{include:Teesworks - keywords - menu}

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:46: minor aquifers.

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:47: question has previously been designated as both minor and non-aquifer in different

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:52: Teardrop plots; the Fleet River between the minor road (NZ575244) and

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:64: Development as the design and layout is still being refined, and minor changes are

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:64: methodologies (major, moderate, minor and not significant).

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:66:  minor – slight, very short or highly localised effect of no significant consequence;

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:11: R/2014/0626/FFM to allow for minor material August 2018.

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:11: restoration and aftercare, the construction of a tunnel therefore only minor additional construction/fitting

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:13: SM Cleveland the existing wharf, jetties and other minor Infrastructure application, STDC commence phased construction of the facility during 24/11/2020

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:15:90 R/2021/0057/V Redcar and STDC – Application for minor material amendment to Land at Former South Unknown Adjacent to it Unknown Approved 1

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:15:91 R/2021/0316/V Redcar and STDC – Application for minor material amendment to Land at Former South Unknown Adjacent to it Unknown Pending 1

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:15: minor typographic error, “not” should be

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:63: WC1 - MINOR ROAD -

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:63: WC5 - MINOR ROAD BELOW

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:63: WC10 - MINOR ROAD - (EXISTING) NZNS STORAGE LTD

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:11:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:12:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:25:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:27:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:37:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:56:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:58:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:69:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:73:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:83:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:87:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:97:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:100:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:101:further, minor editions of mapping which were produced and published in

EN010103-001067-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 14 EC2_D.pdf:103:further, minor editions of mapping which were produced and published in

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:136: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:27: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:29: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:31: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:32: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:32: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:33: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:35: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:39: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:40: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:41: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:41: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:42: App. Sub Type: Minor

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:43: Incident Severity: Category 3 - Minor Incident

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:43: Incident Severity: Category 3 - Minor Incident

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:44: Description: Minor variation to authorisation under RSA

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:29:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:46:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:47:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:63:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:79:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:80:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:91:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:112:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:113:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:114:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:133:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:134:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:135:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:152:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:153:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:166:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:184:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:199:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:202:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:216:further, minor editions of mapping which were produced and published in

EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf:217:further, minor editions of mapping which were produced and published in

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:3: Constitution - 30.05.2018 Minor 30.05.2018

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:11: legislative changes, or to make any minor textual or grammatical corrections. Any

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:21: 20. Confirmatory or minor decisions in writing

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:21: 20.1 Where a decision of a minor or confirmatory nature (for example to confirm of the

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:66: GD6 The provision of services or the purchase of materials or minor items of

EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:69: MO5 To make minor changes to the Constitution and its associated documents in order

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:136: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:86: MinorRoa d

EN010103-001998-NZT DCO 2.1c - Schedule of Changes to the DCO - August 2022(D5).pdf:2:within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and consistency are not set

EN010103-002355-NZT ISH5 S1.pdf:8:issues numbering and minor change to the heading of article 27 were also made. In addition to the

EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:1:minor amendments to the Habitats Regulations Assessment and Final Construction

EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:47:there is only a minor (a) decline in species richness, and (b) disturbance to the diatom-

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:15:High Major Major Moderate Minor

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:15:Medium Major Moderate Minor Minor

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:15:Low Moderate Minor Minor Negligible

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:15: would be less than substantial. A minor or negligible (not significant) effect

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:18: would constitute a low magnitude of impact and a minor adverse effect.

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:20: magnitude of impact and a temporary minor adverse effect.

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:20: and a minor adverse effect.

EN010103-001764-NZT DCO 9.8 - Appendix PPL.1.3c - Teesworks Design Guide - June 2022.pdf:65: Minor Application

EN010103-001764-NZT DCO 9.8 - Appendix PPL.1.3c - Teesworks Design Guide - June 2022.pdf:65: Week 13 RCBC determine applications classified as minor.

EN010103-001173-EN010103 - The ‘Net Zero Teesside Project’ - Final S51 Advice.pdf:2: Minor errors and omissions

EN010103-001173-EN010103 - The ‘Net Zero Teesside Project’ - Final S51 Advice.pdf:2: Any minor errors and/ or omissions are reflected in the Acceptance Checklist.

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC2 - MINOR ROAD & GC1 - RIVER TEES CROSSING -

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC4 - MINOR ROAD - AUGER

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC3 - MINOR ROAD -

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC6 - MINOR ROAD - AUGER

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC8 - MINOR ROAD -

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC7 - MINOR ROAD -

EN010103-000864-NZT DCO 4.7.4 Gas Connection and AGI Plans Sheet 4.pdf:1: GC9 - MINOR ROAD - ABOVE GROUND INSTALLATIONS PLANS

EN010103-000880-NZT DCO 4.12 CO2 Export Pipeline Plan.pdf:1: CEC1 - MINOR ROAD - HDD (NEW)

EN010103-000880-NZT DCO 4.12 CO2 Export Pipeline Plan.pdf:1: CEC2 - MINOR ROAD - HDD (NEW)

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:93: minor significance and above identified within each of the technical assessments

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:94: ­ a minor adverse (not significant) cumulative noise effect upon one NSR (NSR3)

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:110: significance of effects is considered as ‘minor adverse’ (Table 21-7). As such, the

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:111: Teesside, however, this will result in a minor effect and is not significant.

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:118: Proposed Development are predicted to be of up to minor adverse and not

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:118: Development are likely to be up to minor adverse during construction, and minor

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:119: 9 confirms that construction there are predicted minor adverse effects on water

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:119: that are classified as greater than minor adverse. During operation, the largest

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:138: selection of the quietest cost-effective construction effects on receptors are reduced to either minor adverse or less

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:138: plant available; containment of noise or negligible adverse or less. There would be a moderate/minor adverse effect

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:139: possible, the use of landscaping, bunds PCC Site on residential receptors is found to be minor adverse or less.

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:225: This conclusion is taken forward in light of identified minor changes required to the DCO, described

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:226: of minor changes required to the Applicant's Preferred DCO, and as described in Chapter 7 below.“

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:252: significance of effects is considered as ‘minor adverse’ (Table 21-7). As such,

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:254: on Teesside, however, this will result in a minor effect and is not significant.

EN010103-002621-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:8: determination provided for in the Dogger Bank DCO subject to the minor amendments detailed in Sembcorp's supporting

EN010103-002293-Marine Management Organistation - Comments on any other information submitted at Deadline 8.pdf:4:1.2.14 Part 2 (15)(2)© – There appears to be a minor typographic error, “not” should

EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:21: The Applicants have been informed by STDC of There continue to be minor discrepancies in the

EN010103-001234-NZT - Regulation 32 Transboundary Screening (13).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:14:Minor / localised Impacts when taken on their own or in Localised improvement, no

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:14: lead to a minor localised or temporary element

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:14:effect lead to a minor localised or temporary element when balanced

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:15:own have the potential to lead to potential to lead to a minor potential to lead to a minor

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:15:a minor localised or temporary localised or temporary adverse localised or temporary effect on

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:27: previously been designated as both minor and non-aquifer in different locations

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:48: incidents of Category 3 (minor) or worse within 250 m of the Site within the

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:65: Knitting Wife Beck, Kinkerdale Beck, Belasis Beck and minor tributaries of

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:78: the existing tunnel, any maintenance activities are likely to be very minor and

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:82: and temporary minor impact to the Tees Coastal water body due to works to

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:83: Tees Coastal water body would be minor. The main risk would result from

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:83: outfall tunnel. Overall, this impact is considered minor given the mitigation

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:86: minor refurbishment with hand tools is assumed and there would be no

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: Belasis Beck and minor tributaries of these watercourses for the Natural Gas

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: temporary and minor within the waterbodies directly affected and are not

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: Tees Estuary. However, this risk is considered minor given the mitigation

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:88: would be minor. The main risk would result from working immediately

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:89: protocols, then the risk is temporary and minor to aquatic ecology. No

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:90: and minor, and would not be significant at the water body scale. The

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:94: drips, leaks and minor spill and which could be contaminated, shall be located

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:100: of impact is predicted to be negligibleminor and highly localised, especially

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:100: therefore predicted to be negligibleminor and highly localised, especially at

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:106: considered to be minorminornegligible and localised, and not significant at

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:120: increase in DIN is considered to be minor and localised, and not significant

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:148: 10/03/2012 (Minor) 21710 effects - smoke

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:148: 25/12/2013 (Minor) 21710 firefighting runoff

EN010103-001487-NZT-PD_to_accept_change_request.pdf:2:although Change 10 requires a minor increase in the Order Limits for Work No. 9

EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:83: MinorRoa d

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:61: Marine EW explained that a key item is a minor

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:78:Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:100: been removed from envelope; IC confirmed that minor

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:100: that only minor refurbishment / upgrade works would be carried out

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:100: location and works will be minor, consisting of outfall refurbishment

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:124:• Works will be minor, consisting of outfall refurbishment (inspection and hand-based maintenance)

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:29: We measure the percentage of ethnic minorities in our workforce. colleagues. We are working to harmonise WPD’s ethnicity

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:65: investments at a fair value of $491 million and the New York & New Jersey Minority

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:65: minority business growth and job opportunities.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:69:Note: 2020/21 energy consumption has been re-stated to account for a minor misstatement following data reconciliation.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:84: be increased frequency of weather continue to invest in storm These include inspection and maintenance, minor storm

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:88:ethnic minority Average % of issued

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:91: • Director of Minority Corporate

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:102: the Parker Review target for FTSE 100 boards to a non-white ethnic minority.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:102:Executive and Non-executive Directors ethnic minority by 2021.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:102: * Diversity of the Board is defined, in this context, as female and non-white ethnic minorities.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:132:going forward as outlined on page 277 of the Annual Report. Targets assume UK Gas Transmission minority stake is treated as a discontinued operation from start of 2023/24.

EN010103-002143-NZT DCO 4.8.3 - Electrical Connection Plans Sheet 3 August 2022 (D6).pdf:1: EC5 - MINOR ROAD - HDD OR

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:22:TotalEnergies is a minority shareholder in a number of non-state-owned Russian companies: Novatek (19.4%), Yamal LNG (20%), Arctic

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:23:to find a non-Russian buyer for its minority interests in Russia. Abandoning these interests without consideration would enrich Russian

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:23:investors, in contradiction with the sanctions' purpose. In addition, abandoning these minority interests held by TotalEnergies would have

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:24:of the companies Novatek and Yamal LNG, of which TotalEnergies is a minority shareholder, are not materially impacted by the sanctions

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:24:The sanctions adopted since February 2022 have included the designation of one of the minority shareholders of PAO Novatek as

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:58: - In January 2021, TotalEnergies finalized the acquisition of a 20% minority interest in Adani Green Energy Limited (AGEL) from

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:111: - Commitments to purchase shares held by non-controlling interests (put options written on minority interests)

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:131: Luminora Solar 5 65.00 % E Spain Spain

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:131: Luminora Solar cuatro, S.L. 65.00 % E Spain Spain

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:131: Luminora Solar Dos, S.L. 65.00 % E Spain Spain

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:131: Luminora Solar Tres, S.L. 65.00 % E Spain Spain

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:154: financial charges: $30.7 billion to non-controlling minority interests)

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:164:emissions. This part is a minority (about 15%) but should be reduced as improve energy efficiency as part of an investment plan totaling $450

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:175: acquisition of a 20% minority interest in Adani Green Energy Limited

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:187: and minority interests in other companies, including PAO Novatek

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:212: transferred at the end of July 2021 its non-operated minority participation

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:253:varying degrees. Whether these conditions appear alone or in subsidiary Total Venezuela, transferred its 30.32% non-operated minority

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:257:companies Novatek and Yamal LNG, of which TotalEnergies is a minority make funds or economic resources available. Other targeted sanctions

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:258: designation of one of the minority shareholders of PAO Novatek as an impact on project financings, particularly on the amounts that Arctic

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:259: of July 2021 its non-operated minority participation of 30.32% in

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:298: emissions. This part is a minority (about 15%) but should be reduced as obtained through the Company’s regional generation capacity in Europe;

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:417:emissions. This part is a minority (about 15%) but should be reduced as 2.2 GW in solar projects and 0.6 GW in battery storage projects to

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:426: (a) Oil products including bulk refining sales and biofuels ; Natural Gas excluding minority stakes in public companies.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:438: With regard to food waste and food poverty, TotalEnergies’ activities pertaining to food distribution are minor and are therefore not directly affected by

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:450: organization, or membership in a minority group.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:450: religious organization, or membership in a minority group. of management bodies, executive committees and senior management,

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:454: a minority group. workforce in France. Awareness-raising actions on the themes of sexual

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:460: a minority group (refer to point 5.6 of this chapter, in particular for the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:510: Minority interest in proved developed and undeveloped reserves as of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:513: Minority interest in proved developed and undeveloped reserves as of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:516: Minority interest in proved developed and undeveloped reserves as of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:524: Minority interests in future net cash flows as of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:566: (a) Oil products including bulk refining sales and biofuels ; Natural Gas excluding minority stakes in public companies.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:568: membership in a minority group.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:568: equality: women to men, minor to major

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:569: equality: women to men, minor to major

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:605:production sharing contracts and on economic limit dates. equipment is relatively minor compared to the cost of a new well; and (ii)

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:13: therefore classified as being of 'minor adverse' significance.”

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:38:climate change impacts in line with green hydrogen from contrast, a recent analysis suggests only very minor climate

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:44:is assumed to substitute average grid electricity via an emission transport distance has shown minor impacts on LCA results for

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:127:planned deployment remains dominated by EOR – which has a minor role in

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:169: Minor

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:169: has a minor adverse effect that is not significant. It may change can be judged as having a beneficial effect.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:170: For the avoidance of doubt, a ‘minor adverse’ or A ‘minor adverse’ effect or better is therefore a high bar

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:170: adverse effects and beneficial effects are considered to be significant. Minor adverse and negligible effects are not

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:170: Minor adverse: the project’s GHG impacts would be fully consistent with applicable existing and emerging policy

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:170: requirements and good practice design standards for projects of this type. A project with minor adverse effects is

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:188: Alternatives can take diverse forms and may range from minor adjustments to

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:214:Other changes faced by Developers are relatively minor:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:232:The assessment’s findings are regularly set out as different levels of significance (e.g. major, moderate, minor,

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:232:would not. For example, a negative landscape effect described as being of ‘minor significance’ might be

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:234:may range from minor adjustments to the Project, to a complete reimagining of the Project.

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:14: descriptions of Minor beneficial, Moderate Beneficial and Major Beneficial

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:16: effects or loss of minor

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:16:Minor Results in minor measurable change Geology Minor measurable change in

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:16: vulnerability; minor loss of, or

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:16:Minor Results in some measurable change Groundwater Potential low risk of pollution

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:17: Minor effects on an aquifer,

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:17:Negligible Results in effect on attribute, but of Geology Very minor loss or detrimental

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:17:Minor Results in some beneficial effect on Groundwater Reduction of groundwater

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:18:Receptor No change Negligible Minor Moderate Major

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:45:Construction Geology Low Use of trenchless technologies Minor GI is required to confirm Baseline Neutral or T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:45:Construction Minerals - Deep Medium Sterilisation of minerals. Non- Minor Minerals are at depth and are Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:46:Construction Minerals - Medium Safeguarded under the Tees Minor Use trenchless technologies in Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:46:Construction Soils Low Excavation Minor Soils to be stockpiled and re-used Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:46:Construction Soils Medium Spoil resulting from excavations Minor GI is required to confirm Baseline Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:48:Construction Groundwater Medium Changes to Hydrogeological Minor GI and groundwater level and Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:49:Construction Groundwater Medium Impact as above. Minor GI and groundwater level and Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:50:Construction Groundwater – Medium Impact as above. Minor GI and groundwater level and Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:50:Construction Groundwater – High Potential mobilisation of existing Minor Development of and adherence to Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:50:Construction Groundwater – High Potential mobilisation of existing Minor Development of and adherence to Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:51:Construction Contamination High Potential contaminant pathways Minor Note DMRB LM 104, Sustainability Neutral or P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:51:Construction Contamination High Potential contaminant pathways Minor Development and implementation Neutral or P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:52:Operation Contamination High Impacts on soil quality could Minor Storage and handling of processed Slight P

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:53:Decommissio Contamination Medium Excavation of Minor Implementation of DEMP, SWMP, Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:53:Decommissio Contamination Medium Accidental spills. Minor Implementation of DEMP, SWMP, Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:54:Decommissio Groundwater - High Impacts on groundwater and Minor Implementation of DEMP, SWMP, Slight T

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:54:Decommissio Soils Medium Export, excavation, Minor All earthworks operations will need Slight T

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:83:per day, a minor decrease from 2020. Net income was positive effect of PSA and US royalties was 148 mboe and 133 mboe per

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:83:2,070 mboe per day in 2021 and 2020, respectively. The minor production, but they may be higher or lower in any period due to

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:84:mainly related to Kvitebjørn pipeline and minor joint venture assumptions in addition to downward reserves revisions. Other

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:92: minority interest.

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:105:Any such violation, even if minor in monetary terms, could result Operators, partners, and contractors may be unable or unwilling

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:116:inclusion is fundamental to us. As outlined in our code of conduct, who identify as a minority group in terms of disability, ethnicity,

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:126:of petroleum and petroleum-derived products, and other forms non-controlling interest, minority interest), equivalent to 26.5% of

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:203:is relatively minor compared to the cost of a new well. Proved undeveloped reserves are to be recovered from new wells on

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:210: actions taken to maintain and secure safe production during the pandemic. Minor virus outbreaks at some of our facilities have

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:253:remain, but Equinor’s maximum exposure in the case was significantly reduced and at this stage is minor. Amounts reflected in the matter

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:316:b) Return on average capital employed income taxes and minority interest, or to net income, which are

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:343:sustainable key to decarbonisation of the energy system going final product blends have a minor bio-fuel content. The co-

EN010103-Advice-00010-1-FINAL_210621 - Net Zero Teeside Meeting Note.pdf:2: components were minor elements of Infrastructure within an industrial context,

EN010103-Advice-00010-1-FINAL_210621 - Net Zero Teeside Meeting Note.pdf:4: Further minor errors were also identified during the Acceptance checks. The

EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:7: demolition) would result in a low magnitude of impact, and a minor adverse (not

EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:8: magnitude of impact and a minor adverse (not significant) effect. The impact at

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:74:been considered. The first option is for the re-use of the existing outfall with minor refurbishment; for

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:29:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:30:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:44:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:57:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:58:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:70:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:83:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:92:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:97:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:107:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:112:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:121:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:125:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:135:further, minor editions of mapping which were produced and published in

EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf:137:further, minor editions of mapping which were produced and published in

EN010103-002539-NZT DCO 4.5- ARoW Plans Key Plan - Nov 2022 (D12).pdf:1: MinorRoa d

EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf:39:further, minor editions of mapping which were produced and published in

EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf:40:further, minor editions of mapping which were produced and published in

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:2: 2.2 MINOR CHANGES TO THE APPLICATION AND ERRATA ………………….. 27

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:36: • non-contentious or non-substantive changes to remedy minor

EN010103-001234-NZT - Regulation 32 Transboundary Screening (2).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:17: kits will be provided in areas of fuel/oil/minor chemicals storage;

EN010103-001234-NZT - Regulation 32 Transboundary Screening (7).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:16: and yellow-rattle (Rhinanthus minor subsp. stenophyllus);

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:21: species present. Within the Site, lyme-grass is no more than a very minor

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:38: yellow-rattle (Rhinanthus minor subsp. stenophyllus) (A),

EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:17: kits will be provided in areas of fuel/oil/minor chemicals storage;

EN010103-001250-220126 - NZT DCO - Letter to ExA re timing of PM_Exam - Final.pdf:1:Applicants also intend to request other changes, to reduce the Order limits and make other minor

EN010103-001329-NZT DCO 7.7 - Environmental Statement Addendum - Non-Technical Summary - Apr 2022.pdf:9:10 Minor increase in the Order Limits Change 10 will require a minor

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:6: been classified as minor, moderate, major or negligible. The assessment of

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:7: major (adverse or beneficial). Effects identified as being negligible or minor

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:7: High Major Major Moderate Minor

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:7: Medium Major Moderate Minor Negligible

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:7: Low Moderate Minor Negligible Negligible

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:7: Very Low Minor Negligible Negligible Negligible

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:25:20.5.7 In the refurbishment scenario, only very minor works are likely to be required

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:28: it is anticipated that this will result in an overall minor adverse (non-

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:29: assessed as low. A minor adverse (non-significant) adverse effect is

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:30: result in a minor adverse (non-significant) effect due to the medium sensitivity

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:31: help to mitigate against any remaining risk. As a result, a minor adverse (non-

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:31: aware of them. On this basis, a minor adverse (non-significant) effect is

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:31: disruption at the water discharge location and a minor adverse (non-

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:32: As a result, a minor adverse (non-significant) effect is anticipated.

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:33: The Proposed Development is therefore anticipated to have a minor

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:35: the Proposed Development will have a minor (non-significant) beneficial

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:36:Temporary worker accommodation Minor adverse effect Low sensitivity, medium

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:36:Demographic effects and Minor adverse effect Medium sensitivity, low

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:36:Business impacts Minor adverse effect Medium sensitivity, low

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:37:Marine users Minor adverse effect Low sensitivity, medium

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:37:Skills and employment Minor beneficial effect Medium sensitivity, low

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:37:Decommissioning employment Minor beneficial effect Low sensitivity, medium

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:24: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:27: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:28: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:28: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:29: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:29: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:30: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:31: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:31: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:33: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:33: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:33: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:34: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:35: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:35: App. Sub Type: Minor

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:36: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:36: Description: Minor variation to authorisation under RSA

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:37: Description: Minor variation to authorisation under RSA

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:37: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:37: Description: Minor variation to authorisation under RSA

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:38: Description: Minor variation to authorisation under RSA

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:38: Description: Minor variation to authorisation under RSA

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:38: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:39: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:39: Description: Minor variation to authorisation under RSA

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:13: minor crevices present within the walls, or where the walls meet ceilings,

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:13: building were boarded up and, in most cases, these had a close fit. Minor

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:14: and fascia boarding is also comparable with the welfare block, with minor

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:14: due to the presence of minor gaps/crevices within the interior brickwork,

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:14: optimal) and minor gaps behind the timber fascia boards. Given the poor

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:15: The exterior brickwork and mortar is generally in good condition, with minor

EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf:15: tunnel, any maintenance activities are likely to be minor (see below).”

EN010103-001303-NZT DCO - Letter re Notification of Proposed Changes - Final - 18.02.21.pdf:1:reduction in the powers sought over land). In addition, there are other minor changes or updates to

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:15:Minor / localised Impacts when taken on their own or in Localised improvement, no

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:15: lead to a minor localised or temporary element

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:15:effect lead to a minor localised or temporary element when balanced

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:16:own have the potential to lead to potential to lead to a minor potential to lead to a minor

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:16:a minor localised or temporary localised or temporary adverse localised or temporary effect on

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:26: previously been designated as both minor and non-aquifer in different locations

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:42: incidents of Category 3 (minor) or worse within 250 m of the Site within the

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:56: Knitting Wife Beck, Kinkerdale Beck, Belasis Beck and minor tributaries of

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:69: maintenance activities are likely to be very minor and limited to inspection

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: and temporary minor impact to the Tees Coastal water body due to works to

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: minor. The main risk would result from working directly over and within the

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:72: outfall tunnel. Overall, this impact is considered minor given the mitigation

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:75: minor refurbishment with hand tools is assumed and there would be no

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:75: Belasis Beck and minor tributaries of these watercourses for the Natural Gas

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:76: temporary and minor within the waterbodies directly affected and are not

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:76: Tees Estuary. However, this risk is considered minor given the mitigation

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:77: would be minor. The main risk would result from working immediately

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:77: protocols, then the risk is temporary and minor to aquatic ecology. No

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:78: and minor, and would not be significant at the water body scale. The

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:82: drips, leaks and minor spill and which could be contaminated, shall be located

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:86: impact is predicted to be minor and highly localised.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:87: magnitude of impact is therefore predicted to be minor and highly localised.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:88: considered to be minor, and not significant at the water body scale.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:150: 10/03/2012 (Minor) 21710 effects - smoke

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:150: 25/12/2013 (Minor) 21710 firefighting runoff

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:99: minor comments relating to its to COVID-19 restrictions) of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:100: Minor text changes were made

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:157: to either minor adverse or less or negligible adverse or less. .

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:157: to be minor adverse or less.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:173: LL. Approach is acceptable; various minor clarifications. M. Noted and agreed; has been considered within

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:174: help to reduce any minor residual risk

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:389:I have had the opportunity to review the document and have some minor comments to make in reference the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:683: expected to be minor and limited to those described for the outfall refurbishment (i.e. inspection

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:686: are to be relatively minor in nature, comprising construction of a pipeline that will either be

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1031: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1035: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1039: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1043: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1165: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1189: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1194: to allow minor works on the highway network to facilitate the management and routing of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1205:There have subsequently been further minor revisions to the red line boundary.

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC2 454149, 524672 Minor road and pipeline Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC3 453978, 524655 Minor Road (Navigator Trenchless New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC4 453957, 524655 Minor Road (Navigator Trenchless New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC6 4539894, 524655 Minor Road (Navigator Trenchless New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC7 453754, 524447 Minor Road (Seal Sands) Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC8 453698, 524361 Minor Road (Seal Sands) Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC9 453238, 524107 Minor Road (Seal Sands) Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC10 452230, 524110 Minor Road (Seal Sands) Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:11:GC15 456697, 523753 Minor Rd (x2), Pipelines (x2 Trenchless New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:13: refurbishment and maintenance activities are likely to be minor.

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:14:WC7 456717, 523812 Minor road (Bran Sands) Pipe bridge New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:14:WC9 457125, 524490 Minor road (Teesworks) Under road bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:14:WC10 457312, 525065 Minor road (Teesworks) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:14:WC5 457928, 524759 Minor road Below ground Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:16:CEC1 457262, 525685 Minor Road HDD New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:18:EC5 456948, 523808 Minor Road HDD or Open Cut New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:18:EC6 457160, 524200 Minor Road York-Potash Conveyor New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:18:EC8 457097, 523957 Minor roundabout HDD New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:18: Electrical Substation will only require minor above ground site clearance works

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG8 449935, 523567 Minor watercourse Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG11 450662, 523559 Minor Road (Seaton Carew Rd) Culvert Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG12 451035, 523583 Minor Road (Seal Sands) Culvert Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG13 451076, 523585 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG14 452475, 523589 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG15 453489, 523450 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG16 453597, 523627 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG17 453598, 523762 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG18 453681, 524208 Minor Road Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG19 453766, 524337 Minor Road Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG20 453886, 524519 Minor Road Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG21 453946, 524719 Minor Road (Navigator Terminals) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG22 454329, 524754 Minor Road (Navigator Terminals) Pipe bridge New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG27 454979, 524816 Minor Road (Dabholm Gut) Pipe bridge New

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG28 455016, 524781 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG29 455194, 524650 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG30 455378, 524546 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:20:CG31 455559, 524441 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG32 455797, 524296 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG33 455882, 524234 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG34 456189, 524111 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG35 Minor Road (Dabholm Gut) Under road Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG36 456695, 523763 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:21:CG38 Minor Road (Teesworks) Under road Existing

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:26: part of the wharf together with potential minor land-based civil works (site

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:18: ES) minor detail changes to the traffic related cumulative

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:25: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:25: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:26: STDC of the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:27: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the No status change that the

EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:27: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the No status change that the

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:30:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:36:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:49:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:72:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:73:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:84:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:100:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:102:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:117:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:133:further, minor editions of mapping which were produced and published in

EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf:134:further, minor editions of mapping which were produced and published in

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11: negligible, minor, moderate or major (adverse or beneficial).

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11:High Major Major Moderate Minor

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11:Medium Major Moderate Minor Negligible

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11:Low Moderate Minor Negligible Negligible

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11:Very Low Minor Negligible Negligible Negligible

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:11: purposes of the EIA Regulations; minor and negligible effects are ‘not

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:38: low impact). Therefore, the severance effect would be minor (not significant)

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:38: amenity would be minor (not significant) on the A1042 Kirkleatham Lane and

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:38: minor (not significant) on the A1042 Kirkleatham Lane and negligible (not

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:40: Therefore, the severance effect would be minor (not significant) on the A1046

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:40: amenity would be minor (not significant) on the A1046 Port Clarence Road

EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf:41: minor (not significant) on the A1046 Port Clarence Road and negligible (not

EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:79: MinorRoa d

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:51: likelihood of this occurring has been judged as ‘low’ and the consequence ‘minor’, and

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:56:MA.1.2 Applicants The EA are quoted as requesting that the cumulative effects of minor events is addressed in

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:68: are ‘negligible adverse’. However, the effects during construction are described as ‘minor

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:12: minor and limited to those described for the outfall

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:36: minor adverse effect at worst. Boundary noise levels

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:62: fuel/oil/minor chemicals storage.

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:85:been considered. The first option is for the re-use of the existing outfall with minor refurbishment; for

EN010103-001133-NZT DCO 6.4.44 ES Vol III Appendix 20A Economics Benefits Report.pdf:17:17,000 jobs annually. The minor decline in employment from 2030 to 2050 reflects the transition of

EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:3:within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and consistency are not set

EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:41: minor (see below).” of attempting to contract work for the Outfall survey, this

EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:14: minority within the Corridor and instances

EN010103-000834-NZT DCO 4.7.7 Gas Connection and AGI Plans Sheet 7.pdf:1: GC15 - MINOR ROAD (X2) &

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:30:further, minor editions of mapping which were produced and published in

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:31:further, minor editions of mapping which were produced and published in

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:41:further, minor editions of mapping which were produced and published in

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:43:further, minor editions of mapping which were produced and published in

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf:85:further, minor editions of mapping which were produced and published in

EN010103-002044-NZT DCO 2.1d - Schedule of Changes to the DCO August 2022 (D6).pdf:2:within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and consistency are not set

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:11:Beneficial effect on structure/ function or Not significant Minor beneficial

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:11:Adverse effect on structure/ function or Not significant Minor adverse

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:56: although some minor changes in habitat extent, composition and structure

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:56: establishment of tree and shrub seedlings, minor changes in the extent and

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:57: minor.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:58: minor.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:72: to the former Redcar Steelworks, this is not significant (minor adverse);

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:72: significant (minor adverse); and

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:72: significant (minor adverse) given the small scale of the impact.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:72: whitethroat. The bare ground habitat resource performs a minor supporting

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:74: sound levels at this location and might elicit minor behavioural responses for

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:75: which may require some minor refurbishment works, or construction of a new

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:75: to re-use the existing tunnel, any maintenance activities are likely to be minor

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:82: therefore it would not play any more than a minor role in the function and

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:82: assessed not significant (minor adverse).

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:83: Teesmouth and Cleveland Coast SPA would result in a minor adverse effect

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:84: significant (minor adverse) for terrestrial breeding birds.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:84: impact is assessed as not significant (minor adverse).

EN010103-001514-TEXT_ISH2_Session1_NetZeroTeeside_11052022.pdf:15:comments. And we anticipate making a number of minor updates in relation to those the application will

EN010103-001583-NZT DCO 8.1 - RCBC SoCG - May 2022.pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:24:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:26:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:28:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:39:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:40:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:53:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:65:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:67:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:76:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:80:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:81:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:82:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:95:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:96:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:107:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:109:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:119:further, minor editions of mapping which were produced and published in

EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf:121:further, minor editions of mapping which were produced and published in

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:9: requested by the EA in its Deadline 5 submission. Some minor changes have been

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:90: relation to linked platforms considered to be one structure in the Navigation Risk Assessment and a minor amendment has been made to the Layout

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:159: Minor unclassified road

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:159: Minor unclassified road Single Carriageway

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:159: Combination of minor

EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:3: • Green corridors such as minor valleys and former railway lines provide

EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:10: • A network of minor roads create a complex vehicle

EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf:31:further, minor editions of mapping which were produced and published in

EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf:39:further, minor editions of mapping which were produced and published in

EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf:47:further, minor editions of mapping which were produced and published in

EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf:56:further, minor editions of mapping which were produced and published in

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:39: Applicants did make a minor

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:77: outfall tunnel, any maintenance activities are likely to be minor (see

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:22: minor repairs on the PCC. Major and specialist Operations and Maintenance

EN010103-001438-NZT DCO 4.5 - Access and Rights of Way Plans Rev 3.0 - Apr 2022.pdf:1: MinorRoa d

EN010103-001438-NZT DCO 4.5 - Access and Rights of Way Plans Rev 3.0 - Apr 2022.pdf:5: MinorRoa d

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:75: outfall tunnel, any maintenance activities are likely to be minor (see

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:18: minor adverse effect which is not significant.

EN010103-002359-NZT ISH5 S3.pdf:1:drafting. And we've looked at the deadline, nine comments, we've reviewed these, they're all minor

EN010103-002359-NZT ISH5 S3.pdf:3:is a revised draft with them. And the were minor changes made to the version in the DCO. The draft

EN010103-002359-NZT ISH5 S3.pdf:4:So I think that the changes made a deadline aid are relatively minor. Excellent submitted their own

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:25: The Secretary of State disagreed with that recommendation and on 4 October 2019 decided to make the Order (with minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:30: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:31: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:31: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:33: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:33: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:34: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:35: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:35: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:35: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:36: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:38: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:39: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:40: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:41: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:42: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:44: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:44: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:46: App. Sub Type: Minor

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:46: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:47: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:47: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:47: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:47: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:47: Incident Severity: Category 3 - Minor Incident

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:48: Description: Minor variation to authorisation under RSA

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:48: Description: Minor variation to authorisation under RSA

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:48: Description: Minor variation to authorisation under RSA

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:48: Description: Minor variation to authorisation under RSA

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:49: Land Impact: Category 3 - Minor Incident

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:86:demonstrate the qualities of independence Brian’s two external appointments were unlikely and 25% Black, Asian and minority ethnic

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:233: (i) Through existing wells with existing equipment and operating methods or in which the cost of the required equipment is relatively minor

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:60: Marine EW explained that a key item is a minor

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:77:Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:99: been removed from envelope; IC confirmed that minor

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:99: that only minor refurbishment / upgrade works would be carried out

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:99: location and works will be minor, consisting of outfall refurbishment

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:123:• Works will be minor, consisting of outfall refurbishment (inspection and hand-based maintenance)

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:17: ES) minor detail changes to the traffic related cumulative

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:24: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:24: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:26: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:26: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the Applicants are

EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:26: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the Applicants are

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:8: involve remedying two minor points of drafting identified by the Examining Authority at Issue Specific Hearing 2:

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:14: Applicants' submission to this Deadline 5 for the ExA's information/cross-reference only) ), but showing minor

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:16: will follow. The Applicants have not made any changes to any other Requirements, save for minor changes and one

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:74: be possible and/or only require minor readjustments to their development

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:75: a. confirms the intent of the agreement is to provide a mechanism to together and through comparatively minor changes to the programme or the

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:80: determining the dispute, the associated timescales and minor associated

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:81: agreement reached or Expert determination pursuant to the terms of the IA. their associated, minor resulting provisions set out in this clause and those

EN010103-001482-NZT DCO 4.9.1 Rev 1 - Water Connection Plan.pdf:1: WC1 - MINOR ROAD -

EN010103-001482-NZT DCO 4.9.1 Rev 1 - Water Connection Plan.pdf:1: WC5 - MINOR ROAD BELOW

EN010103-001482-NZT DCO 4.9.1 Rev 1 - Water Connection Plan.pdf:1: WC10 - MINOR ROAD - (EXISTING) NZNS STORAGE LTD

EN010103-001234-NZT - Regulation 32 Transboundary Screening (4).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:131: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:17: ES) minor detail changes to the traffic related cumulative

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:24: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:24: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:26: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:26: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the Applicants are

EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:26: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the Applicants are

EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:21:6.1.25 Further along its course to the east, it merges with two other minor drainage ditches

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:72: tunnel, any maintenance activities are likely to be minor (see below).

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:137: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:7: were classed as minor planning applications with site boundaries of less than 1 hectare and not EIA

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:19: planning application for demolition of the existing wharf, jetties and other minor Infrastructure along the river bank

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:23: the EA. The mechanism for agreeing these outstanding and minor points will be through the SoCG. The Applicants

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:26: ES) minor detail changes to the cumulative effects. Online

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:34: for minor material amendments to the Condition 1 of the decision notice states condition. The original close proximity to Site but:

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:34: approved layout and size of buildings; site that the development shall be application variation of Condition (minor

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:34: wilton comprising buildings, landforming of therefore only minor additional

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:36: STDC the existing wharf, jetties and other minor Approved Environmental Assessment

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:37: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent to N Minor alteration to approved

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:37: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent to N Minor alteration to approved

EN010103-001892-NZT DCO 8.1 - RCBC SoCG (Clean) July 2022 (D4).pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:13: minor and limited to those described for the outfall

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:36: minor adverse effect at worst. Boundary noise levels

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:62: fuel/oil/minor chemicals storage.

EN010103-001635-Anglo American - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:11: by any party. In light of the minor nature of the proposed change a reduced list

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:9:Beneficial effect on structure/function or Not significant Minor beneficial

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:9:Adverse effect on structure/function or Not significant Minor adverse

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:33: continue to be present, although some minor changes in habitat extent,

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:33: habitats, and minor changes in the extent and distribution of ruderal

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:33: minor.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:34: minor.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:34: minor given the scale of the predicted sea level rise and within the context of

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:39: (minor adverse).

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:40: consequently is assessed as not significant (minor adverse).

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:41: on scrub from these construction activities would be very minor, with scrub

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:41: level only and is therefore assessed as not significant (minor adverse).

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:43: as not significant (minor adverse).

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:44: (minor adverse).

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:17: ES) minor detail changes to the cumulative effects. Online

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:25: for minor material amendments to the Condition 1 of the decision notice states condition. The original close proximity to Site but:

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:25: approved layout and size of buildings; site that the development shall be application variation of Condition (minor

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:25: wilton comprising buildings, landforming of therefore only minor additional

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:27: STDC the existing wharf, jetties and other minor Approved Environmental Assessment

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:28: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent to N Minor alteration to approved

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:28: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent to N Minor alteration to approved

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:38: International Complex plans) of planning permission R/2014/0626/FFM to allow for minor material 23/05/2018

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:39: R/2021/0057/VC (variation application, STDC demolition of the existing wharf, jetties and other minor Infrastructure along FFM Approved

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:40: 90 R/2021/0057/VC Redcar and Land at Former South STDC – Application for minor material amendment to Permission Ref: 0 Unknown Approved No status change that the Applicants are aware of. 1

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:40: 91 R/2021/0316/VC Redcar and Land at Former South STDC – Application for minor material amendment to Permission Ref: 0 Unknown Approved No status change that the Applicants are aware of. 1

EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:82: MinorRoa d

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:10: 6.1.1 With regard to paragraph 9.4.68 – there appears to be a minor spelling error.

EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:3:within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and consistency are not set

EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:3: Article 37 (Deemed marine Minor amendment to reflect that the numbering of the Parts to Schedule 10 (Project A DML) No

EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:27: other rights over other land affected to NRIL on 24 June 2022 with minor comments, including some points where

EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:81: MinorRoa d

EN010103-002356-NZT ISH5 S2.pdf:2:minor surface bodies, the need for their use will be determined by the contractor as part of the feed

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:9:High Major Major Moderate Minor

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:9:Medium Major Moderate Minor Minor

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:9:Low Moderate Minor Minor Negligible

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:21: resulting in a minor adverse effect.

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:135: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:21: -Minor Road/Local Road

EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:49: Minor Road / Local Road

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:18: which no concerns were raised by any party. In light of the minor nature of the proposed change a

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:37: and are therefore classified as minor adverse significance. The updated IEMA guidance published in

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:45: therefore classified as being of 'minor adverse' significance.”

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:101: welcomes. minor modifications to existing apparatus.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:104: clearly set out the works they will carry out on STDC land prior to discharge of requirements. The Examining Order 2020 (“Immingham Order”) but is nevertheless prescriptive and comprises minor and required early on-site

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:32: App. Sub Type: Minor

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:33: App. Sub Type: Minor

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:33: App. Sub Type: Minor

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:36: Description: Minor variation to authorisation under RSA

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:36: Description: Minor variation to authorisation under RSA

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:36: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:38: Water Impact: Category 3 - Minor Incident

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:38: Land Impact: Category 3 - Minor Incident

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:38: Land Impact: Category 3 - Minor Incident

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:135:posts, man holes, arched passages and minor building projections. Also often

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:17:3.3.20 The Site Boundary crosses a number of minor surface water courses and

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:34: are outlined in Section 3 of this NTS. There are also numerous minor

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:35: relatively minor in nature, comprising construction of a pipeline that will either

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:49:7.14.5 Minor disruption on the local community, businesses, tourism and wider

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:50: budgets. The overall significance of effect is considered as minor adverse

EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:14: provisions. A minor update to

EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:31: minor update made to those

EN010103-000876-NZT DCO 4.11.12 CO2 Gathering Network Plans Sheet 12.pdf:1: CGC25 - MINOR ROAD - AS

EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:80: MinorRoa d

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:30: App. Sub Type: Minor

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:33: App. Sub Type: Minor

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:35: App. Sub Type: Minor

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:35: App. Sub Type: Minor

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Incident Severity: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Incident Severity: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Incident Severity: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Water Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Land Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Water Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Water Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:37: Land Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:38: Air Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:38: Water Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:38: Land Impact: Category 3 - Minor Incident

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:160:apparent omission of minor details such as sewer access points and street

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:161:posts, man holes, arched passages and minor building projections. Also often

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:162:apparent omission of minor details such as sewer access points and street

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:163:posts, man holes, arched passages and minor building projections. Also often

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:164:apparent omission of minor details such as sewer access points and street

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:165:posts, man holes, arched passages and minor building projections. Also often

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:166:apparent omission of minor details such as sewer access points and street

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:167:posts, man holes, arched passages and minor building projections. Also often

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:168:apparent omission of minor details such as sewer access points and street

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:169:posts, man holes, arched passages and minor building projections. Also often

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:170:posts, man holes, arched passages and minor building projections. Also often

EN010103-001614-NZT DCO 3.2a - Supplementary Statement of Reasons - May 2022.pdf:7:2.2.1 As set out in the change request, Change 10 was a “minor increase in the Order Limits

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:19: construction workers EC. Minor isolated exceedances of the chronic construction worker EC were

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:79: slag material with a significant minor component of steel slag, and that both included some unreacted material with

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:88:noted within the soils and minor isolated exceedances of the chronic construction workers GAC were identified for

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:113: comprising variably weathered blast furnace slag material with a significant minor component of steel slag,

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:121:Minor isolated exceedances of the chronic construction worker EC were identified for arsenic and lead which may

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:253:No exceedances were identified of the acute construction worker EC. However, minor isolated exceedances of the

EN010103-001234-NZT - Regulation 32 Transboundary Screening (9).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:23:  minor – formation of large cracks or loosening and falling of plaster or

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:23:11.3.45 BS 7385-2:1993 (BSI, 1993) defines that minor damage occurs at a vibration

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:23: twice that of minor damage. Therefore, this guidance can be used to define the

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:24:Medium Minor 15

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:27: minor and negligible, and adverse, neutral or beneficial). Each effect has been

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:28:Very high Major Major Moderate Minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:28:High Major Moderate Minor Negligible

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:28:Medium Moderate Minor Negligible Negligible

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:28:Low Minor Negligible Negligible Negligible

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:29:  minor – slight, very short or highly localised effect of no significant

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:29:11.3.71 For the purposes of this assessment, negligible and minor effects are considered

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:39: with only a minor contribution from occasional cars using York Road.

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:49: distances from the nearest residential NSRs and minor in comparison to nearby

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:50: Evening N/A2 N/A2 N/A2 Minor Minor Negligible

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:50: Night- N/A2 N/A2 N/A2 Minor Minor Negligible

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:51: for evening and weekend working indicate minor adverse or negligible effects at

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:51: intensity working scenario for night-time working also indicate minor adverse or

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:51:y West, Night- N/A2 Negligible adverse N/A2 Minor adverse

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:51:y West Night- N/A2 N/A1 N/A2 Minor adverse

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:51:Farm Night- N/A2 Minor adverse N/A2 Minor adverse

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:52:NSR7 - All time Minor adverse N/A1 Minor adverse Negligible adverse

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:52:NSR8 - All time Minor adverse N/A1 Minor adverse N/A1

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:52: to minor adverse effects are predicted during the evening or night-time for the

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:53: Table 11-14 effects are minor using the matrix given in The effect resulting from

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:53: effects are predicted to be negligible adverse during the daytime and up to minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:53: minor adverse at night (not significant). This is largely because of the distances

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:58: categorised as minor adverse, before consideration of context, and before

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:59:Initial classification of effect Negligible Negligible Negligible Negligible Minor Minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:60: effects of minor adverse or less (not significant) are expected.

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:61: from all construction phases. Up to minor adverse daytime construction noise

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:61: minor adverse to moderate adverse. However, it would be unlikely that both

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:63:Classification of NZT Negligible Negligible Negligible Negligible Negligible Negligible Minor Minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:63:Classification of Negligible Negligible Minor Negligible Negligible Negligible Minor Minor

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:63: negligible to minor adverse (not significant) with the addition of simultaneous

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:63: committed developments. Predicted minor adverse effects at NSR 7 and

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:64:11.7.1 This assessment has identified effects of up to minor adverse (not significant)

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:65: overall minor adverse effect at worst, based upon the context of the

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67:Construction Noise effects Negligible Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67: construction predicted minor contractors that the BS 5228

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67:Construction Noise effects Negligible/ Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67: on residential minor adverse assessment and less, on the basis

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67: construction of predicted minor contractors that the BS 5228

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67:Construction Noise effects Negligible Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:67: construction of predicted minor contractors that the BS 5228

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:68:Construction Noise effects Negligible/minor Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:68: construction of predicted minor contractors that the BS 5228

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:68:Construction Noise effects Negligible Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:68: construction of predicted minor contractors that the BS 5228

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:68:Operation Operation of Up to Minor Further detailed Minor adverse or Lt, P, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:69:Decommissioning Noise effects Negligible/ Further detailed Minor adverse or St, T, D

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:69: during Minor adverse assessment at less, on the basis

EN010103-000918-NZT DCO 6.2.25 ES Vol I Chapter 25 Summary of Significant Effects.pdf:2: (adverse or beneficial) or major (adverse or beneficial). Minor and negligible

EN010103-002351-NZT CAH3 S1.pdf:12:examination we have got a few minor points outstanding, so, we are hopeful we can conclude that in

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:45: 2. The NZT Project requirements are minor in comparison to the 2. The Applicants have given consideration to NTLL, NTL and NTRL

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:85: classified as being of 'minor adverse' significance. Thus, the

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:96: concentrations In order to assess the suspended sediment to be localised and minor and no additional mitigation is proposed

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:218: maintenance activities are likely to be minor (see below).” through Interface meetings that after a period of attempting to

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:244: be a minor spelling error

EN010103-001234-NZT - Regulation 32 Transboundary Screening (12).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:61: Marine EW explained that a key item is a minor

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:78:Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:100: been removed from envelope; IC confirmed that minor

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:100: that only minor refurbishment / upgrade works would be carried out

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:100: location and works will be minor, consisting of outfall refurbishment

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:124:• Works will be minor, consisting of outfall refurbishment (inspection and hand-based maintenance)

EN010103-000005-EN010103_Scoping Report.pdf:45: minor aquifers.

EN010103-000005-EN010103_Scoping Report.pdf:46: question has previously been designated as both minor and non-aquifer in different

EN010103-000005-EN010103_Scoping Report.pdf:51: Teardrop plots; the Fleet River between the minor road (NZ575244) and

EN010103-000005-EN010103_Scoping Report.pdf:63: Development as the design and layout is still being refined, and minor changes are

EN010103-000005-EN010103_Scoping Report.pdf:63: methodologies (major, moderate, minor and not significant).

EN010103-000005-EN010103_Scoping Report.pdf:65:  minor – slight, very short or highly localised effect of no significant consequence;

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:19:Q. I’m just a small contractor, this minor job isn’t worth pursuing if enquiries are expensive?

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:34: are elected by non-controlling shareholders, thereby giving minority shareholders a larger number of represent-

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:35: minority non-independent female 51-60 years

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:36:© Member appointed from the minority list and independent pursuant replaced Standing Statutory Auditor Mario Notari from September 1st, 2020.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:36:(d) Member appointed from the majority list and independent pursuant * Alternate Auditor: Claudia Mezzabotta - Member appointed from the minority list.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:69: In 2020, the total recordable injury rate (TRIR) of the workforce amounted to 1.15, due to two minor events.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:98: counted entities, mainly the upstream joint venture Vår Energi,  dividends of €150 million paid by minor investments in certain

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:104:Change in the fair value of minor investments with effects

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:107:of the Evolvere company and of minority interests in Fin- related to:

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:109:expected to occur in future reporting periods. As provided for tween net income before minority interests, plus net financial

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:192:Change of minor investments measured at fair value with effects

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:193: Change of minor investments measured at fair value

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:194: Change of minor investments measured at fair value

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:194: Reimbursements to minority shareholders (1) (1)

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:195: Change of minor investments measured at fair value

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:233:minorities in 2003 through a public offering (€706 million). the carrying amount of this CGU, including the allocated

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:277: other minor claims, against numerous persons under facts which could suggest any involvement of any

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:299:Equity pertaining to minority interests as of December 31, 2020, amounted to €78 million (€61 million December 31, 2019).

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:306:“International Financial Reporting Standards” (IFRS) is minority interests are immaterial.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:311:cost of the required equipment is relatively minor compared to cost recovery. Proved oil and gas reserves associated with

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:316:the interest in the reserves held by the joint venture Vår Energi, In 2019, sales of 6 mmbbl related to the divestment of minor

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:319: Zohr field and other minor projects; (iii) upward revisions of 267

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:136: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001234-NZT - Regulation 32 Transboundary Screening (1).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:46:LNG imports were up 6.0% in 2021 after only a minor increase in

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:48:LNG imports were up 6.0% in 2021 after only a minor increase in

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:120:a Shell measure based on salary group levels and is distinct from the representation and inclusion of minority staff.

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:120:ethnic minority. We are creating an environment where people with disabilities can excel.

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:120: were from an ethnic minority background. Our ethnic minority called “Spotlight – Disability Inclusion: A Guide for Line Managers.”

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:143:in a unified and pragmatic way. Subsequently this was deferred to early his clear communication skills, noting only minor areas for improvement.

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:151:quantitative and qualitative principles, considering: ethnic minority representation, beginning in the UK and the USA and

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:211:not part of the audit engagement team. We informed the Audit Committee of the inadvertent breach in July 2021. We considered this to be a minor

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:275:For a minority of commodity derivatives contracts, carrying amounts cannot be derived from quoted market prices or other observable inputs, in which

EN010103-002503-NZT DCO 6.5 - ES Guide - Nov 2022 (D12).pdf:6: Volume I REP12-XXX A minor change to remove a reference to

EN010103-000856-NZT DCO 4.5 Access and Rights of Way Plans.pdf:2: MinorRoa d

EN010103-000856-NZT DCO 4.5 Access and Rights of Way Plans.pdf:3: MinorRoa d

EN010103-000856-NZT DCO 4.5 Access and Rights of Way Plans.pdf:5: MinorRoa d

EN010103-000856-NZT DCO 4.5 Access and Rights of Way Plans.pdf:6: MinorRoa d

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:76: MinorRoa d

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:77: MinorRoa d

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:79: MinorRoa d

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:80: MinorRoa d

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:12:therefore initially categorised as minor adverse, before consideration of context, and

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:12:effects of minor adverse or less (not significant) are expected.

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:12:overall minor adverse effect at worst, based upon the context of the

EN010103-002360-NZT ISH6 S1.pdf:17:you with minor concentrations, which perhaps aren't credible, they're more around modelling

EN010103-002360-NZT ISH6 S1.pdf:27:One last probably minor point was the terminology around mitigation. This has been described as a

EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:2:within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and consistency are not set

EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:3:Schedule 2, (Requirements), Requirement Minor amendment made to specify that the preliminary risk assessment will include a desk top study

EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:5:Schedule 2, (Requirements), Requirement 23 Minor amendment to specify that the piling and penetrative foundation design method statement will

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:25:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:29:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:30:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:31:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:49:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:50:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:51:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:64:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:65:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:66:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:83:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:84:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:98:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:99:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:101:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:114:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:115:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:116:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:134:further, minor editions of mapping which were produced and published in

EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf:135:further, minor editions of mapping which were produced and published in

EN010103-002055-NZT DCO 5.5 Electricity Grid Connection Statement (Tracked) August 2022 (D6).pdf:14: EC5 456950, 523810 Minor Road HDD or Open New

EN010103-002055-NZT DCO 5.5 Electricity Grid Connection Statement (Tracked) August 2022 (D6).pdf:14: EC6 457160, 524200 Minor Road York-Potash New

EN010103-002055-NZT DCO 5.5 Electricity Grid Connection Statement (Tracked) August 2022 (D6).pdf:14: EC8 457100, 523960 Minor HDD New

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:4: over land). In addition, there are other minor changes or updates to the Project.

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:39:there are other minor changes or updates to the NZT Project.

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:52: there are other minor changes or updates to the Proposed Development.

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:124: Project), a reduction in the land required for the project and further minor changes or

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:130:reduction in the land required for the project and further minor changes or updates to the NZT

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:167: 10 Minor increase in the Order Limits STDC has no comments on this change.

EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf:40:further, minor editions of mapping which were produced and published in

EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf:74:further, minor editions of mapping which were produced and published in

EN010103-001422-NZT DCO 4.8.3 Rev 2 - Electrical Connection Plans Sheet 3.pdf:1: EC6 - MINOR ROAD - ABOVE GROUND

EN010103-001422-NZT DCO 4.8.3 Rev 2 - Electrical Connection Plans Sheet 3.pdf:1: EC8 - MINOR ROUNDABOUT - FOR INFORMATION

EN010103-001422-NZT DCO 4.8.3 Rev 2 - Electrical Connection Plans Sheet 3.pdf:1: EC5 - MINOR ROAD - HDD OR

EN010103-001138-NZT DCO 6.4.47 ES Vol III Appendix 24B Assessment of Cumulative Effects Stages 1-3.pdf:3: minor detail changes to the effects.

EN010103-001138-NZT DCO 6.4.47 ES Vol III Appendix 24B Assessment of Cumulative Effects Stages 1-3.pdf:19: of Condition (minor

EN010103-001138-NZT DCO 6.4.47 ES Vol III Appendix 24B Assessment of Cumulative Effects Stages 1-3.pdf:23:90 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to approved

EN010103-001138-NZT DCO 6.4.47 ES Vol III Appendix 24B Assessment of Cumulative Effects Stages 1-3.pdf:23:91 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to approved

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:214: (g) minor structures, such as furniture, refuse or other storage units, signs and lighting;

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:12: In respect of the minor consultation discrepancies identified, s51 advice has been

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:14: Is this of a satisfactory Yes, with a minor discrepancy Is this of a satisfactory Yes, with minor discrepancies noted in

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:14: Is this of a satisfactory Yes, with minor discrepancies noted Is this of a satisfactory Yes

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:15: Is this of a satisfactory Yes, with minor discrepancies noted Is this of a satisfactory Yes, with minor discrepancies noted in

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:16: Is this of a satisfactory Yes, with minor discrepancies noted Is this of a satisfactory Yes, with minor discrepancies noted in

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:17: Is this of a satisfactory Yes, with minor discrepancy noted Is this of a satisfactory Yes

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:18: Is this of a satisfactory Yes, with minor discrepancy noted Are they of a satisfactory Yes, with minor discrepancy noted in box

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:18: Are they of a satisfactory Yes Are they of a satisfactory Yes, with minor discrepancies noted in

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:20: Development, together with sufficient information the Inspectorate has noted minor deficiencies in the mapping of one Ramsar site.

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:14: scale plant and buildings associated with the former Redcar steelworks. voids and removal of minor Infrastructure and services have been

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:42: noted that the statement on ancient woodlands was subject to minor amendment

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:47: is presented in ES Appendix 12B: Ecological Impact Assessment Methods. It is precautionary principle i.e. it was worst case. The minor amendment to the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:55:  Direct habitat loss - While some minor dredging for the outfall head (Work

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:89: subsequently been incorporated into the Teesmouth and Cleveland relatively minor changes in the view with the larger, more notable,

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:96: occurring has been judged as ‘low’ and the consequence ‘minor’, and environmental limits (Water Quality Standards and Drinking Water

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:104: MA.1.2 Applicants The EA are quoted as requesting that the cumulative effects of minor events is The Environment Agency comment relates to slow leakage of CO2 from the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:113: receptors? House Farm and therefore a minor change in ground height between the site

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:113: install the water supply and discharge corridors have been scoped out on the to receptors and the relatively minor nature of the works in the water supply and

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:130: required a relatively minor redistribution of traffic to that assessed.

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:132: construction are described as ‘minor adverse’ in Section 16.6, including those being “very low” with the effect (Ref table 16-3) being minor on the A1042

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:133: purposes of the EIA Regulations; minor and negligible effects are ‘not

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:133: both “negligible” and “minor-adverse” effects are not significant in EIA terms, the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:133: minor works (for instance to improve an access) or to allow the safe access and

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:138: assessments in the ES. The predicted minor adverse traffic and transport

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:138: construction of the Proposed Development, this could have a minor beneficial

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:154: assumes no change or refurbishment to the existing outfall, but paragraph outfall, but possible minor superficial repair works the extent of which would not

EN010103-001025-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 2.pdf:6:2 Good – Minor defects that will not reduce the overall performance of the asset

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:39:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:40:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:53:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:68:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:69:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:84:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:96:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:97:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:110:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:112:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:124:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:138:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:155:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:157:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:168:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:170:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:182:further, minor editions of mapping which were produced and published in

EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf:184:further, minor editions of mapping which were produced and published in

EN010103-001144-NZT DCO 6.4.33 ES Vol III Appendix 14E Coastal Modelling Report.pdf:6:been considered. The first option is for the re-use of the existing outfall with minor refurbishment; for

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:25: App. Sub Type: Minor

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:26: App. Sub Type: Minor

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:27: App. Sub Type: Minor

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:27: Description: Minor variation to authorisation under RSA

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:27: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:28: Land Impact: Category 3 - Minor Incident

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:23: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:24: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:24: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:25: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:25: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:26: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:27: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:28: App. Sub Type: Minor

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:31: Incident Severity: Category 3 - Minor Incident

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:31: Description: Minor variation to authorisation under RSA

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:31: Description: Minor variation to authorisation under RSA

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:32: Description: Minor variation to authorisation under RSA

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:32: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:33: Description: Minor variation to authorisation under RSA

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:33: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:8: unchanged, however, there is a minor amendment to text describing water

EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:9:3.2.6 There are a range of minor updates which have been made to Chapter 4 to

EN010103-000872-NZT DCO 4.11.8 CO2 Gathering Network Plans Sheet 8.pdf:1: CGC25 - MINOR ROAD -

EN010103-000872-NZT DCO 4.11.8 CO2 Gathering Network Plans Sheet 8.pdf:1: CGC24 - MINOR ROAD - DCO Reference Number - 4.11

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:526: BS EN 15297 - Solid biofuels - Determination of minor elements - As, Cd, Co, Cr, Cu,

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:645:with only minor modification.

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:654:the most part any errors in the magnitude of the correction are of minor importance. In general, if the

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:654:imperfections of the machine on the derived parameters is minor.

EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:657:minor uncertainty concerning the origin of the contraction event.

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:37:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:38:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:39:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:58:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:59:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:74:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:77:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:90:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:94:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:107:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:112:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:125:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:130:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:131:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:133:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:149:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:152:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:153:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:155:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:168:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:172:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:183:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:187:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:188:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:200:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:203:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:205:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:216:further, minor editions of mapping which were produced and published in

EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf:218:further, minor editions of mapping which were produced and published in

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG8 449935, 523567 Minor watercourse Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG11 450662, 523559 Minor Road (Seaton Carew Rd) Culvert Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG12 451035, 523583 Minor Road (Seal Sands) Culvert Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG13 451076, 523585 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG14 452475, 523589 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG15 453489, 523450 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG16 453597, 523627 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG17 453598, 523762 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG18 453681, 524208 Minor Road Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG19 453766, 524337 Minor Road Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG20 453886, 524519 Minor Road Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CG21 453946, 524719 Minor Road (Navigator Terminals) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC25 455196, 524652 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC26 455380, 524552 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC27 455562, 524447 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC28 455801, 524301 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC29 455885, 524240 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC30 456193, 524116 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC31 456540, 523836 Minor Road (Dabholm Gut) Under road Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:12:CGC32 456695, 523763 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:13:CGC34 457098, 524604 Minor Road (Teesworks) Auger bore New

EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:24: nevertheless prescriptive and comprises minor and required early on-site activities

EN010103-001933-NZT ISH3 S1.pdf:8:minor drafting ones identified by the examining authority to issue specific hearing to clarify article 12

EN010103-001933-NZT ISH3 S1.pdf:14:minor point on this just wanted to clarify. And it's as simple as asking, should the heading be trend

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:4:Possible 3 Medium 3 Major delay on this Minor impact on 9 to 12

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:4:Unlikely 2 Low 2 Minor delay on this Minor impact on 5 to 8

EN010103-001792-NZT DCO 2.1a - Schedule of Changes to the draft DCO - June 2022.pdf:2:contents) within the draft DCO have been updated accordingly. These changes, along with minor typographical amendments for clarity and

EN010103-001792-NZT DCO 2.1a - Schedule of Changes to the draft DCO - June 2022.pdf:12:Schedules 10 and 11 (Deemed Marine Minor amendments to drafting of licences to reflect drafting comments in the Relevant

EN010103-002166-NZT DCO 4.5_Access_and_Rights_of_Way_Plan_August 2022 (D6).pdf:4: MinorRoa d

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:61: Marine EW explained that a key item is a minor

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:78:Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:100: been removed from envelope; IC confirmed that minor

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:100: that only minor refurbishment / upgrade works would be carried out

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:100: location and works will be minor, consisting of outfall refurbishment

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:124:• Works will be minor, consisting of outfall refurbishment (inspection and hand-based maintenance)

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:13: minor roads, railway lines or small water bodies. Whereas, micro-bored

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:28: a minor effect and is Not Significant. As set out in the assessment

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:42: have actually been developed). The latter has a minor impact on the

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:53: trenchless technologies for the installation of pipelines. The CEMP APP-347 crossing of roads, rail lines and minor surface water bodies. The need for their

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:66: significant distances to receptors and works of a minor nature compared to

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:76: ES) minor detail changes to the cumulative effects. Online

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:83: for minor material amendments to the Condition 1 of the decision notice states condition. The original close proximity to Site but:

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:83: approved layout and size of buildings; site that the development shall be application variation of Condition (minor

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:84: tunnel portal at wilton comprising buildings, therefore only minor additional

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:85: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:86: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent to N Minor alteration to approved No status change that the

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:86: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent to N Minor alteration to approved No status change that the

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:164:Sea level Very Likely Marine Construction Very High Loss of suitable haul- None considered Unlikely Medium Low Minor No None

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:164:Sea level Very Likely Marine Operation Very High Loss of suitable haul- None considered Unlikely Medium Low Minor No None

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:164:Sea level Very Likely Marine Decommissioning Very High Loss of suitable haul- DEMP will be developed and agreed with the Possible Medium Low Minor No None

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:229: tracked-change version as Annex 4), to correct a minor cross-referencing error

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:229: 'Overlap Zone' included minor updates to their protective provisions, and responses to:

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:230:2.3 Specific to the minor amendments to their protective provisions (paragraph 1.1.1.3 of

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:233: and tracked-change version as Annex 5), to correct a minor cross-referencing error from

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:292: Severity of Risk 1. Minor H&S: Injury with short term effect, not

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:292: Project: Minor changes required to achieve

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:292: PROBABILITY Minor Severe Extreme

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:294:Minor injury or health affects Minor effect: Contamination, Minor damage: Brief process Limited impact: Local public

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:294:(e.g. RWC or minor LTI < a permanent effect £100,000 to repair) media/political) 2 Low Low Low Medium Medium

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:296: Various minor to serious 2 Ensure plant is positioned out of the way of Low

EN010103-001930-NZT ISH3 S2.pdf:9:themselves, say for a couple of minor changes and one new requirement which I'll just refer to in a

EN010103-001930-NZT ISH3 S2.pdf:9:moment, there are no other requirements where substantive changes have been made. And the minor

EN010103-001930-NZT ISH3 S2.pdf:9:changes that that had been made, there have been minor changes to requirement 22 which is control

EN010103-001930-NZT ISH3 S2.pdf:9:of noise operation, where there's a minor change to article 3222 one and also a minor change to 20. Or

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:77: outfall tunnel, any maintenance activities are likely to be minor (see

EN010103-001526-NZT-ExQ1.pdf:50: likelihood of this occurring has been judged as ‘low’ and the consequence ‘minor’, and

EN010103-001526-NZT-ExQ1.pdf:56:MA.1.2 Applicants The EA are quoted as requesting that the cumulative effects of minor events is addressed in

EN010103-001526-NZT-ExQ1.pdf:68: are ‘negligible adverse’. However, the effects during construction are described as ‘minor

EN010103-001234-NZT - Regulation 32 Transboundary Screening (11).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002184-NZT DCO 9.33 - Applicants' Response SWQ HE.2.6 - Sept 2022(D7).pdf:13: minor adverse effect, which is not significant.

