 4.(a)create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:89: appropriation, extinguishment or suspension.; and

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:99: injurious matter in suspension or otherwise.

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:21: of this Order to-acquire, appropriate, extinguish, suspend or override any rights in the

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:21: rightsacquisition, appropriation, extinguishment, suspension or override.

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:21: to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:26: (a) creat e, acquire, appropriate, extinguish or suspend any right s or covenant s in respect of

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:26: acquisit ion, appropriat ion, ext inguishment or suspension .; and

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:14: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:15:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:30: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:52: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:84:extinguishment, suspension or override.

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:85:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:89: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:89: appropriation, extinguishment or suspension; and

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:98: injurious matter in suspension or otherwise.

TR030002-000711-Applicants Response to First Questions.pdf:70: secured and delivered through the DCO considered unlikely that sediment that is suspended by

TR030002-000711-Applicants Response to First Questions.pdf:105: with the capital dredging required for the sediment resuspension during the dredging activity) and

TR030002-000711-Applicants Response to First Questions.pdf:105: proposed development. the potential for interaction between sediment suspended

TR030002-000711-Applicants Response to First Questions.pdf:105: combination with the capital dredging suspended during maintenance would be within the

TR030002-000711-Applicants Response to First Questions.pdf:113: suspended deck of the quay (if the open solid quay structure. This was discussed as a possible

TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:12: Complex are symbiotic and suspension in production of the Cracker (for example)

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:3: through an increase in suspended sediments due to the

TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf:1: to temporarily suspend and/or interfere with easements and/or other private

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:53: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:79:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:79:extinguishment or suspension.

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:84:to acquire, appropriate, extinguish, suspend or override any rights in the protected land which are

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:88:this Order create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:88:without such creation, acquisition, appropriation, extinguishment or suspension.

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:88:appropriate, extinguished or suspend any rights over a protected asset if the authorised development

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:88:extinguishment or suspension.

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:96: injurious matter in suspension or otherwise.

TR030002-000829-Document 2.1G - YPL Land Plan Inset 4 - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000739-TATA Steel UK Limited and Others.pdf:13: coke to be built up in advance so that the haulage operation could be suspended, This would

TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:36: metres in width. This would allow for the suspended structure located location of the quay platform would be

TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:8: TSS Total Suspended Solids

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:29: 1. A suspended reinforced concrete deck approximately 524m long and 28m wide,

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:29:A suspended reinforced concrete deck would be formed with steel tubular piles to be

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:29:Indicative cross sections of the suspended deck quay and the continuous quay

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:31:Figure 3.3 Indicative cross section of the suspended quay deck option

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:34: suspended deck or the continuous quay) would require the employment of

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:43:In general, suspended sediment concentrations are low within the estuary and within

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:43:events. In general, the suspended sediment concentrations appear to be dominated by

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:43:downstream. In the vicinity of the proposed scheme, suspended sediment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:43:40mg/l to 80mg/l. In terms of the tidal sequence, the highest suspended sediment levels

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:43:occur close to high water. After storm periods, higher concentrations of suspended

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:44: currents, vessel induced forces and resuspension of material by dredging operations.

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:44: quay structure, berth pocket and deepened approach channel (the suspended

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:45: additional drag force of the piles on the flow (for the suspended deck option) and the

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:45: For the open, suspended deck structure, with a minor change to the configuration of the

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:46: footprints of elevated suspended sediment concentrations and deposition arising from

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:55: The potential exists for sediment disturbance / re-suspension during dredging of the

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:55: terminal itself (e.g. through the installation of piles). The disturbance and re-suspension

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:55: quality within the Tees estuary, due to increased concentrations of suspended solids

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:56:Increased suspended sediment concentration due to maintenance dredging

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:56:increase in suspended sediment concentration. It is anticipated that this would be

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:61:For the suspended deck quay option, the installation of approximately 500 tubular piles

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:61:suspended sediment during dredging and deposition following dredging

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:61:An increase in the total suspended sediment (TSS) concentration in the water column

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:62:the seabed at the locations where sediment settles out of suspension. Dredging is also

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:62:assessments within the Tees) is unlikely to have a prolonged effect on suspended

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:67: resources for birds, in particular terns, through increased total suspended sediment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:73: through temporarily increasing total suspended solids concentrations. At high levels

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:73: and/or for prolonged periods of time, an increase in suspended sediment concentration

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:89: Tees estuary (the suspended deck option would be expected to have a more localised

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:92: • Potential impact on existing water abstraction processes – total suspended

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:106: • Increased total suspended solids may affect food resources for • Use of hydrodynamic and sedime

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:110:waves, tides and suspended mud concentrations in Tees Bay. EX 1938

TR030002-000596-Doc 2.1F - YPL Land Plan Inset 3 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:16: extinguishment, suspension or override.

TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:3: through an increase in suspended sediments due to the

TR030002-000448-ES Section 13 Air quality.pdf:8: materials and resuspension of settled materials, and, therefore, a wide range of site preparation and

TR030002-000771-York Potash Ltd (3).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000771-York Potash Ltd (3).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000771-York Potash Ltd (3).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000771-York Potash Ltd (3).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000771-York Potash Ltd (3).pdf:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000771-York Potash Ltd (3).pdf:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development

TR030002-000771-York Potash Ltd (3).pdf:72:extinguishment or suspension.

TR030002-000771-York Potash Ltd (3).pdf:75:acquire appropriate, extinguished or use or acquire newsuspend any rights over a protected asset

TR030002-000771-York Potash Ltd (3).pdf:75:conditionsacquisition, appropriation, extinguishment or suspension.

TR030002-000771-York Potash Ltd (3).pdf:82: injurious matter in suspension or otherwise.

TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf:31:should be considered beneath the suspended deck of the quay (should an open quay structure be

TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf:47:platforms for shags beneath the suspended deck should be considered, along with the other

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:3: through an increase in suspended sediments due to the

TR030002-000595-Doc 2.1E - YPL Land Plan Inset 2 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:15:• Work shall be suspended and rescheduled during periods of severe or inclement weather.

TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:21:than suspended by rigging which is inherently less stable

TR030002-000594-Doc 2.1D - YPL Land Plan Inset 1 Rev v1.pdf:1: 1 suspend and/or interfere with easements and/or other private rights and to

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:23:9.5.1 As discussed in Section 5.5, the proposed capital dredging would cause suspension of fine sediment

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:24: suspended sediment concentration resulting from the use of this dredging plant is presented in Section

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:24:9.5.2 The potential effect of dredging using a CSD and TSHD on suspended sediment concentration in the

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:24: suspended sediment likely.

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:24:9.5.3 It is predicted that increased suspended sediment concentrations for the duration of capital dredging

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:42:resource due to outlined below. Limiting re-suspension during TSHD c

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:42: Re-suspension of sediment during CSD can be reduce

TR030002-000443-ES Section 8 Marine ecology.pdf:10:intertidal habitat to be lost. For the suspended would be minimised. This will be would create a larger footprint, a area a

TR030002-000443-ES Section 8 Marine ecology.pdf:11: that is suspended by the current from t

TR030002-000443-ES Section 8 Marine ecology.pdf:18: suspended from a surface buoy which in turn was anchored by a weight resting on the seabed via a

TR030002-000443-ES Section 8 Marine ecology.pdf:48: Potential impacts to marine ecology from increased total suspended sediment during dredging

TR030002-000443-ES Section 8 Marine ecology.pdf:48: Sediment resuspension

TR030002-000443-ES Section 8 Marine ecology.pdf:48: suspended into the water column, dispersed and deposited onto the seabed. Hence, the construction

TR030002-000443-ES Section 8 Marine ecology.pdf:48: phase would result in increases in the total suspended sediment (TSS) concentrations of the water

TR030002-000443-ES Section 8 Marine ecology.pdf:49: the potential impact to marine ecology associated with the resuspension of uncontaminated sediment.

TR030002-000443-ES Section 8 Marine ecology.pdf:49: feeding apparatus (e.g. filter feeding molluscs). In addition, high concentrations of suspended sediment

TR030002-000443-ES Section 8 Marine ecology.pdf:49: basis during Phase 1 and Phase 2. During dredging, suspended sediment would rapidly disperse away

TR030002-000443-ES Section 8 Marine ecology.pdf:49: receptors from increased concentrations of suspended sediment and sediment deposition following

TR030002-000443-ES Section 8 Marine ecology.pdf:49: discussed in Section 5.5, a backhoe dredger is considered likely to minimise the resuspension of

TR030002-000443-ES Section 8 Marine ecology.pdf:49: increased concentrations of suspended sediment within the water column due to dredging using a

TR030002-000443-ES Section 8 Marine ecology.pdf:49: suspended sediment is greatest for a TSHD during low river flow and spring tide conditions. On

TR030002-000443-ES Section 8 Marine ecology.pdf:50:8.5.23 As discussed above, a proportion of the sediment that is dredged would be disturbed, re-suspended

TR030002-000443-ES Section 8 Marine ecology.pdf:50:8.5.26 No average increase in suspended sediment concentration is shown over the intertidal for any of the

TR030002-000443-ES Section 8 Marine ecology.pdf:50:8.5.28 The controls outlined within Section 7.5 with regard to minimising suspended sediment load during

TR030002-000443-ES Section 8 Marine ecology.pdf:61: below. Limiting re-suspension during TSHD can be ac

TR030002-000443-ES Section 8 Marine ecology.pdf:61:suspended during Low Low Negligible Reduction of sediment plumes during backhoe dredgin

TR030002-000443-ES Section 8 Marine ecology.pdf:61: Re-suspension of sediment during CSD can be reduce

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:10:the proposed construction options for the berth. One option is based on forming a suspended

TR030002-000821-Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:3: through an increase in suspended sediments due to the

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:7: structure. Under the open quay option, the quay and access bridge would be suspended deck

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:15: suspension of sediment as a result of capital and maintenance dredging and piling, and deterioration of

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:16: increase in suspended sediment would not occur over the intertidal for any of the potential dredge

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:32: increased suspended sediment concentration arising from capital dredging for other projects (should

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:32: would be additive, with an overall combined increase in suspended sediment concentration where the

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:32:3.12.3 The dispersion of suspended sediment and deposition on the seabed during capital dredging has the

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:40: x Increase of suspended solids.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:41: levels of suspended solids and/ or leachates from Made Ground have the potential to enter local

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:47: in suspended solids, and as a result of leaks/spillages from machinery. However, the decommissioning

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:17:2.2.6 For the open quay option, the quay and access bridge structures would be suspended deck structures

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:35: SUSPENDED DECK

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:38: be required to create the stable slope beneath the quay for the open suspended deck option. As part of

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:38: the berth pocket and stable slope beneath the quay for the open suspended deck option. For the solid

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:81: effect on feeding terns due to increased suspended

TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:6: TSS Total Suspended Solids

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:27: 1. A suspended reinforced concrete deck approximately 524m long and 28m wide,

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:27:A suspended reinforced concrete deck would be formed with steel tubular piles to be

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:27:Indicative cross sections of the suspended deck quay and the continuous quay

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:29:Figure 3.3 Indicative cross section of the suspended quay deck option

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:32: suspended deck or the continuous quay) would require the employment of

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:41:In general, suspended sediment concentrations are low within the estuary and within

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:41:events. In general, the suspended sediment concentrations appear to be dominated by

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:41:downstream. In the vicinity of the proposed scheme, suspended sediment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:41:40mg/l to 80mg/l. In terms of the tidal sequence, the highest suspended sediment levels

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:41:occur close to high water. After storm periods, higher concentrations of suspended

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:42: currents, vessel induced forces and resuspension of material by dredging operations.

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:42: quay structure, berth pocket and deepened approach channel (the suspended

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:43: additional drag force of the piles on the flow (for the suspended deck option) and the

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:43: For the open, suspended deck structure, with a minor change to the configuration of the

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:44: footprints of elevated suspended sediment concentrations and deposition arising from

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:53: The potential exists for sediment disturbance / re-suspension during dredging of the

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:53: terminal itself (e.g. through the installation of piles). The disturbance and re-suspension

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:53: quality within the Tees estuary, due to increased concentrations of suspended solids

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:54:Increased suspended sediment concentration due to maintenance dredging

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:54:increase in suspended sediment concentration. It is anticipated that this would be

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:59:For the suspended deck quay option, the installation of approximately 500 tubular piles

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:59:suspended sediment during dredging and deposition following dredging

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:59:An increase in the total suspended sediment (TSS) concentration in the water column

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:60:the seabed at the locations where sediment settles out of suspension. Dredging is also

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:60:assessments within the Tees) is unlikely to have a prolonged effect on suspended

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:65: resources for birds, in particular terns, through increased total suspended sediment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:71: through temporarily increasing total suspended solids concentrations. At high levels

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:71: and/or for prolonged periods of time, an increase in suspended sediment concentration

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:87: Tees estuary (the suspended deck option would be expected to have a more localised

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:90: • Potential impact on existing water abstraction processes – total suspended

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:104: • Increased total suspended solids may affect food resources for • Use of hydrodynamic and sedime

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:108:waves, tides and suspended mud concentrations in Tees Bay. EX 1938

TR030002-000826-York Potash Ltd (2).pdf:25: suspended deck of the quay (if the open quay

TR030002-000826-York Potash Ltd (2).pdf:46:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition

TR030002-000826-York Potash Ltd (2).pdf:47:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000826-York Potash Ltd (2).pdf:58:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf:16:beneath the suspended deck of the quay (if the open quay

TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf:16:was not a mitigation measure for which the HRA had to rely on suspended deck of the quay (should an open quay structure be

TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:12: Complex are symbiotic and suspension in production of the Cracker (for example)

TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:16: extinguishment, suspension or override.

TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to

TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf:1: to suspend and/or interfere with easements and/or other private rights and

TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf:1: to temporarily suspend and/or interfere with easements and/or other private

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:84:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:84:appropriation, extinguishment, suspension or override.

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:89: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:89: appropriation, extinguishment or suspension.; and

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:99: injurious matter in suspension or otherwise.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:14:2.28 The purpose of the MHF is to convert the mineral suspended in

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:16: suspended quay, or a continuous quay as described in Section 3.6

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:29: should the suspended deck structure for the quay be chosen, but

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:40: also the potential for the SoS to suspend consideration of an

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:91: environment and designated sites (water quality, suspended sediment concentration SSC)

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:31: transport for the polyhalite was for the mineral to be suspended in slurry,

TR030002-000275-P D Teesport Limited.pdf:8: injurious matter in suspension or otherwise.

TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf:1: quality (i.e. increase in suspended sediment concentration and dispersion from the disposal site).

TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf:2:22.2.7 Figure 22-1 shows the maximum excess (i.e. increased) suspended sediment concentration predicted

TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf:3: Figure 22-1 Maximum depth-average excess suspended sediment concentration from sediment released

TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf:5: site. Storm waves may bring this material into near-bed suspension, but the low tidal current speeds

TR030002-000802-Document 2.1A - YPL Land Plan Sheet 1 - Rev v4.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000704-Applicant response to First Questions - Appendix 6.pdf:14: suspended deck structures comprised of a reinforced concrete deck supported by driven steel tubular

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:7: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:72:extinguishment or suspension.

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:82: injurious matter in suspension or otherwise.

TR030002-000592-Doc 2.1B - YPL Land Plan Sheet 2 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000676-Doc 7.2 - Summary of Proposals Document.pdf:12: metres in width. This would allow for the suspended structure located location of the quay platform would be

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:1: decommissioning of the conveyor to influence suspended sediment levels in Dabholm Gut). Proposed

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:7:and suspended sediment concentrations (SSC) and designated sites should be presented in the EIA.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:9: where ESQs do not exist (for example, for the assessment of suspended solid concentrations).

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:20: Re-suspension of sediment during dredging and piling

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:20:7.5.3 The above construction phase activities have the potential to cause disturbance and re-suspension of

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:20: sediments and release them into the water column as a plume. This would increase the suspended

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:20: Additionally, increases in suspended sediment concentrations could give rise to high oxygen demands,

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:21: on suspended sediment concentrations (with the exception of an enclosed grab due to the negligible

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:21:7.5.7 The sediment plume simulations for the backhoe dredger predict that an area of elevated suspended

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:21: total suspended solids in the range of 10mg/l to 50mg/l above background in the channel, 500m either

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:21: dredger, at up to 500mg/l of suspended sediment.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:21: suspended sediment concentrations above those normally experienced in the estuary, albeit within a

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:22:Figure 7-3 Simulated average increase in suspended sediment concentration from backhoe dredging in

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:23:Figure 7-4 Simulated average increase in suspended sediment concentration from CSD dredging in spring

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:24: suspended sediment in the range of 10mg/l to 50mg/l above background may be anticipated in the

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:24: predicted in the immediate area of the dredger, at up to 200mg/l of suspended sediment.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:24: re-suspension of sediment into the water column. The proposed use of an enclosed grab for the

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:24: Figure 7-5 Simulated average increase in suspended sediment concentrations from TSHD dredging in spring

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:25: suspended solids are only expected on a short term basis. No increase in suspended sediment is

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:25: construction of the port terminal, would result in re-suspension of bed sediments. This effect, however,

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:25: nature. Consequently, the potential impact on water quality associated with the increase in suspended

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:25:7.5.18 There are a number of controls that would be implemented to ensure that the suspended sediment load

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:25:7.5.19 Limiting re-suspension of sediment during TSHD can be achieved through the following good practice

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:26:7.5.21 The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed,

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: suspended sediment concentrations from runoff.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: reduction in water quality within Bran Sands lagoon would be due to increased suspended sediment

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: concentrations only during deposition. The reduction in water quality from increased suspended

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: it is inevitable that water within the lagoon would experience a temporary increase in suspended

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: suspension due to tidal exchange with the Tees. Based on the above, it is considered that the lagoon

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: is of low sensitivity with respect to changes in suspended sediment concentration.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: suspended sediment are likely to be experienced across the full width of the lagoon. It is considered

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:28: Increased suspended sediment concentration due to maintenance dredging

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:28: to increased suspended sediment concentrations from maintenance dredging.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:30: Increased suspended sediment concentrations during removal of conveyor system

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:30: would be no impact on suspended sediment concentration during decommissioning.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:31: These impacts include re-suspension of suspended sediment as a result of capital and maintenance

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:32:Re-suspension of sediment during Low Low Negligible None required. However controls would be imple

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:32:dredging and piling outlined below. Limiting re-suspension during TS

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:32: Re-suspension of sediment during CSD can be r

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:32:Increased suspended sediment Low Low Negligible None required

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:33:Increased suspended sediment No impact None required

TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:10:suspended deck structure (should that be the selected quay

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:5:deposition of fine material greater outside the boundary of the disposal areas. The suspended

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:6:The dispersion of suspended solids released into Dabholm Gut at Teesport is predicted to be

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:6:similar after the development. The centre of the plume of suspended particles is predicted to be

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:7: 4.3.4 Sensitivity to sediment resuspension……………………………………………. 29

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:11:Figure 4.20 Sensitivity of accretion predictions to resuspension processes in the Estuary

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:11:Figure 5.14 Depth-averaged suspended particle concentrations. Existing layout, spring tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:11:Figure 5.17 Depth-averaged suspended particle concentrations. Existing layout, spring tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:11:Figure 5.20 Depth-averaged suspended particle concentrations. Existing layout, neap tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:12:Figure 5.23 Depth-averaged suspended particle concentrations. Existing layout, neap tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:12:Figure 5.26 Depth-averaged suspended particle concentrations. Proposed layout, spring tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:12:Figure 5.29 Depth-averaged suspended particle concentrations, proposed layout, spring tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:12:Figure 5.32 Depth-averaged suspended particle concentrations. Proposed layout, neap tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:12:Figure 5.35 Depth-averaged suspended particle concentrations. Proposed layout, neap tide,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:13: the construction phase are the suspension of sediment into the water column during the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:33: vessel induced forces and resuspension by dredging operations. These last two were

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:33: system from offshore can be resuspended and moved further upstream into the estuary.

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:34: resuspension of material from the sea bed during storm events. The coarser material,

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:34: stress generated by the tidal currents on the seabed, and suspended load as sand is

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:34: they generate a stirring effect that enhances the suspension of sand from the seabed, and

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:35: model that simulates the advection and dispersion of suspended sediment due to the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:40: during the flood tide having being resuspended from the sea bed in Tees Bay. Once

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:40: circulation present possibly with resuspension by dredging activities or large vessel

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:40: HR Wallingford (1989b) attempted a correlation between suspended sediment

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:41:4.3.4 Sensitivity to sediment resuspension

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:42: great enough to re-suspend material allowing further transport with tidally or density

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:42: driven currents. The barrage studies concluded that further resuspension of bed material

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:42: 5th spring tide without enhanced resuspension as 30.9 m3/tide and the predicted infill

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:42: with enhanced resuspension as 32.1 m3/tide. This result confirms the ability of

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:43: resuspension within the estuary and so the increases are concentrated more in the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:45: dispersion, deposition and resuspension of the fine sediment within the Tees Estuary

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:45: the water column and calculates areas in which suspended particles may settle on the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:45: The deposition and resuspension of particles at the seabed are modelled by assuming

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:45: simulates the increase of suspended sediment concentrations over the back ground

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:46: Measurements of suspended solids concentrations close (~2.25km away) to the disposal

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:46: bed suspended solids concentrations was clearly demonstrated to be associated with

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:46: generate a sediment source that remains available for resuspension by smaller waves for

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:47: of fine material and the associated short term elevations in suspended solids

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:47: discharge, as well as the action of the dredger itself will lead to increases in suspended

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:47: time series of suspended concentration and depth of deposition were also extracted. The

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:48: predicted to increase suspended sediment concentrations by 500mg/l in the immediate

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:48: reclamation. Increases in suspended sediment concentrations above those occurring

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:48: approach channel on suspended sediment concentrations over Seal Sands and in the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:52: establish a repeating pattern of the extents of suspended particle distributions.

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:52: suspended particle concentrations at four states of tide; peak flood, HW, peak ebb and

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:52: On the spring tide, low flow condition (Figure 5.14), the suspended solids plume leaves

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:52: these deposits are re-suspended at times of relatively high current speeds.

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:53: changes in suspended particle distributions between the two flow cases, with less

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:53: suspended particles is much reduced relative to the equivalent spring tide simulation

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:53: Qualitatively, the simulated suspended and deposited particle distributions for the spring

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:53: that the high suspended particle concentrations in the core of the plume are close to the

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:53: plume simulations for suspended particles released into Dabholm Gut, within the area of

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:54: On the whole, the model predictions indicate that the distributions of suspended and

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:54: the plume of suspended particles tends to be closer to the east bank of the River Tees

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:59: The suspended fine sediment concentrations increases were predicted to be less than

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:60: considering the variation in the number of storm event bringing material into suspension

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:60: The dispersion of suspended solids released into Dabholm Gut at Teesport is predicted

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:60: to be of the whole similar after the development. The core of the plume of suspended

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:61: waves, tides and suspended mud concentrations in Tees Bay. EX 1938.

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:160:Figure 4.20 Sensitivity of accretion predictions to resuspension processes in the Estuary

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:174: Gut Suspended solids

TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf:1: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:25:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:25:extinguishment, suspension or override.

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:25:acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to the

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:45:appropriate, extinguish, suspend or override any rights in the protected land if the authorised development

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:45:suspension or override.

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:45:acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to the

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:39:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:41:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:51:part of the crane or suspended load could fall onto the tracks or supporting structures.

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:56:no part of the crane or suspended load could fall onto the roads or supporting structures.

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:30: create the stable slope beneath the quay for the open suspended deck option.

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:31: SUSPENDED DECK

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:34: made predictions of sediment suspension and dispersion using each dredge method, with the impact

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:34: the worst case predictions (in terms of predicted increases is suspended sediment concentrations and

TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf:19:5 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels.

TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:20: platforms for shags could be provided beneath the suspended deck of the

TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:24: and prey availability. Potential impacts include suspended sediment

TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:24:4.33 To avoid contamination as a result of suspended sediment, the silts would

TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:37: Potential impacts include suspended sediment concentration in the water column during capital dredging, sediment

TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:37: To avoid contamination as a result of suspended sediment, the silts would be dredged using an enclosed grab

TR030002-000351-Section 55 Checklist.pdf:17: proposed to suspend and/or interfere with easements and/or other private

TR030002-000351-Section 55 Checklist.pdf:17: temporarily suspend and/or interfere with easements and/or other private rights

TR030002-000701-Environment Agency.pdf:15:  re-suspension of sediment during capital dredging and piling;

TR030002-000701-Environment Agency.pdf:16:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved

TR030002-000701-Environment Agency.pdf:16:  resuspension of sediment during cutter suction dredging can be reduced through

TR030002-000701-Environment Agency.pdf:16:5.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended

TR030002-000434-ES Contents_index.pdf:13: flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:13: flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:13: river flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:14: flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:14: flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:14: river flow conditions a) average increase in suspended sediment

TR030002-000434-ES Contents_index.pdf:16:Figure 7-3 Simulated average increase in suspended sediment concentration from

TR030002-000434-ES Contents_index.pdf:16:Figure 7-4 Simulated average increase in suspended sediment concentration from

TR030002-000434-ES Contents_index.pdf:16:Figure 7-5 Simulated average increase in suspended sediment concentrations from

TR030002-000434-ES Contents_index.pdf:31:Figure 22-1 Maximum depth-average excess suspended sediment concentration

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:50: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:80:to acquire, appropriate, extinguish, suspend or override any rights in the protected land which are

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:83:acquire, appropriate, extinguish or suspend any rights or covenants in respect of any protected asset

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:83:acquisition, appropriation, extinguishment or suspension.

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:90: injurious matter in suspension or otherwise.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:10:Table 25.3 Summary of results of the predictive modelling of suspended sediment concentration

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:116:6.4.23 When the export of spoil is suspended, product grade polyhalite would be exported off-site at the rate of

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:167: incorporating best practice in design for removal of suspended solids and other contaminants.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:251: suspended sediment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252:25.3.2 Suspended sediment concentrations are typically low within the estuary and Tees Bay. The highest

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252: storm events. In general, the suspended sediment concentrations appear to be dominated by

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252:25.3.3 In the middle to lower reaches of the estuary, suspended sediment concentrations are, for the most

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252: highest suspended sediment levels occur close to high water.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252: resuspension of material from the sea bed during storm events. The coarser material, mostly sand, is

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252: Dispersion of suspended sediment and deposition on the seabed during capital dredging

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:252: quiescent areas or when tidal currents slow around slack water can be re-suspended as current speeds

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:253: presents a summary of the results of the predictive modelling of suspended sediment concentration and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:253:25.4.4 In all cases, the maximum increase in suspended sediment concentration in the water column is

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:253: suspended sediment is predicted at the location of the proposed terminal. This is due to the fact that

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:253: the modelling incorporated run-off of water with a high suspended sediment load, representing the de-

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:254:Table 26-3 Summary of results of the predictive modelling of suspended sediment concentration and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:254:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower)

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:255:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower)

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:256:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower)

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:257:  effect of increases in suspended sediments during maintenance dredging on food resources of SPA

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:268: suspended sediment  QEII Berth

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:268: of the estuary (as discussed within the impact assessment below) where suspended sediment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:268: the tidal sequence, the highest suspended sediment levels occur close to high water. This baseline

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:269: Potential for cumulative increase in suspended sediment concentration during capital and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:269: impact would be a greater increase in suspended sediment concentration than predicted for the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:269: resuspension in the water column. This requirement is specified because of the elevated concentration

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:269: suction dredger or backhoe dredger (the implications of both types of dredger on suspended sediment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:270:26.4.6 It is concluded that the predicted suspended sediment concentration generated by capital dredging for

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:270: undertaken elsewhere in the Tees estuary, there is a low potential for suspended sediment arising from

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:270:26.4.10 In terms of dispersion of suspended sediment during dredging, the EIA studies for the Harbour facilities

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:274:27.4.7 The mitigation described in Section 26 with regard to limiting suspended sediment increase and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:274: dispersion during capital dredging is also relevant here (i.e. sediment suspension and dispersion is

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:274: additive effect on suspended sediment concentration within the zone of interaction. Suspended

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:274: zone of increased suspended sediment concentration. However, the effect of a combined plume (in the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:275:27.4.10 The mitigation described in Section 27 with regard to limiting suspended sediment increase and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:278: increased suspended sediment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:279: Potential effect on waterbird feeding resource due to increased suspended sediment during

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:279: occur, with movement away from the zone of increased suspended sediment concentration. However,

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:279:28.4.2 The mitigation described in Section 27 with regard to limiting suspended sediment increase and

TR030002-000458-ES Section 23 Impact interrelationships.pdf:3: sediment re-suspension from

TR030002-000661-Doc 3.9C - Indicative Section Open Quay Construction.pdf:1: SUSPENDED DECK

TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf:32:should be considered beneath the suspended deck of the quay (should an open quay structure be

TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf:48:platforms for shags beneath the suspended deck should be considered, along with the other

TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:16: extinguishment, suspension or override.

TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:4:calibration, validation, increase in suspended sediment data.

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:9:5.4.14 In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:9: values are also attributed to either high rainfall or storm events. In general, the suspended sediment

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:9:5.4.15 In the vicinity of the proposed scheme, suspended sediment concentrations are, for the most part, less

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:9: suspended sediment levels occur close to high water. After storm periods, higher concentrations of

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:9: suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:10: concentrations in Tees Bay are raised by the resuspension of material from the sea bed during storm

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:10: wave induced currents, vessel induced forces and resuspension of material by dredging operations.

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:11:5.5.7 The simulations for the CSD predict that mean elevated suspended sediment concentration increases

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:11:5.5.8 The simulation results for the backhoe dredger predict that an area of elevated suspended sediment

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:11:5.5.9 The simulations for the TSHD show that an area of elevated suspended sediment concentration, in the

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:11: up to 200mg/l of suspended sediment. Fine sediment deposition is predicted to be a maximum of a few

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:11:5.5.10 During simulations for all dredge methods, no average increase in suspended sediment concentration

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:12: a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:13:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:14:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:15:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:16:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:18:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:23: significant source of this fine material is marine sources. Fine sediment moved into suspension during

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:33: CSD x Mean elevated suspended sediment concentration increases above

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:33: Backhoe dredger x An area of elevated suspended sediment concentrations in the range of

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:33: TSHD x An area of elevated suspended sediment concentration, in the range of

TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:33: suspended sediment.

TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf:4:Shafts Suspension gear Suspension gear 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:5:“dredging” means using any device to move material (whether or not suspended in water)

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:12: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:13:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:84:appropriation, extinguishment, suspension or override.

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:88: suspension; and

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:96: injurious matter in suspension or otherwise.

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:7: “dredging” means using any device to move material (whether or not suspended in water)

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:11: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:13:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:24: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:33: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:61: injurious matter in suspension or otherwise.

TR030002-000698-Natural England 1.pdf:37:beneath the suspended deck of the quay (if the open quay structure is of artificial nesting platforms for shags beneath a suspended deck

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:6: “dredging” means using any device to move material (whether or not suspended in water) from

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:13: (3) Any person who suffers loss by the suspension of any private right of way under this article

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:14:practicable from gravel, soil or other solid substance, oil or matter in suspension.

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:84:extinguishment, suspension or override.

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:88: appropriation, extinguishment or suspension; and

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:97: injurious matter in suspension or otherwise.

TR030002-000601-Doc 2.1K - YPL Land Plan Inset 8 Rev v1.pdf:1: suspend and/or interfere with easements and/or other private rights and to

NGCT_Final_ES at KK with figs.pdf:7: 9.2.1 Increase in suspended sediment concentrations and increased

NGCT_Final_ES at KK with figs.pdf:7: 9.2.2 Resuspension of contaminants during capital dredging 267

NGCT_Final_ES at KK with figs.pdf:7: re-mobilisation of suspended solids 270

NGCT_Final_ES at KK with figs.pdf:7: 9.3.1 Periodic increases in suspended sediment concentrations and

NGCT_Final_ES at KK with figs.pdf:7: resuspended by capital dredging within intertidal areas 294

NGCT_Final_ES at KK with figs.pdf:8: resuspended by capital dredging within subtidal areas 296

NGCT_Final_ES at KK with figs.pdf:8: from an increase in suspended sediment concentrations and

NGCT_Final_ES at KK with figs.pdf:8: 11.2.5 Effect of increased suspended sediments on the food resource for

NGCT_Final_ES at KK with figs.pdf:9: increases in suspended sediment concentrations (SSC) due to

NGCT_Final_ES at KK with figs.pdf:14:3.4 Quay wall suspended deck 76

NGCT_Final_ES at KK with figs.pdf:15:9.3 Time histories of suspended solids concentrations in Seaton Channel 266

NGCT_Final_ES at KK with figs.pdf:24:SSC Suspended sediment concentration

NGCT_Final_ES at KK with figs.pdf:28:Plankton Organisms suspended in the water column and

NGCT_Final_ES at KK with figs.pdf:51: suspended solids exceed consent.

NGCT_Final_ES at KK with figs.pdf:52: • Recommends looking at dissolved oxygen issues caused by re suspension of sediments during the dredging.

NGCT_Final_ES at KK with figs.pdf:103: • A piled suspended deck structure

NGCT_Final_ES at KK with figs.pdf:103: gravity wall structures, different types of suspended deck structures and different

NGCT_Final_ES at KK with figs.pdf:103: • A suspended reinforced concrete deck on bored reinforced concrete piles formed

NGCT_Final_ES at KK with figs.pdf:118: suspended concrete deck. These forms of construction are shown in Figures 3.2 and

NGCT_Final_ES at KK with figs.pdf:118: example, for the suspended concrete deck option extensive piling would be required

NGCT_Final_ES at KK with figs.pdf:118: and wave climate would be similar in that, although the suspended concrete deck

NGCT_Final_ES at KK with figs.pdf:118: suspended concrete deck structure would be slightly lower than for the mass

NGCT_Final_ES at KK with figs.pdf:118: concrete gravity wall, however for the piled suspended deck it would be necessary to

NGCT_Final_ES at KK with figs.pdf:118: 4. Piling for the suspended concrete deck quay structure would be bored concrete piles

NGCT_Final_ES at KK with figs.pdf:122: water quality of the Tees Estuary in terms of increases in suspended sediments and

NGCT_Final_ES at KK with figs.pdf:124: Tees Estuary associated with the resuspension of suspended solids. The dredging

NGCT_Final_ES at KK with figs.pdf:129: of negligible significance associated with the re-suspension of contaminated

NGCT_Final_ES at KK with figs.pdf:131: Bathing Waters Directive and that in general background suspended solids

NGCT_Final_ES at KK with figs.pdf:131: into the water during capital dredging most is predicted to fall out of suspension

NGCT_Final_ES at KK with figs.pdf:132: suspended solids in the water column impacting on feeding resources are predicted

NGCT_Final_ES at KK with figs.pdf:133: construction phase is mainly a result of the increase in suspended solids

NGCT_Final_ES at KK with figs.pdf:137: river channel, seabed sediments will become re-suspended and dispersed

NGCT_Final_ES at KK with figs.pdf:138: an impact of minor adverse significance associated with the re-suspension of

NGCT_Final_ES at KK with figs.pdf:185: are associated with the increase in suspended sediment concentrations in the

NGCT_Final_ES at KK with figs.pdf:192: 1. In general, suspended sediment concentrations are low within the estuary and

NGCT_Final_ES at KK with figs.pdf:192: high rainfall or storm events. In general, the suspended sediment

NGCT_Final_ES at KK with figs.pdf:192: of the proposed development (i.e. in the Tees Dock area) suspended sediment

NGCT_Final_ES at KK with figs.pdf:192: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment

NGCT_Final_ES at KK with figs.pdf:192: suspended sediment have been noted around the Shell Jetty, but with little

NGCT_Final_ES at KK with figs.pdf:193: driven currents, wave induced currents, vessel induced forces and resuspension

NGCT_Final_ES at KK with figs.pdf:193: resuspended and moved further upstream into the estuary.

NGCT_Final_ES at KK with figs.pdf:193: concentrations in Tees Bay are raised by the resuspension of material from the

NGCT_Final_ES at KK with figs.pdf:195: d) Losses of suspended sediment are inevitable at the dredging face or draghead,

NGCT_Final_ES at KK with figs.pdf:196: remain in suspension, forming a sediment plume. The plume from the overspill

NGCT_Final_ES at KK with figs.pdf:196: discharge is an order of magnitude greater than sediment resuspension from the

NGCT_Final_ES at KK with figs.pdf:196: plumes of suspended fine sediment. Importantly the TSHD will result in a

NGCT_Final_ES at KK with figs.pdf:196: simulate the dispersion, deposition and resuspension of the released sediment

NGCT_Final_ES at KK with figs.pdf:196: and calculates areas in which suspended particles may settle on the bed, either

NGCT_Final_ES at KK with figs.pdf:196: walk technique. The deposition and resuspension of particles at the seabed are

NGCT_Final_ES at KK with figs.pdf:199: CSD in terms of predicted peak concentration of suspended sediments and peak

NGCT_Final_ES at KK with figs.pdf:202: is predicted to increase suspended sediment concentrations by 500mg/l in the

NGCT_Final_ES at KK with figs.pdf:202: of the run-off from the reclamation. Increases in suspended sediment

NGCT_Final_ES at KK with figs.pdf:202: suspended sediment concentrations over Seal Sands and in the Seaton

NGCT_Final_ES at KK with figs.pdf:203: wave action occurred it would be expected to be resuspended. A similar

NGCT_Final_ES at KK with figs.pdf:203: suspended sediment concentrations and deposition at Bran Sands and North

NGCT_Final_ES at KK with figs.pdf:225: transport model that simulates the advection and dispersion of suspended

NGCT_Final_ES at KK with figs.pdf:226: the flood tide period having been resuspended from the seabed in Tees Bay (i.e.

NGCT_Final_ES at KK with figs.pdf:226: resuspension and upstream movement as a result of agitation by dredging

NGCT_Final_ES at KK with figs.pdf:227: 1. The dispersion of suspended solids released into Dabholm Gut through licensed

NGCT_Final_ES at KK with figs.pdf:227: 2. The model predictions indicate that the distributions of suspended and deposited

NGCT_Final_ES at KK with figs.pdf:227: that following the proposed development the core of the plume of suspended

NGCT_Final_ES at KK with figs.pdf:228: • Increased import of fine sediments resuspended in Tees Bay;

NGCT_Final_ES at KK with figs.pdf:237: 1. The capital dredging will resuspend seabed sediments and enable sediment to

NGCT_Final_ES at KK with figs.pdf:237: the dredge head and the overflow of water (containing suspended sediments)

NGCT_Final_ES at KK with figs.pdf:256: deposition on Seal Sands. As the tide rises, suspended material is carried in the

NGCT_Final_ES at KK with figs.pdf:256: settle). Some of this material will subsequently be resuspended and

NGCT_Final_ES at KK with figs.pdf:257: the potential for dilution and re-suspension following deposition, it is unlikely that

NGCT_Final_ES at KK with figs.pdf:278: that may contain suspended solids, fuels to other contaminants and

NGCT_Final_ES at KK with figs.pdf:282: 1. The capital dredging will result in the suspension of sediment into the water

NGCT_Final_ES at KK with figs.pdf:293:9.2.1 Increase in suspended sediment concentrations and increased turbidity during

NGCT_Final_ES at KK with figs.pdf:293: passage of light rays through the water caused by the presence of suspended

NGCT_Final_ES at KK with figs.pdf:294: 2. In general, suspended solids concentrations are low within the Tees estuary and

NGCT_Final_ES at KK with figs.pdf:294: Tees Bay. Background suspended solid levels in the vicinity to the proposed

NGCT_Final_ES at KK with figs.pdf:294: predicted to occur during spring tides with potentially greater suspended solid

NGCT_Final_ES at KK with figs.pdf:294: 3. The effect of capital dredging on suspended sediment concentration has been

NGCT_Final_ES at KK with figs.pdf:294: 4. When the CSD is located in the Tees Dock turning circle, peak suspended

NGCT_Final_ES at KK with figs.pdf:294: of the dredger; however, effects on suspended sediment concentrations are very

NGCT_Final_ES at KK with figs.pdf:294: located in the area of the proposed quay wall, peak concentrations of suspended

NGCT_Final_ES at KK with figs.pdf:294: dredging in the Tees Dock turning circle. Suspended sediment concentrations

NGCT_Final_ES at KK with figs.pdf:294: reclamation show that peak increases in suspended sediment concentrations of

NGCT_Final_ES at KK with figs.pdf:294: suspended sediment concentration arising during the dredging in the lower

NGCT_Final_ES at KK with figs.pdf:294: channel and the effect of run-off from the reclamation of suspended sediment

NGCT_Final_ES at KK with figs.pdf:295:Figure 9.3 Time histories of suspended solids concentrations in Seaton

NGCT_Final_ES at KK with figs.pdf:296: conditions. All other locations demonstrate lower peak increases in suspended

NGCT_Final_ES at KK with figs.pdf:296: 8. For both types of dredger (CSD and TSHD), peak suspended solids

NGCT_Final_ES at KK with figs.pdf:296: suspended sediment concentrations reduce to less than 50mg/l above

NGCT_Final_ES at KK with figs.pdf:296: 9. Since there are no environment quality standards relating to suspended solids

NGCT_Final_ES at KK with figs.pdf:296: for the Tees estuary, the impact of the increase in suspended solids

NGCT_Final_ES at KK with figs.pdf:296: 11. It can, therefore, be concluded that the predicted suspended solids

NGCT_Final_ES at KK with figs.pdf:296: 12. Given the above, the potential impact associated with the increase in suspended

NGCT_Final_ES at KK with figs.pdf:296:9.2.2 Resuspension of contaminants during capital dredging

NGCT_Final_ES at KK with figs.pdf:296: 1. The resuspension of sediments as described in Section 9.2.1 also has the

NGCT_Final_ES at KK with figs.pdf:296: potential resuspension of contaminants focuses on the effect of capital dredging

NGCT_Final_ES at KK with figs.pdf:298: of detection. Re-suspension of contaminated sediment with high concentrations

NGCT_Final_ES at KK with figs.pdf:298: suspended solids during resuspension and will occur. This is also likely to be

NGCT_Final_ES at KK with figs.pdf:299: of suspended solids

NGCT_Final_ES at KK with figs.pdf:299: 1. The resuspension of sediment as a consequence of the proposed capital

NGCT_Final_ES at KK with figs.pdf:299: operational) phases. In addition, peaks in suspended solids concentrations are

NGCT_Final_ES at KK with figs.pdf:299: 3. Given the above, the resuspension of suspended solids as a result of the

NGCT_Final_ES at KK with figs.pdf:301:9.3.1 Periodic increases in suspended sediment concentrations and increased

NGCT_Final_ES at KK with figs.pdf:303: is resuspended by higher current speeds either side of slack water.

NGCT_Final_ES at KK with figs.pdf:323:10.2.2 Potential smothering effect caused by sedimentation of material resuspended by

NGCT_Final_ES at KK with figs.pdf:323: disturbed and re-suspended into the water column, dispersed and deposited

NGCT_Final_ES at KK with figs.pdf:325:10.2.4 Potential smothering effect caused by sedimentation of material resuspended by

NGCT_Final_ES at KK with figs.pdf:325: resuspended and dispersed as tidal current increase. It is expected, however,

NGCT_Final_ES at KK with figs.pdf:325: tolerant to some degree, to elevations in near-bed suspended sediment

NGCT_Final_ES at KK with figs.pdf:325: increase in suspended sediment concentrations and turbidity

NGCT_Final_ES at KK with figs.pdf:325: 1. The amount of suspended sediment in the water column can influence the depth

NGCT_Final_ES at KK with figs.pdf:325: levels and/or for prolonged periods of time, an increase in suspended sediment

NGCT_Final_ES at KK with figs.pdf:325: suspended sediment concentrations that are predicted beyond the immediate

NGCT_Final_ES at KK with figs.pdf:325: estuarine environment (and therefore tolerance to elevations in suspended

NGCT_Final_ES at KK with figs.pdf:326: which would not have a prolonged effect on suspended sediment

NGCT_Final_ES at KK with figs.pdf:326: 3. Particularly large increases in suspended sediment concentrations are predicted

NGCT_Final_ES at KK with figs.pdf:326: suspended sediment concentrations in these areas does not represent an

NGCT_Final_ES at KK with figs.pdf:326: suspended sediment concentrations is considered to be of negligible

NGCT_Final_ES at KK with figs.pdf:326: 1. Section 7 describes the potential impacts associated with the resuspension and

NGCT_Final_ES at KK with figs.pdf:326: the reclamation, sediments within this area will not be resuspended in the water

NGCT_Final_ES at KK with figs.pdf:327: of the peaks of suspended solids, mean that it is unlikely that dissolved oxygen

NGCT_Final_ES at KK with figs.pdf:351:11.2.5 Effect of increased suspended sediments on the food resource for terns

NGCT_Final_ES at KK with figs.pdf:351: predicted to cause an increase in the peak suspended sediment concentrations

NGCT_Final_ES at KK with figs.pdf:351: the dredger. In Tees Bay, increases in suspended sediment concentrations

NGCT_Final_ES at KK with figs.pdf:352: fish away from the areas of increased suspended sediment concentrations.

NGCT_Final_ES at KK with figs.pdf:352: the basis of the localised area affected by increased suspended concentrations

NGCT_Final_ES at KK with figs.pdf:354: d) Increased import of fine sediments resuspended in Tees Bay;

NGCT_Final_ES at KK with figs.pdf:356: through increasing the suspended sediment concentration of the water column

NGCT_Final_ES at KK with figs.pdf:369: suspended sediment concentrations (SSC) due to dredging and dewatering of

NGCT_Final_ES at KK with figs.pdf:369: 1. The construction phase will result in increases in the suspended sediment

NGCT_Final_ES at KK with figs.pdf:369: characteristics of the change in suspended solids concentrations (SSC) are fully

NGCT_Final_ES at KK with figs.pdf:370: dredger (see Section 9.2). Peak suspended solid concentrations in the main

NGCT_Final_ES at KK with figs.pdf:370: concentrations of suspended solids decrease significantly outside of the

NGCT_Final_ES at KK with figs.pdf:370: suspended solids also occurs when the dredger is located in the main channel

NGCT_Final_ES at KK with figs.pdf:370: adjacent to North Gare Sands, however suspended solid concentrations are

NGCT_Final_ES at KK with figs.pdf:370: significant elevations in suspended sediment concentrations are predicted to

NGCT_Final_ES at KK with figs.pdf:370: suspended sediment concentrations throughout the course of the capital

NGCT_Final_ES at KK with figs.pdf:370: adopted, the overall impact on fish species due to elevations in suspended

NGCT_Final_ES at KK with figs.pdf:370: arise as a result of the resuspension of contaminated sediments during capital

NGCT_Final_ES at KK with figs.pdf:371: discussed in Section 9.2, the resuspension of sediments in the water column is

NGCT_Final_ES at KK with figs.pdf:371: exchange), combined with the short term nature of the increases in suspended

NGCT_Final_ES at KK with figs.pdf:373: the deposition of fine sediment that is suspended and dispersed during capital

NGCT_Final_ES at KK with figs.pdf:407: 3. One possible form of construction is a piled suspended concrete deck. The

NGCT_Final_ES at KK with figs.pdf:436: • Resuspension of road dust, particularly on unmade roads;

NGCT_Final_ES at KK with figs.pdf:455: l/s/m length. . Due to the proposed construction of a suspended deck over the

NGCT_Final_ES at KK with figs.pdf:455: be prevented. The suspended deck would absorb and deflect the waves rather

NGCT_Final_ES at KK with figs.pdf:456: with the loading arm deck at +6.00mOD and a suspended roadway between at

NGCT_Final_ES at KK with figs.pdf:460: settled out of suspension in the immediate vicinity of the dredger. No impact on

NGCT_Final_ES at KK with figs.pdf:460: 2. In the vicinity of the Corus abstraction, suspended solid concentrations are not

NGCT_Final_ES at KK with figs.pdf:460: Again, gross solids will have settled out of suspension within the vicinity of the

NGCT_Final_ES at KK with figs.pdf:478: 4. Measurements of suspended solids concentrations close (approximately 2.25km

NGCT_Final_ES at KK with figs.pdf:478: during neaps. However, the major influence on near bed suspended solids

NGCT_Final_ES at KK with figs.pdf:478: sediment source that remains available for resuspension by smaller waves for 3-

NGCT_Final_ES at KK with figs.pdf:488: of maintenance dredgings and there will be a negligible effect on suspended

NGCT_Final_ES at KK with figs.pdf:492:Increased suspended sediment Peak increases in suspended sediment concentrations of None required It is not appropriate to assess

NGCT_Final_ES at KK with figs.pdf:495:Increase in suspended solid Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:496:Resuspension of chemical Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:496:mobilisation of suspended

NGCT_Final_ES at KK with figs.pdf:496:result of resuspending

NGCT_Final_ES at KK with figs.pdf:496:suspended solids

NGCT_Final_ES at KK with figs.pdf:497:material resuspended by capital

NGCT_Final_ES at KK with figs.pdf:497:material resuspended by capital

NGCT_Final_ES at KK with figs.pdf:497:suspended solids

NGCT_Final_ES at KK with figs.pdf:499:Effect of increased suspended Negligible None required Negligible

NGCT_Final_ES at KK with figs.pdf:501:increases in suspended dredging to occur during the

NGCT_Final_ES at KK with figs.pdf:510: the disposal site boundary. Suspended solids concentrations

NGCT_Final_ES at KK with figs.pdf:518:waters species should not deviate result in an increase in suspended required

NGCT_Final_ES at KK with figs.pdf:526: 15. RPS (2005) concludes that the dredging would result in increases in suspended

NGCT_Final_ES at KK with figs.pdf:539:waves, tides and suspended mud concentrations in Tees Bay. EX 1938.

20171212 EIA Scoping Response Teesport Extension Final.pdf:5: suspended sediments from the dredging activities.

IBPB8270R001F01_EIA REPORT(2).pdf:20:Settling basins will allow suspended sediment to settle out from the mudstone reclamation slurry. Overflow

IBPB8270R001F01_EIA REPORT(2).pdf:20:water from the reclamation will then pass through silt traps to limit the amount of suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:20: of suspended sediment into the river.

IBPB8270R001F01_EIA REPORT(2).pdf:40: • A piled suspended deck structure.