EN010103-002184-NZT DCO 9.33 - Applicants' Response SWQ HE.2.6 - Sept 2022(D7).pdf:13: heritage value, resulting in a minor adverse effect, which is not significant.

EN010103-002184-NZT DCO 9.33 - Applicants' Response SWQ HE.2.6 - Sept 2022(D7).pdf:15: Corrections and minor amendments (https://historicengland.org.uk/listing/the-list/minor-amendments/)

EN010103-002184-NZT DCO 9.33 - Applicants' Response SWQ HE.2.6 - Sept 2022(D7).pdf:17: Corrections and minor amendments

EN010103-002184-NZT DCO 9.33 - Applicants' Response SWQ HE.2.6 - Sept 2022(D7).pdf:19: Corrections and minor amendments

EN010103-001946-NZT ISH4 S2.pdf:18:relatively minor question perhaps but about how your discussions are progressing with Northumbrian

EN010103-001946-NZT ISH4 S2.pdf:24:Richard Lowe represented the applicants, the level of effect we've identified is, is minor and temporary.

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:137: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:30: cases, the likelihood is that through refurbishment and or minor upgrade, the actual

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:43: Marine EW explained that a key item is a minor

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:67: Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-002543-NZT DCO 4.9 - Water Connection Plan Nov 2022 (D12).pdf:1: WC1 - MINOR ROAD -

EN010103-002543-NZT DCO 4.9 - Water Connection Plan Nov 2022 (D12).pdf:1: WC5 - MINOR ROAD BELOW

EN010103-002543-NZT DCO 4.9 - Water Connection Plan Nov 2022 (D12).pdf:1: WC10 - MINOR ROAD - (EXISTING) NZNS STORAGE LTD

EN010103-001256-220131 - Response to Applicants' Letter of 26.01 Final.pdf:2:minor updates or changes to the Project. A draft timetable for the proposed change

EN010103-001256-220131 - Response to Applicants' Letter of 26.01 Final.pdf:2: e. the extent of minor updates or changes proposed to the Project.

EN010103-002167-NZT DCO 4.5_Access_and_Rights_of_Way_Plan_Key_Plan_August 2022 (D6).pdf:1: MinorRoa d

EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:17: kits will be provided in areas of fuel/oil/minor chemicals storage;

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:6: moderate, minor and negligible, and adverse, neutral or beneficial). Each

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:7: throughout this ES (major, moderate, minor and negligible), and effects are

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:7: • minor – slight, very short or highly localised effect;

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:7: • moderate – limited effect but greater than that for minor (by extent,

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:8:High Major Major Moderate Minor

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:8:Medium Major Moderate Minor Negligible

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:8:Low Moderate Minor Negligible Negligible

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:8:Very Low Minor Negligible Negligible Negligible

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:135: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-002147-NZT DCO 4.11.3 - CO2 Gathering Network Plans Sheet 3 August 2022 (D6).pdf:1: CGC8 - MINOR CGC9 - FARM TRACK CROSSING - CULVERT CGC11 - PUBLIC ROAD

EN010103-002313-NZT DCO 8.1 - RCBC SoCG Sept 2022 (D9) - final signed.pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:53: suggests that Coatham Dunes plays a minor role as a roost site in the

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:9: to a significance level on a scale of neutral, minor, moderate and major

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:10: Beneficial effect on structure/function or Not significant Minor

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:10: Adverse effect on structure/function or Not significant Minor adverse

EN010103-000879-NZT DCO 4.11.3 CO2 Gathering Network Plans Sheet 3.pdf:1: CGC8 - MINOR CGC9 - FARM TRACK CROSSING - CULVERT CGC11 - PUBLIC ROAD

EN010103-001585-NZT DCO 8.3 - STDC TVCA Teesworks SoCG - May 2022.pdf:20: There are minor discrepancies in the names of

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:16: ES) minor detail changes to the traffic related cumulative

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:24: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:24: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:25: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:26: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the

EN010103-002246-NZT DCO - 9.34 Updated List of Developments (Tracked) - Sept 2022 (D8).pdf:26: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the

EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:25: encourage integrated minor ancillary interest for the

EN010103-001234-NZT - Regulation 32 Transboundary Screening (6).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002064-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Clean.pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-002065-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Tracked.pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:16: minor, moderate or major. Moderate and major effects are considered to be

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:24: and Vibration (Document Ref. 6.2) concludes there would be minor adverse or

EN010103-002352-NZT CAH3 S2.pdf:1:It's a very minor point was just to say that I think I think we're actually waiting for the documents to be

EN010103-002352-NZT CAH3 S2.pdf:15:May 2022. We returned relatively minor amendments on the 24th of June. A substantive response is

EN010103-002352-NZT CAH3 S2.pdf:15:account for minor changes.

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:29: Other minor land interests (including former ICI landfill) 99.0 40.0

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:52: surface water flooding in the area and beyond at the A1085 at some isolated points. Minor improvements to the area

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:58:the Official Receiver. The material realises a minor market

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:62:early years of development, with some relatively minor

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:32:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:57:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:76:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:77:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:93:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:95:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:97:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:113:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:115:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:117:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:133:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:134:further, minor editions of mapping which were produced and published in

EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf:135:further, minor editions of mapping which were produced and published in

EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:17: kits will be provided in areas of fuel/oil/minor chemicals storage;

EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:22: There continue to be minor discrepancies in the

EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:15: A minor update to the

EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:35: at Deadline 2) and a minor

EN010103-001219-NZT DCO 4.5 - ARoW Plans - Oct 2021 Rev.2.0.pdf:1: MinorRoa d

EN010103-001219-NZT DCO 4.5 - ARoW Plans - Oct 2021 Rev.2.0.pdf:5: MinorRoa d

EN010103-001219-NZT DCO 4.5 - ARoW Plans - Oct 2021 Rev.2.0.pdf:7: MinorRoa d

EN010103-001219-NZT DCO 4.5 - ARoW Plans - Oct 2021 Rev.2.0.pdf:8: MinorRoa d

EN010103-001258-220204 - NZT DCO - Response to ExA let_31.01.22_re timing of PM_Exam - Final.pdf:4:Question 2e – What is the extent of the minor updates and changes proposed to the Project?

EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:137: This builds in the opportunity for certain aspects to be varied if appropriate (e.g. minor

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:22: to be a minor typographic error,

EN010103-002673-STDC - Preferred PPs End of Examination TRACK - 10 Nov 2022.pdf:4: these paragraphs, subject to inclusion of the minor

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:4: 7a. Minor changes have been made to the Document Ref. 5.8 ‘Combined Heat

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:7: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:8: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:9: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:10: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:11: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:11: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:13: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:14: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:16: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:17: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:17: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:18: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:18: Minor errors and omissions

EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:18: minor changes (repagination and correction of a Rev. 2.0.

EN010103-002505-NZT DCO 7.14 - Third ES Addendum NTS - Nov 2022 (D12).pdf:7: minor change to remove a reference to

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:74: is minor, with a maximum increase of 0.3 PCU during both the AM and PM Peaks

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:74: is minor, with a maximum increase of 0.58 seconds during the AM peak (Arm D

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:77: of construction has a minor impact upon the DoS and Max Queue figures across

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:77: Plus Committed Development plus Peak of Construction scenarios is minor, and

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:79: with the Proposed Development are temporary and relatively minor particularly

EN010103-001305-220224 - NZT - Letter to Applicants re Change Request - Final.pdf:2:take (or a reduction in the powers sought over land), together with other minor

EN010103-001305-220224 - NZT - Letter to Applicants re Change Request - Final.pdf:2:land) although a single minor extension to the existing Order Land is also proposed.

EN010103-001305-220224 - NZT - Letter to Applicants re Change Request - Final.pdf:3:should include both clean and tracked changes versions, (or where minor changes are

EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:21: There are continue to be minor discrepancies in

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:90: minor significance and above identified within each of the technical assessments

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:91: ­ a minor adverse (not significant) cumulative noise effect upon one NSR (NSR3)

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:107: of effects is considered as ‘minor adverse’ (Table 21-7). As such, the operation of the

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:108: will result in a minor effect and is not significant.

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:115: Proposed Development are predicted to be of up to minor adverse and not

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:115: Development are likely to be up to minor adverse during construction, and minor

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:115: 9 confirms that construction there are predicted minor adverse effects on water

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:115: that are classified as greater than minor adverse. During operation, the largest

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:134: selection of the quietest cost-effective construction effects on receptors are reduced to either minor adverse or less

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:134: plant available; containment of noise or negligible adverse or less. There would be a moderate/minor adverse effect

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:135: possible, the use of landscaping, bunds PCC Site on residential receptors is found to be minor adverse or less.

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:221: This conclusion is taken forward in light of identified minor changes required to the DCO, described

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:222: of minor changes required to the Applicant's Preferred DCO, and as described in Chapter 7 below.”

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:248: significance of effects is considered as ‘minor adverse’ (Table 21-7). As such,

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:250: on Teesside, however, this will result in a minor effect and is not significant.

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:135: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001259-220207 - NZT - Letter to IPs and APs.pdf:1:other minor updates or changes to the Project. A draft timetable for the change

EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:23: encourage integrated minor ancillary interest for the

EN010103-002006-NZT-ExQ2-FINAL.pdf:36: of a minor nature compared to PCC paragraph 11.6.22 of APP-093 and REP2-016. In

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:7: • minor–, very short or highly localised effects of no significant

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:18: • from minority backgrounds;

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:21: to be of up to minor adverse and not significant for the construction,

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:22: adverse effects predicted that are classified as greater than minor

EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:24: encourage integrated minor ancillary interest for the

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:17: ES) minor detail changes to the cumulative effects. Online

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:25: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:25: approved layout and size of buildings; site states that the development shall be application variation of Condition (minor

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:25: aftercare, the construction of a tunnel portal therefore only minor additional

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:27: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:28:90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent to N Minor alteration to No status change that the No status change that the

EN010103-002185-NZT DCO - 9.34 Updated List of Developments - Response to SWQ GEN.2.2(i) - Sept 2022 (D7).pdf:28:91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent to N Minor alteration to No status change that the No status change that the

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:16: GC2 454150, 524670 Minor road and pipeline Open Cut New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:16: GC3 453980, 524660 Minor Road (Navigator Auger New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:16: GC4 453960, 524670 Minor Road (Navigator Auger New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC6 453910, 524690 Minor Road (Navigator Auger New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC7 453750, 524450 Minor Road (Seal Sands) Open Cut New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC8 453700, 524360 Minor Road (Seal Sands) Open Cut New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC9 453240, 524110 Minor Road (Seal Sands) Open Cut New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC10 452230, 524110 Minor Road (Seal Sands) Open Cut New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:17: GC15 456696, Minor Rd (x2), Pipelines Trenchless New

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:18: other minor watercourses, transport Infrastructure) and land required for such

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:22: minor repairs on the PCC. Major and specialist Operations and Maintenance

EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:63:Aclis minor - - - - - - - - - - - - - - - - - - - 3 - - -

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:30:Workforce diversity Ethnic minorities During 2019/20, the representation of our female and ethnic minority groups has increased

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:30:ethnic minorities in our workforce. We aim to 18.3 18.1 17.9

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:62: minorities. For more information about our UK gender pay, visit our

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:63:of ‘minority’ racial or ethnic heritage and we currently have 24.7% Gender demographic as at 31 March 2020

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:64:‘Minority’ refers to racial/ethnic heritage declarations as recorded in our lockdown in both our UK and US businesses.

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:64:Minority 3,918

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:64:Minority (%) 18.3 US 16.1

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:84:Following the external Board evaluation which was undertaken account in the evaluation. The results confirmed that there were minor

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:89:Corporate audit • The Committee received a review of the Corporate Audit Charter. Minor changes were made to reflect the SOX control testing

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:92: against the Company’s financial risk appetite; approved minor policy changes to funding risk, considered these plans further and approved

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:95:to have at least one director from a non-white ethnic minority by 2021. minority on the Board. Additionally, our mandatory requirement for a

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:95: from non-white ethnic minorities.

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:108:• Completed sale of minority stake in Cadent in line with agreed timing

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:109: proportion of women and minorities in leadership and managerial positions

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:262: impact of inflation. Pension costs were £9 million higher mainly related to the due to more expenditure on ‘minor’ storms (non-deferrable) and increased

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:264:Black, Asian and Minority Ethnic (being the UK term used to refer to

EN010103-000846-NZT DCO 4.9.1 Water Connection Plan.pdf:1: WC1 - MINOR ROAD -

EN010103-000846-NZT DCO 4.9.1 Water Connection Plan.pdf:1: WC5 - MINOR ROAD BELOW

EN010103-000846-NZT DCO 4.9.1 Water Connection Plan.pdf:1: WC10 - MINOR ROAD - (EXISTING) NZNS STORAGE LTD

EN010103-001481-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final.pdf:15: GC5 456696, 523754 Minor Rd (x2), Pipelines (x2 – Trenchless New

EN010103-001481-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final.pdf:15:5.2.9 Trenchless technologies may be needed for crossing points (e.g. minor watercourses,

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:13: minor and limited to those described for the outfall

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:37: minor adverse effect at worst. Boundary noise levels

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:62: fuel/oil/minor chemicals storage.

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:10:and Management, 20, ES likely to be very minor and limited to those described for the outfall refurbishment. Owing to the No. 5

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:29: impact and a minor adverse effect at worst. Boundary noise levels will be proposed based on Requirement 21: Control of Noise and

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:48:Framework CEMP, 9C - COSHH guidelines, whilst spill kits will be provided in areas of fuel/oil/minor chemicals storage. Requirement 16: Construction

EN010103-000830-NZT DCO 5.5 - Electricity Grid Connection Statement.pdf:14: EC5 456950, 523810 Minor Road HDD or Open New

EN010103-000830-NZT DCO 5.5 - Electricity Grid Connection Statement.pdf:14: EC6 457160, 524200 Minor Road York-Potash New

EN010103-000830-NZT DCO 5.5 - Electricity Grid Connection Statement.pdf:14: EC8 457100, 523960 Minor HDD New

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:33:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:34:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:36:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:37:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:38:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:52:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:54:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:70:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:84:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:87:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:89:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:109:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:110:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:125:further, minor editions of mapping which were produced and published in

EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf:129:further, minor editions of mapping which were produced and published in

EN010103-001875-Redcar and Cleveland Borough Council.pdf:40: relatively minor building alterations 5.7 The display of advertisements is not a

EN010103-001875-Redcar and Cleveland Borough Council.pdf:40: doors and minor extensions. While except at 102 Coatham Road where the

EN010103-001875-Redcar and Cleveland Borough Council.pdf:42: regarded as being of minor or even no is a significant townscape building and

EN010103-001875-Redcar and Cleveland Borough Council.pdf:67: For minor domestic, agricultural and Queen Anne through Baroque, Rococo

EN010103-001875-Redcar and Cleveland Borough Council.pdf:95:  Other minor building works including

EN010103-001875-Redcar and Cleveland Borough Council.pdf:96:  Minor developments including the specimen trees and a narrow

EN010103-001875-Redcar and Cleveland Borough Council.pdf:97: 6.4 Over the next 100 years a few minor Kirkleatham Hall.

EN010103-001875-Redcar and Cleveland Borough Council.pdf:140: minor alterations and extensions to

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:18: ES) minor detail changes to the traffic related cumulative

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:25: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:25: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:26: STDC of the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:27: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the No status change that the

EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:27: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the No status change that the No status change that the

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:49: App. Sub Type: Minor

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:49: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:50: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:50: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:50: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:50: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:50: Incident Severity: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:51: Air Impact: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:51: Land Impact: Category 3 - Minor Incident

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:68: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:68: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:81: minor significance and above identified within each of the technical assessments

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:81: - a minor adverse (not significant) cumulative noise effect upon one NSR (NSR3)

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:97: of effects is considered as ‘minor adverse’ (Table 21-7). As such, the operation of the

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:98: will result in a minor effect and is not significant.

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:105: Proposed Development are predicted to be of up to minor adverse and not

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:106: Development are likely to be up to minor adverse during construction, and minor

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:106: 9 confirms that construction there are predicted minor adverse effects on water

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:106: that are classified as greater than minor adverse. During operation, the largest

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:125: selection of the quietest cost-effective construction effects on receptors are reduced to either minor adverse or less

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:125: plant available; containment of noise or negligible adverse or less. There would be a moderate/minor adverse effect

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:126: possible, the use of landscaping, bunds PCC Site on residential receptors is found to be minor adverse or less.

EN010103-001280-Rule 6 Letter.pdf:4:land take (or a reduction in the powers sought over land), together with other minor

EN010103-001280-Rule 6 Letter.pdf:18: • Potential cumulative effects of minor events.

EN010103-001234-NZT - Regulation 32 Transboundary Screening (8).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:28: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:29: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:30: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:31: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:31: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:31: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:31: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:31: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:32: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:32: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:32: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:33: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:34: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:35: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:38: App. Sub Type: Minor

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:38: App. Sub Type: Minor

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:38: App. Sub Type: Minor

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:15: GC2 454149, 524672 Minor road and pipeline Open Cut New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:15: GC3 453978, 524655 Minor Road (Navigator Auger New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:15: GC4 453957, 524655 Minor Road (Navigator Auger New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC6 4539894, 524655 Minor Road (Navigator Auger New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC7 453754, 524447 Minor Road (Seal Sands) Open Cut New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC8 453698, 524361 Minor Road (Seal Sands) Open Cut New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC9 453238, 524107 Minor Road (Seal Sands) Open Cut New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC10 452230, 524110 Minor Road (Seal Sands) Open Cut New

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:16: GC15 456697, 523753 Minor Rd (x2), Pipelines Trenchless New

EN010103-001915-NZT DCO 9.20 - Applicants response to Orsted HP4 D3 Submission July 2022 (D4).pdf:32: (usually minor) change in parameters can be tested, with the option to revert back

EN010103-001234-NZT - Regulation 32 Transboundary Screening (10).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:9:Beneficial effect on structure/function or Not significant Minor beneficial

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:9:Adverse effect on structure/function or Not significant Minor adverse

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:29: continue to be present. Minor changes in habitat extent, composition and

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:31: minor.

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:36: There will be minor indirect impacts on habitat (i.e. fine sediments) and water

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:37: quality, in the event that any minor incidents occur.

EN010103-Advice-00011-1-Teesside Net Zero Meeting Note_15 Sept 2021_Final.pdf:3:assessments due to the minor nature of the elements. An updated Explanatory

EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:4:as a requirement 13, paragraph five, it was a minor point but it's referring to works numbers where

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:73: to be minor (see below).

EN010103-001824-Orsted Hornsea Project Four Limited - Comments on the Applicants’ dDCO.pdf:28:anhydrite zones. Sutherland et al 27 describe it thus “…. only minor faulting is observed in the overburden above

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:4: over land). In addition, there are other minor changes or updates to the

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:7: However, a single minor extension to the existing Order Land is proposed

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:11: Minor Updates to Land Requirements across the Project

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:11: Applicants have also identified the need for a minor increase in the size

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:13: 10 Minor increase in the Order Limits for Work No. No

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:18: Change 10: Minor increase in the Order Limits for Work No. 9 Temporary

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:18: minor change therefore transfers this portion of Seal Sands Road to

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:24:3.11 Change 10: Minor Increase in the Order Limits for Work No. 9

EN010103-002540-NZT DCO 4.5- ARoW Plans Sheets 1 to 7 - Nov 2022 (D12).pdf:4: MinorRoa d

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:10:minor impact over a prolonged period = a major

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:36:O-13 Earthquake / seismic event Asset damage, potential The impact of an earthquake Although minor earthquakes Yes Yes

EN010103-000888-NZT DCO 6.2.3 ES Vol I Chapter 3 Description of the Existing Environment.pdf:8: are generally aquifers formerly classified as minor aquifers.

EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:17: kits will be provided in areas of fuel/oil/minor chemicals storage;

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:26:further, minor editions of mapping which were produced and published in

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:31:further, minor editions of mapping which were produced and published in

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:33:further, minor editions of mapping which were produced and published in

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:42:further, minor editions of mapping which were produced and published in

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:47:further, minor editions of mapping which were produced and published in

EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf:48:further, minor editions of mapping which were produced and published in

EN010103-001943-NZT CAH2 S2.pdf:11:but one minor points on the updated ca shedule. With the significant changes attract change version

EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:20: Incident Severity: Category 3 - Minor Incident

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:14:Minor / localised Impacts when taken on their own or in Localised improvement, no

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:14: lead to a minor localised or temporary element

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:14:effect lead to a minor localised or temporary element when balanced

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:15:own have the potential to lead to potential to lead to a minor potential to lead to a minor

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:15:a minor localised or temporary localised or temporary adverse localised or temporary effect on

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:26: previously been designated as both minor and non-aquifer in different locations

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:46: incidents of Category 3 (minor) or worse within 250 m of the Site within the

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:63: Knitting Wife Beck, Kinkerdale Beck, Belasis Beck and minor tributaries of

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: and temporary minor impact to the Tees Coastal water body due to works to

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: Tees Coastal water body would be minor. The main risk would result from

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:80: outfall tunnel. Overall, this impact is considered minor given the mitigation

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:83: Belasis Beck and minor tributaries of these watercourses for the Natural Gas

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:84: temporary and minor within the waterbodies directly affected and are not

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:84: Tees Estuary. However, this risk is considered minor given the mitigation

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:85: would be minor. The main risk would result from working immediately

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:85: protocols, then the risk is temporary and minor to aquatic ecology. No

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:86: and minor, and would not be significant at the water body scale. The

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:90: drips, leaks and minor spill and which could be contaminated, shall be located

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:101: be minor and localised, and not significant at the water body scale.

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:114: increase in DIN is considered to be minor and localised, and not significant

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:142: 10/03/2012 (Minor) 21710 effects - smoke

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:142: 25/12/2013 (Minor) 21710 firefighting runoff

EN010103-002054-NZT DCO 5.5 Electricity Grid Connection Statement (Clean) August 2022 (D6).pdf:14: EC5 456950, 523810 Minor Road HDD or Open New

EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:32: benthic habitats and species. Arsenic had one minor exceedance at Station

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:132: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:21: -Minor Road/Local Road

EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:54: Minor Road / Local Road

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:21:TotalEnergies is a minority shareholder in a number of non-state-owned Russian companies: Novatek (19.4%), Yamal LNG (20%), Arctic

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:22:to find a non-Russian buyer for its minority interests in Russia. Abandoning these interests without consideration would enrich Russian

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:22:investors, in contradiction with the sanctions' purpose. In addition, abandoning these minority interests held by TotalEnergies would have

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:23:of the companies Novatek and Yamal LNG, of which TotalEnergies is a minority shareholder, are not materially impacted by the sanctions

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:23:The sanctions adopted since February 2022 have included the designation of one of the minority shareholders of PAO Novatek as

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:57: - In January 2021, TotalEnergies finalized the acquisition of a 20% minority interest in Adani Green Energy Limited (AGEL) from

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:110: - Commitments to purchase shares held by non-controlling interests (put options written on minority interests)

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:130: Luminora Solar 5 65.00 % E Spain Spain

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:130: Luminora Solar cuatro, S.L. 65.00 % E Spain Spain

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:130: Luminora Solar Dos, S.L. 65.00 % E Spain Spain

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:130: Luminora Solar Tres, S.L. 65.00 % E Spain Spain

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:153: financial charges: $30.7 billion to non-controlling minority interests)

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:163:emissions. This part is a minority (about 15%) but should be reduced as improve energy efficiency as part of an investment plan totaling $450

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:174: acquisition of a 20% minority interest in Adani Green Energy Limited

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:186: and minority interests in other companies, including PAO Novatek

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:211: transferred at the end of July 2021 its non-operated minority participation

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:252:varying degrees. Whether these conditions appear alone or in subsidiary Total Venezuela, transferred its 30.32% non-operated minority

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:256:companies Novatek and Yamal LNG, of which TotalEnergies is a minority make funds or economic resources available. Other targeted sanctions

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:257: designation of one of the minority shareholders of PAO Novatek as an impact on project financings, particularly on the amounts that Arctic

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:258: of July 2021 its non-operated minority participation of 30.32% in

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:297: emissions. This part is a minority (about 15%) but should be reduced as obtained through the Company’s regional generation capacity in Europe;

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:416:emissions. This part is a minority (about 15%) but should be reduced as 2.2 GW in solar projects and 0.6 GW in battery storage projects to

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:425: (a) Oil products including bulk refining sales and biofuels ; Natural Gas excluding minority stakes in public companies.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:437: With regard to food waste and food poverty, TotalEnergies’ activities pertaining to food distribution are minor and are therefore not directly affected by

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:449: organization, or membership in a minority group.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:449: religious organization, or membership in a minority group. of management bodies, executive committees and senior management,

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:453: a minority group. workforce in France. Awareness-raising actions on the themes of sexual

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:459: a minority group (refer to point 5.6 of this chapter, in particular for the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:509: Minority interest in proved developed and undeveloped reserves as of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:512: Minority interest in proved developed and undeveloped reserves as of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:515: Minority interest in proved developed and undeveloped reserves as of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:523: Minority interests in future net cash flows as of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:565: (a) Oil products including bulk refining sales and biofuels ; Natural Gas excluding minority stakes in public companies.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:567: membership in a minority group.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:567: equality: women to men, minor to major

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:568: equality: women to men, minor to major

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:604:production sharing contracts and on economic limit dates. equipment is relatively minor compared to the cost of a new well; and (ii)

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:16: ES) minor detail changes to the traffic related cumulative

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:24: allow for minor material amendments to the Condition 1 of the decision notice condition. The original close proximity to Site but:

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:24: mounding; on-site attenuation ponds, Swales commenced prior to the 14 August (R/2014/0626/FFM) was for (minor amendments)

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:25: STDC the existing wharf, jetties and other minor Approved Report, Environmental

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:26: 90 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the

EN010103-002245-NZT DCO - 9.34 Updated List of Developments (Clean) - Sept 2022(D8).pdf:26: 91 Land at Former STDC – Application for minor material 0 Unknown Unknown Approved 1 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y N N N Proximity to Site (adjacent N Minor alteration to No status change that the No status change that the No status change that the

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:10:Water Resources Bay and a number of minor watercourses on the north and south bank of the Tees. Details relating to additional constraints for surface water, flood

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:11:Transportation the A Road and minor road links which connect the site to the Trunk Road network (A1 and A19).Full details are provided within Chapter 16: Traffic

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:39: impact, resulting in a minor adverse effect. Considering the modelled

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:52: recreational (marine) traffic. • minor disruption on the local Volume I, Document Ref. 6.2).

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:53: minor (a limited range of vessels are

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:55: floor; this is considered to be of minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:11: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:12: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:12: vehicles, the junction is predicted to remain within capacity with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:12: increases in the DoS, with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:13: well as the DoS <90% on all the arms with only minor levels of predicted delay.

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:14: well as the DoS <90% on all the arms with only minor levels of predicted delay.

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:15: well as the DoS <90% on all the arms with only minor levels of predicted delay.

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:18: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:19: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:19: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:20: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:20: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:21: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:21: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:22: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:22: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:23: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:23: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:24: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:24: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:25: remain within capacity with all arms predicted to have a DoS <90% with only minor

EN010103-002342-NZT ExQ3 final.pdf:17: of a minor nature compared to PCC paragraph 11.6.22 of APP-093 and REP2-016. In

EN010103-001234-NZT - Regulation 32 Transboundary Screening (14).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:13: A minor update to the Deadline 8 PPs agreeing a set of private

EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:34: minor update made to those

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:61: Marine EW explained that a key item is a minor

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:78:Marine Licensing • Key item is a minor addition to the draft DML before circulation to MMO

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:100: been removed from envelope; IC confirmed that minor

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:100: that only minor refurbishment / upgrade works would be carried out

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:100: location and works will be minor, consisting of outfall refurbishment

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:124:• Works will be minor, consisting of outfall refurbishment (inspection and hand-based maintenance)

EN010103-001577-NZT DCO 9.4 - Written Summary CAH1 - May 2022.pdf:7: There is only one change (10) which results in an increase in the order limits. That increase is minor.

EN010103-001577-NZT DCO 9.4 - Written Summary CAH1 - May 2022.pdf:8: other minor updates where appropriate. The text setting out the substance of the case for

EN010103-000841-NZT DCO 4.8.3 Electrical Connection Plans Sheet 3.pdf:1: EC6 - MINOR ROAD - ABOVE GROUND

EN010103-000841-NZT DCO 4.8.3 Electrical Connection Plans Sheet 3.pdf:1: EC8 - MINOR ROUNDABOUT - FOR INFORMATION

EN010103-000841-NZT DCO 4.8.3 Electrical Connection Plans Sheet 3.pdf:1: EC5 - MINOR ROAD - HDD OR

EN010103-000832-NZT DCO 4.7.5 Gas Connection and AGI Plans Sheet 5.pdf:1: GC10 - MINOR ROAD -

EN010103-000832-NZT DCO 4.7.5 Gas Connection and AGI Plans Sheet 5.pdf:1: GC9 - MINOR ROAD -

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:15: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:15: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:15: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:15: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:17: App. Sub Type: Minor

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:17: App. Sub Type: Minor

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:17: App. Sub Type: Minor

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:18: App. Sub Type: Minor

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:20: Incident Severity: Category 3 - Minor Incident

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:20: Description: Minor variation to authorisation under RSA

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:20: Description: Minor variation to authorisation under RSA

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:9: and paragraph numbering, and a minor change to the Article 27

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:22: the proposed changes to the Requirements (R) in HPKC explains that the Applicants have made some minor and generally

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:38: DMLs submitted at Deadline 8. With the exception of a handful of relatively minor

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:40: have reviewed these points which are all relatively minor, related to the

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:42: minor changes.

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:42: for minor changes, and were previously updated earlier in the examination.

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:137: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:13: remain in-situ (subject to appropriate measures). Subject to some minor alterations

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:114: - Commitments to purchase shares held by non-controlling interests (put options written on minority interests)

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:134: Luminora Solar cuatro, S.L. 65.00 % E Spain Spain

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:134: Luminora Solar Dos, S.L. 65.00 % E Spain Spain

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:134: Luminora Solar Tres, S.L. 65.00 % E Spain Spain

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:156: financial charges: $17.6 billion paid to non-controlling minority interests)

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:161: 80 TWh of sales to 9 million customers by 2025. TOTAL confirms its of a 20% minority stake in Adani Green Energy Limited (AGEL), one of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:164:from the Adani Group of a 20% minority stake in Adani Green Energy decision has already been taken (Nigeria LNG train 7 in Nigeria and ECA

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:174:ventures that are not necessarily controlled by TOTAL. TOTAL SE has listed on NASDAQ, and minority interests in other companies, including PAO

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:185:markets. Over the next decade, TOTAL’s energy production is Early 2021, TOTAL acquired a 20% minority interest in Adani Green

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:190: In January 2021, TOTAL acquired a 20% minority interest in Adani Green

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:267: and their impact on air quality is therefore considered to be minor.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:364: action in a variety of ways to fulfill that goal. Beyond its efforts in the or membership in a minority group.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:364: or membership in a minority group. recommendations on issues identified each year by the Executive

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:378: and their impact on air quality is therefore considered to be minor.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:381:to food distribution are minor and are therefore not directly affected waste produced by all operated sites, at every stage of their operations.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:438: Minority interest in proved developed and undeveloped reserves as of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:440: Minority interest in proved developed and undeveloped reserves as of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:443:Minority interest in proved developed and undeveloped reserves as of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:450: Minority interests in future net cash flows as of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:496: or religious organization, or membership in a minority group.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:496:equality: women to men, minor to major ethnic

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:505: relatively minor compared to the cost of a new well; and (ii) through

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:7:Small Slight loss or small scale Change has little tangible Minor changes to key

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:10:Minor Small change to a limited area of landscape of high or medium sensitivity or a more

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:16:Minor Where the proposed development would form a perceptible but not enhancing or

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:17: while having only a minor cumulative effect in conjunction with other existing

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:15: comprising the minor fraction. The tests indicated that

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:19: also contain minor fractions of Basic Oxygen Steel (BOS) slag and

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:19: dominated by blast furnace slags but with a minor fraction of steel slag which

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:27: undulated with minor changes in ground

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:75: formerly classified as minor aquifers”.

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:75: designated as both minor and non-aquifer in different locations due to the

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:88:Plan - 1954 internal rail linkages between the two buildings. Minor external north of the former Redcar Iron Works.

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:93: The 1:10,000 map of 2006 shows minor changes in Infrastructure 2000 on reclaimed land north of Dabholm Beck corresponding

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:101:Survey Plan - 1962 - 1972 minor changes to the disposition of smaller structures, however,

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:178: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:178: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:178: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:178: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:179: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:179: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:179: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:180: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:180: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:195: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:195: Severity: Category 3 - Minor Incident

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:203: considered to be dominated by blast furnace slags but there is a minor

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:215: CIRIA 552), classified as: Severe, Medium, Mild, Minor.

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:215: and Minor, the latter according to CIRIA guidance reflecting a non-

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:216: Severe Medium Mild Minor

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:230: Phytotoxicity Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:230:Petroleum Fuel - (TPH - PRO, DRO) Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:230: Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Petroleum Fuel - (TPH - PRO, DRO) General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Infrastructure (8,9) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:231: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:232: Phytotoxicity Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:232: Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:232:Oils, lubricants, greases (TPH - LRO) 1. Ingestion / skin contact Ground Workers (1) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:232: Site Users (1) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: 3. Vapour Inhalation General Public (off-site) (1) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: 5. Plant Uptake / Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: Infrastructure (8) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233:General Organics (VOC / SVOC Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: Site Users (1,2,3,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: Infrastructure (9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233:Metals, metalloids 1. Ingestion / skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: Site Users (1,2) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: Metals, metalloids 3. Vapour Inhalation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: 7. Leaching to groundwater Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235:POPs: PCBs, dioxins, furans Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235:Hazardous Gas Ground Workers (4) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Site Users (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Infrastructure (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235:Metals, metalloids 1. Ingestion / skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: 3. Vapour Inhalation Site Users (1,2) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: 8. Corrosion / chemical Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235:pH, acids, alkalis, sulphate, chloride, 9. Permeation of pipes Ground Workers (1,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Site Users (1,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: General Public (off-site) (1) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:236: Infrastructure (4,8,9) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:236: Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:236:General Organics (VOC / SVOC Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:236: Site Users (1,2,3,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: Infrastructure (9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237:Coal Dust Ground Workers (4) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: Site Users (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:237: Infrastructure (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238:Petroleum Fuel - (TPH - PRO, DRO) 7. Leaching to groundwater Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: attack Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: 9. Permeation of pipes General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: Site Users (3) Minor Unlikely Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: Fauna & Flora (5) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238: Infrastructure (8,9) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: Infrastructure (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240:Metals, metalloids 1. Ingestion / skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: 3. Vapour Inhalation Site Users (1,2) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: 8. Corrosion / chemical Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240:pH, acids, alkalis, sulphate, chloride, 9. Permeation of pipes Ground Workers (1,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Site Users (1,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: General Public (off-site) (1) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: Infrastructure (8,9) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241:General Organics (VOC / SVOC Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Site Users (1,2,3,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Infrastructure (9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241:Organic Matter Ground Workers (4) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Site Users (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:241: Infrastructure (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242:Organic Matter Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242:Hazardous Gas Ground Workers (4) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Site Users (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Infrastructure (4) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242:Metals, metalloids 1. Ingestion / skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: 3. Vapour Inhalation Site Users (1,2) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: 8. Corrosion / chemical Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242:pH, acids, alkalis, sulphate, chloride, 9. Permeation of pipes Ground Workers (1,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Site Users (1,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: General Public (off-site) (1) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: Infrastructure (8,9) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243:Petroleum Fuel - (TPH - PRO, DRO) Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Surface Water (6) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:243: Groundwater (7) Minor Low Very low

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:259:Possible 3 Medium 3 Major delay on this Minor impact on cost 9 to 12

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:259:Unlikely 2 Low 2 Minor delay on this Minor impact on cost 5 to 8

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:25:Medium Watercourses not having a WFD classification Shows signs of previous alteration and / or minor flow regulation but still Less vulnerable

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:25: need for maintenance dredging. Artificial and minor drains and ditches

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:26:Minor Adverse Results in some Minor effects of water supplies.

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:26:Minor Beneficial Results in some beneficial Contribution to minor improvement in water

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:27:Minor Neutral / Slight Slight Slight / Moderate Moderate / Large

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:54: in question has previously been designated as both minor and non-aquifer in

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:56: Category 3 (minor) or worse within 250 m of the Site within the last 10 years.

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:56: 10/03/2012 (Minor) 21710 effects - smoke

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:56: 25/12/2013 (Minor) 21710 firefighting runoff

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:74: chemical pollutants from minor leaks and spills (i.e. surface water drainage

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:76: and minor spill and which could be contaminated, shall be located within

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:80: and the Electrical Connection Corridor and Belasis Beck and minor tributaries

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:81: the Site (The Mill Race and Lackenby Channel ) a minor magnitude impact

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:81: short-term, minor adverse impact on the very high importance Tees Bay, given

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:81: an unlikely, short-term and localised Minor adverse impact may occur to these

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:82:9.6.24 Should the existing Tees Bay water discharge outfall be used, then only minor

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:82: abundance of similar surrounding substrate, this is considered a minor impact.

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:92: and so a magnitude of minor adverse is considered appropriate. A Slight effect

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:93: magnitude of impact is considered to be minor adverse, a Slight effect (not

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:99:Surface Water Quality – Tees Estuary, Tees Tees Estuary: Minor Tees Estuary: Moderate Further to the Tees Estuary: Slight

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:99: (Tees Bay): Minor (Tees Bay): Moderate (Tees Bay): Slight

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:99: Belasis Beck: Minor Belasis Beck: Moderate during construction will be Belasis Beck: Slight

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:99: (S Bank)): Minor adverse (not significant) (not significant)

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:100: Minor adverse (not significant) (not significant)

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:100:waterbodies (Tees Bay): Low (for (Tees Bay): Minor (Tees Bay): Slight however, this effect may (Tees Bay): Slight

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:103:Flooding from drainage Flood Risk: Low Minor adverse Slight adverse (not Implementation of the Slight adverse (not

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:36: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:37: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:38: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:39: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:40: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:41: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:42: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:43: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:44: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:45: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:46: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:47: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:48: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:49: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:50: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:51: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:51: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:51: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:51: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:52: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:53: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:54: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:54: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:54: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:54: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:54: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:55: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:55: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:56: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:56: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:57: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:58: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:59: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:60: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:61: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:61: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:61: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:61: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:61: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:62: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:63: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:64: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:65: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:66: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:66: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:66: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:66: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:66: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:67: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:70: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:72: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:74: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:75: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:76: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:77: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:78: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:79: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:80: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:81: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:81: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:84: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:84: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:84: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:84: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:85: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:86: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:87: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:88: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:90: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:91: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:92: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:93: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:94: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:95: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:95: App. Sub Type: Minor

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:96: Incident Severity: Category 3 - Minor Incident

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:97: Incident Severity: Category 3 - Minor Incident

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:97: Incident Severity: Category 3 - Minor Incident

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:98: Process Type: Minor variation to an application under S13 or S14 of RSA to accumulate or

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:98: Description: Minor variation to authorisation under RSA

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:99: Water Impact: Category 3 - Minor Incident

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:99: Air Impact: Category 3 - Minor Incident

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:107: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:107: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:107: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:108: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:19: to ‘minor’.

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:19:75% or less of Negligible Negligible Negligible Minor Moderate

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:19:76-94% of Negligible Negligible Minor Moderate Moderate

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:19:95-102% of Negligible Minor Moderate Moderate Major

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:20: (minor) impact;

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:21: for EIA purposes. Effects found to be ‘minor’ or ‘negligible’ are considered to

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:84:per day, a minor decrease from 2020. Net income was positive effect of PSA and US royalties was 148 mboe and 133 mboe per

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:84:2,070 mboe per day in 2021 and 2020, respectively. The minor production, but they may be higher or lower in any period due to

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:85:mainly related to Kvitebjørn pipeline and minor joint venture assumptions in addition to downward reserves revisions. Other

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:93: minority interest.

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:106:Any such violation, even if minor in monetary terms, could result Operators, partners, and contractors may be unable or unwilling

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:117:inclusion is fundamental to us. As outlined in our code of conduct, who identify as a minority group in terms of disability, ethnicity,

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:127:of petroleum and petroleum-derived products, and other forms non-controlling interest, minority interest), equivalent to 26.5% of

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:204:is relatively minor compared to the cost of a new well. Proved undeveloped reserves are to be recovered from new wells on

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:211: actions taken to maintain and secure safe production during the pandemic. Minor virus outbreaks at some of our facilities have

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:254:remain, but Equinor’s maximum exposure in the case was significantly reduced and at this stage is minor. Amounts reflected in the matter

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:317:b) Return on average capital employed income taxes and minority interest, or to net income, which are

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:344:sustainable key to decarbonisation of the energy system going final product blends have a minor bio-fuel content. The co-

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:10: minor maintenance and diffuser to include:

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:15:Non-significant Minor beneficial Beneficial effect on designated sites,

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:15: Minor adverse Adverse effect on designated sites,

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:71: receptors, from injury to minor behavioural responses. The impact pathways

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:71: Minor or temporary behavioural responses are often simply evidence

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:84: resilient to minor strikes and collisions (Wilson et al., 2007). However, a direct

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:96: Ref. 6.2) has concluded a minor adverse non-significant effect to marine water

EN010103-001234-NZT - Regulation 32 Transboundary Screening (5).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:5: experiencing a minor adverse or worse effect during operation;

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:5: • Noise and vibration – effects on receptors experiencing a minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:5: • Visual effects – effects on receptors experiencing a minor adverse or

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:14:Minor (adverse or Where the combined effects of the Proposed Development upon an individual or

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:24: Section 73 application for a minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:24: application for minor material

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:47: for cumulative noise effects during from the Proposed Development alone. 6; Minor adverse at

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:47: operation of the Proposed Development Minor adverse (not

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:47: overall effect would be minor /slight adverse (the

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:51: would be minor adverse, whereas for the Proposed Development alone it

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:51: it would be minor adverse, i.e. the same as for the Proposed Development

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:52: normal environmental conditions and would not constitute more than a minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:52: increase from negligible to minor adverse (not significant) compared to the

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:79:Eston Hills High Construction: A number of the cumulative developments will introduce construction activity within views Very low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:79: Opening (Year 1): A number of the cumulative developments will introduce additional built form within Very low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:79: Operation (Year 15): The impacts during operation are anticipated to be similar to the opening Very low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:79:Redcar Flats Medium Construction: A number of the cumulative developments are located within or adjacent to the Redcar Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:79: Opening (Year 1): The built form associated with the cumulative developments within the LCTr would Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:80: Operation (Year 15): The impacts during operation are anticipated to be similar to the opening Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:80:East Medium Construction: A number of the cumulative developments will introduce construction activity within views Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:80: Opening (Year 1): A number of the cumulative developments will introduce additional built form within Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:80: Operation (Year 15): The impacts during operation are anticipated to be similar to the opening Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:80:Coastal High Construction: A number of the cumulative developments will introduce construction activity within views Low Minor1

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:81: Opening (Year 1): A number of the cumulative developments will introduce built form within views from Very low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:81: Operation (Year 15): The impacts during operation are anticipated to be similar to the opening Very low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:81:Estuarine Medium Construction: As above for Coastal Fringe LCT. Low Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:81:GLVIA 3. Therefore, a receptor that just falls within high sensitivity with a low impact can be considered, through professional judgement, to have a minor effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:84:2: The Cliff, CBRE Anaerobic Biogas (ID residential and of the areas within STDC ownership and the construction proposed for cumulative Minor adverse (not

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:84: STDC Steel House (ID 87) and reversible, resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:84:3: Waste (ID 36) recreational demolition of the areas within STDC ownership and the proposed for cumulative Minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:85: minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:85:4: North CBRE Anaerobic Biogas (ID recreational demolition of the areas within STDC ownership and the proposed for cumulative Minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:85:Sands Energy recovery facility (ID the view. The construction of the Redcar Energy Centre Opening: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:85: conveyor (ID 27) Development. The presence of the other characteristic, Operation: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:85: Northern Gateway Container short term and reversible, resulting in a minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:86: and reversible, resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:86: will be long term and reversible, resulting in a minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:86: 13) visible behind the Proposed Development. The presence Opening: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:86: visible from this location. The addition of the construction Operation: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:87: and reversible, resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:87: will be long term and reversible, resulting in a minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:88: – construction period only The presence of the other characteristic, cumulative Opening: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:88: medium cumulative impact, although no greater than that Minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89: resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89: will be long term and reversible, resulting in a minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89:9: conveyor (ID 27) recreational structures associated with the identified cumulative proposed for cumulative Minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89:Marsh – construction period only across the majority of the visible landform on the horizon. Opening: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89: 77) from this location. The addition of the construction Operation: Minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:89: resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:90: resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:90: reversible, resulting in a minor adverse effect.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:91: be subject to minor adverse (not significant) cumulative effects during

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:91: predicted to be subject to minor adverse cumulative effects during

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:94: Proposed Development, ranging from negligible or minor (not significant) to

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:95: effects of minor or greater magnitude have been considered. The types of

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: up to a minor adverse residual effect on the nearest sensitive receptors

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: simultaneously. There could also be residual minor adverse effects, during

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: and limited intervening vegetation. There would also be minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: identifies a number of minor adverse effects during construction of the

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: Proposed Development including minor adverse effects on: temporary

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96:24.6.14 None of the viewpoints which would experience residual effects of minor or

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:96: NSR4 - Marsh House Farm) which could experience residual minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:97: would be minor adverse.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:97: effects, i.e. a less than minor effects, at all receptors within the air quality

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:97: I, Document Ref. 6.2) concludes that there would be a residual minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:97: structures associated with the Proposed Development. There would be minor

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:98:24.6.21 None of the viewpoints which would experience residual effects of minor or

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:NSR1 - 58 High NR NR Minor adverse NR NR NR No additional mitigation measures No combined effect NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:NSR3 -131 High NR NR Minor adverse NR NR NR No additional mitigation measures No combined effect NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:NSR4 – March High NR NR Minor adverse NR NR NR No additional mitigation measures No combined effect NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99: and minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:NSR7- High NR NR Up to a minor NR NR NR NR No combined effect NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:Viewpoint 2 - , High NR NR NR NR Short-term, minor NR No additional mitigation measures No combined effect NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:99:Viewpoint 5 - Low NR NR NR NR Short-term, Minor adverse No additional mitigation measures There would be combined Minor adverse

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:100: would be minor adverse.

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:100:NSR4 – Marsh House High NR NA Minor adverse NA NA NR No additional mitigation No combined NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:100:Viewpoint 3 - Teesmouth High NR NA NR NA Minor adverse effects on visual receptors, including NR No additional mitigation No combined NA

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:101: effects of minor significance and above, identified within each of the technical

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:101: • a minor adverse (not significant) cumulative noise effect upon one NSR

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:136: • There is likely to be minor, localised disturbance of the seabed around the perimeter of

EN010103-001508-TEXT_CAH1_Session1_NetZeroTeeside_11052022.pdf:4:results in an increase in the order limits and that is only minor but that's the one that triggers the

EN010103-001508-TEXT_CAH1_Session1_NetZeroTeeside_11052022.pdf:4:changes and make other minor updates where appropriate. But the text setting out the substance of the

EN010103-001234-NZT - Regulation 32 Transboundary Screening (3).pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:12:Environment Agency as an undifferentiated secondary aquifer having “previously been designated as both minor

EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:15:considered to be dominated blast furnace slags but with a significant minor component of steel slag containing

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:12: minor and limited to those described for the outfall

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:35: minor adverse effect at worst. Boundary noise levels

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:61: fuel/oil/minor chemicals storage.

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:15: installation will involve site clearance with the potential for minor land-based civil

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:16:Connection - existing tunnel, any refurbishment and maintenance activities are likely to be minor.

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:16:Treated Water likely to be minor.

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:20:Connection- In a refurbishment scenario, only minor primarily hand-based maintenance

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:21:Connection-Treated In a refurbishment scenario, only minor primarily hand-based maintenance

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:15:further, minor editions of mapping which were produced and published in

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:16:further, minor editions of mapping which were produced and published in

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:30:further, minor editions of mapping which were produced and published in

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:31:further, minor editions of mapping which were produced and published in

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:46:further, minor editions of mapping which were produced and published in

EN010103-001065-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 12 EC2_C.pdf:82:further, minor editions of mapping which were produced and published in

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:75:been considered. The first option is for the re-use of the existing outfall with minor refurbishment; for

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:11: Change 10: Minor Increase in the Order Limits for Work

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:11:2.2.29 Change 10 involves a minor increase in the size of the proposed Saltholme

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:11:2.2.30 This small increase in the area of Work No. 9 and correspondingly minor

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:19:GC5 456696, 523754 Minor Rd (x2), Existing Trenchless New

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21: Sembcorp No. 2 Tunnel (Change 7, Work No. 6) has been added. Minor

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG8 449935, 523567 Minor watercourse Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG11 450662, 523559 Minor Road (Seaton Carew Rd) Culvert Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG12 451035, 523583 Minor Road (Seal Sands) Culvert Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG13 451076, 523585 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG14 452475, 523589 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG15 453489, 523450 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:21:CG16 453597, 523627 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CG17 453598, 523762 Minor Road (Seal Sands) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CG18 453681, 524208 Minor Road Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CG19 453766, 524337 Minor Road Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CG20 453886, 524519 Minor Road Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CG21 453946, 524719 Minor Road (Navigator Terminals) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC25 455196, 524652 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC26 455380, 524552 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC27 455562, 524447 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC28 455801, 524301 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC29 455885, 524240 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC30 456193, 524116 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC31 456540, 523836 Minor Road (Dabholm Gut) Under road Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC32 456695, 523763 Minor Road (Dabholm Gut) Pipe bridge Existing

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:22:CGC34 457098, 524604 Minor Road (Teesworks) Auger bore New

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:71:NSR8 - Seal Sands offices All time Minor adverse

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:18: it is standard accounting practice to exclude minor sources as these are not

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:19: minor sources are still considered complete for verification purposes. This

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:20:Low Increase Minor adverse significance

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:20:Low Reduction Minor beneficial significance

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:25: assumed to be a minor fraction.

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:26: known at this stage of design although these are likely to be a minor

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:29: adjusted accordingly. The only minor changes to a linear relationship are

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:35: classified as ‘minor adverse’ significance (Table 21-7).

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: increase from negligible, minor or moderate to major.

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: from negligible or minor to moderate.

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: topic, to increase from negligible to minor.

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: Consequence Very low Negligible Negligible Minor

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: Low Negligible Minor Moderate

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:47: Medium Minor Moderate Major

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:51:Sea level rise Very Likely Marine Very High Loss of suitable haul- None considered Unlikely Medium Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:52:Sea level Very Marine Very High Loss of suitable None considered Unlikely Medium Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:52:Sea level Very Marine Very High Loss of suitable DEMP will be Possible Medium Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:60:Low Localised Infrastructure disruption and minor loss of service;

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:60: No permanent damage, minor restoration work required; and

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:61: Low Negligible Minor Minor Minor Minor

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:61: Medium Negligible Minor Moderate Moderate Moderate

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:61: High Negligible Minor Moderate Major Major

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:61: Very high Negligible Minor Moderate Major Major

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:64: Staff, visitors Increased heat Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:67:Increase to Possible Assets, See-Increase See-Increase Unlikely Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:67: Staff, visitors See-Increase See-Increase Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:67:Increase in Unlikely Assets, Damage to Detailed in Unlikely Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:68: Staff, visitors Impacts on the •Detailed Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:69: Function of Reduced The power Possible Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:71:Increase to Very Likely Built terrestrial Surface water • Suitable Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:74:Increase to Possible Assets, See-Increase See-Increase Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:74: Staff, visitors See-Increase See-Increase Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:75: Function of See-Increase See-Increase Possible Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:76:Sea level rise Very Likely Assets, See- Increase See- Increase Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:78:Increase in Unlikely Assets, Damage to To be detailed Unlikely Low Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:78:Sea level rise Very Likely Assets, See- Increase To be detailed Unlikely Medium Minor No None

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:79: result in a minor effect and is Not Significant. As set out in the assessment

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:16: are considered to be significant. Minor adverse and negligible effects are not

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:16: Minor adverse The projects GHG impacts would be fully Not significant

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:17: assessed as Minor Adverse, which would be Not Significant.

EN010103-001916-NZT DCO 9.21 - Notification of Further Proposed Changes and Update on Remaining Optionality July 2022 (D4).pdf:9: This minor reduction in land take will not affect the environmental assessments as

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:7: Assessment (EIA) practice; while minor and negligible effects are considered

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:8: minor and negligible effects are considered to be ‘not significant’. Where

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:34:Eston Hills LCTr High The Proposed Development lies outside of this LCTr but will introduce construction Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:34:Redcar Flats Medium Construction activities associated with the Proposed Development will indirectly impact Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:34:East Billingham Medium The CO2 Gathering Network and Natural Gas Connection Corridor lie within this LCA and Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:35:Coastal Fringe High The Proposed Development lies outside of this LCT but will introduce views of Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:35:Estuarine LCT Medium The Proposed Development lies outside of this LCT but will introduce views of Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:36:Eston Hills LCTr High The Proposed Development lies outside of this LCTr but will introduce views of the PCC Site within Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:36:Redcar Flats LCTr Medium The Proposed Development will introduce views of the PCC Site directly adjacent to the LCTr. The Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:36:East Billingham to Medium Part of the proposed CO2 Gathering Network and Natural Gas Connection Corridor lies within this LCA Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:36:Coastal Fringe High The Proposed Development lies outside of this LCT but will introduce views of the PCC Site due to Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:38:Eston Hills LCTr High The impacts during operation are anticipated to be similar to the opening assessment scenario. The Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:38:Redcar Flats LCTr Medium The impacts during operation are anticipated to be similar to the opening assessment scenario. The Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:38:East Billingham to Medium The impacts during operation are anticipated to be similar to the opening assessment scenario. The Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:38:Coastal Fringe High The impacts during operation are anticipated to be similar to the opening assessment scenario. The Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:41:Significance of effect at construction Residential and recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:42:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:42:Significance of effect at opening Recreational Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:42:Significance of effect at operation Recreational Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:43:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:43:Significance of effect at opening Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:43:Significance of effect at operation Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:44:Significance of effect at opening Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:44:Significance of effect at operation Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:47:Significance of effect at opening Recreational users and Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:47:Significance of effect at operation Recreational users and Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:48:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:48:Significance of effect at opening Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:48:Significance of effect at operation Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:2 High The Cliff, Seaton Carew Residential and Minor adverse Negligible adverse Negligible adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:3 High Teesmouth National Nature Recreational Minor adverse Minor adverse Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:4 High North Gare Sands Recreational Minor adverse Minor adverse Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:5 High South Gare Breakwater Recreational Moderate adverse Minor adverse Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:8 High Redcar seafront Recreational and Moderate adverse Minor adverse Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:53:9 Medium Coatham Marsh Nature Reserve Recreational Minor adverse Minor adverse Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:58:Eston Hills LCTr High A number of the cumulative developments will introduce construction activity within Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:58:Redcar Flats Medium A number of the cumulative developments are located within or adjacent to the Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:58:East Billingham Medium A number of the cumulative developments will introduce construction activity within Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:58:Coastal Fringe High A number of the cumulative developments will introduce construction activity within Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:58:Estuarine LCT Medium Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:59:Eston Hills LCTr High A number of the cumulative developments will introduce additional built form Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:59:Redcar Flats LCTr Medium The built form associated with the cumulative developments within the LCTr Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:59:East Billingham to Medium A number of the cumulative developments will introduce additional built form Low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:59:Coastal Fringe LCT High A number of the cumulative developments will introduce built form within Very low Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:60:Eston Hills LCTr High The impacts during operation are anticipated to be similar to the Very low Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:60:Redcar Flats Medium The impacts during operation are anticipated to be similar to the Low Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:60:East Billingham Medium The impacts during operation are anticipated to be similar to the Low Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:60:Coastal Fringe High The impacts during operation are anticipated to be similar to the Very low Minor adverse (not

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:63:Significance of effect at Residential and recreational users Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:64:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:65:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:65:Significance of effect at opening Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:65:Significance of effect at operation Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:68:Significance of effect at construction Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:69:Significance of effect at opening Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:69:Significance of effect at operation Recreational Minor adverse

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:69:17.9.13 The remaining viewpoints are all predicted to receive minor adverse

EN010103-001234-NZT - Regulation 32 Transboundary Screening.pdf:6: Appendix 20B. ES Chapter 20 Socio-economics concludes that there may be some minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:16: Process Type: IPC minor (non-substantial) variation to previous variation

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:16: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:17: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:17: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:17: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:17: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:18: App. Sub Type: Minor

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:18: Incident Severity: Category 3 - Minor Incident

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:18: Incident Severity: Category 3 - Minor Incident

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:18: Description: Minor variation to a registration under the Act of an open source which is also

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:73:posts, man holes, arched passages and minor building projections. Also often

EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:8: the resolution of disputes (see below). These are minor consequential amendments only in order to

EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:8: the resolution of disputes (see below). These are minor consequential amendments only in order to

EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:10:60. Sembcorp has no objection to option one being included in the final dDCO subject to the minor

EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:11: following minor changes:

EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:11:62. Sembcorp considers that, overall, these minor amendment will provide greater certainty for the

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:38:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:40:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:60:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:61:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:63:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:79:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:83:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:84:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:86:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:104:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:119:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:120:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:135:further, minor editions of mapping which were produced and published in

EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf:136:further, minor editions of mapping which were produced and published in

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:20: to groundwater quality were considered as being generally minor apart from

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:26: Minor Moderate/Larg Slight/Moderate Slight Neutral/Slight

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:31: LF/BH01 and MS/BH04 respectively. In addition, in both boreholes, minor

EN010103-001993-NZT DCO 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5).pdf:10: from the consumption of gas during the reporting year. There may be some minor

EN010103-001993-NZT DCO 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5).pdf:10: minor variations are therefore very unlikely to make a potential material difference

EN010103-001893-NZT DCO 8.1 - RCBC SoCG (Tracked) July 2022 (D4).pdf:8: RCBC provided a response on 1 June 2020 setting out minor

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:3: - CIRIA 552), classified as: Severe, Medium, Mild, Minor; and

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:4: Severe Medium Mild Minor

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:10: 5. Plant Uptake / Phytotoxicity Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:10:Petroleum Fuel - (TPH - Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:10: Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Infrastructure (8,9) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:11: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:12: 5. Plant Uptake / Phytotoxicity Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:12: Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:12:Oils, lubricants, greases 1. Ingestion/ skin contact Ground Workers (1) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:12: Site Users (1) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: 3. Vapour Inhalation General Public (off-site) (1) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: 6. Leaching to surface water Infrastructure (8) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13:General Organics Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13:Olefins) Site Users (1,2,3,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: Infrastructure (9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13:Metals, metalloids 1. Ingestion/ skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: Site Users (1,2) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: 3. Vapour Inhalation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: 6. Leaching to surface water Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: 7. Leaching to groundwater Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15:Hazardous Gas Ground Workers (4) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Site Users (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Infrastructure (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15:Metals, metalloids 1. Ingestion/ skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Site Users (1,2) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: 7. Leaching to groundwater Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: 8. Corrosion/ chemical attack Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15:pH, acids, alkalis, sulphate, Ground Workers (1,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Site Users (1,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: General Public (off-site) (1) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:16: Infrastructure (4,8,9) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:16: Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:16: Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:16: Site Users (1,2,3,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17:General Organics General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17: Infrastructure (9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17:Coal Dust Ground Workers (4) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17: Site Users (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:17: Infrastructure (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18:Petroleum Fuel - (TPH - 8. Corrosion/ chemical attack Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: Site Users (3) Minor Unlikely Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: Fauna & Flora (5) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Infrastructure (8,9) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:19: Infrastructure (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20:Metals, metalloids 1. Ingestion/ skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: Site Users (1,2) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: 7. Leaching to groundwater Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: 8. Corrosion/ chemical attack Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20:pH, acids, alkalis, sulphate, Ground Workers (1,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20:cyanides Site Users (1,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: General Public (off-site) (1) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21: Infrastructure (8,9) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21:General Organics Ground Workers (1,2,3,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21:Olefins) Site Users (1,2,3,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:21: Infrastructure (9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22:Organic Matter Ground Workers (4) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Site Users (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Infrastructure (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22:Hazardous Gas Ground Workers (4) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Site Users (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Infrastructure (4) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22:Metals, metalloids 1. Ingestion/ skin contact Ground Workers (1,2,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Site Users (1,2) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: 7. Leaching to groundwater Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: 8. Corrosion/ chemical attack Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22:pH, acids, alkalis, sulphate, Ground Workers (1,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22:cyanides Site Users (1,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: General Public (off-site) (1) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Infrastructure (8,9) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23:Petroleum Fuel - (TPH - Ground Workers (1,2,3,4,10) Minor Likely Low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Site Users (1,2,3,4,9) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: General Public (off-site) (1,2,3) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:23: Groundwater (7) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:24: Surface Water (6) Minor Low Very low

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:24: Groundwater (7) Minor Low Very low

EN010103-001941-NZT CAH2 S1.pdf:34:operational rights in that corridor, and elsewhere across the audit limits. So just just a minor comment

EN010103-001941-NZT CAH2 S1.pdf:36:Yeah, just just a very minor commentating just to confirm we recognise the concerns raised by Mr.

EN010103-001956-c 16 May 2022.pdf:9: chemical storage facilities, other minor Infrastructure and auxiliaries/ services (all

EN010103-001956-c 16 May 2022.pdf:10: • minor associated development.

EN010103-001956-c 16 May 2022.pdf:12: cover an area of 69.7 hectares (ha) (a minor increase of 0.3ha in the amount of the

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:9: significant adverse effects (minor to moderate) are confined to visual amenity at a small number

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:43: levels; and considered to be, at worst, minor and likely not significant.

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:43: may help codify mitigation. residual effects are considered to be, at worst, minor and likely not significant.

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:45: archaeological interest, the applicant should carry out an appropriate desk- landscape. The level of effect on the Eston Nab site is considered to be minor and therefore not

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:46: proposals, a judgement is to be made as to whether the visual effects on Residual effects range from not significant to minor to moderate and will reduce

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:49: control practice. minor watercourses/drainage ditches in close proximity to the site, the potential for existing

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:55: of the Teesside landscape. The level of effect on the Eston Nab site is considered to be minor

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:58: Residual effects range from not significant to minor to moderate and will reduce over time as the Proposed

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:58: considered to be minor and therefore not significant.

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:60: superficial deposits overlying mudstone. Whilst there are several minor watercourses/drainage ditches in close

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:61: to be minor and therefore not significant. Furthermore, the setting of any listed building will not be adversely

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:62: Residual effects range from not significant to minor to moderate and will reduce over time as the Proposed

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:63: to be minor and therefore not significant.

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:66:6.3 There will be visual effects of not significant to minor to moderate significance on a small number

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:66: Development will deliver. The significant adverse effects (minor to moderate) are confined to

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:13: largely in the form discussed, save for necessary minor amendments made for clarification and to

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:19: wide waste management plan which may, subject to minor amendments,

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:22: plans or schemes must be minor or immaterial and must be unlikely to give

EN010082-000012-Scoping Opinion.pdf:92:Whilst we anticipate our role in the proposed development will be relatively minor, it will be important

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:22:these requirements must be minor or immaterial and in order to obtain approval to such

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:41: the Examination. I consider these amendments are relatively minor and

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:56: minor lateral movement of the stacks would not change the conclusions

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:65: negligible to minor adverse and therefore not significant.

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:65: Eston Nab is therefore minor and not significant.

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:69: (VP4 – High Street, Lazenby) the effect was assessed as ‘minor to

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:69: small, and the significance of effect ‘minor.’

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:70: assessed as ‘minor to moderate’. Effects of moderate and above are

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:70: range of effect is more towards ‘minor’ AS-013.

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:70: effects range from not significant to minor to moderate and will reduce

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:75: minor impact on the landscape character of the area, and at worst a

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:95: my Rule 6 letter PD-005) and some minor clarifications around

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:103: any minor lateral movement of the stacks within this zone would not

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:120: were the result of typographical or grammatical errors or were minor

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:121: ‘preliminary works’ to include only works that are preparatory and minor

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:124: • Part 2 Minor Operations

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:180:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:8: Very minor change from scoping.

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:8: next to an operating 850 MW plant. Very minor

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:8: and so both scenarios require assessment. Minor

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:9: assessment. Minor change from scoping.

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:9:3.19 The influence of a phased development is minor for some of the topics

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:19:For other impacts nominal levels of magnitude (e.g. small, of more than minor significance may warrant re-examination to see if an impact

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:22: minor significance are usually managed through the implementation of

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:23:3.75 Effects of minor significance are brought to the attention of decision-makers

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:45: • The works will be minor, localised and temporary (estimated duration).

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:20: Small Not Significant Minor Moderate

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:20: Medium Minor Moderate Major

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:23: • Two minor streams / are present c.600 m south and

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:24: 1976 minor streams / drainage industrial development is Military

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:30: refers to two minor stream / drainage channels previously present at the

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:34: minor and a non-aquifer in different locations due to the variable

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:39: (Minor Oil

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:39: (Minor Oil Stream/River

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:43: considered to be negligible in relation to topsoil and minor in relation to

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:56:Discharge of Pollution of surface Vertical Low Medium Small • All process water will Small Minor to

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:77: mudstone. Whilst there are several minor watercourses/drainage ditches in

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000179-EN010082-6.2.8-ES-Chapter 8-Noise and Vibration-Final-November 2017.pdf:14: minor exceptions there will be no planned work outside of these days and

EN010082-000179-EN010082-6.2.8-ES-Chapter 8-Noise and Vibration-Final-November 2017.pdf:14: minor activities all of inherently low noise characteristics. In the event of

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:16:14.57 Ethnic minorities, young people and the disabled generally face the highest

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:35: minor or not significant and it is unlikely that the changes to the landscape

EN010082-000267-TEES CCPP Section 55 Acceptance of Applications Checklist Final.pdf:18: minor

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:18: • Very minor loss or benefit.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:18: ’minor’, ‘moderate’ and ‘major’, and can be positive or negative. It takes into

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:18: of minor significance and above are considered to be significant for the

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:19: Small (Adverse / Beneficial) Not significant Minor Moderate

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:19: Medium (Adverse / Beneficial) Minor Moderate Major

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:30: considered to equate to a beneficial effect of minor significance. This will still

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:32: considered to equate to a beneficial effect of minor significance. This will still

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:35: to be of greater than minor significance, (refer to Chapter 7 Air Quality and

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:36: to be of greater than minor significance, (refer to Chapter 7 Air Quality and

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:36: anticipated to of greater than minor significance.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:38: impact is assessed as minor/moderate.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:39: impact is assessed as minor/moderate.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:40: is assessed as minor/moderate. The operational employment impacts are

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:41: anticipated to be medium magnitude and therefore minor significant

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:42: than those reported here. Overall, minor beneficial effects would be

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:44: considered to equate to a beneficial effect of minor significance. equate to a beneficial effect of minor significance.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:44: to be of greater than minor significance. two periods and therefore these effects will be repeated at these nearby

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:44: than minor significance.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:45: minor/moderate significance. means the overall impact is assessed minor/moderate significance.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:45: from employment generation are anticipated to be medium anticipated to be medium magnitude and therefore minor significant

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:45: magnitude and therefore minor significant beneficial effects on beneficial effects on the economy are anticipated.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:46: employment and economic effects of minor significance are anticipated during

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:46: economy. Minor beneficial employment and economic effects are anticipated

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:46: Overall, minor beneficial effects would be anticipated during

EN010082-000187-EN010082-6.2.16-ES-Chapter 16-Summary of Cumulative and Indirect Effects-Final-November 2017.pdf:5: change is considered to be small resulting in a minor to moderate cumulative

EN010082-000187-EN010082-6.2.16-ES-Chapter 16-Summary of Cumulative and Indirect Effects-Final-November 2017.pdf:5: minor but not significant.

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:20: mitigation, will be (at worst) minor and not significant.

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:20: recommended to control these emissions and residual effects are considered to be, at worst, minor and not

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:23: The level of effect on the Eston Nab site is considered to be minor and therefore not significant.

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:24:18.5 Residual effects range from not significant to minor to moderate and will reduce over time as the

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:27: for example. Whilst there are several minor watercourses/drainage ditches in close proximity to the site,

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:30: minor amendments, and it is considered that these would appropriately control the design, construction,

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:14: discussed, save for necessary minor amendments made for clarification and to ensure consistency

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:21: wide waste management plan which may, subject to minor amendments,

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:24: thresholds, plans or schemes must be minor or immaterial and must be

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:22:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000393-7 7 - Tees CCPP - SoCG with Historic England - DRAFT.pdf:7: be minimal to small with the overall level of effect considered to be negligible to minor adverse and

EN010082-000393-7 7 - Tees CCPP - SoCG with Historic England - DRAFT.pdf:7: minor and not significant.

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:9: designated as both minor and non-aquifer in different locations due to the

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:9:D1.19 Several minor watercourses are present within the area immediately

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:11:  Two minor streams / drainage  Low density residential areas are

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:12:1975 -  Ratten Lane and the two minor  Further commercial / industrial Russian

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:23: 1953), it is likely that this refers to the two minor stream / drainage channels

EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:23: associated with crude sewage, minor impact on land, no impact on air;

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:16: These works are considered to be preparatory and minor in nature, rather than true construction works. It is important that the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:16: As set out above the exempted works are minor in nature and based on the revised list of exempted works it is not envisaged by the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:18: blocks will be fixed north-south (as shown in Figure 8.1) APP-050 with the stacks located in the north of the Site. Any minor lateral

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:18: zones would be relatively minor in terms of their effect, and normal acoustic design procedures would be incorporated to

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:19:  Part 2 Minor Operations;

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:31: judged to be significant whereas minor and negligible impacts are considered “In predicting magnitude the effect of all the project mitigation in place (i.e. committed to by Sembcorp) will be taken into account.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:31: effects of minor significance and above are considered to be significant for the standards. For exceedances, further mitigation must be incorporated by the project to reduce the magnitude of the impact (and the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:31: effectiveness of proposed mitigation. resource or a receptor to a particular impact. Effects of more than minor significance may warrant re-examination to see if an impact

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:32: Scheduled Monument, where the cumulative magnitude of change was assessed to be small, the overall effect minor but not

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: assessed as minor to moderate. Nevertheless in Table 11.6 it is stated that the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: range of effect is more towards minor due to the fact that the stacks would be The two stacks are the only visible components of the Project and will be seen alongside other taller components (Ensus Plant and

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: Applicant provide further explanation of how this judgement has been made? of the LVIA section). The significance of effect within Table 11.6 of the ES falls into the Minor to Moderate range strictly according

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: to the adopted assessment criteria but the effect is judged to be Minor given the wider context of the site.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: (Application Document Ref: 8.3) as part of the non-material change, which concludes that Viewpoint 4 would remain Minor to

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:43: Moderate, with range of effect that is more towards Minor. Given the fact that there are other tall industrial components in the skyline,

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:45: seen from viewpoint 10 but does not change the significance rating as it will be a minor addition to the west.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:50:Q1.10.8 Applicant Please clarify what is meant by ‘none of these effects are expected to be minor Should be amended to:

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:50: However, none of these effects are expected to be minor or not significant and it is unlikely that the changes to the landscape would

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:89: We would also expect the environmental statement Eston Nab site is considered to be minor and therefore

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:90: Council proposed development will be relatively minor overall, sharing the HRA with NYCC.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:296: For other impacts nominal levels of magnitude (e.g. small, of more than minor significance may warrant re-examination to see if an impact

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:302: are several minor watercourses/drainage ditches in close proximity to the site,

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:302: worst, minor and likely not significant.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:305: range from not significant to minor to moderate and will reduce over time as

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:305: and industrial development within this context constitutes minor change or

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:306: result in minor beneficial employment and economic effects during operation.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:307: they are considered to result in a minor to moderate cumulative effect.

EN010082-000562-Report on the Implications for European Sites.pdf:6: 001], which included some minor clarifications regarding mitigation and

EN010082-000562-Report on the Implications for European Sites.pdf:21: any minor lateral movement of the stacks within this zone will not cause

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:18: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:19: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:20: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:21: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:22: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:23: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:24: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:25: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:26: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:27: Process Type: IPC minor (non-substantial) variation to previous variation

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:27: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:27: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:27: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:28: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:28: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:28: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:28: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:29: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:31: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:33: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:33: App. Sub Type: Minor

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:33: Incident Severity: Category 3 - Minor Incident

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:34: Incident Severity: Category 3 - Minor Incident

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:34: Description: Minor variation to authorisation under RSA

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:34: Description: Minor variation to a registration under the Act of an open source which is also

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:35: Description: Minor variation to authorisation under RSA

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:35: Description: Minor variation to a registration under the Act of an open source which is also

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:36: Description: Minor variation to a registration under the Act of an open source which is also

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:36: Description: Minor variation to authorisation under RSA

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:37: Description: Minor variation to authorisation under RSA

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:37: Description: Minor variation to a registration under the Act of an open source which is also

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:40: Land Impact: Category 3 - Minor Incident

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:40: Water Impact: Category 3 - Minor Incident

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:40: Land Impact: Category 3 - Minor Incident

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:127:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:131:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:132:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:133:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:150:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:151:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:162:further, minor editions of mapping which were produced and published in

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:163:further, minor editions of mapping which were produced and published in

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:20: degree of significance (defined in terms of Minor, Moderate or Major). The

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:20: Small Minor Minor Moderate

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:20: Medium Minor Moderate Major

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:41: the Examination. I consider these amendments are relatively minor and

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:56: minor lateral movement of the stacks would not change the conclusions

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:65: negligible to minor adverse and therefore not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:65: Eston Nab is therefore minor and not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:69: (VP4 – High Street, Lazenby) the effect was assessed as ‘minor to

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:69: small, and the significance of effect ‘minor.’

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:70: assessed as ‘minor to moderate’. Effects of moderate and above are

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:70: range of effect is more towards ‘minor’ AS-013.

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:70: effects range from not significant to minor to moderate and will reduce

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:75: minor impact on the landscape character of the area, and at worst a

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:95: my Rule 6 letter PD-005) and some minor clarifications around

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:103: any minor lateral movement of the stacks within this zone would not

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:120: were the result of typographical or grammatical errors or were minor

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:121: ‘preliminary works’ to include only works that are preparatory and minor

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:124: • Part 2 Minor Operations

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:180:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:6: definition of major accidents and/or natural disaster (eg minor leaks and

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000350-Placeholder for ExA's Written Questions.pdf:25: moderate impacts are judged to be significant whereas minor and negligible impacts are considered to

EN010082-000350-Placeholder for ExA's Written Questions.pdf:25: be not significant. However, in paragraph 13.48 APP-055 it is stated that effects of minor

EN010082-000350-Placeholder for ExA's Written Questions.pdf:38:Q1.8.12 Applicant The effect of the Proposed Development on visual amenity at Viewpoint 4 is assessed as minor to

EN010082-000350-Placeholder for ExA's Written Questions.pdf:38: moderate. Nevertheless in Table 11.6 it is stated that the range of effect is more towards minor due to

EN010082-000350-Placeholder for ExA's Written Questions.pdf:45:Q1.10.8 Applicant Please clarify what is meant by ‘none of these effects are expected to be minor or not significant’ in

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:22:these requirements must be minor or immaterial and in order to obtain approval to such

EN010082-000586-Applicant's Cover Letter LATE submission DL7.pdf:1:8.62) has been subject to some minor amendments in the enclosed SoCG. The amendments were

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:22:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:27: Low: areas of transient occupation, no Not Minor Moderate

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:27: Medium: general population, permanent Minor Moderate Major

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:53: Construction Impacts associated with dust Mitigation as per IAQM (2014) guidance At worst Minor, or Not significant

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:53: Decommissioning Impacts associated with dust Mitigation as per IAQM (2014) guidance (or At worst Minor, or Not significant

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:54: residual effects are considered to be, at worst, minor and likely not significant.

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:54: emissions; residual effects are considered to be, at worst, minor and likely not

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:55: only a minor change (1 m increase) from the air quality basis of assessment

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:20:requirements must be minor or immaterial and in order to obtain approval to such amendments or variations

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:13: largely in the form discussed, save for necessary minor amendments made for clarification and to

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:20: wide waste management plan which may, subject to minor amendments,

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:23: thresholds, plans or schemes must be minor or immaterial and must be

EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:17: located in the north of the Site and would only be moved further north. Any minor lateral movements of

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:8:For other impacts nominal levels of magnitude (e.g. small, of more than minor significance may warrant re-examination to see if an impact

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:13: there are several minor watercourses/drainage ditches in close proximity to

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:14: worst, minor and likely not significant.

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:17: minor to moderate and will reduce over time as the Project is within a large

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:18: and industrial development within this context constitutes minor change or

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:19: result in minor beneficial employment and economic effects during operation.

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:20: they are considered to result in a minor to moderate cumulative effect.

EN010082-000517-8.43 - Tees CCPP - Written Summary of Oral Case - Env Matters ISH - FINAL - 05.07.18.pdf:9: ranges from negligible to medium and the significance of effects from not significant to minor. As can be

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:14: necessary minor amendments made for clarification and to ensure consistency across the

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:23: may, subject to minor amendments, satisfy the terms of this requirement.

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:26: thresholds, plans or schemes must be minor or immaterial and must be

EN010082-000189-EN010082-6.2.18-ES_Chapter 18-Conclusions-Final-November 2017.pdf:3: considered to be, at worst, minor and likely not significant.

EN010082-000189-EN010082-6.2.18-ES_Chapter 18-Conclusions-Final-November 2017.pdf:4: the Project site. There will be effects of not significant to minor to

EN010082-000409-8.14 - Table 3.2 update.pdf:2: minor change from scoping. However, by taking the worst-case likely noise levels a levels. Therefore, the combination of operation noise and

EN010082-000409-8.14 - Table 3.2 update.pdf:3: consideration may need to be scale of construction activity (greater footprint and Scenario 1 and Minor during operation. It is reasonable to

EN010082-000409-8.14 - Table 3.2 update.pdf:3: Very minor change from unlikely to change significantly under Scenario 2. These are

EN010082-000409-8.14 - Table 3.2 update.pdf:4: Minor change from scoping. It concludes that the construction phase for Scenario 1 results

EN010082-000409-8.14 - Table 3.2 update.pdf:4: Minor change from scoping. staff.

EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:8:1990) identified relatively minor ground contamination in the north western corner of site.

EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:34: identified relatively minor ground contamination in the north western corner of site. Slightly

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:13: largely in the form discussed, save for necessary minor amendments made for clarification and to

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:20: a site wide waste management plan which may, subject to minor

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:22: plans or schemes must be minor or immaterial and must be unlikely to give

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:20: mitigation, will be (at worst) minor and not significant.

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:20: recommended to control these emissions and residual effects are considered to be, at worst, minor and not

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:23: The level of effect on the Eston Nab site is considered to be minor and therefore not significant.

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:24: Residual effects range from not significant to minor to moderate and will reduce over time as the

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:27: for example. Whilst there are several minor watercourses/drainage ditches in close proximity to the site,

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:30: minor amendments, and it is considered that these would appropriately control the design, construction,

EN010082-000387-7 1 - Tees CCPP - SoCG with TVWT - Signed_Redacted.pdf:8: benefits, and that the significant adverse effects (minor to moderate) are confined to visual amenity

EN010082-000387-7 1 - Tees CCPP - SoCG with TVWT - Signed_Redacted.pdf:9: should also be considered. Residual effects range from ‘not significant’ to ‘minor’ to ‘moderate’ and

EN010082-000387-7 1 - Tees CCPP - SoCG with TVWT - Signed_Redacted.pdf:9: 2.22 The minor to moderate (significant) effects are confined to a small number of residential and

EN010082-000387-7 1 - Tees CCPP - SoCG with TVWT - Signed_Redacted.pdf:9: result of the Proposed Development is minor and not significant. It should also be reiterated that the

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to such

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:27: Low: areas of transient occupation, no Not significant Minor Moderate

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:27: Medium: general population, permanent Minor Moderate Major

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:53:Construction Impacts associated with dust Mitigation as per IAQM (2014) guidance At worst Minor, or Not significant

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:53:Decommissioning Impacts associated with dust Mitigation as per IAQM (2014) guidance (or At worst Minor, or Not significant

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:54: residual effects are considered to be, at worst, minor and likely not significant.

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:54: emissions; residual effects are considered to be, at worst, minor and likely not

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:55: only a minor change (1 m increase) from the air quality basis of assessment

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:12: significant, minor, minor to moderate, moderate, moderate to major and major.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:12: the EIA Regulations, whereas minor and negligible impacts are considered to

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:21: Estate Land very minor broad undulations. village and surrounding landscape

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:35: VP1- view Medium Scrub vegetation and trees Small Not Scrub vegetation and Only the stacks Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:36: At night construction Negligible Not Small Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:36:VP2- view Medium Effects very similar to VP1. Small Not Effects very similar to Small Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:36: Impacts due to lighting are Negligible Not footpath. Small Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:36:VP3-view Medium Effects very similar to VP1. Small Not Effects very similar to Very similar to Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:36: At night construction Negligible Not Small Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:37:VP4- view High Views to site are restricted Negligible Not Views to site are Magnitude of Minor to

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:37: Minor.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:37:VP5-view Medium Effects very similar to VP1. Small Not Scrub vegetation and Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:37: Negligible Not Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:38:VP6- view Medium Views to the site are Negligible Not Intervening vegetation in Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:38: Not Small Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:39:VP8- view Low Direct views to the site. Small Not The Project will be clearly Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:39: At night construction Significant At night, operational and change is Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:39:VP9- View Medium Partial long medium Negligible Not The Project will be Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:39:VP10- View Medium Long medium distance Negligible Not The Project will be visible Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:40: At night construction Magnitude Not Magnitude of Minor

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:49: resulting in a minor to moderate cumulative effect.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:49: in minor cumulative effect.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:50:11.67 Visual effects are generally either of minor significance or not significant at all

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:50: viewpoints, with only one exception of an effect of minor to moderate

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:50: are assessed as being predominantly of minor significance or not significant.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:51:11.72 Residual effects range from not significant to minor to moderate and will reduce

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:12: significant, minor, minor to moderate, moderate, moderate to major and major.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:12: the EIA Regulations, whereas minor and negligible impacts are considered to

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:21: Estate Land very minor broad undulations. village and surrounding landscape

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:35: VP1- view Medium Scrub vegetation and trees Small Not Scrub vegetation and Only the stacks Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:36: At night construction Negligible Not Small Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:36:VP2- view Medium Effects very similar to VP1. Small Not Effects very similar to Small Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:36: Impacts due to lighting are Negligible Not footpath. Small Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:36:VP3-view Medium Effects very similar to VP1. Small Not Effects very similar to Very similar to Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:36: At night construction Negligible Not Small Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:37:VP4- view High Views to site are restricted Negligible Not Views to site are Magnitude of Minor to

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:37: Minor.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:37:VP5-view Medium Effects very similar to VP1. Small Not Scrub vegetation and Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:37: Negligible Not Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:38:VP6- view Medium Views to the site are Negligible Not Intervening vegetation in Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:38: Not Small Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:39:VP8- view Low Direct views to the site. Small Not The Project will be clearly Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:39: At night construction Significant At night, operational and change is Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:39:VP9- View Medium Partial long medium Negligible Not The Project will be Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:39:VP10- View Medium Long medium distance Negligible Not The Project will be visible Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:40: At night construction Magnitude Not Magnitude of Minor

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:49: resulting in a minor to moderate cumulative effect.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:49: in minor cumulative effect.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:50:11.67 Visual effects are generally either of minor significance or not significant at all

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:50: viewpoints, with only one exception of an effect of minor to moderate

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:50: are assessed as being predominantly of minor significance or not significant.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:51:11.72 Residual effects range from not significant to minor to moderate and will reduce

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:44:For other impacts nominal levels of magnitude (e.g. small, of more than minor significance may warrant re-examination to see if an impact

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:60: assessed given that this Infrastructure is already present. If minor works are

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:64:previously been designated both minor and non-aquifers in different locations

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:107:than minor significance, and will be fully investigated in the EIA process.

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:108:determined to be of minor significance.

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:108:assessed as minor. The employment impacts of operational are expected to

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:108:term impact is assessed as being positive but of minor significance.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:11: significant, minor, minor to moderate, moderate, moderate to major and major.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:11: the EIA Regulations, whereas minor and negligible impacts are considered to

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:20: Estate Land very minor broad undulations. village and surrounding landscape

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:35:VP1- view Medium Scrub vegetation and trees Small Not Scrub vegetation and trees to Only tThe Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:35: Negligible Not Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:35:VP2- view Medium Effects very similar to VP1. Small Not Effects very similar to VP1. Small Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:36: Negligible Not and footpath. Small Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:36:VP3-view Medium Effects very similar to VP1. Small Not Effects very similar to VP1. Very similar to Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:36: At night construction Negligible Not At night, operational and Small. Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:36:VP4- view High Views to site are restricted Negligible Not Views to site are restricted Magnitude of Minor to

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:36: Minor.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:37:VP5-view Medium Effects very similar to VP1. Small Not Scrub vegetation and trees to Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:37: Negligible Not Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:37:VP6- view Medium Views to the site are Negligible Not Intervening vegetation in the Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:37: Not buildings. Small Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:38:VP8- view Low Direct views to the site. Small Not The Project will be clearly Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:38: At night construction Significant At night, operational and change is Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:38:VP9- View Medium Partial long medium Negligible Not The Project will be partially Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:38:VP10- View Medium Long medium distance Negligible Not The Project will be visible Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:39: At night construction Magnitud Not At night, operational and Magnitude of Minor

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:48: resulting in a minor to moderate cumulative effect.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:48: in minor cumulative effect.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:49:11.67 Visual effects are generally either of minor significance or not significant at all

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:49: viewpoints, with only one exception of an effect of minor to moderate

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:49: are assessed as being predominantly of minor significance or not significant.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:50:11.72 Residual effects range from not significant to minor to moderate and will reduce

EN010082-000578-8.58 - Tees CCPP - Deadline 7 Submission 2 - Cover Letter - FINAL - 26.09.18.pdf:2:minor amendment to the wording proposed by the Environment Agency, on the basis that it is not

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:11: significant, minor, minor to moderate, moderate, moderate to major and major.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:11: the EIA Regulations, whereas minor and negligible impacts are considered to

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:20: Estate Land very minor broad undulations. village and surrounding landscape

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:34:VP1- view Medium Scrub vegetation and trees Small Not Scrub vegetation and trees to The stacks’ Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:35: At night construction Negligible Not hedgerows. Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:35:VP2- view Medium Effects very similar to VP1. Small Not Effects very similar to VP1. Small Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:35: Impacts due to lighting are Negligible Not Small Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:36:VP3-view Medium Effects very similar to VP1. Small Not Effects very similar to VP1. Very similar to Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:36: At night construction Negligible Not At night, operational and Small Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:36:VP4- view High Views to site are restricted Negligible Not Views to site are restricted Magnitude of Minor to

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:36: Minor.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:36:VP5-view Medium Effects very similar to VP1. Small Not Scrub vegetation and trees to Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:37: Negligible Not A1053 and industrial area in background. Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:37:VP6- view Medium Views to the site are Negligible Not Intervening vegetation in the Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:37: Not buildings. Small Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:38:VP8- view Low Direct views to the site. Small Not The Project will be clearly Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:38: At night construction Significant At night, operational and change is Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:38:VP9- View Medium Partial long medium Negligible Not The Project will be partially Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:38:VP10- View Medium Long medium distance Negligible Not The Project will be visible Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:39: At night construction Magnitude Not At night, operational and Magnitude of Minor

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:48: resulting in a minor to moderate cumulative effect.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:48: in minor cumulative effect.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:49:11.67 Visual effects are generally either of minor significance or not significant at all

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:49: viewpoints, with only one exception of an effect of minor to moderate

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:49: are assessed as being predominantly of minor significance or not significant.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:50:11.72 Residual effects range from not significant to minor to moderate and will reduce

EN010082-000215-EN010082-5.9-Statutory Nuisance Statement-Final-November 2017.pdf:8: not significant, and of minor, moderate or major significance. Any impact of

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:94:Whilst we anticipate our role in the proposed development will be relatively minor, it will be important

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: Minimal • Very minor changes to archaeological materials or setting

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: • Very minor changes to key historic landscape elements, parcels or

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: Table 12. 4. Four levels of effect are defined: negligible, minor, moderate and

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: High Minor Minor to Moderate to Major

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: Medium Negligible Minor Minor to Moderate to

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:17: Low Negligible Minor / Minor Minor to

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:31: minor and therefore not significant.

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:31: change was assessed to be small and the overall effect to be minor but not

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:32: general constitutes minor change or ‘like for like’.

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:32: to be negligible to minor adverse and therefore not significant.

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:32: landscape. The level of effect on the Eston Nab site is considered to be minor

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:13: discussed, save for necessary minor amendments made for clarification and to ensure consistency

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:19: waste management plan which may, subject to minor amendments, satisfy

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:21: plans or schemes must be minor or immaterial and must be unlikely to

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:41: the Examination. I consider these amendments are relatively minor and

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:56: minor lateral movement of the stacks would not change the conclusions

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:65: negligible to minor adverse and therefore not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:65: Eston Nab is therefore minor and not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:69: (VP4 – High Street, Lazenby) the effect was assessed as ‘minor to

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:69: small, and the significance of effect ‘minor.’

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:70: assessed as ‘minor to moderate’. Effects of moderate and above are

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:70: range of effect is more towards ‘minor’ AS-013.

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:70: effects range from not significant to minor to moderate and will reduce

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:75: minor impact on the landscape character of the area, and at worst a

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:95: my Rule 6 letter PD-005) and some minor clarifications around

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:103: any minor lateral movement of the stacks within this zone would not

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:120: were the result of typographical or grammatical errors or were minor

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:121: ‘preliminary works’ to include only works that are preparatory and minor

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:124: • Part 2 Minor Operations

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:180:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:27: Low: areas of transient occupation, no Not significant Minor Moderate

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:27: Medium: general population, permanent Minor Moderate Major

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:53:Construction Impacts associated with dust Mitigation as per IAQM (2014) guidance At worst Minor, or Not significant

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:53:Decommissioning Impacts associated with dust Mitigation as per IAQM (2014) guidance (or At worst Minor, or Not significant

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:55: residual effects are considered to be, at worst, minor and likely not significant.

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:55: emissions; residual effects are considered to be, at worst, minor and likely not

EN010082-000019-Scoping Report.pdf:42:For other impacts nominal levels of magnitude (e.g. small, of more than minor significance may warrant re-examination to see if an impact

EN010082-000019-Scoping Report.pdf:58: assessed given that this Infrastructure is already present. If minor works are

EN010082-000019-Scoping Report.pdf:62:previously been designated both minor and non-aquifers in different locations

EN010082-000019-Scoping Report.pdf:105:than minor significance, and will be fully investigated in the EIA process.

EN010082-000019-Scoping Report.pdf:106:determined to be of minor significance.

EN010082-000019-Scoping Report.pdf:106:assessed as minor. The employment impacts of operational are expected to

EN010082-000019-Scoping Report.pdf:106:term impact is assessed as being positive but of minor significance.

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:41: the Examination. I consider these amendments are relatively minor and

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:56: minor lateral movement of the stacks would not change the conclusions

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:65: negligible to minor adverse and therefore not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:65: Eston Nab is therefore minor and not significant.

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:69: (VP4 – High Street, Lazenby) the effect was assessed as ‘minor to

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:69: small, and the significance of effect ‘minor.’

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:70: assessed as ‘minor to moderate’. Effects of moderate and above are

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:70: range of effect is more towards ‘minor’ AS-013.

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:70: effects range from not significant to minor to moderate and will reduce

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:75: minor impact on the landscape character of the area, and at worst a

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:95: my Rule 6 letter PD-005) and some minor clarifications around

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:103: any minor lateral movement of the stacks within this zone would not

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:120: were the result of typographical or grammatical errors or were minor

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:121: ‘preliminary works’ to include only works that are preparatory and minor

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:124: • Part 2 Minor Operations

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:180:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

EN010082-000575-Applicant's DL7 submission Imperial Report - CCR.pdf:7:guidance, with the minor exception of laydown for construction, discussed below.

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:5:1.9 Given that the requested change is only a minor change (1 m increase) from

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:7: significance of effects from not significant to minor. As can be seen in the

EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to such

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:23: significance of effects from not significant to minor. As is

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:28: monitoring platform is an integral part of the overall plant design to ensure Project’s detailed design, they did not include minor details. For

EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:10: 06 September 2018 (Application Document Ref: 8.49). However, the Applicant has proposed a minor

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:21:pursuant to these requirements must be minor or immaterial and in order to obtain approval to

TR030002-001873-Decision holding letter (2).pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:12: development of the detailed design to ensure that the implications of any minor variations to the design,

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:14: as the relatively minor nature of the proposed works, the works associated with the development of the

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:15: the current time any alterations to the existing Whitby P&R are expected to be minor but may include

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:37:surveys (2012) minor streams, ditches and rush-pasture/marsh habitats and were

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:102: Less pronounced minor undulations in the ground surface are present throughout. To the south of

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:104: Purple Moor-grass. Other species are typically rare and represent only a minor element of the sward.

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:120: include minor advserse impacts on the landscape structure, due to the loss of woodland, change in

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:130: facility would be minor, and effects could be readily mitigated by the provision of long-term screening on

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:18: “Minor Aquifer High”.

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:24: Category 3 (minor incidents) with the exception of one substantiated (Category 2) incident in 2007

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 1 Chemical industry 1995/6 0 A number of Category 3 – Minor Incidents –

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 2 Urban Runoff April 1996 0 Category 3 - Minor Incident – pollution of

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 3 Chemical industry 1995 0 Two Category 3 - Minor Incidences –

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 5 Oil Industry March 1996 270 Category 3 – Minor Incident - pollution

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 6 Chemical Industry October 1996 357 Category 3 - Minor Incident - pollution found

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: 7 Fuel Oils March 1996 363 Category 3 – Minor Incident - pollution

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:25: time (>10years) that has elapsed and their minor nature.

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:80: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:81: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:82: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:83: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:83: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:84: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:84: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:84: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:84: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:84: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:85: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:85: Air Impact: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:88: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:88: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:132: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:133: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:133: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:133: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:133: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:134: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:134: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:134: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:134: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:135: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:136: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:136: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:136: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:136: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:137: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:138: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:139: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:140: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:140: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:140: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:140: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:140: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:141: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:141: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:141: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:141: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:141: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:142: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:142: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:142: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:142: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:142: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:143: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:143: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:143: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:143: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:143: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:144: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:145: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:145: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:145: Process Type: IPC minor (non-substantial) variation to previous variation

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:146: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:146: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:148: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:149: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:150: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:151: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:153: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:153: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:155: App. Sub Type: Minor

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:155: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:155: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:156: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:156: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:156: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:156: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:156: Description: Minor variation to authorisation under RSA

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:157: Description: Minor variation to authorisation under RSA

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:157: Description: Minor variation to authorisation under RSA

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:157: Description: Minor variation to authorisation under RSA

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:157: Land Impact: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:207: Incident Severity: Category 3 - Minor Incident

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:207: Land Impact: Category 3 - Minor Incident

TR030002-000647-Doc 3.4E - Temporary Compound Site D.pdf:1: C 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000468-Section 6 App 6.2 Land Quality Generic Risk Assessment.pdf:155:Minor Stress At Failure (kPa) 73.0 127.0 224.0

TR030002-000468-Section 6 App 6.2 Land Quality Generic Risk Assessment.pdf:160:Minor Stress At Failure (kPa) 75.0 159.0 245.0

TR030002-000468-Section 6 App 6.2 Land Quality Generic Risk Assessment.pdf:165:Minor Stress At Failure (kPa) 112.0 152.0 246.0

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:81: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:81: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:82: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:82: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:83: D MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:83: C MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:84: E eL D MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:84: RW C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:85: S D MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:85: S- S C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:86: TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:86: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:87: GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:87: RW C C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:88: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:88: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:89: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:89: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:90: D MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:90: t C MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:91: E TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:91:GA S- GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:92: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:92: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:93: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:93: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:94: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:94: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:95: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:95: C MINOR REVISIONS LW DGB MH

TR030002-001873-Decision holding letter (3).pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000872-York Potash Ltd 1.pdf:26: 7. Probability of full bore rupture vs minor leak vs no leak (Fault tree Ref A)

TR030002-000872-York Potash Ltd 1.pdf:26:in a full bore rupture, or whether a minor leak (e.g. a crack or small hole) occurs, or whether the

TR030002-000872-York Potash Ltd 1.pdf:26:EGIG (ref 2) quotes 0.016 ruptures per 1000km of pipeline per year, 0.135 minor leaks per 1000km of

TR030002-000872-York Potash Ltd 1.pdf:26:Hence impact from piling: 0.05 full bore rupture, 0.5 minor leak, 0.45 pipeline damaged but no loss of

TR030002-000872-York Potash Ltd 1.pdf:26:that these activities will lead to a full bore rupture - a minor leak or no leak at all is probable

TR030002-000872-York Potash Ltd 1.pdf:26:Hence impact from dropped load, excavation or backfilling: 0.01 full bore rupture, 0.1 minor leak, 0.89

TR030002-000872-York Potash Ltd 1.pdf:27:Hence impact from other causes: 0.1 minor leak, 0.9 pipeline damaged but no loss of containment

TR030002-000872-York Potash Ltd 1.pdf:27:Pinhole crack / hole = 4.4 - 2.3%. Suggest use 0.03 for minor leak ignition probability

TR030002-000872-York Potash Ltd 1.pdf:27:Use 0.3 for FBR, 0.03 for minor leak

TR030002-000872-York Potash Ltd 1.pdf:33: location moved 0.0001 0 5 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C3. Multiple fatalities on site 1 98E-03

TR030002-000872-York Potash Ltd 1.pdf:33: 0.132 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C6. Multiple fatalities on site 3 96E-04

TR030002-000872-York Potash Ltd 1.pdf:33: failure 0.001 AND 0 000002 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C11. Multiple fatalities on site 1.62E-06

TR030002-000872-York Potash Ltd 1.pdf:33: (pipeline buried) 0.00005 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C14. Multiple fatalities on site 5.40E-05

TR030002-000872-York Potash Ltd 1.pdf:33: causes impact 0 001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C19. Multiple fatalities on site 4 20E-05

TR030002-000872-York Potash Ltd 1.pdf:34: execution causes pipeline settling 0 001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C22. Multiple fatalities on site 2.10E-05

TR030002-000872-York Potash Ltd 1.pdf:34: AND 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C25. Multiple fatalities on site 2.70E-05

TR030002-000872-York Potash Ltd 1.pdf:34: Pipeline fails 0 05 0 0005775 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C31. Multiple fatalities on site 1.73E-06

TR030002-000872-York Potash Ltd 1.pdf:35: location moved 0.00005 0.5 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C3. Multiple fatalities on site 0.00002025

TR030002-000872-York Potash Ltd 1.pdf:35: 0.0099 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C6. Multiple fatalities on site 0 0000297

TR030002-000872-York Potash Ltd 1.pdf:35: failure 0.001 AND 2E-07 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C11. Multiple fatalities on site 9.72E-08

TR030002-000872-York Potash Ltd 1.pdf:35: (pipeline buried) 0 00005 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C14. Multiple fatalities on site 0 0000081

TR030002-000872-York Potash Ltd 1.pdf:35: causes impact 0.0001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C19. Multiple fatalities on site 0 0000012

TR030002-000872-York Potash Ltd 1.pdf:36: execution causes pipeline settling 0 001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C22. Multiple fatalities on site 0.000006

TR030002-000872-York Potash Ltd 1.pdf:36: AND 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C25. Multiple fatalities on site 0.000009

TR030002-000872-York Potash Ltd 1.pdf:36: Pipeline fails 0.05 0 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C31. Multiple fatalities on site 0

TR030002-000872-York Potash Ltd 1.pdf:37: location moved 0.00005 0.5 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C3. Multiple fatalities on site 0 0000675

TR030002-000872-York Potash Ltd 1.pdf:37: 0.033 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C6. Multiple fatalities on site 0.000099

TR030002-000872-York Potash Ltd 1.pdf:37: failure 0.001 AND 2E-07 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C11. Multiple fatalities on site 1.47294E-05

TR030002-000872-York Potash Ltd 1.pdf:37: (pipeline buried) 0 00005 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C14. Multiple fatalities on site 0 0000147

TR030002-000872-York Potash Ltd 1.pdf:37: causes impact 0.0001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C19. Multiple fatalities on site 0 0000012

TR030002-000872-York Potash Ltd 1.pdf:38: execution causes pipeline settling 0 001 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C22. Multiple fatalities on site 0.000006

TR030002-000872-York Potash Ltd 1.pdf:38: AND 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C25. Multiple fatalities on site 0.000009

TR030002-000872-York Potash Ltd 1.pdf:38: Pipeline fails 0.05 0 0.1 Minor Leak 0 03 Ignited Release (jet fire) 1 Onsite population present C31. Multiple fatalities on site 0

TR030002-000803-Document 3.3K - Conveyor Route Plans Northern Route Sheet 3 - Rev G.pdf:1: BP D MINOR REVISIONS CH DGB MH

TR030002-000803-Document 3.3K - Conveyor Route Plans Northern Route Sheet 3 - Rev G.pdf:1: E GAS - BP CATS C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: resource; minor improvement to attribute quality (Beneficial).

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: minor improvement to attribute quality (Beneficial).

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element;

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Very High Major Major Moderate Moderate Minor

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: High Major Moderate Moderate Minor Negligible

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Medium Moderate Moderate Minor Minor Negligible

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Low Minor Minor Minor Negligible Negligible

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Very Low Minor Negligible Negligible Negligible Negligible

TR030002-000439-ES Section 4 Approach to EIA.pdf:10:4.3.35 Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

TR030002-000439-ES Section 4 Approach to EIA.pdf:10: also recognised that minor and negligible impacts could become significant when considered

TR030002-000439-ES Section 4 Approach to EIA.pdf:12: within the EIA process. The standard EIA approach assesses whether an impact is minor, moderate or

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:14: disposal movements and mobilisation / demobilisation of marine plant, are minor. The estimate of

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:29: Minor injury or

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:29: 2 Marginal Minor damage Minor effect Minor impact 2 4 5 6 8

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Transport Minor adverse Minor adverse To be assessed nearer the time

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Amenity & Minor adverse to users of PROW and open Negligible/no effects Negligible/no effects

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Socio-economics Minor beneficial due to local employment and Major beneficial at local level and minor beneficial at a sub- Negligible/minor adverse

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Landscape & visual Effects ranging from minor to major adverse By year 15, minor and moderate beneficial effects as No effects

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Geology & Minor/moderate adverse Minor adverse Negligible

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Hydrology & flood Negligible Largely negligible; minor adverse effects possible due to Negligible

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Land uses and soils Minor adverse on soil degradation and loss Minor adverse due to land being taken out of existing use for Mainly negligible; minor adverse effects on

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Special qualities of Moderate/major effects on features Minor beneficial effects on the diversity of landscape, wide No impact

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: for artistic, scientific and literary inspiration; inspiration; minor adverse effects on tranquillity; otherwise no or

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: minor adverse or negligible effects on all negligible effects on all other identified special qualities

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Transport Minor adverse Minor adverse To be assessed nearer the time

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Amenity & Minor/moderate adverse depending on Minor beneficial effect at Lady Cross and Lockwood Beck due to No impact

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Socio-economics Minor beneficial due to local employment and Major beneficial at local level and minor beneficial at a sub- Negligible/minor adverse

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Ecology Minor adverse Minor beneficial effects on statutory sites and habitats; low On removal of all elements and the

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Landscape & visual Lady Cross – mainly minor/moderate Lady Cross – minor adverse/negligible effects in Year 1 to No effects

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: adverse; otherwise negligible adverse/no minor/negligible beneficial effects in Year 15 as landscaping

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Lockwood Beck – mainly major through to Lockwood Beck – minor moderate/negligible adverse effects in

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: minor adverse Year 1 to negligible adverse/no change by Year 15

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Tocketts Lythe – mainly moderate/minor Tocketts Lythe – minor adverse/negligible effects in Year 1 to

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: adverse effects minor/negligible beneficial effects in Year 15

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Geology & Mainly negligible; some receptors with a Mainly negligible; some receptors with minor adverse effects at Negligible

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: hydrogeology minor adverse effect Lady Cross Plantation

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Land uses and soils Moderate adverse due to land being taken Minor adverse effects due to land being taken out of existing Mainly negligible or minor adverse effects

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: out of existing use; minor adverse on soil use; otherwise negligible effects

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Special qualities of Moderate/major effects on features Minor beneficial effects on the diversity of landscape, wide No impact

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: for artistic, scientific and literary inspiration; inspiration; minor adverse effects on tranquillity; otherwise no or

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: minor adverse or negligible effects on all negligible effects on all other identified special qualities

TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:4:(2009) and Lucke et al (2009) suggest that a minor behavioural response may be expected at 150 dB SPL peak and 145 dB SPLpeak

TR030002-000460-Section 3 App 3.1 Waste management.pdf:37: minor.

TR030002-000460-Section 3 App 3.1 Waste management.pdf:42: used chemical products from minor maintenance. These would be hazardous waste when discarded.

TR030002-000853-151216 TR030002 Huntsman - Response to the ExA's dDCO and Schedule 9 Protective Provisions.pdf:3: relation to the Protective Provisions. Given the seriousness of even a minor

TR030002-000824-Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H.pdf:1: GA L TS F 01.09.15 MINOR REVISIONS (NWL SERVICES) LW CDJ DGB

TR030002-000824-Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H.pdf:1: TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000824-Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H.pdf:1: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: minor change to the existing condition. with the existing industrialised setting, where large scale approximately year 6 of completion of Phase 1. Operational

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: the LCA and would constitute a minor change set amongst irreversible.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: LCA returning inland along the River Tees. being perceptible and minor.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: a minor change.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: parts of the eastern edge of the LCA but would be in scale being perceptible and minor.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: development would constitute a minor change.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: skyline views from parts of the eastern edge of the LCA being perceptible and minor.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:5: development would constitute a minor change.

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6:as being negligible, minor, minor moderate, moderate, moderate major or major and as being either beneficial or adverse. The following colour system is used to highlight significance values:

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6: Minor moderate beneficial/ Minor moderate adverse/

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6: minor beneficial minor adverse

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6:Industrialised Estuary (including the development Low Low adverse Minor adverse The proposed development would not result in the loss of any

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6:Redcar LCA R5 (Sandy Shoreline – Coatham Low Minor adverse Minor adverse The proposed development would be visible on the south bank

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6:Stockton on Tees LCA – East Billingham to Low Minor adverse Minor adverse The proposed development would be visible from heavily

TR030002-000502-Section 20 App 20.2 Landscape assessment.pdf:6:Hartlepool – Coastal Fringe Landscape Type Low Minor adverse Minor adverse The proposed development would be visible on the south bank

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:84: (5) IfFollowing the completion of a relevant work if damage is of a minor nature, and can be

TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:14: minor amendments have been made to sub-paragraphs (3) and (4) as requested

TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:21: architect. ii Minor wording amendments in response to the Examining

TR030002-001866-The York Potash Harbour Facilities Order Amendment Application Statement.pdf:9: the local planning authority and the delayed delivery of minor highway works to the A1085

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:5: form a minor component of the view.

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:6: forms the main focus of views with chimney form a minor change to the view. Decommissioning

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:7: minor change to overall view character. Decommissioning

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:7: chimney/ flare stacks. (views 3 and 4) and would form a minor change to the Negligible/ low

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:7: Sands and Teesport, with flare stacks and character and would form a minor change Decommissioning

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:7: would form minor components within the

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:7: port/ industrial structures including minor change in overall view character.

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:8: vapour plumes drawing the eye. and would form a minor change to the phase:

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:8: would form minor features within the view.

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:8: Infrastructure with Wilton International in constitute a very minor change in view Negligible adverse

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:9: would constitute a minor change to view

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11:as being negligible, minor, minor moderate, moderate, moderate major or major and as being either beneficial or adverse. The following colour system is used to highlight significance values:

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11: Minor moderate beneficial/ Minor moderate adverse/

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11: minor beneficial minor adverse

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11:Residents at Broadway High Low adverse Minor moderate adverse Existing screen planting and security fence measures heavily All proposed structures are inherently in

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11: Negligible to low adverse Minor adverse impacts during operational and decommissioning phases.

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11: option: Low adverse option: Minor moderate structure and transfer tower at the south east corner of the

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11:and 102/2A/2 minor moderate adverse in distant views only and in the context of existing industrial

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:11: Infrastructure within the view. Minor moderate effect only

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Users of the Teesdale Way High Low adverse Minor moderate adverse Effects relate to taller quayside structures and ship loading

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Users of byways S1A and High Negligible/ low adverse Negligible/ minor adverse Effects relate to taller quayside structures, these would be

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Visitors to Saltholme Nature High Low adverse Minor moderate adverse Effects relate to quayside structures and ship loading activity,

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Visitors to Teesmouth High Low adverse Minor moderate adverse Effects relate to quayside structures and ship loading activity,

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Users of marina at Paddy’s Medium Low adverse Minor adverse Effects relate to taller quayside structures and loading

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Visitors to beaches at North High Low adverse Minor moderate adverse Effects relate to quayside structures and ship loading activity,

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Drivers on West Coatham Low Low adverse Minor adverse Effects relate to the conveyor structure, this would be seen in

TR030002-000503-Section 20 App 20.3 Visual assessment.pdf:12:Workers in surrounding Low Low adverse Minor adverse Conveyor structures and quayside structures would be

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:39: will prevent vehicles from using the minor roads through areas like Ruswarp and • “Concerned about traffic and the

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:63: responded suggesting some minor amendments to the document. The

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:86: disabilities and ethnic minority groups. YPL will continue to publicise its

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:96: vehicles, as well as the large scale Additional noise reduction measures controlled, resulting in no significant maybe potential minor impacts due to

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:122: and cleveland areas. discreet than many impacts of traffic. minor temporary

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:123:7448714 Supportive In favour No concerns The economic benefits vastly outweigh the minor disruption to a small corner Yes In favour Satisfied in Supportive Yes The need for Positive

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:124:7573060 Supportive In favour No concerns Significant ' Socio Economic ' upside ‐ Minor / manageable environmental Yes In favour Satisfied in Satisfied in Yes The need for Positive

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:138: they are the minority,

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:139: for North Yorkshire and Teeside if a minority (probably less than 1%) stops

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:140:7897609 Supportive In favour No concerns As a mid‐twenty year old recent graduate, born and raised in the local area, I Yes In favour The supply of many Support Couldn't be better Supportive Yes The need for Any minor short term Positive The area is cr

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:151: Although there is always reluctance to allow major (and minor) industrial tremendous to minimise development virtually impossible to

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:168: the vociferous minority objectors. Local people want it. IT MUST GO UNDERGROUND SO impact is minimal. belt system minimises completed development

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:179:8081163 Supportive In favour No concerns It will provide much needed jobs and other activities for the people and the Yes In favour This area of the Support Minor distortions to Supportive Yes The need for Positive

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:183: minor grievances Sometimes those who

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:185: which needs investment in both) far outweighs any possible minor concerns. development

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:189:8321724 Supportive In favour No concerns The need for employment, and export potential, far outweighs any minor Yes In favour Support Supportive Yes The need for No or neutral

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:201: outweighs the short term minor disruption and longer term small visual impact is in the living on the m

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:221: concern is tht all the minor details will be ironed out and common sense will

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:104:Environmental Impact Assessment and Environmental Statement is robust bar a few minor errors

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:8: flow through the embankment being one of these sources, but a minor one in the context of the wider

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:30:11.3.5 No mitigation is proposed for the effect of the MHF given the very minor effect predicted and that the

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:33: facility would be minor, and effects could be readily mitigated by the provision of long-term screening on

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:42: as the relatively minor nature of the proposed works, the works associated with the development of the

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:42: Alterations to the existing Whitby Park & Ride are expected to be minor, but may include an additional

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:58:the proposed port terminal would be lost and there would be a (very minor) direct impact in Dabholm Gut or

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:58:Bran Sands lagoon due to the impact would be of minor case, however, the above

TR030002-000823-Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H.pdf:1: L F 01.09.15 MINOR REVISIONS (NWL SERVICES) LW CDJ DGB

TR030002-000823-Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H.pdf:1: RW S -B D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000823-Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H.pdf:1: -G GA S LL C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000566-Doc 7.1 Planning Statement.pdf:33: 4. three minor access roads (providing access to various facilities within

TR030002-000577-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 2.pdf:9: area between the branches forms a small horst Table 1), marked initially by minor lithological

TR030002-000577-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 2.pdf:11: possible interpretation of the consequences of movement in the region of minor faulting at about 1.5 km; if substantiated it

TR030002-000577-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 2.pdf:12: dip and some very minor faulting, deformation is to show any part of the trough. The western margin

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:4: whether an impact is minor, moderate or major, and whether it is beneficial or adverse. This is not

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:29: have any hydromorphological impacts as the pile structures are relatively minor in comparison to the

TR030002-001873-Decision holding letter.pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:77: 17. If the damage is of a minor nature, and can be easily repaired by the owner of the relevant

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:5: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:5: C MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:6: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:6: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:7: D MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:7: th C MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:8: E eL D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:8: RW C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:9: FS S- D MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:9: GA TA S- TS C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:10: D MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:10: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:11: GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:11: RW CA C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:12: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:12: C MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:13: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:13: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:14: D MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:14: th C MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:15: CA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:15: S- GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:16: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:16: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:17: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:17: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:18: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:18: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:19: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:19: C MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:49: D 11-03-15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:50: C 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:51: C 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:52: E 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000438-ES Section 3 Project description_2 of 2.pdf:52: D 11-03-15 MINOR REVISIONS LW DGB MH

TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:9:to the Order, subject to the minor amendment to the proposed definition of “pipelines”

TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:11:54. The Secretary of State is making a number of other minor textual amendments to the

TR030002-000453-ES Section 18 Infrastructure.pdf:16: background) extend to the vicinity of the Corus UK water abstraction point. This is a minor elevation

TR030002-000453-ES Section 18 Infrastructure.pdf:16: above background levels, and any minor reduction in water quality in the vicinity of the abstraction point

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:26:  Minor Beneficial / Adverse.

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:27: Minor Slight improvement in night Creating a safer environment from a

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:27: Minor Slight increase in lighting levels

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:39: construction phases, the residual impact is likely to be minor adverse (in the context of luminaire

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:39: Summer Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:39: Winter Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:41:5.7.5 The magnitude of change at this viewpoint is predicted to be minor, as this viewpoint is likely to have

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:42:5.7.8 It is considered the construction lighting would have a minor adverse impact upon the residents of the

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:42: Summer Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:42: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:42: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:44:5.8.5 The magnitude of change at this viewpoint is considered to be minor, as this viewpoint is likely to have

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:45:5.8.8 It is considered that the construction lighting would have a minor adverse impact upon the residents of

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:45: Summer Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:45: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:45: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:48:5.9.8 The effect of the construction phase lighting upon this viewpoint is predicted to be minor adverse in

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:48: Summer Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:48: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:48: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:50:5.10.8 The effect of the construction phase lighting upon this viewpoint is considered to be minor adverse in

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:50: Summer Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:50: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:51: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:53: minor adverse impact in terms of light intrusion.

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:53: Summer Months: No Effect Minor Adverse Moderate Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:53: Winter Months: No Effect Minor Adverse Moderate Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:54: Summer Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:54: Winter Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:56:5.12.4 The magnitude of change at this viewpoint is predicted to be minor, as this viewpoint would have views

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:60: identified within Table 6.1, it is anticipated there would be minor adverse effects with regard to

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:60: Summer Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:60: Winter Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Winter Months: Negligible Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Winter Months: Negligible Minor Adverse Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Summer Months: No Effect Negligible Minor Adverse

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:61: Winter Months: No Effect Negligible Minor Adverse

TR030002-000653-Doc 3.6B - Substation Elevations Sites A and C.pdf:1: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:1: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:1:Cumulative effect – minor moderate adverse (Bank Field wind farm) (no cumulative change)

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:2: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:3: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:4: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:5: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:6:Cumulative effect – minor adverse (Lockwood Beck winding tower, Bank Field wind farm, Boulby Mine

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:7:View from minor road set within open moorland, near junction with A171. Smooth moorland horizons are

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:7: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:7:and very small scale. Cumulative impact would not exceed the minor moderate level occurring at

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:7:Cumulative effect – minor moderate adverse (Lockwood Beck winding tower and spoil placement activity)

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:8: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:8:significance above that of the individual features (minor adverse). All features would be seen in

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:8:visible individual features (minor adverse)

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:8:Cumulative effect – minor adverse (Dove’s Nest, Lady Cross and Lockwood Beck winding towers) (no

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:9: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:9:Cumulative effect – minor adverse (assumed worst case Lockwood Beck within potential open views) (no

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:10: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:10:Cumulative effect – minor adverse (Lady Cross winding tower) (no cumulative change)

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:11: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:12: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:13: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:13:Cumulative effect – minor adverse (RAF Fylingdales and Lady Cross winding tower) (no cumulative

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:14: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:15: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:16: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:16:Cumulative effect – Minor moderate adverse (Dove’s Nest winding towers) (no cumulative change)

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:17: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:18: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:19: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:20: minor

TR030002-000547-Doc 6.6 App 22.2 Representative viewpoint assessment.pdf:20:Cumulative effect – minor adverse (Dove’s nest Farm, winding towers and ground level activity) (no

TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:49: surveys. Therefore, the survey has been supported remaining visual impacts will be reduced to minor

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:8: x Low potential – only minor crevices or cracks present; considered to offer poor roosting spaces

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:25: predicted that there would be a long-term impact of minor beneficial significance.

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:25: there would be a long-term impact of minor beneficial significance.

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:25: sensitivity. Hence there would be a long-term impact of minor beneficial significance on otters.

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:26: potential impacts are predicted to be of negligible or minor beneficial significance.

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:27:Bats High Low Negligible Implementation of landscape Minor beneficial

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:27:Reptiles High Low Negligible Implementation of landscape Minor beneficial

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:27:Otters High Low Negligible Creation of new shallows and Minor beneficial

TR030002-000689-York Potash Ltd (4).pdf:2:PDT referred to two minor corrections required to Schedule 11 of These corrections were incorporated into the draft DCO submitted

TR030002-000689-York Potash Ltd (4).pdf:6: minor amendments to the relevant constructability notes being

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:9: • Green corridors such as minor valleys and former railway lines provide

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:15:are forecast to be of minor adverse significance at worst. Through the

TR030002-000456-ES Section 21 Recreation and access.pdf:2: Coastal Access Act, 2009. RCBC anticipates that some minor upgrades to the Teesdale Way footpath

TR030002-000456-ES Section 21 Recreation and access.pdf:6: High Major Moderate Minor Negligible

TR030002-000456-ES Section 21 Recreation and access.pdf:6: Medium Moderate Minor Minor Negligible

TR030002-000456-ES Section 21 Recreation and access.pdf:6: Low Minor Minor Negligible Negligible

TR030002-000456-ES Section 21 Recreation and access.pdf:11:21.5.6 On this basis, an impact of minor adverse significance is predicted with respect to recreational users

TR030002-000456-ES Section 21 Recreation and access.pdf:12: recreational users of the footpath and cycle routes would be of minor adverse significance at worst.

TR030002-000456-ES Section 21 Recreation and access.pdf:13: impact of minor moderate adverse significance was predicted to users of these footpaths with regard to

TR030002-000456-ES Section 21 Recreation and access.pdf:13: would be of minor adverse significance (given that the visual experience is only part of the recreational

TR030002-000456-ES Section 21 Recreation and access.pdf:13: considered to be of minor adverse significance as the predicted visual impact would remain during the

TR030002-000456-ES Section 21 Recreation and access.pdf:14: would be of minor adverse significance during the operation phase (given that the visual experience is

TR030002-000456-ES Section 21 Recreation and access.pdf:14: impact on recreation and amenity is predicted to be of minor adverse significance at worst (as the

TR030002-000456-ES Section 21 Recreation and access.pdf:15: receptors (discussed in Section 21.4), an impact of minor adverse significance is predicted with

TR030002-000456-ES Section 21 Recreation and access.pdf:16: would be of minor adverse significance during the decommissioning phase (given that the visual

TR030002-000456-ES Section 21 Recreation and access.pdf:16: combined indirect impact of minor adverse (pre-mitigation) would occur during the construction,

TR030002-000456-ES Section 21 Recreation and access.pdf:16: implementation of mitigation measures, the residual impact would be minor adverse (during

TR030002-000456-ES Section 21 Recreation and access.pdf:18:Direct disturbance to users of public High (National Trail) Low Minor adverse Info

TR030002-000456-ES Section 21 Recreation and access.pdf:18:Indirect disturbance to recreational users High (National Trail) N/A Minor adverse Imp

TR030002-000456-ES Section 21 Recreation and access.pdf:19:Indirect disturbance to recreational users High (National Trail) N/A Minor adverse Non

TR030002-000456-ES Section 21 Recreation and access.pdf:19:Direct disturbance to users of public High (National Trail) Low Minor adverse (National Infor

TR030002-000456-ES Section 21 Recreation and access.pdf:19:Indirect disturbance to recreational users High (National Trail) N/A Minor adverse Impl

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:8: Medium x A noticeable change (minor) in one (maybe more) key characteristics of the baseline

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:8: Low x Very minor loss of or alteration to one (maybe more) key characteristic of the baseline.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:8: Very low x Possible very minor change to the baseline which are not expected to be detectable above

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:25: TSS concentrations) from dredging is low, and an impact of minor adverse significance is predicted.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:27: estuary. Hence an impact of minor adverse significance is predicted with regard to the effect of

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:27: be less, and therefore an impact of minor adverse significance is predicted.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:27: proposed scheme. Therefore the residual impact would be minor adverse with regard to the subtidal

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:27: be progressed; and minor adverse should an open quay structure be progressed.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:43:11.5.49 With the implementation of the mitigation measures outlined above, a residual impact of minor adverse

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:47:Effects on fish High Low Minor adverse Limiting resuspension during TSHD can be ac

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:47:loss of fish, fish Low Minor adverse are unavoidable consequences of the propose

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:47: Low (open quay) Minor adverse (open

TR030002-000099-141104_TR030002_Meeting_Note.pdf:4:Pins noted that there are some minor issues regarding the plans, and that more

TR030002-000722-York Potash Limited 4.pdf:8: impact of minor adverse significance has been predicted with regard to construction workers,

TR030002-000722-York Potash Limited 4.pdf:8:4.5. A potential impact of minor adverse significance on surface waters was predicted associated

TR030002-000722-York Potash Limited 4.pdf:10:5.5. Potential impacts are predicted to be of minor adverse significance.