IBPB8270R001F01_EIA REPORT(2).pdf:40:the anchored combi-piled wall from a technical perspective. A piled suspended deck structure could also

IBPB8270R001F01_EIA REPORT(2).pdf:57: • Sediment regime (including background levels of suspended sediment and sources of suspended

IBPB8270R001F01_EIA REPORT(2).pdf:57:sediment deposition with limited natural re-suspension, an average of approximately 1 million m 3 of material

IBPB8270R001F01_EIA REPORT(2).pdf:58:dispersion, deposition and resuspension of released sediment in the Tees estuary. A 3D flow model was

IBPB8270R001F01_EIA REPORT(2).pdf:59:6.3.1 Increase in suspended sediment concentrations and deposition resulting

IBPB8270R001F01_EIA REPORT(2).pdf:59:The modelling predicts that the largest rise in peak suspended sediment concentrations (SSC) above

IBPB8270R001F01_EIA REPORT(2).pdf:59:this zone, it is predicted that the concentrations of suspended solids will be significantly less (approximately

IBPB8270R001F01_EIA REPORT(2).pdf:60:material would settle on Seal Sands. Some resuspension is also anticipated. A similar scenario is predicted

IBPB8270R001F01_EIA REPORT(2).pdf:60:for deposition in Seaton Channel. The dredging is predicted to have little influence on suspended solid

IBPB8270R001F01_EIA REPORT(2).pdf:67:This is because fine material will be released into suspension, some of which will then settle in the various

IBPB8270R001F01_EIA REPORT(2).pdf:72: dispersion of suspended sand due to the effects of both tidal currents and wave stirring. Simulations

IBPB8270R001F01_EIA REPORT(2).pdf:86:become deposited following re-suspension into the water column (see Figure 7.2). The results of the particle

IBPB8270R001F01_EIA REPORT(2).pdf:91:suspension of sediments and release them into the water column as a plume. This would increase the TSS

IBPB8270R001F01_EIA REPORT(2).pdf:91:to the potential resuspension of sediments from a turbidity perspective only (on the basis that the sediment

IBPB8270R001F01_EIA REPORT(2).pdf:91:In general, suspended solids concentrations are low within the Tees estuary and Tees Bay. Background

IBPB8270R001F01_EIA REPORT(2).pdf:91:suspended solid levels in the vicinity of the proposed scheme are, for the most part, less than 20mg/l with

IBPB8270R001F01_EIA REPORT(2).pdf:91:to occur during spring tides with potentially greater suspended solid concentrations occurring during high

IBPB8270R001F01_EIA REPORT(2).pdf:91:further afield (along the tidal axis) compared to dredging in the Tees Dock turning circle. Suspended

IBPB8270R001F01_EIA REPORT(2).pdf:92:It can, therefore, be concluded that the predicted suspended solids concentrations generated by dredging

IBPB8270R001F01_EIA REPORT(2).pdf:92:Given the above, the potential impact to water quality associated with the increase in suspended solids in

IBPB8270R001F01_EIA REPORT(2).pdf:93:demonstrates the nature of the deposition on Seal Sands. As the tide rises, suspended material is carried

IBPB8270R001F01_EIA REPORT(2).pdf:93:be resuspended and redistributed by tidal currents on the following tide given that it will not be consolidated

IBPB8270R001F01_EIA REPORT(2).pdf:95:Limiting re-suspension of sediment during TSHD can be achieved through the following good practice

IBPB8270R001F01_EIA REPORT(2).pdf:95:The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing

IBPB8270R001F01_EIA REPORT(2).pdf:95:The resuspension of sediment as a consequence of the proposed capital dredging could potentially affect

IBPB8270R001F01_EIA REPORT(2).pdf:96:nature of the peaks in suspended solids predicted by the hydrodynamic modelling, the potential impact on

IBPB8270R001F01_EIA REPORT(2).pdf:98:area than this but some of this material is resuspended by higher current speeds either side of slack water.

IBPB8270R001F01_EIA REPORT(2).pdf:104: • Impacts on marine ecology from increases suspended sediment during capital dredging and

IBPB8270R001F01_EIA REPORT(2).pdf:128:9.5.2 Potential impacts to marine ecology from increased total suspended

IBPB8270R001F01_EIA REPORT(2).pdf:128:Sediment resuspension

IBPB8270R001F01_EIA REPORT(2).pdf:128:During capital dredging, a proportion of the material that is dredged would be disturbed and re-suspended

IBPB8270R001F01_EIA REPORT(2).pdf:128:on the potential impact to marine ecology associated with the resuspension of non-contaminated sediment

IBPB8270R001F01_EIA REPORT(2).pdf:128:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

IBPB8270R001F01_EIA REPORT(2).pdf:128:Background suspended solid levels in the vicinity of the proposed scheme are, for the most part, less then

IBPB8270R001F01_EIA REPORT(2).pdf:128:For both types of dredger (CSD and TSHD), peak suspended solids concentrations (i.e. up to 500mg/l above

IBPB8270R001F01_EIA REPORT(2).pdf:128:in suspended sediment. This information is presented below.

IBPB8270R001F01_EIA REPORT(2).pdf:129:be of low sensitivity to increases in suspended sediment.

IBPB8270R001F01_EIA REPORT(2).pdf:129:resistance and resilience to changes in suspended sediment, and low sensitivity (to changes in suspended

IBPB8270R001F01_EIA REPORT(2).pdf:129:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

IBPB8270R001F01_EIA REPORT(2).pdf:129:the low sensitivity of the key species present in the estuary to increased suspended sediment, an impact of

IBPB8270R001F01_EIA REPORT(2).pdf:129:Smothering caused by sedimentation of material resuspended by capital dredging within intertidal

IBPB8270R001F01_EIA REPORT(2).pdf:129:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

IBPB8270R001F01_EIA REPORT(2).pdf:130:Smothering caused by sedimentation of material resuspended by capital dredging within subtidal

IBPB8270R001F01_EIA REPORT(2).pdf:130:5mm). This deposition occurs over the slack water period and would be subsequently resuspended and

IBPB8270R001F01_EIA REPORT(2).pdf:156:As discussed in Section 6, the proposed capital dredge and reclamation process would cause suspension

IBPB8270R001F01_EIA REPORT(2).pdf:156:prey due to the resuspension of sediment which contains concentrations of contaminants in excess of Action

IBPB8270R001F01_EIA REPORT(2).pdf:156:impacts to little tern foraging ability as a result of increased suspended sediments during the construction

IBPB8270R001F01_EIA REPORT(2).pdf:158:and re-suspension of sediment (Cook and Burton, 2010). Common tern have been reported to have a high

IBPB8270R001F01_EIA REPORT(2).pdf:159:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD

IBPB8270R001F01_EIA REPORT(2).pdf:159:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT(2).pdf:159:and tending to be more confined to the shallower waters. Mitigation of the suspended sediment generated

IBPB8270R001F01_EIA REPORT(2).pdf:164: • increased import of fine sediments resuspended in Tees Bay;

IBPB8270R001F01_EIA REPORT(2).pdf:168: • Impacts caused by increased suspended sediment during capital dredging and dewatering during

IBPB8270R001F01_EIA REPORT(2).pdf:187:12.5.2 Potential impacts on shellfish and fish caused by increases in suspended

IBPB8270R001F01_EIA REPORT(2).pdf:187:located in the Tees Dock turning circle or in the area of the proposed quay wall, concentrations of suspended

IBPB8270R001F01_EIA REPORT(2).pdf:187:in suspended solids also occurs when the dredger is located in the main channel adjacent to North Gare

IBPB8270R001F01_EIA REPORT(2).pdf:188:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT(2).pdf:188:suspended into the water column. Hence, the construction phase would result in temporary increases in

IBPB8270R001F01_EIA REPORT(2).pdf:188:assessment presented below relates to the potential impact on fish due to the resuspension of non-

IBPB8270R001F01_EIA REPORT(2).pdf:189:The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect

IBPB8270R001F01_EIA REPORT(2).pdf:189:It has also been reported that dredging activities often generate no more increased suspended sediments

IBPB8270R001F01_EIA REPORT(2).pdf:189:floods and large tides can increase suspended sediments over much larger areas, for longer periods that

IBPB8270R001F01_EIA REPORT(2).pdf:189:fish (Forewind, 2014). For lethal effects to occur, concentrations of suspended sediment have to be on the

IBPB8270R001F01_EIA REPORT(2).pdf:189:Peak suspended solid concentrations in the main channel are predicted to be significantly affected by the

IBPB8270R001F01_EIA REPORT(2).pdf:189:wall, concentrations of suspended solids decrease significantly outside of the immediate vicinity of the

IBPB8270R001F01_EIA REPORT(2).pdf:189:decrease in suspended solids also occurs when the dredger is located in the main channel adjacent to North

IBPB8270R001F01_EIA REPORT(2).pdf:189:Gare Sands, however suspended solid concentrations are predicted to remain above natural variation both

IBPB8270R001F01_EIA REPORT(2).pdf:189:high sensitivity of resident and migratory fish in the Tees to increases in suspended sediment, an overall

IBPB8270R001F01_EIA REPORT(2).pdf:190:the Tees to increased suspended sediment. Based on the information available on MarLIN for the dominant

IBPB8270R001F01_EIA REPORT(2).pdf:190:‘tolerant’ and ‘not sensitive’ to increases in suspended sediment.

IBPB8270R001F01_EIA REPORT(2).pdf:190:The controls outlined in Section 7 with regard to minimising suspended sediment load during dredging are

IBPB8270R001F01_EIA REPORT(2).pdf:221:at +6.00mOD and a suspended roadway between at +8.00mOD. The slag embankment has a slope of 1 in

IBPB8270R001F01_EIA REPORT(2).pdf:226:increase in total suspended solid concentrations could impact upon the processes for which the water is

IBPB8270R001F01_EIA REPORT(2).pdf:226:settled out of suspension in the immediate vicinity of the dredger (see Section 6 for further detail). No

IBPB8270R001F01_EIA REPORT(2).pdf:226:In the vicinity of the Corus abstraction and the Tees Bulk Handling abstraction, suspended solid

IBPB8270R001F01_EIA REPORT(2).pdf:226:quality in the vicinity of the abstraction point due to increased suspended sediment would be temporary in

IBPB8270R001F01_EIA REPORT(2).pdf:256: Increase in suspended

IBPB8270R001F01_EIA REPORT(2).pdf:256:sensitive to smothering or increases in suspended sediment.

IBPB8270R001F01_EIA REPORT(2).pdf:259:disturbance and increased suspended sediments on migratory fish).

IBPB8270R001F01_EIA REPORT(2).pdf:266: • dispersion of suspended sediment during capital dredging and deposition;

IBPB8270R001F01_EIA REPORT(2).pdf:266:Dispersion of suspended sediment and deposition on the seabed during capital dredging

IBPB8270R001F01_EIA REPORT(2).pdf:266:immediately after the period of construction. This is because fine material will be released into suspension,

IBPB8270R001F01_EIA REPORT(2).pdf:267:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

IBPB8270R001F01_EIA REPORT(2).pdf:267:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

IBPB8270R001F01_EIA REPORT(2).pdf:267:increase with no long-term accumulation on the seabed at the initial point of deposition. The suspended

IBPB8270R001F01_EIA REPORT(2).pdf:267:Figure 27.1 Predicted increase in suspended sediment concentration (left) and deposition on the seabed

IBPB8270R001F01_EIA REPORT(2).pdf:268:Figure 27.3 Predicted increase in suspended sediment concentration (left) and deposition on the seabed

IBPB8270R001F01_EIA REPORT(2).pdf:269:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

IBPB8270R001F01_EIA REPORT(2).pdf:269:sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. This

IBPB8270R001F01_EIA REPORT(2).pdf:271:Potential for cumulative increase in suspended sediment during capital and maintenance dredging

IBPB8270R001F01_EIA REPORT(2).pdf:271:peak suspended sediment above those normally experienced in the estuary (this effect would be additive).

IBPB8270R001F01_EIA REPORT(2).pdf:274:Potential effect on waterbird feeding resource due to increased suspended sediment during capital

IBPB8270R001F01_EIA REPORT(2).pdf:298:Reductions in water quality due to resuspension of sediment

IBPB8270R001F01_EIA REPORT(2).pdf:298:interest features of the pSPA and Ramsar site is therefore via an increase in suspended sediment within

IBPB8270R001F01_EIA REPORT(2).pdf:298:Figures 6.2 to 6.4 indicate that the magnitude of the effect (i.e. increased suspended sediment) is likely to

IBPB8270R001F01_EIA REPORT(2).pdf:298:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD

IBPB8270R001F01_EIA REPORT(2).pdf:299:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT(2).pdf:299:the shallower waters. Mitigation of the suspended sediment generated by reducing the size of the dredger,

IBPB8270R001F01_EIA REPORT(2).pdf:302:from the area of increased suspended sediment. It should be noted, however, that the effect of the combined

IBPB8270R001F01_EIA REPORT(2).pdf:303:the potential for the re-suspension of contaminated sediment and subsequent deposition over other areas

IBPB8270R001F01_EIA REPORT(2).pdf:303:The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the

IBPB8270R001F01_EIA REPORT(2).pdf:303:species was predicted due to either suspended sediments or habitat change. As outlined in Section 12, the

IBPB8270R001F01_EIA REPORT(2).pdf:303:Given the conclusions of the Dogger Bank A and B assessment (i.e. no significant effect on suspended

IBPB8270R001F01_EIA REPORT(2).pdf:303:with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

IBPB8270R001F01_EIA REPORT(2).pdf:317:(25) A programme of monitoring of dissolved oxygen and suspended solid

IBPB8270R001F01_EIA REPORT(2).pdf:317:until a scheme for water column monitoring (water quality) and suspended

IBPB8270R001F01_EIA REPORT(2).pdf:342: 1. In general, suspended sediment concentrations are low within the estuary and

IBPB8270R001F01_EIA REPORT(2).pdf:342: high rainfall or storm events. In general, the suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:342: of the proposed development (i.e. in the Tees Dock area) suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:342: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:342: suspended sediment have been noted around the Shell Jetty, but with little

IBPB8270R001F01_EIA REPORT(2).pdf:343: driven currents, wave induced currents, vessel induced forces and resuspension

IBPB8270R001F01_EIA REPORT(2).pdf:343: resuspended and moved further upstream into the estuary.

IBPB8270R001F01_EIA REPORT(2).pdf:343: concentrations in Tees Bay are raised by the resuspension of material from the

IBPB8270R001F01_EIA REPORT(2).pdf:345: d) Losses of suspended sediment are inevitable at the dredging face or draghead,

IBPB8270R001F01_EIA REPORT(2).pdf:346: remain in suspension, forming a sediment plume. The plume from the overspill

IBPB8270R001F01_EIA REPORT(2).pdf:346: discharge is an order of magnitude greater than sediment resuspension from the

IBPB8270R001F01_EIA REPORT(2).pdf:346: plumes of suspended fine sediment. Importantly the TSHD will result in a

IBPB8270R001F01_EIA REPORT(2).pdf:346: simulate the dispersion, deposition and resuspension of the released sediment

IBPB8270R001F01_EIA REPORT(2).pdf:346: and calculates areas in which suspended particles may settle on the bed, either

IBPB8270R001F01_EIA REPORT(2).pdf:346: walk technique. The deposition and resuspension of particles at the seabed are

IBPB8270R001F01_EIA REPORT(2).pdf:349: CSD in terms of predicted peak concentration of suspended sediments and peak

IBPB8270R001F01_EIA REPORT(2).pdf:352: is predicted to increase suspended sediment concentrations by 500mg/l in the

IBPB8270R001F01_EIA REPORT(2).pdf:352: of the run-off from the reclamation. Increases in suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:352: suspended sediment concentrations over Seal Sands and in the Seaton

IBPB8270R001F01_EIA REPORT(2).pdf:353: wave action occurred it would be expected to be resuspended. A similar

IBPB8270R001F01_EIA REPORT(2).pdf:353: suspended sediment concentrations and deposition at Bran Sands and North

IBPB8270R001F01_EIA REPORT(2).pdf:375: transport model that simulates the advection and dispersion of suspended

IBPB8270R001F01_EIA REPORT(2).pdf:376: the flood tide period having been resuspended from the seabed in Tees Bay (i.e.

IBPB8270R001F01_EIA REPORT(2).pdf:376: resuspension and upstream movement as a result of agitation by dredging

IBPB8270R001F01_EIA REPORT(2).pdf:377: 1. The dispersion of suspended solids released into Dabholm Gut through licensed

IBPB8270R001F01_EIA REPORT(2).pdf:377: 2. The model predictions indicate that the distributions of suspended and deposited

IBPB8270R001F01_EIA REPORT(2).pdf:377: that following the proposed development the core of the plume of suspended

IBPB8270R001F01_EIA REPORT(2).pdf:378: • Increased import of fine sediments resuspended in Tees Bay;

IBPB8270R001F01_EIA REPORT(2).pdf:391:Quay construction would entail either a mass concrete gravity wall or a piled suspended concrete deck.

IBPB8270R001F01_EIA REPORT(2).pdf:391:the suspended concrete deck quay structure would be bored concrete piles formed within steel tubes.

IBPB8270R001F01_EIA REPORT(2).pdf:400:a sealed barge to minimise re-suspension of sediment into the water column. No such requirements

IBPB8270R001F01_EIA REPORT(2).pdf:404:minimise the resuspension of sediment into the water column.

IBPB8270R001F01_EIA REPORT(2).pdf:424:loading into a sealed barge to minimise re-suspension of sediment into the water column. No such

IBPB8270R001F01_EIA REPORT(2).pdf:496:with grain size (Witbaard et al. 2019). High levels of fine or suspended sediments may impact A. islandica growth

IBPB8270R001F01_EIA REPORT(2).pdf:511:the proposed construction options for the berth. One option is based on forming a suspended

IBPB8270R001F01_EIA REPORT(2).pdf:634:been used to simulate dispersion, deposition and suspension of released sediment in the Tees estuary. A

IBPB8270R001F01_EIA REPORT(2).pdf:636:The deposition of fine sediment resuspended by the dredging process is not anticipated to impact on the

IBPB8270R001F01_EIA REPORT(2).pdf:636:The construction phase will result in increases in the suspended sediment concentration of the water

IBPB8270R001F01_EIA REPORT(2).pdf:636:of sediment plumes during dredging was modelled. The largest rise in peak suspended sediment

IBPB8270R001F01_EIA REPORT(2).pdf:636:It is predicted that the increase in suspended solid concentrations arising during capital dredging would be

IBPB8270R001F01_EIA REPORT(2).pdf:636:undertaken to inform the EIA has predicted that peak suspended solid concentrations in the main channel

IBPB8270R001F01_EIA REPORT(2).pdf:636:circle or in the area of the proposed quay wall, concentrations of suspended solids decrease significantly

IBPB8270R001F01_EIA REPORT(2).pdf:636:the vessel. This significant decrease in suspended solids also occurs when the dredger is located in the

IBPB8270R001F01_EIA REPORT(2).pdf:636:main channel adjacent to North Gare Sands, however suspended solid concentrations are predicted to

IBPB8270R001F01_EIA REPORT(2).pdf:637:sediment is anticipated to fall out of suspension within the immediate vicinity of the dredger, particularly in

IBPB8270R001F01_EIA REPORT(2).pdf:637:to increases in suspended sediment concentrations, the effects are short term and will only occur during

IBPB8270R001F01_EIA REPORT(2).pdf:658: Could affect water clarity, temperature, During the reclamation process, settling basins will allow suspended sediment to settle out this water body

IBPB8270R001F01_EIA REPORT(2).pdf:658: patterns continuously for longer than a spring pass through silt traps to limit the amount of suspended sediment discharged to the river.

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:14:quality associated with the increase in suspension, dispersion, remobilisation and

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:14:redistribution of suspended solids would lead residual impacts of negligible

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:15: and suspended solid concentrations monitoring.

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:15: monitoring and suspended sediment monitoring.

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:22:suspended sediment concentrations (SSC) would have any significant impact on

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:22: • Impacts caused by increased suspended sediment during capital dredging

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:25:Tees is considered to be low and the impact to shellfish from increased suspended

IBPB8270R001F01_EIA REPORT.pdf:20:Settling basins will allow suspended sediment to settle out from the mudstone reclamation slurry. Overflow

IBPB8270R001F01_EIA REPORT.pdf:20:water from the reclamation will then pass through silt traps to limit the amount of suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:20: of suspended sediment into the river.

IBPB8270R001F01_EIA REPORT.pdf:40: • A piled suspended deck structure.

IBPB8270R001F01_EIA REPORT.pdf:40:the anchored combi-piled wall from a technical perspective. A piled suspended deck structure could also

IBPB8270R001F01_EIA REPORT.pdf:57: • Sediment regime (including background levels of suspended sediment and sources of suspended

IBPB8270R001F01_EIA REPORT.pdf:57:sediment deposition with limited natural re-suspension, an average of approximately 1 million m 3 of material

IBPB8270R001F01_EIA REPORT.pdf:58:dispersion, deposition and resuspension of released sediment in the Tees estuary. A 3D flow model was

IBPB8270R001F01_EIA REPORT.pdf:59:6.3.1 Increase in suspended sediment concentrations and deposition resulting

IBPB8270R001F01_EIA REPORT.pdf:59:The modelling predicts that the largest rise in peak suspended sediment concentrations (SSC) above

IBPB8270R001F01_EIA REPORT.pdf:59:this zone, it is predicted that the concentrations of suspended solids will be significantly less (approximately

IBPB8270R001F01_EIA REPORT.pdf:60:material would settle on Seal Sands. Some resuspension is also anticipated. A similar scenario is predicted

IBPB8270R001F01_EIA REPORT.pdf:60:for deposition in Seaton Channel. The dredging is predicted to have little influence on suspended solid

IBPB8270R001F01_EIA REPORT.pdf:67:This is because fine material will be released into suspension, some of which will then settle in the various

IBPB8270R001F01_EIA REPORT.pdf:72: dispersion of suspended sand due to the effects of both tidal currents and wave stirring. Simulations

IBPB8270R001F01_EIA REPORT.pdf:86:become deposited following re-suspension into the water column (see Figure 7.2). The results of the particle

IBPB8270R001F01_EIA REPORT.pdf:91:suspension of sediments and release them into the water column as a plume. This would increase the TSS

IBPB8270R001F01_EIA REPORT.pdf:91:to the potential resuspension of sediments from a turbidity perspective only (on the basis that the sediment

IBPB8270R001F01_EIA REPORT.pdf:91:In general, suspended solids concentrations are low within the Tees estuary and Tees Bay. Background

IBPB8270R001F01_EIA REPORT.pdf:91:suspended solid levels in the vicinity of the proposed scheme are, for the most part, less than 20mg/l with

IBPB8270R001F01_EIA REPORT.pdf:91:to occur during spring tides with potentially greater suspended solid concentrations occurring during high

IBPB8270R001F01_EIA REPORT.pdf:91:further afield (along the tidal axis) compared to dredging in the Tees Dock turning circle. Suspended

IBPB8270R001F01_EIA REPORT.pdf:92:It can, therefore, be concluded that the predicted suspended solids concentrations generated by dredging

IBPB8270R001F01_EIA REPORT.pdf:92:Given the above, the potential impact to water quality associated with the increase in suspended solids in

IBPB8270R001F01_EIA REPORT.pdf:93:demonstrates the nature of the deposition on Seal Sands. As the tide rises, suspended material is carried

IBPB8270R001F01_EIA REPORT.pdf:93:be resuspended and redistributed by tidal currents on the following tide given that it will not be consolidated

IBPB8270R001F01_EIA REPORT.pdf:95:Limiting re-suspension of sediment during TSHD can be achieved through the following good practice

IBPB8270R001F01_EIA REPORT.pdf:95:The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing

IBPB8270R001F01_EIA REPORT.pdf:95:The resuspension of sediment as a consequence of the proposed capital dredging could potentially affect

IBPB8270R001F01_EIA REPORT.pdf:96:nature of the peaks in suspended solids predicted by the hydrodynamic modelling, the potential impact on

IBPB8270R001F01_EIA REPORT.pdf:98:area than this but some of this material is resuspended by higher current speeds either side of slack water.

IBPB8270R001F01_EIA REPORT.pdf:104: • Impacts on marine ecology from increases suspended sediment during capital dredging and

IBPB8270R001F01_EIA REPORT.pdf:128:9.5.2 Potential impacts to marine ecology from increased total suspended

IBPB8270R001F01_EIA REPORT.pdf:128:Sediment resuspension

IBPB8270R001F01_EIA REPORT.pdf:128:During capital dredging, a proportion of the material that is dredged would be disturbed and re-suspended

IBPB8270R001F01_EIA REPORT.pdf:128:on the potential impact to marine ecology associated with the resuspension of non-contaminated sediment

IBPB8270R001F01_EIA REPORT.pdf:128:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

IBPB8270R001F01_EIA REPORT.pdf:128:Background suspended solid levels in the vicinity of the proposed scheme are, for the most part, less then

IBPB8270R001F01_EIA REPORT.pdf:128:For both types of dredger (CSD and TSHD), peak suspended solids concentrations (i.e. up to 500mg/l above

IBPB8270R001F01_EIA REPORT.pdf:128:in suspended sediment. This information is presented below.

IBPB8270R001F01_EIA REPORT.pdf:129:be of low sensitivity to increases in suspended sediment.