TR030002-000722-York Potash Limited 4.pdf:12: potential impact of minor adverse significance was predicted.

TR030002-000722-York Potash Limited 4.pdf:16: a high abundance of some species (particularly Capitella capitalla). An impact of minor adverse

TR030002-000722-York Potash Limited 4.pdf:16: unavoidable consequences of the proposed scheme. The residual impacts is therefore of minor

TR030002-000722-York Potash Limited 4.pdf:16: measures, a residual impact of minor adverse significance is anticipated.

TR030002-000722-York Potash Limited 4.pdf:18: exception of flood hazard to construction workers which is predicted to be of minor adverse

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:10: Minor temporary increases in flood depths with no new flooding internally in properties expected

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:10: (minor increases that do not breach existing property threshold levels).

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:14: Based on the above, a residual impact of minor beneficial significance is predicted due to the

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:14:17.5.10 No mitigation measures are required. The residual impact would be of minor beneficial significance

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:15:17.5.16 Based on the localised and very minor increases in wave heights anticipated to occur within the estuary

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:17:Flood hazard to Medium Medium Minor adverse All construction workers No residual

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:17:Flooding at and Low Low Negligible Quay construction provides Minor beneficial

TR030002-000738-York Potash Limited 3.pdf:9:4.5. Potential impacts are predicted to be of minor adverse significance.

TR030002-000738-York Potash Limited 3.pdf:11: potential impact of minor adverse significance was predicted.

TR030002-000738-York Potash Limited 3.pdf:12: implemented where no impact piling is carried out. A residual impact of minor adverse

TR030002-000738-York Potash Limited 3.pdf:19: predicted to be of negligible or minor beneficial significance.

TR030002-000738-York Potash Limited 3.pdf:19: minor beneficial significance, a number of mitigation measures / control measures are

TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf:6:outcomes were identified; a) full-bore rupture of the pipeline, b) minor leak or c) no release; the

TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf:6:minor leak would not extend beyond the proposed development (no offsite impacts) and thus would

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:10: x Minor loss of or alteration to an asset which leave its current significance

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:10: x Minor and/or short term changes to setting which do not affect the key

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:10: x Minor alteration of an asset which does not affect its significance in any

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:10: x Minor and short term, or very minor and reversible, changes to its setting

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:11: High Major Major Moderate Minor

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:11: Medium Major Moderate Minor Minor

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:11: Low Moderate Minor Minor Negligible

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:11: Very Low Minor Minor Negligible Negligible

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:23: magnitude of effect on the asset. The resulting impact is therefore assessed to be of minor adverse

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:24: the asset is documented and recorded. This would result in a residual impact of minor adverse

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:25: minor adverse (based on a worst case scenario).

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:25: the protocol would result in a reduced residual impact, predicted to be of minor adverse significance.

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:30:example the recorded location of a deserted medieval Minor during construction related ground works in

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:30: Minor deposits should be included as part of the a

TR030002-000454-ES Section 19 Socioeconomics.pdf:5: x minor;

TR030002-000454-ES Section 19 Socioeconomics.pdf:20: creation could, therefore, have minor beneficial impacts in terms of local employment.

TR030002-000454-ES Section 19 Socioeconomics.pdf:21: effects of investment and job creation could, therefore, have temporary minor beneficial impacts at a

TR030002-000454-ES Section 19 Socioeconomics.pdf:22: districts and the LEP, resulting in a negligible to minor beneficial impact. As with indirect employment

TR030002-000454-ES Section 19 Socioeconomics.pdf:22: This would result in an impact of minor beneficial significance at a LEP level. The methodology used to

TR030002-000454-ES Section 19 Socioeconomics.pdf:23: through stakeholder consultation and partnership and would result in minor beneficial local impacts

TR030002-000454-ES Section 19 Socioeconomics.pdf:24: consultation and partnership and would result in minor beneficial local impacts with respect to

TR030002-000454-ES Section 19 Socioeconomics.pdf:24: the operation so the impact is assessed to be minor adverse at a local level.

TR030002-000454-ES Section 19 Socioeconomics.pdf:24: investment and job creation could, therefore, have minor beneficial impacts in terms of local

TR030002-000454-ES Section 19 Socioeconomics.pdf:25: minor beneficial local impacts with respect to employment.

TR030002-000454-ES Section 19 Socioeconomics.pdf:25: consultation and partnership and would result in minor beneficial local impacts with respect to

TR030002-000454-ES Section 19 Socioeconomics.pdf:25: districts and the LEP, resulting in a negligible to minor beneficial impact.

TR030002-000454-ES Section 19 Socioeconomics.pdf:25: GVA of the Tees Valley LEP which would result in minor beneficial effects in the LEP context. Including

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Peak construction employment N/A Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Indirect employment effects resulting from N/A Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Induced employment effects resulting from N/A Negligible to Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Increase in GDP resulting from N/A Negligible to Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Operational employment N/A Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:27:Indirect and induced effects of operation N/A Minor Beneficial None p

TR030002-000454-ES Section 19 Socioeconomics.pdf:28: Loss of direct and indirect employment N/A Minor Adverse YPL w

TR030002-000410-ExA First Round Questions.pdf:35:minor’ (but is not quantified) and that the habitat affected (short grass sward) is

TR030002-000410-ExA First Round Questions.pdf:35:Please can the applicant put the statement of ‘very minor’ into context, for

TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:19: • Minor snagging of some loads may cause a loss of stability.

TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:53: surveys. Therefore, the survey has been supported remaining visual impacts will be reduced to minor

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:27:On some occasions (for example when two vessels are converging from minor channels into the main navigation

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:28: overlap, but which would in practice be avoided by minor adjustments of the course of the vessels, or;

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:29:the distance and taken minor action (slowing down or speeding up) in order to maintain safe separation. This is also

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:29:next section of the report, the minor delays recorded within the validation models will not be further commented on

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:37:of these incidents could be managed and avoided with minor modifications to the order of movements.

TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: 6.13.21 Paragraph 17 relates to minor repairs stating that the pipe owner will carry these out at

TR030002-001856-Examining Authority’s Recommendation Report.pdf:13: and the minor alterations and clarifications that were made during the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:16: national grid power lines, several minor access roads serving parts of

TR030002-001856-Examining Authority’s Recommendation Report.pdf:19: routes. These incorporate minor revisions in the light of receipt of

TR030002-001856-Examining Authority’s Recommendation Report.pdf:53: residual impact is assessed in the ES as minor adverse. Other

TR030002-001856-Examining Authority’s Recommendation Report.pdf:62: With these measures in place the residual impact is assessed as minor

TR030002-001856-Examining Authority’s Recommendation Report.pdf:62: food sources from dredging is regarded as of minor adverse

TR030002-001856-Examining Authority’s Recommendation Report.pdf:63: indicate that there could be an impact of minor adverse significance to

TR030002-001856-Examining Authority’s Recommendation Report.pdf:65: would be reduced to minor adverse. The ES also suggests that there

TR030002-001856-Examining Authority’s Recommendation Report.pdf:66: change/negligible impact to minor adverse. As detailed in section

TR030002-001856-Examining Authority’s Recommendation Report.pdf:77: planning authority, RCBC within whose area all but a minority of the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:80: thresholds so that the impact is assessed as minor adverse during

TR030002-001856-Examining Authority’s Recommendation Report.pdf:83: surface water is still only regarded as minor adverse and on

TR030002-001856-Examining Authority’s Recommendation Report.pdf:84: perceived there to be a potential impact of minor adverse significance

TR030002-001856-Examining Authority’s Recommendation Report.pdf:86: impacts of the scheme would be either negligible or minor adverse and

TR030002-001856-Examining Authority’s Recommendation Report.pdf:105: for both routes. These incorporate minor revisions in the light of

TR030002-001856-Examining Authority’s Recommendation Report.pdf:125: should be noted that minor changes had been made to these

TR030002-001856-Examining Authority’s Recommendation Report.pdf:125: terms cannot be reached. For this reason a minor alteration to the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:140:8.7.53 In the light of the foregoing, subject to the very minor variations in

TR030002-001856-Examining Authority’s Recommendation Report.pdf:147: expectation of further minor amendments to the Constructability Notes

TR030002-001856-Examining Authority’s Recommendation Report.pdf:149: January 2016 subject only to the minor amendments that I

TR030002-001856-Examining Authority’s Recommendation Report.pdf:158: indicated are of minor nature, the definition of the Classes of Rights

TR030002-001856-Examining Authority’s Recommendation Report.pdf:161: apply to all known interests in the land. Otherwise minor adjustments

TR030002-001856-Examining Authority’s Recommendation Report.pdf:164: enforceable. It is better in my view for there to be this minor element

TR030002-001856-Examining Authority’s Recommendation Report.pdf:169: conclusions here, but I did conclude that two minor amendments to

TR030002-001856-Examining Authority’s Recommendation Report.pdf:172: the scheme would be either negligible or only minor adverse and in all

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:9: x green corridors such as minor valleys and former railway lines provide links between

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:16: Industrialised Estuary (including the development site area) Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:16: Redcar LCA R5 (Sandy Shoreline – Coatham Sands) Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:16: Stockton on Tees LCA – East Billingham to Teesmouth Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:16: Hartlepool – Coastal Fringe Landscape Type Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:16: Residents at Wilton Avenue and Broadway West, Dormanstown Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Minor moderate adverse (northern section of the

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Users of footpaths 116/31/3 and 102/2A/2 Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Users of the Teesdale Way at South Gare Breakwater Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Users of byways S1A and S1B (Seaton Carew) Negligible/ minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Visitors to Saltholme Nature Reserve (Bran Sands) Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Visitors to Teesmouth National Nature Reserve (North Gare Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Users of marina at Paddy’s Hole, South Gare Breakwater Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Visitors to beaches at North Gare Sands Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Drivers on West Coatham Lane Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:17: Workers in surrounding industrial complexes Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:18:20.6.6 Construction phase lighting impacts have been assessed at Appendix 20.4. A number of minor and

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:18: Industrialised Estuary (including the proposed scheme Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:18: Redcar LCA R5 (Sandy Shoreline – Coatham Sands) Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:18: Stockton on Tees LCA – East Billingham to Teesmouth Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:18: Hartlepool – Coastal Fringe Landscape Type Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Residents at Wilton Avenue and Broadway West, Dormanstown Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19: Year 15 – Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19: Minor moderate adverse (northern

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Users of footpaths 116/31/3 and 102/2A/2 Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Users of the Teesdale Way at South Gare Breakwater Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Users of byways S1A and S1B (Seaton Carew) Negligible minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Visitors to Saltholme Nature Reserve (Bran Sands) Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Visitors to Teesmouth National Nature Reserve (North Gare Sands) Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Users of marina at Paddy’s Hole, South Gare Breakwater Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Visitors to beaches at North Gare Sands Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Drivers on West Coatham Lane Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:19:Workers in surrounding industrial complexes Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:20: Industrialised Estuary (including the proposed scheme Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:20: Redcar LCA R5 (Sandy Shoreline – Coatham Sands) Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:20: Stockton on Tees LCA – East Billingham to Teesmouth Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:20: Hartlepool – Coastal Fringe Landscape Type Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Residents at Wilton Avenue and Broadway West, Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Minor moderate adverse (northern section of the

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Users of footpaths 116/31/3 and 102/2A/2 Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Users of the Teesdale Way at South Gare Breakwater Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Users of byways S1A and S1B (Seaton Carew) Negligible minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Visitors to Saltholme Nature Reserve (Bran Sands) Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Visitors to Teesmouth National Nature Reserve (North Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Users of marina at Paddy’s Hole, South Gare Breakwater Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Visitors to beaches at North Gare Sands Minor moderate adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Drivers on West Coatham Lane Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:21: Workers in surrounding industrial complexes Minor adverse

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:22: intervisible with the proposed development would be minor adverse. These

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:23: affect an area of landscape value and would have minor adverse indirect

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:23: would cause a minor indirect effect on surrounding areas of landscape.

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:25: minor and moderate adverse impacts would occur for a short period of time during the construction

TR030002-000711-Applicants Response to First Questions.pdf:20: minor change was felt by all to be beneficial it could

TR030002-000711-Applicants Response to First Questions.pdf:33: and operation of Phase 1 will be minor and will not have

TR030002-000711-Applicants Response to First Questions.pdf:106: minor’ (but is not quantified) and that the

TR030002-000711-Applicants Response to First Questions.pdf:107: statement of ‘very minor’ into context, for ‘very minor effect’, which refers to the scale of effect on

TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: 6.13.21 Paragraph 17 relates to minor repairs stating that the pipe owner will carry these out at

TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:9: its anchor. Although the damage to the CATS pipeline was relatively minor (requiring

TR030002-000646-Doc 3.4D - Temporary Compound Site B.pdf:1: D 11-03-15 MINOR REVISIONS LW DGB MH

TR030002-000509-Doc 6.6 App 1.1 Description of the YPP.pdf:6: Alterations to the existing Whitby Park & Ride are expected to be minor, but may include an additional

TR030002-000449-ES Section 14 Noise and vibration.pdf:21: High Major Major Moderate Minor Negligible

TR030002-000449-ES Section 14 Noise and vibration.pdf:21: Medium Major Moderate Minor Negligible Negligible

TR030002-000449-ES Section 14 Noise and vibration.pdf:21: Low Moderate Minor Negligible Negligible Negligible

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:8: CHANGE OF USE FROM SCHOOL (CLASS D2) TO MIXED USE (SUI GENERIS) INCLUDING MINOR INTERNAL REPAIRS AND

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:8: R/2010/0330/FFM RCBC Minor changes in traffic terms to existing application No NONE

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:8: R/2009/0781/CAM RCBC Minor changes in traffic terms to existing application No NONE

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:8: R/2013/0427/FFM RCBC BOUNDARY TREATMENTS AND ASSOCIATED LANDSCAPING AT PLOTS 140; 141; 145 - 153 (INCL); 157 - 166 (INCL); 169 - 171 (INCL); Minor changes in traffic terms to existing application No TA

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:12:NY/2013/0407/ENV Scarborough dam, a stilling basin, a control structure, minor diversion of Eller Beck, a control structure, a new road junction and access road from the A65 and Discount, too far from study area. No NONE

TR030002-001873-Decision holding letter (1).pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:45: For the open, suspended deck structure, with a minor change to the configuration of the

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:56:dredging, the effect of the disposal of fine material at the disposal sites is of minor

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:63: An impact of minor significance was anticipated with regard to the disposal of fine

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:23: contains three steeply incised minor valleys or ‘cloughs’, which drain to the east and

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:40: Scarborough and On and off-road rides Bridleways and minor

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:40: Scarborough and Rambling and walking on PRoW in North PRoW / minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:40: Burniston local Dog walking, short walks PRoW and minor roads

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:40: Cloughton local Dog walking, short walks PRoW and minor roads

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:51: Scarborough and On and off-road rides Bridleways and minor

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:51: Scarborough and Rambling and walking on PRoW in North PRoW / minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:51: Burniston local Dog walking, short walks PRoW and minor roads

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:62: Whitby and District On and off-road rides Bridleways and minor

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:62: Scarborough and Rambling and walking on PRoW in North PRoW / minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:62: Briggswath local Dog walking, short walks Minor roads in Briggswath

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:64: bisected by three small incised valleys, associated with minor watercourses. Land use

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:73: Whitby and District On and off-road rides Bridleways and minor roads

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:73: Scarborough and Rambling and walking on PRoW in North PRoW / minor roads in North

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:74: Briggswath local Dog walking, short walks PRoW and minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:74: Sleights local residents Dog walking, short walks PRoW and minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:75: site. Small incised valleys, associated with minor watercourses and tree cover, cut into

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:85: Whitby and District On and off-road rides Bridleways and minor

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:85: Scarborough and Rambling and walking on PRoW in North PRoW / minor roads in

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:85: Little Beck local Dog walking, short walks Minor roads connecting

TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:83: receptors would include minor adverse impacts in the first year, when the new mounds would be

TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:83: recently completed. That would change to a minor beneficial impact as planting matures and

TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:84: would provide a minor landscape benefit. This is an exceptional outcome which has only been

TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf:13:the proposed port terminal would be lost and there would be a (very minor) direct impact in Dabholm Gut or

TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf:13:Bran Sands lagoon due to the impact would be of minor case, however, the above

TR030002-000649-Doc 3.4G - Temporary Compound Site F.pdf:1: E 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000649-Doc 3.4G - Temporary Compound Site F.pdf:1: D 11-03-15 MINOR REVISIONS LW DGB MH

TR030002-000852-151216 TR030002 SABIC - Response to the ExA's dDCO and Schedule 9 Protective Provisions.pdf:3: relation to the Protective Provisions. Given the seriousness of even a minor

TR030002-001873-Decision holding letter (4).pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000868-CATS Parties - young lady report.pdf:37: If the watch manager is satisfied that the incident is of a minor nature then he might

TR030002-000868-CATS Parties - young lady report.pdf:37: that the incident is of a minor nature and is being effectively controlled he might decide

TR030002-000868-CATS Parties - young lady report.pdf:50: likely to be relatively minor. However, breach of a similar oil pipeline - noting the CATS

TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:19: • Minor snagging of some loads may cause a loss of stability.

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:10: Low Minor removal or addition of landscape features and/or addition of new

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:10: motorways) are considered to be of lower sensitivity than those using minor country lanes, where

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:12: Minor

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:12:  Minor moderate

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:12:  Minor

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:12: categories of minor negligible, minor moderate and moderate major will be used where the

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:13: Minor Small changes in landscape or visual conditions, affecting any

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:38: modelling, although there is potential for minor increase in wave energy on the narrow spits located

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:38: status. Given the minor area of habitat that would be affected, the magnitude of the effect is predicted

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:40: are considered to be, at worst, of minor significance.

TR030002-000443-ES Section 8 Marine ecology.pdf:45: minor adverse significance.

TR030002-000443-ES Section 8 Marine ecology.pdf:46: associated with the loss would be of minor adverse significance. This assessment is precautionary

TR030002-000443-ES Section 8 Marine ecology.pdf:57:8.5.53 With the implementation of the above mitigation measures, a residual impact of minor adverse

TR030002-000443-ES Section 8 Marine ecology.pdf:61:Direct removal of Medium Minor adverse However, habitat enhancement measures are included

TR030002-000443-ES Section 8 Marine ecology.pdf:61:construction and High Minor adverse biodiversity gain. In addition, YPL have progressed di

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:30:“relatively minor and/or brief, score 0-3; with higher potential to affect feeding, reproduction, or

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:48: E473R0203 03 31/10/2014 Minor amendments

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:1: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:1: C MINOR REVISIONS LW DGB MH

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:14: significance upon hydrology and human health receptors to those of minor adverse significance on

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:14: and hydrogeology are of minor adverse significance, with an impact of negligible significance predicted

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:16: irreversible loss of habitat, a minor adverse impact was predicted.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:16: such, a minor adverse impact predicted. Notwithstanding this, habitat enhancement measures (in Bran

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:16: result in a residual impact of minor adverse significance.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:18: (without mitigation) or of minor beneficial significance.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:19: populations within the estuary. An impact of minor adverse significance is predicted.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:19: construction and operational phases are predicted to be of minor adverse and negligible significance

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:23: resulting in a negligible to minor beneficial impact.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:25: predicted that a combined indirect impact of minor adverse significance would occur during the

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:28:3.2.2 When assessed with other non-YPP plans and projects, minor beneficial effects are predicted with

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:28: minor/moderate beneficial for the wider regional economy.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:28: forecast to be of minor adverse significance at worst.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:30: to protected species, were assessed as being of negligible and minor adverse significance respectively.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:30: Eastern Moors (1B) character area. Construction phase traffic is predicted to result in a minor adverse

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:30: NYMNP and North Yorkshire and Cleveland Heritage Coast was predicted to be minor adverse.

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:30: intervisibility between the sites. Minor beneficial operational phase cumulative impacts are predicted to

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:32: they coincide with the dredging for the Harbour facilities) was predicted to be of minor adverse

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:32: residual cumulative impact of minor adverse significance.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:9: Very High Major Major Moderate Moderate Minor

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:9: High Major Moderate Moderate Minor Negligible

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:9: Medium Moderate Moderate Minor Minor Negligible

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:9: Low Minor Minor Minor Negligible Negligible

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:9: Very Low Minor Negligible Negligible Negligible Negligible

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:43: predicted to be of minor adverse significance.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:44: of the effect is considered to be high. The potential impact is, therefore, predicted to be of minor

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:46: magnitude for groundwater. Given the high sensitivity of the surface waters, an impact of minor

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:47: the impact to surface water is assessed as minor adverse and for groundwater (low / very low

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:50:Surface water High Low Minor Adverse Physical controls would be in place in the form of enclose

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:51:Surface water High Low Minor Adverse Construction work would be carried out in accordance with

TR030002-000825-Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H.pdf:1: Pipe Gantry F 01.09.15 MINOR REVISIONS (NWL SERVICES) LW CDJ DGB

TR030002-000825-Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H.pdf:1: UE GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000825-Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H.pdf:1: WE S - NW CA C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000729-Applicant response to First Questions - Appendix 1.pdf:2: Minority Interest

TR030002-000729-Applicant response to First Questions - Appendix 1.pdf:2: = minority interest in a Canadian company (potentially divesting)

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:18: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:18: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:19: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:19: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:20: D MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:20: C MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:21: E eL D MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:21: RW C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:22: S D MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:22: S- S C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:23: TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:23: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:24: GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:24: RW C C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:25: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:25: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:26: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:26: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:27: D MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:27: t C MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:28: E TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:28:GA S- GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:29: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:29: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:30: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:30: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:31: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:31: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:32: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:32: C MINOR REVISIONS LW DGB MH

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:35: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:36: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:43: For the open, suspended deck structure, with a minor change to the configuration of the

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:54:dredging, the effect of the disposal of fine material at the disposal sites is of minor

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:61: An impact of minor significance was anticipated with regard to the disposal of fine

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:8:  Minor local impacts on The Mill Race river and potentially

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:52: construction and operational phases are forecast to be of minor adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Fear and Intimidation Proposed mitigation for the effects of fear Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Driver Delay Proposed mitigation for the effects of driver Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Severance No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Pedestrian Amenity No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Fear and Intimidation No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Driver Delay No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:76: Severance No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:77: Pedestrian Amenity Proposed mitigation for pedestrian amenity Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:77: Fear and Intimidation No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:77: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:77: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:77: Driver Delay No mitigation further to that embedded within Minor Adverse

TR030002-000826-York Potash Ltd (2).pdf:5: PD Teesport Limited have advised the Applicant of two minor

TR030002-000826-York Potash Ltd (2).pdf:5: 2008PA, as amended, will not be applicable please applicable in relation to the minor works to be carried out to

TR030002-000826-York Potash Ltd (2).pdf:9:apart from two minor amendments (agreed with the Tees Port

TR030002-000826-York Potash Ltd (2).pdf:27: Access plan (Document 3.14). These works are very minor in

TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: 6.13.21 Paragraph 17 relates to minor repairs stating that the pipe owner will carry these out at

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:102:Environmental Impact Assessment and Environmental Statement is robust bar a few minor errors

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:8: expresses a predicted minor to major adverse impact. However, it should

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:9: predicted to be minor beneficial in nature.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:9: Some minor adverse effects arising during construction have been

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:9: 29 There would be no minor adverse effects related to tourism that would

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:37: A minor informal access exists directly into the commercial forestry area

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:40: production capacity from the outset, therefore only minor additional

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:71: proposals, the scheme would provide a minor landscape benefit. As

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:72: b) Noise impacts are predicted to be minor to negligible; dust emissions

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:74: with the EIA confirming a minor adverse impact during

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:75: minor adverse for the duration of the construction phase.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:76: majority of the operational phase of the Project. As such a minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:76: within the NYMNP. The impact on SQ2 is assessed as minor to major

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:76: assessed as minor beneficial with respect to this special quality.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:77: context of SQ3 is assessed as being minor adverse.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:77: operational phase is predicted to be minor beneficial overall.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:77: involved would render the impact minor adverse.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:78: ecological value. As such, a minor adverse impact upon the special

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:78: the Mine and intermediate shaft sites would have a minor adverse impact

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:79: assessed as minor adverse due to the loss of locally important

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:79: occur, however, access would be maintained. Overall, a minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:80: areas with a limited sense of remoteness and, as such, a minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:81: operational phase is predicted to be minor adverse.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: Walk. As a result, a minor beneficial impact on SQ 14 is anticipated in

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: therefore, range from minor beneficial, and no impact (13 in number,

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: conditions) through to moderate adverse (2) and minor to major adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: (1). Other impacts are negligible or minor adverse in nature. Of the

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: expresses a predicted minor to major adverse impact. However, it should

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: predicted to be minor beneficial in nature.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:82: special quality, predicted to switch to a minor beneficial impact).

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:85: a minor landscape benefit. As the restoration scheme matures, and post-

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:85: make a minor but positive contribution to landscape character.”

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:85: and post-decommissioning, the site would continue to make a minor but

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:85: the National Park and would provide a minor landscape benefit. As the

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:85: continue to make a minor but positive contribution to landscape character.”

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:88: High Strategy would Minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:88:Impacts on birds High breeding Minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:89: Permanent High Strategy would Low Minor beneficial

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:89: Permanent High Low Minor beneficial

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:91:6.69 Some minor adverse effects arising during construction have been

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:91:6.71 There would be no minor adverse effects related to tourism that would

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Socio-Economics Minor beneficial due Major beneficial at Negligible/minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: to local employment local level and minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Geology & Minor/moderate Minor adverse Negligible

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Risk minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Land Uses and Soils Minor adverse on soil Minor adverse due to Mainly negligible;

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: degradation and loss land being taken out minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Socio-Economics Minor beneficial due Major beneficial at Negligible/minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: to local employment local level and minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: a minor adverse minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: Land Uses and Soils Moderate adverse Minor adverse Mainly negligible or

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: due to land being effects due to due to minor adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:96: use; minor adverse of existing use;

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:97: Socio-Economics Short term, negligible Minor to major Adverse effects due

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:97: to minor beneficial beneficial impact on to loss of direct and

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:97: Cultural Heritage Minor local impact on No impact on any No impact on any

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:97: Geology and Minor adverse Negligible or no Negligible or no

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:105: Severance Proposed mitigation for the effects of Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:105: Pedestrian Amenity Proposed mitigation for pedestrian amenity Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:105: Fear and Intimidation Proposed mitigation for the effects of fear Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Driver Delay Proposed mitigation for the effects of driver Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Severance No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Pedestrian Amenity No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Fear and Intimidation No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Driver Delay No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Severance No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Pedestrian Amenity Proposed mitigation for pedestrian amenity Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Fear and Intimidation No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:106: Pedestrian Delay No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:107: Highway Safety No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:107: Driver Delay No mitigation further to that embedded within Minor Adverse

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:107: during the construction and operational phases are forecast to be of minor

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:113: whole, would be minor adverse at worst, and it is the case that this impact

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:160: with only minor damage often have to be wholly replaced;

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:45: the Project-wide consultation, there was a small minority who objected

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:52: provided comments on 10 June 2014. Minor changes were made to the

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:22: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:22: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:23: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:23: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:24: D MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:24: C MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:25: E eL D MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:25: RW C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:26: S D MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:26: S- S C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:27: TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:27: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:28: GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:28: RW C C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:29: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:29: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:30: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:30: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:31: D MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:31: t C MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:32: E TS D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:32:GA S- GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:33: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:33: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:34: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:34: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:35: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:35: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000704-Applicant response to First Questions - Appendix 6.pdf:25: other minor developments’ (less than 1,000m2 floor space). Under these headings a standard list of

TR030002-000704-Applicant response to First Questions - Appendix 6.pdf:25: minor developments’ covers applications listed as ‘minerals processing’, ‘listed building consent’ and

TR030002-000704-Applicant response to First Questions - Appendix 6.pdf:42: Regulator - Permit Low Permits in place, minor variations may be required

TR030002-000483-Section 12 App 12.3 Construction Traffic Management Plan.pdf:129:A condition factor of 0.8 was used to allow for the combined effect of all minor defects present. The condition

TR030002-000483-Section 12 App 12.3 Construction Traffic Management Plan.pdf:149: 1 Primary deck element (Table 2) Minor surface weathering. Algal, efflorescence and water

TR030002-000483-Section 12 App 12.3 Construction Traffic Management Plan.pdf:194:on minor roads. These loads will definitely require self escort.

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:48:potassium, sulphur, magnesium and calcium, and other minor nutrients. All essential

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:79:Some minor crops, also have a low chloride tolerance including: peas, field beans,

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:79:sensitive to salt (Table 17). Other minor crops with a low salt tolerance include

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:81:minor crops that may also have a high demand for the nutrients in Polyhalite. One

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:83: soybeans, rice, potatoes and onions, and minor crops including brassica

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:122: Even allowing for growth in volume, these alternative materials will contribute a minor

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:122: present. Together, these alternative sources make a minor contribution to applied potash

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:153: Even allowing for growth in volume, these alternative materials are likely to contribute a minor

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:241:multiple passes over his fields to apply fertilizers. However, a minority of farmers rent

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:7: Minor injury or

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:7: 2 Marginal Minor damage Minor effect Minor impact 2 4 5 6 8

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16:p Continuous Plant Discharges to Soil (Minor) Spills Damage to environment Environmental impact assessment Emission control equipment

TR030002-000773-York Potash Ltd (4).pdf:9: (Document 4.1B). Further minor amendments are awaited from the MMO as

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:27: assessment matrix presented in Section 4, an impact of minor adverse significance is anticipated.

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:32:Reduced water quality due to Low Medium Minor adverse Use of a silt box through which the placed materi

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:18:points and that if more minor points are to be made to support the case that the minehead for the

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:54: K2Ca2Mg(SO4)4.2H2O and it is a typically minor constituent of many ancient evaporite

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:55: Charter Consolidated Ltd (though later ICI’s shares were bought by Minorco/Anglo-

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:94: The drillholes in the east indicate the Basin polyhalite is inter-layered with halite (and minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:95: Polyhalite (wi h Halite+minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:101: Polyhalite interbedded Halite+minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:101: Polyhalite with minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:101: minor Halite

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:101: Basin H1 1978 2003 24 Polyhalite+minor Halite Halite? (uncertain) Unknown

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:173: by polyhalite – a complex potassium-magnesium-calcium sulphate – with minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:175: has been suspected, as a minor component only, at certain horizons within the Boulby

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:176: very minor, if any.

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:181: anhydrite, with minor halite. At Fordon the polyhalite content overall was

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:182: gangue or associated minerals with this polyhalite are chiefly halite, with minor

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:184: minor red and grey mudstone and some anhydrite; and is sometimes called the Boulby

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:187: Although the potash is cut by abundant minor movement planes and veins of

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:188: displacements of minor faults (normally only up to the overall thickness of the

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:193: with ICI’s shares bought by Minorco/Anglo-American Corporation).

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:6:parts of the development include only minor dredging (an increase in depth from a currently

TR030002-000781-151103 TR030002 P D Teesport Limited - Response to second round of questions.pdf:2: subject to two minor corrections which the Promoters have stated will be made in the

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:6: c) Tata Steel UK Limited – some minor amendments to Schedule 9

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:10:features including minor topographical changes, buildings, hedgerows and other lower

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:13:bisected by three small incised valleys, associated with minor watercourses. Land use

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:14:incised valleys, associated with minor watercourses and tree cover, cut into the lower

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:25: Tranquil site, no significant detractors, Burniston conservation area. Potential minor adverse

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:25: by mature tree cover, occasional views of Potential minor adverse effects in very tourist destination and S

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:27: with tributary streams. minor watercourses. Site levels vary tree cover.

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:27: degree of enclosure. minor east-west valleys. accommodate spoil and construction adapted and the degree

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:29: AOD. associated with a minor watercourses. (SBC character area H1) and on a (SBC character area H1

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:29: degree of enclosure. south eastern edge of the site. open valley side and minor tributaries characteristic field patte

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:29: Localised audible and visual impact and open visibility to construction side and minor tributarie

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:30: minor becks which flow to the coast or the east, gradients fall gently east and influencing views from the north, west views from Heritage Co

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:30: woodland. associated with minor watercourses east and north east, including open Potential for increased a

TR030002-000579-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4.pdf:30: minor lanes link settlements. including shelterbelts running parallel to boundaries and mature trees, potential surrounding PROW, inc

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:3: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:3: C MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:4: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:4: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:5: D MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:5: th C MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:6: E eL D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:6: RW C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:7: FS S- D MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:7: GA TA S- TS C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:8: D MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:8: S GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:9: GA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:9: RW CA C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:10: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:10: C MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:11: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:11: C 12.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:12: D MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:12: th C MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:13: CA D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:13: S- GA C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:14: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:14: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:15: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:15: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:16: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:16: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:17: D 16.03.15 MINOR REVISIONS CH DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:17: C MINOR REVISIONS LW DGB MH

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:31: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:32: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000437-ES Section 3 Project description_1 of 2.pdf:39: volume of capital dredged material required for these proposals is relatively minor in the context of the

TR030002-000810-Document 3.4E - Contractor's Temporary Compound Layout Site D- Rev F.pdf:1: F 04-11-15 MINOR REVISIONS GIC RWP RWP

TR030002-000810-Document 3.4E - Contractor's Temporary Compound Layout Site D- Rev F.pdf:1: C 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000648-Doc 3.4F - Temporary Compound Site E.pdf:1: C 12-03-15 MINOR REVISIONS LW DGB MH

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:1:Significance of change is reported as being negligible, minor, minor moderate, moderate,

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:1:Minor moderate beneficial/ Minor moderate adverse/

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:1:minor beneficial minor adverse

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:2:N4 Distant forward view to LCP Minor adverse 1887.7 1:53

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:2:N6 Distant slightly oblique view to Minor adverse 911.3 0:54

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:2:N8 Oblique and perpendicular open Minor moderate adverse 3710.7 3.42

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:2:N9 Partially filtered perpendicular Minor adverse 256.3 0:15

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E2 Forward views to LB winding tower Range from minor to major adverse 1924.6 1:55

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E9 Forward views to LCP winding Minor moderate adverse 974.2 0:58

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E10 Forward filtered views of LCP Minor moderate adverse 161.6 0:09

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E11 Forward views to LCP winding Minor moderate adverse 582.6 0:34

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E16 Distant oblique filtered views of Minor adverse 491.1 0:29

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E18 Distant oblique view to minehead Minor adverse 52.7 0:03

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E20 Distant oblique view to minehead Minor adverse 354.7 0:21

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E22 Distant oblique view to minehead Minor adverse 571.0 0:34

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3:E24 Distant views to minehead winding Minor adverse 337.2 0:20

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:4:E25 Intermittent distant views to Minor adverse 1163.6 1:09

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:4:E27 Intermittent or filtered distant views Minor moderate adverse 1889.0 1:53

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W1 Distant forward views to minehead Minor adverse 118.5 0:07

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W3 Distant forward views to minehead Minor adverse 534.6 0:32

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W5 Distant forward views to minehead Minor adverse 139.1 0:08

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W7 Distant oblique views to minehead Minor adverse 99.6 0:05

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W13 Intermittent or filtered Minor moderate adverse 1466.7 1:28

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W15 Intermittent perpendicular distant Minor adverse 1163.6 1:09

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W16 Perpendicular distant views to Minor adverse 337.3 0:20

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W18 Perpendicular distant oblique Minor adverse 573.1 0:34

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5:W20 Perpendicular distant view to Minor adverse 355.1 0:21

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:6:W38 Distant views to LB winding tower Minor adverse 889.8 0:53

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:6:W40 Forward views to LB winding tower Range from minor to major adverse 1343.9 1:20

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:6:W42 Oblique filtered views to TL Minor adverse 194.4 0:11

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8: towers and very distant views to Minor adverse

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8: towers Minor adverse

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8: towers Minor adverse

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:10 Very distant views to minehead Minor adverse 557.8 6:41

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:11 Distant views to LB winding tower Minor adverse 1351.8 16:13

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:12 Distant views to LB winding tower Minor adverse 118.9 1:25

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:13 Distant views to LB winding tower Minor adverse 208.5 2:30

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:15 Distant views to LB winding tower Minor adverse 325.2 3:54

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:17 Distant views to TL winding tower Minor adverse 142.0 1:42

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8:18 Distant views to LB and TL Minor adverse 600.5 7:12

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:9:27 Distant views to TL winding tower Minor moderate adverse 223.6 2:40

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:5 Filtered views to minehead ground Minor moderate adverse 206.8 0:37

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:8 Filtered views to minehead ground Minor moderate adverse 137.5 0:24

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:10 Filtered views to minehead ground Minor moderate adverse 506.4 1:31

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:12 Very limited view of minehead Minor adverse 24.7 0:04

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:no The separate northern section of Minor adverse Distance not Time not

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10:no plan The Wilton MHF and MTS Portal Minor moderate adverse Distance not Time not included

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:11: backdrop, resulting in minor

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12: (minor areas shown as being

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:4 Very distant views to minehead Minor adverse 1251.8 3:45

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:6 Distant oblique views to LCP Minor adverse 1031.4 3:05

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:8 Oblique intermittent and filtered Minor adverse 286.0 0:51

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:10 Oblique intermittent and filtered Minor adverse 209.3 0:37

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:11 Oblique views to LCP winding Minor moderate adverse 460.6 1:22

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:12 Oblique views to LCP winding Minor moderate adverse 539.9 1:37

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:17 Oblique and perpendicular limited Minor adverse 409.3 1:13

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12:19 Oblique limited views to tops of Minor adverse 282.1 0:50

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:21 Very distant forward views to Minor adverse 276.5 0:49

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:23 Distant oblique views to minehead Minor adverse 454.1 1:21

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:24 Distant oblique intermittent views Minor adverse 220.3 0:39

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:26 Distant oblique filtered views to Minor adverse 172.6 0:31

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:28 Distant oblique views to minehead Minor adverse 52.9 0:09

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:30 Distant oblique filtered views to Minor adverse 156.5 0:28

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:32 Distant oblique views to minehead Minor adverse 291.3 0:52

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13:34 Distant oblique intermittent/ filtered Minor adverse 492.5 1:28

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:1 Distant view to LCP winding tower Minor adverse 363.9 4:22

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:3 Distant view to LCP winding tower Minor adverse 324.7 3:53

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:6 Distant views to LCP tower and Minor adverse 1205.2 14:27

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:8 Distant views to LCP tower and Minor adverse 700.2 8:24

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:9 Distant view to LCP winding tower Minor adverse 780.2 9:21

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:11 Distant view to LCP winding tower Minor adverse 129.1 1:32

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:13 Distant view to LCP winding tower Minor adverse 869.0 10:25

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:15 Distant view to LCP winding tower Minor adverse 826.2 9:54

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:17 Distant view to LCP winding tower Minor adverse 49.2 0:35

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:19 Distant view to LCP winding tower Minor adverse 81.0 0:58

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:21 Distant view to LCP winding tower Minor moderate adverse 70.1 0:50

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:23 Distant view to LCP winding tower Minor moderate adverse 2651.9 31:49

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14:24 Forward open views to minehead Minor moderate adverse 519.3 6:13

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:15:27 Filtered views of minehead Minor adverse and minor moderate 562.4 6:44

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:15:32 Filtered views of minehead ground Negligible adverse and minor 528.5 6:20

TR030002-000510-Doc 6.6 App 5.1 TN2 Workforce.pdf:18: mining specific experience and a minority would not require any prior work experience (although

TR030002-000351-Section 55 Checklist.pdf:9: acceptable with minor amendments.

TR030002-000657-Doc 3.8C - Indicative Section Solid Quay Construction.pdf:1: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000447-ES Section 12 Traffic and transport.pdf:12: a physical barrier created by the road itself. It can also relate to quite minor traffic flows if they impede

TR030002-000447-ES Section 12 Traffic and transport.pdf:14: addition, whilst minor impacts are not strictly considered to be significant in their own right, it is

TR030002-000447-ES Section 12 Traffic and transport.pdf:14: High Major Major Moderate Minor

TR030002-000447-ES Section 12 Traffic and transport.pdf:14: Medium Major Moderate Minor Negligible

TR030002-000447-ES Section 12 Traffic and transport.pdf:14: Low Moderate Minor Negligible Negligible

TR030002-000447-ES Section 12 Traffic and transport.pdf:30: from these effects is assessed as minor adverse significance.

TR030002-000447-ES Section 12 Traffic and transport.pdf:35: forecast as a worst case of minor adverse and negligible significance respectively.

TR030002-000701-Environment Agency.pdf:13: impact of minor adverse significance has been predicted with regard to construction workers,

TR030002-000701-Environment Agency.pdf:13:4.5. A potential impact of minor adverse significance on surface waters was predicted associated

TR030002-000701-Environment Agency.pdf:15:5.5. Potential impacts are predicted to be of minor adverse significance.

TR030002-000701-Environment Agency.pdf:17: potential impact of minor adverse significance was predicted.

TR030002-000701-Environment Agency.pdf:21: a high abundance of some species (particularly Capitella capitalla). An impact of minor adverse

TR030002-000701-Environment Agency.pdf:21: unavoidable consequences of the proposed scheme. The residual impacts is therefore of minor

TR030002-000701-Environment Agency.pdf:21: measures, a residual impact of minor adverse significance is anticipated.

TR030002-000701-Environment Agency.pdf:23: exception of flood hazard to construction workers which is predicted to be of minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:26:Extensions or alterations to an existing development considered to be minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:27:Minor Infrastructure applications, e.g. single wind turbine, single access road

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:35: COMMUNITY MINOR INTERNAL REPAIRS AND ALTERATIONS (RETROSPECTIVE)

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:60: in a temporary minor/moderate beneficial impact at the TTWA level.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:61: accommodation of the YPP components within the NYMNP would be temporary, short term, minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:62: the occupancy rate of tourist accommodation, increased demand would have a temporary and minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:67: moderate beneficial impact in the TTWA and a minor beneficial impact at a LEP level.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:73: Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:73: Minor/Moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: Users of Access Land to the west of site: Sleights Moor Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: NW corner of site to Belt Plantations, Belt Plantations to Users of Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: Minor/Moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: Minor/Moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:74: Minor/Moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:75: Special Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:75: Special Minor/Moderate to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:76: Special Minor Adverse to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:76: Special Minor Adverse to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:80: impacts to minor or negligible effects.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:80: pedestrian and driver delay and safety are assessed to be negligible or minor on all links.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:81: minor with the exception of:

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:81: of 30mph to mitigate against the increased HGV traffic, reducing the effect to intermittent and minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:81:5.3.52 At Year 1 of operation, all of the landscape and visual impacts from PRoW would be reduced to minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:83: impacts would be reduced to minor or negligible significance after 1 year of operation; and negligible to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:84:5.3.72 The residual effect on tourism is therefore assessed to be no worse than minor adverse during the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:86: proposed Harbour development and forecasts worst case impacts of minor adverse and negligible

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:93: a physical barrier created by the road itself. It can also relate to quite minor traffic flows if they impede

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:96: significant. In addition, whilst minor impacts are not strictly considered to be significant in their own

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:96: High Major Major Moderate Minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:96: Medium Major Moderate Minor Negligible

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:103: sample of points on the minor road network are counted each year. Data from these counts are used to produce

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:103: estimates of traffic growth on minor roads.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:113:A contingency has been applied to all daily HGV traffic (full Ensures minor omissions or design changes can be

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:132: of effect is assessed as very low; resulting in predicted impacts of minor adverse to negligible

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:134: GEART thresholds between 7am to 8am. The remaining links would all experience impacts of minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:134: effect is assessed as low on a medium value receptor; resulting in the prediction of a minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:135: impacts of minor adverse to negligible significance.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:135: 9 802 607 831 878 Low Minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:135: 12 766 749 840 976 Low Minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:136: impact is predicted to be of minor adverse significance.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:138: that the magnitude of the effect would be very low and result in an impact of no greater than minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:138: The impact is therefore assessed as very low on a high value receptor, resulting in a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:138: The impact is therefore assessed as very low on a high value receptor, resulting in a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:139: The impact is therefore assessed as very low on a high value receptor, resulting in a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:139: road safety is assessed a very low on high value receptors; resulting in the prediction of a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:148:6.5.62 Table 6-30 identifies that, for fear and intimidation, links 3 and 44 would experience impacts of minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:148: 44 714 456 750 641 Low Minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:154: forecast to be of minor adverse significance at worst.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:154: Severance Minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:154: Pedestrian amenity Minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:154: Fear and intimidation Minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:154: Pedestrian delay Minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:155:Highway safety Minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:164: Potential negligible to minor  Lockwood Beck Intermediate Shaft Site Tees Mercia Mudstone & Redcar

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:167: Chemical Negligible to minor at: At the catchment-scale, the Tees Mercia None

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:167: extractive material  Tocketts Lythe Intermediate tolerant of the negligible or minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:176: Cleveland Heritage Coast). The MTS Portal forms a relatively minor element of the MHF site at Wilton

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:190: this effect would be negligible. Cumulatively with the YPP, the workforce could have minor beneficial

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:190: RCBC, SBC and NYMNPA and of minor to moderate beneficial significance for the wider regional

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:190:16.2.19 Whilst the EIA supporting this application acknowledges some minor and short term (during

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:191: expected. Minor adverse effects could occur to onshore tourist destinations, recreation activities and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:191: Special Qualities of the NYMNP, and these would be minor. Minor adverse effects would occur on-

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:191:16.2.24 In combination with the minor adverse effects on tourism generated by the YPP, the cumulative effect

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:191: on tourism would be no greater than minor adverse.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:210: minor significance.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:210: Hence even a very high magnitude (physical or chemical) effect on this receptor would result in a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:211: bedrock mudstone aquifer and, when combined with the negligible and minor impacts due to the YPP

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:211: for projects to adhere to environmental best practice, when combined with the negligible and minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:211: an impact of minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:226: cumulative impact could be of minor adverse significance.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:230:22.3.11 The Wilton Operational Park & Ride ride facility would form a minor extension of the existing Whitby

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:234: predicted to be minor adverse.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:235: minor adverse impacts could occur at worst case distances up to 16km from limited elevated vantage

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:235: winding towers from other areas of moorland would result in a negligible and minor adverse impact

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:235: predicted to be minor adverse, with the impact mainly occurring across areas of open moorland within

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:236: have a wider minor beneficial cumulative impact across the NYMNP. The location and concentration

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:236: to provide a minor cumulative benefit to its physical fabric and landscape character.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:237: temporary winding towers. A minor adverse impact, based on individual impacts associated with

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:237: these wider areas would range between negligible and minor adverse; with the winding towers

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:237: backdrop, resulting in a minor adverse impact (viewpoint 1 (Part 3 Appendix 22.2)). The Tocketts

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:237: range and in association with ground level activity, resulting in a minor to moderate adverse impact.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:237: Plantation and Lockwood Beck winding towers would be visible as distant features resulting in a minor

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:238: tower would be possible from the A169 at Goathland Moor, resulting in negligible to minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:238: impacts. Minor to moderate adverse impacts would occur within oblique views of the Mine winding

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:239:22.3.50 After passing the Lockwood Beck site, a range of no change, negligible adverse and minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:239: the horizon would result in intermittent minor adverse impacts between Selly Hill and Broad Ings Farm.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:239: Stainsacre and Hawsker, with minor/moderate adverse impacts.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:239: rise to a minor adverse impact, but this effect would be experienced in the context of a busy urban

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:239: Moor with distant forward views of the Mine towers resulting in a minor adverse impact.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240:22.3.61 A minor/moderate adverse impact would occur in perpendicular, filtered and intermittent views to the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: Mine site along the section of road between Hawsker and Stainsacre. Minor adverse impacts would

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240:22.3.63 Between Lady Cross and Freebrough Farm, intermittent negligible adverse and minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: minor to major adverse as the Lockwood Beck is directly passed, with close range views of both

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: tower and spoil placement area would be possible resulting in a minor adverse impact. At the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: sites. A minor adverse impact would occur in views from parts of the route near Whitby Abbey and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: and west, minor adverse impacts would also occur within views at Rockhole Hill and near

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:240: Warsett Hill further minor adverse impacts would occur where the Lockwood Beck and Tocketts Lythe

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:241: A minor/moderate adverse impact would occur in views from the section of route passing Highcliff

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:241: with limited filtered views to Mine winding tower and ground level activity resulting in minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:241: and minor/moderate adverse impacts. The distant Lady Cross Plantation winding tower would be

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:241: near Loftus and Brotton, resulting in minor adverse impacts.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:241: would be seen against the existing Teesside industrial backdrop, resulting in a minor/moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242: winding towers would result in negligible and minor adverse impacts.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242: would be possible above intervening woodland cover, resulting in minor adverse and minor/moderate

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242: and open oblique distant views to the Mine winding towers resulting in minor adverse impacts.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242: minor adverse impacts.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242:22.3.83 Minor/moderate adverse impacts would occur in views where the route rises up the southern Esk

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:242: minor/moderate adverse and moderate adverse impacts for approximately 17 minutes.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:244: construction traffic and other committed development would result in a minor adverse impact only.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:244: phase traffic is predicted to result in a minor adverse impact along other road corridors, including the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:244: predicted to be minor adverse.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:245: between the operational sites and the lack of intervisibility between the sites. Minor beneficial

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:249: Trail and any other effects on local PRoW would be minor. The proposed Northumbrian Water

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:265:25.4.29 The ES for the NGCT concluded that the effect of construction on tidal propagation would be minor,

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:265:25.4.30 A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:270: overlap, there would be an additive (combined) effect that is considered to be of minor adverse

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:270:26.4.11 It is concluded that the residual impact would be of minor adverse significance.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:276:27.4.22 With the implementation of the above mitigation measures, a residual impact of minor adverse

TR030002-000652-Doc 3.6A - Permanent Building Elevations Site C.pdf:1: C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000661-Doc 3.9C - Indicative Section Open Quay Construction.pdf:1: 1 1/12/14 MINOR AMENDMENTS TF RWP RWP

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:45: Halite+minor

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:46: minor anhydrite) and therefore while there is a total reported thickness of

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:50: Basin FO1 1905 2018 112 Polyhalite interbedded Halite Halite+minor

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:50: Basin FO1 2018 2074 56 Polyhalite with minor Unknown Unknown

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:50: minor Halite

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:50: Basin H1 1978 2003 24 Polyhalite+minor Halite Halite? Unknown

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:79: the polyhalite appears to be inter-layered with halite (and minor anhydrite),

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:89: arable farmland on the north flank of the River Esk valley. Two minor water

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:89: hectares of open, elevated fields, with minor watercourses and tree cover

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:117: AOD) to east (190m AOD). It is considered that this comparatively minor

TR030002-000786-Document 3.3L - Conveyor Route Plans Northern Route Sheet 4 - Rev F.pdf:1: NW D MINOR REVISIONS CH DGB MH

TR030002-000786-Document 3.3L - Conveyor Route Plans Northern Route Sheet 4 - Rev F.pdf:1: WL C 11.03.15 MINOR REVISIONS LW DGB MH

TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf:14:the proposed port terminal would be lost and there would be a (very minor) direct impact in Dabholm Gut or

TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf:14:Bran Sands lagoon due to the impact would be of minor case, however, the above

TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:15: minor amendments have been made to sub-paragraphs (3) and (4) as requested

TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:22: ii Minor wording amendments in response to the Examining Authority’s Second

TR030002-000822-Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H.pdf:1: S- L F 01.09.15 MINOR REVISIONS (NWL SERVICES) LW CDJ DGB

TR030002-000822-Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H.pdf:1: MINOR REVISIONS CH DGB MH

TR030002-000822-Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H.pdf:1: C MINOR REVISIONS LW DGB MH

TR030002-000851-151216 TR030002 INEOS - Response to the ExA's dDCO and Schedule 9 Protective Provisions.pdf:4: relation to the Protective Provisions. Given the seriousness of even a minor

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:54: 17.If the damage is of a minor nature, and can be easily repaired by the owner of the relevant

TR030002-001873-Decision holding letter (5).pdf:9:44. Minor drafting amendments have been made by the Secretary of State to

TR030002-000417-Doc 1.5 s55 Checklist.pdf:10: “Minor changes were made to the SoCC at the Council’s request

NGCT_Final_ES at KK with figs.pdf:49:Minor adverse The impact is undesirable but of limited concern

NGCT_Final_ES at KK with figs.pdf:49:Minor beneficial The impact is of minor significance but has some

NGCT_Final_ES at KK with figs.pdf:130: become operational there will be a benefit of minor significance associated with the

NGCT_Final_ES at KK with figs.pdf:131: overall residual impact of minor beneficial significance.

NGCT_Final_ES at KK with figs.pdf:131: impact of minor adverse significance on contaminant levels in the water column but

NGCT_Final_ES at KK with figs.pdf:132: during the operational phase and hence the overall impact will be of minor adverse

NGCT_Final_ES at KK with figs.pdf:132: proposed terminal. This is predicted to be of minor to moderate adverse significance;

NGCT_Final_ES at KK with figs.pdf:132: minor adverse significance. Impacts of negligible significance are predicted to occur

NGCT_Final_ES at KK with figs.pdf:133: and, therefore, reduce the potential impact to being of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:138: an impact of minor adverse significance associated with the re-suspension of

NGCT_Final_ES at KK with figs.pdf:138: contaminated sediment during construction there would be a benefit of minor

NGCT_Final_ES at KK with figs.pdf:138: be of only minor adverse significance. The same was found to be true for the

NGCT_Final_ES at KK with figs.pdf:141: tidal ranges is predicted to be negligible. However a minor adverse impact is

NGCT_Final_ES at KK with figs.pdf:161: considered to be of minor to moderate adverse significance, with the most notable

NGCT_Final_ES at KK with figs.pdf:171: further proposed modification document puts forward a minor amendment to policy

NGCT_Final_ES at KK with figs.pdf:172: have also been minor changes to the wording of the policy where it now reads

NGCT_Final_ES at KK with figs.pdf:185: development on air quality are considered to be of minor adverse significance at

NGCT_Final_ES at KK with figs.pdf:228: the proposed capital dredge introduces only minor changes to the existing

NGCT_Final_ES at KK with figs.pdf:228: direction and minor changes to the slopes of the entrance channel are predicted

NGCT_Final_ES at KK with figs.pdf:233: small and localised effect of the minor changes to the design of the approach

NGCT_Final_ES at KK with figs.pdf:233: proposed capital dredging are not affected by the proposed minor changes to

NGCT_Final_ES at KK with figs.pdf:257: the receptor sites, particularly Seal Sands where minor deposition is predicted to

NGCT_Final_ES at KK with figs.pdf:257: 4. Due to the relatively minor differences in contaminant levels for most parameters

NGCT_Final_ES at KK with figs.pdf:258: 2. It is predicted, therefore, that there will be an overall impact of minor beneficial

NGCT_Final_ES at KK with figs.pdf:258: 3. No mitigation measures are required and the residual impact is of minor

NGCT_Final_ES at KK with figs.pdf:259: 3. The site is underlain by a minor aquifer, which is indicated by the Environment

NGCT_Final_ES at KK with figs.pdf:267: respective DWS is a key indicator that these exceedances are minor in nature.

NGCT_Final_ES at KK with figs.pdf:267: are minor in nature. This corresponds with hydrocarbon odour noted in the trial

NGCT_Final_ES at KK with figs.pdf:271: evaluation of the results, minor exceedances of both the DWS and EQS for

NGCT_Final_ES at KK with figs.pdf:272: Negligible risk ƒ If contamination sources are present they are considered to be minor in

NGCT_Final_ES at KK with figs.pdf:276: − Shallow Groundwater - The site is underlain by a minor aquifer, which is

NGCT_Final_ES at KK with figs.pdf:278: considered to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:279: 5: Tyne & Tees) to constitute a minor aquifer of variable permeability. However,

NGCT_Final_ES at KK with figs.pdf:281: development is considered to present a minor adverse significance with

NGCT_Final_ES at KK with figs.pdf:281: minor beneficial significance.

NGCT_Final_ES at KK with figs.pdf:296: solids in the water column is considered to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:296: impact would be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:299: impact of minor adverse significance. These temporary increases will

NGCT_Final_ES at KK with figs.pdf:299: therefore be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:299: dredging is predicted to result in an impact of minor adverse significance on

NGCT_Final_ES at KK with figs.pdf:299: oxygen concentrations. The residual impact would therefore be of minor

NGCT_Final_ES at KK with figs.pdf:305: 5. Overall, it is concluded that the proposed development has a minor influence on

NGCT_Final_ES at KK with figs.pdf:323: benthic invertebrate resource is considered to be of minor adverse

NGCT_Final_ES at KK with figs.pdf:323: is not possible to mitigate and the residual impact would be of minor adverse

NGCT_Final_ES at KK with figs.pdf:326: those measured in the channel area, although differences are relatively minor.

NGCT_Final_ES at KK with figs.pdf:327: 6. Due to the relatively minor differences in the majority of the contaminant levels

NGCT_Final_ES at KK with figs.pdf:327: 8. Given the above, the impact is predicted to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:327: be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:327: presented in Section 6. The scheme is predicted to have very minor effects on

NGCT_Final_ES at KK with figs.pdf:327: navigation channel (generally decreases of up to 0.1m/s). Minor increases in

NGCT_Final_ES at KK with figs.pdf:329: proposed scheme would make a minor contribution to the supply of fine material

NGCT_Final_ES at KK with figs.pdf:331: 3. Overall, the impact during the operational phase would be of minor beneficial

NGCT_Final_ES at KK with figs.pdf:331: 4. No mitigation is required. There would be an impact of minor beneficial

NGCT_Final_ES at KK with figs.pdf:350: minor, with no change in elevation of either high or low water downstream of the

NGCT_Final_ES at KK with figs.pdf:350: minor increase in the level of low water of the order of 0.002m (2mm) at low

NGCT_Final_ES at KK with figs.pdf:352: relatively minor (less than 25 mg/l). Deposition of sediment is largely limited to

NGCT_Final_ES at KK with figs.pdf:352: the confines of the navigation channel, with some minor (less than 1mm) peak

NGCT_Final_ES at KK with figs.pdf:353: longer term impact would revert to minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:361: considered to be of minor to moderate adverse significance overall, with the

NGCT_Final_ES at KK with figs.pdf:362: is predicted that the residual impact would be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:370: sediment concentrations is predicted to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:373: impact is therefore predicted to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:373: be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:417: works (e.g. the Vopak foreshore) an impact of minor adverse significance is

NGCT_Final_ES at KK with figs.pdf:417: and of minor adverse significance (Vopak foreshore)

NGCT_Final_ES at KK with figs.pdf:439: considered to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:439: objective of 200µg.m-3, these impacts are considered to be of minor adverse

NGCT_Final_ES at KK with figs.pdf:444: minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:445: 40µg.m-3, these impacts are all considered to be of minor adverse

NGCT_Final_ES at KK with figs.pdf:445: impacts are considered to be of minor adverse significance.

NGCT_Final_ES at KK with figs.pdf:446: of minor adverse significance at worst.

NGCT_Final_ES at KK with figs.pdf:447:Road Traffic NO2 Long-term Adverse Minor

NGCT_Final_ES at KK with figs.pdf:447:Cargo Handling NO2 Long-term Adverse Minor

NGCT_Final_ES at KK with figs.pdf:456: capital dredging represent a minor change. Overall, a potential impact of minor

NGCT_Final_ES at KK with figs.pdf:457: 13. This potential impact is not possible to mitigate and a residual impact of minor

NGCT_Final_ES at KK with figs.pdf:472: minor beneficial significance for the Tees economy.

NGCT_Final_ES at KK with figs.pdf:472: 6. No mitigation is required and the residual impact would be of minor beneficial

NGCT_Final_ES at KK with figs.pdf:474: minor beneficial significance.

NGCT_Final_ES at KK with figs.pdf:474: 7. No mitigation is required. The residual impact would therefore be of minor

NGCT_Final_ES at KK with figs.pdf:487: minor significance. The capital dredging will result in far lower rates of

NGCT_Final_ES at KK with figs.pdf:494:Potential change in sediment Minor beneficial None required Minor beneficial

NGCT_Final_ES at KK with figs.pdf:495:Potential for risk to humans and Moderate adverse Various mitigation measures Minor adverse

NGCT_Final_ES at KK with figs.pdf:495:Potential for risk to humans and Minor adverse The covering of the area with Minor beneficial

NGCT_Final_ES at KK with figs.pdf:495:Increase in suspended solid Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:496:Resuspension of chemical Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:496:Impact on dissolved oxygen Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:497:Direct loss of subtidal benthic Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:497:Remobilisation of potentially Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:498:Recovery of marine Minor beneficial None required Minor beneficial

NGCT_Final_ES at KK with figs.pdf:499:Loss of waterbird interest within Moderate adverse It is proposed that some of the Negligible to minor adverse

NGCT_Final_ES at KK with figs.pdf:500:Direct loss of ecological interest Minor to moderate adverse A number of mitigation Minor adverse

NGCT_Final_ES at KK with figs.pdf:501:Potential impacts on shellfish Moderate adverse It is recommended that PD Minor adverse

NGCT_Final_ES at KK with figs.pdf:501:Potential impact on feeding Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:505:Impacts of piling on sites and Negligible to minor adverse depending on location of site None required. Negligible to minor adverse

NGCT_Final_ES at KK with figs.pdf:506:Emission of pollutants from Minor adverse None required Minor adverse

NGCT_Final_ES at KK with figs.pdf:507:Emission of pollutants due to Minor adverse None required Minor adverse

NGCT_Final_ES at KK with figs.pdf:508:Potential effect on frequency of Minor adverse None possible Minor adverse

NGCT_Final_ES at KK with figs.pdf:509:Generation of employment due Minor beneficial None required Minor beneficial

NGCT_Final_ES at KK with figs.pdf:509:Increased direct employment by Minor beneficial None required Minor beneficial

NGCT_Final_ES at KK with figs.pdf:523: significantly from an established Channel will make a minor contribution

NGCT_Final_ES at KK with figs.pdf:523: and food species (seed-bearing Channel will make a minor contribution

NGCT_Final_ES at KK with figs.pdf:526: hydraulic regime would be limited to minor effects in Seaton Channel.

IBPB8270R001F01_EIA REPORT(2).pdf:52: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

IBPB8270R001F01_EIA REPORT(2).pdf:52: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

IBPB8270R001F01_EIA REPORT(2).pdf:52: minor improvement to attribute quality (Beneficial).