IBPB8270R001F01_EIA REPORT.pdf:129:resistance and resilience to changes in suspended sediment, and low sensitivity (to changes in suspended

IBPB8270R001F01_EIA REPORT.pdf:129:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

IBPB8270R001F01_EIA REPORT.pdf:129:the low sensitivity of the key species present in the estuary to increased suspended sediment, an impact of

IBPB8270R001F01_EIA REPORT.pdf:129:Smothering caused by sedimentation of material resuspended by capital dredging within intertidal

IBPB8270R001F01_EIA REPORT.pdf:129:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

IBPB8270R001F01_EIA REPORT.pdf:130:Smothering caused by sedimentation of material resuspended by capital dredging within subtidal

IBPB8270R001F01_EIA REPORT.pdf:130:5mm). This deposition occurs over the slack water period and would be subsequently resuspended and

IBPB8270R001F01_EIA REPORT.pdf:156:As discussed in Section 6, the proposed capital dredge and reclamation process would cause suspension

IBPB8270R001F01_EIA REPORT.pdf:156:prey due to the resuspension of sediment which contains concentrations of contaminants in excess of Action

IBPB8270R001F01_EIA REPORT.pdf:156:impacts to little tern foraging ability as a result of increased suspended sediments during the construction

IBPB8270R001F01_EIA REPORT.pdf:158:and re-suspension of sediment (Cook and Burton, 2010). Common tern have been reported to have a high

IBPB8270R001F01_EIA REPORT.pdf:159:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD

IBPB8270R001F01_EIA REPORT.pdf:159:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT.pdf:159:and tending to be more confined to the shallower waters. Mitigation of the suspended sediment generated

IBPB8270R001F01_EIA REPORT.pdf:164: • increased import of fine sediments resuspended in Tees Bay;

IBPB8270R001F01_EIA REPORT.pdf:168: • Impacts caused by increased suspended sediment during capital dredging and dewatering during

IBPB8270R001F01_EIA REPORT.pdf:187:12.5.2 Potential impacts on shellfish and fish caused by increases in suspended

IBPB8270R001F01_EIA REPORT.pdf:187:located in the Tees Dock turning circle or in the area of the proposed quay wall, concentrations of suspended

IBPB8270R001F01_EIA REPORT.pdf:187:in suspended solids also occurs when the dredger is located in the main channel adjacent to North Gare

IBPB8270R001F01_EIA REPORT.pdf:188:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT.pdf:188:suspended into the water column. Hence, the construction phase would result in temporary increases in

IBPB8270R001F01_EIA REPORT.pdf:188:assessment presented below relates to the potential impact on fish due to the resuspension of non-

IBPB8270R001F01_EIA REPORT.pdf:189:The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect

IBPB8270R001F01_EIA REPORT.pdf:189:It has also been reported that dredging activities often generate no more increased suspended sediments

IBPB8270R001F01_EIA REPORT.pdf:189:floods and large tides can increase suspended sediments over much larger areas, for longer periods that

IBPB8270R001F01_EIA REPORT.pdf:189:fish (Forewind, 2014). For lethal effects to occur, concentrations of suspended sediment have to be on the

IBPB8270R001F01_EIA REPORT.pdf:189:Peak suspended solid concentrations in the main channel are predicted to be significantly affected by the

IBPB8270R001F01_EIA REPORT.pdf:189:wall, concentrations of suspended solids decrease significantly outside of the immediate vicinity of the

IBPB8270R001F01_EIA REPORT.pdf:189:decrease in suspended solids also occurs when the dredger is located in the main channel adjacent to North

IBPB8270R001F01_EIA REPORT.pdf:189:Gare Sands, however suspended solid concentrations are predicted to remain above natural variation both

IBPB8270R001F01_EIA REPORT.pdf:189:high sensitivity of resident and migratory fish in the Tees to increases in suspended sediment, an overall

IBPB8270R001F01_EIA REPORT.pdf:190:the Tees to increased suspended sediment. Based on the information available on MarLIN for the dominant

IBPB8270R001F01_EIA REPORT.pdf:190:‘tolerant’ and ‘not sensitive’ to increases in suspended sediment.

IBPB8270R001F01_EIA REPORT.pdf:190:The controls outlined in Section 7 with regard to minimising suspended sediment load during dredging are

IBPB8270R001F01_EIA REPORT.pdf:221:at +6.00mOD and a suspended roadway between at +8.00mOD. The slag embankment has a slope of 1 in

IBPB8270R001F01_EIA REPORT.pdf:226:increase in total suspended solid concentrations could impact upon the processes for which the water is

IBPB8270R001F01_EIA REPORT.pdf:226:settled out of suspension in the immediate vicinity of the dredger (see Section 6 for further detail). No

IBPB8270R001F01_EIA REPORT.pdf:226:In the vicinity of the Corus abstraction and the Tees Bulk Handling abstraction, suspended solid

IBPB8270R001F01_EIA REPORT.pdf:226:quality in the vicinity of the abstraction point due to increased suspended sediment would be temporary in

IBPB8270R001F01_EIA REPORT.pdf:256: Increase in suspended

IBPB8270R001F01_EIA REPORT.pdf:256:sensitive to smothering or increases in suspended sediment.

IBPB8270R001F01_EIA REPORT.pdf:259:disturbance and increased suspended sediments on migratory fish).

IBPB8270R001F01_EIA REPORT.pdf:266: • dispersion of suspended sediment during capital dredging and deposition;

IBPB8270R001F01_EIA REPORT.pdf:266:Dispersion of suspended sediment and deposition on the seabed during capital dredging

IBPB8270R001F01_EIA REPORT.pdf:266:immediately after the period of construction. This is because fine material will be released into suspension,

IBPB8270R001F01_EIA REPORT.pdf:267:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

IBPB8270R001F01_EIA REPORT.pdf:267:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

IBPB8270R001F01_EIA REPORT.pdf:267:increase with no long-term accumulation on the seabed at the initial point of deposition. The suspended

IBPB8270R001F01_EIA REPORT.pdf:267:Figure 27.1 Predicted increase in suspended sediment concentration (left) and deposition on the seabed

IBPB8270R001F01_EIA REPORT.pdf:268:Figure 27.3 Predicted increase in suspended sediment concentration (left) and deposition on the seabed

IBPB8270R001F01_EIA REPORT.pdf:269:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

IBPB8270R001F01_EIA REPORT.pdf:269:sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. This

IBPB8270R001F01_EIA REPORT.pdf:271:Potential for cumulative increase in suspended sediment during capital and maintenance dredging

IBPB8270R001F01_EIA REPORT.pdf:271:peak suspended sediment above those normally experienced in the estuary (this effect would be additive).

IBPB8270R001F01_EIA REPORT.pdf:274:Potential effect on waterbird feeding resource due to increased suspended sediment during capital

IBPB8270R001F01_EIA REPORT.pdf:298:Reductions in water quality due to resuspension of sediment

IBPB8270R001F01_EIA REPORT.pdf:298:interest features of the pSPA and Ramsar site is therefore via an increase in suspended sediment within

IBPB8270R001F01_EIA REPORT.pdf:298:Figures 6.2 to 6.4 indicate that the magnitude of the effect (i.e. increased suspended sediment) is likely to

IBPB8270R001F01_EIA REPORT.pdf:298:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD

IBPB8270R001F01_EIA REPORT.pdf:299:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the

IBPB8270R001F01_EIA REPORT.pdf:299:the shallower waters. Mitigation of the suspended sediment generated by reducing the size of the dredger,

IBPB8270R001F01_EIA REPORT.pdf:302:from the area of increased suspended sediment. It should be noted, however, that the effect of the combined

IBPB8270R001F01_EIA REPORT.pdf:303:the potential for the re-suspension of contaminated sediment and subsequent deposition over other areas

IBPB8270R001F01_EIA REPORT.pdf:303:The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the

IBPB8270R001F01_EIA REPORT.pdf:303:species was predicted due to either suspended sediments or habitat change. As outlined in Section 12, the

IBPB8270R001F01_EIA REPORT.pdf:303:Given the conclusions of the Dogger Bank A and B assessment (i.e. no significant effect on suspended

IBPB8270R001F01_EIA REPORT.pdf:303:with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

IBPB8270R001F01_EIA REPORT.pdf:317:(25) A programme of monitoring of dissolved oxygen and suspended solid

IBPB8270R001F01_EIA REPORT.pdf:317:until a scheme for water column monitoring (water quality) and suspended

IBPB8270R001F01_EIA REPORT.pdf:342: 1. In general, suspended sediment concentrations are low within the estuary and

IBPB8270R001F01_EIA REPORT.pdf:342: high rainfall or storm events. In general, the suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:342: of the proposed development (i.e. in the Tees Dock area) suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:342: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:342: suspended sediment have been noted around the Shell Jetty, but with little

IBPB8270R001F01_EIA REPORT.pdf:343: driven currents, wave induced currents, vessel induced forces and resuspension

IBPB8270R001F01_EIA REPORT.pdf:343: resuspended and moved further upstream into the estuary.

IBPB8270R001F01_EIA REPORT.pdf:343: concentrations in Tees Bay are raised by the resuspension of material from the

IBPB8270R001F01_EIA REPORT.pdf:345: d) Losses of suspended sediment are inevitable at the dredging face or draghead,

IBPB8270R001F01_EIA REPORT.pdf:346: remain in suspension, forming a sediment plume. The plume from the overspill

IBPB8270R001F01_EIA REPORT.pdf:346: discharge is an order of magnitude greater than sediment resuspension from the

IBPB8270R001F01_EIA REPORT.pdf:346: plumes of suspended fine sediment. Importantly the TSHD will result in a

IBPB8270R001F01_EIA REPORT.pdf:346: simulate the dispersion, deposition and resuspension of the released sediment

IBPB8270R001F01_EIA REPORT.pdf:346: and calculates areas in which suspended particles may settle on the bed, either

IBPB8270R001F01_EIA REPORT.pdf:346: walk technique. The deposition and resuspension of particles at the seabed are

IBPB8270R001F01_EIA REPORT.pdf:349: CSD in terms of predicted peak concentration of suspended sediments and peak

IBPB8270R001F01_EIA REPORT.pdf:352: is predicted to increase suspended sediment concentrations by 500mg/l in the

IBPB8270R001F01_EIA REPORT.pdf:352: of the run-off from the reclamation. Increases in suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:352: suspended sediment concentrations over Seal Sands and in the Seaton

IBPB8270R001F01_EIA REPORT.pdf:353: wave action occurred it would be expected to be resuspended. A similar

IBPB8270R001F01_EIA REPORT.pdf:353: suspended sediment concentrations and deposition at Bran Sands and North

IBPB8270R001F01_EIA REPORT.pdf:375: transport model that simulates the advection and dispersion of suspended

IBPB8270R001F01_EIA REPORT.pdf:376: the flood tide period having been resuspended from the seabed in Tees Bay (i.e.

IBPB8270R001F01_EIA REPORT.pdf:376: resuspension and upstream movement as a result of agitation by dredging

IBPB8270R001F01_EIA REPORT.pdf:377: 1. The dispersion of suspended solids released into Dabholm Gut through licensed

IBPB8270R001F01_EIA REPORT.pdf:377: 2. The model predictions indicate that the distributions of suspended and deposited

IBPB8270R001F01_EIA REPORT.pdf:377: that following the proposed development the core of the plume of suspended

IBPB8270R001F01_EIA REPORT.pdf:378: • Increased import of fine sediments resuspended in Tees Bay;

IBPB8270R001F01_EIA REPORT.pdf:391:Quay construction would entail either a mass concrete gravity wall or a piled suspended concrete deck.

IBPB8270R001F01_EIA REPORT.pdf:391:the suspended concrete deck quay structure would be bored concrete piles formed within steel tubes.

IBPB8270R001F01_EIA REPORT.pdf:400:a sealed barge to minimise re-suspension of sediment into the water column. No such requirements

IBPB8270R001F01_EIA REPORT.pdf:404:minimise the resuspension of sediment into the water column.

IBPB8270R001F01_EIA REPORT.pdf:424:loading into a sealed barge to minimise re-suspension of sediment into the water column. No such

IBPB8270R001F01_EIA REPORT.pdf:496:with grain size (Witbaard et al. 2019). High levels of fine or suspended sediments may impact A. islandica growth

IBPB8270R001F01_EIA REPORT.pdf:511:the proposed construction options for the berth. One option is based on forming a suspended

IBPB8270R001F01_EIA REPORT.pdf:634:been used to simulate dispersion, deposition and suspension of released sediment in the Tees estuary. A

IBPB8270R001F01_EIA REPORT.pdf:636:The deposition of fine sediment resuspended by the dredging process is not anticipated to impact on the

IBPB8270R001F01_EIA REPORT.pdf:636:The construction phase will result in increases in the suspended sediment concentration of the water

IBPB8270R001F01_EIA REPORT.pdf:636:of sediment plumes during dredging was modelled. The largest rise in peak suspended sediment

IBPB8270R001F01_EIA REPORT.pdf:636:It is predicted that the increase in suspended solid concentrations arising during capital dredging would be

IBPB8270R001F01_EIA REPORT.pdf:636:undertaken to inform the EIA has predicted that peak suspended solid concentrations in the main channel

IBPB8270R001F01_EIA REPORT.pdf:636:circle or in the area of the proposed quay wall, concentrations of suspended solids decrease significantly

IBPB8270R001F01_EIA REPORT.pdf:636:the vessel. This significant decrease in suspended solids also occurs when the dredger is located in the

IBPB8270R001F01_EIA REPORT.pdf:636:main channel adjacent to North Gare Sands, however suspended solid concentrations are predicted to

IBPB8270R001F01_EIA REPORT.pdf:637:sediment is anticipated to fall out of suspension within the immediate vicinity of the dredger, particularly in

IBPB8270R001F01_EIA REPORT.pdf:637:to increases in suspended sediment concentrations, the effects are short term and will only occur during

IBPB8270R001F01_EIA REPORT.pdf:658: Could affect water clarity, temperature, During the reclamation process, settling basins will allow suspended sediment to settle out this water body

IBPB8270R001F01_EIA REPORT.pdf:658: patterns continuously for longer than a spring pass through silt traps to limit the amount of suspended sediment discharged to the river.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:8: • A piled suspended deck structure.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:8:A piled suspended deck structure could also be an appropriate option from a technical perspective and

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:10:dispersion, deposition and resuspension of released sediment in the Tees estuary during the construction

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:10:The largest rise in peak suspended sediment concentrations above background concentrations is predicted

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:10:the predicted increases in concentrations of suspended sediment above background are significantly less.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:11:a temporary basis due to increased suspended sediment concentrations.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:11:suspension of sediments as a result of dredging or runoff from the reclamation. In addition, the following

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:13:and migratory fish due to the resuspension of sediments. The adoption of the mitigation measures outlined

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:suspended sediment than predicted for the NGCT alone, but with the same predicted spatial extent of the

Licence Document (Marine).pdf:21:being taken. This can include variation, revocation or suspension of the licence,

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:14:quality associated with the increase in suspension, dispersion, remobilisation and

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:14:redistribution of suspended solids would lead residual impacts of negligible

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:15: and suspended solid concentrations monitoring.

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:15: monitoring and suspended sediment monitoring.

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:22:suspended sediment concentrations (SSC) would have any significant impact on

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:22: • Impacts caused by increased suspended sediment during capital dredging

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:25:Tees is considered to be low and the impact to shellfish from increased suspended

Decision Letter (Marine).pdf:2:fail to comply with all the conditions in the licence we may vary, suspend or revoke your

Decision Letter (Marine).pdf:2:suspending or revoking the licence. Our terms and conditions relating to charging can

MLA_2021_00215-Licence Document (Marine)-20.pdf:7:suspended deck structure detailed above, requiring the

MLA_2021_00215-Licence Document (Marine)-20.pdf:7:will be installed between the bankseat and suspended

MLA_2021_00215-Licence Document (Marine)-20.pdf:8:time as the tubular piles required for the new suspended

MLA_2021_00215-Licence Document (Marine)-20.pdf:16:being taken. This can include variation, revocation or suspension of the licence,

MLA_2021_00215-Licence Document (Marine)-16.pdf:5:disposal of dredged materials, a new suspended deck structure and new sheet pile

MLA_2021_00215-Licence Document (Marine)-16.pdf:6: further back from its current location. A new suspended

MLA_2021_00215-Licence Document (Marine)-16.pdf:6:Methodology Suspended deck structure

MLA_2021_00215-Licence Document (Marine)-16.pdf:6: The suspended deck will be a piled structure with a

MLA_2021_00215-Licence Document (Marine)-16.pdf:6: at the back of the new suspended deck structure to retain

MLA_2021_00215-Licence Document (Marine)-16.pdf:7:suspended deck quay structure will be formed of

MLA_2021_00215-Licence Document (Marine)-16.pdf:7:suspended deck structure detailed above, requiring the

MLA_2021_00215-Licence Document (Marine)-16.pdf:7:bankseat and suspended deck structure in dry conditions.

MLA_2021_00215-Licence Document (Marine)-16.pdf:8:at the back of the new suspended deck structure, and

MLA_2021_00215-Licence Document (Marine)-16.pdf:8:in the new bankseat and suspended deck. The anchored

MLA_2021_00215-Licence Document (Marine)-16.pdf:9: time as the tubular piles required for the new suspended

MLA_2021_00215-Licence Document (Marine)-16.pdf:16:being taken. This can include variation, revocation or suspension of the licence,

MLA_2021_00215-Decision Letter (Marine)-19.pdf:1:suspended deck structure initially proposed and licensed under L/2021/00325/1.

MLA_2021_00215-TG Notice 13.8-3.pdf:1: no waiting at any time restrictions on following roads in Skinningrove:- further back from its current location. A new suspended deck is proposed to be constructed,

MLA_2021_00215-Decision Letter (Marine)-14.pdf:1:Additionally, a new suspended deck will be built, along with new sheet piles to

MLA_2021_00215-Decision Letter (Marine)-14.pdf:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your

MLA_2021_00215-Decision Letter (Marine)-14.pdf:2:suspending or revoking the licence. Our terms and conditions relating to charging can

MLA_2021_00215-APPLICATION-FORM.pdf:2:(and disposal of dredged materials), a new suspended deck structure and new sheet

MLA_2021_00215-APPLICATION-FORM.pdf:12:2). A new suspended deck is proposed to be built, along with new sheet piles to replace

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:7:dredged materials), a new suspended deck structure and new sheet pile walls.

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:10:bankseat located 25m further back from its current location (Figure 2). A new suspended deck is proposed

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:10: 1. Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:11: FOR SUSPENDED DECK

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:12: FOR SUSPENDED DECK STRUCTURE

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:12: BANKSEAT AND SUSPENDED DECK STRUCTURE

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:12: FOR SUSPENDED DECK STRUCTURE FOR SUSPENDED DECK STRUCTURE

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:13:2.3.1 Suspended deck structure

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:13:The suspended deck will be a piled structure with a reinforced concrete deck constructed within the footprint

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:13:A sheet piled wall will be installed at the back of the new suspended deck structure to retain material behind

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:14:The new crosshead beams and deck for the new suspended deck quay structure will be formed of both pre-

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:14:The new bankseat will be a similar construction to the suspended deck structure detailed above, requiring

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:14:new sheet pile wall will be installed between the bankseat and suspended deck structure in dry conditions

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:14:It is anticipated that a sheet piled wall will be required at the back of the new suspended deck structure, and

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:14:also an anchored sheet pile wall will be required to tie in the new bankseat and suspended deck. The

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:16:suspended deck structure, in dry conditions prior to the removal of the existing fronting sheet pile wall. The

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:17: NEW SUSPENDED DECK

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:33:Sediment re-suspension caused by grab-dredging can be reduced in the following ways:

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:33:The literature indicates that the suspended sediment plume induced by a clamshell bucket under estuarine

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:33:sediment to be resuspended however, due to the consolidated nature of these geological features this will

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:33:that would be resuspended by the dredging activities would be small in scale and localised, settling out of

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:33:suspension within 100m of the dredging activity, indicating that any potential impacts to water quality would

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:34:new structures will have an open piled/suspended deck structure and as such will not reduce in flood

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:36:environmentally sensitive technique, such as a clamshell dredger or similar, to minimise resuspension of

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:36:sediment that would be resuspended by the dredging activities would be small in scale. The literature also

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:36:indicates that the effect would be highly localised, settling out of suspension within 100m of the dredging

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:40:minimise the volume of this sediment which could be suspended into the water column and redistributed.

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:40:would be potentially released and resuspended by the dredging activities would be small in scale and

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:40:localised, settling out of suspension within 100m of the dredging activity (Bohlen, 1978). It is therefore

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:40:to within Tees Dock. As such no significant impact on marine mammals from the potential resuspension of

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:41:Waste Framework Directive (2008/98/EC). Some of the arisings from the excavation for the suspended

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:47:Dock and will involve the replacement of the existing Number 2 Ro-Ro pontoon, a new suspended deck,

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:47:including some limited percussive piling, to install the piles required to support the new suspended deck

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:48:Bohlen, W. F. (1978). Factors governing the distribution of dredge-resuspended sediments. Proceedings of

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:52:  Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:58: • Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:67: availability • Common resuspended. Potential impacts due to suspended sediment are

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:67: predicted to fall out of suspension within 100m of the dredging

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:69:and consists of two main activities – the installation of piles to support the new suspended deck structure,

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:72: • Reduce sediment resuspension;

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:74: modified for the same limited resuspension of sediment, and once completed the maintenance dredge requirement will slightly maintenance

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:74: Standards Directive be resuspended and redistributed

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:75: cycle (about 14 days)? followed by 6 hours of augering and on port operations, and will not be suspended during this

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:75: resuspension of sediment the deposits which are considered to be suspended during regular

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:76: day) and temporary (piling will take resuspended by the dredging

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:76: suspended during this

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:76: the proposed scheme, at the end of settling out of suspension within

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:76: suspended during regular

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:78: • Reduce sediment resuspension;

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:78:The proposed scheme would cause the resuspension of sediment through the capital dredging activity

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:78:reduce the volume of sediment that will be suspended and it is therefore predicted that SSCs will be

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:79:In order to minimise the volume of the unconsolidated material that is suspended during the dredging

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:79:been designed to minimise the resuspension of sediment during the dredging activity, specifically when the

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:79:indicates that the suspended sediment plume induced by a clamshell bucket under estuarine conditions is

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:79:that would be resuspended by the dredging activities would be small in scale and highly localised, settling

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:79:out of suspension within 100m of the dredging activity, indicating that any potential impacts to water quality

MLA_2021_00215-TG Notice 20.8-2.pdf:1:further back from its current location. A new suspended deck is proposed to be constructed,

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:1:a combi wall in the place of the proposed suspended deck structure which constitutes a change to the

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:1:compares the methodology with the methodology for the suspended deck structure set out in the Marine

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:1:installation is presented below. It is proposed that this methodology should replace that of the suspended

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2:Table 3.1 below presents a comparison between the methodology for the suspended deck structure

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: Suspended deck structure instead of the suspended deck structure, within the footprint

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: The suspended deck will be a piled structure with a reinforced of the solid dock structure.

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: solid dock structure. The structure will be supported by steel suspended deck structure is once completed the structure will

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: suspended deck structure to retain material behind the anchors will be installed behind the combi wall. The combi

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: same as for the suspended deck structure a mix of pre-

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: The new crosshead beams and deck for the new suspended The new crosshead beams and deck for the new combi wall

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:3: back of the new suspended deck structure, and also an

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:3: bankseat and suspended deck. The anchored sheet pile wall The proposed combi-wall structure means that the sheet piled

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:3: will comprise a front wall anchored with tie rods at wall to the back of the suspended deck structure is no longer

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:4:underneath the suspended deck reducing the waste generated during the scheme. All other elements of

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:5: EXISTING SUSPENDED DECK SW SW SW SW

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:5: SUSPENDED DECK AS PER EXISITNG

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:7: SUSPENDED DECK

MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:7: SUSPENDED DECK TO TIE INTO EXISTING SUSPENDED

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:7:dredged materials), a new suspended deck structure and new sheet pile walls.

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:10:bankseat located 25m further back from its current location (Figure 2). A new suspended deck is proposed

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:10: 1. Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:11: FOR SUSPENDED DECK

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:12: FOR SUSPENDED DECK STRUCTURE

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:12: BANKSEAT AND SUSPENDED DECK STRUCTURE

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:12: FOR SUSPENDED DECK STRUCTURE FOR SUSPENDED DECK STRUCTURE

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:13:2.3.1 Suspended deck structure

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:13:The suspended deck will be a piled structure with a reinforced concrete deck constructed within the footprint

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:13:A sheet piled wall will be installed at the back of the new suspended deck structure to retain material behind

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:14:The new crosshead beams and deck for the new suspended deck quay structure will be formed of both pre-

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:14:The new bankseat will be a similar construction to the suspended deck structure detailed above, requiring

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:14:new sheet pile wall will be installed between the bankseat and suspended deck structure in dry conditions

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:14:It is anticipated that a sheet piled wall will be required at the back of the new suspended deck structure, and

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:14:also an anchored sheet pile wall will be required to tie in the new bankseat and suspended deck. The

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:16:suspended deck structure, in dry conditions prior to the removal of the existing fronting sheet pile wall. The

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:17: NEW SUSPENDED DECK

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:33:Sediment re-suspension caused by grab-dredging can be reduced in the following ways:

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:33:The literature indicates that the suspended sediment plume induced by a clamshell bucket under estuarine

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:33:sediment to be resuspended however, due to the consolidated nature of these geological features this will

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:33:that would be resuspended by the dredging activities would be small in scale and localised, settling out of

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:33:suspension within 100m of the dredging activity, indicating that any potential impacts to water quality would

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:34:new structures will have an open piled/suspended deck structure and as such will not reduce in flood

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:36:environmentally sensitive technique, such as a clamshell dredger or similar, to minimise resuspension of

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:36:sediment that would be resuspended by the dredging activities would be small in scale. The literature also

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:36:indicates that the effect would be highly localised, settling out of suspension within 100m of the dredging

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:40:minimise the volume of this sediment which could be suspended into the water column and redistributed.