IBPB8270R001F01_EIA REPORT(2).pdf:52: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

IBPB8270R001F01_EIA REPORT(2).pdf:52: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

IBPB8270R001F01_EIA REPORT(2).pdf:52: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

IBPB8270R001F01_EIA REPORT(2).pdf:52: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

IBPB8270R001F01_EIA REPORT(2).pdf:53: Very high Major Major Moderate Moderate Minor

IBPB8270R001F01_EIA REPORT(2).pdf:53: High Major Moderate Moderate Minor Negligible

IBPB8270R001F01_EIA REPORT(2).pdf:53: Medium Moderate Moderate Minor Minor Negligible

IBPB8270R001F01_EIA REPORT(2).pdf:53: Low Minor Minor Minor Negligible Negligible

IBPB8270R001F01_EIA REPORT(2).pdf:53: Very low Minor Negligible Negligible Negligible Negligible

IBPB8270R001F01_EIA REPORT(2).pdf:53:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

IBPB8270R001F01_EIA REPORT(2).pdf:53:recognised that minor and negligible impacts could become significant when considered cumulatively with

IBPB8270R001F01_EIA REPORT(2).pdf:72:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed NGCT and at

IBPB8270R001F01_EIA REPORT(2).pdf:74:of the material dredged in the outer channel is predicted to deposit on Seal Sands. This is a minor effect

IBPB8270R001F01_EIA REPORT(2).pdf:85:location within the proposed Tees GasPort dredge footprint. Minor exceedances of Action Level 1 were

IBPB8270R001F01_EIA REPORT(2).pdf:86:VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances of

IBPB8270R001F01_EIA REPORT(2).pdf:86:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

IBPB8270R001F01_EIA REPORT(2).pdf:92:the water column is considered to be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:96:the water column is predicted to be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:96:No mitigation measures are required. There would be a residual impact of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:96:It is predicted, therefore, that there will be an overall impact of minor beneficial significance.

IBPB8270R001F01_EIA REPORT(2).pdf:96:No mitigation measures are required. There would be a residual impact of minor beneficial significance.

IBPB8270R001F01_EIA REPORT(2).pdf:98:Overall, it is concluded that the proposed scheme has a minor influence on the pattern of deposition of

IBPB8270R001F01_EIA REPORT(2).pdf:125:from capital dredging on A. islandica and S. spinulosa is predicted to be minor adverse.

IBPB8270R001F01_EIA REPORT(2).pdf:127:be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:127:would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:133:With the implementation of the above mitigation measures, a residual impact of minor adverse significance

IBPB8270R001F01_EIA REPORT(2).pdf:134:assessment matrix presented in Section 5, an impact of minor adverse is predicted during construction.

IBPB8270R001F01_EIA REPORT(2).pdf:134:the residual impact will be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:134:scheme is predicted to have very minor effects on the flow regime, with very small decreases in flows being

IBPB8270R001F01_EIA REPORT(2).pdf:134:predicted for the navigation channel (generally decreases of up to 0.1m/s). Minor increases in flow speeds

IBPB8270R001F01_EIA REPORT(2).pdf:136:ecology of Seal Sands. It is predicted that the proposed scheme would make a minor contribution to the

IBPB8270R001F01_EIA REPORT(2).pdf:137:5, therefore, the impact significance is predicted to be minor adverse (assuming that the receptor has a

IBPB8270R001F01_EIA REPORT(2).pdf:138:considered to be low. It is therefore concluded that the impact to marine mammals is of minor adverse

IBPB8270R001F01_EIA REPORT(2).pdf:138:conservatively assumed that the residual impact will be minor adverse during operation. This conclusion

IBPB8270R001F01_EIA REPORT(2).pdf:158:SSC is relatively minor in the vast majority of the estuary (in the order of 25mg/l increase outside of the

IBPB8270R001F01_EIA REPORT(2).pdf:159:waterbirds would be minor adverse.

IBPB8270R001F01_EIA REPORT(2).pdf:159:The modelling studies conclude that the effect on tidal propagation would be minor, with no change in

IBPB8270R001F01_EIA REPORT(2).pdf:162:Tees estuary, but that an impact of minor adverse significance will arise.

IBPB8270R001F01_EIA REPORT(2).pdf:167:impact of minor beneficial significance

IBPB8270R001F01_EIA REPORT(2).pdf:167:improvement measures, would be of minor beneficial significance.

IBPB8270R001F01_EIA REPORT(2).pdf:188:With the implementation of the above measures, the residual impact is considered to be minor adverse to

IBPB8270R001F01_EIA REPORT(2).pdf:190:to be of minor adverse significance at worst to adult and juvenile fish. No impact is predicted to eggs and

IBPB8270R001F01_EIA REPORT(2).pdf:193:resident species would be minor adverse as a result of the proposed piling activity.

IBPB8270R001F01_EIA REPORT(2).pdf:221:capital dredging represent a minor change. Overall, a potential impact of minor adverse significance is

IBPB8270R001F01_EIA REPORT(2).pdf:221:This potential impact is not possible to mitigate and a residual impact of minor adverse significance would

IBPB8270R001F01_EIA REPORT(2).pdf:226:5mg/l respectively. This is a minor elevation above background levels, and any minor reduction in water

IBPB8270R001F01_EIA REPORT(2).pdf:236: Minor beneficial None required Minor beneficial

IBPB8270R001F01_EIA REPORT(2).pdf:236: Minor beneficial None required Minor beneficial

IBPB8270R001F01_EIA REPORT(2).pdf:236:works through a contractor do not change the baseline or assessment conclusions relating to this minor

IBPB8270R001F01_EIA REPORT(2).pdf:236:of works through a contractor do not change the baseline or assessment conclusions relating to this minor

IBPB8270R001F01_EIA REPORT(2).pdf:250:material, the effect of depositing fine material at the Tees Bay C offshore disposal site will be of minor

IBPB8270R001F01_EIA REPORT(2).pdf:259: • generate their own residual impacts of at least minor significance;

IBPB8270R001F01_EIA REPORT(2).pdf:263: involves minor ‘top-side’ works to the existing Infrastructure at Jetty adjacent to the

IBPB8270R001F01_EIA REPORT(2).pdf:270:construction on tidal propagation will be minor, with no change in elevation of either high or low water

IBPB8270R001F01_EIA REPORT(2).pdf:270:downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of

IBPB8270R001F01_EIA REPORT(2).pdf:271:The CIA for the consented York Potash Harbour Facilities concluded that this impact would be of minor

IBPB8270R001F01_EIA REPORT(2).pdf:272:It is concluded that the residual impact would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:272:progressed). The significance of this impact is reported to be minor adverse due to the low value nature of

IBPB8270R001F01_EIA REPORT(2).pdf:272:that the impact associated with the loss would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT(2).pdf:272:of the proposed NGCT and the York Potash Harbour Facilities, a cumulative impact of minor adverse is

IBPB8270R001F01_EIA REPORT(2).pdf:274:With the implementation of the above measures, a minor adverse residual cumulative impact is predicted.

IBPB8270R001F01_EIA REPORT(2).pdf:274:the scheme (Royal HaskoningDHV, 2017). An impact of minor adverse significant was predicted. No impact

IBPB8270R001F01_EIA REPORT(2).pdf:275:As reported in Section 11, an impact of minor adverse significance has been predicted to waterbirds and

IBPB8270R001F01_EIA REPORT(2).pdf:285:remove certain types of development that are judged to be insignificant in nature and scale (e.g. minor

IBPB8270R001F01_EIA REPORT(2).pdf:285:change of use application or conversions to existing buildings, minor residential developments etc.) and, as

IBPB8270R001F01_EIA REPORT(2).pdf:285:such, there is no pathway for in-combination effects due to the minor nature of those schemes.

IBPB8270R001F01_EIA REPORT(2).pdf:290: involves minor ‘top-side’ works to the existing Infrastructure at the dredge considered to be of a sufficiently small

IBPB8270R001F01_EIA REPORT(2).pdf:293:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed NGCT and at

IBPB8270R001F01_EIA REPORT(2).pdf:296:As reported in Section 11.5, a worst-case impact of minor adverse significance is predicted to waterbirds as

IBPB8270R001F01_EIA REPORT(2).pdf:298:in SSC is relatively minor in the vast majority of the estuary (in the order of 25mg/l increase outside of the

IBPB8270R001F01_EIA REPORT(2).pdf:300:the effect of the MHF given the very minor effect predicted in addition to the fact that the habitat to be

IBPB8270R001F01_EIA REPORT(2).pdf:303:Section 6 of this report states that the predicted increase in SSC is relatively minor in the majority of the

IBPB8270R001F01_EIA REPORT(2).pdf:336: AW stated that there are likely to be some minor tweaks to the

IBPB8270R001F01_EIA REPORT(2).pdf:378: the proposed capital dredge introduces only minor changes to the existing

IBPB8270R001F01_EIA REPORT(2).pdf:378: direction and minor changes to the slopes of the entrance channel are predicted

IBPB8270R001F01_EIA REPORT(2).pdf:383: small and localised effect of the minor changes to the design of the approach

IBPB8270R001F01_EIA REPORT(2).pdf:383: proposed capital dredging are not affected by the proposed minor changes to

IBPB8270R001F01_EIA REPORT(2).pdf:401:any concentrations of contaminants above Action Level 2. Minor exceedances of Action Level 1 only

IBPB8270R001F01_EIA REPORT(2).pdf:424:minor contamination, it was determined that the ‘soft’ sediments within ‘Tees Dock Water Area’

IBPB8270R001F01_EIA REPORT(2).pdf:425:contaminants above AL2. Minor exceedances of AL1 only were identified.

IBPB8270R001F01_EIA REPORT(2).pdf:531:“relatively minor and/or brief, score 0-3; with higher potential to affect feeding, reproduction, or

IBPB8270R001F01_EIA REPORT(2).pdf:549: E473R0203 03 31/10/2014 Minor amendments

IBPB8270R001F01_EIA REPORT(2).pdf:575: completed by the end of 2014. Only relatively minor improvements to the A66/A1053 are

IBPB8270R001F01_EIA REPORT(2).pdf:634:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed scheme and at

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:19:The report concluded that there would be a minor adverse effect for marine ecology

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:27:would be minor adverse. For bird species it was concluded that the effects would be

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:27:minor/negligible without mitigation and negligible with mitigation.

IBPB8270R001F01_EIA REPORT.pdf:52: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

IBPB8270R001F01_EIA REPORT.pdf:52: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

IBPB8270R001F01_EIA REPORT.pdf:52: minor improvement to attribute quality (Beneficial).

IBPB8270R001F01_EIA REPORT.pdf:52: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

IBPB8270R001F01_EIA REPORT.pdf:52: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

IBPB8270R001F01_EIA REPORT.pdf:52: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

IBPB8270R001F01_EIA REPORT.pdf:52: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

IBPB8270R001F01_EIA REPORT.pdf:53: Very high Major Major Moderate Moderate Minor

IBPB8270R001F01_EIA REPORT.pdf:53: High Major Moderate Moderate Minor Negligible

IBPB8270R001F01_EIA REPORT.pdf:53: Medium Moderate Moderate Minor Minor Negligible

IBPB8270R001F01_EIA REPORT.pdf:53: Low Minor Minor Minor Negligible Negligible

IBPB8270R001F01_EIA REPORT.pdf:53: Very low Minor Negligible Negligible Negligible Negligible

IBPB8270R001F01_EIA REPORT.pdf:53:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

IBPB8270R001F01_EIA REPORT.pdf:53:recognised that minor and negligible impacts could become significant when considered cumulatively with

IBPB8270R001F01_EIA REPORT.pdf:72:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed NGCT and at

IBPB8270R001F01_EIA REPORT.pdf:74:of the material dredged in the outer channel is predicted to deposit on Seal Sands. This is a minor effect

IBPB8270R001F01_EIA REPORT.pdf:85:location within the proposed Tees GasPort dredge footprint. Minor exceedances of Action Level 1 were

IBPB8270R001F01_EIA REPORT.pdf:86:VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances of

IBPB8270R001F01_EIA REPORT.pdf:86:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

IBPB8270R001F01_EIA REPORT.pdf:92:the water column is considered to be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:96:the water column is predicted to be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:96:No mitigation measures are required. There would be a residual impact of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:96:It is predicted, therefore, that there will be an overall impact of minor beneficial significance.

IBPB8270R001F01_EIA REPORT.pdf:96:No mitigation measures are required. There would be a residual impact of minor beneficial significance.

IBPB8270R001F01_EIA REPORT.pdf:98:Overall, it is concluded that the proposed scheme has a minor influence on the pattern of deposition of

IBPB8270R001F01_EIA REPORT.pdf:125:from capital dredging on A. islandica and S. spinulosa is predicted to be minor adverse.

IBPB8270R001F01_EIA REPORT.pdf:127:be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:127:would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:133:With the implementation of the above mitigation measures, a residual impact of minor adverse significance

IBPB8270R001F01_EIA REPORT.pdf:134:assessment matrix presented in Section 5, an impact of minor adverse is predicted during construction.

IBPB8270R001F01_EIA REPORT.pdf:134:the residual impact will be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:134:scheme is predicted to have very minor effects on the flow regime, with very small decreases in flows being

IBPB8270R001F01_EIA REPORT.pdf:134:predicted for the navigation channel (generally decreases of up to 0.1m/s). Minor increases in flow speeds

IBPB8270R001F01_EIA REPORT.pdf:136:ecology of Seal Sands. It is predicted that the proposed scheme would make a minor contribution to the

IBPB8270R001F01_EIA REPORT.pdf:137:5, therefore, the impact significance is predicted to be minor adverse (assuming that the receptor has a

IBPB8270R001F01_EIA REPORT.pdf:138:considered to be low. It is therefore concluded that the impact to marine mammals is of minor adverse

IBPB8270R001F01_EIA REPORT.pdf:138:conservatively assumed that the residual impact will be minor adverse during operation. This conclusion

IBPB8270R001F01_EIA REPORT.pdf:158:SSC is relatively minor in the vast majority of the estuary (in the order of 25mg/l increase outside of the

IBPB8270R001F01_EIA REPORT.pdf:159:waterbirds would be minor adverse.

IBPB8270R001F01_EIA REPORT.pdf:159:The modelling studies conclude that the effect on tidal propagation would be minor, with no change in

IBPB8270R001F01_EIA REPORT.pdf:162:Tees estuary, but that an impact of minor adverse significance will arise.

IBPB8270R001F01_EIA REPORT.pdf:167:impact of minor beneficial significance

IBPB8270R001F01_EIA REPORT.pdf:167:improvement measures, would be of minor beneficial significance.

IBPB8270R001F01_EIA REPORT.pdf:188:With the implementation of the above measures, the residual impact is considered to be minor adverse to

IBPB8270R001F01_EIA REPORT.pdf:190:to be of minor adverse significance at worst to adult and juvenile fish. No impact is predicted to eggs and

IBPB8270R001F01_EIA REPORT.pdf:193:resident species would be minor adverse as a result of the proposed piling activity.

IBPB8270R001F01_EIA REPORT.pdf:221:capital dredging represent a minor change. Overall, a potential impact of minor adverse significance is

IBPB8270R001F01_EIA REPORT.pdf:221:This potential impact is not possible to mitigate and a residual impact of minor adverse significance would

IBPB8270R001F01_EIA REPORT.pdf:226:5mg/l respectively. This is a minor elevation above background levels, and any minor reduction in water

IBPB8270R001F01_EIA REPORT.pdf:236: Minor beneficial None required Minor beneficial

IBPB8270R001F01_EIA REPORT.pdf:236: Minor beneficial None required Minor beneficial

IBPB8270R001F01_EIA REPORT.pdf:236:works through a contractor do not change the baseline or assessment conclusions relating to this minor

IBPB8270R001F01_EIA REPORT.pdf:236:of works through a contractor do not change the baseline or assessment conclusions relating to this minor

IBPB8270R001F01_EIA REPORT.pdf:250:material, the effect of depositing fine material at the Tees Bay C offshore disposal site will be of minor

IBPB8270R001F01_EIA REPORT.pdf:259: • generate their own residual impacts of at least minor significance;

IBPB8270R001F01_EIA REPORT.pdf:263: involves minor ‘top-side’ works to the existing Infrastructure at Jetty adjacent to the

IBPB8270R001F01_EIA REPORT.pdf:270:construction on tidal propagation will be minor, with no change in elevation of either high or low water

IBPB8270R001F01_EIA REPORT.pdf:270:downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of

IBPB8270R001F01_EIA REPORT.pdf:271:The CIA for the consented York Potash Harbour Facilities concluded that this impact would be of minor

IBPB8270R001F01_EIA REPORT.pdf:272:It is concluded that the residual impact would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:272:progressed). The significance of this impact is reported to be minor adverse due to the low value nature of

IBPB8270R001F01_EIA REPORT.pdf:272:that the impact associated with the loss would be of minor adverse significance.

IBPB8270R001F01_EIA REPORT.pdf:272:of the proposed NGCT and the York Potash Harbour Facilities, a cumulative impact of minor adverse is

IBPB8270R001F01_EIA REPORT.pdf:274:With the implementation of the above measures, a minor adverse residual cumulative impact is predicted.

IBPB8270R001F01_EIA REPORT.pdf:274:the scheme (Royal HaskoningDHV, 2017). An impact of minor adverse significant was predicted. No impact

IBPB8270R001F01_EIA REPORT.pdf:275:As reported in Section 11, an impact of minor adverse significance has been predicted to waterbirds and

IBPB8270R001F01_EIA REPORT.pdf:285:remove certain types of development that are judged to be insignificant in nature and scale (e.g. minor

IBPB8270R001F01_EIA REPORT.pdf:285:change of use application or conversions to existing buildings, minor residential developments etc.) and, as

IBPB8270R001F01_EIA REPORT.pdf:285:such, there is no pathway for in-combination effects due to the minor nature of those schemes.

IBPB8270R001F01_EIA REPORT.pdf:290: involves minor ‘top-side’ works to the existing Infrastructure at the dredge considered to be of a sufficiently small

IBPB8270R001F01_EIA REPORT.pdf:293:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed NGCT and at

IBPB8270R001F01_EIA REPORT.pdf:296:As reported in Section 11.5, a worst-case impact of minor adverse significance is predicted to waterbirds as

IBPB8270R001F01_EIA REPORT.pdf:298:in SSC is relatively minor in the vast majority of the estuary (in the order of 25mg/l increase outside of the

IBPB8270R001F01_EIA REPORT.pdf:300:the effect of the MHF given the very minor effect predicted in addition to the fact that the habitat to be

IBPB8270R001F01_EIA REPORT.pdf:303:Section 6 of this report states that the predicted increase in SSC is relatively minor in the majority of the

IBPB8270R001F01_EIA REPORT.pdf:336: AW stated that there are likely to be some minor tweaks to the

IBPB8270R001F01_EIA REPORT.pdf:378: the proposed capital dredge introduces only minor changes to the existing

IBPB8270R001F01_EIA REPORT.pdf:378: direction and minor changes to the slopes of the entrance channel are predicted

IBPB8270R001F01_EIA REPORT.pdf:383: small and localised effect of the minor changes to the design of the approach

IBPB8270R001F01_EIA REPORT.pdf:383: proposed capital dredging are not affected by the proposed minor changes to

IBPB8270R001F01_EIA REPORT.pdf:401:any concentrations of contaminants above Action Level 2. Minor exceedances of Action Level 1 only

IBPB8270R001F01_EIA REPORT.pdf:424:minor contamination, it was determined that the ‘soft’ sediments within ‘Tees Dock Water Area’

IBPB8270R001F01_EIA REPORT.pdf:425:contaminants above AL2. Minor exceedances of AL1 only were identified.

IBPB8270R001F01_EIA REPORT.pdf:531:“relatively minor and/or brief, score 0-3; with higher potential to affect feeding, reproduction, or

IBPB8270R001F01_EIA REPORT.pdf:549: E473R0203 03 31/10/2014 Minor amendments

IBPB8270R001F01_EIA REPORT.pdf:575: completed by the end of 2014. Only relatively minor improvements to the A66/A1053 are

IBPB8270R001F01_EIA REPORT.pdf:634:Minor changes in current speeds are predicted in the estuary in the vicinity of the proposed scheme and at

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:10:Minor changes in current speeds are predicted in the estuary during operation, with the overall effect

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:11:All construction phase impacts are of minor adverse significance or negligible, with the exception of

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:12:standard guidelines; this would result in a minor adverse impact to marine mammals. Impacts during the

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:12:operational phase have been assessed as minor adverse in the worst case.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:12:All of the above potential impacts have been assessed as either minor adverse, negligible or of no impact,

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:13:impact of minor beneficial significance.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:13:in Section 8.2 will control the spatial extent of the sediment plume, resulting in a residual impact of minor

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:15:The outputs of hydrodynamic modelling predict a minor increase in the risk of wave overtopping locally

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:15:within the estuary, particularly under extreme swell conditions (resulting in a minor adverse impact). It is

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:15:not possible to mitigate the minor increase in risk of overtopping.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:16:The assessment concluded impacts of minor beneficial during construction (due to generation of temporary

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:are minor adverse in the worst case. No significant impacts are therefore predicted and no mitigation

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:maintenance dredgings, the effect of depositing fine material at Tees Bay C will be of minor significance.

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:York Potash Harbour facilities is predicted to result in a minor adverse impact.

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:19:The report concluded that there would be a minor adverse effect for marine ecology

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:27:would be minor adverse. For bird species it was concluded that the effects would be

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:27:minor/negligible without mitigation and negligible with mitigation.

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:36:minor piling may be required in the intertidal zone for the construction of the new bankseat for the proposed

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:38:The footprint of the works is approximately 6,000m2 (0.006km2) which is considered to be minor in

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:39:minor piling may be required in the intertidal zone for the construction of the new bankseat for the proposed

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:43:within PDT and any such minor increase will be of a temporary nature, and short in duration. There are

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:44:of 7%). The minor change to the pontoon structure, and the increase in vessel size, will not be discernible

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:44: Minor ‘top-side’ works to the existing

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:78:however this is anticipated to be minor as the volume of sediment is 3,000m3, small very small proportion

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:36:minor piling may be required in the intertidal zone for the construction of the new bankseat for the proposed

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:38:The footprint of the works is approximately 6,000m2 (0.006km2) which is considered to be minor in

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:39:minor piling may be required in the intertidal zone for the construction of the new bankseat for the proposed

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:43:within PDT and any such minor increase will be of a temporary nature, and short in duration. There are

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:44:of 7%). The minor change to the pontoon structure, and the increase in vessel size, will not be discernible

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:44: Minor ‘top-side’ works to the existing

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:78:however this is anticipated to be minor as the volume of sediment is 3,000m3, small very small proportion

Appendix 16.1a - DNV Report Rev1 2004.pdf:2:indicate minor changes in sediment transport and sedimentation rates. Some increase in sedimentation may be

Appendix 16.1a - DNV Report Rev1 2004.pdf:5:The modelled results indicate minor changes in sediment transport and sedimentation rates.

Appendix 16.1a - DNV Report Rev1 2004.pdf:12:sedimentation. This is justified by the hydrodynamic modelling results, which indicate minor

3 EIS Appendices (3).pdf:117:indicate minor changes in sediment transport and sedimentation rates. Some increase in sedimentation may be

3 EIS Appendices (3).pdf:120:The modelled results indicate minor changes in sediment transport and sedimentation rates.

3 EIS Appendices (3).pdf:127:sedimentation. This is justified by the hydrodynamic modelling results, which indicate minor

1911South-Tees-Master-Plan-Nov-19.2.pdf:29: Other minor land interests (including former ICI landfill) 99.0 40.0

1911South-Tees-Master-Plan-Nov-19.2.pdf:52: surface water flooding in the area and beyond at the A1085 at some isolated points. Minor improvements to the area

1911South-Tees-Master-Plan-Nov-19.2.pdf:58:the Official Receiver. The material realises a minor market

1911South-Tees-Master-Plan-Nov-19.2.pdf:62:early years of development, with some relatively minor

R-2021-0674-NM-DECISION NOTICE.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:1: • Minor amendments to the wording of the licensed activity relating to the placement of rock within

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:7: Minor comments (all below) STDL note that the proposed monitoring set out within the Scheme of Monitoring

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:9: MMO Question 6. Minor presentational comments if they affect the No comment.

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3:Minor comments

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3:Minor comments

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3: shows a greater number of minor or negligible outcomes relative to more significant categories

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4: the assessment is that this is a minor adverse effect, because temporary) and hence ecology.

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4: In coastal process terms, the temporary suspension itself is indeed probably of minor

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4: reversible, as being of minor significance and hence not mitigated). Other water quality impacts

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4: are assessed as minor also, including the remobilisation of chemicals within the SSC plumes

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:4:Minor comments

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:5:Minor comments

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:5: assign minor significance to this impact. The applicant should indicate the general form of

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:7:Question 19 Are there any minor technical or presentational comments that affect

20210729 MLA202000506 Tees South Bank - Further Proposed Sampling to delineate an exclusion zone+SJB.pdf:2:11. Minor comment: I understand the applicant’s intention behind the use of “clean”, however,

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:7: Minor comments (all below) STDL note that the proposed monitoring set out within the Scheme of Monitoring

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:9: MMO Question 6. Minor presentational comments if they affect the No comment.

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:2:Minor:

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:2:Question 5: Are there any minor technical or presentational comments that affect the overall

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:3:Minor comment:

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:2:12. Minor comment: During previous consultation1, Cefas fisheries advisors stated that, in the

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:4:15. Minor comment: I note that all recorded data will be collated and summarised in a short report

20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf:4:MMO Question 10. Minor presentational comments if they affect the conclusions or

MLA202000506 and MLA202000507 Draft HRA (2).pdf:25: • Gadwall the works would be minor. Further considered to be of higher value, such as

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:2:Minor comments

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:2:Question 5: Are there any minor technical or presentational comments that affect the overall

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:3:Minor comments

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:3:Minor comments

20210406 MLA202000506 Tees South Bank Phase 1 Request to review interim analysis results SEAL Advice FINAL.pdf:2:10. Minor Comments: The results templates all require updating to ensure the data can be used

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:3: barrier effect on migratory species caused by noise from TSHD is considered to be minor adverse. I

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:3:21. Minor comment: I have briefly reviewed Appendix 8 Underwater noise assessment, which considers the

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:4:Question 5: Are there any minor technical or presentational comments that affect the overall

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:6:Minor comments

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:10:Question 5. Are there any minor technical or presentational comments that affect the overall

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:11: concluded that the cumulative effect will be minor adverse. However, as per my comments 22-24,

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:7:MMO Question 6. Minor presentational comments if they affect the conclusions or

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:1: wharf, jetties and other minor Infrastructure along the river bank at South Bank (including an

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:2:Minor comments

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4:Are there any minor technical or presentational comments that affect the overall

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4:Minor comments

MLA202000506 and MLA202000507 Draft HRA.pdf:24: • Gadwall the works would be minor. Further considered to be of higher value, such as

20210615 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA _ SEAL Advice Followup+SJB.pdf:6:21. Minor comment: I take this point to reiterate this comment, noting that disposing of such

20210615 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA _ SEAL Advice Followup+SJB.pdf:6:22. Minor comment: I’d further reiterate comments from the initial consultation which discussed

20220608 MLA2020005061 L20121003331 Cefas advice Final.pdf:3:15. Minor comment. Further sampling would be required to determine the nature of the material

20220608 MLA2020005061 L20121003331 Cefas advice Final.pdf:3:17. Minor comment. Changes in be level may change hydrodynamics within the river and changes

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: minor improvement to attribute quality (Beneficial).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:47: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48: Very high Major Major Moderate Moderate Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48: High Major Moderate Moderate Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48: Medium Moderate Moderate Minor Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48: Low Minor Minor Minor Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48: Very low Minor Negligible Negligible Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48:recognised that minor and negligible impacts could become significant when considered cumulatively with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:90:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:132:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:141:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:153:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:153:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:162:impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:162:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:163:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:163:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:166:considered to be medium, the overall impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:166:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:167:overall impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:167:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:177:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:177:Very Low – minor permanent or Land quality – Human health

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:178:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:180:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:187:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:188:overall impact during construction is considered to be of negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:188:negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:189:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:189:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:189:considered to medium following development. Thus, the impact to the built environment is of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:207:in an impact significance of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:209:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:214:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:214:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:214:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:214:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:253:For the purposes of this assessment, any effects with a significance level of minor or less have been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:253: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:253: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:253: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:253: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:265:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:265:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:266:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:267:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:268:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:268:assessed to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:268:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:268:impact is considered to be minor adverse in significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:269:The residual impact to brown hare and hedgehog is minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:269:anticipated to be of minor - moderate adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:269:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:296:be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:296:be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:298:increased SSC would be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:298:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:298:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:301:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:303:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:304:residual impact is minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:304:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:306:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:306:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:320:With the implementation of the above measure, the residual impact is considered to be minor adverse to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:325:noise from TSHD is considered to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:325:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:329:impact on sheltering fish would be reduced to minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:330:magnitude and there would be significant increase on noise levels already experienced. The minor increase

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:348: High Major Major Moderate Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:348: Medium Major Moderate Minor Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:348: Low Moderate Minor Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:348: Negligible Minor Negligible Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:348: Minor unlikely to be material considerations in the decision making process.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:349:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:358:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:359:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:359:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:359:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:360: sustained in light of sea level rise. This could be considered a minor beneficial impact to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:370: Minor / low 1.0 - 2.9

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:407: • Green corridors such as minor valleys and former railway lines provide links between urban areas

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:415:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:415:magnitude and incur a minor negligible adverse significance of effect.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:418:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:418:is minor adverse. In terms of EIA these effects are not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:418:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:419:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:419:significance of effect in the view is minor negligible adverse and not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:419:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:426: • Minor temporary increases in flood depths with no new flooding internally in properties

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:433:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:444: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:444: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:444: Minor Where the proposed scheme could be expected to result in a small, very short or highly

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:444: High Substantial Moderate to Minor to Moderate Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:444: Medium Moderate to Moderate Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:445: Low Minor to Moderate Minor Negligible to Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:455:phase are considered to be temporary (short term), minor beneficial.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:455:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:456:are considered to be temporary (short term), minor beneficial.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:456:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:476:would be negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490: • generate their own residual impacts of at least minor significance;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:494: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:499: proposed scheme, the works are very minor in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:505:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:505:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:507:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:508:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:511:worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:511:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:512:worse than minor adverse in significance when considered cumulatively with the landside EIA.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:512:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:512:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:513:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:513:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:513:cumulative effect is anticipated to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:513:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:514:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:514:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:515:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:515:at any one time. As such, the cumulative effect is predicted to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:547: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:547: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:560:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:560:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:564: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:569: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:574:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:574:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:576:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:577:impacts on waterbirds within the local area from construction or operation phase noises would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:579:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:580:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:584:combined plumes is expected to be minor.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:585:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:1: • Minor amendments to the wording of the licensed activity relating to the placement of rock within

MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf:4:the EIA Report with respect to shellfish receptors (minor adverse).

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:11:Minor exceedances of Action Level 1 were recorded in material from the surface at BH31 and BH34 which

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:17:impact of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:17:impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:loss caused by capital dredging would be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:27:the North Tees Mudflat, as stated within the EIA Report. As such, the minor adverse impact predicted in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:28:and the upgraded sensitivity score, an impact significance of minor adverse is concluded for effects on

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:29:The residual impact will be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:34: Moderate Minor adverse Minor adverse Wharf. The surveys did not indicate any unforeseen sensitivities not considered in the EIA Report. In addition,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:34:Underwater noise Minor adverse Minor adverse Minor adverse trends of fish migrations within the estuary. The site-specific survey work undertaken and reported in Section

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:34: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:42:dredging / Minor adverse Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:42: Minor adverse Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:42: Minor adverse Minor adverse season.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:455:Tees Mudflat (Sector 3 and 4) beyond very minor reactions to ship-wash at the tidal margins.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1134-L.2021.00333 South Bank Quay Marine Licence Variation Request 2-62.pdf:1:wall together with minor corrections identified after determination of first marine licence variation request.

MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf:2: receptors (minor adverse).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: minor improvement to attribute quality (Beneficial).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Very high Major Major Moderate Moderate Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: High Major Moderate Moderate Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Medium Moderate Moderate Minor Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Low Minor Minor Minor Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Very low Minor Negligible Negligible Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:recognised that minor and negligible impacts could become significant when considered cumulatively with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:132:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:141:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:153:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:153:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:163:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:163:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:considered to be medium, the overall impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:overall impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:177:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:177:Very Low – minor permanent or Land quality – Human health

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:180:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:187:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:188:overall impact during construction is considered to be of negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:188:negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:considered to medium following development. Thus, the impact to the built environment is of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:in an impact significance of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:209:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253:For the purposes of this assessment, any effects with a significance level of minor or less have been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:265:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:265:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:266:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:267:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:assessed to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:impact is considered to be minor adverse in significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:The residual impact to brown hare and hedgehog is minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:anticipated to be of minor - moderate adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:increased SSC would be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:301:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:303:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:304:residual impact is minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:304:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:320:With the implementation of the above measure, the residual impact is considered to be minor adverse to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:325:noise from TSHD is considered to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:325:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:impact on sheltering fish would be reduced to minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:330:magnitude and there would be significant increase on noise levels already experienced. The minor increase

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: High Major Major Moderate Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Medium Major Moderate Minor Minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Low Moderate Minor Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Negligible Minor Negligible Negligible Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Minor unlikely to be material considerations in the decision making process.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:349:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:360: sustained in light of sea level rise. This could be considered a minor beneficial impact to

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370: Minor / low 1.0 - 2.9

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:407: • Green corridors such as minor valleys and former railway lines provide links between urban areas

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:415:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:415:magnitude and incur a minor negligible adverse significance of effect.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:is minor adverse. In terms of EIA these effects are not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:significance of effect in the view is minor negligible adverse and not significant.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:426: • Minor temporary increases in flood depths with no new flooding internally in properties

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:433:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Minor Where the proposed scheme could be expected to result in a small, very short or highly

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: High Substantial Moderate to Minor to Moderate Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Medium Moderate to Moderate Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:445: Low Minor to Moderate Minor Negligible to Minor Negligible

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:455:phase are considered to be temporary (short term), minor beneficial.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:455:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:456:are considered to be temporary (short term), minor beneficial.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:456:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:would be negligible to minor adverse significance.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490: • generate their own residual impacts of at least minor significance;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:494: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:499: proposed scheme, the works are very minor in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:505:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:505:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:507:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:508:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:worse than minor adverse in significance when considered cumulatively with the landside EIA.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:cumulative effect is anticipated to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:514:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:514:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:at any one time. As such, the cumulative effect is predicted to be minor adverse.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:547: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:547: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:560:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:560:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:564: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:569: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:574:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:574:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:577:impacts on waterbirds within the local area from construction or operation phase noises would be minor

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:579:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:580:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:combined plumes is expected to be minor.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:585:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:1: • Minor amendments to the wording of the licensed activity relating to the placement of rock within

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:3: • Minor corrections.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:9:implementing this mitigation, the EIA Report concludes an effect of minor adverse significance.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:9:(minor adverse).

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:10:direct habitat loss or alteration to minor adverse.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:10: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:10: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:14:environment. Overall, the EIA Report records an effect of minor adverse significance upon benthic

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:14:The EIA Report therefore concludes an effect of minor adverse significance with respect to direct loss of

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:17: Direct loss of habitat Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:17: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:17: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:17: Direct loss of habitat Minor adverse Minor adverse

MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:24: • Gadwall the works would be minor. Further considered to be of higher value, such as

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:1:existing OSPAR line 1 and line of the new quay wall together with minor corrections identified after

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:13:a residual impact of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-wide

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:and minor adverse significance to human health. This is on the basis that the embedded mitigation

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:impacts are of minor adverse significance at worst.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:are minor beneficial to controlled waters and negligible to human health.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:scheme footprint and the results of the hydrodynamic and sediment plume modelling, an impact of minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:in a minor beneficial impact.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:anticipated to be significantly affected by the proposed scheme, with a worst-case impact of minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:of minor adverse is predicted for the identified terrestrial ecology receptors.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:foraging / roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:such, impacts on prey resources and foraging are predicted to be minor adverse, at worst.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:predicted to be minor adverse, at worst.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:measures in place to reduce the magnitude of such effects, any residual impact is predicted to be minor.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:‘verti-pools’ means that the net loss would only result in a minor adverse effect on juvenile fish.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:will already be habituated to regular dredging noises within the estuary and a minor adverse impact is

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:The assessment concludes that the proposed scheme will have a temporary, short-term and minor beneficial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:term and minor beneficial effect in relation to economic output (as measured by Gross Value Added) during

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:20:proposed scheme. A worst-case cumulative impact of minor adverse significance is predicted.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:211:than within the dredged areas, sediment deposition on the river bed will be of very minor magnitudes, in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:240: present consultation. No other exceedances of AL2 were observed, but minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:designated as both minor and non-aquifer in different locations due to the variable characteristics of the rock

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:268: Approximately 400m north west there was a minor (Category 3) pollution incident of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:Minor or cosmetic harm

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:116:Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: P276R0102 - 05/10/2020 Minor revisions, inclusion of SPLpeak criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180: Unlikely Minor Negligible

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180: Unlikely Minor Negligible

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: minor injury Costs declared but criteria not

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: 2 Minor Minor Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: (single minor Minor damage Tier 1 – Tier 2 criteria reached. Bad local publicity

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: Multiple minor Moderate damage Tier 2 spill criteria reached but Bad widespread

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: river passage. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Tanker injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Collision - Tanker river passage. Single minor Major damage to property; Tier

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Tanker ICW collides with a injury; Minor damage to 3 criteria reached with pollution

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: failure. Master / Skipper passage. Single minor Tanker collides with a ship

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: error. Pilot / PEC holder injury; Very minor damage assist tug or other Workboat on

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: failure. Master error. minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: action with 3rd party injury; Very minor damage fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: failure. Master error. the river. Single minor single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: Collision - General Cargo Pilot / PEC holder error. injury; Minor damage to property; Tier 2 spill criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: General Cargo river passage. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Vessel collides injury; Very minor damage fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: failure. Master error. minor injury; Minor Major damage to property; Tier

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Collision - action with 3rd party injury; Very minor damage fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: failure. Master / Skipper minor injury; Very minor Multiple minor or single major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: error. Result of avoiding towing). Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: action with 3rd party injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: damaged. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: Workboat injury; Minor damage to fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: services with ensuing loss minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: action with 3rd party injury; Minor damage to fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: during racing. Visiting services with ensuing loss minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: minor injury; Very minor fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: services with ensuing loss minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: difficulty/girts failure (tug or vessel minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: A Tanker minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: A General failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Contact - minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Contact - failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: (Including minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: A Project failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Glancing blow. Very minor Recreational Vessel is most

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: A Recreational injury; Very minor damage damaged. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Contact - Vessel to property; No effect of Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Mechanical defect / speed. Very minor injury; Single minor injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: failure. Master error. Minor damage to damage to property; Tier 2 spill

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / Single minor injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: failure. Skipper error. Minor damage to Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / Multiple minor or single major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Mechanical defect / speed. Very minor injury; Uncontrolled berthing. Single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: failure. Skipper error. Very minor damage to minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Head-on contact. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Head-on contact. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Glancing blow. Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Head-on contact. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Contact A Workboat injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: failure. Skipper error. injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Glancing blow. Very minor minor or single major injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: failure. Master error. injury; Very minor damage Moderate damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: dredging operations. Fire services with ensuing loss revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Head-on contact. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Contact A Recreational failure. Skipper error. injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Contact minor injury; Minor Moderate damage to vessel.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Contact minor injury; Minor Moderate damage to vessel.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Vessel touches the bottom minor injury; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: and refloats. Very minor property; Tier 3 criteria reached

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: injury; Minor damage to with pollution requiring

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / minor injury; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: failure. Skipper error. injury; Very minor damage minor injury; Moderate damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / minor injury; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: failure. Skipper error. injury; Very minor damage minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: minor injury; Very minor berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: of revenue. minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: minor injury; Very minor berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: of revenue. minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: A Workboat minor injury; Very minor vessel breaks away from the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Mooring (Including damage to property; No berth. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Incident - Dredgers) is effect of note. Tier 1 may Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: A Project Inadequate seamanship berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: mooring by large vessel moving in revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: minor injury; Very minor vessel breaks away from the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: damage to property; No berth. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: effect of note. Tier 1 may Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: A Workboat minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: river passage. Single minor injuries or single fatality; Major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: injury; Minor damage to damage to property; Tier 3 criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Collision - river passage. Single minor single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Tanker ICW injury; Minor damage to property; Tier 3 criteria reached with

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: passage. Single minor Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: injury; Very minor damage fatality; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: failure. Master error. minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: PEC holder error. damaged. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Result of avoiding injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: failure. Master error. the river. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Collision - General Cargo Pilot / PEC holder injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: river passage. Single minor river passage. Multiple major injuries

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: General Cargo injury; Very minor damage or single fatality; Moderate damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: failure. Master error. minor injury; Minor injuries or single fatality; Major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: PEC holder error. damaged. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Collision - Result of avoiding injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: injury; Minor damage to major injuries or single fatality;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: short-term disruption to term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: PEC holder error. towing). Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: Result of avoiding injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: injury; Minor damage to major injuries or single fatality;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: short-term disruption to term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: PEC holder error. damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: Result of avoiding injury; Minor damage to major injuries or single fatality;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: taking additional risks short-term disruption to term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: action with 3rd party minor injury; Very minor major injuries or single fatality;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: during racing. Visiting short-term disruption to term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: failure (tug or vessel minor injury; Very minor single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: weather. Fire and short-term disruption to including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: A Tanker Navigation buoy is sunk. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Contact - contacts a injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Contact - A General Cargo Navigation buoy is sunk. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: General Vessel contacts injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: A Workboat Navigation buoy is sunk. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: contacts a injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: failure. Master error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: A Project Cargo Navigation buoy is sunk. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: contacts a injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: injury; Very minor damage Recreational Vessel is most damaged.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Contact - to property; No effect of Very minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: failure. Master error. Minor damage to Single minor injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Master error. Single minor injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Mechanical defect / speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Skipper error. Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Single minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Master error. Multiple minor or single major injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: 3rd party vessel. Fire revenue including minor disruption

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Mechanical defect / speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: failure. Skipper error. Very minor damage to Uncontrolled berthing. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Contact Adverse weather. property; No effect of injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: navigable channel by Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Mechanical defect / Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: failure. Skipper error. Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: A Workboat Adverse weather. Minor damage to property; No effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: navigable channel by Glancing blow. Very minor Head-on contact. Multiple minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Contact failure. Skipper error. Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: vessel Adverse weather. Minor damage to property; No effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Contact minor injury; Minor injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Contact minor injury; Minor injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Vessel touches the bottom Vessel heavily aground. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: and refloats. Very minor injury; Major damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: injury; Minor damage to Tier 3 criteria reached with pollution

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / Vessel heavily aground. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Vessel heavily aground. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: failure. Skipper error. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / Vessel heavily aground. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Mechanical defect / and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: failure. Skipper error. injury; Very minor damage Vessel heavily aground. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Adverse weather. to property; No effect of injury; Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: A Tanker is seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: large vessel moving in services with ensuing loss term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: A General Cargo seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: large vessel moving in services with ensuing loss term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: A Project Cargo seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: 41 River breaks away weather. Excessive be declared but criteria Minor impact on environment Tier 1 1 1 1 1 3.0 3 3 2 3 2.0 1.65

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Mooring minor injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: minor injury; Very minor in service. Multiple major injuries or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: minor injury; Very minor in service. Multiple major injuries or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: passage. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Collision - Minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: river passage. Single minor fatality; Major damage to property; Tier 3

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: 2 River Collision injury; Minor damage to criteria reached with pollution requiring 2 2 1 1 3.5 4 4 4 5 2.0 3.84

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Collision - minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: damaged. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Master error. Pilot / PEC river. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: holder error. Result of Minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: avoiding action with 3rd passage. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: party vessel / dredging Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: damaged. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Glancing blow. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Collision - Mechanical defect / failure. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: One of the Workboats sinks. Multiple minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: minor injury; Very minor Multiple major injuries or single fatality;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: term disruption to services revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: damaged. Single minor Recreational Vessel sunk. Multiple major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: injury; Minor damage to injuries or single fatality; Moderate damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Very short-term disruption revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: avoiding action with 3rd damaged. Single minor Recreational Vessel sunk. Multiple major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Collision - party vessel / dredging injury; Minor damage to injuries or single fatality; Moderate damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Vessel additional risks during Very short-term disruption revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: avoiding action with 3rd during racing). Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: party vessel / dredging injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Vessel revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: operation. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: A tug in Mechanical defect / failure injury; Very minor damage Tug girts. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: project cargo assisted).Adverse weather. necessarily met; Very short- Short-term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: A Tanker contacts a note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: General Cargo note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Mechanical defect / failure. Glancing blow. Minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Master error. Pilot / PEC Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Workboat A Workboat Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: (Including (Including Dredgers) Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Project Cargo note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Mechanical defect / failure. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: A Recreational Vessel minor injury; Very minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Mechanical defect / failure. speed. Very minor injury; Uncontrolled berthing at speed. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Master error. Pilot / PEC Minor damage to property; injury; Moderate damage to property; Tier 2

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: speed. Very minor injury; Uncontrolled berthing at speed. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Minor damage to property; injury; Moderate damage to property; Tier 1 –

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Mechanical defect / failure. speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Uncontrolled berthing at speed. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Skipper error. Adverse Minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Contact berth injury; Minor damage to property; No effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Master error. Pilot / PEC minor or single major injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: dredging operations. Fire including minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Mechanical defect / failure. speed. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Skipper error. Adverse Very minor damage to Uncontrolled berthing. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Contact berth weather. Reduced visibility. property; No effect of note. Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Head-on contact. Single minor injury; Major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Head-on contact. Single minor injury; Major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Contact vessel Minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Skipper error. Adverse Head-on contact. Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: injury; Very minor damage Head-on contact. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: with ensuing loss of minor disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Mechanical defect / failure. injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Contact vessel Skipper error. Adverse to property; No effect of Head-on contact. Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: Mechanical defect / failure. Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Minor damage to Major damage to property; Tier 2 spill criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: Skipper error. Adverse Vessel heavily aground. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Minor damage to Major damage to property; Tier 2 spill criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: and refloats. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: Skipper error. Adverse Vessel heavily aground. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: Grounding - weather. Reduced visibility. Minor damage to property; No effect of note.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: seamanship / watch damage to property; No from the berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: seamanship / watch damage to property; No from the berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: from the berth. Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: A Project Cargo is from the berth. Multiple minor or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: minor disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: Mooring A Recreational Vessel from the berth. Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: unattended. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: unattended. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: injury; Very minor damage

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: / PEC holder error. Result Single minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: / PEC holder error. Result on river passage. Single minor injuries or single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: of avoiding action with injury; Minor damage to property; Tier 3 criteria reached with

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: error. Result of avoiding on river passage. Single minor other Workboat on river passage. Multiple

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: action with 3rd party injury; Very minor damage to major injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: Mechanical defect / Glancing blow. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: failure. Master error. Pilot injury; Minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: error. Result of avoiding damaged. Single minor injury; Recreational vessel sunk. Multiple major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: action with 3rd party Very minor damage to injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: General General Cargo river. Single minor injury; or single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Cargo Vessel collides Minor damage to property; No property; Tier 2 spill criteria reached but

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: action with 3rd party Single minor injury; Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Mechanical defect / Glancing blow. Single minor Head-on collision. Multiple major injuries

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Collision - failure. Master error. Pilot injury; Minor damage to or single fatality; Major damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: error. Result of avoiding damaged. Single minor injury; Recreational Vessel sunk. Multiple major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: General Cargo action with 3rd party Very minor damage to injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: action with 3rd party damaged. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Collision - Workboat vessel. Traffic control Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Short-term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: whilst towing). Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: injury; Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: disembarkation term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: action with 3rd party damaged. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Workboat vessel. Traffic control Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Vessel Short-term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: damaged. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Minor damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Vessel Vessel additional risks during Short-term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Result of avoiding action during racing). Single minor Recreational Vessel sinks. Multiple major

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Collision - Recreational with 3rd party vessel. injury; Very minor damage to injuries or single fatality; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Vessel Vessel risks during racing. Very short-term disruption to Short-term loss of revenue including minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: A tug in Mechanical defect / operation. Very minor injury; Tug girts. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: difficulty/girts failure (tug or vessel being Very minor damage to fatality; Major damage to property; No

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: a project cargo weather. Fire and Very short-term disruption to including minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: A Tanker failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Contact - contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Contact - A General Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: General Vessel contacts / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Workboat failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Project Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Recreational injury; Very minor damage to Recreational Vessel is most damaged. Very

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Vessel contacts property; No effect of note. minor injury; Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: Very minor injury; Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot minor injury; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot Very minor injury; Minor minor injury; Moderate damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: Very minor injury; Minor Uncontrolled berthing at speed. Single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: damage to property; No effect minor injury; Minor damage to property;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot Very minor injury; Very minor minor or single major injury; Moderate

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: 3rd party vessel. Fire and term disruption to services revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Very minor injury; Very minor Uncontrolled berthing. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Contact damage to property; No effect Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: channel by overhanging Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Mechanical defect / Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Single minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: injury; Minor damage to Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: A Workboat property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: channel by overhanging Head-on contact. Multiple minor injuries or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Glancing blow. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Contact injury; Very minor damage to Head-on contact. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: vessel property; No effect of note. Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 3 criteria

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: / PEC holder error. Minor damage to property; No reached with pollution requiring national

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Grounding - / PEC holder error. Minor damage to property; No criteria reached but capable of being

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / refloats. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Vessel heavily aground. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Skipper error. Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: / PEC holder error. Minor damage to property; No criteria reached but capable of being

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Mechanical defect / refloats. Very minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Vessel heavily aground. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: failure. Skipper error. Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: moving in the port services with ensuing loss of revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: moving in the port services with ensuing loss of revenue including minor disruption to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: away from the berth. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Mooring Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mooring Incident - is ranged or weather. Excessive wash Tier 1 may be declared but property; Minor impact on environment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: mooring gear. Inadequate Mooring line parts. Very minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: seamanship / watch injury; Very minor damage to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: away from the berth. Single minor injury;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Minor damage to property; No effect of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Foundering A Recreational failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:271:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:299:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:300:Significance of Effect Medium sensitivity x Medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:301:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor negligible significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:302: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:303: Significance of Effect Low sensitivity x Medium high magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:304: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:305:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:306:Significance of Effect Low sensitivity x Low medium magnitude of effect = Minor negligible significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:307: Significance of Effect Medium sensitivity x Low medium magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:309:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:310: Significance of Effect High sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:316: element(s) to be changed would be minor and/or any landscape element(s) lost or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:316: created make only a minor contribution to landscape character and/or value.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Medium high Minor moderate effect Moderate effect Moderate major effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Medium Minor effect Minor moderate effect Moderate effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Low medium Minor negligible effect Minor effect Minor moderate effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Low Negligible effect Minor negligible effect Minor effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Negligible Negligible effect Negligible effect Minor negligible effect

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:352:means that the layer in question has previously been designated as both minor and non-aquifer in different

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:384:Could significantly impact the hydromorphology of any the existing estuary bed, this will be minor and highly localised. Alterations to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:11:Minor exceedances of Action Level 1 were recorded in material from the surface at BH31 and BH34 which

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:17:impact of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:17:impact is predicted to be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:loss caused by capital dredging would be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:27:the North Tees Mudflat, as stated within the EIA Report. As such, the minor adverse impact predicted in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:28:and the upgraded sensitivity score, an impact significance of minor adverse is concluded for effects on

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:29:The residual impact will be of minor adverse significance.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:34: Moderate Minor adverse Minor adverse Wharf. The surveys did not indicate any unforeseen sensitivities not considered in the EIA Report. In addition,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:34:Underwater noise Minor adverse Minor adverse Minor adverse trends of fish migrations within the estuary. The site-specific survey work undertaken and reported in Section

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:34: Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:42:dredging / Minor adverse Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:42: Minor adverse Minor adverse Minor adverse

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:42: Minor adverse Minor adverse season.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:455:Tees Mudflat (Sector 3 and 4) beyond very minor reactions to ship-wash at the tidal margins.

MLA_2020_00506-MMO VARIATION OBJECTION_S_Rennie.pdf:2:new quay wall together with minor corrections identified

R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0830-CD-DECISION NOTICE 0684.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: April 2022 the Metric 3.0 was replaced by the Metric 3.1, which introduced minor changes from

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:46:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0830-CD-INCA21-09 Quay 1 South Bank biodiversity units Rev A.pdf:2:very minor discrepancies in determining the exact boundaries and habitat condition. However, this

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf:1: Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf:1: CONCRETE RETAINING WALL Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: 0.0 Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf:1: Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: Comments Minor changes

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf:1: Comments Minor changes

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:12:the principal species are recorded, other minor species may be omitted. Trees and shrubs which

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:12:principal species are recorded, other minor species may be omitted.

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:5:protected with enhancements supported. Whilst the proposals include some minor alterations to the

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:12:the principal species are recorded, other minor species may be omitted. Trees and shrubs which

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:12:principal species are recorded, other minor species may be omitted.

R-2021-0754-FFM-Officer Report 0754.pdf:3:roads and white line separated or shared footway / cycleways on all minor

R-2021-0754-FFM-Decision Notice 0754.pdf:4: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:9: • Minor – effects which will be slight or very localised;

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:9: • Minor – effects which will be slight or very localised or only effect receptors that are defined

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:15: any impacts would be minor and therefore the severance or amenity effect of construction traffic

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:17: therefore be minor adverse;

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:18: Low Minor Minor adverse

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:18: Low Minor Minor adverse

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:18: Trunk Road Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:19: Smith’s footbridge over the railway to access South Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:19: Medium non-motorised users to cross at the Minor Negligible

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:19: Trunk Road/ non-motorised users to cross at the Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:19: High Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:19: effect on pedestrian and cyclist amenity is therefore considered to be minor beneficial as

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:20: magnitude of change is however considered to be minor as the arms predominantly affected

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:20: Overall therefore, the effect is considered to be of minor adverse significance; and

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:20: junction and appearing to be minor shunt type collisions. The proposed development will add

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:20: and could have a minor adverse effect on accidents and safety.

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: Dockside Road Minor adverse None identified - Dockside Road provides the main Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: Old Station Moderate Upgrade to A66/Cargo Fleet Lane junction could Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: Middlesbrough Moderate Travel Planning measures to be introduced to Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: A66/Old Station Moderate Travel Planning measures, alongside a Servicing Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: A66/Tees Dock Moderate Travel Planning measures, alongside a Servicing Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:24: A1053/A1085 Moderate Travel Planning measures, alongside a Servicing Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:25: Smith’s Dock Minor beneficial None required Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:25: A1053 (T) Moderate Travel Planning measures, alongside a Servicing Minor

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:25: A1085 Trunk Minor adverse Travel Planning measures, alongside a Servicing Negligible

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:25: A66/Normanby Minor adverse Travel Planning measures to be introduced to Negligible

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:26: Dockside Road Minor, temporary Development of a CTMP Unknown – but

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:26: Old Station Minor, temporary Development of a CTMP Unknown – but

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:26: Dockside Road Minor, permanent South Tees Regeneration Masterplan Minor adverse - as

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:26: Old Station Moderate, South Tees Regeneration Masterplan Minor adverse – the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:26: Middlesbrough Moderate adverse Travel Planning measures to be Minor adverse - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:27: A66/Old Station Moderate adverse Travel Planning measures, alongside Minor adverse – as

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:27: A66/Tees Dock Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:27: A1053/A1085 Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:27: Smith’s Dock Minor beneficial None required Minor beneficial

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:27: A1053 (T) Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:28: A1085 Trunk Minor adverse Travel Planning measures, alongside Negligible - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:28: A66/Normanby Minor adverse Travel Planning measures to be Negligible - the

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:28:C8.6 Overall, Table C8 shows that the proposed development results in some minor adverse residual

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:28: effects and one minor beneficial effect during operation.

R-2021-0754-FFM-highways.pdf:1:and cycleways on the main roads and white line separated or shared footway / cycleways on all minor roads.

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:12: of this junction could be detrimentally affected in 2030. However it is a minor

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:63: A171 Cargo Fleet Lane / Minor Access Road SN2

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:63: A1043 Nunthorpe Bypass /Unamed Minor Access Road MACRO

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:117: • J-13: A171 Cargo Fleet Lane / Minor Access Road.

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:119: J-13 A171 Cargo Fleet Lane / Minor Access Road ✕ ✕ ✕

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:182: • J-25: A1043 Nunthorpe Bypass /Unamed Minor Access Road.

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:184: J-25 A1043 Nunthorpe Bypass / Unamed Minor Access Road ✕ ✕ ✕

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:192: J-13 A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:192: J-25 A1043 Nunthorpe Bypass / Unamed Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:864:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:864:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:864:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:865:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:865:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:865:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:866:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:866:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:866:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:867:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:867:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:867:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:868:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:868:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:868:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:869:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:869:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:869:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:870:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:870:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:870:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:871:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:871:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:871:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:872:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:872:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:872:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:873:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:873:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:873:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:874:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:874:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:874:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:875:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:875:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:875:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:876:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:876:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:876:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:877:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:877:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:877:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:878:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:878:Arm Reference: B B: Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:878:Name Minor Access Road

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1000: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1000: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1001: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1001: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1002: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1002: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1003: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1003: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1004: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1004: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1005: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1005: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1006: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1006: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1007: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1007: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1008: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:1008: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:1:G7.3 For the River Tees surface water body, which is of very high sensitivity, the minor magnitude of

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:1: that would be minor, and not significant albeit positive.

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:1: moderately beneficial impact which would result in a minor positive impact for the surface

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:1: will be minor, so the level of effect is therefore negligible, and not significant. Additional

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2: of minor to moderate magnitude of change, which combined with a low sensitivity receptor

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2: gives an effect greater than minor or negligible, which is not significant.

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2: groundwater quality. This is likely to result a minor magnitude of change given the on-site

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2:G7.9 Surface water - flows: - there would be a minor magnitude of change from the mitigation

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2: will be minor, so the level of effect is therefore negligible, and not significant. Additional

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:2: implementation of the mitigation measures and result in minor beneficial effect

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:91:straightened planform. Some minor

R-2022-0049-CD-Decision Notice 2020 0318.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: 0.0 Comments Minor changes

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C03-South_Bank_General_Arrangement_Inter_Tidal_Channel.pdf:1: Comments Minor changes

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C03-South_Bank_General_Arrangement_Inter_Tidal_Channel.pdf:1: H Comments Minor changes

R-2022-0231-FF-DECISION NOTICE.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:666: BS EN 15297 - Solid biofuels - Determination of minor elements - As, Cd, Co, Cr, Cu,

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:11: • Minor: Harm, not necessarily significant, but that could result in financial loss or

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:11: probability x consequence Severe Medium Mild Minor

R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:40: be minimal and short-term. It is not considered likely that these minor

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:23: and made some minor amendments. It extends to England and Wales, and to a limited extent

R-2023-0246-RMM-TV_ERF_Interim_Travel_Plan.pdf:34:Middlesbrough Bus Station 0505 - 1300 - 2100 Following customer requests, there will be some minor retiming of

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:45: 2021 which has created some minor changes to the paragraph quotes used and

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:45: • Paragraph 8 b) – minor text change

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:60: structures as they were earmarked for preservation, resulting in a minor-moderate

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:60: moderate positive impact resulting in a minor beneficial effect. There is no

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:65: will be minor and therefore not significant. Overall, therefore, the updated

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:66: being minor to neutral. The updated landscape and visual impact assessment in

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:69:11.11 There have been minor changes to the site layout and construction programme

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:79: development is considered to be of minor adverse significance at the local level,

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:80: • A potential impact on accidents and safety of minor adverse significance

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:81: amenity, fear and intimidation, and accidents and safety of minor adverse

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:81: • A residual impact on accidents and safety of minor adverse significance

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:81: be minor and therefore not significant.

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:116: in the December 2019 ES and concludes that these details and minor

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:23: in the December 2019 ES and concludes that these details and minor

R-2023-0246-RMM-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:2: 2 14/02/2022 Minor corrections to Table 8 and Table 11 SMN RSF

R-2023-0246-RMM-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:11: from thermal treatment facilities is typically a very minor pathway and is typically very small relative

R-2023-0246-RMM-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:11: a minor contributor to the total risk.

R-2023-0246-RMM-TV_ERF_Transport_Statement.pdf:23:Middlesbrough Bus Station 0505 - 1300 - 2100 Following customer requests, there will be some minor retiming of

R-2023-0246-RMM-TV-XX-ZZ-DR-L-P003_F_Tree_Planting_and_Grass_Mixes.pdf:1: 1.5 RHINANTHUS minor Yellow Rattle 10 SALIX caprea Goat Willow 20-40cm (h) Bareroot 1m 1+0 transplant, branched Middlesbrough, Redcar & Cleveland, and Stockton Unitary Authorities and

R-2023-0246-RMM-TV_ERF_Flood_Risk_Assessment.pdf:8: • Minor disposal of items deemed unfit for re‐use on site.

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:7:  Minor disposal of items deemed unfit for re‐use on site.

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:34: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:39:• Minor amendments to the boundary to address mapping errors and anomalies

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:70: minor adverse, temporary effect on the environment and require no mitigation

R-2021-0296-NM-Decision 0270.pdf:6:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0296-NM-STDC_HWY-ATK-HGN-PR-DR-CH-000004_C02.pdf:1: (access closed) MINOR EMBANKMENT

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:1:South Bank Site – Demolition of Minor Buildings

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:2:Document title: South Bank Site – Demolition of Minor Buildings Outline Method Statement

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:2:V1.0 Minor amendments Draft 12/06/2020 LCD

R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0832-CD-DECISION NOTICE 0318.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: April 2022 the Metric 3.0 was replaced by the Metric 3.1, which introduced minor changes from

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:46:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: minor improvement to attribute quality (Beneficial).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Very high Major Major Moderate Moderate Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: High Major Moderate Moderate Minor Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Medium Moderate Moderate Minor Minor Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Low Minor Minor Minor Negligible Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Very low Minor Negligible Negligible Negligible Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:recognised that minor and negligible impacts could become significant when considered cumulatively with

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:1:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:2:Significance of Effect Medium sensitivity x Medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:3:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor negligible significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:4: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:5: Significance of Effect Low sensitivity x Medium high magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:6: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:7:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:8:Significance of Effect Low sensitivity x Low medium magnitude of effect = Minor negligible significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:9: Significance of Effect Medium sensitivity x Low medium magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:11:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0685-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:12: Significance of Effect High sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9: Minor / low 1.0 - 2.9

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-wide

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:and minor adverse significance to human health. This is on the basis that the embedded mitigation

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:impacts are of minor adverse significance at worst.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:are minor beneficial to controlled waters and negligible to human health.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:scheme footprint and the results of the hydrodynamic and sediment plume modelling, an impact of minor

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:in a minor beneficial impact.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:anticipated to be significantly affected by the proposed scheme, with a worst-case impact of minor adverse

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:of minor adverse is predicted for the identified terrestrial ecology receptors.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:foraging / roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:such, impacts on prey resources and foraging are predicted to be minor adverse, at worst.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:predicted to be minor adverse, at worst.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:measures in place to reduce the magnitude of such effects, any residual impact is predicted to be minor.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:‘verti-pools’ means that the net loss would only result in a minor adverse effect on juvenile fish.