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:40:would be potentially released and resuspended by the dredging activities would be small in scale and

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:40:localised, settling out of suspension within 100m of the dredging activity (Bohlen, 1978). It is therefore

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:40:to within Tees Dock. As such no significant impact on marine mammals from the potential resuspension of

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:41:Waste Framework Directive (2008/98/EC). Some of the arisings from the excavation for the suspended

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:47:Dock and will involve the replacement of the existing Number 2 Ro-Ro pontoon, a new suspended deck,

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:47:including some limited percussive piling, to install the piles required to support the new suspended deck

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:48:Bohlen, W. F. (1978). Factors governing the distribution of dredge-resuspended sediments. Proceedings of

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:52:  Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:58: • Construction of suspended deck structure to replace existing quay wall;

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:67: availability • Common resuspended. Potential impacts due to suspended sediment are

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:67: predicted to fall out of suspension within 100m of the dredging

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:69:and consists of two main activities – the installation of piles to support the new suspended deck structure,

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:72: • Reduce sediment resuspension;

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:74: modified for the same limited resuspension of sediment, and once completed the maintenance dredge requirement will slightly maintenance

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:74: Standards Directive be resuspended and redistributed

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:75: cycle (about 14 days)? followed by 6 hours of augering and on port operations, and will not be suspended during this

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:75: resuspension of sediment the deposits which are considered to be suspended during regular

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:76: day) and temporary (piling will take resuspended by the dredging

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:76: suspended during this

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:76: the proposed scheme, at the end of settling out of suspension within

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:76: suspended during regular

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:78: • Reduce sediment resuspension;

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:78:The proposed scheme would cause the resuspension of sediment through the capital dredging activity

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:78:reduce the volume of sediment that will be suspended and it is therefore predicted that SSCs will be

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:79:In order to minimise the volume of the unconsolidated material that is suspended during the dredging

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:79:been designed to minimise the resuspension of sediment during the dredging activity, specifically when the

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:79:indicates that the suspended sediment plume induced by a clamshell bucket under estuarine conditions is

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:79:that would be resuspended by the dredging activities would be small in scale and highly localised, settling

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:79:out of suspension within 100m of the dredging activity, indicating that any potential impacts to water quality

501 - Water FD MASTER.pdf:6: Estuarine Ecology and the resuspension of contaminated sediments. These impacts

Appendix 16.1a - DNV Report Rev1 2004.pdf:2:the lower parts of the channel. Suspended sediment concentrations, sediment dispersion and sedimentation

Appendix 16.1a - DNV Report Rev1 2004.pdf:2:sedimentation. The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l

Appendix 16.1a - DNV Report Rev1 2004.pdf:3:5.1.2.1 Suspended sediment 27

Appendix 16.1a - DNV Report Rev1 2004.pdf:5:Suspended sediment concentrations, sediment dispersion and sedimentation from the suggested

Appendix 16.1a - DNV Report Rev1 2004.pdf:5:The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l for

Appendix 16.1a - DNV Report Rev1 2004.pdf:6:column suspended sediment concentrations due to the dredging activity, which is done in co

Appendix 16.1a - DNV Report Rev1 2004.pdf:15:SSFATE is a versatile suspended sediment computer modelling system based on the concept of

Appendix 16.1a - DNV Report Rev1 2004.pdf:15:series plots of suspended sediment concentrations, and the spatial distribution of sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:16:transport, dispersion, and settling of suspended dredged material released to the water column as

Appendix 16.1a - DNV Report Rev1 2004.pdf:22:and areas of deposition and erosion where compared to measured data (suspended material) from

Appendix 16.1a - DNV Report Rev1 2004.pdf:23:Sand will tend to stay where it falls out of suspension. This is also the view expressed in /2/,

Appendix 16.1a - DNV Report Rev1 2004.pdf:23:where it is found that re-suspension of sediments “does not take place in the Tees to any great

Appendix 16.1a - DNV Report Rev1 2004.pdf:23:0.5 mg/l (average) in Seaton Channel. If one assumes that the suspended sediment grain size

Appendix 16.1a - DNV Report Rev1 2004.pdf:23:distribution “mirrors” the sediment distribution, and based on a median suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:23:relatively fast out of suspension. This is known not to reflect the true processes in the Tees

Appendix 16.1a - DNV Report Rev1 2004.pdf:24: in suspension

Appendix 16.1a - DNV Report Rev1 2004.pdf:25:To determine suspended sediment plumes resulting from the dredging activities, a numerical

Appendix 16.1a - DNV Report Rev1 2004.pdf:25:equilibrium suspended plume is established by the end of two days of dredging. Simulations

Appendix 16.1a - DNV Report Rev1 2004.pdf:29: - Modelling erosion (resuspension), particle transport and sedimentation;

Appendix 16.1a - DNV Report Rev1 2004.pdf:29: to the water column (dissolved state) due to resuspension into to water column. Generally

Appendix 16.1a - DNV Report Rev1 2004.pdf:29: - The modelling shall also consider the suspended sediment concentrations in light of the

Appendix 16.1a - DNV Report Rev1 2004.pdf:30:Teesmouth consist mainly of sand /1/, /2/, /7/. Finer fractions stay in suspension longer and are

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:patterns influencing the suspension of sediments in the Tees bay, from decreased maintenance

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:dredging resulting in less suspended sediment, or from a combination of these possibilities.

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:5.1.2.1 Suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:Suspended sediment is of high importance in the Tees estuary as little re-suspension of settled

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:sediments occurs /2/. Carriage in suspension is thus the main pathway where sediments may

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:adsorbed/entrained pollutants. Data on suspended sediment cover 26 sampling points as shown

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:in Figure 5-1. Median suspended sediment concentrations in the period 2003-2004 are shown in

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:Figure 5-2 and Figure 5-3. The data show rather large variations in the suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:traffic will have a great influence on the suspended sediment concentration due to erosion by

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:which have increased the concentrations of suspended sediments, affecting the sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:31:Based on data from throughout 2003 and early 2004 /7/ the median amount of suspended

Appendix 16.1a - DNV Report Rev1 2004.pdf:32:Figure 5-1 Sampling locations for suspended sediment. Data from EA

Appendix 16.1a - DNV Report Rev1 2004.pdf:32:(chart 9 and 10 in /2/). The silt and clay are re-suspended by activities like shipping and

Appendix 16.1a - DNV Report Rev1 2004.pdf:33:means that deposited sediment will tend to stay where it falls out of suspension unless the

Appendix 16.1a - DNV Report Rev1 2004.pdf:33:sediment is disturbed some other way (dredging, shipping). Suspended sediments concentrations

Appendix 16.1a - DNV Report Rev1 2004.pdf:33:lists some controlling factors regarding suspended sediment and sediment transport. See also

Appendix 16.1a - DNV Report Rev1 2004.pdf:33: Median suspended sediment (mg/l)

Appendix 16.1a - DNV Report Rev1 2004.pdf:33:Figure 5-2 Suspended sediment concentrations mg/l (medians)

Appendix 16.1a - DNV Report Rev1 2004.pdf:34: Median suspended sediment (mg/l)

Appendix 16.1a - DNV Report Rev1 2004.pdf:34:Figure 5-3 Suspended sediment sampling (medians)

Appendix 16.1a - DNV Report Rev1 2004.pdf:45:The suspended sediment concentration of sand (at T=210) along Seaton Channel, through Tees

Appendix 16.1a - DNV Report Rev1 2004.pdf:45:main source is the estuary and that sand gradually falls out of suspension.

Appendix 16.1a - DNV Report Rev1 2004.pdf:46:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly

Appendix 16.1a - DNV Report Rev1 2004.pdf:47:The suspended sediment concentration of silt/clay (at T=210 hrs) along Seaton Channel, through

Appendix 16.1a - DNV Report Rev1 2004.pdf:48:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly

Appendix 16.1a - DNV Report Rev1 2004.pdf:50:water flow and sediment suspension such as storms, waves, traffic and dredging will produce a

Appendix 16.1a - DNV Report Rev1 2004.pdf:51:suspends sediments that are transported to other areas. Throughout the scenarios the shear stress

Appendix 16.1a - DNV Report Rev1 2004.pdf:52:Figure 5-25 Differences in suspended sand and clay concentrations (mg/l) between

Appendix 16.1a - DNV Report Rev1 2004.pdf:53:from the sea with incoming tides when already suspended by waves, in fact 90 % of siltation

Appendix 16.1a - DNV Report Rev1 2004.pdf:54: undercurrent) and re-suspension by dredging and shipping activities

Appendix 16.1a - DNV Report Rev1 2004.pdf:55: - Suspended solids samples hourly for two days, at 1 m intervals to the bottom

Appendix 16.1a - DNV Report Rev1 2004.pdf:56:distribution and quality, suspended sediment, temperature, salinity, tidal elevation and water

Appendix 16.1a - DNV Report Rev1 2004.pdf:57:SSFATE provides several type of output. These include animations of suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:57:picture of the suspended sediment plume showing the maximum concentrations computed

Appendix 16.1a - DNV Report Rev1 2004.pdf:57:in this area, the plume is of limited extent. It can be seen that maximum total suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:58:Figure 7-1 Maximum total suspended sediment concentrations (mg/l) for backhoe at

Appendix 16.1a - DNV Report Rev1 2004.pdf:59:Figure 7-3 Maximum total suspended sediment concentrations (mg/l) for backhoe at

Appendix 16.1a - DNV Report Rev1 2004.pdf:59:deposition. For dredging during a spring tide, Figure 7-7 displays the suspended sediment plume

Appendix 16.1a - DNV Report Rev1 2004.pdf:65:Figure 7-17 and Figure 7-19 show the maximum concentration of suspended sediment plumes

Appendix 16.1a - DNV Report Rev1 2004.pdf:65:dredging line. The spring tide suspended sediment plume extents all the way to the boundary of

Appendix 16.1a - DNV Report Rev1 2004.pdf:67:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:78:the sedimentation pattern may change. Suspended sediment is in reality not only introduced by

Appendix 16.1a - DNV Report Rev1 2004.pdf:78:above, produce far higher concentrations of suspended sediment that, dependent on the tidal

Appendix 16.1a - DNV Report Rev1 2004.pdf:78:“continuous operation” /2/, so higher concentrations of suspended sediment may be expected

Appendix 16.1a - DNV Report Rev1 2004.pdf:78:As the sedimentation potential increases, the suspended sediments not considered in the

Appendix 16.1a - DNV Report Rev1 2004.pdf:79:size fractions SSFATE computations realistically represent suspended sediment plumes that will

Appendix 16.1a - DNV Report Rev1 2004.pdf:79:total suspended sediment concentrations can exceed 1000 mg/l for the backhoe dredge, but are

Appendix 16.1a - DNV Report Rev1 2004.pdf:79:suspended sediment plumes when the backhoe is operating in Area #1. However, some

Appendix 16.1a - DNV Report Rev1 2004.pdf:79:tide, suspended sediments can be transported out to the sea as a result of the hopper dredge

Appendix 16.1a - DNV Report Rev1 2004.pdf:80:simultaneously, there will be little interaction of the suspended sediment plumes when the

Appendix 16.1a - DNV Report Rev1 2004.pdf:80:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment

Appendix 16.1a - DNV Report Rev1 2004.pdf:80:suspended material. Experiments with marine fish have shown that demersal fish are more

Appendix 16.1a - DNV Report Rev1 2004.pdf:83: of sediment resuspension characteristics of selected dredges,” Technical Report HL-89-

Appendix 16.1a - DNV Report Rev1 2004.pdf:84:/28/ More, P.G. 1977. Inorganic particulate suspension in the sea and their effects on marine

3 EIS Appendices (3).pdf:42:f) Re-suspension of contaminated sediment

3 EIS Appendices (3).pdf:43: suspension.

3 EIS Appendices (3).pdf:43: contaminants. Re-suspension of contaminants caused by dredging could

3 EIS Appendices (3).pdf:117:the lower parts of the channel. Suspended sediment concentrations, sediment dispersion and sedimentation

3 EIS Appendices (3).pdf:117:sedimentation. The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l

3 EIS Appendices (3).pdf:118:5.1.2.1 Suspended sediment 27

3 EIS Appendices (3).pdf:120:Suspended sediment concentrations, sediment dispersion and sedimentation from the suggested

3 EIS Appendices (3).pdf:120:The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l for

3 EIS Appendices (3).pdf:121:column suspended sediment concentrations due to the dredging activity, which is done in co

3 EIS Appendices (3).pdf:130:SSFATE is a versatile suspended sediment computer modelling system based on the concept of

3 EIS Appendices (3).pdf:130:series plots of suspended sediment concentrations, and the spatial distribution of sediment

3 EIS Appendices (3).pdf:131:transport, dispersion, and settling of suspended dredged material released to the water column as

3 EIS Appendices (3).pdf:137:and areas of deposition and erosion where compared to measured data (suspended material) from

3 EIS Appendices (3).pdf:138:Sand will tend to stay where it falls out of suspension. This is also the view expressed in /2/,

3 EIS Appendices (3).pdf:138:where it is found that re-suspension of sediments “does not take place in the Tees to any great

3 EIS Appendices (3).pdf:138:0.5 mg/l (average) in Seaton Channel. If one assumes that the suspended sediment grain size

3 EIS Appendices (3).pdf:138:distribution “mirrors” the sediment distribution, and based on a median suspended sediment

3 EIS Appendices (3).pdf:138:relatively fast out of suspension. This is known not to reflect the true processes in the Tees

3 EIS Appendices (3).pdf:139: in suspension

3 EIS Appendices (3).pdf:140:To determine suspended sediment plumes resulting from the dredging activities, a numerical

3 EIS Appendices (3).pdf:140:equilibrium suspended plume is established by the end of two days of dredging. Simulations

3 EIS Appendices (3).pdf:144: - Modelling erosion (resuspension), particle transport and sedimentation;

3 EIS Appendices (3).pdf:144: to the water column (dissolved state) due to resuspension into to water column. Generally

3 EIS Appendices (3).pdf:144: - The modelling shall also consider the suspended sediment concentrations in light of the

3 EIS Appendices (3).pdf:145:Teesmouth consist mainly of sand /1/, /2/, /7/. Finer fractions stay in suspension longer and are

3 EIS Appendices (3).pdf:146:patterns influencing the suspension of sediments in the Tees bay, from decreased maintenance

3 EIS Appendices (3).pdf:146:dredging resulting in less suspended sediment, or from a combination of these possibilities.

3 EIS Appendices (3).pdf:146:5.1.2.1 Suspended sediment

3 EIS Appendices (3).pdf:146:Suspended sediment is of high importance in the Tees estuary as little re-suspension of settled

3 EIS Appendices (3).pdf:146:sediments occurs /2/. Carriage in suspension is thus the main pathway where sediments may

3 EIS Appendices (3).pdf:146:adsorbed/entrained pollutants. Data on suspended sediment cover 26 sampling points as shown

3 EIS Appendices (3).pdf:146:in Figure 5-1. Median suspended sediment concentrations in the period 2003-2004 are shown in

3 EIS Appendices (3).pdf:146:Figure 5-2 and Figure 5-3. The data show rather large variations in the suspended sediment

3 EIS Appendices (3).pdf:146:traffic will have a great influence on the suspended sediment concentration due to erosion by

3 EIS Appendices (3).pdf:146:which have increased the concentrations of suspended sediments, affecting the sediment

3 EIS Appendices (3).pdf:146:Based on data from throughout 2003 and early 2004 /7/ the median amount of suspended

3 EIS Appendices (3).pdf:147:Figure 5-1 Sampling locations for suspended sediment. Data from EA

3 EIS Appendices (3).pdf:147:(chart 9 and 10 in /2/). The silt and clay are re-suspended by activities like shipping and

3 EIS Appendices (3).pdf:148:means that deposited sediment will tend to stay where it falls out of suspension unless the

3 EIS Appendices (3).pdf:148:sediment is disturbed some other way (dredging, shipping). Suspended sediments concentrations

3 EIS Appendices (3).pdf:148:lists some controlling factors regarding suspended sediment and sediment transport. See also

3 EIS Appendices (3).pdf:148: Median suspended sediment (mg/l)

3 EIS Appendices (3).pdf:148:Figure 5-2 Suspended sediment concentrations mg/l (medians)

3 EIS Appendices (3).pdf:149: Median suspended sediment (mg/l)

3 EIS Appendices (3).pdf:149:Figure 5-3 Suspended sediment sampling (medians)

3 EIS Appendices (3).pdf:160:The suspended sediment concentration of sand (at T=210) along Seaton Channel, through Tees

3 EIS Appendices (3).pdf:160:main source is the estuary and that sand gradually falls out of suspension.

3 EIS Appendices (3).pdf:161:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly

3 EIS Appendices (3).pdf:162:The suspended sediment concentration of silt/clay (at T=210 hrs) along Seaton Channel, through

3 EIS Appendices (3).pdf:163:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly

3 EIS Appendices (3).pdf:165:water flow and sediment suspension such as storms, waves, traffic and dredging will produce a

3 EIS Appendices (3).pdf:166:suspends sediments that are transported to other areas. Throughout the scenarios the shear stress

3 EIS Appendices (3).pdf:167:Figure 5-25 Differences in suspended sand and clay concentrations (mg/l) between

3 EIS Appendices (3).pdf:168:from the sea with incoming tides when already suspended by waves, in fact 90 % of siltation

3 EIS Appendices (3).pdf:169: undercurrent) and re-suspension by dredging and shipping activities

3 EIS Appendices (3).pdf:170: - Suspended solids samples hourly for two days, at 1 m intervals to the bottom

3 EIS Appendices (3).pdf:171:distribution and quality, suspended sediment, temperature, salinity, tidal elevation and water

3 EIS Appendices (3).pdf:172:SSFATE provides several type of output. These include animations of suspended sediment

3 EIS Appendices (3).pdf:172:picture of the suspended sediment plume showing the maximum concentrations computed

3 EIS Appendices (3).pdf:172:in this area, the plume is of limited extent. It can be seen that maximum total suspended sediment

3 EIS Appendices (3).pdf:173:Figure 7-1 Maximum total suspended sediment concentrations (mg/l) for backhoe at

3 EIS Appendices (3).pdf:174:Figure 7-3 Maximum total suspended sediment concentrations (mg/l) for backhoe at

3 EIS Appendices (3).pdf:174:deposition. For dredging during a spring tide, Figure 7-7 displays the suspended sediment plume

3 EIS Appendices (3).pdf:180:Figure 7-17 and Figure 7-19 show the maximum concentration of suspended sediment plumes

3 EIS Appendices (3).pdf:180:dredging line. The spring tide suspended sediment plume extents all the way to the boundary of

3 EIS Appendices (3).pdf:182:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment

3 EIS Appendices (3).pdf:193:the sedimentation pattern may change. Suspended sediment is in reality not only introduced by

3 EIS Appendices (3).pdf:193:above, produce far higher concentrations of suspended sediment that, dependent on the tidal

3 EIS Appendices (3).pdf:193:“continuous operation” /2/, so higher concentrations of suspended sediment may be expected

3 EIS Appendices (3).pdf:193:As the sedimentation potential increases, the suspended sediments not considered in the

3 EIS Appendices (3).pdf:194:size fractions SSFATE computations realistically represent suspended sediment plumes that will

3 EIS Appendices (3).pdf:194:total suspended sediment concentrations can exceed 1000 mg/l for the backhoe dredge, but are

3 EIS Appendices (3).pdf:194:suspended sediment plumes when the backhoe is operating in Area #1. However, some

3 EIS Appendices (3).pdf:194:tide, suspended sediments can be transported out to the sea as a result of the hopper dredge

3 EIS Appendices (3).pdf:195:simultaneously, there will be little interaction of the suspended sediment plumes when the

3 EIS Appendices (3).pdf:195:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment

3 EIS Appendices (3).pdf:195:suspended material. Experiments with marine fish have shown that demersal fish are more

3 EIS Appendices (3).pdf:198: of sediment resuspension characteristics of selected dredges,” Technical Report HL-89-

3 EIS Appendices (3).pdf:199:/28/ More, P.G. 1977. Inorganic particulate suspension in the sea and their effects on marine

Appendix 16.1b - DNV Addendum Report 2005.pdf:3:9 SUSPENDED SEDIMENT AND DISSOLVED OXYGEN………………………………. 16

Appendix 16.1b - DNV Addendum Report 2005.pdf:7:in suspension locally (this again being entrained by our CW system) and potentially increase

Appendix 16.1b - DNV Addendum Report 2005.pdf:10:suspended.

Appendix 16.1b - DNV Addendum Report 2005.pdf:10:British Energy should be invited to comment on what concentrations of suspended sediments are

Appendix 16.1b - DNV Addendum Report 2005.pdf:11:show the suspended sediment concentration and deposition for the modelled scenarios i.e. when

Appendix 16.1b - DNV Addendum Report 2005.pdf:11:The hopper dredge will generate by far the largest suspended sediment concentration and

Appendix 16.1b - DNV Addendum Report 2005.pdf:11:the max suspended sediment concentration and deposition when using a hopper dredge after two

Appendix 16.1b - DNV Addendum Report 2005.pdf:11:The suspended sediment concentration and the deposition rate are for all sediment fractions

Appendix 16.1b - DNV Addendum Report 2005.pdf:12:transported longer than the coarser fraction which will fall out of suspension relatively fast, the

Appendix 16.1b - DNV Addendum Report 2005.pdf:13:be spread to Seal Sand by the fine fraction of the suspended sediment, but as nothing is known

Appendix 16.1b - DNV Addendum Report 2005.pdf:16:The suspended sediment levels are presented in the DNV Report 2004-1387 figs 7-1, 7-3, 7-5, 7-

Appendix 16.1b - DNV Addendum Report 2005.pdf:16:suspended sediment concentration is presented and discussed in Chapter 5.1.2.1.

Appendix 16.1b - DNV Addendum Report 2005.pdf:18:9 SUSPENDED SEDIMENT AND DISSOLVED OXYGEN

Appendix 16.1b - DNV Addendum Report 2005.pdf:18:The presence of suspended sediments in the water column has little effect on the dissolved

Licence Document (Marine).pdf:16:being taken. This can include variation, revocation or suspension of the licence,

Decision Letter (Marine).pdf:2:You should ensure that methods are employed to minimise re-suspension of sediment

Decision Letter (Marine).pdf:2:suspended in the event that the Licence Holder fails to make full payment of the final

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:2: is likely to compare with the suspended sediment concentrations and plumes modelled within the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:2: proposed to minimise the resuspension of contaminated sediments.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:3:3.3 Suspended sediment concentrations

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:3:Effects’ (document reference PC1084-RHD-SB-EN-NT-EV-1141) for a commentary on the suspended

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:3:The scheduling of the activities helps to mitigate the risk of resuspension of the contaminated sediments.

MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf:6: suspended solids confined to coastal habitats, away from the main estuary channel.

MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf:6: suspended sediments during dredging represents a very localised,

MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf:7: suspended solids

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:4: impacts (e.g., increased suspended sediment concentrations, poor

MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf:6: suspended solids confined to coastal habitats, away from the main estuary channel.

MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf:6: suspended sediments during dredging represents a very localised,

MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf:7: suspended solids

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:2: suspended sediment brought in from the sea. Short term peaks in suspended sediment (during

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3: are presented principally as changes in suspended sediment concentration (SSC), the principal

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4: In coastal process terms, the temporary suspension itself is indeed probably of minor

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:4: impacts (e.g., increased suspended sediment concentrations, poor

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:6:UWN from piling or SSC from dredging) whilst waiting in refuges areas. The effects of suspended

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:6:to environmentally relevant, suspended sediment-generated turbidities.

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:6:Elevated concentrations of suspended sediment can have the following physical effects on all life

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:6: suspended sediment concentration, water velocity and gill dimensions (Appleby and

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine fish

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids.

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming performance

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:7:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:8:Changes in suspended Bird Species. Yes Tern foraging may be inhibited by a decrease in water clarity caused

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:8: pSPA: suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:8: • Common Tern (B) temporary and short-term disturbance, with any suspended sediment

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:9: the effects of the proposed scheme may increase suspended

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:18: • Pied avocet (B) suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:18: • Ruff (NB) temporary and short-term disturbance, with any suspended

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:20: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:21:changes in suspended sediments (water clarity).

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:22: suspended Common tern, Breeding excavation of the foreshore, and the works at low tide will significantly

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:24: Changes in suspended sediment (water clarity) submitted with this application. Licence application

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:4: To restrict suspended sediment plumes to one side of the estuary at a time, and

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:6: To restrict suspended sediment plumes to one side of the estuary at a time, in

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:7: works must be suspended. Once temperatures have not reached zero degrees

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:9: suspended sediment

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:1:dredging associated with the South Bank Quay project that sediment suspended within the dredging

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:2:is carried in suspension by the prevailing currents (for finer-grained sediment fractions). Near surface

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:2:Figure 2.1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging

PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf:2:maximum enhanced areas of suspended sediment concentrations from the dredge) were selected based

PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf:3:The EIA Report (Royal HaskoningDHV, 2020) predicted that sediment suspended within the dredging

PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf:3:after this if it is carried in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal

PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf:3:Figure 1 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities during

PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf:4:Figure 2 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities

MLA202000506 and MLA202000507 Draft HRA (2).pdf:8:suspended solids by the proposed dredge. The occurrence of almost daily

MLA202000506 and MLA202000507 Draft HRA (2).pdf:8: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA (2).pdf:8: temporary and short-term disturbance, with any suspended sediment

MLA202000506 and MLA202000507 Draft HRA (2).pdf:9: the effects of the proposed scheme may increase suspended

MLA202000506 and MLA202000507 Draft HRA (2).pdf:18: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA (2).pdf:18: temporary and short-term disturbance, with any suspended

MLA202000506 and MLA202000507 Draft HRA (2).pdf:20: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA202000506 and MLA202000507 Draft HRA (2).pdf:22: from suspended sediment.

MLA202000506 and MLA202000507 Draft HRA (2).pdf:23:changes in suspended sediments (water clarity).

MLA202000506 and MLA202000507 Draft HRA (2).pdf:26:suspended passage) and excavation works of the dock

MLA202000506 and MLA202000507 Draft HRA (2).pdf:26: localised increase in suspended half of the river cross section, to prevent

MLA202000506 and MLA202000507 Draft HRA (2).pdf:27: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA202000506 and MLA202000507 Draft HRA (2).pdf:29: from suspended sediment.

EA MLA_2020_00506 v2 29 June 2021 OFFICIAL.pdf:2:are realised in respect to elevated concentrations of suspended solids.

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:3: i. Changes in marine water quality (i.e. increased suspended sediment) due to dredging

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:6: season (e.g. salmon), as a result of increased suspended sediment concentrations, poor water

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:7: suspended sediment concentrations and the extent of the plume across the river channel will be

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:7: conditions are present (Sigler et al., 1984; Bash et al., 2001). The effects of suspended sediment

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:7: relevant, suspended sediment-generated turbidities.

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:12:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:12:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids.

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:12:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:12:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:12:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation,

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:14:Elevated concentrations of suspended sediment can have the following physical effects on all life stage

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:14: suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt,

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:15: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:15: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2: To restrict suspended sediment

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:potential monitoring of suspended solid concentrations (hereafter “SSC”) and associated active

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:dredging associated with the South Bank project that sediment suspended within the dredging plumes will

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:3:in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal HaskoningDHV,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:3:Figure 2-1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging activities during Phase

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:4:maximum concentrations of suspended solids for all projects are predicted to be localised to the dredging

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:In terms of the baseline suspended solids, concentrations are generally low within the estuary and within

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:the tidal sequence, the highest suspended sediment levels occur close to high water. After storm periods,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:higher concentrations of suspended sediment have been noted around the Shell Jetty, but with little

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:6:being The Effects of Turbidity and Suspended Sediments on ESA-Listed Species from Projects Occurring

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:6:in the analysis of projects that generate suspended sediments. Concentrations in the literature are not,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:7:in a laboratory as the water sample has to be filtered to determine the dry weight of suspended solids per

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:8: • Site 1: this site would reflect concentrations of suspended solids on the east side of the channel.

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:8: • Site 2: this site would reflect concentrations of suspended solids on the west side of the channel.

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:10: 4. NOAA Fisheries (2018) The effects of turbidity and suspended sediments on ESA-Listed

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:11: 8. Wilber DH, Clarke, DG. 2001. Biological effects of suspended sediments: a review of suspended

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:1: 5.2. The effects of turbidity and suspended sediments on ESA-Listed Species from Projects

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:2: (e.g., increased suspended sediment concentrations, poor water quality and underwater

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:3: oxygen, turbidity and suspended sediment concentrations (SSC) levels falls outside my

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:3: • Site 1: this site would reflect concentrations of suspended solids on the east side of the

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:4: • Site 2: this site would reflect concentrations of suspended solids on the west side of the

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:5: effects occurred in adult fish during 24 hours of exposure to suspended sediment up to 1,000

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:6: been acknowledged that suspended sediment will fall to the riverbed within the dredged areas

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:9:Reason: To restrict suspended sediment plumes to one side of the estuary at a time, in order to

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:10:UWN from piling or SSC from dredging) whilst waiting in refuges areas. The effects of suspended

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:10:to environmentally relevant, suspended sediment-generated turbidities.

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:10:Elevated concentrations of suspended sediment can have the following physical effects on all life

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:10: suspended sediment concentration, water velocity and gill dimensions (Appleby and

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine fish

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids.

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming performance

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:11:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval

MLA_2020_00506_1 South Bank Wharf Variation Response FINAL 392938.pdf:3:licenced activities then any piling works must be suspended. Once temperatures have not reached

338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf:4: To restrict suspended sediment plumes to one side of the estuary at a time, and

338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf:6: To restrict suspended sediment plumes to one side of the estuary at a time, in

338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf:7: works must be suspended. Once temperatures have not reached zero degrees

338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf:9: suspended sediment

MLA202000506 and MLA202000507 Draft HRA.pdf:8:suspended solids by the proposed dredge. The occurrence of almost daily

MLA202000506 and MLA202000507 Draft HRA.pdf:8: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA.pdf:8: temporary and short-term disturbance, with any suspended sediment

MLA202000506 and MLA202000507 Draft HRA.pdf:9: the effects of the proposed scheme may increase suspended

MLA202000506 and MLA202000507 Draft HRA.pdf:18: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA202000506 and MLA202000507 Draft HRA.pdf:18: temporary and short-term disturbance, with any suspended

MLA202000506 and MLA202000507 Draft HRA.pdf:19: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA202000506 and MLA202000507 Draft HRA.pdf:22:changes in suspended sediments (water clarity).

MLA202000506 and MLA202000507 Draft HRA.pdf:25:suspended passage) and excavation works of the dock

MLA202000506 and MLA202000507 Draft HRA.pdf:25: localised increase in suspended half of the river cross section, to prevent

MLA202000506 and MLA202000507 Draft HRA.pdf:26: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:32: • Suspended deck.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:32:A piled suspended deck structure would be technically feasible, however this option would require more

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:54:1989 between waves, tides and suspended mud HR Wallingford, 1989

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:57: and suspended mud concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:60: predict movement of suspended sediment from the proposed dredging and disposal activities by

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:81:Suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:81: Suspended sediment concentrations (mg/l)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:143: including stop / start thresholds for parameters such as suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:156: Suspended sediment concentrations (mg/l)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:167:As these works progress, there is the potential for sediment to be suspended when working in and around

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:9.5.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:importance (where information is available) to increases in suspended sediment. This information is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:to increases in suspended sediment concentrations, according to this sensitivity review.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:213:and any species of conservation importance (where information is available) to increases in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:297:tern species as a result of increased suspended sediments during the construction phase.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:309: thresholds for parameters such as suspended sediment and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:482: Increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:482:sensitive to smothering or increases in suspended sediment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:488:The offshore disposal of dredged material would temporarily increase the suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490:disturbance and increased suspended sediments on migratory fish).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:500:(increased suspended sediment concentrations) are relevant to the CIA.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:500:immediately after the period of construction. This is because fine material will be released into suspension,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:506: • dispersion of suspended sediment during marine works, dredging and disposal; and,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:526: 24.Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:528: suspended solids

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:528: The installation and presence of the rock impacted is less than suspended solids

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:541: Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:542: Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:2:that the most important potential coastal process impact would be changes in suspended sediment plumes,

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does

MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf:9:operations temporarily suspended.

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:2:that the most important potential coastal process impact would be changes in suspended sediment plumes,

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:6:Cefas fisheries advisors have raised concerns in relation to impacts on fish from increased suspended

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:6:additional dredged material is likely to compare with the suspended sediment concentrations and plumes

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:7:comparison of the suspended sediment concentrations and plumes modelled within the original EIA, with

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:7:Please provide a side-by-side comparison of the suspended sediment concentrations and plumes

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:1:dredging associated with the South Bank Quay project that sediment suspended within the dredging

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:2:is carried in suspension by the prevailing currents (for finer-grained sediment fractions). Near surface

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:2:Figure 2.1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:4:Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:5: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:9:South Bank Wharf development project that was undertaken to investigate the suspended sediment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:10:The sediment dispersion model has been setup with four layers in order to differentiate between suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:17: Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:18:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:19:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:20: Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:23: Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:24: Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:25: Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:29:plumes will disperse under wave and current action and all sediment particles suspended in the water

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:3:topic areas, I note that the Applicant considers that only potential increases in suspended sediment and effects upon water quality are likely

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:The reason for this is that increases in suspended sediment concentration in the water column and plumes of suspended sediment created

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:is likely that greater concentrations of non-consolidated finer sediments, such as clay, will remain suspended in the water column for longer

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:fisheries advisors raised concerns in relation to impacts on fish from increased suspended sediment concentrations repeatedly during

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:discussion of how the additional dredged material is likely to compare with the suspended sediment concentrations and plumes modelled

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:boundary has the potential to cause the resuspension of contaminated sediments. In particular, where consolidated clay is removed, organic

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:organic contaminants and materials (Kemp et al., 2011). Such increases in bioavailability of contaminants through resuspension of

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:4:the resuspension of contaminated sediments.

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:5:suspended sediment into the water column, thus it may be likely that greater concentrations of suspended sediments are observed as a

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:5:result of this method. Suspended sediment is of concern in relation to fish receptors for the reasons outlined in comment 20 above, and in

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:5:However, elevated suspended sediment concentrations also have the potential to deplete levels of dissolved oxygen (DO) in the water

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:7: suspended sediment concentrations and plumes modelled within the original EIA. The MMO do not require additional modelling at this

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:7: in proximity to the contaminated material boundary is proposed to minimise the resuspension of contaminated sediments.

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:8: Increased suspended sediment concentration (SSC) can affect an organism’s filter-feeding mechanisms and its ability to respire and excrete.

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:9:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish and shellfish with special reference

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:9:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of juvenile salmonids. In: Hartman, G.F.

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:9:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval survival and settlement in a

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:9:Goldes, S.A., Ferguson, H.W., Moccia, R.D. and Daoust, P.Y., (1988). Histological effects of the inert suspended clay kaolin on the gills of

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:11:again upon their return to the sea after spawning. Elevated concentrations of suspended sediment resulting from dredging and disposal of

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:11: depends on size and shape of particles, suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt,

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:12:V. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal blooms, causing a reduction in water quality

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:12:VI. Resuspension of sediments resulting from dredging can smother organisms and hinder growth, feeding and survival rates (Gilmour

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:3:2.2.3 Suspended solid concentrations 10

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:3:3.2.2 Effects of increased suspended sediment concentrations during dredging on marine species and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:11:the re-suspension of sediment as the material is removed. An enclosed grab results in virtually no release

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:13:values (Environment Agency. 2019). The assessment uses the predicted concentrations of suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:14:2.2.3 Suspended solid concentrations

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:14:The tool requires the input of predicted suspended solids concentrations arising from the dredge plume. For

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:14:levels of suspended solids over baseline during Stage 2 of the proposed dredging schedule, when the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:15:Figure 2.2 Stage 2 dredging results for suspended solids concentrations when dredger is located on the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:15:Figure 2.3 shows the predicted suspended solid concentrations at selected water quality monitoring points

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:15:85mg/l is transitory and only predicted to occur once during this period, a more representative suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:Figure 2.3 Time series of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:achieved when suspended sediment concentrations reduce to 31mg/l (see maximum acceptable sediment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:uplift column in Appendix 2). It can be seen in Figure 2.2 that the suspended sediment plume is predicted

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:to be relatively localised to the dredging activity and suspended sediment concentrations reduce to typically

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:when suspended solid concentrations reach the predicted peak at 85mg/l, EQS failure is possible.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:16:Concentrations of fluoranthene are only predicted to reach EQS when suspended solids concentrations

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:17:concentrations of suspended solids; rather, they are predicted to remain in close proximity to the dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:24:and capital dredging, effects from increased suspended sediment concentrations, and effects from

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:25: increased suspended sediment “Effects of smothering following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:25: physical removal of Changes in suspended sediment Smothering

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:26: increased suspended sediment “Effects of smothering following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:26: physical removal of Changes in suspended sediment Smothering

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:3.2.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:microscopic stages of the seaweeds during recruitment can be affected by changes in suspended solids, at

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:the benchmark used for the sensitivity assessment. This benchmark for changes in suspended solids is “a

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:suspended sediment during dredging is expected to be in the form of a narrow plume within the river, which

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:suspended sediment concentrations to a level that will change the WFD scale for one year (the benchmark

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:Although the intertidal fucoid biotopes are of medium sensitivity to changes to suspended sediments, the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:28:receptors from increased suspended sediments remains at negligible significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:229: suspension is measured using a Jenway Model 3510 pH meter fitted with a combination pH

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:319: resuspension through expulsion of loose pseudofaeces directly into the water column

MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf:3: suspended sediment concentrations during previous consultations, and I noted in my previous

MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf:3: suspended sediment concentrations and plumes modelled within the original EIA, in order for

MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf:3: and I would ask the Applicant to please provide a side-by-side comparison of the suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32: • Suspended deck.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:A piled suspended deck structure would be technically feasible, however this option would require more

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:54:1989 between waves, tides and suspended mud HR Wallingford, 1989

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:57: and suspended mud concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:60: predict movement of suspended sediment from the proposed dredging and disposal activities by

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:Suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81: Suspended sediment concentrations (mg/l)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:143: including stop / start thresholds for parameters such as suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156: Suspended sediment concentrations (mg/l)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:As these works progress, there is the potential for sediment to be suspended when working in and around

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:9.5.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:importance (where information is available) to increases in suspended sediment. This information is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:to increases in suspended sediment concentrations, according to this sensitivity review.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:213:and any species of conservation importance (where information is available) to increases in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:297:tern species as a result of increased suspended sediments during the construction phase.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:309: thresholds for parameters such as suspended sediment and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:482: Increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:482:sensitive to smothering or increases in suspended sediment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:The offshore disposal of dredged material would temporarily increase the suspended sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:disturbance and increased suspended sediments on migratory fish).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:(increased suspended sediment concentrations) are relevant to the CIA.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:immediately after the period of construction. This is because fine material will be released into suspension,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:506: • dispersion of suspended sediment during marine works, dredging and disposal; and,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: 24.Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528: suspended solids

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528: The installation and presence of the rock impacted is less than suspended solids

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541: Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:542: Reduce sediment resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

MLA_2020_00506-Licence Document (Marine).pdf:16: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat.

MLA_2020_00506-Licence Document (Marine).pdf:20:being taken. This can include variation, revocation or suspension of the licence,

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:9:demonstrates that the trajectory of suspended sediment is influenced predominantly by river and tidal

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:14: • Effects of increased suspended sediment concentrations during dredging; and

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:5.2.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:concentration of suspended sediment would be between 100-200 mg/L within the immediate vicinity of

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:cases, the modelling indicates that sediments suspended as a result of dredging activities is predicted to

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:suspended sediment concentrations. In light of this, as well as considering the temporary and localised

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:nature of the predicted increase in suspended sediment concentrations, the EIA Report concludes an

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:effect of negligible significance with regard to increased suspended sediment concentrations. Therefore,

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:benthic receptors due to deposition of suspended sediments caused by dredging and disposal activities.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:This is because of the temporary and localised nature of the predicted increase in suspended sediment

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:15:excavators, the volume of suspended sediment associated with the dredging of this material is expected

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:16:sensitivity of species within the Tees estuary to changes in suspended sediment concentrations, it is

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:16:temporarily suspend the feeding and respiration of this species, it would be able to relocate to its

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:34:Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:35: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:39:South Bank Wharf development project that was undertaken to investigate the suspended sediment

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:40:The sediment dispersion model has been setup with four layers in order to differentiate between suspended

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:47: Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:48:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:49:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:50: Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:53: Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:54: Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:55: Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:59:plumes will disperse under wave and current action and all sediment particles suspended in the water

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:8:suspended solids by the proposed dredge. The occurrence of almost daily

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:8: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:8: temporary and short-term disturbance, with any suspended sediment

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:9: the effects of the proposed scheme may increase suspended

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:18: • Common Tern (B) suspended sediments during dredging represents a very localised,

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:18: temporary and short-term disturbance, with any suspended

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:19: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:22:changes in suspended sediments (water clarity).

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:25:suspended passage) and excavation works of the dock

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:25: localised increase in suspended half of the river cross section, to prevent

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:26: Changes in suspended sediment (water clarity) submitted with this application. Licence application

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:1: 2. Will the removal of bank material via dredging change the level of suspended sediment compared

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:3:current OSPAR line. It is considered that the only potential increases in suspended sediment and effects

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:5:3 Suspended Sediment Levels

MLA_2020_00506-Licence Document (Marine)-45.pdf:15: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat.

MLA_2020_00506-Licence Document (Marine)-45.pdf:18:being taken. This can include variation, revocation or suspension of the licence,

MLA_2020_00506-Decision Letter (Marine)-43.pdf:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your

MLA_2020_00506-Decision Letter (Marine)-43.pdf:2:suspending or revoking the licence. Our terms and conditions relating to charging can

MLA_2020_00506-Decision Letter (Marine)-43.pdf:4: Suspended sediment concentrations

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2: To restrict suspended sediment

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:potential monitoring of suspended solid concentrations (hereafter “SSC”) and associated active

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:dredging associated with the South Bank project that sediment suspended within the dredging plumes will

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:3:in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal HaskoningDHV,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:3:Figure 2-1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging activities during Phase

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:4:maximum concentrations of suspended solids for all projects are predicted to be localised to the dredging

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:In terms of the baseline suspended solids, concentrations are generally low within the estuary and within

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:the tidal sequence, the highest suspended sediment levels occur close to high water. After storm periods,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:5:higher concentrations of suspended sediment have been noted around the Shell Jetty, but with little

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:6:being The Effects of Turbidity and Suspended Sediments on ESA-Listed Species from Projects Occurring

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:6:in the analysis of projects that generate suspended sediments. Concentrations in the literature are not,

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:7:in a laboratory as the water sample has to be filtered to determine the dry weight of suspended solids per

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:8: • Site 1: this site would reflect concentrations of suspended solids on the east side of the channel.

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:8: • Site 2: this site would reflect concentrations of suspended solids on the west side of the channel.

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:10: 4. NOAA Fisheries (2018) The effects of turbidity and suspended sediments on ESA-Listed

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:11: 8. Wilber DH, Clarke, DG. 2001. Biological effects of suspended sediments: a review of suspended

MLA_2020_00506-Licence Document (Marine)-58.pdf:16: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat.

MLA_2020_00506-Licence Document (Marine)-58.pdf:19:being taken. This can include variation, revocation or suspension of the licence,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:61:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:61:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities).

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:92: 7.3 Suspended Sediment Conversion ………………………………………………………………………………………..20

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:108:7.3 Suspended Sediment Conversion

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:117: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:117: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:139: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:191:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:192:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:200:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:201: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:202: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:203: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:204: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:205: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:206: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:209: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:210:and all sediment particles suspended in the water column will eventually settle to the river or sea bed,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:211:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:173: Significant operation temporarily suspended). These hazards and associated risk

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:173: 9 - 10 High permanently suspended). These hazards and associated risk control

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: injury immediate area within site suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion. term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: short-term disruption to term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and disembarkation suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: taking additional risks short-term disruption to Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: Reduced visibility. Fire short-term disruption to term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: short-term disruption to Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Cargo Traffic control failure. short-term disruption to Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Vessel taking additional risks short-term disruption to Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: 3rd party vessel / environmental amenity; suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: dredging operations. Fire suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Tanker berth 3rd party vessel / suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: 3rd party vessel / suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: General not necessarily met; Bad Medium-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Project not necessarily met; Bad Medium-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: short-term disruption to term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: 3rd party vessel / term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: 3rd party vessel / term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: short-term disruption to suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: necessarily met; Very publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: necessarily met; Very publicity. Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: necessarily met; Very publicity. Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Cargo control failure. short-term disruption to term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Vessel Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: avoiding action with environmental amenity; term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: 3rd party vessel. Fire suspension of commercial activities

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Tanker term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: publicity. Medium-term suspension

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: necessarily met; Very publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: avoiding action with suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: avoiding action with suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: large vessel moving in services with ensuing loss within site. Temporary suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: failure. Reduced visibility. publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: criteria not necessarily met; publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Pilot boarding and suspension of commercial activities and/or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: operations. Traffic control Very short-term disruption publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: additional risks during suspension of commercial activities and/or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Vessel suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Dredgers) Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Vessel additional risks during suspension of commercial activities and/or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: with 3rd party vessel / environmental amenity; suspension of operations or prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: short-term disruption to Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: berth - Tanker berth publicity. Medium-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: General Cargo publicity. Medium-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: with 3rd party vessel / publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: Vessel criteria not necessarily met; international publicity. Long-term suspension

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: criteria not necessarily met; international publicity. Long-term suspension

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. Very short-term disruption to Long-term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: disembarkation Very short-term disruption to Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: Long-term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: additional risks during Very short-term disruption to Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Cargo Vessel necessarily met; Very short- Long-term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Workboat regional publicity. Temporary suspension

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: of avoiding action with Medium-term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: berth Reduced visibility. Result Medium-term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: of avoiding action with suspension of operations or prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: berth Reduced visibility. Result Medium-term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: criteria not necessarily met; Medium-term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: criteria not necessarily met; Medium-term suspension of operations or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: of avoiding action with necessarily met; Very short- suspension of operations, prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: moving in the port services with ensuing loss of site. Temporary suspension of operations

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386: and temporary. Any sediment resuspension is unlikely to last more than a few hours per

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted.

MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf:4: To restrict suspended sediment plumes to one side of the estuary at a time, and

MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf:6: To restrict suspended sediment plumes to one side of the estuary at a time, in

MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf:7: works must be suspended. Once temperatures have not reached zero degrees

MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf:9: suspended sediment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:3:2.2.3 Suspended solid concentrations 10

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:3:3.2.2 Effects of increased suspended sediment concentrations during dredging on marine species and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:11:the re-suspension of sediment as the material is removed. An enclosed grab results in virtually no release

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:13:values (Environment Agency. 2019). The assessment uses the predicted concentrations of suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:14:2.2.3 Suspended solid concentrations

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:14:The tool requires the input of predicted suspended solids concentrations arising from the dredge plume. For

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:14:levels of suspended solids over baseline during Stage 2 of the proposed dredging schedule, when the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:15:Figure 2.2 Stage 2 dredging results for suspended solids concentrations when dredger is located on the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:15:Figure 2.3 shows the predicted suspended solid concentrations at selected water quality monitoring points

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:15:85mg/l is transitory and only predicted to occur once during this period, a more representative suspended

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:Figure 2.3 Time series of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:achieved when suspended sediment concentrations reduce to 31mg/l (see maximum acceptable sediment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:uplift column in Appendix 2). It can be seen in Figure 2.2 that the suspended sediment plume is predicted

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:to be relatively localised to the dredging activity and suspended sediment concentrations reduce to typically

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:when suspended solid concentrations reach the predicted peak at 85mg/l, EQS failure is possible.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:16:Concentrations of fluoranthene are only predicted to reach EQS when suspended solids concentrations

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:17:concentrations of suspended solids; rather, they are predicted to remain in close proximity to the dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:24:and capital dredging, effects from increased suspended sediment concentrations, and effects from

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:25: increased suspended sediment “Effects of smothering following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:25: physical removal of Changes in suspended sediment Smothering

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:26: increased suspended sediment “Effects of smothering following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:26: physical removal of Changes in suspended sediment Smothering

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:3.2.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:microscopic stages of the seaweeds during recruitment can be affected by changes in suspended solids, at

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:the benchmark used for the sensitivity assessment. This benchmark for changes in suspended solids is “a

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:suspended sediment during dredging is expected to be in the form of a narrow plume within the river, which

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:suspended sediment concentrations to a level that will change the WFD scale for one year (the benchmark

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:Although the intertidal fucoid biotopes are of medium sensitivity to changes to suspended sediments, the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:28:receptors from increased suspended sediments remains at negligible significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:229: suspension is measured using a Jenway Model 3510 pH meter fitted with a combination pH

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:319: resuspension through expulsion of loose pseudofaeces directly into the water column

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21: a driven scaffold frame, so as to form a suspended walkway, or on top of a compression-

R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf:19: Hazard Indices of 0.7 for Suspended Solids, 0.6 for Metals and 0.7 for hydrocarbons.

R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf:19: Permeable paving provides pollution mitigation indices of 0.7 for Suspended Solids, 0.6 for

R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf:7:provides a connection to Redcar British Steel railway station. Services at the station have been suspended

R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf:10:but services at the station have been suspended since 2019. As part of the emerging Transport Strategy for

Environmental Statement, Chapter G Water Management and Flooding Section 6 mitigation.pdf:3: sediments in surface would be retained within the site, remove silt and other suspended solids, as

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:38: result in increased sediment suspension, potentially

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:44: caused by increases in suspended sediment, reduced

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:44: suspended sediment causing increases in nutrients

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:45: sediment suspension in the water body, potentially

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:45: resulting in localised increases in nutrients suspended

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:53: growth (Appendix A), therefore any suspended silt is not

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:53: caused by increases in suspended sediment,

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:54: Adverse impacts may also result from suspended

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:16: flood bank could temporarily cause the suspension of sediments in the channel. Contamination caused by the removal undertaken as part of the

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:16: Common tern Sterna suspension of sediments in the channel. Contamination caused by the removal of the estuarine bank will be temporary alone.

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:17: flood bank could temporarily cause the suspension of sediments in the channel. Contamination caused by the removal undertaken as part of the

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:23: tide to limit suspension of silt.

MLA_2022_00248-APPLICATION-FORM.pdf:13:suspension of silt into the tidal River Tees. All excavated material will be disposed at the

MLA_2022_00248-APPLICATION-FORM.pdf:14:turbid due to the movement and velocity of the water. Suspended silt is not anticipated

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:40:It is understood that a ground bearing slab is to be used and that a suspended floor slab is not a desired option

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:40:(the costs to pile the suspended slab are likely to be very high). As such, the designers will need to ensure

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:43:As such, if a piled suspended floor slab solution is not proposed, a ground bearing slab should be designed to

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:651: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:655: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:655: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:655: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:656: total suspended matter in the sample.