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:will already be habituated to regular dredging noises within the estuary and a minor adverse impact is

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:The assessment concludes that the proposed scheme will have a temporary, short-term and minor beneficial

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:term and minor beneficial effect in relation to economic output (as measured by Gross Value Added) during

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:20:proposed scheme. A worst-case cumulative impact of minor adverse significance is predicted.

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:11: P276R0102 - 05/10/2020 Minor revisions, inclusion of SPLpeak criteria

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:12:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:12:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:impact is of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:22:minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:22:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:considered to be medium, the overall impact is of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:overall impact is of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:11: • Green corridors such as minor valleys and former railway lines provide links between urban areas

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:19:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:19:magnitude and incur a minor negligible adverse significance of effect.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:is minor adverse. In terms of EIA these effects are not significant.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:significance of effect in the view is minor negligible adverse and not significant.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:26: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:26: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

R-2020-0685-ESM-OFFICER REPORT.pdf:1:other minor Infrastructure along the river bank at South Bank (including an

R-2020-0685-ESM-OFFICER REPORT.pdf:20:estuary is medium, the overall impact is of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:20:minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:21:be medium, the overall impact is of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:21:of the Tees estuary is considered to be medium, the overall impact is of minor

R-2020-0685-ESM-OFFICER REPORT.pdf:22:range between negligible and minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:24:health is considered to be of negligible to minor adverse significance

R-2020-0685-ESM-OFFICER REPORT.pdf:25:therefore considered to be of minor beneficial significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:25:environment is therefore considered to be of minor significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:26:is considered to be minor adverse for surface waters (very high sensitivity)

R-2020-0685-ESM-OFFICER REPORT.pdf:26:considered to be of negligible to minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:26:The residual impact is therefore considered to be of minor beneficial

R-2020-0685-ESM-OFFICER REPORT.pdf:30:considered to be low. This results in an impact significance of minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:31:be of low quality. This results in an impact of minor beneficial significance on

R-2020-0685-ESM-OFFICER REPORT.pdf:32:impact is therefore predicted to be of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:32:in the berthing pocket and quay wall. The residual impact would be of minor

R-2020-0685-ESM-OFFICER REPORT.pdf:37:woodland that will require removal, the ES concludes that a minor adverse

R-2020-0685-ESM-OFFICER REPORT.pdf:38:impacts on otters ranging from spills, strikes from construction vessels (minor

R-2020-0685-ESM-OFFICER REPORT.pdf:38:water quality (minor significance), dust and particle matter (not significant) and

R-2020-0685-ESM-OFFICER REPORT.pdf:38:minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:38:of habitat and breeding resource would be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:38:potential impact is therefore considered to be minor adverse in significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:39:existing habitat within the site is considered to result in impacts of minor -

R-2020-0685-ESM-OFFICER REPORT.pdf:39:breeding resource for invertebrates. The residual impact is of minor adverse

R-2020-0685-ESM-OFFICER REPORT.pdf:40:therefore considered to be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:40:of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:42:development is considered to be of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:43:common tern as a result of increased SSC would be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:43:would have a minor adverse impact on waterbirds using areas of intertidal

R-2020-0685-ESM-OFFICER REPORT.pdf:44:be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:45:be of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:45:impact is predicted to be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:45:light spill. As such, the residual impact is considered to be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:48:minor adverse impact on these due to the activities. However the use of

R-2020-0685-ESM-OFFICER REPORT.pdf:50:resulting disturbance through the estuary The minor increase

R-2020-0685-ESM-OFFICER REPORT.pdf:50:to be minor adverse to both resident and migratory fish.

R-2020-0685-ESM-OFFICER REPORT.pdf:50:considered to be minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:51:impact on sheltering fish would be reduced to minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:59:mitigation the residual impact can be reduced to minor adverse.

R-2020-0685-ESM-OFFICER REPORT.pdf:60: considered a minor beneficial impact to any buried archaeology within

R-2020-0685-ESM-OFFICER REPORT.pdf:61:the residual impact is considered to be minor adverse and not significant in

R-2020-0685-ESM-OFFICER REPORT.pdf:61:resulting in a residual impact predicted to be of minor adverse in significate.

R-2020-0685-ESM-OFFICER REPORT.pdf:73:between minor moderate adverse to minor adverse. In terms of EIA these

R-2020-0685-ESM-OFFICER REPORT.pdf:73:of effect in views from recreational routes to the south of the site is minor

R-2020-0685-ESM-OFFICER REPORT.pdf:73:the transporter bridge is minor adverse. In terms of EIA the effect is not

R-2020-0685-ESM-OFFICER REPORT.pdf:73:assessment of the significance of effect in the views is minor moderate

R-2020-0685-ESM-OFFICER REPORT.pdf:74:significance of effect in the view is minor negligible adverse and not

R-2020-0685-ESM-OFFICER REPORT.pdf:74:in the view is minor negligible adverse. In terms of EIA these effects are not

R-2020-0685-ESM-OFFICER REPORT.pdf:75:range between negligible to minor adverse. Many of the views considered

R-2020-0685-ESM-OFFICER REPORT.pdf:79:of minor adverse significance.

R-2020-0685-ESM-OFFICER REPORT.pdf:83:temporary and minor beneficial.

R-2020-0685-ESM-OFFICER REPORT.pdf:84:No mitigation measures are required. The residual impact would be of minor

R-2020-0685-ESM-OFFICER REPORT.pdf:90:human health would be negligible to minor adverse in significance.

R-2020-0685-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-Appendix 6_Sediment sampling plan.pdf:3: present consultation. No other exceedances of AL2 were observed, but minor

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:1:Could significantly impact the hydromorphology of any the existing estuary bed, this will be minor and highly localised. Alterations to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:9:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:9:Very Low – minor permanent or Land quality – Human health

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:12:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:19:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:20:overall impact during construction is considered to be of negligible to minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:20:negligible to minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:considered to medium following development. Thus, the impact to the built environment is of minor adverse

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:81:than within the dredged areas, sediment deposition on the river bed will be of very minor magnitudes, in

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:5: element(s) to be changed would be minor and/or any landscape element(s) lost or

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:5: created make only a minor contribution to landscape character and/or value.

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Medium high Minor moderate effect Moderate effect Moderate major effect

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Medium Minor effect Minor moderate effect Moderate effect

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Low medium Minor negligible effect Minor effect Minor moderate effect

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Low Negligible effect Minor negligible effect Minor effect

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Negligible Negligible effect Negligible effect Minor negligible effect

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:6: • Minor temporary increases in flood depths with no new flooding internally in properties

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:13:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:in an impact significance of minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:19:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:50: Unlikely Minor Negligible

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:50: Unlikely Minor Negligible

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: minor injury Costs declared but criteria not

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: 2 Minor Minor Minor Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: (single minor Minor damage Tier 1 – Tier 2 criteria reached. Bad local publicity

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: Multiple minor Moderate damage Tier 2 spill criteria reached but Bad widespread

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: river passage. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Tanker injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Collision - Tanker river passage. Single minor Major damage to property; Tier

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Tanker ICW collides with a injury; Minor damage to 3 criteria reached with pollution

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: failure. Master / Skipper passage. Single minor Tanker collides with a ship

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: error. Pilot / PEC holder injury; Very minor damage assist tug or other Workboat on

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: failure. Master error. minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: action with 3rd party injury; Very minor damage fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: failure. Master error. the river. Single minor single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: Collision - General Cargo Pilot / PEC holder error. injury; Minor damage to property; Tier 2 spill criteria

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: General Cargo river passage. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Vessel collides injury; Very minor damage fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: failure. Master error. minor injury; Minor Major damage to property; Tier

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Collision - action with 3rd party injury; Very minor damage fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: failure. Master / Skipper minor injury; Very minor Multiple minor or single major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: error. Result of avoiding towing). Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: action with 3rd party injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: damaged. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: Workboat injury; Minor damage to fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: services with ensuing loss minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: action with 3rd party injury; Minor damage to fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: during racing. Visiting services with ensuing loss minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: minor injury; Very minor fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: services with ensuing loss minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: difficulty/girts failure (tug or vessel minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: A Tanker minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: A General failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Contact - minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Contact - failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: (Including minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: A Project failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Glancing blow. Very minor Recreational Vessel is most

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: A Recreational injury; Very minor damage damaged. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Contact - Vessel to property; No effect of Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Mechanical defect / speed. Very minor injury; Single minor injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: failure. Master error. Minor damage to damage to property; Tier 2 spill

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / Single minor injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: failure. Skipper error. Minor damage to Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / Multiple minor or single major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Mechanical defect / speed. Very minor injury; Uncontrolled berthing. Single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: failure. Skipper error. Very minor damage to minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Head-on contact. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Head-on contact. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Glancing blow. Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Head-on contact. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Contact A Workboat injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: failure. Skipper error. injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Glancing blow. Very minor minor or single major injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: failure. Master error. injury; Very minor damage Moderate damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: dredging operations. Fire services with ensuing loss revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Head-on contact. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Contact A Recreational failure. Skipper error. injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Contact minor injury; Minor Moderate damage to vessel.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Contact minor injury; Minor Moderate damage to vessel.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Vessel touches the bottom minor injury; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: and refloats. Very minor property; Tier 3 criteria reached

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: injury; Minor damage to with pollution requiring

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / minor injury; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: failure. Skipper error. injury; Very minor damage minor injury; Moderate damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / minor injury; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: failure. Skipper error. injury; Very minor damage minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: minor injury; Very minor berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: of revenue. minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: minor injury; Very minor berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: of revenue. minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: A Workboat minor injury; Very minor vessel breaks away from the

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Mooring (Including damage to property; No berth. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Incident - Dredgers) is effect of note. Tier 1 may Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: A Project Inadequate seamanship berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: mooring by large vessel moving in revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: minor injury; Very minor vessel breaks away from the

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: damage to property; No berth. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: effect of note. Tier 1 may Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: A Workboat minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: river passage. Single minor injuries or single fatality; Major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: injury; Minor damage to damage to property; Tier 3 criteria

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Collision - river passage. Single minor single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Tanker ICW injury; Minor damage to property; Tier 3 criteria reached with

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: passage. Single minor Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: injury; Very minor damage fatality; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: failure. Master error. minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: PEC holder error. damaged. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Result of avoiding injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: failure. Master error. the river. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Collision - General Cargo Pilot / PEC holder injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: river passage. Single minor river passage. Multiple major injuries

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: General Cargo injury; Very minor damage or single fatality; Moderate damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: failure. Master error. minor injury; Minor injuries or single fatality; Major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: PEC holder error. damaged. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Collision - Result of avoiding injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: injury; Minor damage to major injuries or single fatality;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: short-term disruption to term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: PEC holder error. towing). Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: Result of avoiding injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: injury; Minor damage to major injuries or single fatality;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: short-term disruption to term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: PEC holder error. damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: Result of avoiding injury; Minor damage to major injuries or single fatality;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: taking additional risks short-term disruption to term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: action with 3rd party minor injury; Very minor major injuries or single fatality;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: during racing. Visiting short-term disruption to term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: failure (tug or vessel minor injury; Very minor single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: weather. Fire and short-term disruption to including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: A Tanker Navigation buoy is sunk. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Contact - contacts a injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Contact - A General Cargo Navigation buoy is sunk. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: General Vessel contacts injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: A Workboat Navigation buoy is sunk. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: contacts a injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: failure. Master error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: A Project Cargo Navigation buoy is sunk. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: contacts a injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: injury; Very minor damage Recreational Vessel is most damaged.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Contact - to property; No effect of Very minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: failure. Master error. Minor damage to Single minor injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Master error. Single minor injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Mechanical defect / speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Skipper error. Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Single minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Master error. Multiple minor or single major injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: 3rd party vessel. Fire revenue including minor disruption

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Mechanical defect / speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: failure. Skipper error. Very minor damage to Uncontrolled berthing. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Contact Adverse weather. property; No effect of injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: navigable channel by Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Mechanical defect / Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: failure. Skipper error. Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: A Workboat Adverse weather. Minor damage to property; No effect

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: navigable channel by Glancing blow. Very minor Head-on contact. Multiple minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Contact failure. Skipper error. Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: vessel Adverse weather. Minor damage to property; No effect

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Contact minor injury; Minor injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Contact minor injury; Minor injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Vessel touches the bottom Vessel heavily aground. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: and refloats. Very minor injury; Major damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: injury; Minor damage to Tier 3 criteria reached with pollution

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / Vessel heavily aground. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Vessel heavily aground. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: failure. Skipper error. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / Vessel heavily aground. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Mechanical defect / and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: failure. Skipper error. injury; Very minor damage Vessel heavily aground. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Adverse weather. to property; No effect of injury; Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: A Tanker is seamanship / watch damage to property; No minor or single major injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: large vessel moving in services with ensuing loss term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: A General Cargo seamanship / watch damage to property; No minor or single major injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: large vessel moving in services with ensuing loss term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: A Project Cargo seamanship / watch damage to property; No minor or single major injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: 41 River breaks away weather. Excessive be declared but criteria Minor impact on environment Tier 1 1 1 1 1 3.0 3 3 2 3 2.0 1.65

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Mooring minor injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: minor injury; Very minor in service. Multiple major injuries or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: minor injury; Very minor in service. Multiple major injuries or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: passage. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Collision - Minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: river passage. Single minor fatality; Major damage to property; Tier 3

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: 2 River Collision injury; Minor damage to criteria reached with pollution requiring 2 2 1 1 3.5 4 4 4 5 2.0 3.84

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Collision - minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: damaged. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Master error. Pilot / PEC river. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: holder error. Result of Minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: avoiding action with 3rd passage. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: party vessel / dredging Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: damaged. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Glancing blow. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Collision - Mechanical defect / failure. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: One of the Workboats sinks. Multiple minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: minor injury; Very minor Multiple major injuries or single fatality;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: term disruption to services revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: damaged. Single minor Recreational Vessel sunk. Multiple major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: injury; Minor damage to injuries or single fatality; Moderate damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Very short-term disruption revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: avoiding action with 3rd damaged. Single minor Recreational Vessel sunk. Multiple major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Collision - party vessel / dredging injury; Minor damage to injuries or single fatality; Moderate damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Vessel additional risks during Very short-term disruption revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: avoiding action with 3rd during racing). Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: party vessel / dredging injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Vessel revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: operation. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: A tug in Mechanical defect / failure injury; Very minor damage Tug girts. Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: project cargo assisted).Adverse weather. necessarily met; Very short- Short-term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: A Tanker contacts a note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: General Cargo note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Mechanical defect / failure. Glancing blow. Minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Master error. Pilot / PEC Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Workboat A Workboat Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: (Including (Including Dredgers) Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Project Cargo note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Mechanical defect / failure. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: A Recreational Vessel minor injury; Very minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Mechanical defect / failure. speed. Very minor injury; Uncontrolled berthing at speed. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Master error. Pilot / PEC Minor damage to property; injury; Moderate damage to property; Tier 2

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: speed. Very minor injury; Uncontrolled berthing at speed. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Minor damage to property; injury; Moderate damage to property; Tier 1 –

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Mechanical defect / failure. speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Uncontrolled berthing at speed. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Skipper error. Adverse Minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Contact berth injury; Minor damage to property; No effect

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Master error. Pilot / PEC minor or single major injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: dredging operations. Fire including minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Mechanical defect / failure. speed. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Skipper error. Adverse Very minor damage to Uncontrolled berthing. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Contact berth weather. Reduced visibility. property; No effect of note. Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Head-on contact. Single minor injury; Major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Head-on contact. Single minor injury; Major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Contact vessel Minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Skipper error. Adverse Head-on contact. Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: injury; Very minor damage Head-on contact. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: with ensuing loss of minor disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Mechanical defect / failure. injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Contact vessel Skipper error. Adverse to property; No effect of Head-on contact. Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: Mechanical defect / failure. Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Minor damage to Major damage to property; Tier 2 spill criteria

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: Skipper error. Adverse Vessel heavily aground. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Minor damage to Major damage to property; Tier 2 spill criteria

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: and refloats. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: Skipper error. Adverse Vessel heavily aground. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: Grounding - weather. Reduced visibility. Minor damage to property; No effect of note.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: seamanship / watch damage to property; No from the berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: seamanship / watch damage to property; No from the berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: from the berth. Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: A Project Cargo is from the berth. Multiple minor or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: minor disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: Mooring A Recreational Vessel from the berth. Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: unattended. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: unattended. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: injury; Very minor damage

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: / PEC holder error. Result Single minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: / PEC holder error. Result on river passage. Single minor injuries or single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: of avoiding action with injury; Minor damage to property; Tier 3 criteria reached with

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: error. Result of avoiding on river passage. Single minor other Workboat on river passage. Multiple

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: action with 3rd party injury; Very minor damage to major injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: Mechanical defect / Glancing blow. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: failure. Master error. Pilot injury; Minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: error. Result of avoiding damaged. Single minor injury; Recreational vessel sunk. Multiple major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: action with 3rd party Very minor damage to injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: General General Cargo river. Single minor injury; or single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Cargo Vessel collides Minor damage to property; No property; Tier 2 spill criteria reached but

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: action with 3rd party Single minor injury; Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Mechanical defect / Glancing blow. Single minor Head-on collision. Multiple major injuries

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Collision - failure. Master error. Pilot injury; Minor damage to or single fatality; Major damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: error. Result of avoiding damaged. Single minor injury; Recreational Vessel sunk. Multiple major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: General Cargo action with 3rd party Very minor damage to injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: action with 3rd party damaged. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Collision - Workboat vessel. Traffic control Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Short-term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: whilst towing). Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: injury; Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: disembarkation term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: action with 3rd party damaged. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Workboat vessel. Traffic control Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Vessel Short-term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: damaged. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Minor damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Vessel Vessel additional risks during Short-term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Result of avoiding action during racing). Single minor Recreational Vessel sinks. Multiple major

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Collision - Recreational with 3rd party vessel. injury; Very minor damage to injuries or single fatality; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Vessel Vessel risks during racing. Very short-term disruption to Short-term loss of revenue including minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: A tug in Mechanical defect / operation. Very minor injury; Tug girts. Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: difficulty/girts failure (tug or vessel being Very minor damage to fatality; Major damage to property; No

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: a project cargo weather. Fire and Very short-term disruption to including minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: A Tanker failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Contact - contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Contact - A General Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: General Vessel contacts / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Workboat failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Project Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Recreational injury; Very minor damage to Recreational Vessel is most damaged. Very

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Vessel contacts property; No effect of note. minor injury; Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: Very minor injury; Minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot minor injury; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot Very minor injury; Minor minor injury; Moderate damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: Very minor injury; Minor Uncontrolled berthing at speed. Single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: damage to property; No effect minor injury; Minor damage to property;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot Very minor injury; Very minor minor or single major injury; Moderate

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: 3rd party vessel. Fire and term disruption to services revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Very minor injury; Very minor Uncontrolled berthing. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Contact damage to property; No effect Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: channel by overhanging Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Mechanical defect / Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Single minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: injury; Minor damage to Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: A Workboat property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: channel by overhanging Head-on contact. Multiple minor injuries or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Glancing blow. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Contact injury; Very minor damage to Head-on contact. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: vessel property; No effect of note. Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 3 criteria

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: / PEC holder error. Minor damage to property; No reached with pollution requiring national

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Grounding - / PEC holder error. Minor damage to property; No criteria reached but capable of being

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / refloats. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Vessel heavily aground. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Skipper error. Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: / PEC holder error. Minor damage to property; No criteria reached but capable of being

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Mechanical defect / refloats. Very minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Vessel heavily aground. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: failure. Skipper error. Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: moving in the port services with ensuing loss of revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: moving in the port services with ensuing loss of revenue including minor disruption to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: away from the berth. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Mooring Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mooring Incident - is ranged or weather. Excessive wash Tier 1 may be declared but property; Minor impact on environment

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: mooring gear. Inadequate Mooring line parts. Very minor

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: seamanship / watch injury; Very minor damage to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: away from the berth. Single minor injury;

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Minor damage to property; No effect of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Foundering A Recreational failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:82:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:91:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:10:means that the layer in question has previously been designated as both minor and non-aquifer in different

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:increased SSC would be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:32:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:34:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:35:residual impact is minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:35:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:5:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:would be negligible to minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10:For the purposes of this assessment, any effects with a significance level of minor or less have been

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:22:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:22:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:23:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:24:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:assessed to be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:impact is considered to be minor adverse in significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:The residual impact to brown hare and hedgehog is minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:anticipated to be of minor - moderate adverse significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:minor adverse significance.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: sediment plume modelling, an impact of minor adverse significance is predicted with regard to

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: within the proposed berth pocket; this is predicted to result in a minor beneficial impact.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:25: worst-case impact of minor adverse predicted.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:25:5.25 Following the mitigation outlined above, a worst-case impact of minor adverse is predicted for

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:25: supporting habitat are expected to be minor adverse.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: and short-lived. As such, impacts on prey resources and foraging are predicted to be minor

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: With mitigation in place, disturbance impacts are predicted to be minor adverse, at worst.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: of such effects, any residual impact is predicted to be minor.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: only result in a minor adverse effect on juvenile fish.

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: only a minor adverse impact is predicted. A review of potential impacts from land-based piling

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: ecological receptors and minor adverse significance to human health. This is on the basis that

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: strategy. With implementation of mitigation measures, the residual impacts are of minor

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: operation are predicted to be minor beneficial to controlled waters and negligible to human

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: minor beneficial impact on the local economy by creating new construction (and supply chain)

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: jobs and a temporary, short-term and minor beneficial effect in relation to economic output (as

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:32:6.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Minor Where the proposed scheme could be expected to result in a small, very short or highly

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Medium Moderate to Moderate Minor Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:9: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:19:phase are considered to be temporary (short term), minor beneficial.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:19:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:20:are considered to be temporary (short term), minor beneficial.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:20:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0685-ESM-DECISION NOTICE.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:designated as both minor and non-aquifer in different locations due to the variable characteristics of the rock

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:22: Approximately 400m north west there was a minor (Category 3) pollution incident of

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:Minor or cosmetic harm

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:722:Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1: • generate their own residual impacts of at least minor significance;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:5: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:10: proposed scheme, the works are very minor in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:16:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:16:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:18:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:19:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:worse than minor adverse in significance when considered cumulatively with the landside EIA.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:cumulative effect is anticipated to be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:25:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:25:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:at any one time. As such, the cumulative effect is predicted to be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:10:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:10:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:14: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:19: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:24:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:24:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:27:impacts on waterbirds within the local area from construction or operation phase noises would be minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:29:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:30:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:combined plumes is expected to be minor.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:35:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:14:With the implementation of the above measure, the residual impact is considered to be minor adverse to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:19:noise from TSHD is considered to be minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:19:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:impact on sheltering fish would be reduced to minor adverse.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:24:magnitude and there would be significant increase on noise levels already experienced. The minor increase

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: High Major Major Moderate Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Medium Major Moderate Minor Minor

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Low Moderate Minor Minor Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Negligible Minor Negligible Negligible Negligible

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Minor unlikely to be material considerations in the decision making process.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:11:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:22: sustained in light of sea level rise. This could be considered a minor beneficial impact to

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:10: • Demolition of the existing wharf, jetties and other minor Infrastructure;

R-2019-0427-FFM-Decision Notice_R20190427FFM.pdf:5: • 12 weeks of the date of this notice for a householder application/minor commercial

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:68: 1 15 N Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:68: 4 122 NE Pollutant: Specific Waste Materials Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:68: Water Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:68:10B 412 E Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92: These are generally aquifers formerly classified as minor aquifers

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92: These are generally aquifers formerly classified as minor aquifers

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92:3 0 On Site general these layers have previously been designated as both minor and non-aquifer

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92:4 0 On Site general these layers have previously been designated as both minor and non-aquifer

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:94: Minor Aquifer/High Leaching

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:94: Minor Aquifer/High Leaching

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:94: Minor Aquifer/Low Leaching

R-2019-0427-FFM-STDC-NEZ-WA-PLA-0002 Warrenby CLE31 Existing cross sections.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-MR-PLA-0001 Metals Recovery Existing Long Section.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45:1 304 W Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45: Incident Identification: 1187178.0 Water Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45:3A 410 E Pollutant: Atmospheric Pollutants and Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45: Incident Identification: 1187178.0 Water Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45:4A 410 E Pollutant: Atmospheric Pollutants and Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45: Incident Identification: 1187178.0 Water Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:45:5A 410 E Pollutant: Contaminated Water Land Impact: Category 3 (Minor)

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70: These are generally aquifers formerly classified as minor aquifers

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70:3 211 NW general these layers have previously been designated as both minor and non-aquifer

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70:3 0 On Site general these layers have previously been designated as both minor and non-aquifer

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70:4 181 W general these layers have previously been designated as both minor and non-aquifer

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:72: Minor Aquifer/High Leaching

R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:91: occurrences are likely to be of minor localised extent and infrequent. It should be noted, however, that

R-2019-0427-FFM-STDC-SIZ-GP-PLA-0001- Grangetown Prairie Existing Contours.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:29: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:37: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:50: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:58: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:58: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:58: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:213: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:213: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:214: Minor Very low risk Very low risk Low Risk Low Risk

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:214: realised would normally be mild or minor.

R-2019-0427-FFM-STDC-NEZ-WA-PLA-0003 Stock pile 3a details & sections.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-GP-PLA-0004 Stockpile 1b.PDF:1: E Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-GP-PLA-0003 Stockpile 1a.PDF:1: E Minor contours (0.5m intervals)

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:21:For both Warrenby 3A and 3B model results show that minor flooding occurs from the drainage ditches

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:21:during 1%AEP event. These exceedance flows will be held locally on site through minor changes in the site

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:26:of no more than 500mm will result in minor alteration of the existing drainage regimes. It is intended that

R-2019-0427-FFM-STDC-NEZ-WA-PLA-0001 Warrenby CLE31 Existing contours and long sections.PDF:1: 000 Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-NEZ-WA-PLA-0004 Stock pile 3b details & sections.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-GP-PLA-0002 - Grangetown Prairie Cross Sections.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-GP-PLA-0005 Stockpile 1c.PDF:1: E Minor contours (0.5m intervals)

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:27: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:35: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:48: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:56: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:56: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:56: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:211: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:211: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:212: Minor Very low risk Very low risk Low Risk Low Risk

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:212: realised would normally be mild or minor.

R-2019-0427-FFM-STDC-SIZ-MR-PLA-0003 Metals Recovery Stock pile 2 Contours & Sections.PDF:1: Minor contours (0.5m intervals)

R-2019-0427-FFM-STDC-SIZ-MR-PLA-0002 Metals Recovery Existing Cross Sections.PDF:1: Minor contours (0.5m intervals)

R-2021-0473-ESM-Decision Notice 0473.pdf:3: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0676-FF-Covering Letter 09.07.21.pdf:2:Whilst the proposals are relatively minor in scale relate to engineering works to re-route essential

R-2021-0534-FF-DECISION NOTICE.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:3: Minor Adverse (Not Significant).

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: unchanged - Minor Adverse (Not Significant).

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: industrialised landscape. The additional 4m in height would not alter the Minor Adverse

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: susceptibility, value and visual sensitivity receptors would continue to experience Minor

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: would continue to experience Minor Adverse (Not Significant) effects.

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: and, as such receptors would continue to experience Minor Adverse (Not Significant)

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:4: boundary). The effect upon these receptors would remain unchanged - Minor Adverse

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:5: and as such the effect would remain unchanged – Minor Adverse (Not Significant).

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:5: continue to experience Minor Adverse (Not Significant) effects resulting from the

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:5: unchanged - Minor Adverse (Not Significant).

R-2022-0242-FF-0242 Decision.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf:1: Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf:1: Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf:1: CONCRETE RETAINING WALL Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf:1: Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: 0.0 Comments Minor changes

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: Comments Minor changes

R-2021-0166-FFM-Environmental Risk Assessment.pdf:20:and carbazole were detected in minor amounts in some soil samples. These are indicative of incomplete

R-2021-0166-FFM-Environmental Risk Assessment.pdf:28:in soil with the exception of minor amounts of 1,1-dichloropropene, 4-nitrophenol and carbazole. However,

R-2021-0166-FFM-Environmental Risk Assessment.pdf:29:assumed to also be active, although the contaminant flux may be low based on the minor impacts identified in

R-2021-0166-FFM-Decision Notice 0166.pdf:4: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:18:  Based on the petrology and expansion testing a minority of the slag deposits at the site are considered

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:19:  Based on the petrology and expansion testing a minority of the slag deposits at the site are considered

R-2021-0166-FFM-Ground Remediation Options Report.pdf:38: 2 -Minor impact on future site operation

R-2021-0166-FFM-Ground Remediation Options Report.pdf:38: 3 -Very Minor Operational Requirement (e.g. Monitoring Only)

R-2022-0494-FFM-OFFICER REPORT.pdf:2:car park, over the minor watercourse via a new temporary bridge (see below)

R-2022-0494-FFM-OFFICER REPORT.pdf:2:A new temporary bridge, over the existing bridge which crosses the minor

R-2022-0494-FFM-DECISION NOTICE.pdf:4:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0494-FFM-19293141_1.pdf:2: P02 / 14 December 2020 Minor edits to site maps John McNicholas

R-2022-0494-FFM-19293141_1.pdf:18: event (representative of a high flood risk) and there are only three minor isolated areas

R-2022-0494-FFM-19293141_1.pdf:19: blue-green networks and minor watercourses with a catchment of less than 5km 2) the

R-2022-0494-FFM-21089271_1.pdf:10: and was reported to predominantly accept steelmaking slag with minor amounts of canteen and

R-2022-0494-FFM-21089271_1.pdf:64: Stability: Minor spalling.

R-2022-0494-FFM-Covering Letter.pdf:2:park, over a minor watercourse and up to a private road as defined on the accompanying Site Location

R-2022-0494-FFM-Covering Letter.pdf:3:The temporary haul road will run from the area of works, through the former car park, over the minor

R-2022-0494-FFM-Covering Letter.pdf:3:A new temporary bridge, over the existing bridge which crosses the minor watercourse, is proposed as

R-2022-0048-NM-Decision Notice.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: requirement widening of the access track, however some minor modifications may be

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:85:buildings B1 to B6, they are likely to have negligible suitability for roosting bats. Due to the minor suitable

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:91: Station LWS light vehicles passes through the LWS using an existing access track. This may include minor works to the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:101: Bladderwort flea-beetle Utricularia minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:17:  Cohesive Made Ground: Generally described as soft to very stiff clay containing minor constituents

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:37: basic steel slag, with the latter comprising the minor fraction in most cases. The testing indicated

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:83:more minor amounts of merwinite, larnite, bredigite, monticellite, wollastonite,

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:83:glassy and finely ceramic material was present in minor amounts. Secondary

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:83:consisted mainly of dicalcium silicate, along with more minor amounts of RO &

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:84:Minor amounts (small) of basic refractory material were seen in two of the

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:84:samples. This material, even in minor amounts, can have significant potential for

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:86:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:87: minor amounts of glassy and ceramic material were seen. The slag

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:87: slag (with only minor amounts of basic steel slag) recorded expansion

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:87: • Minor amounts of basic steel slag were seen in most of the samples.

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:87: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:91:The unaltered slag consists mainly of melilite (Ca,Mg,Al silicate) with minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:91:amounts of spinel (MgAl2O4) as a second principle phase. Minor amounts of

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:92:reflectance of individual crystals that is related to their content of minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:95:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:95:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:102:fume/dust. Other constituents seen, generally in minor amounts, included

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:105: more minor constituent of three. The basic steel slag, which was

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:105: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:105: • Other materials present, generally in minor concentrations, included

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:108:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:108:phases (complex Ca alumino-ferrites). There are minor amounts of another

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:109:dolomet (originally finely crystalline periclase and lime phase bonded by minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:112:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:112:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:118:consisted predominantly of melilite, along with more minor amounts of

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:118:basic steel slag consisted mainly of dicalcium silicate, along with more minor

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:119:Minor amounts (small / very small) of basic refractory material were seen in

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:119:samples 15 and 18. This material, even in minor amounts, can have significant

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:121:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:122: crystalline although minor amounts of glassy and ceramic material

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:122: slag (with only minor amounts of basic steel slag) recorded expansion

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:122: • Minor amounts of basic refractory material were seen in two of the 24

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:126:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:130:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:130:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-Decision Notice 1048(1).pdf:5: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:39: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-Earthworks Specification.pdf:35: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:3: 02 July 2022 JM Minor updates to text, discussion of historic GI added.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:3: 03 July 2022 JM Minor updates to text and figures

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact - Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: classified as minor aquifers -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: These have only a minor value

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:23:contaminants capable of leaching at concentrations above the screening criteria, they are generally only minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:37: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:96: Incident Identification: 32506 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:96: Incident Identification: 721753 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:99: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:99: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:100: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:101: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:24: 03-10-2009 Minor impact to land

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:24: Significant Minor impact to air

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:27:There is a risk of minor fuel spills and oil leaks from vehicles but these are comparatively negligible.

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:38: there’s a much larger number of ‘minor’

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:59: the site ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:59: public ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:59: public ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:59: sea ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:61: Air quality ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:62: ✓ Minor Low Very Low should be recorded within the site’s

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:62: public ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:65: Spillages could range from minor

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:65: ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:66: ✓ Minor Low Very Low likely in the event of a larger spillage

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:70: and site visitors ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:70: the site ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:70: public ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:72: ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:72: Air quality ✓ Minor Unlikely Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:73: Ecosystems ✓ Minor Low Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:75: Ecosystems ✓ Minor Low Very Low

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:77: significance of pollution). A significant change in major or minor aquifer.

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:77: Minor Harm, although not necessarily significant harm, The presence of contaminants at such

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:78: Severe Medium Mild Minor

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:9: Minor culverts drain into Dabholm Beck, likely used to drain run-off from the A1085. The

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:9: catchments of two minor watercourses which contribute the Dabholm Beck before its

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:19: event (representative of a high flood risk) and there are only minor isolated areas mapped

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:20: differ if the site is developed and ground levels are evened out. For the very minor areas

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:20: any potential blue-green Infrastructure and minor watercourses with a catchment of less

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:35: with surface water flooding but within the site. For the very minor areas mapped at

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:37: to the north and two minor access roads to the east. It is understood that the primary

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:14: Land Impact Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:14: Land Impact - Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:18: classified as minor aquifers -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:18: formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:18: These have only a minor value

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:22:contaminants capable of leaching at concentrations above the screening criteria, they are generally only minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:88: Incident Identification: 32506 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:88: Incident Identification: 721753 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:92: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:93: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:3: Minor changes to DoWCoP discussion and updates to

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:8: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:13: • Cohesive Made Ground: Generally described as soft to very stiff clay containing minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:38: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:17:In addition to the above, cohesive Made Ground (generally described as soft to very stiff clay containing minor

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:710:more minor amounts of merwinite, larnite, bredigite, monticellite, wollastonite,

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:710:glassy and finely ceramic material was present in minor amounts. Secondary

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:710:consisted mainly of dicalcium silicate, along with more minor amounts of RO &

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:711:Minor amounts (small) of basic refractory material were seen in two of the

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:711:samples. This material, even in minor amounts, can have significant potential for

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:713:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:714: minor amounts of glassy and ceramic material were seen. The slag

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:714: slag (with only minor amounts of basic steel slag) recorded expansion

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:714: • Minor amounts of basic steel slag were seen in most of the samples.

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:714: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:718:The unaltered slag consists mainly of melilite (Ca,Mg,Al silicate) with minor

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:718:amounts of spinel (MgAl2O4) as a second principle phase. Minor amounts of

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:719:reflectance of individual crystals that is related to their content of minor

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:722:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:722:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:1000: Determination of minor elements - As,

R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:1417:with only minor modification.

R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:1426:the most part any errors in the magnitude of the correction are of minor importance. In general, if the

R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:1426:imperfections of the machine on the derived parameters is minor.

R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:1429:minor uncertainty concerning the origin of the contraction event.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:99: Negligible Minor Moderate Major Severe

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:102: There may be some minor/superficial damage to equipment that

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:102: Minor 2

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:102: Moderate 3 damaged that incurs a financial cost to repair. Minor project delay

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:17:In addition to the above, cohesive Made Ground (generally described as soft to very stiff clay containing minor

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:8:Minor Aquifer (High), which refers to areas able to easily transmit pollution to groundwater. Teesmouth

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:25:The site is also mapped within a Groundwater Vulnerability Zone Minor Aquifer (High) i.e. a minor

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: Elevated pH Made Ground Vertical migration Human Health ‐ Construction √ Minor Low Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: and existing Human Health ‐ Site neighbours √ Minor Unlikely Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: Surface water Human Health ‐ Construction √ Minor Low Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: Human health ‐ Future/End users √ Minor Low Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: Human Health ‐ Site neighbours √ Minor Low Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:69: Migration via Human Health ‐ Construction √ Minor Unlikely Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:70: Human Health ‐ Site neighbours √ Minor Unlikely Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:70: Controlled water ‐ Groundwater √ Minor Unlikely Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:70: Controlled water ‐ Surface Water √ Minor Unlikely Very

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:77: significance of pollution). A significant change in major or minor aquifer.

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:78: Minor Harm, although not necessarily significant harm, The presence of contaminants at such

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:79: Severe Medium Mild Minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:16:In addition to the above, cohesive Made Ground (generally described as soft to very stiff clay containing minor

R-2021-1048-FFM-Appendix1.pdf:13:All accidents, however minor, are to be reported to the Enviros site Co-ordinator

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact - Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: classified as minor aquifers -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: These have only a minor value

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:22:contaminants capable of leaching at concentrations above the screening criteria, they are generally only minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88: Incident Identification: 32506 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88: Incident Identification: 721753 Land Impact: Category 3 (Minor)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:92: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:93: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2021-1048-FFM-Factual Report SSI 1.pdf:112: coal , coke, and minor slag. (Coal dust)

R-2021-1048-FFM-Factual Report SSI 1.pdf:667:fume/dust. Other constituents seen, generally in minor amounts, included

R-2021-1048-FFM-Factual Report SSI 1.pdf:670: more minor constituent of three. The basic steel slag, which was

R-2021-1048-FFM-Factual Report SSI 1.pdf:670: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-Factual Report SSI 1.pdf:670: • Other materials present, generally in minor concentrations, included

R-2021-1048-FFM-Factual Report SSI 1.pdf:673:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-Factual Report SSI 1.pdf:673:phases (complex Ca alumino-ferrites). There are minor amounts of another

R-2021-1048-FFM-Factual Report SSI 1.pdf:674:dolomet (originally finely crystalline periclase and lime phase bonded by minor

R-2021-1048-FFM-Factual Report SSI 1.pdf:677:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-Factual Report SSI 1.pdf:677:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:3: Minor changes to DoWCoP discussion and updates to

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:3: Minor updates to monitoring and maintenance plan and

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:3: 05 August 2022 JM Minor changes to text

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:13: • Cohesive Made Ground: Generally described as soft to very stiff clay containing minor

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:41: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:6:they are generally only minor exceedances, generally ranging from just above the screening criteria,

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:16:screening criteria, they are generally only minor exceedances. Of the samples of Made Ground

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:54:they are generally only minor exceedances, generally ranging from just above the screening criteria,

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:67:fume/dust. Other constituents seen, generally in minor amounts, included

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:70: more minor constituent of three. The basic steel slag, which was

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:70: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:70: • Other materials present, generally in minor concentrations, included

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:73:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:73:phases (complex Ca alumino-ferrites). There are minor amounts of another

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:74:dolomet (originally finely crystalline periclase and lime phase bonded by minor

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:77:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:77:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:83:consisted predominantly of melilite, along with more minor amounts of

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:83:basic steel slag consisted mainly of dicalcium silicate, along with more minor

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:84:Minor amounts (small / very small) of basic refractory material were seen in

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:84:samples 15 and 18. This material, even in minor amounts, can have significant

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:86:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:87: crystalline although minor amounts of glassy and ceramic material

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:87: slag (with only minor amounts of basic steel slag) recorded expansion

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:87: • Minor amounts of basic refractory material were seen in two of the 24

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:91:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:95:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:95:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:210: coal , coke, and minor slag. (Coal dust)

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:765:fume/dust. Other constituents seen, generally in minor amounts, included

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:768: more minor constituent of three. The basic steel slag, which was

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:768: • Minor amounts of basic refractory material were seen in two of the

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:768: • Other materials present, generally in minor concentrations, included

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:771:(MgAl2O4) as a second principle phase. Minor amounts of merwinite (Ca,Mg

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:771:phases (complex Ca alumino-ferrites). There are minor amounts of another

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:772:dolomet (originally finely crystalline periclase and lime phase bonded by minor

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:775:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:775:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-0269-CD-61586 Teesworks - Phasing Note - Version 2 - July 2021 .pdf:1: 2 Minor updates to text. Phase 1b revised and phases 1c and 1d added.

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf:93: Determination of minor elements - As,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:16: variable characteristics and being previously defined as both a minor

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1375: Determination of minor elements - As,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:02. The blast furnace slag was predominantly crystalline with only minor

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:unaltered slag consisted predominantly of melilite, along with more minor

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:minor amounts (small/very small), sample BG0E03 contained a medium amount,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:slag consisted largely of dicalcium silicate, along with more minor amounts of RO

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:Minor amounts (small / very small) of basic refractory material were seen in four

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:of the samples. This material, even in minor amounts, can have significant

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:Other constituents seen in the samples in minor concentrations included

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1400:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: (BG0E01-03) and a minor constituent in the remaining three. The slag

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: was mainly crystalline although minor amounts of glassy material were

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: BG0F01-02. It was also present in more minor amounts (vs to m) in

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: • Minor amounts of basic refractory material were seen in four of the six

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1402: • Other products were seen in the samples in minor amounts including

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1404:contains minor amounts of iron metal occurring as tiny globules and prills and,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1407:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1407:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1408:contains minor amounts of iron metal. Secondary alteration is moderate. It is

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1411:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1411:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf:76: Determination of minor elements - As,

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:13: Severe Medium Mild Minor

R-2022-0050-FFM-0050 Dec.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0753-FFM-Decision Notice 0753.pdf:3: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:For both Warrenby 3A and 3B model results show that minor flooding occurs from the drainage ditches

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:during 1%AEP event. These exceedance flows will be held locally on site through minor changes in the site

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:26:of no more than 500mm will result in minor alteration of the existing drainage regimes. It is intended that

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:31: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:39: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:52: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:60: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:60: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:60: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:115: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:115: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:116: Minor Very low risk Very low risk Low Risk Low Risk

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:116: realised would normally be mild or minor.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:139:mixed with whole and part refractory bricks, with clasts locally fused by the action of lime. Minor deposits

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:140:section of TP105 only, and minor (10%) slag was observed within BOS Oxide deposits in TP109. Slag

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:140:Minor pockets of brown clay and silt, interpreted as representing channel dredgings were identified in

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:354:characteristics allowing it to function as both a minor and non‐aquifer in different locations.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:354:Classification of “minor aquifer high”

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:377:unlikely to pose a constraint. A Category 3 – Minor Incident to water, associated with the release of oils

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:380:by mixing limestone/chalk and clay or shale together with other minor materials. This may include

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:441: Coke Works and By‐ Controlled water ‐ √ Minor Unlikely Very Low

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:469: significance of pollution). A significant change in or minor aquifer.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:470: Minor Harm, although not necessarily significant harm, The presence of contaminants at such

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:471: Severe Medium Mild Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:492:to those agreed in the design SPMP. The sections are reproduced below with any minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:549:Minor Components Concrete Stones (< 5 mm)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:552:Minor Components Stones (< 5 mm) Stones (5 - 20 mm) Stones (< 5 mm) Stones (< 5 mm) Rubble Brick Stones (< 5

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:564:Minor Components Coal Stones (< 5 mm) Coal Stones (< 5

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:567:Minor Components Sandy Soil Sandy Soil Sandy Soil Sand Sandy Soil

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:570:Minor Components Sandy Soil Sandy Soil Stones (< 5 mm) Stones (< 5 mm) Stones (< 5 mm) Waste Material

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:573:Minor Components Sandy Soil Sandy S

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:576:Minor Components Sandy Soil Stones (< 5 mm) Stones (< 5 mm) Stones (< 5 mm) Stones (< 5 mm) Stones (< 5

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:652: major faulting is shown but minor faults may be present.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:652: and recent sand and gravel deposits as a “Minor A quifer” which may have “variable

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:653:Sand & gravel Sand & gravel . 2.9m to Ref. 4 0.84mbgl to Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:653:Estuarine Clay Clay with bands of silt and U p to 4.8m Ref. 4 Unlikely. Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:655: Groundwater Minor Aquifer Low Site underlain by a Minor Aquifer. No

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:706: faulting is shown but minor faults may be present.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:726: faulting is shown but minor faults may be present.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:727: flats and recent sand and gravel deposits as a “Minor Aquifer” which may have

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:727:Made Ground D ense to very dense 1.3m to Ref. 4 1.16mbgl to Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:727:Estuarine and Grey to brown soft brown Up to 9.1m Ref. 4 1.16mbgl to Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:729: Groundwater Minor Aquifer Low Site underlain by a Minor Aquifer . No

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:814: Groundwater – the alluvium in the vicinity of the site is classified as a Minor Aquifer

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:815: • Groundwater (the underlying drift deposits are classified as a Minor Aquifer);

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:816: (classified as a Minor Aquifer by the EA) are assessed as being low. Our

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:823: are collectively classified as Minor Aquifers by the Environment Agency. There are

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:824: • Groundwater (the underlying drift deposits are classified as a Minor Aquifer);

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:825: (classified as a Minor Aquifer by the EA) are assessed as being low in most areas

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:854: minor significance. The exposure risks are assessed against the present site

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:855: Minor or short lived damage to aquatic or other ecosystems, which is unlikely to result in a

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:855: Minor damage to crops, buildings or property.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:856: Minor No measurable effect on humans.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:856: Severe Medium Mild Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:858: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:859: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:860: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:861: as Minor Aquifer) clay in some areas, but absence of widespread contaminat ion

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:861: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:863: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:864: as Minor Aquifer) encountered at two locations within Made Ground.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:865: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:866: as Minor Aquifer) a c r o s s the area.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:867: as Minor Aquifer) contaminants.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:867: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:868: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:869: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:870: as Minor Aquifer) sands.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:872: as Minor Aquifer) inhibit downward migration of contaminants. Limited evidence of

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:872: as Minor Aquifer) migration of contaminants.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:873: as Minor Aquifer) contamination detected.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:873: as Minor Aquifer) contaminants.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:875: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:875: as Minor Aquifer)

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:878: classed as Minor groundwater.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:879: classed as Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:880: classed as Minor some protection from downward migration.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:881: classed as Minor GRO, TPH. Estuarine alluvium and Boulder Clay may provide some

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:882: classed as Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:882: classed as Minor groundwater to the River Tees bordering the wharfe.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:884: classed as Minor protection to downward migration of contaminants.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:885: classed as Minor protection from downward migration.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:886: classed as Minor Boulder Clay may provide some protection from downward

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:887: classed as Minor Boulder Clay may provide some protection from downward

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:888: classed as Minor m i g ration toward River Tees but groundwater flow shows local

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:889: classed as Minor

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:890: classed as Minor Mild Tees but mitigated by distance, approximately 2km.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:893:CLEVELAND cont. classified as a Minor Aquifer), nearby surface waters i.e. the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:896:to the west. Extensive estuarine sands (Bran Sands) and the are classified as a Minor Aquifer by the Environment Agency.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:898:widespread basis in the northern section of the site in Area 16 being classified as a Minor Aquifer), nearby surface waters

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:10: Ecological features deemed to be of low earthworks resulting in a limited or minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:11: Low Human Health: Slight reversible short-term Minor impact on feature or

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:12: Very High Substantial Substantial Moderate Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:12: High Substantial Moderate Minor Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:12: Medium Moderate Minor Negligible Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:12: Low Minor Negligible Negligible Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:21: locally fused by the action of lime. Minor deposits of other waste, including metal machine parts

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:21: were also encountered within slag layers with minor pockets of brown clay and silt, interpreted

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:23: characteristics allowing it to function as both a minor and non‐aquifer in different locations.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:23: Classification of “minor aquifer high”.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:31: facilities) is considered to be of minor adverse significance which is not considered ‘significant’

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:31: be of minor adverse significance which is not considered ‘significant’ in terms of this EIA

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:32: considered to be of minor adverse significance which is not considered ‘significant’ in terms of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:41:Management Minor A T I M R Negligible A T I ST L

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:41: Minor A T D M L - Negligible A T D ST L

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:41: Minor A T D ST L Negligible A T D ST L

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:5: Minor positive effect on invasive non-native

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:6: Negligible to minor beneficial impacts (not

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:6: Transport Minor beneficial effect on pedestrian and cyclist

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:6: Minor adverse effects are predicted on severance,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:6: Minor positive effect on invasive non-native

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:7: Minor beneficial effects (not significant) on Holme

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:7: Landscape and Visual Impact Effects will generally be negligible to minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:7: minor adverse (not significant) impacts.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:8: although minor adverse (not significant) impacts

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:9: reference is made to Minor or Moderate ‘insignificant’ residual effects where relevant. The EIA

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:10: RED – adverse effect; GREEN – beneficial effect; BLACK – unknown; ( ) – minor effect; - negligible/no

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:13: International Complex Permission R/2014/0626/FFM to allow for minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:19: magnitude of impact with mitigation would be minor and not significant for the low sensitivity

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:19: Channel and Cleveland channel) which would have a substantial (significant) effect and minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:19: cumulative magnitude of impact with mitigation would be minor and not significant for the low

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:22: for primary and secondary materials. Cumulative impacts may be minor to moderate (but not

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:23:N4.61 Potential minor beneficial cumulative effect through development on the Prairie site reducing

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:23:N4.63 Potential minor beneficial cumulative effect upon Viewpoint 8 through an increase in the area of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:25: Potential minor beneficial cumulative impacts are predicted on Viewpoint 1 (Eston Nab Hill

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:25: of the massing of the proposed development. Minor beneficial cumulative impacts are also

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:12: blue-green networks and minor watercourses with a catchment of less than 5km2) the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:17:1 The magnitude (severity) of the effect (major, moderate, minor, no change) (Table G3.2)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:19: Minor reduction in resource availability

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:20: Minor Results in minor impact on feature, with Measurable reduction in groundwater

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:20: for minor damage to property and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:20: Where 'substantial', 'moderate' or 'minor' is referenced as a level of effect, this can be either

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:21: Major Substantial Substantial Substantial Moderate Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:21: Moderate Substantial Substantial Moderate Minor Neutral/

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:21: Minor Moderate Moderate Minor Neutral/ Neutral/

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:21: considered to be minor or less, these are generally not deemed significant in terms of the EIA

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:21: potentially minor effects could be judged as significant in terms of the EIA Regulations, and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:31: means that the layer in question has previously been designated as both minor and non-aquifer

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:36: Culvert is low and the magnitude of change minor and so the effect would be negligible and not

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:36: change is minor, there is the potential for moderately significant effects without further

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:37: flooding is anticipated, albeit at high magnitude events. This is likely to result a minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:37: have a minor effect and so not significant.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:37: the magnitude of the effect of excavation on groundwater flow is deemed to be minor. Alongside

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:38: therefore minor, and not significant.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:38: being developed but without this there would likely be minor magnitude of change which for the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:38: Holme Beck and Knitting Wife Culvert, this would have a minor effect and so not significant

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:38: Hence, for these low sensitivity groundwater receptors the level of effect is minor and not

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:38: level of effect on the low sensitivity groundwater receptors is minor, and not significant.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:46:G7.3 For the River Tees surface water body, which is of very high sensitivity, the minor magnitude of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:46: that would be minor, and not significant albeit positive.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:46: moderately beneficial impact which would result in a minor positive impact for the surface

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:46: will be minor, so the level of effect is therefore negligible, and not significant. Additional

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47: of minor to moderate magnitude of change, which combined with a low sensitivity receptor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47: gives an effect greater than minor or negligible, which is not significant.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47: groundwater quality. This is likely to result a minor magnitude of change given the on-site

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47:G7.9 Surface water - flows: - there would be a minor magnitude of change from the mitigation

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47: will be minor, so the level of effect is therefore negligible, and not significant. Additional

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:47: implementation of the mitigation measures and result in minor beneficial effect

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:49: runoff rates whilst taking into account potential from residual impacts. Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:50: Moderate adverse spills/oil and grease, prior to discharge. minor significance.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:51:bodies (Holme Beck, drainage strategy to reduce runoff rates whilst residual impacts. Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: Mobilisation of Minor adverse Implementation of Drainage Strategy to No significant adverse effect

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: Minor adverse discharge. change so minor beneficial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: Pollution from spills Minor adverse Disposal of any surplus materials shall be No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: Contaminant Minor adverse Management Licensing Regulations 1994 and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:53: Pollution from spills Minor Adverse Disposal of any surplus materials shall be No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:53: pathways activated Minor adverse Duty of Care requirements in accordance with

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:53: required other than those embedded into the residual impacts. Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:53:bodies (Holme Beck, required other than those embedded into the residual impacts. Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54:Cleveland & Lackenby Spillages and Minor adverse The aspiration for blue green networks across No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54: routes) will seek to improve the quality of minor beneficial change.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54:Mercia Mudstone Reduced infiltration Low Minor adverse No additional mitigation measures are required No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54: Pollution from spills Minor adverse No additional mitigation measures are required No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54:Superficial aquifer Reduced infiltration Low Minor adverse No additional mitigation measures are required No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:54: Pollution from spills Minor adverse No additional mitigation measures are required. No significant effect from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:55: Reduced generation Low Minor Beneficial Remediation strategy and hardstanding will No significant effect from

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:22:collisions distributed around the junction and appearing to be minor shunt type

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:40:junction and were generally minor shunt type collisions. No collisions involving

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:40:minor impact on collisions and safety.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:42: for the occupier, for employees to bring bicycles in for servicing and minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:10: Minor Changes to key archaeological materials, such that the asset is slightly altered.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:10: Negligible Very minor changes to archaeological materials or setting.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Magnitude of Change No Change Negligible Minor Moderate Substantial No Change

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Significance High Neutral Minor Moderate Substantial Substantial High

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Medium Neutral Negligible Minor Moderate Substantial Medium

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Low Neutral Negligible Negligible Minor Moderate Low

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Negligible Neutral Negligible Negligible Negligible Minor Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: the effect on the receptor will be Neutral, Negligible, Minor, Moderate or Substantial.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Minor Adverse The development partly satisfies the subject environmental objective but fails

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Minor Beneficial The development satisfies the subject environmental objective and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:20: Foundations of World War I submarine Medium Substantial Minor Adverse

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:20: Foundations of World War II HAA Medium Substantial Minor Adverse

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:21: deposits, and the recording of buildings would ensure impacts are no greater than Minor

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:11: construction traffic would be minor and therefore not significant.

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:11: would experience a perceptible change in traffic flows which would have a minor adverse (not

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:12: have a minor adverse (not significant) effect on driver and bus user delay due to an increase in

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:12: experience a negligible impact, or in the case of Smiths Dock Road, minor beneficial effects are

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:16: receptors is considered to be minor or negligible and therefore not significant.

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:16: This is anticipated to lead to a minor impact on receptors. This is not, however, considered to be

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:17: Highfield Landfill site and this is considered to have a minor adverse (but not significant) effect

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:17: be in place. It is therefore anticipated that there will be minor adverse impacts (not significant).

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:20: LCZs are considered to be minor or negligible in nature. There is the potential for a moderate

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:20: considered to be minor or negligible in nature and are therefore not significant.

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:21: these four locations would ensure impacts are no greater than Minor Adverse.

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:21:15.3 There may be minor additional impacts associated with waste and materials management and

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:21: other surface water bodies. It is also acknowledged that there will be minor beneficial

R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:8: Minor settlement will have occurred during the tunnelling operations associated with the

R-2020-0357-OOM-Transport Assessment.pdf:20:collisions distributed around the junction and appearing to be minor shunt type

R-2020-0357-OOM-Transport Assessment.pdf:38:junction and were generally minor shunt type collisions. No collisions involving

R-2020-0357-OOM-Transport Assessment.pdf:38:minor impact on collisions and safety.

R-2020-0357-OOM-Transport Assessment.pdf:40: for the occupier, for employees to bring bicycles in for servicing and minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:13: Minor 3.0 to 4.9

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:13: Minor 1.0 to 2.9

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:14: construction traffic would be minor and therefore not significant.

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:14: would experience a perceptible change in traffic flows which would have a minor adverse (not

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:14: a minor adverse (not significant) effect on driver and bus user delay due to an increase in

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:14: experience a negligible impact, or in the case of Smiths Dock Road, minor beneficial effects are

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:18: receptors is considered to be minor or negligible and therefore not significant.

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:18: This is anticipated to lead to a minor impact on receptors. This is not, however, considered to be

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:19: Highfield Landfill site and this is considered to have a minor adverse (but not significant) effect

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:19: be in place. It is therefore anticipated that there will be minor adverse impacts (not significant).

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:23: LCZs are considered to be minor or negligible in nature. There is the potential for a moderate

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:23: considered to be minor or negligible in nature and are therefore not significant.

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:23: these four locations would ensure impacts are no greater than Minor Adverse.

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:24:15.3 There may be minor additional impacts associated with waste and materials management and

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:24: other surface water bodies. It is also acknowledged that there will be minor beneficial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:41: Invasive Non- Spread of INNS as a Continued reduction of biodiversity value Moderate Updated INNS survey of each phase of the Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:42: Disturbance of species Lighting columns have the potential to Minor Lighting used during construction and Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:42: Otter Disturbance to otter Noise and vibration originating from the Minor Screening of any construction works Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:43: Marine Disturbance to marine Noise and vibration originating from the Minor Screening of any construction works Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:43: Migratory Fish Potential harm of Pollution of the River Tees as a result of Minor Employment of CEMP during construction Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:43: Hedgehog Potential harm of Uncovered dug trenches and excavations Minor Cover trenches overnight or include Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:13: Minor The consumption of one or more materials would be between 1-5% by volume of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:13: Substantial, Moderate and Minor effects are Adverse and that significant adverse effects are

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:14: No change Negligible Minor Moderate Major

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:14: Very high Neutral Minor Moderate Substantial Substantial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:14: High Neutral Slight Minor / Moderate Substantial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:14: Low Neutral Negligible / Negligible Slight Minor /

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:21: the proposed development would have a magnitude of impact of minor (1-5%) on the regional

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: tonnes, which equates to 3% (minor impact) of the regional material availability. This data does

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: Minor Where the proposed development could be expected to result in a small, very short or

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: Medium Moderate to Moderate Minor Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:13: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:28: adverse. The magnitude of effects is assessed as being substantial, moderate, minor or

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:9: • Minor – effects which will be slight or very localised;

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:9: • Minor – effects which will be slight or very localised or only effect receptors that are defined

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:15: any impacts would be minor and therefore the severance or amenity effect of construction traffic

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:17: therefore be minor adverse;

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:18: Low Minor Minor adverse

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:18: Low Minor Minor adverse

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:18: Trunk Road Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:19: Smith’s footbridge over the railway to access South Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:19: Medium non-motorised users to cross at the Minor Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:19: Trunk Road/ non-motorised users to cross at the Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:19: High Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:19: effect on pedestrian and cyclist amenity is therefore considered to be minor beneficial as

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:20: magnitude of change is however considered to be minor as the arms predominantly affected

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:20: Overall therefore, the effect is considered to be of minor adverse significance; and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:20: junction and appearing to be minor shunt type collisions. The proposed development will add

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:20: and could have a minor adverse effect on accidents and safety.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: Dockside Road Minor adverse None identified - Dockside Road provides the main Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: Old Station Moderate Upgrade to A66/Cargo Fleet Lane junction could Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: Middlesbrough Moderate Travel Planning measures to be introduced to Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: A66/Old Station Moderate Travel Planning measures, alongside a Servicing Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: A66/Tees Dock Moderate Travel Planning measures, alongside a Servicing Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:24: A1053/A1085 Moderate Travel Planning measures, alongside a Servicing Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:25: Smith’s Dock Minor beneficial None required Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:25: A1053 (T) Moderate Travel Planning measures, alongside a Servicing Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:25: A1085 Trunk Minor adverse Travel Planning measures, alongside a Servicing Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:25: A66/Normanby Minor adverse Travel Planning measures to be introduced to Negligible

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:26: Dockside Road Minor, temporary Development of a CTMP Unknown – but

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:26: Old Station Minor, temporary Development of a CTMP Unknown – but

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:26: Dockside Road Minor, permanent South Tees Regeneration Masterplan Minor adverse - as

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:26: Old Station Moderate, South Tees Regeneration Masterplan Minor adverse – the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:26: Middlesbrough Moderate adverse Travel Planning measures to be Minor adverse - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:27: A66/Old Station Moderate adverse Travel Planning measures, alongside Minor adverse – as

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:27: A66/Tees Dock Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:27: A1053/A1085 Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:27: Smith’s Dock Minor beneficial None required Minor beneficial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:27: A1053 (T) Moderate adverse Travel Planning measures, alongside Minor adverse - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:28: A1085 Trunk Minor adverse Travel Planning measures, alongside Negligible - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:28: A66/Normanby Minor adverse Travel Planning measures to be Negligible - the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:28:C8.6 Overall, Table C8 shows that the proposed development results in some minor adverse residual

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:28: effects and one minor beneficial effect during operation.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:23: 03/06/2020 Minor amendments following John McNicholas and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:38: blue-green networks and minor watercourses with a catchment of less than 5km 2) the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:33: surface flow pattern. There were a number of in channel structures including minor weirs. The

R-2020-0357-OOM-Planning Statement - July 2020.pdf:40: development will form a minor component in the overall visible landscape and may not have a

R-2020-0357-OOM-Planning Statement - July 2020.pdf:43: Road Network (‘SRN’). The only effects considered to be significant are minor adverse effects on

R-2020-0357-OOM-Planning Statement - July 2020.pdf:43: Tees site transport strategy, which should mitigate the forecast minor adverse impact of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:12: mitigation measures. Minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:16: for minor material

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:27: 3 Minor 3 beneficial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:27: 5 Minor3 adverse

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:27: 3 Minor - slight, very short or highly localised effects

R-2020-0357-OOM-Officer report.pdf:44: permanent effect would therefore be minor adverse;

R-2020-0357-OOM-Officer report.pdf:44:locations set out in the table range from minor adverse to moderate adverse.

R-2020-0357-OOM-Officer report.pdf:44:There is also considered to be a minor beneficial change at Smiths Dock

R-2020-0357-OOM-Officer report.pdf:45:minor adverse.