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:657: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:657: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:657: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:657: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:658: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:659: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with

R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:21: could be deposited by vehicles leaving the ERF site and re-suspended by

R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:32: deposited by vehicles leaving the ERF site and re-suspended by vehicles

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:107: attenuation pond will also help reduce suspended

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:108: other suspended solids, as well as capture any spills/oil and grease, prior to

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:24: • use of silt traps used to capture suspended solids;

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:2: including stop / start thresholds for parameters such as suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:this period, concentrations of suspended sediment were very low. It should be noted however, that the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15: Suspended sediment concentrations (mg/l)

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:16:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:17:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:19:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:20:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:20:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:23: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:As these works progress, there is the potential for sediment to be suspended when working in and around

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: 24.Reduce sediment resuspension

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7: suspended solids

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7: The installation and presence of the rock impacted is less than suspended solids

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:11:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:11:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:16:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:16:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:17:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:17:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:18: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20: Reduce sediment resuspension

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:21: Reduce sediment resuspension

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:24:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:28:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:1:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:1:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:5: Increase in suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:5:sensitive to smothering or increases in suspended sediment.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:The offshore disposal of dredged material would temporarily increase the suspended sediment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

R-2020-0685-ESM-OFFICER REPORT.pdf:17:took place; suspended sediment concentrations, sediment sources and

R-2020-0685-ESM-OFFICER REPORT.pdf:19:An assessment has also been made of suspended sediment concentrations.

R-2020-0685-ESM-OFFICER REPORT.pdf:19:suspended solid concentrations, for the most part, are less than 20mg/l with

R-2020-0685-ESM-OFFICER REPORT.pdf:20:period, concentrations of suspended sediment were very low as illustrated in

R-2020-0685-ESM-OFFICER REPORT.pdf:21:It is acknowledged that there is the potential for sediment to be suspended

R-2020-0685-ESM-OFFICER REPORT.pdf:21:increases in suspended solids concentrations are likely to be highly localised

R-2020-0685-ESM-OFFICER REPORT.pdf:28:  Impacts on marine ecology from increased suspended sediment during

R-2020-0685-ESM-OFFICER REPORT.pdf:30:suspended sediment concentrations during dredging on marine species and

R-2020-0685-ESM-OFFICER REPORT.pdf:30:habitats, effects of increased suspended sediment concentrations during

R-2020-0685-ESM-OFFICER REPORT.pdf:30:increase in suspended sediment concentrations. Matters relating to this have

R-2020-0685-ESM-OFFICER REPORT.pdf:30:predicted increase in suspended sediment, in addition to the low/very low

R-2020-0685-ESM-OFFICER REPORT.pdf:30:sensitivity of the key species present in the estuary to increased suspended

R-2020-0685-ESM-OFFICER REPORT.pdf:32:With regard to suspended sediment concentrations no mitigation measures

R-2020-0685-ESM-OFFICER REPORT.pdf:35:in suspended sediments during dredging or other activities will have a

R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf:5: 7.3 Suspended Sediment Conversion ………………………………………………………………………………………..20

R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf:21:7.3 Suspended Sediment Conversion

R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf:30: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020

R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf:30: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:2:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:3: and temporary. Any sediment resuspension is unlikely to last more than a few hours per

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:3:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile.

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:3:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted.

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:9: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:61:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:62:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:70:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:71: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:72: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:73: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:74: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:75: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:76: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:79: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:80:and all sediment particles suspended in the water column will eventually settle to the river or sea bed,

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:1: • Impacts on marine ecology from increased suspended sediment during capital dredging and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:9.5.2 Effects of increased suspended sediment concentrations during dredging

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:will disturb sediment, which will result in localised and short-term increases in suspended sediment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:importance (where information is available) to increases in suspended sediment. This information is

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:to increases in suspended sediment concentrations, according to this sensitivity review.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:23:and any species of conservation importance (where information is available) to increases in suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:23:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:43: Significant operation temporarily suspended). These hazards and associated risk

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:43: 9 - 10 High permanently suspended). These hazards and associated risk control

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: injury immediate area within site suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion. term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: short-term disruption to term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and disembarkation suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: taking additional risks short-term disruption to Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: Reduced visibility. Fire short-term disruption to term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: short-term disruption to Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Cargo Traffic control failure. short-term disruption to Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Vessel taking additional risks short-term disruption to Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: 3rd party vessel / environmental amenity; suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: dredging operations. Fire suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Tanker berth 3rd party vessel / suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: 3rd party vessel / suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: General not necessarily met; Bad Medium-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Project not necessarily met; Bad Medium-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: short-term disruption to term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: 3rd party vessel / term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: 3rd party vessel / term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: short-term disruption to suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: necessarily met; Very publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: necessarily met; Very publicity. Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: necessarily met; Very publicity. Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Cargo control failure. short-term disruption to term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Vessel Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: avoiding action with environmental amenity; term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: 3rd party vessel. Fire suspension of commercial activities

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Tanker term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: publicity. Medium-term suspension

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: necessarily met; Very publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: avoiding action with suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: avoiding action with suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: large vessel moving in services with ensuing loss within site. Temporary suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: failure. Reduced visibility. publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: criteria not necessarily met; publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Pilot boarding and suspension of commercial activities and/or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: operations. Traffic control Very short-term disruption publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: additional risks during suspension of commercial activities and/or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Vessel suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Dredgers) Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Vessel additional risks during suspension of commercial activities and/or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: with 3rd party vessel / environmental amenity; suspension of operations or prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: short-term disruption to Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: berth - Tanker berth publicity. Medium-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: General Cargo publicity. Medium-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: with 3rd party vessel / publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: Vessel criteria not necessarily met; international publicity. Long-term suspension

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: criteria not necessarily met; international publicity. Long-term suspension

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. Very short-term disruption to Long-term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: disembarkation Very short-term disruption to Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: Long-term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: additional risks during Very short-term disruption to Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Cargo Vessel necessarily met; Very short- Long-term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Workboat regional publicity. Temporary suspension

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: of avoiding action with Medium-term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: berth Reduced visibility. Result Medium-term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: of avoiding action with suspension of operations or prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: berth Reduced visibility. Result Medium-term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: criteria not necessarily met; Medium-term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: criteria not necessarily met; Medium-term suspension of operations or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: of avoiding action with necessarily met; Very short- suspension of operations, prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: moving in the port services with ensuing loss of site. Temporary suspension of operations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:3: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:4:1989 between waves, tides and suspended mud HR Wallingford, 1989

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:7: and suspended mud concentrations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:10: predict movement of suspended sediment from the proposed dredging and disposal activities by

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:Suspended sediment concentrations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31: Suspended sediment concentrations (mg/l)

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:35: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:41:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:60:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:60:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:62:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:63:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:68:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:68:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:72:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:81:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:91:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:28:tern species as a result of increased suspended sediments during the construction phase.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:28:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: structures and capital dredging, increased suspended sediment concentrations and increased

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: increased suspended sediment concentrations or sediment deposition during construction.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.29 Impacts on fish resources within the subtidal area, as a result of increased suspended sediment,

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.34 Adverse impacts may be expected as a result of temporary increases in suspended solids

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.35 Other water quality issues, such as a reduction in dissolved oxygen or suspension of

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: potential impact on water quality has been identified due to the resuspension of sediment,

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: Additionally, sediment plume modelling shows relatively limited areas of high suspended solids

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: concentrations, which only occur for a matter of hours at a time before the suspended sediment

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: process to minimise the potential for resuspension of sediments. Such measures include

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:5:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18: • Suspended deck.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:A piled suspended deck structure would be technically feasible, however this option would require more

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:suspended deck option also reduces the potential for the incorporation of environmental enhancement

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:disturbance and increased suspended sediments on migratory fish).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:(increased suspended sediment concentrations) are relevant to the CIA.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:Dispersion of suspended sediment and deposition on the seabed during capital dredging

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:immediately after the period of construction. This is because fine material will be released into suspension,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:17: • dispersion of suspended sediment during marine works, dredging and disposal; and,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:3: thresholds for parameters such as suspended sediment and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:12:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:13:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:22: runoff from the mounds could result in elevated levels of suspended sediment. A number of

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:21:contribute to the removal of suspended sediment from the surface water discharge from these sites.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may

R-2021-0166-FFM-Environmental Risk Assessment.pdf:25:sediment suspension as samples were filtered on the second monitoring round. The TPH and PAH

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:24:suggest that suspended flor slabs will be more appropriate.

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:27:Ground beams and floor slabs would need to be suspended.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:5: Increased suspended sediment concentrations (SSC) 42

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:42:Increased suspended sediment concentrations (SSC)

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:42: 6.2.3 There is potential for temporary increases in SSC and turbidity due to suspension,

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:42: resuspension and deposition of sediments and potentially formation of sediment plumes

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:42: 6.2.4 The Site is located in the tidally-influenced stretch of the estuary where most suspended

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:977: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:977: The electrical conductance of a soil suspension in water or

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:977: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979: Suspended matter is removed from a measured volume of

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979: Suspended Solids:

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979: Suspended and the total suspended matter is determined gravimetrically

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979: left in suspension after settlement for 1 hour (or other

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:979: agreed time) from the total suspended matter in the

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:980: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:980: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:980:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:982: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:983: particulates in suspension.

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:1005: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:31: Oils and Suspended solids

R-2021-1048-FFM-Appendix1.pdf:10: and no-one stands beneath suspended equipment.

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:7:piles designed to mitigate the effects of expansion and potentially suspended floors. Lightly loaded

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:38:  Reinforced concrete cast in situ floor slab (suspended, non‐suspended or raft) with at least

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:65:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:70: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:70: The electrical conductance of a soil suspension in water or

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:70: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72: Suspended matter is removed from a measured volume of

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72: Suspended Solids:

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72: Suspended and the total suspended matter is determined gravimetrically

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72: left in suspension after settlement for 1 hour (or other

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:72: agreed time) from the total suspended matter in the

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:73: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:73: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:73:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:75: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:76: particulates in suspension.

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1347:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: The electrical conductance of a soil suspension in water or

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended matter is removed from a measured volume of

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended Solids:

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended and the total suspended matter is determined gravimetrically

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: left in suspension after settlement for 1 hour (or other

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: agreed time) from the total suspended matter in the

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1357: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1358: particulates in suspension.

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:48:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:53: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:53: The electrical conductance of a soil suspension in water or

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:53: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55: Suspended matter is removed from a measured volume of

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55: Suspended Solids:

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55: Suspended and the total suspended matter is determined gravimetrically

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55: left in suspension after settlement for 1 hour (or other

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:55: agreed time) from the total suspended matter in the

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:56: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:56: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:56:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:58: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:59: particulates in suspension.

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:26: • use of silt traps used to capture suspended solids;

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:contribute to the removal of suspended sediment from the surface water discharge from these sites.

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:133:of settling ponds are present in the southern section of the site; formerly an aqueous suspension of

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:534: trial pit etc. Should the excavation become unsafe, operations shall be suspended until

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:597:streams that feed the SLEMS to deposit out of suspension prior to discharge from the Installation. The

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:605:suspended solids that are dredged from the channels. The sample locations shall be investigated using a

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:605:condition of land at the location of the suspended solid drying beds where no pollution prevention

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:605:perched water at the location of the suspended solid drying beds where no pollution prevention measures

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:651: 16 ü Iron ore (in suspended matter load in controlled waters. Pyrite in

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:706: 8 migration via wind or suspended in steam to

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:726: E ü Heavy metals, suspended solids, carbon.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:15: present in the southern section of the site; formerly an aqueous suspension of BOS oxide was

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:10: consideration of design features to remove silt and other suspended

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:15: of design features to remove silt and other suspended solids, as well as capture any spills/oil

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:9: onto the public road network where it may be deposited and then re-suspended by vehicles

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:37:G5.7 The potential for pollution of surface water is principally when high levels of suspended solids

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:41: sediments in within the site, or suspended solids, as well as capture

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:50: sediment suspended solids, as well as capture any magnitude of change and so

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: contaminants and remove silt and other suspended solids, as well from residual impacts.

R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:7: impact on National Grid tunnel assets then we reserve the right to suspend the piling works.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:3: suspension when dry due to small

R-2020-0357-OOM-Planning Statement - July 2020.pdf:38: consider the effects of construction, demolition, trackout (dust deposited or resuspended by

R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:6: This section includes a brief description of some of the hazards Length of suspension

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:134: suspended sediment release on or adjacent to the proposed development. This

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:135: The potential for pollution of surface water is principally when high levels of suspended

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:135: The potential for pollution of surface water is principally when high levels of suspended

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:139: increased suspended solids, as well as capture any spills/oil

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:143: contaminants silt and other suspended solids, as well as capture from residual impacts.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:144: contaminants adverse silt and other suspended solids, as well as capture from residual impacts.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:252: suspended solids, as well as capture any spills/oil and grease, prior to discharge.

R-2019-0767-OOM-officer report.pdf:52: increased suspended sediment release on or adjacent to the proposed

R-2019-0767-OOM-officer report.pdf:52:Surface water quality could be impacted by suspended solids entering the

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:324:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:329: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:329: The electrical conductance of a soil suspension in water or

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:329: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331: Suspended matter is removed from a measured volume of

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331: Suspended Solids:

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331: Suspended and the total suspended matter is determined gravimetrically

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331: left in suspension after settlement for 1 hour (or other

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:331: agreed time) from the total suspended matter in the

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:332: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:332: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:332:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:334: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:335: particulates in suspension.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:43:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:48: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:48: The electrical conductance of a soil suspension in water or

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:48: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50: Suspended matter is removed from a measured volume of

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50: Suspended Solids:

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50: Suspended and the total suspended matter is determined gravimetrically

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50: left in suspension after settlement for 1 hour (or other

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:50: agreed time) from the total suspended matter in the

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:51: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:51: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:51:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:53: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:54: particulates in suspension.

R-2023-0224-CD-50134151_1_CPP.pdf:4:5.21.5 Platforms suspended by Crane …………………………………………………………………………………………………………….. 50

R-2023-0224-CD-50134151_1_CPP.pdf:44:Platform Procedure (AA426 51) and Safe use of Crane Suspended Work Platforms (AA426 52).

R-2023-0224-CD-50134151_1_CPP.pdf:50:5.21.5 Platforms suspended by Crane

R-2023-0224-CD-50134151_1_CPP.pdf:50:Crane suspended work platforms can only be used where other means of reaching an elevated work

R-2023-0224-CD-50134151_1_CPP.pdf:50:Use of crane suspended work platforms requires HZI Site Management authorisation in writing.

R-2023-0224-CD-50134151_1_CPP.pdf:50:When the carriage of personnel by crane suspended work platform is required, and subject to HZI

R-2023-0224-CD-50134151_1_CPP.pdf:50:restriction/approval, the crane suspended work platforms must be suitably tested by an authorised

R-2023-0224-CD-50134151_1_CPP.pdf:50:All sides of the crane suspended work platform shall be enclosed by a top guard rail, 1.1 meters high and

R-2023-0224-CD-50134151_1_CPP.pdf:50:The floor of the crane suspended work platform shall have a solid non-slip surface with drain points to

R-2023-0224-CD-50134151_1_CPP.pdf:50:Four independent sling wires shall be used for lifting the crane suspended work platform. All wire ropes and

R-2023-0224-CD-50134151_1_CPP.pdf:50:All persons using the crane suspended work platform must be secured by a safety harness fixed to the

R-2023-0224-CD-50134151_1_CPP.pdf:50:All cranes used for lifting crane suspended work platforms must be fitted with anti-two block devices to

R-2023-0224-CD-50134151_1_CPP.pdf:51:For additional info on Platforms suspended by Crane please refer to Doc. No. AA426 52.

R-2023-0224-CD-50134151_1_CPP.pdf:53:Safe means of promptly rescuing a fallen worker or a worker suspended by fall arrest shall be available at all

R-2023-0224-CD-50134151_1_CPP.pdf:54:If there is any doubt about the security of any anchorage, suspension points or ties for a scaffold e.g. strength of

R-2023-0224-CD-50134151_1_CPP.pdf:58:Strict cable management shall be enforced. Cables should be suspended off the ground by a minimum of 2

R-2023-0224-CD-50134151_1_CPP.pdf:65:worker suspended by fall arrest shall be available at all times.

R-2023-0224-CD-50134151_1_CPP.pdf:67: AA 426 52 Safe Use of Crane Suspended Work Platforms X

R-2023-0224-CD-50134216_1_CEMP.pdf:14: Contaminants off- ensure that silt and other suspended solids and contaminants are not

R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14: promoting the settlement of suspended siltation from the water.

R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:be provided across the surface water drainage network to intercept suspended silt close to

R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:to aid in the treatment of surface water by providing opportunity for suspended silt to settle,

R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:16:connections) shall be cast iron and, where appropriate shall be suspended from the above

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf:14: this plan and to be supported by the suspension/banning of any vehicle

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf:14: this plan and to be supported by the suspension/banning of any vehicle

R-2023-0247-OOM-TV_BAF_Heritage_Statement_Part_1of2.pdf:25: by fast flowing water and clays that settle out of suspension during overbank

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:147: attenuation pond will also help reduce suspended

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:148: other suspended solids, as well as capture any spills/oil and grease, prior to

R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:20: could be deposited by vehicles leaving the site and re-suspended by

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:11: where it may be deposited and then re-suspended by vehicles using the network. This arises when

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:29: prone to suspension when dry due to small particle size), > 10 heavy earth

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:22: 16 ü Iron ore (in suspended matter load in controlled waters. Pyrite in

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:77: 8 migration via wind or suspended in steam to

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:97: E ü Heavy metals, suspended solids, carbon.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1381: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1381: The electrical conductance of a soil suspension in water or

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1381: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383: Suspended matter is removed from a measured volume of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383: Suspended Solids:

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383: Suspended and the total suspended matter is determined gravimetrically

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383: left in suspension after settlement for 1 hour (or other

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1383: agreed time) from the total suspended matter in the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1384: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1384: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1384:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1386: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1387: particulates in suspension.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1409: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1436:sediment suspension as samples were filtered on the second monitoring round. The TPH and PAH

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1569: Water treatment separates suspended

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1607:suggest that suspended flor slabs will be more appropriate.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1610:Ground beams and floor slabs would need to be suspended.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1638:complete removal and weathering, use of suspended floors, and installation of piles isolated from potential

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:12: suspended since 2019.

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:39: silt and other suspended solids, as well as capture any spills/oil and grease, prior to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:12: suspended since 2019.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:15: to remove silt and other suspended solids,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:43: primarily when high levels of suspended solids and/or leachates from Made Ground have the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:46: remove silt and other suspended solids, as well as capture any spills/oil and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:48:Kinkerdale Beck sediments in surface retained within the site. The remove silt and other suspended solids, as

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:55: and sediment suspended solids, as well as

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:56: contaminants other suspended solids, as Not Significant

R-2020-0270-FFM-EA R_2020_0270_FFM 26 June 2020 OFFICIAL.pdf:2:0004). This would further reduce flow rates and aid the removal of suspended solids and

R-2021-0432-FFM-Decision.pdf:2: time trigger) until such time as a scheme to treat and remove suspended

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:15:  Water Treatment Plant to remove free phase hydrocarbons and suspended sediments.

R-2021-0432-FFM-Off Rep.pdf:2:time trigger) until such time as a scheme to treat and remove suspended

R-2021-0432-FFM-Off Rep.pdf:9: suspended solids and possible contamination from surface water run-off

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:2:were present, the water did not contain suspended solids or contamination associated with the

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:2:suspended solids.

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:3:suspended solids and contaminants associated with the suspended solids.

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:3:It should be considered that the water quality including chemical parameters, suspended solids and

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:3:Suspended solids max 250 mg/l

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:4: • Dewatering Pumps: pump(s) shall be required to uplift water and suspended sediments from

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:5: remaining suspended particles which may remain in the water and prevent them from fouling

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:7: is to reduce the concentration of suspended solids in the aqueous phase. T2 is fitted

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:8: in reverse direction thus expanding the bed and forcing out trapped suspended solids.

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:14: processed, particularly the concentration of suspended solids.

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:17: removal of silts is more labour intensive. The water quality and level of suspended

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:20: suspended solids are filtered by the sand and accumulate within the top layer of the

R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:20: suspended solids on the outlet of the sand filter. Sample taps are fitted to the sand

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1088: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1088: The electrical conductance of a soil suspension in water or

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1088: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090: Suspended matter is removed from a measured volume of

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090: Suspended Solids:

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090: Suspended and the total suspended matter is determined gravimetrically

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090: left in suspension after settlement for 1 hour (or other

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1090: agreed time) from the total suspended matter in the

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1091: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1091: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1091:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1093: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1094: particulates in suspension.

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1116: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days

R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf:1:trigger) until such time as a scheme to treat and remove suspended solids and possible

R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf:5: Suspended Solids dried at 105°C 200 -

R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf:5: Settled Suspended Solids dried at 200 -

R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf:6: reference card, demonstrating gross suspended solid removal.

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:84: Water treatment separates suspended

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:10: both an oil refinery and chemical plant. Refining was suspended in 2009, however, the site continues to

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:contribute to the removal of suspended sediment from the surface water discharge from these sites.

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:93:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: The electrical conductance of a soil suspension in water or

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended matter is removed from a measured volume of

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended Solids:

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended and the total suspended matter is determined gravimetrically

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: left in suspension after settlement for 1 hour (or other

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: agreed time) from the total suspended matter in the

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:103: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:104: particulates in suspension.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:22:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: The electrical conductance of a soil suspension in water or

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended matter is removed from a measured volume of

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended Solids:

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended and the total suspended matter is determined gravimetrically

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: left in suspension after settlement for 1 hour (or other

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: agreed time) from the total suspended matter in the

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:32: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:33: particulates in suspension.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:110:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: The electrical conductance of a soil suspension in water or

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended matter is removed from a measured volume of

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended Solids:

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended and the total suspended matter is determined gravimetrically

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: left in suspension after settlement for 1 hour (or other

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: agreed time) from the total suspended matter in the

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:120: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:121: particulates in suspension.

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf:14: this plan and to be supported by the suspension/banning of any vehicle

R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14: promoting the settlement of suspended siltation from the water.

R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:be provided across the surface water drainage network to intercept suspended silt close to

R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:to aid in the treatment of surface water by providing opportunity for suspended silt to settle,

R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:16:connections) shall be cast iron and, where appropriate shall be suspended from the above

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf:14: this plan and to be supported by the suspension/banning of any vehicle

R-2023-0253-RMM-50134151_1_CPP.pdf:4:5.21.5 Platforms suspended by Crane …………………………………………………………………………………………………………….. 50

R-2023-0253-RMM-50134151_1_CPP.pdf:44:Platform Procedure (AA426 51) and Safe use of Crane Suspended Work Platforms (AA426 52).

R-2023-0253-RMM-50134151_1_CPP.pdf:50:5.21.5 Platforms suspended by Crane

R-2023-0253-RMM-50134151_1_CPP.pdf:50:Crane suspended work platforms can only be used where other means of reaching an elevated work

R-2023-0253-RMM-50134151_1_CPP.pdf:50:Use of crane suspended work platforms requires HZI Site Management authorisation in writing.

R-2023-0253-RMM-50134151_1_CPP.pdf:50:When the carriage of personnel by crane suspended work platform is required, and subject to HZI

R-2023-0253-RMM-50134151_1_CPP.pdf:50:restriction/approval, the crane suspended work platforms must be suitably tested by an authorised

R-2023-0253-RMM-50134151_1_CPP.pdf:50:All sides of the crane suspended work platform shall be enclosed by a top guard rail, 1.1 meters high and

R-2023-0253-RMM-50134151_1_CPP.pdf:50:The floor of the crane suspended work platform shall have a solid non-slip surface with drain points to

R-2023-0253-RMM-50134151_1_CPP.pdf:50:Four independent sling wires shall be used for lifting the crane suspended work platform. All wire ropes and

R-2023-0253-RMM-50134151_1_CPP.pdf:50:All persons using the crane suspended work platform must be secured by a safety harness fixed to the

R-2023-0253-RMM-50134151_1_CPP.pdf:50:All cranes used for lifting crane suspended work platforms must be fitted with anti-two block devices to

R-2023-0253-RMM-50134151_1_CPP.pdf:51:For additional info on Platforms suspended by Crane please refer to Doc. No. AA426 52.

R-2023-0253-RMM-50134151_1_CPP.pdf:53:Safe means of promptly rescuing a fallen worker or a worker suspended by fall arrest shall be available at all

R-2023-0253-RMM-50134151_1_CPP.pdf:54:If there is any doubt about the security of any anchorage, suspension points or ties for a scaffold e.g. strength of

R-2023-0253-RMM-50134151_1_CPP.pdf:58:Strict cable management shall be enforced. Cables should be suspended off the ground by a minimum of 2

R-2023-0253-RMM-50134151_1_CPP.pdf:65:worker suspended by fall arrest shall be available at all times.

R-2023-0253-RMM-50134151_1_CPP.pdf:67: AA 426 52 Safe Use of Crane Suspended Work Platforms X

R-2023-0253-RMM-50134216_1_CEMP.pdf:14: Contaminants off- ensure that silt and other suspended solids and contaminants are not

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:structures and capital dredging, increased suspended sediment concentrations and increased sediment

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:areas. Impacts on fish resources within the subtidal area, as a result of increased suspended sediment,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:Adverse impacts may be expected as a result of temporary increases in suspended sediment during

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:or suspension of contaminants, are not considered to have any significant impact on resident or

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: a short-lived localised increase in suspended sediment concentrations by the order of a few hundred

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: A potential impact on water quality has been identified due to the resuspension of sediment,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: plume modelling shows relatively limited areas of high suspended solids concentrations, which only

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: occur for a matter of hours at a time before the suspended sediment concentrations return to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: does not predict long term and large scale extends of elevated concentrations of suspended solids;

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:61:resuspension of contaminants during dredging

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:105: suspensions or pending prosecutions

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:166: and surface deposit-feeder, whose feeding activities result in sediment resuspension through GS13, GS15, GS21, GS24, GS26)

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:169: addition, as detailed in the EIA Report it is predicted that suspended

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:170: within sediments to other areas of the Tees (due to resuspension of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:170: suspended sediment during dredging, which will minimise the risk of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:170: suspended sediment would likely re-settle in areas close to the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:184: quality due to resuspension water quality monitoring scheme has been

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:structures and capital dredging, increased suspended sediment concentrations and increased sediment

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:areas. Impacts on fish resources within the subtidal area, as a result of increased suspended sediment,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:Adverse impacts may be expected as a result of temporary increases in suspended sediment during

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:or suspension of contaminants, are not considered to have any significant impact on resident or

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: a short-lived localised increase in suspended sediment concentrations by the order of a few hundred

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: A potential impact on water quality has been identified due to the resuspension of sediment,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: plume modelling shows relatively limited areas of high suspended solids concentrations, which only

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: occur for a matter of hours at a time before the suspended sediment concentrations return to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: does not predict long term and large scale extends of elevated concentrations of suspended solids;

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:61:resuspension of contaminants during dredging

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:105: suspensions or pending prosecutions

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:156: quality due to resuspension water quality monitoring scheme has been

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:13: • It has been assumed that internal office space has hard suspended ceiling.