R-2020-0357-OOM-Officer report.pdf:46:minor adverse, with also some minor beneficial.

R-2020-0357-OOM-Officer report.pdf:46:development results in some minor adverse residual effects and one minor

R-2020-0357-OOM-Officer report.pdf:75:impact on human receptors prior to mitigation is considered to be of minor

R-2020-0357-OOM-Officer report.pdf:75:impact on surface waters and/or groundwater is considered to be of minor

R-2020-0357-OOM-Officer report.pdf:96:minor adverse effect on views; and temporary, short-term, moderate adverse

R-2020-0357-OOM-Officer report.pdf:97:term, minor adverse effect on the Urban, Intertidal Estuary, Eston Hills and

R-2020-0357-OOM-Officer report.pdf:97:ranging from negligible to a temporary, short-term minor to moderate adverse

R-2020-0357-OOM-Officer report.pdf:97:is noted that the significance of effect ranges from negligible to minor adverse

R-2020-0357-OOM-Officer report.pdf:97:is noted that the significance of the effects are mainly minor adverse which

R-2020-0357-OOM-Officer report.pdf:98:(significant) effect on views 1, 4 and 5; a temporary, short-term, minor

R-2020-0357-OOM-Officer report.pdf:98:The construction phase will have a temporary, short-term, minor adverse

R-2020-0357-OOM-Officer report.pdf:99:Other impacts upon specified LCZs are considered to be minor or negligible in

R-2020-0357-OOM-Officer report.pdf:99:to minor or negligible in nature.

R-2020-0357-OOM-Officer report.pdf:99:minor to negligible adverse impacts. As stated above the site is allocated for

R-2020-0357-OOM-Officer report.pdf:102:ensure impacts are no greater than Minor Adverse. This is not significant in

R-2020-0357-OOM-Officer report.pdf:105:Cumulative impacts may be minor to moderate but not significant. This is

R-2020-0357-OOM-Officer report.pdf:106:very localised. Potential minor beneficial cumulative impacts are predicted on

R-2020-0357-OOM-Officer report.pdf:106:development. Minor beneficial cumulative impacts are also predicted on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:13: Minor The size and scale of change is considered small due to the extent and proportion of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:15: on a minor road will tend to have a limited importance. A viewpoint that is visited or used by a

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:18: Minor The proposed development forms a minor component of the landscape and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: Minor beneficial Complement the character of the receiving landscape.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: Minor adverse The proposals may detract slightly from, or not quite fit the distinctive visual

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: magnitude of change that is beneficial in nature. Alternatively, a minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: Minor beneficial The proposed development would cause a perceptible improvement in a

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: minor/ moderate magnitude of change that is beneficial in nature.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: Minor adverse The proposed development would cause a perceptible deterioration in a

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:20: minor/ moderate magnitude of change and one which is adverse in nature.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:21: magnitude of change that is adverse in nature. Alternatively, a minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:21: EIA terms. Those classified as minor or negligible are likely to be not significant in EIA terms

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:22: Magnitude of Minor Minor Minor Minor to Moderate*

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:22: Change Moderate Minor Moderate* Moderate* to

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:22: Substantial Minor to Moderate* to Substantial*

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:25: 9 Green corridors such as minor valleys and former railway lines provide links between urban

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:28:L4.26 To the north, the landscape is low lying with minor topographical changes created by

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:45: adverse effect on views 1, 4 and 5; a temporary, short-term, minor adverse effect on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:45:L5.7 The above aspects of the construction phase will have a temporary, short-term, minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:45: negligible to a temporary, short-term minor to moderate adverse effect upon views and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:46: as a whole, it is likely that construction would result in a minor sift away from baseline

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47: experience indirect, minor adverse effects during construction, and in the operational stage.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47:L5.17 Due to the scale size and permanence of the proposed development, this would result in a minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47: change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47:L5.18 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47: LCZ 2 - Urban Low Minor Minor Adverse Indirect, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47: The magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47:L5.23 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:47: LCZ 3 – Intertidal Medium Minor Minor Adverse Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:49:L5.38 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:49: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse Indirect, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:50:L5.53 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:51: LCZ 9 – Urban Low-Medium Moderate Minor Adverse Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:51: LCZ 2 - Urban Low Minor Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:51: LCZ 3 – Intertidal Medium Minor Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:51: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:51: LCZ 9 – Urban Low-Medium Moderate Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52: notable within the proposed development from this view, however this has some minor

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52:L5.59 The proposed development will form a minor component in the overall visible landscape and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52:L5.60 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52: VP1 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52: the western elevation of Plot I, where it will appear as a minor component in the overall view.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52:L5.65 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52:L5.66 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:52: VP2 Road and Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:53: very minor visibility of Plot E, which may become slightly more visible during winter months.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:53:L5.70 The proposed development would form a minor component in the landscape and visual context

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:53:L5.71 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:53:L5.72 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:53: VP3 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:54:L5.78 Based on the above assessment, the magnitude of change is therefore considered to be Minor-

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:54:L5.79 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:54: VP4 Footpath Users Minor-Moderate Minor Adverse Direct,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:54:L5.84 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:54: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55:L5.89 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55: VP6 Footpath Users Negligible Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55:L5.94 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55: VP7 Footpath Users Negligible Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55: increased in winter months. The skyline is altered in a very minor way, filling in gaps between

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:55: and existing building designs. The proposed development forms a minor component of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:56:L5.100 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:56:L5.101 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:56: VP8 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:56:L5.106 The skyline is altered in a minor-moderate way, filling in gaps between residential properties

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:56: and I, where they appear as a minor component in the overall view, and its influence on the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57:L5.111 The skyline is altered in a minor way as Development Plot I fills in the view of the road looking

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57:L5.114 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57:L5.115 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57: VP10 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57: down onto the proposed development. The proposed development has minor visibility due to

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57: Industrial development within the context of the view. The skyline has minor alterations from

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:57:L5.121 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58:L5.122 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP11 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: in a very minor way, replacing a view of the existing stockpiled gravel mounds with new built

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: would change the baseline characteristics in a minor way.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58:L5.128 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58:L5.129 Combining all of these criteria, it is considered that there will be a Minor Adverse level of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP12 Workers Minor Minor Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP1 Footpath Users - Minor Moderate Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP2 Road and Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP3 Footpath Users - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:58: VP4 Footpath Users - Minor-Moderate Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP5 Road Users - Moderate Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP6 Footpath Users - Negligible Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP7 Footpath Users - Negligible Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP8 Road Users Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP10 Road Users – Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP11 Footpath Users - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:59: VP12 Workers - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: (significant) effect on views 1, 4 and 5; a temporary, short-term, minor adverse effect on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61:L7.3 The construction phase will have a temporary, short-term, minor adverse effect on the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: LCZ 2 - Urban Low Minor Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: LCZ 3 – Intertidal Medium Minor Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: LCZ 9 – Urban Green Low-Medium Moderate Minor Adverse – Indirect,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: VP1 Footpath Users - Minor Moderate Adverse Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:61: VP2 Road and Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP3 Footpath Users - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP4 Footpath Users - Minor-Moderate Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP5 Road Users - Moderate Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP6 Footpath Users - Negligible Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP7 Footpath Users - Negligible Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP8 Road Users Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP10 Road Users – Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP11 Footpath Users - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:62: VP12 Workers - Minor Minor Adverse - Direct, Permanent

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:63: considered to be minor or negligible in nature.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:63: Viewpoint 9. The effects upon other viewpoint are considered to minor or negligible in nature.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:63: LCZ 2 - Urban Minor Adverse – Buildings to be articulated in a way Minor Adverse –

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:63: LCZ 3 – Intertidal Minor Adverse – Buildings to be articulated in a way Minor Adverse –

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:63: LCZ 6 – Eston Hills Minor Adverse – Buildings to be articulated in a way Minor Adverse –

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:64: LCZ 9 – Urban Minor Adverse – Buildings to be articulated in a way Minor Adverse –

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:64: VP2 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:64: VP3 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:64: VP4 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:64: VP5 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP6 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP7 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP8 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP10 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP11 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:65: VP12 Minor Adverse - Buildings to be articulated in a way Minor Adverse -

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:12: of this junction could be detrimentally affected in 2030. However it is a minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:63: A171 Cargo Fleet Lane / Minor Access Road SN2

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:63: A1043 Nunthorpe Bypass /Unamed Minor Access Road MACRO

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:117: • J-13: A171 Cargo Fleet Lane / Minor Access Road.

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:119: J-13 A171 Cargo Fleet Lane / Minor Access Road ✕ ✕ ✕

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:182: • J-25: A1043 Nunthorpe Bypass /Unamed Minor Access Road.

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:184: J-25 A1043 Nunthorpe Bypass / Unamed Minor Access Road ✕ ✕ ✕

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:192: J-13 A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:192: J-25 A1043 Nunthorpe Bypass / Unamed Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:864:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:864:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:864:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:865:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:865:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:865:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:866:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:866:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:866:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:867:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:867:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:867:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:868:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:868:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:868:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:869:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:869:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:869:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:870:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:870:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:870:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:871:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:871:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:871:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:872:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:872:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:872:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:873:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:873:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:873:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:874:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:874:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:874:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:875:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:875:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:875:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:876:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:876:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:876:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:877:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:877:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:877:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:878:J-13 J-13: A171 Cargo Fleet Lane / Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:878:Arm Reference: B B: Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:878:Name Minor Access Road

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1000: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1000: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1001: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1001: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1002: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1002: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1003: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1003: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1004: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1004: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1005: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1005: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1006: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1006: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1007: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1007: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1008: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:1008: A: A1043 Nunthorpe Bypass (East) B: Unamed Minor Access Road C: A1043 Nunthorpe Bypass (West)

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:12: 3 Minor3 beneficial

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:12: 5 Minor3 adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:12: 3 Minor - slight, very short or highly localised effects

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:21: West Terrace / Cromwell Street Low Minor access route / residential area

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: Greystones High Greatest increase in delay of 3 Negligible Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: Riverside Park Road Medium Greatest increase in delay of 2 Negligible Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: Hartington High Greatest increase in delay of 19 Minor Moderate

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: West Terrace / Low Greatest increase in delay of 6 Minor Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: A66 / Borough High Greatest increase in delay of 31 Minor Moderate

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: A171 Cargo Fleet Medium Greatest increase in delay of 2 Negligible Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: A171 Cargo Fleet Medium Greatest increase in delay of 3 Minor Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:23: Ormesby Road / Medium Greatest increase in delay of 6 Negligible Minor adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:24: Newport Moderate STDC transport strategy to outline measures to Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: Hartington Moderate quayside, and Servicing Management Plan, to reduce Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: A66 / Borough Moderate strategy to assess if additional mitigation is required Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: A171 Cargo Fleet Moderate Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: A171 Cargo Fleet Moderate Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: A66 / A171 Cargo Moderate Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: A171 Cargo Fleet Moderate Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: Greystones Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: Riverside Park Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:25: Newport Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: Hartington Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: West Terrace / Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A66 / Borough Minor, permanent STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A171 Cargo Fleet Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A171 Cargo Fleet Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A171 Cargo Fleet Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A66 / A171 Cargo Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A171 Cargo Fleet Moderate, STDC transport strategy to outline Minor adverse - the

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:26: A171 Cargo Fleet Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:27: Ormesby Road / Minor, permanent STDC transport strategy to outline Negligible

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:27:3.31 Overall, Table 3.4 shows that the proposed development results in some minor, permanent

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:54: methodology as presented in the original ES from paragraph F3.23 onwards with only minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:69: Prehistoric activity or Medium Minor Moderate Adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:70: Foundations of World War I submarine base Medium Substantial Minor Adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:70: Foundations of World War II HAA battery and Medium Substantial Minor Adverse

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:70: Prehistoric remains Medium Minor Negligible /

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:71: deposits, and the recording of buildings would ensure impacts are no greater than Minor

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:74: RED – adverse effect; GREEN – beneficial effect; BLACK – unknown; ( ) – minor effect; - negligible/no effect anticipated; * -

R-2020-0357-OOM-Habitats Regulation Assessment.pdf:21:• Minor amendments to the boundary to address mapping errors and anomalies

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 1).PDF:4:Complex Permission R/2014/0626/FFM to allow for minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:45: Minor Negative Discernible negative impact and/or on a small scale.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:45: Minor Positive Discernible positive impact and/or on a small scale.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:45: • Minor: The impact is slightly detectable/noticeable and of some temporary and

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Moderate- Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: negative Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Moderate- Moderate Minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Minor negative

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Minor- Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: negative Minor Minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Minor positive

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Minor- Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: positive Minor Minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: positive Moderate- Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: Moderate Minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:46: provides Moderate- Minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:123: Minor reduction in resource

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:124: Minor Results in minor impact on feature, Measurable reduction in

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:124: potential for minor damage to

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:125: Minor Moderate Moderate Slight Negligible Negligible

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:131: been designated as both minor and non-aquifer in different locations due to the variable

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:132: Groundwater vulnerability in the east of the site is classed as ‘Minor Aquifer High’. The

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:134: design mitigation in place the minor magnitude of change which may be expected

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:134: Nonetheless, for other surface water receptors, a minor magnitude of change would

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:135: location, they may present a risk to surface water quality. This is likely to result a minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:135: mitigation in place, the minor magnitude of change would mean that the level of effect

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:135: discharges. This is likely to result a minor magnitude of change given the on-site

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:136: deemed to be minor. Alongside a receptor sensitivity category for the superficial aquifer

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:136: minor magnitude. As such, the level of effect to this low sensitivity receptor is

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:136: site. Therefore, any effects on groundwater quality are likely to be of minor to moderate

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:136: may present a risk to groundwater quality. This is likely to result a minor magnitude of

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:165: Non Designated local Earth moving / Low Minor Adverse • Application of Site Good Practice.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:165: Wear Magnesian Piling - High Minor - moderate • No soakaways proposed drainage. Not significant

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:165: Surface water Contamination Low Minor Adverse • All operational areas will be bunded and Not significant

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:166:Groundwater Contamination Low Minor - moderate • No soakaways proposed for road drainage. Not significant

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:166:Abstraction from a Adverse impact Medium Minor - moderate • Protection for migratory fish and eels, and

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:170: Minor integrity and significance of the asset. Change to the setting

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:171: Minor Positive

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:177: interpretation is considered to result in a minor positive magnitude of impact on these

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:177: minor-moderate beneficial significance of effect.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:177: would result in a minor-moderate adverse significance of effect on these remains of

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:177: minor-moderate beneficial effect as there is no additional mitigation to be implemented as

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:178: and steel foundations during construction residual minor-moderate adverse

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:178: Remains of Preservation in situ High Minor No further mitigation The conservation, preservation in

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:178: planting with furnace bases will lead to a minor

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:178: place them within This would result in a minor-

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:179: Minor Moderate Major

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:191: as being minor to neutral.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:217: Minor a small, barely noticeable effect (either adverse or

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:218: Moderate Major Moderate Minor Negligible

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:218: Low Moderate Minor Negligible Negligible

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:219: considered to be “minor” or “negligible” are not considered to be significant in the

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:227: considered to be of minor adverse significance at the local level, prior to the

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:230: is considered to be of minor adverse significance at the local level. The potential impact

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:231: result in a medium-term (3 years) minor adverse impact at the local level.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:232: of accidents and safety, has been identified as being of minor adverse significance at

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:232: identified as being of minor adverse significance at the local level.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:232: completed development phase was previously identified as being of minor adverse

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:233: • A residual impact on accidents and safety of minor adverse significance.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:234: Driver Delay, Severance, Minor adverse significance Construction Environmental Negligible significance

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:234: Minor adverse significance

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:234: Accidents and Safety at the local level – - Minor adverse significance

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:12: A minor change in the site location, moving the site west, resulted in the submission of a revised

R-2019-0767-OOM-Non Technical Summary_Final.pdf:9:on groundwater quality are likely to be of minor to moderate magnitude of change, and the level of

R-2019-0767-OOM-officer report.pdf:23:condenser building and stack (up to 80m high) several other minor structures

R-2019-0767-OOM-officer report.pdf:32: Minor: The impact is slightly detectable/noticeable and of some

R-2019-0767-OOM-officer report.pdf:60: minor positive magnitude of impact on these archaeological remains of

R-2019-0767-OOM-officer report.pdf:60: high cultural heritage value. This would result in a long term, minor-

R-2019-0767-OOM-officer report.pdf:61:would result in a minor-moderate adverse significance of effect on these

R-2019-0767-OOM-officer report.pdf:61:unchanged as a minor-moderate beneficial effect as there is no additional

R-2019-0767-OOM-officer report.pdf:72:development is considered to be of minor adverse significance at the local

R-2019-0767-OOM-officer report.pdf:72:on accidents and safety is considered to be of minor adverse significance at

R-2019-0767-OOM-officer report.pdf:72:in terms of accidents and safety, has been identified as being of minor

R-2019-0767-OOM-officer report.pdf:72:phase are identified as being of minor adverse significance at the local level.

R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: April 2022 the Metric 3.0 was replaced by the Metric 3.1, which introduced minor changes from

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:46:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:40:habitats close to watercourses and waterbodies, so the impact is considered to be minor given the

R-2021-0057-VC-STDC-SIZ-SB-PLA-0004 South Bank Existing Ground Cross Sections.PDF:1: Minor contours (0.5m intervals)

R-2021-0057-VC-STDC-SIZ-SB-PLA-0003 South Bank Existing Ground Level Contours and Sections.PDF:1: Minor contours (0.5m intervals)

R-2021-0057-VC-email.pdf:11:Q. I’m just a small contractor, this minor job isn’t worth pursuing if enquiries are expensive?

R-2021-0057-VC-60686_S.73 cover letter_Jan 2021.PDF:1:Former South Bank Works – Application for Minor Material Amendment to

R-2021-0057-VC-STDC-SIZ-SB-PLA-0005 South Bank Proposed Stockpiles 4a b c Details and Sections.PDF:1: Minor contours (0.5m intervals)

R-2021-0057-VC-STDC-SIZ-SB-PLA-0006 South Bank Proposed Stockpile 5 Details and Sections.PDF:1: 20 Minor contours (0.5m intervals)

R-2020-0743-CD-Redcar - MPA Area Summary.pdf:6:• Minor exceedances of WQS in soil leachate from Made

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:352: Determination of minor elements - As,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:360:07. The blast furnace slag was predominantly crystalline with only minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:360:minor amounts of spinel, metallic iron and sulphides.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:360:minor amounts of RO & R3O4 phase, CaF phase, lime phase and periclase. The

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:361:material, even in minor amounts, can have significant potential for expansion

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:361:Other constituents seen in the samples, generally in minor concentrations,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:363:Sample BG0G09 (consisting predominantly of blast furnace slag, with minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:363: (BG0G 06, 08 & 09) and a minor constituent in the remaining two.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:363: The slag was mainly crystalline although minor amounts of glassy

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:363: furnace slag (with minor basic steel slag & basic refractory) recorded

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:364: • Minor amounts of basic refractory material were seen in sample BG0G

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:364: • Other products were seen in the samples in minor amounts including

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:366:The slag contains minor amounts of iron metal occurring as tiny globules and prills and,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:366:under the microscope. Minor amounts of calcite (CaCO3) and well-crystallised gypsum

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:366:(CaO with some Fe, Mn and Mg in solid solution) is present in minor amounts. It occurs

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:368:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:368:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:71: Determination of minor elements - As,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:79:07. The blast furnace slag was predominantly crystalline with only minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:79:minor amounts of spinel, metallic iron and sulphides.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:79:minor amounts of RO & R3O4 phase, CaF phase, lime phase and periclase. The

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:80:material, even in minor amounts, can have significant potential for expansion

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:80:Other constituents seen in the samples, generally in minor concentrations,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:82:Sample BG0G09 (consisting predominantly of blast furnace slag, with minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:82: (BG0G 06, 08 & 09) and a minor constituent in the remaining two.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:82: The slag was mainly crystalline although minor amounts of glassy

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:82: furnace slag (with minor basic steel slag & basic refractory) recorded

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:83: • Minor amounts of basic refractory material were seen in sample BG0G

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:83: • Other products were seen in the samples in minor amounts including

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:85:The slag contains minor amounts of iron metal occurring as tiny globules and prills and,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:85:under the microscope. Minor amounts of calcite (CaCO3) and well-crystallised gypsum

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:85:(CaO with some Fe, Mn and Mg in solid solution) is present in minor amounts. It occurs

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:87:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:87:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:181:07. The blast furnace slag was predominantly crystalline with only minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:181:slag consisted predominantly of melilite, along with more minor amounts of

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:182:minor amounts of RO & R3O4 phase, CaF phase, lime phase and periclase. The

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:182:material, even in minor amounts, can have significant potential for expansion

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:182:Other constituents seen in the samples, generally in minor concentrations,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:183: (BG0G 06, 08 & 09) and a minor constituent in the remaining two.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:183: The slag was mainly crystalline although minor amounts of glassy

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:183: • Minor amounts of basic refractory material were seen in sample BG0G

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:183: • Other products were seen in the samples in minor amounts including

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:185:with other silicates. The slag contains minor amounts of iron metal occurring as

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:185:granular and are difficult to identify specifically under the microscope. Minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:185:present in minor amounts. It occurs mainly as granular particles up to about 0.1

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:188:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:188:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:195:07. The blast furnace slag was predominantly crystalline with only minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:195:minor amounts of spinel, metallic iron and sulphides.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:195:minor amounts of RO & R3O4 phase, CaF phase, lime phase and periclase. The

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:196:material, even in minor amounts, can have significant potential for expansion

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:196:Other constituents seen in the samples, generally in minor concentrations,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:198:Sample BG0G09 (consisting predominantly of blast furnace slag, with minor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:198: (BG0G 06, 08 & 09) and a minor constituent in the remaining two.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:198: The slag was mainly crystalline although minor amounts of glassy

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:198: furnace slag (with minor basic steel slag & basic refractory) recorded

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:199: • Minor amounts of basic refractory material were seen in sample BG0G

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:199: • Other products were seen in the samples in minor amounts including

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:201:The slag contains minor amounts of iron metal occurring as tiny globules and prills and,

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:201:under the microscope. Minor amounts of calcite (CaCO3) and well-crystallised gypsum

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:201:(CaO with some Fe, Mn and Mg in solid solution) is present in minor amounts. It occurs

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:203:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:203:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2023-0224-CD-50134151_1_CPP.pdf:23:For minor maintenance activities at Site that involve work for less than one shift a short induction training

R-2023-0224-CD-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:17: achieve biodiversity benefit. The management prescriptions may be subject to minor revisions

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:23:the co-location site showed minor variation for most of the year, however September

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:16: Construction works will take approximately 36 months to complete. Initially, only minor

R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:16: minor works are being undertaken. Once the main works have commenced, noise

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:12: are minor topographic features that are too small to be picked up. The Bluesky

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:24: very minor impacts over a very minor extent of the character area. The magnitude

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:25: therefore considered that the proposals will create negligible to very minor impacts

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:26:6.20 The proposals will create very minor to negligible impacts on the

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:28: proposals will create only minor alterations to the composition of the view from a

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:28:6.39 It is therefore considered that the proposals will create only minor alterations to the

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:29: create very minor alterations to the composition of the view through the introduction

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:30:6.53 The proposals will create minor alterations to the composition of the view that being

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:30: impact of the proposals will create very minor alterations to the composition of the

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:31:6.62 The proposed BA Facility will therefore create minor alterations to the view that will

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:32: minor alterations to the composition and nature of the view with the introduction of

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:32:6.73 These visible sections of the proposed BA Facility will form only minor alterations to

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:33:6.77 The proposed BA Facility will create partial to minor alterations to the composition

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:34: only minor to very minor or negligible impacts on their landscape/townscape

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:35:7.5 The proposals will create only minor alterations to the composition of views from a

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:54: embankments and other minor topographic features, out to an initial distance of

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:54: DSM and the actual landform where there are minor topographic features that are

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:59: is judged as major, partial, minor or very minor based on the criteria set out in figure

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:61: major, partial, minor or very minor based on the criteria set out in figure A2.4 The

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:64: Minor impact on landscape

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:64: Very minor impact on landscape

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:64: itself or a very minor extent

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:66: Minor alteration to the composition or

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:66: Very minor alteration to the composition

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:14: Minor watercourses in the vicinity of the site include the former course of Holme Beck to the west of the

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:24: Future site users (commercial) Minor Very low

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:24: gas/vapours, PFOS/PFOA in confined spaces Buildings Minor Very low

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:59: Mild Minor or short lived damage to aquatic or other ecosystems, which is unlikely to result in a

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:59: Minor damage to crops, buildings or property.

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:59: Minor

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:60: Severe Medium Mild Minor

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:61:harm if realised would normally be mild or minor.

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:22: in a residual minor impact on driver delay, severance, pedestrian delay, pedestrian

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:23: amenity and a residual minor adverse effect on accidents and safety, which will

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:26: create only minor to very minor or negligible impacts on their landscape /

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:27:4.89 The proposals will create only minor alterations to the composition of views from a

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:85: 2021 which has created some minor changes to the paragraph quotes used and

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:85: • Paragraph 8 b) – minor text change

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:100: structures as they were earmarked for preservation, resulting in a minor-moderate

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:100: moderate positive impact resulting in a minor beneficial effect. There is no

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:105: will be minor and therefore not significant. Overall, therefore, the updated

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:106: being minor to neutral. The updated landscape and visual impact assessment in

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:109:11.11 There have been minor changes to the site layout and construction programme

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:119: development is considered to be of minor adverse significance at the local level,

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:120: • A potential impact on accidents and safety of minor adverse significance

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:121: amenity, fear and intimidation, and accidents and safety of minor adverse

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:121: • A residual impact on accidents and safety of minor adverse significance

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:121: be minor and therefore not significant.

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:156: in the December 2019 ES and concludes that these details and minor

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:41: biodiversity will be minor and temporary, limited to the construction phase, and

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:43: impacts upon the character of the site and wider industrial area will be minor or

R-2023-0247-OOM-TV_BAF_Transport_Statement.pdf:24:Middlesbrough Bus Station 0505 - 1300 - 2100 Following customer requests, there will be some minor retiming of

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:26: impacts on biodiversity will be minor and temporary, limited to the construction phase, and will

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28: and made some minor amendments. It extends to England and Wales, and to a limited extent

R-2021-0316-VC-Metals Recovery Area Cover letter.pdf:1:Metals Recovery Area - Application for Minor Material Amendment to

R-2021-0316-VC-Metals Recovery Area Proposed Stockpile 2 Contours and Sections.pdf:1: Minor contours (0.5m intervals)

R-2021-0316-VC-CAT-PPI-PRC-019.pdf:8:Q. I’m just a small contractor, this minor job isn’t worth pursuing if enquiries are expensive?

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:11: to a common list of criteria, including: Substantial, Moderate, Minor, Negligible or Neutral.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:15: Minor 1.0 to 2.9

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:15: 2 For areas exposed to higher noise levels (above SOAEL), a Minor impact (1dB or greater) is

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:10:a CTMP and phased construction programme, any impacts would be minor and therefore the severance or

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:12: therefore considered to be Minor Adverse. This is considered Not Significant.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:14: Medium increase in traffic flow should not affect the Moderate Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:14: Medium the increase in traffic flow should not affect Minor Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:14: High non-motorised users to cross at the Minor Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:15: Greystones Roundabout High Moderate Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:15: location is therefore considered to be Minor Adverse as the crossing facility is already signalised to

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:15: Therefore, the effects on pedestrian and cyclist amenity at this location is considered to be Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:15: be Minor Adverse. This considered Not Significant

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter L - Cumulative Effects - Dec 2020.PDF:15: increase in traffic is therefore considered to be Minor Adverse. This is considered Not Significant.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19:E3.40 If the impact descriptor is Negligible or Slight (Minor), this is considered to not have a

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19: Moderate, Minor and Negligible/Neutral and reference to these terms are included in the below

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19: 75% or less of objective Negligible Negligible Slight (Minor) Moderate

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19: 76-94% of objective Negligible Slight (Minor) Moderate Moderate

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19: (Minor)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:19: 10-20% of hourly mean NO2 threshold Small Slight (Minor)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:20: significant effect and a ‘Negligible’ or ‘Slight’ (Minor) impact will not result in a significant

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:32: As stated in paragraph E3.44, where the impact is Negligible or Slight (Minor) then the overall

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:14: Minor The size and scale of change are considered small due to the extent and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:16: on a minor road will tend to have limited importance. A viewpoint that is visited or used by a

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:19: Minor The proposed development forms a minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:20: Minor Beneficial Complement the character of the receiving landscape.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:20: Minor Adverse The proposed development may detract slightly from, or not quite fit

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: Alternatively, a minor magnitude of change on a highly sensitive

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: Minor Beneficial The proposed development would cause a perceptible improvement in

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: experience a minor/ moderate magnitude of change that is beneficial in

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: Minor Adverse The proposed development would cause a perceptible deterioration in

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: experience a minor/ moderate magnitude of change and one which is

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:21: a minor magnitude of change on a highly sensitive receptor or a major

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:22: in EIA terms. Those classified as Minor or Negligible are likely to be Not Significant in EIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:23: Minor Minor Minor Minor to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:23: Moderate Minor Moderate* Moderate* to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:23: Substantial Minor to Moderate* to Substantial*

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:26: 9 Green corridors such as minor valleys and former railway lines provide links between urban

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:29:J4.31 To the north, the landscape is low lying with minor topographical changes created by

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:40:J5.13 Combining all of these criteria, it is considered that there will be a Minor Beneficial level of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:40: LCZ 1 - Industrial Low Minor Minor Beneficial Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:40: is likely that construction would result in a minor shift away from baseline conditions and would

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:41: experience indirect, minor adverse effects during construction, and in the operational stage.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:41:J5.18 Due to the scale size and permanence of the proposed development, this would result in a minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:41: change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:41:J5.19 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:41: LCZ 2 - Urban Low Minor Minor Adverse Indirect, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:44: J5.39 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:44: LCZ 6 – Eston Hills Medium-High Minor Minor Adverse Indirect, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46:J5.52 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46: LCZ 9 – Urban Green Low-Medium Moderate Minor Adverse Indirect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46:J5.56 The proposed development will form a minor component in the overall visible landscape and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46:J5.57 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46:J5.58 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46: VP1 Footpath Users Minor Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47: as a minor component in the overall view, and its influence on the receptor may be missed.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47:J5.61 The skyline is altered in a minor way as the proposed development partially fills in the view of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47:J5.64 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47:J5.65 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47: VP2 Road Users Minor Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47: visibility of which may be increased in winter months. The skyline is altered in a very minor way,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47: and existing building designs. The proposed development forms a minor component of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:47:J5.71 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:48:J5.72 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:48: VP3 Road Users Minor Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:48:J5.77 Based on the above assessment, the magnitude of change is therefore considered to be Minor-

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:48:J5.78 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:48: VP4 Overbridge Users Minor-Moderate Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:49:J5.83 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:49: VP5 Road Users Moderate Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:49:J5.87 The proposed development will form a minor component in the overall visible landscape and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:50: down onto the proposed development. The proposed development has minor visibility due to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51: Industrial development within the context of the view. The skyline has minor alterations from

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51:J5.100 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51:J5.101 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51: VP14 Footpath Users - Minor Minor Adverse – Not Direct.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51:J5.106 The skyline is altered in a minor way, filling in gaps between the few builidngs visible on the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51:J5.107 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:51:J5.108 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:52: VP15 Footpath Users Minor Minor Adverse Direct,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:52:J5.112 The skyline is altered in a very minor way, filling in gaps between existing industrial chimneys

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:52: and existing building designs. The proposed development forms a minor component of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: VP1 Footpath Users - Minor Moderate Adverse - Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: VP2 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: VP3 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: VP4 Overbridge Users Minor-Moderate Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: Vp13 Footpath Users - Minor Minor Adverse Direct. Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:53: Vp14 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: LCZ 1 - Industrial Low Minor Minor Beneficial – Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: LCZ 2 - Urban Low Minor Minor Adverse – Indirect, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse – Indirect, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: LCZ 9 – Urban Low-Medium Moderate Minor Adverse – Indirect, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: VP1 Footpath Users - Minor Moderate Adverse - Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:55: VP2 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:56: VP3 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:56: VP4 Overbridge Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:56: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:56: VP13 Footpath Users - Minor Minor Adverse Direct. Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:56: VP14 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:57: and operation All other effects are anticipated to be Minor or Negligible (and Not Significant).

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:57: LCZ 1 - Impact of Minor beneficial – Not Buildings to be Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:57: LCZ 2 - Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:58: LCZ 6 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:59: LCZ 9 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:59: VP2 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:60: VP3 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:60: VP4 Impact of Minor Adverse Buildings to be Minor Advese

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:60: VP5 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:61: VP13 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:61: VP14 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:14: earthworks resulting in a limited or minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:16: Low Human Health: Slight reversible short-term Minor impact on feature or

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:16: Very High Substantial Substantial Moderate Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:16: High Substantial Moderate Minor Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:16: Medium Moderate Minor Negligible Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:16: Low Minor Negligible Negligible Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:21: approximately north to south by Kinkerdale Beck until the late 1950s. Minor areas were

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:25: minor and non‐aquifer in different locations. A Secondary A aquifer is described as “Permeable

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:25: classified as minor aquifers”. Whilst an unproductive aquifer is described as “These are rock

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:27: was mainly crystalline although minor amounts of glassy and ceramic material were seen. The

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:27:G4.59 Further testing of samples consisting predominantly of blast furnace slag (with only minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:27:G4.60 Minor amounts of basic steel slag were seen in most of the samples. However, more dominant

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:27: present a significant risk of expansion. Minor amounts of basic refractory material were also

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:32: earthworks resulting in a limited or minor increase in demand on waste management

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:33: be of Minor Adverse significance which is considered ‘Not Significant’ in terms of this EIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:37: workers of Minor Adverse significance and impacts on nearby residents of Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:38: significance of the impacts identified is considered to be Minor Adverse / Negligible and Not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:38: Construction Exposure to Substantial Adverse: Remediation / Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:38: Built Soil/materials Minor Adverse and Not Minimisation of waste Negligible and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:39: in a limited or minor Materials Management

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:23: major faulting is shown but minor faults may be present.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:23: and recent sand and gravel deposits as a “Minor A quifer” which may have “variable

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:24:Sand & gravel Sand & gravel . 2.9m to Ref. 4 0.84mbgl to Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:24:Estuarine Clay Clay with bands of silt and U p to 4.8m Ref. 4 Unlikely. Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:26: Groundwater Minor Aquifer Low Site underlain by a Minor Aquifer. No

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:77: faulting is shown but minor faults may be present.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:97: faulting is shown but minor faults may be present.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:98: flats and recent sand and gravel deposits as a “Minor Aquifer” which may have

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:98:Made Ground D ense to very dense 1.3m to Ref. 4 1.16mbgl to Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:98:Estuarine and Grey to brown soft brown Up to 9.1m Ref. 4 1.16mbgl to Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:100: Groundwater Minor Aquifer Low Site underlain by a Minor Aquifer . No

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:186: Groundwater – the alluvium in the vicinity of the site is classified as a Minor Aquifer

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:187: • Groundwater (the underlying drift deposits are classified as a Minor Aquifer);

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:188: (classified as a Minor Aquifer by the EA) are assessed as being low. Our

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:195: are collectively classified as Minor Aquifers by the Environment Agency. There are

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:196: • Groundwater (the underlying drift deposits are classified as a Minor Aquifer);

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:197: (classified as a Minor Aquifer by the EA) are assessed as being low in most areas

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:226: minor significance. The exposure risks are assessed against the present site

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:227: Minor or short lived damage to aquatic or other ecosystems, which is unlikely to result in a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:227: Minor damage to crops, buildings or property.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:228: Minor No measurable effect on humans.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:228: Severe Medium Mild Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:230: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:231: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:232: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:233: as Minor Aquifer) clay in some areas, but absence of widespread contaminat ion

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:233: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:235: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:236: as Minor Aquifer) encountered at two locations within Made Ground.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:237: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:238: as Minor Aquifer) a c r o s s the area.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:239: as Minor Aquifer) contaminants.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:239: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:240: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:241: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:242: as Minor Aquifer) sands.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:244: as Minor Aquifer) inhibit downward migration of contaminants. Limited evidence of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:244: as Minor Aquifer) migration of contaminants.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:245: as Minor Aquifer) contamination detected.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:245: as Minor Aquifer) contaminants.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:247: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:247: as Minor Aquifer)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:250: classed as Minor groundwater.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:251: classed as Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:252: classed as Minor some protection from downward migration.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:253: classed as Minor GRO, TPH. Estuarine alluvium and Boulder Clay may provide some

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:254: classed as Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:254: classed as Minor groundwater to the River Tees bordering the wharfe.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:256: classed as Minor protection to downward migration of contaminants.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:257: classed as Minor protection from downward migration.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:258: classed as Minor Boulder Clay may provide some protection from downward

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:259: classed as Minor Boulder Clay may provide some protection from downward

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:260: classed as Minor m i g ration toward River Tees but groundwater flow shows local

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:261: classed as Minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:262: classed as Minor Mild Tees but mitigated by distance, approximately 2km.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:266:CLEVELAND cont. classified as a Minor Aquifer), nearby surface waters i.e. the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:269:to the west. Extensive estuarine sands (Bran Sands) and the are classified as a Minor Aquifer by the Environment Agency.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:271:widespread basis in the northern section of the site in Area 16 being classified as a Minor Aquifer), nearby surface waters

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:276:consisted predominantly of melilite, along with more minor amounts of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:276:was present in minor amounts. Secondary alteration was moderate, consisting

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:277:steel slag consisted mainly of dicalcium silicate, along with more minor amounts

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:277:Minor amounts (small / very small) of basic refractory material were seen in nine

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:277:of the samples. This material, even in minor amounts, can have significant

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:280:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:280: samples examined. The slag was mainly crystalline although minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:280: slag (with only minor amounts of basic steel slag) recorded expansion

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:280: • Minor amounts of basic steel slag were seen in most of the samples.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:280: Minor amounts of basic refractory material were seen in nine of the 21

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:286:13-21 lack spinel suggesting a slight compositional change). Minor amounts of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:287:exsolution of very finely granular periclase. There are minor amounts of others

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:287:minor amounts of silicates). There is also some partly hydrated periclase from

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:287:magnesia refractory and, very minor, chrome-magnesia refractory..

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:290:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:290:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1036:consisted predominantly of melilite, along with more minor amounts of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1036:was present in minor amounts. Secondary alteration was moderate, consisting

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1037:steel slag consisted mainly of dicalcium silicate, along with more minor amounts

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1037:Minor amounts (small / very small) of basic refractory material were seen in nine

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1037:of the samples. This material, even in minor amounts, can have significant

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1040:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1040: samples examined. The slag was mainly crystalline although minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1040: slag (with only minor amounts of basic steel slag) recorded expansion

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1040: • Minor amounts of basic steel slag were seen in most of the samples.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1040: Minor amounts of basic refractory material were seen in nine of the 21

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1046:13-21 lack spinel suggesting a slight compositional change). Minor amounts of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1047:exsolution of very finely granular periclase. There are minor amounts of others

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1047:minor amounts of silicates). There is also some partly hydrated periclase from

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1047:magnesia refractory and, very minor, chrome-magnesia refractory..

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1050:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1050:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1404: Determination of minor elements - As,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1431:and carbazole were detected in minor amounts in some soil samples. These are indicative of incomplete

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1439:in soil with the exception of minor amounts of 1,1-dichloropropene, 4-nitrophenol and carbazole. However,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1440:assumed to also be active, although the contaminant flux may be low based on the minor impacts identified in

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1497:until the late 1950’s however minor areas were developed prior to this. Small clay pits are shown in the north

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1504: • Cohesive Made Ground: Generally described as soft to very stiff containing minor constituents of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1533: basic steel slag, with the latter comprising the minor fraction in most cases. The testing indicated only

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1601:  Based on the petrology and expansion testing a minority of the slag deposits at the site are considered

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1602:  Based on the petrology and expansion testing a minority of the slag deposits at the site are considered

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1632:expansion of Made Ground with more minor amounts of slag cannot be excluded.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1655: 2 -Minor impact on future site operation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1655: 3 -Very Minor Operational Requirement (e.g. Monitoring Only)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1656:Operational Implementation 2 1 1 2 1 1 2 -Minor impact on future site operation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1656: 3 -Very Minor Operational Requirement (e.g. Monitoring Only)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1657:Operational Implementation 3 1 3 1 2 -Minor impact on future site operation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1657: 3 -Very Minor Operational Requirement (e.g. Monitoring Only)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1688: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1696: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1709: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1717: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1717: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1717: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1872: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1872: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1873: Minor Very low risk Very low risk Low Risk Low Risk

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1873: realised would normally be mild or minor.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1961: Incident Identification: 617951 Land Impact: Category 3 (Minor)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1963: These are generally aquifers formerly classified as minor aquifers

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1964: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1964: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1965: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1966: (undifferentiated) general these layers have previously been designated as both minor and non-aquifer

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:26: Complex 23.05.2018 R/2014/0626/FFM to allow for minor material amendments to the approved

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:29: 9 Minor 3 beneficial

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:29:3 Minor – slight, very short or highly localised effects

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:30: 11 Minor10 adverse

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:45: blue-green networks and minor watercourses with a catchment of less than 5km2) the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:14: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:14: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:14: Minor Where the proposed development could be expected to result in a small, very short or

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:14: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:14: Medium Moderate to Moderate Minor Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:15: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:30: Adverse. The magnitude of effects is assessed as being Substantial, Moderate, Minor or

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:44: vantage point in the area) during construction. All other effects are anticipated to be minor or

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:44: development will form a minor component in the overall visible landscape and may not have a

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:47: Tees Dock Road roundabout. All other effects will be reduced to minor or negligible and not

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:49: groundwater, the built environment and landscape will all be of minor adverse / negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:14: Minor The consumption of one or more materials would be between 1-5% by volume of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:14: No change Negligible Minor Moderate Major

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:14: Very high Neutral Minor Moderate Substantial Substantial

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:14: High Neutral Minor Moderate Moderate Substantial

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:14: Medium Neutral Negligible Minor Moderate Moderate

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:22: within the proposed development would have a magnitude of impact of minor on the regional

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:22:and appearing to be minor shunt type collisions. No collisions involving

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:57: for the occupier, for employees to bring bicycles in for servicing and minor

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:61:a minor reduction in car mode share and is based on traffic increasing in the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:99: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:294: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:11: development traffic. Other effects would be Not Significant. There would be a Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:11: a Minor Adverse (and Not Significant) effect on pedestrian and cyclist amenity. There would be

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:15: These impacts are considered to be Negligible to Minor Adverse and Not Significant for all

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:15: impacts on groundwater quality are considered to be Minor Beneficial, both of which would be

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:16: (described below) and embedded mitigation, this is expected to result in a Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17:8.18 The implementation of these measures will result in Minor Adverse or Negligible (and Not

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:20: ability of the UK to meet its national targets. The development is assessed as Minor Adverse and

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:20: as Minor Adverse and Not Significant for operational stage.

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:21: effects ranging from Negligible to Minor Adverse/Minor Beneficial. There will be a Moderate

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:21: considered to be Not Significant, with effects ranging from Negligible to Minor Adverse.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:15: minor, moderate or substantial. An assessment is then made on whether the effects are

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:21: reduced from those in the current budgets. However, given the minor adverse contribution of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:22: the annual emissions from Redcar and Cleveland as a whole. This is a minor adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:27:I7.3 However, it is not considered that these minor adverse emissions will compromise the ability of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:27:I7.7 It is not considered that the minor adverse emissions during operation will compromise the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:28: Atmosphere/ Total Minor Design to reduce material quantities Minor adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:28: Atmosphere/ Total Minor Reduce future maintenance with early Minor adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:18: Complex to allow for minor material amendments Potash project and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:20: marine side applicati and other minor Infrastructure along the Lichfields to STDC in November

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:30: 3 Minor3 beneficial

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:30: 5 Minor3 adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:30: Minor - slight, very short or highly localised effects

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:18: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:14: blue-green networks and minor watercourses with a catchment of less than 5 km2) the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:19: 2 The magnitude (severity) of the effect (major, moderate, minor, no change) (Table F3.3)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:21: Minor reduction in resource availability

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:22: Minor Results in minor impact on feature, with Measurable reduction in groundwater

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:22: for minor damage to property and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:22: 'Minor' or ‘Negligible’ is referenced as a level of effect, this can be either Beneficial or Adverse.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:23: Major Substantial Substantial Substantial Moderate Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:23: Moderate Substantial Substantial Moderate Minor Neutral/

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:23: of change Minor Moderate Moderate Minor Neutral/ Neutral/

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:23: level of effect is considered to be minor or less, these are generally not deemed significant in

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:23: is possible that some potentially minor effects could be judged as significant in terms of the EIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:33: layer in question has previously been designated as both minor and non-aquifer in different

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:42: be minor.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:43: be minor. The receptor sensitivity of the Cleveland and Lackenby Channels, Kinkerdale Beck

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:44: to be minor, due to the commitment to adhere to the measures included in the CEMP during the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:44: magnitude of the effect of excavation on groundwater flow is deemed to be minor. Alongside a

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:44: to be of minor magnitude without embedded mitigation. With the implementation of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:44: CEMP, this would reduce but still be of minor magnitude. Alongside a receptor sensitivity

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:45: water flows during the operation phase is considered to be minor. The receptor sensitivity of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:45: of change for groundwater flows during operation is minor. The site is located near the River

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:45: magnitude of change for groundwater quality during operation is minor, and the level of effect

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:51: during the construction phase is considered to be minor and so the effect of the improvements

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:51: of change will be minor, so the level of effect is therefore Negligible Adverse, and Not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:52:F7.11 Overall, any effects on groundwater quality are likely to be of minor magnitude of change, given

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:52: residual effects is considered to be minor. The receptor sensitivity of the Cleveland and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:52: aquifers is low, and the magnitude of the effects will be minor, so the level of effect is therefore

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:53: and its potential for mobilisation. This should result in a minor magnitude of change from the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:53: implementation of the mitigation measures and result in Minor Beneficial effect which is Not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:59: Water Quality - Minor Adverse and Not Any Surface water channels Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:60: Pollution from Negligible Beneficial and The SWMP and DIA will Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:60: Pollution from Negligible Beneficial and The SWMP and DIA will Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:10: • Minor – effects which will be slight or very localised;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:10: • Minor – effects which will be slight or very localised or only effect receptors that are defined

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:18: this stage, professional judgement indicates that, with a CTMP, any impacts would be minor and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:20: Medium Minor Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:21: of Tees Negligible Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:21: therefore should have little effect on the Minor Moderate

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:21: Negligible Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:21: permanent Minor adverse effect. The crossing facility on the A66 by Whitworth Road

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:21: • The A1053 has a minor magnitude in change as the HGV increase is 33%. Due to the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:22: SRN, and therefore have a Minor Adverse effect on pedestrian and cyclist amenity. It is

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:22: and could have a Minor Adverse effect on accidents and safety. This is expected to be Not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:22: junction and appearing to be minor shunt type collisions. The proposed development will add

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:24: A174/ Moderate Junction improvements are expected to be Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:24: A1085 Trunk Moderate The A1053 already has an existing high HGV flow in Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:25: A66 west of Minor adverse Traffic increase is low and the crossing facility on Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:25: A174 / Minor adverse A series of footbridges are already provided over Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:27: A174/ Moderate Junction performance Junction improvements are Minor Adverse -

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:27: A1053 Moderate Potential accidents Travel Planning measures Minor Adverse –

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:27: A66 west of Minor adverse Potential accidents Travel Planning measure Minor Adverse (as

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:27: A174 / Minor adverse Potential accidents Travel Planning measures Negligible – travel

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:6: Ground Conditions and Remediation Minor Adverse (Not Significant) effect on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:7: Climate Change Minor Adverse (Not Significant) effect on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:7: Minor Adverse (Not Significant) effects on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:7: Water Management and Flooding Minor Beneficial (Not Significant) effects on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:8: Climate Change Minor Adverse (Not Significant) effect on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:8: Landscape and Visual Impact Minor Beneficial (Not Significant) effect on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:8: Minor Adverse (Not Significant) effect on:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:10: reference is made to Minor or Negligible ‘insignificant’ residual effects where relevant. The EIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:10: predicted, the residual effects of the development are either Minor or Negligible Adverse and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:10: Not Significant or Substantial Beneficial (Significant) or Minor Beneficial or Neutral.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:11: RED - adverse effect; GREEN - beneficial effect; ( ) - Minor/Negligible non-significant effect; X no/neutral

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:18: International 139/VC permission R/2014/0626/FFM to allow for minor material 23.05.2018 permission relates to the York

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:42: effects are deemed to be Minor Beneficial and Not Significant (in terms of groundwater

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:42: pollution / contamination), Minor Adverse and Not Significant for ground water flows. Smaller

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:45: than those in the current budgets. However, given the overall Minor Adverse contribution of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:46:L5.68 Whilst individual sites are expected to have a Minor Adverse (Not Significant)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:47: percentage impact of 1.03% on the regional landfill capacity. This is considered to be a minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:47: considered to be minor. The overall significance is considered to be Negligible (Not Significant).

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:49: indicates that, with a CTMP and phased construction programme, any impacts would be Minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:49: Moderate Adverse effect is forecast on the A66 and Normanby Road, with a Minor Adverse

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:55: • For areas exposed to higher noise levels (above SOAEL), a minor impact (1dB or greater) is

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:64: Negligible impact at most receptor locations and Slight (Minor) Adverse at five receptor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:64: R20), the A1085 and Kirkleatham Lane respectively). Negligible and Slight (Minor Adverse)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:65: If a value of 0.4µg/m3 is assumed that the impact at the two receptors becomes Slight (Minor)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:66: Where the impact is Negligible or Slight (Minor Adverse) then the overall effect of the proposed

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:67: Minor Adverse and Not Significant for ground water, and for surface water the impact on

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:69: considered to be Minor. Consequently, the overall significance is considered to be Negligible

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:70: applications within the region (such as the Tier 1 applications) have Minor impacts, a similar

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:70: Minor impacts a similar influence could be anticipated from Tier 2 schemes. Therefore, the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:70: as the Tier 1 applications, have Minor impacts a similar influence could be anticipated from Tier

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:8: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0270-FFM-STDC_HWY-ATK-LDC-PR-DR-CH-000012_C01.PDF:1: Minor Contour (0.5m)

R-2020-0270-FFM-STDC_HWY-ATK-LDC-PR-DR-CH-000013_C01.PDF:1: Minor Contour (0.5m)

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:32: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:55: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:66: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: Minor Very low risk Very low risk Low Risk Low Risk

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: realised would normally be mild or minor.

R-2020-0270-FFM-STDC_HWY-ATK-LDC-PR-DR-CH-000011_C01.PDF:1: Minor Contour (0.5m)

R-2020-0270-FFM-STDC_HWY-ATK-LDC-PR-DR-CH-000002_C01.PDF:1: Minor Contour (0.5m)

R-2020-0270-FFM-STDC_HWY-ATK-LDC-PR-DR-CH-000010_C01.PDF:1: Minor Contour (0.5m)

R-2020-0270-FFM-Decision 0270.pdf:6:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:10: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:16:• Minor amendments to the boundary to address mapping errors and anomalies

R-2021-0432-FFM-Decision.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0432-FFM-19736928_1.PDF:11:• Surface water - The Environment Agency Surface Water Flood Map, included in Figure 5-1, shows minor

R-2021-0432-FFM-19736928_1.PDF:12:water flooding. These are primarily associated with minor variations in ground levels. Due to the site being

R-2021-0432-FFM-19736928_1.PDF:16:water flooding. These are primarily associated with minor variations in ground levels that result in depressions

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:743:consisted predominantly of melilite, along with more minor amounts of

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:743:was present in minor amounts. Secondary alteration was moderate, consisting

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:744:steel slag consisted mainly of dicalcium silicate, along with more minor amounts

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:744:Minor amounts (small / very small) of basic refractory material were seen in nine

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:744:of the samples. This material, even in minor amounts, can have significant

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:747:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:747: samples examined. The slag was mainly crystalline although minor

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:747: slag (with only minor amounts of basic steel slag) recorded expansion

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:747: • Minor amounts of basic steel slag were seen in most of the samples.

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:747: Minor amounts of basic refractory material were seen in nine of the 21

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:753:13-21 lack spinel suggesting a slight compositional change). Minor amounts of

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:754:exsolution of very finely granular periclase. There are minor amounts of others

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:754:minor amounts of silicates). There is also some partly hydrated periclase from

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:754:magnesia refractory and, very minor, chrome-magnesia refractory..

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:757:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:757:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:1111: Determination of minor elements - As,

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:12:until the late 1950’s however minor areas were developed prior to this. Small clay pits are shown in the north

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:19: • Cohesive Made Ground: Generally described as soft to very stiff containing minor constituents of

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:48: basic steel slag, with the latter comprising the minor fraction in most cases. The testing indicated only

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:84: Incident Identification: 124998 Land Impact: Category 3 (Minor)

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:86: Undifferentiated In general these layers have previously been designated as both minor and non-

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:86: generally aquifers formerly classified as minor aquifers

R-2023-0339-CD-ApplicationForm 0339.pdf:6: Minor amendment to client details on application form

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Low Some measurable change in attributes, quality Minor short-term benefit to, or addition

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: or vulnerability; minor loss of, or alteration to, of, one (maybe more) key

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Negligible Very minor loss or detrimental alteration to one Very minor temporary benefit to or

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Negligible No change Negligible Negligible or Negligible or Minor

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Minor

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Low No change Negligible or Negligible or Minor Minor or

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Minor Moderate

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Medium No change Negligible or Minor Moderate Moderate or

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Major

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: High No change Minor Minor or Moderate or Major or

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Very high No change Minor Moderate or Major or Substantial

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: temporary or minor chronic harm to human health; or a severe temporary or localised

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: • Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: design of the project. For example, minor adverse effects could include: the potential for

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: temporary slight/minor harm to human health; localised reduction in the quality of any

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: minor beneficial effect could include: slight improvement in human health (or slight reduction

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: in existing human health risk factors; a minor local scale improvement in the quality of any

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:14:9.5.5 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.9 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.15 On this the basis, the level of effect is considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:16:9.5.21 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:16:9.5.30 On this basis, the level of effect is considered to be up to minor beneficial, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:17:9.5.34 On this basis, the level of effect is considered to be up to minor beneficial, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:17: minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:18: considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: considered to be minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: users and groundwater would be up to minor beneficial.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: would be negligible to minor adverse, which is not significant.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: CoCP, site Negligible Minor adverse Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Mobilisation of CoCP, site Negligible Minor adverse Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23:Groundwater – Tidal CoCP, site Low Minor adverse Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Direct damage to geology CoCP, site Negligible Minor adverse Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23:Human Health – Mobilisation of Validation report, Up to Medium Up to Minor Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:24: Mobilisation of Validation report, Up to Medium Up to Minor Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:24: Very High Dermal exposure, vapours Environmental permit Negligible Minor adverse Not significant

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:24:Cleveland Coast High Negligible Minor adverse Not significant

R-2022-0355-FFM-Decision Notice.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0846-FFM-DECISION NOTICE.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:For both Warrenby 3A and 3B model results show that minor flooding occurs from the drainage ditches

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:21:during 1%AEP event. These exceedance flows will be held locally on site through minor changes in the site

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:26:of no more than 500mm will result in minor alteration of the existing drainage regimes. It is intended that

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:121: Determination of minor elements - As,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:50: Determination of minor elements - As,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:138: Determination of minor elements - As,

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:16: Construction works will take approximately 36 months to complete. Initially, only minor

R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:16: minor works are being undertaken. Once the main works have commenced, noise

R-2023-0253-RMM-Grangetown ERF - PS - RM - Mar 23.pdf:40: periwinkle Vinca minor 'Atropurpurea' 20/30 17

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:208:the co-location site showed minor variation for most of the year, however September

R-2023-0253-RMM-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:17: achieve biodiversity benefit. The management prescriptions may be subject to minor revisions

R-2023-0253-RMM-50134151_1_CPP.pdf:23:For minor maintenance activities at Site that involve work for less than one shift a short induction training

R-2021-0943-CD-DECISION NOTICE.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:of minor adverse significance with regard to habitat loss. No significant impacts are predicted to marine

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:With the adoption of mitigation measures, a worst case impact of minor adverse was predicted.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:short-lived. As such, impacts on prey resources and foraging are predicted to be minor adverse, at

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:minor adverse, at worst.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:impact is predicted to be minor. Other water quality issues, such as a reduction in dissolved oxygen

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:29:expected that fish will already be habituated to regular dredging noises within the estuary and a minor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:45: minor adverse significance to human health. This is on the basis that the mitigation measures

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:46: • Groundwater including Minor and Major Aquifers underlying the site

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: The demolition of South Bank Wharf and jetties will have only minor, localised and temporary effects

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:52: in the upper layers. Overall, a minor adverse impact is predicted.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:73: adverse significance (pre-mitigation) and minor adverse (post-mitigation).

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:of minor adverse significance with regard to habitat loss. No significant impacts are predicted to marine

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:With the adoption of mitigation measures, a worst case impact of minor adverse was predicted.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:short-lived. As such, impacts on prey resources and foraging are predicted to be minor adverse, at

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:minor adverse, at worst.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:impact is predicted to be minor. Other water quality issues, such as a reduction in dissolved oxygen

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:29:expected that fish will already be habituated to regular dredging noises within the estuary and a minor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:45: minor adverse significance to human health. This is on the basis that the mitigation measures

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:46: • Groundwater including Minor and Major Aquifers underlying the site

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: The demolition of South Bank Wharf and jetties will have only minor, localised and temporary effects

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:52: in the upper layers. Overall, a minor adverse impact is predicted.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:73: adverse significance (pre-mitigation) and minor adverse (post-mitigation).

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-MS-WM-000001.pdf:1: 1 Minor Medium risk

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:2:Minor Ancillary Buildings.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:3: 14. Minor Ancillary Buildings 3

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:7: Minor amendments to the method of works (“Red Penning”) will be conducted

R-2021-0397-PND-officer report.pdf:1:Minor Ancillary Buildings.

R-2020-0598-FF-email.pdf:9:Q. I’m just a small contractor, this minor job isn’t worth pursuing if enquiries are expensive?

R-2020-0598-FF-Decision Notice_R20200598FF.pdf:3: • 12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:16: variable characteristics and being previously defined as both a minor

R-2020-0318-FFM-Decision Notice.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1375: Determination of minor elements - As,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:02. The blast furnace slag was predominantly crystalline with only minor

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:unaltered slag consisted predominantly of melilite, along with more minor

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:minor amounts (small/very small), sample BG0E03 contained a medium amount,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1397:slag consisted largely of dicalcium silicate, along with more minor amounts of RO

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:Minor amounts (small / very small) of basic refractory material were seen in four

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:of the samples. This material, even in minor amounts, can have significant

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1398:Other constituents seen in the samples in minor concentrations included

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1400:Samples consisting predominantly of blast furnace slag, with only minor amounts

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: (BG0E01-03) and a minor constituent in the remaining three. The slag

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: was mainly crystalline although minor amounts of glassy material were

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: BG0F01-02. It was also present in more minor amounts (vs to m) in

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1401: • Minor amounts of basic refractory material were seen in four of the six

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1402: • Other products were seen in the samples in minor amounts including

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1404:contains minor amounts of iron metal occurring as tiny globules and prills and,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1407:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1407:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1408:contains minor amounts of iron metal. Secondary alteration is moderate. It is

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1411:spinel ((Mg,Fe)Al2O4). The slag typically carries minor amounts of periclase (MgO with some Fe in solid

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1411:solution) and lime phase (CaO with some Fe, Mn & Mg in solid solution). Other possible minor

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:8: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:11: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:16:• Minor amendments to the boundary to address mapping errors and anomalies

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:32: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:55: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:66: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: Minor Very low risk Very low risk Low Risk Low Risk

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: realised would normally be mild or minor.

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:91:straightened planform. Some minor

R-2023-0291-ESM-ES Vol 1 Chapter 13 Climate Change and GHG.pdf:13: Minor Adverse

R-2023-0291-ESM-ES Vol 1 Chapter 13 Climate Change and GHG.pdf:13: projects of this type. A project with minor adverse effects is fully in line with

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:4: Minor discernible differences. Affecting the character area / receptor

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:4: to a minor extent.

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:4: Minor alteration to few elements,

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:5: Moderate Partial/noticeable or minor alteration to

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:5: Minor Minor alteration to few elements of the

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:15: Character of the Low Although the Site is largely undeveloped, following the clearing of built form relating to its historic refinery uses, Moderate Minor-Moderate Moderate Moderate Adverse Minor Minor adverse

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:15: Surrounding Low Within the surrounding urban context, the new Green Lithium facility - comprising a low carbon lithium refinery, Moderate Minor- Adverse Minor Minor Adverse Minor Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:17:Recreational users of Medium For recreational users of the England Coast Path long distance route, views of the Site vary depending Minor Minor Adverse Minor Minor Adverse Negligible Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:17:Local road users to the Low PVP 3 illustrates the view from the junction of the A66 and Eston Road, where intervening built form will Minor Minor Adverse Minor Minor Adverse Negligible Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:18:Transient users of Low Photoviewpoints 6 and 7 illustrate views on the approach to the Site along Teesport Road from the Major Moderate Adverse Moderate Minor-Moderate Minor Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:18:Transient users of Low For transient users of the A1085 Trunk Road and Public Retail Development users, the views towards Minor Minor Adverse Minor Minor Adverse Negligible Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:19:Recreational users of Medium to High This view is representative of those from the Eston Nab Hill viewpoint. It is a local landmark, and is well Minor Moderate Adverse Minor Moderate Adverse Negligible Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:19: evident as a minor addition to the views and experienced within the surrounding building uses of the

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:19:Visitors to Coatham Low to Medium Distant views towards the Site are heavily filtered by intervening built form: cranes and industrial Minor Minor Adverse Negligible Negligible Negligible Negligible

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:20:Residents to the south Low to Medium Viewpoint 5 is representative of views towards the Site from the residential properties within a Minor Minor Adverse Negligible Negligible Negligible Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:5: • The potential effects have been given a significance of Negligible or Minor, Moderate or Major

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:5: • Where any predicted effects are Minor, Moderate or Major Adverse, these are considered

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:6: A minor shift away from baseline conditions. Change arising from the loss/alteration will

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:6: Minor

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:6: Major Major Moderate to Major Minor to Moderate

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:6: Moderate Moderate to Major Minor to Moderate Minor

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:7: Minor Minor to Moderate Minor Negligible to Minor

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:7: Site. A number of minor surface water drains are present on Site located mainly within the north-western

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:8: Deposits been designated as both minor and non-aquifer in

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:11: topography is relatively flat, and there are a number of minor surface water drains located on the

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:13: Proposed Development is considered to be Minor. Prior to mitigation, the effect significance is

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:13: considered to be Negligible to Minor Adverse for surface water drainage (low sensitivity receptor).