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1347:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: The electrical conductance of a soil suspension in water or

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1352: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended matter is removed from a measured volume of

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended Solids:

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: Suspended and the total suspended matter is determined gravimetrically

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: left in suspension after settlement for 1 hour (or other

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1354: agreed time) from the total suspended matter in the

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1355:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1357: Water Soluble particulates in suspension. contamination on former gasworks and

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1358: particulates in suspension.

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:38: result in increased sediment suspension, potentially

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:44: caused by increases in suspended sediment, reduced

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:44: suspended sediment causing increases in nutrients

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:45: sediment suspension in the water body, potentially

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:45: resulting in localised increases in nutrients suspended

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:53: growth (Appendix A), therefore any suspended silt is not

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:53: caused by increases in suspended sediment,

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:54: Adverse impacts may also result from suspended

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:17: remove suspended sediment before discharge to surface water or to ground. If oil is observed in the

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:23: • use of silt traps used to capture suspended solids;

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:70: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:74: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:74: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:74: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:75: total suspended matter in the sample.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:76: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:76: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:76: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:76: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:77: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:78: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:4: To restrict suspended sediment plumes to one side of the estuary at a time, and

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:6: To restrict suspended sediment plumes to one side of the estuary at a time, in

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:7: works must be suspended. Once temperatures have not reached zero degrees

338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf:9: suspended sediment

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:2: suspended sediment brought in from the sea. Short term peaks in suspended sediment (during

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3: are presented principally as changes in suspended sediment concentration (SSC), the principal

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4: In coastal process terms, the temporary suspension itself is indeed probably of minor

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:3: i. Changes in marine water quality (i.e. increased suspended sediment) due to dredging

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:6: season (e.g. salmon), as a result of increased suspended sediment concentrations, poor water

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:7: suspended sediment concentrations and the extent of the plume across the river channel will be

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:7: conditions are present (Sigler et al., 1984; Bash et al., 2001). The effects of suspended sediment

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:7: relevant, suspended sediment-generated turbidities.

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:12:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:12:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids.

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:12:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:12:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:12:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation,

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:14:Elevated concentrations of suspended sediment can have the following physical effects on all life stage

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:14: suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt,

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:15: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:15: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:32: • Suspended deck.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:32:A piled suspended deck structure would be technically feasible, however this option would require more

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:54:1989 between waves, tides and suspended mud HR Wallingford, 1989

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:57: and suspended mud concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:60: predict movement of suspended sediment from the proposed dredging and disposal activities by

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:81:Suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:81: Suspended sediment concentrations (mg/l)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:143: including stop / start thresholds for parameters such as suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:156: Suspended sediment concentrations (mg/l)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167:As these works progress, there is the potential for sediment to be suspended when working in and around

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:9.5.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:importance (where information is available) to increases in suspended sediment. This information is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:to increases in suspended sediment concentrations, according to this sensitivity review.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:213:and any species of conservation importance (where information is available) to increases in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:297:tern species as a result of increased suspended sediments during the construction phase.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:309: thresholds for parameters such as suspended sediment and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:482: Increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:482:sensitive to smothering or increases in suspended sediment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:488:The offshore disposal of dredged material would temporarily increase the suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490:disturbance and increased suspended sediments on migratory fish).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:500:(increased suspended sediment concentrations) are relevant to the CIA.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:500:immediately after the period of construction. This is because fine material will be released into suspension,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:506: • dispersion of suspended sediment during marine works, dredging and disposal; and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:526: 24.Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:528: suspended solids

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:528: The installation and presence of the rock impacted is less than suspended solids

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:541: Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:542: Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:61:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:61:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities).

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:92: 7.3 Suspended Sediment Conversion ………………………………………………………………………………………..20

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:108:7.3 Suspended Sediment Conversion

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:117: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:117: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:137:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:139: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:191:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:192:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:200:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:201: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:202: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:203: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:204: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:205: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:206: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:209: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:210:and all sediment particles suspended in the water column will eventually settle to the river or sea bed,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:211:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:2:that the most important potential coastal process impact would be changes in suspended sediment plumes,

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does

MLA_2020_00507-Decision Letter (Marine)-16.pdf:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your

MLA_2020_00507-Decision Letter (Marine)-16.pdf:2:suspending or revoking the licence. Our terms and conditions relating to charging can

MLA_2020_00507-Decision Letter (Marine)-16.pdf:3: Suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32: • Suspended deck.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:A piled suspended deck structure would be technically feasible, however this option would require more

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:54:1989 between waves, tides and suspended mud HR Wallingford, 1989

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:57: and suspended mud concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:60: predict movement of suspended sediment from the proposed dredging and disposal activities by

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:Suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:81: Suspended sediment concentrations (mg/l)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:143: including stop / start thresholds for parameters such as suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:156: Suspended sediment concentrations (mg/l)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:As these works progress, there is the potential for sediment to be suspended when working in and around

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:9.5.2 Effects of increased suspended sediment concentrations during dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:importance (where information is available) to increases in suspended sediment. This information is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:to increases in suspended sediment concentrations, according to this sensitivity review.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:213:and any species of conservation importance (where information is available) to increases in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:297:tern species as a result of increased suspended sediments during the construction phase.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:309: thresholds for parameters such as suspended sediment and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:482: Increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:482:sensitive to smothering or increases in suspended sediment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:The offshore disposal of dredged material would temporarily increase the suspended sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:disturbance and increased suspended sediments on migratory fish).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:(increased suspended sediment concentrations) are relevant to the CIA.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:500:immediately after the period of construction. This is because fine material will be released into suspension,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:506: • dispersion of suspended sediment during marine works, dredging and disposal; and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: 24.Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528: suspended solids

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528: The installation and presence of the rock impacted is less than suspended solids

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541: Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:542: Reduce sediment resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:173: Significant operation temporarily suspended). These hazards and associated risk

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:173: 9 - 10 High permanently suspended). These hazards and associated risk control

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: injury immediate area within site suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion. term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: short-term disruption to term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and disembarkation suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: taking additional risks short-term disruption to Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: Reduced visibility. Fire short-term disruption to term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: short-term disruption to Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Cargo Traffic control failure. short-term disruption to Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Vessel taking additional risks short-term disruption to Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: 3rd party vessel / environmental amenity; suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: dredging operations. Fire suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Tanker berth 3rd party vessel / suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: 3rd party vessel / suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: General not necessarily met; Bad Medium-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Project not necessarily met; Bad Medium-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: short-term disruption to term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: 3rd party vessel / term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: 3rd party vessel / term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: short-term disruption to suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: necessarily met; Very publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: necessarily met; Very publicity. Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: necessarily met; Very publicity. Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Cargo control failure. short-term disruption to term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Vessel Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: avoiding action with environmental amenity; term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: 3rd party vessel. Fire suspension of commercial activities

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Tanker term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: publicity. Medium-term suspension

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: necessarily met; Very publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: avoiding action with suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: avoiding action with suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: large vessel moving in services with ensuing loss within site. Temporary suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: failure. Reduced visibility. publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: criteria not necessarily met; publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Pilot boarding and suspension of commercial activities and/or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: operations. Traffic control Very short-term disruption publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: additional risks during suspension of commercial activities and/or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Vessel suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Dredgers) Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Vessel additional risks during suspension of commercial activities and/or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: with 3rd party vessel / environmental amenity; suspension of operations or prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: short-term disruption to Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: berth - Tanker berth publicity. Medium-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: General Cargo publicity. Medium-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: with 3rd party vessel / publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: Vessel criteria not necessarily met; international publicity. Long-term suspension

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: criteria not necessarily met; international publicity. Long-term suspension

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. Very short-term disruption to Long-term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: disembarkation Very short-term disruption to Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: Long-term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: additional risks during Very short-term disruption to Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Cargo Vessel necessarily met; Very short- Long-term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Workboat regional publicity. Temporary suspension

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: of avoiding action with Medium-term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: berth Reduced visibility. Result Medium-term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: of avoiding action with suspension of operations or prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: berth Reduced visibility. Result Medium-term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: criteria not necessarily met; Medium-term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: criteria not necessarily met; Medium-term suspension of operations or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: of avoiding action with necessarily met; Very short- suspension of operations, prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: moving in the port services with ensuing loss of site. Temporary suspension of operations

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386: and temporary. Any sediment resuspension is unlikely to last more than a few hours per

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted.

MLA_2020_00507-Licence Document (Marine)-14.pdf:14: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging

MLA_2020_00507-Licence Document (Marine)-14.pdf:17:being taken. This can include variation, revocation or suspension of the licence,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:32: • Suspended deck.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:32:A piled suspended deck structure would be technically feasible, however this option would require more

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:54:1989 between waves, tides and suspended mud HR Wallingford, 1989

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:57: and suspended mud concentrations

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:60: predict movement of suspended sediment from the proposed dredging and disposal activities by

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:81:Suspended sediment concentrations

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:81: Suspended sediment concentrations (mg/l)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:143: including stop / start thresholds for parameters such as suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:156: Suspended sediment concentrations (mg/l)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167:As these works progress, there is the potential for sediment to be suspended when working in and around

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:9.5.2 Effects of increased suspended sediment concentrations during dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:importance (where information is available) to increases in suspended sediment. This information is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:to increases in suspended sediment concentrations, according to this sensitivity review.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:213:and any species of conservation importance (where information is available) to increases in suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:297:tern species as a result of increased suspended sediments during the construction phase.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:309: thresholds for parameters such as suspended sediment and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:482: Increase in suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:482:sensitive to smothering or increases in suspended sediment.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:488:The offshore disposal of dredged material would temporarily increase the suspended sediment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490:disturbance and increased suspended sediments on migratory fish).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:500:(increased suspended sediment concentrations) are relevant to the CIA.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:500:immediately after the period of construction. This is because fine material will be released into suspension,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:506: • dispersion of suspended sediment during marine works, dredging and disposal; and,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:526: 24.Reduce sediment resuspension

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:528: suspended solids

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:528: The installation and presence of the rock impacted is less than suspended solids

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:541: Reduce sediment resuspension

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:542: Reduce sediment resuspension

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:5:stop start thresholds for parameters such as suspended sediment and dissolved oxygen

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities).

R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf:5: 7.3 Suspended Sediment Conversion ………………………………………………………………………………………..20

R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf:21:7.3 Suspended Sediment Conversion

R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf:30: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020

R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf:30: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:3: thresholds for parameters such as suspended sediment and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:12:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:13:of suspended sediments are predicted to decrease significantly with increased distance from the dredging

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:1: • Impacts on marine ecology from increased suspended sediment during capital dredging and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:9.5.2 Effects of increased suspended sediment concentrations during dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:will disturb sediment, which will result in localised and short-term increases in suspended sediment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:ecology as a result of increased concentrations of suspended sediment within the water column (i.e.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:importance (where information is available) to increases in suspended sediment. This information is

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:to increases in suspended sediment concentrations, according to this sensitivity review.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:21:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:22:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:23:and any species of conservation importance (where information is available) to increases in suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:23:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:disturbance and increased suspended sediments on migratory fish).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:(increased suspended sediment concentrations) are relevant to the CIA.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:Dispersion of suspended sediment and deposition on the seabed during capital dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:11:immediately after the period of construction. This is because fine material will be released into suspension,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:A review of all EIA studies for the above projects highlights that the maximum increase in suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:12:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:14:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:17: • dispersion of suspended sediment during marine works, dredging and disposal; and,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:43: Significant operation temporarily suspended). These hazards and associated risk

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:43: 9 - 10 High permanently suspended). These hazards and associated risk control

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: injury immediate area within site suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion. term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: short-term disruption to term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and disembarkation suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: taking additional risks short-term disruption to Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: Reduced visibility. Fire short-term disruption to term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: short-term disruption to Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Cargo Traffic control failure. short-term disruption to Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Vessel taking additional risks short-term disruption to Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: 3rd party vessel / environmental amenity; suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: dredging operations. Fire suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Tanker berth 3rd party vessel / suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: 3rd party vessel / suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: General not necessarily met; Bad Medium-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Project not necessarily met; Bad Medium-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: short-term disruption to term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: 3rd party vessel / term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: 3rd party vessel / term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: short-term disruption to suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: necessarily met; Very publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: necessarily met; Very publicity. Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: necessarily met; Very publicity. Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Cargo control failure. short-term disruption to term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Vessel Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: avoiding action with environmental amenity; term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: 3rd party vessel. Fire suspension of commercial activities

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Tanker term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: publicity. Medium-term suspension

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: necessarily met; Very publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: avoiding action with suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: avoiding action with suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: large vessel moving in services with ensuing loss within site. Temporary suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: failure. Reduced visibility. publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: criteria not necessarily met; publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Pilot boarding and suspension of commercial activities and/or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: operations. Traffic control Very short-term disruption publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: additional risks during suspension of commercial activities and/or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Vessel suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Dredgers) Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Vessel additional risks during suspension of commercial activities and/or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: with 3rd party vessel / environmental amenity; suspension of operations or prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: short-term disruption to Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: berth - Tanker berth publicity. Medium-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: General Cargo publicity. Medium-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: with 3rd party vessel / publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: Vessel criteria not necessarily met; international publicity. Long-term suspension

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: criteria not necessarily met; international publicity. Long-term suspension

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. Very short-term disruption to Long-term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: disembarkation Very short-term disruption to Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: Long-term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: additional risks during Very short-term disruption to Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Cargo Vessel necessarily met; Very short- Long-term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Workboat regional publicity. Temporary suspension

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: of avoiding action with Medium-term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: berth Reduced visibility. Result Medium-term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: of avoiding action with suspension of operations or prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: berth Reduced visibility. Result Medium-term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: criteria not necessarily met; Medium-term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: criteria not necessarily met; Medium-term suspension of operations or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: of avoiding action with necessarily met; Very short- suspension of operations, prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: moving in the port services with ensuing loss of site. Temporary suspension of operations

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:7:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:9: movement of suspended sediment from the proposed dredging and disposal activities by coupling with

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:61:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:62:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:70:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:71: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:72: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:73: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:74: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:75: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:76: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:79: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:80:and all sediment particles suspended in the water column will eventually settle to the river or sea bed,

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

R-2020-0684-ESM-Officer Report 0684.pdf:17:took place; suspended sediment concentrations, sediment sources and

R-2020-0684-ESM-Officer Report 0684.pdf:19:An assessment has also been made of suspended sediment concentrations.

R-2020-0684-ESM-Officer Report 0684.pdf:19:suspended solid concentrations, for the most part, are less than 20mg/l with

R-2020-0684-ESM-Officer Report 0684.pdf:20:period, concentrations of suspended sediment were very low as illustrated in

R-2020-0684-ESM-Officer Report 0684.pdf:21:It is acknowledged that there is the potential for sediment to be suspended

R-2020-0684-ESM-Officer Report 0684.pdf:21:increases in suspended solids concentrations are likely to be highly localised

R-2020-0684-ESM-Officer Report 0684.pdf:28: Impacts on marine ecology from increased suspended sediment during

R-2020-0684-ESM-Officer Report 0684.pdf:29:suspended sediment concentrations during dredging on marine species and

R-2020-0684-ESM-Officer Report 0684.pdf:30:habitats, effects of increased suspended sediment concentrations during

R-2020-0684-ESM-Officer Report 0684.pdf:30:increase in suspended sediment concentrations. Matters relating to this have

R-2020-0684-ESM-Officer Report 0684.pdf:30:predicted increase in suspended sediment, in addition to the low/very low

R-2020-0684-ESM-Officer Report 0684.pdf:30:sensitivity of the key species present in the estuary to increased suspended

R-2020-0684-ESM-Officer Report 0684.pdf:32:With regard to suspended sediment concentrations no mitigation measures

R-2020-0684-ESM-Officer Report 0684.pdf:34:in suspended sediments during dredging or other activities will have a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:2: including stop / start thresholds for parameters such as suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:this period, concentrations of suspended sediment were very low. It should be noted however, that the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:15: Suspended sediment concentrations (mg/l)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:16:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:17:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:19:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:20:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:20:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:23: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:As these works progress, there is the potential for sediment to be suspended when working in and around

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3: and temporary. Any sediment resuspension is unlikely to last more than a few hours per

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile.

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:5:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: 24.Reduce sediment resuspension

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7: suspended solids

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7: The installation and presence of the rock impacted is less than suspended solids

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:11:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:11:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:13:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:14:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:16:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:16:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:17:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:17:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:18: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20: Reduce sediment resuspension

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:21: Reduce sediment resuspension

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:24:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:28:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:1:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:1:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:5: Increase in suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:5:sensitive to smothering or increases in suspended sediment.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:The offshore disposal of dredged material would temporarily increase the suspended sediment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf:11:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re-

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:28:tern species as a result of increased suspended sediments during the construction phase.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:28:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: structures and capital dredging, increased suspended sediment concentrations and increased

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: increased suspended sediment concentrations or sediment deposition during construction.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.29 Impacts on fish resources within the subtidal area, as a result of increased suspended sediment,

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.34 Adverse impacts may be expected as a result of temporary increases in suspended solids

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26:5.35 Other water quality issues, such as a reduction in dissolved oxygen or suspension of

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: potential impact on water quality has been identified due to the resuspension of sediment,

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: Additionally, sediment plume modelling shows relatively limited areas of high suspended solids

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: concentrations, which only occur for a matter of hours at a time before the suspended sediment

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: process to minimise the potential for resuspension of sediments. Such measures include

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18: • Suspended deck.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:A piled suspended deck structure would be technically feasible, however this option would require more

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:suspended deck option also reduces the potential for the incorporation of environmental enhancement

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:18:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:3: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:4:1989 between waves, tides and suspended mud HR Wallingford, 1989

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:7: and suspended mud concentrations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:10: predict movement of suspended sediment from the proposed dredging and disposal activities by

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:Suspended sediment concentrations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:31: Suspended sediment concentrations (mg/l)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:34:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:35: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:41:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:60:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:60:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:62:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:63:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:68:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:68:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north-

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:72:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:81:and all sediment particles suspended in the water column will eventually settle to the river or seabed,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:91:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of

R-2022-0526-CD-AQIA_FINAL.pdf:39: public road network, where it may be deposited and then re-suspended by

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:26:  use of silt traps used to capture suspended solids;

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:93:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: The electrical conductance of a soil suspension in water or

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:98: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended matter is removed from a measured volume of

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended Solids:

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: Suspended and the total suspended matter is determined gravimetrically

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: left in suspension after settlement for 1 hour (or other

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:100: agreed time) from the total suspended matter in the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:101:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:103: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:104: particulates in suspension.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:110:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: The electrical conductance of a soil suspension in water or

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:115: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended matter is removed from a measured volume of

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended Solids:

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: Suspended and the total suspended matter is determined gravimetrically

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: left in suspension after settlement for 1 hour (or other

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:117: agreed time) from the total suspended matter in the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:118:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:120: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:121: particulates in suspension.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:22:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters)

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: The electrical conductance of a soil suspension in water or

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:27: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended matter is removed from a measured volume of

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended Solids:

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: Suspended and the total suspended matter is determined gravimetrically

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29:DETSC Suspended, Settleable and Total MCERTS(Waters)-

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: left in suspension after settlement for 1 hour (or other

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:29: agreed time) from the total suspended matter in the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:30:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:32: Water Soluble particulates in suspension. contamination on former gasworks and

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:33: particulates in suspension.

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:6: monitoring of NO2 using diffusion tubes, monitoring of suspended and deposited dust from

R-2020-0411-FFM-Appendix 8.2 Outline Drainage Strategy.pdf:6: presented by each area. SuDS features would be suitably designed to reduce total suspended

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:15: include water quality impacts (e.g. elevated suspended sediments, release of contaminants,

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:18: presented by each area. SuDS features would be suitably designed to reduce total suspended

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:22: presented by each area. SuDS features would be suitably designed to reduce total suspended

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10: suspended (i.e. airborne) dust is deposition. The rate of deposition depends largely on the size of

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10: determine the distance it travels and how long it stays suspended in the air before it settles out

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10: • PM10 particles, those up to 10 µm in diameter, remain suspended in the air for long periods

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10:11.2.39 Concentration-based limit values and objectives have been set for the PM10 suspended particle

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:33: considered Suspended particulate

R-2020-0411-FFM-Chapter 2 Project Description.pdf:2: refinery was both an oil refinery and chemical plant. Refining was suspended in 2009,

R-2020-0411-FFM-Chapter 2 Project Description.pdf:24: River Tees to the west. Silty water will be treated to allow suspended solids to

R-2020-0411-FFM-Non Technical Summary.pdf:19: excavation, wheel washing, and dust and mud on site. Suspended sediments can reach surface

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:18: water will be treated to allow suspended solids to settle out before disposal. Treatment is

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:21: construction phase to ensure no discharge of pollutants or increase in suspended sediment

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:13: refinery was both an oil refinery and chemical plant. Refining was suspended in 2009,

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:20: suspended, such as Christmas and Easter when public holiday combine with weekend.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:9: Site. The refinery was both an oil refinery and chemical plant and refining was suspended in

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:10: both an oil refinery and chemical plant. Refining was suspended in 2009, however, the site continues to

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:84:Suspended access The Work at Height Regulations INDG367- Inspecting fall arrest equipment made from

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23: 9. Work in low light levels. Various injures from unseen Med Small teams of operatives Med Med Either suspend work Low

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:117: number of delays, including a fire and a temporary suspension due to the COVID-19

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:17: suspended solids, as well as capture

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:12: have been suspended since 2019.

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:42: silt and other suspended solids, as well as capture any spills/oil and grease, prior to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:11: have been suspended since 2019.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:42: for pollution of surface water is primarily when high levels of suspended solids and/or leachates

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:45: remove silt and other suspended solids, as well as capture any spills/oil and grease,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:47:Holme Beck Culvert, sediments in surface retained within the site. The remove silt and other suspended solids, as

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:53: and sediment suspended solids, as well

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:54: and sediment suspended solids, as well

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:454:Total Suspended Solids # <10 82 41 21 58 <10 mg/l TM37/PM0

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:466: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:466: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:472:Total Suspended Solids # 19 64 42 <10 mg/l TM37/PM0

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:483: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:483: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:489:Total Suspended Solids 69 60 16 91 12 68 24 <10 mg/l TM37/PM0

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:501: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:501: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:507:Total Suspended Solids 69 60 16 91 12 68 24 <10 mg/l TM37/PM0

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:519: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:519: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um

R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf:1:as a scheme to treat and remove suspended solids and possible contamination from surface water run-off

R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf:1:treatment and removal of suspended solids and possible contamination.

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:4: time trigger) until such time as a scheme to treat and remove suspended

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:4:and removals of suspended solids and possible contamination.

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:4: suspended solids in the aqueous phase. The clarified water from this tank flows via

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:5: process will remove any remaining finer suspended particles which may remain in

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:18: is to reduce the concentration of suspended solids in the aqueous phase. T2 is fitted

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:19: in reverse direction thus expanding the bed and forcing out trapped suspended solids.

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:25: processed, particularly the concentration of suspended solids.

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:28: removal of silts is more labour intensive. The water quality and level of suspended

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:31: suspended solids are filtered by the sand and accumulate within the top layer of the

R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:31: suspended solids on the outlet of the sand filter. Sample taps are fitted to the sand

R-2021-0906-CD-Agent email.pdf:1:the submission of a scheme to treat and remove suspended solids and possible contamination from surface water

R-2021-0906-CD-Agent email.pdf:1:suspended solids collects in the downstream excavation during construction, this will be removed via a vacuum tanker

R-2021-0906-CD-Agent email.pdf:1:suspended solids via a series of filters and discharge the waters via NWL trade effluent consent manhole 7902. No

R-2021-0906-CD-Decision Notice 0906.pdf:2: time trigger) until such time as a scheme to treat and remove suspended solids

R-2021-0906-CD-Officer Report 0906.pdf:1:time trigger) until such time as a scheme to treat and remove suspended solids and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:46: potential for pollution of surface water is primarily when high levels of suspended solids and/or

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:51: remove silt and other suspended solids, as well as capture any spills/oil and grease,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:53:Gill Beck, Dabholm Beck, sediments in surface retained within the site. The remove silt and other suspended solids,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:61: and sediment suspended solids, as well as

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:62: contaminants Not Significant other suspended solids, as Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:16: suspended solids, as well as

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:7: currently suspended, is located on the boundary of the site, just to the south east of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:10: extent of the site, where services have been suspended since 2019; the South Bank Station, to

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:14: station. Services at the station have been suspended since 2019. As part of the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:20:have been suspended since 2019. As part of the emerging Transport Strategy for

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:20: could be deposited by vehicles leaving the ERF site and re-suspended by

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:31: deposited by vehicles leaving the ERF site and re-suspended by vehicles

teesworks_-_keywords_-_suspen.txt · Last modified: 2024/04/02 18:11 by 127.0.0.1