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:15: Minor. Prior to mitigation, the effect significance is considered to be to be Minor Adverse on

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:15: is considered to be Minor on both groundwater (medium sensitivity) and surface water (high sensitivity).

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:15: is considered to be Minor to Moderate Adverse for groundwater and surface water.

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:17: construction phase is considered to be Minor on flooding (medium sensitivity). Prior to mitigation, the

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:17: effect significance is considered to be Minor Adverse for flood risk.

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:18: into groundwater and surface water is considered Minor. Prior to mitigation, the effect significance of

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:18: is considered to be Minor to Moderate Adverse for groundwater and surface water.

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:19: operational phase is considered to be Minor on flooding (medium sensitivity). Prior to mitigation, the

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:19: effect significance is considered to be Minor Adverse for flood risk

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:20: water drainage would be Negligible to Minor Beneficial when compared to the existing scenario.

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:24: ratings of the assessment and the resulting residual effects would remain Negligible to Minor Beneficial.

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: surface water (surface water Minor - Installation of drainage works

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor Adverse

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: groundwater Minor Minor Adverse Groundwater monitoring will be

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor to

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor Moderate will be designed and managed to

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor - Dewatering of excavations and

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: water and Minor Adverse tanks). Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: of High Minor to appropriate remediation carried

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: contamination Minor Moderate - Foundation works risk

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor Minor Adverse undertaken prior to construction

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: surface water (surface water Negligible Minor Water Drainage Strategy

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:26: Minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:5: Low Minor reduction in environmental risk to

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:5: Minor environmental risk to sensitive

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:5: environmental receptors requiring no sensitive environmental receptors. Minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:6: Residual risk considered to be so minor to sensitive receptors that it would not be

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:6:14.14. The potential effects have been classified, prior to mitigation, as minor, moderate or major (either

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:6: High Major Moderate/Major Moderate Minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:6: Medium Moderate/Major Moderate Minor/Moderate Negligible/Minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:6: Low Moderate Minor/Moderate Negligible/Minor Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: Minor Adverse Temporary and minor environmental risk to a sensitive environmental receptor, for

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: example minor local reduction in groundwater and/or surface water quality, minor local

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: impact on ecosystems. Effects are reversible. Minor effect on human health.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: health. Any minor adverse effects are reversible.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: Minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: Minor reduction in environmental risk to humans or a sensitive environmental receptor. For

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: Beneficial example, minor local improvement in groundwater and/or surface water quality, minor

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:7: local improvement in impact on ecosystems and minor improvement in human health

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:8:14.16. Any impacts of minor significance or lower are not considered to be significant and as such it will not be

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:16: aquifers only have a minor value and negligible significance for water supply to rivers lakes or

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:20: • The nearest pollution incident relates to a release of diesel causing a minor impact to land

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:24: the absence of mitigation, the effect is likely to be temporary, local, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:25: groundwater is temporary, local, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:25: local, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:26: is long-term, Site-wide, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:27: absence of mitigation, effects are long-term, Site-wide, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:27: absence of mitigation, effects are long-term, local, adverse and of minor significance.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:29: during the demolition and construction works would be minor beneficial.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:30: and construction phase is considered to be minor beneficial.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:33: Demolition & Construction Temporary Minor Adverse Site investigation and Minor beneficial

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:33: Demolition & Construction Temporary Minor Adverse Site investigation and Minor beneficial

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:33: Completed development Permanent Minor Adverse Site investigation and Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:33: Completed development Permanent Minor Adverse Site investigation and Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:33: Completed development Permanent Minor Adverse Site investigation and Negligible

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:9: – Moderate – Moderate / Minor – Minor – Negligible.

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:9: MAJOR MAJOR MAJOR/MODERATE MODERATE/MINOR

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:9: MODERATE MAJOR/MODERATE MODERATE MINOR

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:9: MINOR MODERATE/MINOR MINOR MINOR

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:9: Control of Surface Water Negligible to Minor

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:9: Character of the Site Minor New Planting

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:10: Character of the Site Minor No additional mitigation required

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:10: Negligible to Minor

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:11: Effects on human health Minor Beneficial Construction Environmental Management Plan

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:11: Contamination of Minor Beneficial Site Investigation and Remediation. Construction Environmental Management Plan. Foundation Works Risk

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:71:5.22. It is noted that the Proposed Development will result in a permanent minor visual impact to the overall

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:84: i. proposals for new development (including minor development and change of use) in Flood Zones 3a

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:57: Incident Identification: 65029 Land Impact: Category 3 (Minor)

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:61: Undifferentiated In general these layers have previously been designated as both minor and non-

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:61: generally aquifers formerly classified as minor aquifers

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:62: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:63: (undifferentiated) general these layers have previously been designated as both minor and non-aquifer

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:30:deposits. These aquifers only have a minor value and negligible significance for water supply to

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:33:release of diesel that caused a minor impact to the land.

R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:3:11.9. The potential effects have been classified, prior to mitigation, as minor, moderate or major (either

R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:10: considered to have a minor adverse effect which will be temporary in nature.

R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:12: considered to have a potential minor adverse effect which will be temporary in nature.

R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:14: Temporary Minor Adverse Neutral

R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:14: Temporary Minor Adverse Neutral

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:6: building damage, which would require levels of at least 15 mm/s ppv to result in minor cosmetic damage

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:7: Minor 0.3 - 1 73.3 - 185.1

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:8: Significance Negligible Minor Moderate Major

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:8: High Negligible Minor Moderate Major

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:8: Moderate Negligible Negligible Minor Moderate

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:8: Low Negligible Negligible Negligible Minor

R-2023-0291-ESM-ES Vol 1 Chapter 12 Noise.pdf:18: cautious consideration, any cumulative effects may be considered to be Minor (not significant).

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 9 - Water.pdf:12: There are a number of minor surface water drains, electrical lines and other utilities

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 9 - Water.pdf:13:There a number of minor surface water drains present on the site as visible on the service plans

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 9 - Water.pdf:15:only a minor value (GOV.uk, 2022).

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf:2:determining whether it is of a major or minor significance. The exposure risks are assessed

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf:3: Minor/ Negligible Non-permanent health effects to human health (easily prevented by appropriate use of PPE). Minor pollution to

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf:3: non-sensitive water resources. Minor damage to non-sensitive environments (unprotected ecosystems e.g.

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf:3: Minor /

R-2023-0291-ESM-INCA 2023-11 HRA.pdf:6:However these will be relatively minor compared to the consented remediation operations that are

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:22: level of detailed information available at the time of assessment, the potential for minor alterations to

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:33: to replace the old system of aquifer classifications, such as Major, Minor and Non-Aquifer. This new

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:39: • Minor Beneficial or Adverse effect - where the development would cause a barely perceptible

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:47: minor installation works (fitout, mechanical and electrical installation, commissioning works etc) carried

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.C - Online Public Consultation Page.pdf:9: minor issues have been fixed and amended accordingly, with plant design and equipment

R-2020-0799-CD-Decision Notice R 2020 0318.pdf:5:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:7:  Minor disposal of items deemed unfit for re‐use on site.

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:34: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:39:• Minor amendments to the boundary to address mapping errors and anomalies

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:70: minor adverse, temporary effect on the environment and require no mitigation

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:3: 02.1 January 2021 Jonathan Miles Minor update to planning details

R-2022-0237-CD-Decision Notice R 2021 0166 FFM.pdf:4: 12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf:85: BS EN 15297 - Solid biofuels - Determination of minor elements - As, Cd, Co, Cr, Cu,

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:22:hydrocarbon contamination present at the surface. This contamination is thought to represent a minor spillage

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:26:is likely to be minor.

R-2021-0608-PND-19931629_1.pdf:7: Minor amendments to the method of works (“Red Penning”) will be conducted

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:2:Minor:

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:2:Question 5: Are there any minor technical or presentational comments that affect the overall

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:3:Minor comment:

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:2:Minor comments

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:2:Question 5: Are there any minor technical or presentational comments that affect the overall

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:3:Minor comments

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:3:Minor comments

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3:Minor comments

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3:Minor comments

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3: shows a greater number of minor or negligible outcomes relative to more significant categories

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4: the assessment is that this is a minor adverse effect, because temporary) and hence ecology.

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4: In coastal process terms, the temporary suspension itself is indeed probably of minor

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4: as being of minor significance and hence not mitigated). Other water quality impacts are

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4: assessed as minor also, including the remobilisation of chemicals within the SSC plumes due

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:4:Minor comments

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:5:Minor comments

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:5: assign minor significance to this impact. The applicant should indicate the general form of

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:7:Question 19 Are there any minor technical or presentational comments that affect

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:6:Minor comments

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:10:Question 5. Are there any minor technical or presentational comments that affect the overall

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:11: concluded that the cumulative effect will be minor adverse. However, as per my comments 22-24,

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:3: barrier effect on migratory species caused by noise from TSHD is considered to be minor adverse. I

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:3:21. Minor comment: I have briefly reviewed Appendix 8 Underwater noise assessment, which considers the

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:4:Question 5: Are there any minor technical or presentational comments that affect the overall

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:1: wharf, jetties and other minor Infrastructure along the river bank at South Bank (including an

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:2:Minor comments

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4:Are there any minor technical or presentational comments that affect the overall

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4:Minor comments

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-wide

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:and minor adverse significance to human health. This is on the basis that the embedded mitigation

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:impacts are of minor adverse significance at worst.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:are minor beneficial to controlled waters and negligible to human health.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:scheme footprint and the results of the hydrodynamic and sediment plume modelling, an impact of minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:in a minor beneficial impact.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:anticipated to be significantly affected by the proposed scheme, with a worst-case impact of minor adverse

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:of minor adverse is predicted for the identified terrestrial ecology receptors.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:foraging / roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:such, impacts on prey resources and foraging are predicted to be minor adverse, at worst.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:predicted to be minor adverse, at worst.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:measures in place to reduce the magnitude of such effects, any residual impact is predicted to be minor.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:‘verti-pools’ means that the net loss would only result in a minor adverse effect on juvenile fish.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:15:will already be habituated to regular dredging noises within the estuary and a minor adverse impact is

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:The assessment concludes that the proposed scheme will have a temporary, short-term and minor beneficial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:term and minor beneficial effect in relation to economic output (as measured by Gross Value Added) during

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:20:proposed scheme. A worst-case cumulative impact of minor adverse significance is predicted.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: minor improvement to attribute quality (Beneficial).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:47: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48: Very high Major Major Moderate Moderate Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48: High Major Moderate Moderate Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48: Medium Moderate Moderate Minor Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48: Low Minor Minor Minor Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48: Very low Minor Negligible Negligible Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48:recognised that minor and negligible impacts could become significant when considered cumulatively with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:132:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:141:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:153:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:153:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:162:impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:162:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:163:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:163:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:166:considered to be medium, the overall impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:166:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167:overall impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:177:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:177:Very Low – minor permanent or Land quality – Human health

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:178:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:180:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:187:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:188:overall impact during construction is considered to be of negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:188:negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:189:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:189:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:189:considered to medium following development. Thus, the impact to the built environment is of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:in an impact significance of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:209:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:214:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:214:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:214:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:214:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:253:For the purposes of this assessment, any effects with a significance level of minor or less have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:253: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:253: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:253: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:253: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:265:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:265:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:266:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:267:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:assessed to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:impact is considered to be minor adverse in significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:269:The residual impact to brown hare and hedgehog is minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:269:anticipated to be of minor - moderate adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:269:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:298:increased SSC would be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:298:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:298:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:301:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:303:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:304:residual impact is minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:304:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:306:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:306:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:320:With the implementation of the above measure, the residual impact is considered to be minor adverse to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:325:noise from TSHD is considered to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:325:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:329:impact on sheltering fish would be reduced to minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:330:magnitude and there would be significant increase on noise levels already experienced. The minor increase

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:348: High Major Major Moderate Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:348: Medium Major Moderate Minor Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:348: Low Moderate Minor Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:348: Negligible Minor Negligible Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:348: Minor unlikely to be material considerations in the decision making process.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:349:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:359:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:359:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:359:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:360: sustained in light of sea level rise. This could be considered a minor beneficial impact to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:370: Minor / low 1.0 - 2.9

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:407: • Green corridors such as minor valleys and former railway lines provide links between urban areas

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:415:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:415:magnitude and incur a minor negligible adverse significance of effect.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:418:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:418:is minor adverse. In terms of EIA these effects are not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:418:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:419:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:419:significance of effect in the view is minor negligible adverse and not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:419:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:426: • Minor temporary increases in flood depths with no new flooding internally in properties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:433:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:444: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:444: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:444: Minor Where the proposed scheme could be expected to result in a small, very short or highly

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:444: High Substantial Moderate to Minor to Moderate Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:444: Medium Moderate to Moderate Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:445: Low Minor to Moderate Minor Negligible to Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:455:phase are considered to be temporary (short term), minor beneficial.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:455:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:456:are considered to be temporary (short term), minor beneficial.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:456:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:476:would be negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490: • generate their own residual impacts of at least minor significance;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:494: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:499: proposed scheme, the works are very minor in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:505:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:505:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:507:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:508:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:511:worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:511:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:512:worse than minor adverse in significance when considered cumulatively with the landside EIA.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:512:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:512:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:513:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:513:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:513:cumulative effect is anticipated to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:513:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:514:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:514:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:515:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:515:at any one time. As such, the cumulative effect is predicted to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:547: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:547: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:560:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:560:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:564: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:569: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:574:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:574:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:577:impacts on waterbirds within the local area from construction or operation phase noises would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:579:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:580:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:584:combined plumes is expected to be minor.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:585:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:211:than within the dredged areas, sediment deposition on the river bed will be of very minor magnitudes, in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:240: present consultation. No other exceedances of AL2 were observed, but minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:designated as both minor and non-aquifer in different locations due to the variable characteristics of the rock

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:268: Approximately 400m north west there was a minor (Category 3) pollution incident of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: minor improvement to attribute quality (Beneficial).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:47: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Very high Major Major Moderate Moderate Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: High Major Moderate Moderate Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Medium Moderate Moderate Minor Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Low Minor Minor Minor Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48: Very low Minor Negligible Negligible Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:recognised that minor and negligible impacts could become significant when considered cumulatively with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:132:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:141:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:153:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:153:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:162:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:163:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:163:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:considered to be medium, the overall impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:166:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:overall impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:177:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:177:Very Low – minor permanent or Land quality – Human health

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:178:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:180:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:187:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:188:overall impact during construction is considered to be of negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:188:negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:189:considered to medium following development. Thus, the impact to the built environment is of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:in an impact significance of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:209:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:214:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253:For the purposes of this assessment, any effects with a significance level of minor or less have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Major Major Moderate Minor Minor Moderate Major Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Major Moderate Minor Minor Minor Minor Moderate Major

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:253: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:265:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:265:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:266:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:267:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:assessed to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:No mitigation measures are required. The residual impact is of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:impact is considered to be minor adverse in significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:The residual impact to brown hare and hedgehog is minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:anticipated to be of minor - moderate adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:269:minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:increased SSC would be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:298:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:301:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:303:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:304:residual impact is minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:304:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:320:With the implementation of the above measure, the residual impact is considered to be minor adverse to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:325:noise from TSHD is considered to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:325:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:impact on sheltering fish would be reduced to minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:330:magnitude and there would be significant increase on noise levels already experienced. The minor increase

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: High Major Major Moderate Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Medium Major Moderate Minor Minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Low Moderate Minor Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Negligible Minor Negligible Negligible Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:348: Minor unlikely to be material considerations in the decision making process.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:349:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:360: sustained in light of sea level rise. This could be considered a minor beneficial impact to

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370: Minor / low 1.0 - 2.9

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:407: • Green corridors such as minor valleys and former railway lines provide links between urban areas

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:415:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:415:magnitude and incur a minor negligible adverse significance of effect.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:is minor adverse. In terms of EIA these effects are not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:418:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:significance of effect in the view is minor negligible adverse and not significant.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:419:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:426: • Minor temporary increases in flood depths with no new flooding internally in properties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:433:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Minor Where the proposed scheme could be expected to result in a small, very short or highly

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: High Substantial Moderate to Minor to Moderate Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:444: Medium Moderate to Moderate Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:445: Low Minor to Moderate Minor Negligible to Minor Negligible

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:455:phase are considered to be temporary (short term), minor beneficial.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:455:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:456:are considered to be temporary (short term), minor beneficial.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:456:No mitigation measures are required. The residual impact would be of minor beneficial significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:would be negligible to minor adverse significance.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490: • generate their own residual impacts of at least minor significance;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:494: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:499: proposed scheme, the works are very minor in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:505:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:505:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:507:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:508:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:worse than minor adverse in significance when considered cumulatively with the landside EIA.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:512:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:cumulative effect is anticipated to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:513:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:514:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:514:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:at any one time. As such, the cumulative effect is predicted to be minor adverse.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:547: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:547: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:560:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:560:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:564: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:569: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:574:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:574:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:577:impacts on waterbirds within the local area from construction or operation phase noises would be minor

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:579:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:580:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:584:combined plumes is expected to be minor.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:585:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:Minor or cosmetic harm

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:116:Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: P276R0102 - 05/10/2020 Minor revisions, inclusion of SPLpeak criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180: Unlikely Minor Negligible

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180: Unlikely Minor Negligible

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: minor injury Costs declared but criteria not

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: 2 Minor Minor Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: (single minor Minor damage Tier 1 – Tier 2 criteria reached. Bad local publicity

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:190: Multiple minor Moderate damage Tier 2 spill criteria reached but Bad widespread

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: river passage. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Tanker injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Collision - Tanker river passage. Single minor Major damage to property; Tier

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: Tanker ICW collides with a injury; Minor damage to 3 criteria reached with pollution

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: failure. Master / Skipper passage. Single minor Tanker collides with a ship

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: error. Pilot / PEC holder injury; Very minor damage assist tug or other Workboat on

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: failure. Master error. minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: action with 3rd party injury; Very minor damage fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: failure. Master error. the river. Single minor single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: Collision - General Cargo Pilot / PEC holder error. injury; Minor damage to property; Tier 2 spill criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: General Cargo river passage. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Vessel collides injury; Very minor damage fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: failure. Master error. minor injury; Minor Major damage to property; Tier

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: Collision - action with 3rd party injury; Very minor damage fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: failure. Master / Skipper minor injury; Very minor Multiple minor or single major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: error. Result of avoiding towing). Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: action with 3rd party injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: damaged. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: Workboat injury; Minor damage to fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: services with ensuing loss minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: error. Result of avoiding damaged. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: action with 3rd party injury; Minor damage to fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: during racing. Visiting services with ensuing loss minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: minor injury; Very minor fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: services with ensuing loss minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: difficulty/girts failure (tug or vessel minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: A Tanker minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: A General failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Contact - minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Mechanical defect / Glancing blow. Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: Contact - failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: (Including minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: A Project failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Glancing blow. Very minor Recreational Vessel is most

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: A Recreational injury; Very minor damage damaged. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Contact - Vessel to property; No effect of Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: Mechanical defect / speed. Very minor injury; Single minor injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: failure. Master error. Minor damage to damage to property; Tier 2 spill

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / Single minor injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: failure. Skipper error. Minor damage to Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Mechanical defect / Multiple minor or single major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Mechanical defect / speed. Very minor injury; Uncontrolled berthing. Single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: failure. Skipper error. Very minor damage to minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Head-on contact. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Head-on contact. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Glancing blow. Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Head-on contact. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Contact A Workboat injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: failure. Skipper error. injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Glancing blow. Very minor minor or single major injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: failure. Master error. injury; Very minor damage Moderate damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: dredging operations. Fire services with ensuing loss revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Mechanical defect / Head-on contact. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: Contact A Recreational failure. Skipper error. injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Contact minor injury; Minor Moderate damage to vessel.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Contact minor injury; Minor Moderate damage to vessel.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: Vessel touches the bottom minor injury; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: and refloats. Very minor property; Tier 3 criteria reached

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: injury; Minor damage to with pollution requiring

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / minor injury; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: failure. Skipper error. injury; Very minor damage minor injury; Moderate damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: Mechanical defect / minor injury; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: failure. Skipper error. injury; Very minor damage minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: minor injury; Very minor berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: of revenue. minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: minor injury; Very minor berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: of revenue. minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: A Workboat minor injury; Very minor vessel breaks away from the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Mooring (Including damage to property; No berth. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Incident - Dredgers) is effect of note. Tier 1 may Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: A Project Inadequate seamanship berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: mooring by large vessel moving in revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: minor injury; Very minor vessel breaks away from the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: damage to property; No berth. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: effect of note. Tier 1 may Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: A Workboat minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: river passage. Single minor injuries or single fatality; Major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: injury; Minor damage to damage to property; Tier 3 criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Collision - river passage. Single minor single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Tanker ICW injury; Minor damage to property; Tier 3 criteria reached with

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: passage. Single minor Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: injury; Very minor damage fatality; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: failure. Master error. minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: PEC holder error. damaged. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Result of avoiding injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: failure. Master error. the river. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: Collision - General Cargo Pilot / PEC holder injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: river passage. Single minor river passage. Multiple major injuries

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: General Cargo injury; Very minor damage or single fatality; Moderate damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: failure. Master error. minor injury; Minor injuries or single fatality; Major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: PEC holder error. damaged. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Collision - Result of avoiding injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: injury; Minor damage to major injuries or single fatality;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: short-term disruption to term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: PEC holder error. towing). Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: Result of avoiding injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: injury; Minor damage to major injuries or single fatality;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: short-term disruption to term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: PEC holder error. damaged. Single minor Recreational Vessel sunk. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: Result of avoiding injury; Minor damage to major injuries or single fatality;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: taking additional risks short-term disruption to term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: action with 3rd party minor injury; Very minor major injuries or single fatality;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: during racing. Visiting short-term disruption to term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: failure (tug or vessel minor injury; Very minor single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: weather. Fire and short-term disruption to including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: A Tanker Navigation buoy is sunk. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Contact - contacts a injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Contact - A General Cargo Navigation buoy is sunk. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: General Vessel contacts injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: A Workboat Navigation buoy is sunk. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: contacts a injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: failure. Master error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: A Project Cargo Navigation buoy is sunk. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: contacts a injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: injury; Very minor damage Recreational Vessel is most damaged.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Contact - to property; No effect of Very minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: failure. Master error. Minor damage to Single minor injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Master error. Single minor injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Mechanical defect / speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Skipper error. Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Single minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: failure. Master error. Multiple minor or single major injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: 3rd party vessel. Fire revenue including minor disruption

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Mechanical defect / speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: failure. Skipper error. Very minor damage to Uncontrolled berthing. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Contact Adverse weather. property; No effect of injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: navigable channel by Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: Mechanical defect / Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: failure. Skipper error. Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: A Workboat Adverse weather. Minor damage to property; No effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: navigable channel by Glancing blow. Very minor Head-on contact. Multiple minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: Contact failure. Skipper error. Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: vessel Adverse weather. Minor damage to property; No effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Contact minor injury; Minor injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Contact minor injury; Minor injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: Vessel touches the bottom Vessel heavily aground. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: and refloats. Very minor injury; Major damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: injury; Minor damage to Tier 3 criteria reached with pollution

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / Vessel heavily aground. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Vessel heavily aground. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: failure. Skipper error. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: Mechanical defect / Vessel heavily aground. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Mechanical defect / and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: failure. Skipper error. injury; Very minor damage Vessel heavily aground. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Adverse weather. to property; No effect of injury; Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: A Tanker is seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: large vessel moving in services with ensuing loss term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: A General Cargo seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: large vessel moving in services with ensuing loss term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor breaks away from the berth. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: A Project Cargo seamanship / watch damage to property; No minor or single major injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: 41 River breaks away weather. Excessive be declared but criteria Minor impact on environment Tier 1 1 1 1 1 3.0 3 3 2 3 2.0 1.65

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Inadequate minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Mooring minor injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: minor injury; Very minor in service. Multiple major injuries or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: minor injury; Very minor in service. Multiple major injuries or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: passage. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Collision - Minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: river passage. Single minor fatality; Major damage to property; Tier 3

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: 2 River Collision injury; Minor damage to criteria reached with pollution requiring 2 2 1 1 3.5 4 4 4 5 2.0 3.84

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Collision - minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: damaged. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Master error. Pilot / PEC river. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: holder error. Result of Minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: avoiding action with 3rd passage. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: party vessel / dredging Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: damaged. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Glancing blow. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Collision - Mechanical defect / failure. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: One of the Workboats sinks. Multiple minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: minor injury; Very minor Multiple major injuries or single fatality;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: term disruption to services revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: damaged. Single minor Recreational Vessel sunk. Multiple major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: injury; Minor damage to injuries or single fatality; Moderate damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Very short-term disruption revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: avoiding action with 3rd damaged. Single minor Recreational Vessel sunk. Multiple major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Collision - party vessel / dredging injury; Minor damage to injuries or single fatality; Moderate damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Vessel additional risks during Very short-term disruption revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: avoiding action with 3rd during racing). Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: party vessel / dredging injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: Vessel revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: operation. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: A tug in Mechanical defect / failure injury; Very minor damage Tug girts. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: project cargo assisted).Adverse weather. necessarily met; Very short- Short-term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: A Tanker contacts a note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: General Cargo note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Mechanical defect / failure. Glancing blow. Minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Master error. Pilot / PEC Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: Workboat A Workboat Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: (Including (Including Dredgers) Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Project Cargo note. Tier 1 may be Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Mechanical defect / failure. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: A Recreational Vessel minor injury; Very minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Mechanical defect / failure. speed. Very minor injury; Uncontrolled berthing at speed. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: Master error. Pilot / PEC Minor damage to property; injury; Moderate damage to property; Tier 2

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: speed. Very minor injury; Uncontrolled berthing at speed. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Minor damage to property; injury; Moderate damage to property; Tier 1 –

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Mechanical defect / failure. speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Uncontrolled berthing at speed. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Skipper error. Adverse Minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Contact berth injury; Minor damage to property; No effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Master error. Pilot / PEC minor or single major injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: dredging operations. Fire including minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Mechanical defect / failure. speed. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Skipper error. Adverse Very minor damage to Uncontrolled berthing. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Contact berth weather. Reduced visibility. property; No effect of note. Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Head-on contact. Single minor injury; Major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: Head-on contact. Single minor injury; Major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Contact vessel Minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Skipper error. Adverse Head-on contact. Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: injury; Very minor damage Head-on contact. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: with ensuing loss of minor disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Mechanical defect / failure. injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: Contact vessel Skipper error. Adverse to property; No effect of Head-on contact. Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: Mechanical defect / failure. Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Minor damage to Major damage to property; Tier 2 spill criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: Skipper error. Adverse Vessel heavily aground. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and refloats. Very minor Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: injury; Minor damage to Major damage to property; Tier 2 spill criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: and refloats. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: Skipper error. Adverse Vessel heavily aground. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: Grounding - weather. Reduced visibility. Minor damage to property; No effect of note.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: seamanship / watch damage to property; No from the berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: seamanship / watch damage to property; No from the berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: from the berth. Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: A Project Cargo is from the berth. Multiple minor or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: minor disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: mooring gear. Inadequate minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: Mooring A Recreational Vessel from the berth. Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: unattended. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: unattended. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: injury; Very minor damage

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: / PEC holder error. Result Single minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: / PEC holder error. Result on river passage. Single minor injuries or single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: of avoiding action with injury; Minor damage to property; Tier 3 criteria reached with

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: error. Result of avoiding on river passage. Single minor other Workboat on river passage. Multiple

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: action with 3rd party injury; Very minor damage to major injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: Mechanical defect / Glancing blow. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: failure. Master error. Pilot injury; Minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: error. Result of avoiding damaged. Single minor injury; Recreational vessel sunk. Multiple major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: action with 3rd party Very minor damage to injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: General General Cargo river. Single minor injury; or single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Cargo Vessel collides Minor damage to property; No property; Tier 2 spill criteria reached but

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: action with 3rd party Single minor injury; Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Mechanical defect / Glancing blow. Single minor Head-on collision. Multiple major injuries

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: Collision - failure. Master error. Pilot injury; Minor damage to or single fatality; Major damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: error. Result of avoiding damaged. Single minor injury; Recreational Vessel sunk. Multiple major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: General Cargo action with 3rd party Very minor damage to injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: action with 3rd party damaged. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Collision - Workboat vessel. Traffic control Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Short-term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: whilst towing). Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: injury; Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: disembarkation term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: action with 3rd party damaged. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Workboat vessel. Traffic control Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: Vessel Short-term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: damaged. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Minor damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Vessel Vessel additional risks during Short-term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Result of avoiding action during racing). Single minor Recreational Vessel sinks. Multiple major

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Collision - Recreational with 3rd party vessel. injury; Very minor damage to injuries or single fatality; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Vessel Vessel risks during racing. Very short-term disruption to Short-term loss of revenue including minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: A tug in Mechanical defect / operation. Very minor injury; Tug girts. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: difficulty/girts failure (tug or vessel being Very minor damage to fatality; Major damage to property; No

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: a project cargo weather. Fire and Very short-term disruption to including minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: A Tanker failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: Contact - contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Contact - A General Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: General Vessel contacts / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Workboat failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Mechanical defect / Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Project Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: A Recreational injury; Very minor damage to Recreational Vessel is most damaged. Very

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: Vessel contacts property; No effect of note. minor injury; Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: Very minor injury; Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot minor injury; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot Very minor injury; Minor minor injury; Moderate damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: Very minor injury; Minor Uncontrolled berthing at speed. Single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: damage to property; No effect minor injury; Minor damage to property;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: failure. Master error. Pilot Very minor injury; Very minor minor or single major injury; Moderate

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: 3rd party vessel. Fire and term disruption to services revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Very minor injury; Very minor Uncontrolled berthing. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Contact damage to property; No effect Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: channel by overhanging Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Mechanical defect / Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: Glancing blow. Single minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: injury; Minor damage to Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: A Workboat property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: channel by overhanging Head-on contact. Multiple minor injuries or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Glancing blow. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: Contact injury; Very minor damage to Head-on contact. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: vessel property; No effect of note. Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 3 criteria

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: / PEC holder error. Minor damage to property; No reached with pollution requiring national

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Grounding - / PEC holder error. Minor damage to property; No criteria reached but capable of being

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / refloats. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Vessel heavily aground. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Skipper error. Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: / PEC holder error. Minor damage to property; No criteria reached but capable of being

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Mechanical defect / refloats. Very minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Vessel heavily aground. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: failure. Skipper error. Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: moving in the port services with ensuing loss of revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: moving in the port services with ensuing loss of revenue including minor disruption to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: mooring gear. Inadequate Mooring line parts. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: seamanship / watch injury; Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: away from the berth. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: Mooring Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mooring Incident - is ranged or weather. Excessive wash Tier 1 may be declared but property; Minor impact on environment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: mooring gear. Inadequate Mooring line parts. Very minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: seamanship / watch injury; Very minor damage to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: away from the berth. Single minor injury;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Minor damage to property; No effect of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Foundering A Recreational failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:271:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:299:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:300:Significance of Effect Medium sensitivity x Medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:301:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor negligible significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:302: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:303: Significance of Effect Low sensitivity x Medium high magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:304: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:305:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:306:Significance of Effect Low sensitivity x Low medium magnitude of effect = Minor negligible significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:307: Significance of Effect Medium sensitivity x Low medium magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:309:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:310: Significance of Effect High sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:316: element(s) to be changed would be minor and/or any landscape element(s) lost or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:316: created make only a minor contribution to landscape character and/or value.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Medium high Minor moderate effect Moderate effect Moderate major effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Medium Minor effect Minor moderate effect Moderate effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Low medium Minor negligible effect Minor effect Minor moderate effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Low Negligible effect Minor negligible effect Minor effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:320: Negligible Negligible effect Negligible effect Minor negligible effect

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:352:means that the layer in question has previously been designated as both minor and non-aquifer in different

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:384:Could significantly impact the hydromorphology of any the existing estuary bed, this will be minor and highly localised. Alterations to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: minor improvement to attribute quality (Beneficial).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:47: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48: Very high Major Major Moderate Moderate Minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48: High Major Moderate Moderate Minor Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48: Medium Moderate Moderate Minor Minor Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48: Low Minor Minor Minor Negligible Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48: Very low Minor Negligible Negligible Negligible Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48:recognised that minor and negligible impacts could become significant when considered cumulatively with

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:132:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:141:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:153:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:153:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:162:impact is of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:162:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:163:minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:163:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:166:considered to be medium, the overall impact is of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:166:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167:overall impact is of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:177:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:177:Very Low – minor permanent or Land quality – Human health

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:178:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:180:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:187:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:188:overall impact during construction is considered to be of negligible to minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:188:negligible to minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:189:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:189:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:189:considered to medium following development. Thus, the impact to the built environment is of minor adverse

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:in an impact significance of minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:209:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:214:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:214:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:214:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:214:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:253:For the purposes of this assessment, any effects with a significance level of minor or less have been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:253: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:253: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:253: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:253: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:265:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:265:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:266:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:267:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:assessed to be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:impact is considered to be minor adverse in significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:269:The residual impact to brown hare and hedgehog is minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:269:anticipated to be of minor - moderate adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:269:minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:298:increased SSC would be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:298:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:298:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:301:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:303:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:304:residual impact is minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:304:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:306:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:306:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:320:With the implementation of the above measure, the residual impact is considered to be minor adverse to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:325:noise from TSHD is considered to be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:325:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:329:impact on sheltering fish would be reduced to minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:330:magnitude and there would be significant increase on noise levels already experienced. The minor increase

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:348: High Major Major Moderate Minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:348: Medium Major Moderate Minor Minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:348: Low Moderate Minor Minor Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:348: Negligible Minor Negligible Negligible Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:348: Minor unlikely to be material considerations in the decision making process.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:349:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:359:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:359:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:359:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:360: sustained in light of sea level rise. This could be considered a minor beneficial impact to

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:370: Minor / low 1.0 - 2.9

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:407: • Green corridors such as minor valleys and former railway lines provide links between urban areas

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:415:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:415:magnitude and incur a minor negligible adverse significance of effect.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:418:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:418:is minor adverse. In terms of EIA these effects are not significant.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:418:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:419:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:419:significance of effect in the view is minor negligible adverse and not significant.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:419:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:426: • Minor temporary increases in flood depths with no new flooding internally in properties

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:433:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:444: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:444: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:444: Minor Where the proposed scheme could be expected to result in a small, very short or highly

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:444: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:444: Medium Moderate to Moderate Minor Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:445: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:455:phase are considered to be temporary (short term), minor beneficial.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:455:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:456:are considered to be temporary (short term), minor beneficial.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:456:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:476:would be negligible to minor adverse significance.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490: • generate their own residual impacts of at least minor significance;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:494: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:499: proposed scheme, the works are very minor in

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:505:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:505:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:507:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:508:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:511:worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:511:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:512:worse than minor adverse in significance when considered cumulatively with the landside EIA.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:512:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:512:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:513:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:513:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:513:cumulative effect is anticipated to be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:513:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:514:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:514:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:515:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:515:at any one time. As such, the cumulative effect is predicted to be minor adverse.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:515:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:547: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:547: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:560:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:560:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:564: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:569: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:574:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:574:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:577:impacts on waterbirds within the local area from construction or operation phase noises would be minor

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:579:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:580:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:584:combined plumes is expected to be minor.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:585:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:5: element(s) to be changed would be minor and/or any landscape element(s) lost or

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:5: created make only a minor contribution to landscape character and/or value.

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Medium high Minor moderate effect Moderate effect Moderate major effect

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Medium Minor effect Minor moderate effect Moderate effect

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Low medium Minor negligible effect Minor effect Minor moderate effect

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Low Negligible effect Minor negligible effect Minor effect

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:9: Negligible Negligible effect Negligible effect Minor negligible effect

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:14:With the implementation of the above measure, the residual impact is considered to be minor adverse to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:19:noise from TSHD is considered to be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:19:detectable across the entire width of the river. As such, the residual effect will remain minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:impact on sheltering fish would be reduced to minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:24:magnitude and there would be significant increase on noise levels already experienced. The minor increase

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; measurable change in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Minor improvement to, or addition of, one (maybe more) key characteristics, features or elements of the resource;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: minor improvement to attribute quality (Beneficial).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Very minor loss of, or alteration to, one (maybe more) key characteristics, features or elements; noticeable

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Very minor improvement to, or addition of, one (maybe more) key characteristic, feature or element; very minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Temporary or intermittent very minor loss of, or alteration to, one (maybe more) characteristic, feature or element;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:6: Possible very minor improvement to, or addition of, one (maybe more) characteristic, feature or element; possible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Very high Major Major Moderate Moderate Minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: High Major Moderate Moderate Minor Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Medium Moderate Moderate Minor Minor Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Low Minor Minor Minor Negligible Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7: Very low Minor Negligible Negligible Negligible Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:Whilst mitigation for minor or negligible impacts may not be specifically defined as a matter of course,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:recognised that minor and negligible impacts could become significant when considered cumulatively with

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:5:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-Appendix 6_Sediment sampling plan.pdf:3: present consultation. No other exceedances of AL2 were observed, but minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:in an impact significance of minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:19:that the impact on the benthic habitats due to the loss of the intertidal would be of minor adverse

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:intertidally and subtidally), even if the habitat will be of low quality. This results in an impact of minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:The scheme is predicted to have very minor effects on the flow regime, with very small increases in flows

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:24:tide). Minor decreases in flow speeds of up to 0.1m/s from the baseline conditions are predicted the middle

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-wide

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:and minor adverse significance to human health. This is on the basis that the embedded mitigation

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:impacts are of minor adverse significance at worst.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:are minor beneficial to controlled waters and negligible to human health.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:scheme footprint and the results of the hydrodynamic and sediment plume modelling, an impact of minor

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:in a minor beneficial impact.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:anticipated to be significantly affected by the proposed scheme, with a worst-case impact of minor adverse

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:of minor adverse is predicted for the identified terrestrial ecology receptors.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:foraging / roosting waterbirds as a result of changes to supporting habitat are expected to be minor adverse.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:such, impacts on prey resources and foraging are predicted to be minor adverse, at worst.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:predicted to be minor adverse, at worst.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:measures in place to reduce the magnitude of such effects, any residual impact is predicted to be minor.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:‘verti-pools’ means that the net loss would only result in a minor adverse effect on juvenile fish.

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:15:will already be habituated to regular dredging noises within the estuary and a minor adverse impact is

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:The assessment concludes that the proposed scheme will have a temporary, short-term and minor beneficial

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:term and minor beneficial effect in relation to economic output (as measured by Gross Value Added) during

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:20:proposed scheme. A worst-case cumulative impact of minor adverse significance is predicted.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1: • generate their own residual impacts of at least minor significance;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:5: involves minor ‘top-side’ works to the existing Infrastructure at Jetty Immediately The works are considered to be of a sufficiently

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:10: proposed scheme, the works are very minor in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:16:propagation will be minor, with no change in elevation of either high or low water downstream of the site of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:16:the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:18:pocket. The significance of this impact is reported to be minor adverse due to the low value nature of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:19:minor changes in the hydrodynamic regime, specifically currents, may lead to a slight increase in sediment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:No additional mitigation is proposed and the residual cumulative impact would be of minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:worse than minor adverse in significance when considered cumulatively with the landside EIA.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:23:impacts worse than minor adverse in significance when considered cumulatively with the other projects.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:No mitigation measures are required and the residual cumulative impact would be of minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:have a minor impact at worst (with the mitigation measures in place). With mitigation measures in place for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:cumulative effect is anticipated to be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:24:12.5.4 (i.e. shrouding employed at the piling rigs) in place, there is anticipated to be (at worst) a minor impact

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:25:Section 12.5.1) at South Bank, the impact on waterbirds is considered to be minor. By comparison, loss of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:25:are undertaken simultaneously, and the cumulative effect is anticipated to be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:the land-based piling, there may be minor adverse impacts from the dredging noises which could potentially

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:at any one time. As such, the cumulative effect is predicted to be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:26:No further mitigation measures are possible (or necessary). The residual cumulative impact would be minor

R-2020-0684-ESM-DECISION NOTICE.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Minor Where the proposed scheme could be expected to result in a small, very short or highly

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:8: Medium Moderate to Moderate Minor Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:9: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:19:phase are considered to be temporary (short term), minor beneficial.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:19:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:20:are considered to be temporary (short term), minor beneficial.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:20:No mitigation measures are required. The residual impact would be of minor beneficial significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:6: • Minor temporary increases in flood depths with no new flooding internally in properties

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:13:the magnitude of the effect. On this basis, the residual risk to site users is determined to be of minor

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:11: P276R0102 - 05/10/2020 Minor revisions, inclusion of SPLpeak criteria

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:1:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:2:Significance of Effect Medium sensitivity x Medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:3:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor negligible significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:4: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:5: Significance of Effect Low sensitivity x Medium high magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:6: Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:7:Significance of Effect Medium sensitivity x Low magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:8:Significance of Effect Low sensitivity x Low medium magnitude of effect = Minor negligible significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:9: Significance of Effect Medium sensitivity x Low medium magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:11:Significance of Effect High sensitivity x Low medium magnitude of effect = Minor moderate significance of effect. Minor Minor

R-2020-0684-ESM-Appendix 12_Representative viewpoint analysis tables.pdf:12: Significance of Effect High sensitivity x Low magnitude of effect = Minor significance of effect. Minor Minor

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:10: • Demolition of the existing wharf, jetties and other minor Infrastructure;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:9:affecting usability, risk or value • short-term temporary or minor change to existing risk exposure (adverse / beneficial); or

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:9:Very Low – minor permanent or Land quality – Human health

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Short-term with no effect on • very minor or intermittent impact on local water quality or availability (adverse /

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Major or moderate environmental impacts are considered to be ‘significant’ in EIA terms. Whilst minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:10:Minor Small change in receptor condition (adverse or beneficial), which may be important but are unlikely to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:12:been designated as both minor and non-aquifers in different locations due to the variable characteristics of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:19:Therefore the impact is considered to be minor adverse for surface waters (very high sensitivity) which is

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:20:overall impact during construction is considered to be of negligible to minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:20:negligible to minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:beneficial. The overall impact to controlled waters during operation is therefore considered to be of minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:No additional mitigation measures required. The residual impact would be of minor beneficial significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:21:considered to medium following development. Thus, the impact to the built environment is of minor adverse

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10:For the purposes of this assessment, any effects with a significance level of minor or less have been

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Major Major Moderate Minor Minor Moderate Major Major

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Major Moderate Minor Minor Minor Minor Moderate Major

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Moderate Minor Minor Negligible Negligible Minor Minor Moderate

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:10: Minor Negligible Negligible Negligible Negligible Negligible Negligible Minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:22:magnitude is considered to be low but permanent. As such, a minor adverse impact to local woodland

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:22:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:23:noise. Overall, the potential impacts associated with vessels is anticipated to be of minor adverse

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:24:unlikeliness of the impact occurring, an impact of minor significance is predicted on prey resource.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:habitat fragmentation. The magnitude of impact is anticipated to be low. Overall an impact of minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:assessed to be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:No mitigation measures are required. The residual impact is of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:impact is considered to be minor adverse in significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:The residual impact to brown hare and hedgehog is minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:anticipated to be of minor - moderate adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:26:minor adverse significance.

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9: Minor / low 1.0 - 2.9

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:50: Unlikely Minor Negligible

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:50: Unlikely Minor Negligible

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: minor injury Costs declared but criteria not

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: 2 Minor Minor Minor Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: (single minor Minor damage Tier 1 – Tier 2 criteria reached. Bad local publicity

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:60: Multiple minor Moderate damage Tier 2 spill criteria reached but Bad widespread

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: river passage. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Tanker injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Collision - Tanker river passage. Single minor Major damage to property; Tier

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: Tanker ICW collides with a injury; Minor damage to 3 criteria reached with pollution

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: failure. Master / Skipper passage. Single minor Tanker collides with a ship

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: error. Pilot / PEC holder injury; Very minor damage assist tug or other Workboat on

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: failure. Master error. minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: action with 3rd party injury; Very minor damage fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: failure. Master error. the river. Single minor single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: Collision - General Cargo Pilot / PEC holder error. injury; Minor damage to property; Tier 2 spill criteria

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: General Cargo river passage. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Vessel collides injury; Very minor damage fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: failure. Master error. minor injury; Minor Major damage to property; Tier

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: Collision - action with 3rd party injury; Very minor damage fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: failure. Master / Skipper minor injury; Very minor Multiple minor or single major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: error. Result of avoiding towing). Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: action with 3rd party injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: damaged. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: Workboat injury; Minor damage to fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: services with ensuing loss minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: error. Result of avoiding damaged. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: action with 3rd party injury; Minor damage to fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: during racing. Visiting services with ensuing loss minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: minor injury; Very minor fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: services with ensuing loss minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: difficulty/girts failure (tug or vessel minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: A Tanker minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: A General failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Contact - minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Mechanical defect / Glancing blow. Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: Contact - failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: (Including minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: A Project failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Glancing blow. Very minor Recreational Vessel is most

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: A Recreational injury; Very minor damage damaged. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Contact - Vessel to property; No effect of Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: Mechanical defect / speed. Very minor injury; Single minor injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: failure. Master error. Minor damage to damage to property; Tier 2 spill

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / Single minor injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: failure. Skipper error. Minor damage to Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Mechanical defect / Multiple minor or single major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Mechanical defect / speed. Very minor injury; Uncontrolled berthing. Single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: failure. Skipper error. Very minor damage to minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Head-on contact. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Head-on contact. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Glancing blow. Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Head-on contact. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Contact A Workboat injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: failure. Skipper error. injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Glancing blow. Very minor minor or single major injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: failure. Master error. injury; Very minor damage Moderate damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: dredging operations. Fire services with ensuing loss revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Mechanical defect / Head-on contact. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: Contact A Recreational failure. Skipper error. injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Contact minor injury; Minor Moderate damage to vessel.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Contact minor injury; Minor Moderate damage to vessel.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: Vessel touches the bottom minor injury; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: and refloats. Very minor property; Tier 3 criteria reached

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: injury; Minor damage to with pollution requiring

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / minor injury; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: failure. Skipper error. injury; Very minor damage minor injury; Moderate damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: Mechanical defect / minor injury; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Mechanical defect / and refloats. Very minor Vessel heavily aground. Single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: failure. Skipper error. injury; Very minor damage minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: minor injury; Very minor berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: of revenue. minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: minor injury; Very minor berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: of revenue. minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: A Workboat minor injury; Very minor vessel breaks away from the

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Mooring (Including damage to property; No berth. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Incident - Dredgers) is effect of note. Tier 1 may Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: A Project Inadequate seamanship berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: mooring by large vessel moving in revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: minor injury; Very minor vessel breaks away from the

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: damage to property; No berth. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: effect of note. Tier 1 may Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: A Workboat minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: river passage. Single minor injuries or single fatality; Major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: injury; Minor damage to damage to property; Tier 3 criteria

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Collision - river passage. Single minor single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Tanker ICW injury; Minor damage to property; Tier 3 criteria reached with

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: passage. Single minor Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: injury; Very minor damage fatality; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: failure. Master error. minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: PEC holder error. damaged. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Result of avoiding injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: failure. Master error. the river. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: Collision - General Cargo Pilot / PEC holder injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: river passage. Single minor river passage. Multiple major injuries

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: General Cargo injury; Very minor damage or single fatality; Moderate damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: failure. Master error. minor injury; Minor injuries or single fatality; Major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: PEC holder error. damaged. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Collision - Result of avoiding injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: injury; Minor damage to major injuries or single fatality;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: short-term disruption to term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: PEC holder error. towing). Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: Result of avoiding injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: injury; Minor damage to major injuries or single fatality;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: short-term disruption to term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: PEC holder error. damaged. Single minor Recreational Vessel sunk. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: Result of avoiding injury; Minor damage to major injuries or single fatality;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: taking additional risks short-term disruption to term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: action with 3rd party minor injury; Very minor major injuries or single fatality;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: during racing. Visiting short-term disruption to term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: failure (tug or vessel minor injury; Very minor single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: weather. Fire and short-term disruption to including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: A Tanker Navigation buoy is sunk. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Contact - contacts a injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Contact - A General Cargo Navigation buoy is sunk. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: General Vessel contacts injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: A Workboat Navigation buoy is sunk. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: contacts a injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: failure. Master error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: A Project Cargo Navigation buoy is sunk. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: contacts a injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: injury; Very minor damage Recreational Vessel is most damaged.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Contact - to property; No effect of Very minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: Mechanical defect / speed. Very minor injury; Uncontrolled berthing at speed.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: failure. Master error. Minor damage to Single minor injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Master error. Single minor injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Mechanical defect / speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Skipper error. Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Single minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: failure. Master error. Multiple minor or single major injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: 3rd party vessel. Fire revenue including minor disruption

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Mechanical defect / speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: failure. Skipper error. Very minor damage to Uncontrolled berthing. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Contact Adverse weather. property; No effect of injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: navigable channel by Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: Mechanical defect / Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: failure. Skipper error. Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: A Workboat Adverse weather. Minor damage to property; No effect

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: navigable channel by Glancing blow. Very minor Head-on contact. Multiple minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: Contact failure. Skipper error. Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: vessel Adverse weather. Minor damage to property; No effect

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Contact minor injury; Minor injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Contact minor injury; Minor injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: Vessel touches the bottom Vessel heavily aground. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: and refloats. Very minor injury; Major damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: injury; Minor damage to Tier 3 criteria reached with pollution

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / Vessel heavily aground. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Vessel heavily aground. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: failure. Skipper error. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: Mechanical defect / Vessel heavily aground. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Mechanical defect / and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: failure. Skipper error. injury; Very minor damage Vessel heavily aground. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Adverse weather. to property; No effect of injury; Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: A Tanker is seamanship / watch damage to property; No minor or single major injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: large vessel moving in services with ensuing loss term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: A General Cargo seamanship / watch damage to property; No minor or single major injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: large vessel moving in services with ensuing loss term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor breaks away from the berth. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: A Project Cargo seamanship / watch damage to property; No minor or single major injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: 41 River breaks away weather. Excessive be declared but criteria Minor impact on environment Tier 1 1 1 1 1 3.0 3 3 2 3 2.0 1.65

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Inadequate minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Mooring minor injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: minor injury; Very minor in service. Multiple major injuries or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: minor injury; Very minor in service. Multiple major injuries or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: passage. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Collision - Minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: river passage. Single minor fatality; Major damage to property; Tier 3

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: 2 River Collision injury; Minor damage to criteria reached with pollution requiring 2 2 1 1 3.5 4 4 4 5 2.0 3.84

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Collision - minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: damaged. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Master error. Pilot / PEC river. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: holder error. Result of Minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: avoiding action with 3rd passage. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: party vessel / dredging Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Mechanical defect / failure. Glancing blow. Single minor Head-on collision. Multiple major injuries or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Master error. Pilot / PEC injury; Minor damage to single fatality; Major damage to property; Tier

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: damaged. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Glancing blow. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Collision - Mechanical defect / failure. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: One of the Workboats sinks. Multiple minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: minor injury; Very minor Multiple major injuries or single fatality;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: term disruption to services revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: damaged. Single minor Recreational Vessel sunk. Multiple major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: injury; Minor damage to injuries or single fatality; Moderate damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Very short-term disruption revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: avoiding action with 3rd damaged. Single minor Recreational Vessel sunk. Multiple major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Collision - party vessel / dredging injury; Minor damage to injuries or single fatality; Moderate damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Vessel additional risks during Very short-term disruption revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: avoiding action with 3rd during racing). Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: party vessel / dredging injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: Vessel revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: operation. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: A tug in Mechanical defect / failure injury; Very minor damage Tug girts. Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: project cargo assisted).Adverse weather. necessarily met; Very short- Short-term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: A Tanker contacts a note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: General Cargo note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Mechanical defect / failure. Glancing blow. Minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Master error. Pilot / PEC Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: Workboat A Workboat Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: (Including (Including Dredgers) Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Contact - to property; No effect of Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Project Cargo note. Tier 1 may be Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Mechanical defect / failure. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: A Recreational Vessel minor injury; Very minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Mechanical defect / failure. speed. Very minor injury; Uncontrolled berthing at speed. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: Master error. Pilot / PEC Minor damage to property; injury; Moderate damage to property; Tier 2

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: speed. Very minor injury; Uncontrolled berthing at speed. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Minor damage to property; injury; Moderate damage to property; Tier 1 –

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Mechanical defect / failure. speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Uncontrolled berthing at speed. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Skipper error. Adverse Minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Contact berth injury; Minor damage to property; No effect

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Master error. Pilot / PEC minor or single major injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: dredging operations. Fire including minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Mechanical defect / failure. speed. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Skipper error. Adverse Very minor damage to Uncontrolled berthing. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Contact berth weather. Reduced visibility. property; No effect of note. Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Head-on contact. Single minor injury; Major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: Head-on contact. Single minor injury; Major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Contact vessel Minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Skipper error. Adverse Head-on contact. Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: injury; Very minor damage Head-on contact. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: with ensuing loss of minor disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Mechanical defect / failure. injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: Contact vessel Skipper error. Adverse to property; No effect of Head-on contact. Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: assessment of HOT. minor injury; Minor damage cable. Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: Mechanical defect / failure. Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Minor damage to Major damage to property; Tier 2 spill criteria

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: Skipper error. Adverse Vessel heavily aground. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and refloats. Very minor Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: injury; Minor damage to Major damage to property; Tier 2 spill criteria

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: and refloats. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: Skipper error. Adverse Vessel heavily aground. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: Grounding - weather. Reduced visibility. Minor damage to property; No effect of note.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: seamanship / watch damage to property; No from the berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: mooring gear. Inadequate minor injury; Very minor All mooring lines part and vessel breaks away

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: seamanship / watch damage to property; No from the berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: (Especially at low water). with ensuing loss of minor disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: from the berth. Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: A Project Cargo is from the berth. Multiple minor or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: minor disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: mooring gear. Inadequate minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: Mooring A Recreational Vessel from the berth. Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: unattended. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: unattended. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: injury; Very minor damage

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: / PEC holder error. Result Single minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: / PEC holder error. Result on river passage. Single minor injuries or single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: of avoiding action with injury; Minor damage to property; Tier 3 criteria reached with

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: error. Result of avoiding on river passage. Single minor other Workboat on river passage. Multiple

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: action with 3rd party injury; Very minor damage to major injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: Mechanical defect / Glancing blow. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: failure. Master error. Pilot injury; Minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: error. Result of avoiding damaged. Single minor injury; Recreational vessel sunk. Multiple major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: action with 3rd party Very minor damage to injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: General General Cargo river. Single minor injury; or single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Cargo Vessel collides Minor damage to property; No property; Tier 2 spill criteria reached but

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: action with 3rd party Single minor injury; Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Mechanical defect / Glancing blow. Single minor Head-on collision. Multiple major injuries

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: Collision - failure. Master error. Pilot injury; Minor damage to or single fatality; Major damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: error. Result of avoiding damaged. Single minor injury; Recreational Vessel sunk. Multiple major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: General Cargo action with 3rd party Very minor damage to injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: action with 3rd party damaged. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Collision - Workboat vessel. Traffic control Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Short-term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: whilst towing). Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: injury; Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: disembarkation term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: action with 3rd party damaged. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Workboat vessel. Traffic control Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: Vessel Short-term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: damaged. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Minor damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Vessel Vessel additional risks during Short-term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Result of avoiding action during racing). Single minor Recreational Vessel sinks. Multiple major

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Collision - Recreational with 3rd party vessel. injury; Very minor damage to injuries or single fatality; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Vessel Vessel risks during racing. Very short-term disruption to Short-term loss of revenue including minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: A tug in Mechanical defect / operation. Very minor injury; Tug girts. Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: difficulty/girts failure (tug or vessel being Very minor damage to fatality; Major damage to property; No

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: a project cargo weather. Fire and Very short-term disruption to including minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: A Tanker failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: Contact - contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Contact - A General Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: General Vessel contacts / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Workboat failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Mechanical defect / Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Project Cargo failure. Master error. Pilot injury; Very minor damage to Navigation buoy is sunk. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: contacts a / PEC holder error. property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: A Recreational injury; Very minor damage to Recreational Vessel is most damaged. Very

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: Vessel contacts property; No effect of note. minor injury; Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: Very minor injury; Minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot minor injury; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot Very minor injury; Minor minor injury; Moderate damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: Very minor injury; Minor Uncontrolled berthing at speed. Single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: damage to property; No effect minor injury; Minor damage to property;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: failure. Master error. Pilot Very minor injury; Very minor minor or single major injury; Moderate

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: 3rd party vessel. Fire and term disruption to services revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Very minor injury; Very minor Uncontrolled berthing. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Contact damage to property; No effect Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: channel by overhanging Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Mechanical defect / Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: Glancing blow. Single minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: injury; Minor damage to Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: A Workboat property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: channel by overhanging Head-on contact. Multiple minor injuries or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Glancing blow. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: Contact injury; Very minor damage to Head-on contact. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: vessel property; No effect of note. Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: minor injury; Minor damage to fatality; Moderate damage to vessel. Tier 1

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 3 criteria

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: / PEC holder error. Minor damage to property; No reached with pollution requiring national

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Grounding - / PEC holder error. Minor damage to property; No criteria reached but capable of being

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / refloats. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Vessel heavily aground. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Skipper error. Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: Mechanical defect / Vessel touches the bottom and Vessel heavily aground. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: failure. Master error. Pilot refloats. Very minor injury; Major damage to property; Tier 2 spill

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: / PEC holder error. Minor damage to property; No criteria reached but capable of being

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Mechanical defect / refloats. Very minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Vessel heavily aground. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: failure. Skipper error. Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: moving in the port services with ensuing loss of revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: moving in the port services with ensuing loss of revenue including minor disruption to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: mooring gear. Inadequate Mooring line parts. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: seamanship / watch injury; Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: away from the berth. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: Mooring Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: mooring gear. Inadequate Mooring line parts. Very minor All mooring lines part and vessel breaks

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: seamanship / watch injury; Very minor damage to away from the berth. Multiple minor or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mooring Incident - is ranged or weather. Excessive wash Tier 1 may be declared but property; Minor impact on environment

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: mooring gear. Inadequate Mooring line parts. Very minor

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: seamanship / watch injury; Very minor damage to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: away from the berth. Single minor injury;

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Minor damage to property; No effect of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Mechanical defect / unattended. Very minor injury; Vessel founders or is swamped whilst in

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Foundering A Recreational failure. Master / Skipper Very minor damage to service. Multiple major injuries or single

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:81:than within the dredged areas, sediment deposition on the river bed will be of very minor magnitudes, in

R-2020-0684-ESM-Officer Report 0684.pdf:1:other minor Infrastructure along the river bank at South Bank (including an

R-2020-0684-ESM-Officer Report 0684.pdf:20:estuary is medium, the overall impact is of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:20:minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:21:be medium, the overall impact is of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:21:of the Tees estuary is considered to be medium, the overall impact is of minor

R-2020-0684-ESM-Officer Report 0684.pdf:22:range between negligible and minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:24:health is considered to be of negligible to minor adverse significance

R-2020-0684-ESM-Officer Report 0684.pdf:25:therefore considered to be of minor beneficial significance.

R-2020-0684-ESM-Officer Report 0684.pdf:25:environment is therefore considered to be of minor significance.

R-2020-0684-ESM-Officer Report 0684.pdf:26:is considered to be minor adverse for surface waters (very high sensitivity)

R-2020-0684-ESM-Officer Report 0684.pdf:26:considered to be of negligible to minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:26:The residual impact is therefore considered to be of minor beneficial

R-2020-0684-ESM-Officer Report 0684.pdf:30:considered to be low. This results in an impact significance of minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:31:be of low quality. This results in an impact of minor beneficial significance on

R-2020-0684-ESM-Officer Report 0684.pdf:32:impact is therefore predicted to be of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:32:in the berthing pocket and quay wall. The residual impact would be of minor

R-2020-0684-ESM-Officer Report 0684.pdf:37:woodland that will require removal, the ES concludes that a minor adverse

R-2020-0684-ESM-Officer Report 0684.pdf:37:impacts on otters ranging from spills, strikes from construction vessels (minor

R-2020-0684-ESM-Officer Report 0684.pdf:37:water quality (minor significance), dust and particle matter (not significant) and

R-2020-0684-ESM-Officer Report 0684.pdf:38:minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:38:of habitat and breeding resource would be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:38:potential impact is therefore considered to be minor adverse in significance.

R-2020-0684-ESM-Officer Report 0684.pdf:38:existing habitat within the site is considered to result in impacts of minor -

R-2020-0684-ESM-Officer Report 0684.pdf:39:breeding resource for invertebrates. The residual impact is of minor adverse

R-2020-0684-ESM-Officer Report 0684.pdf:39:therefore considered to be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:40:of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:42:development is considered to be of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:42:common tern as a result of increased SSC would be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:43:would have a minor adverse impact on waterbirds using areas of intertidal

R-2020-0684-ESM-Officer Report 0684.pdf:44:be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:45:be of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:45:impact is predicted to be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:45:light spill. As such, the residual impact is considered to be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:48:minor adverse impact on these due to the activities. However the use of

R-2020-0684-ESM-Officer Report 0684.pdf:49:resulting disturbance through the estuary The minor increase

R-2020-0684-ESM-Officer Report 0684.pdf:50:to be minor adverse to both resident and migratory fish.

R-2020-0684-ESM-Officer Report 0684.pdf:50:considered to be minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:50:impact on sheltering fish would be reduced to minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:59:mitigation the residual impact can be reduced to minor adverse.

R-2020-0684-ESM-Officer Report 0684.pdf:60: considered a minor beneficial impact to any buried archaeology within

R-2020-0684-ESM-Officer Report 0684.pdf:61:the residual impact is considered to be minor adverse and not significant in

R-2020-0684-ESM-Officer Report 0684.pdf:61:resulting in a residual impact predicted to be of minor adverse in significate.

R-2020-0684-ESM-Officer Report 0684.pdf:73:between minor moderate adverse to minor adverse. In terms of EIA these

R-2020-0684-ESM-Officer Report 0684.pdf:73:of effect in views from recreational routes to the south of the site is minor

R-2020-0684-ESM-Officer Report 0684.pdf:73:the transporter bridge is minor adverse. In terms of EIA the effect is not

R-2020-0684-ESM-Officer Report 0684.pdf:73:assessment of the significance of effect in the views is minor moderate

R-2020-0684-ESM-Officer Report 0684.pdf:74:significance of effect in the view is minor negligible adverse and not

R-2020-0684-ESM-Officer Report 0684.pdf:74:in the view is minor negligible adverse. In terms of EIA these effects are not

R-2020-0684-ESM-Officer Report 0684.pdf:75:range between negligible to minor adverse. Many of the views considered

R-2020-0684-ESM-Officer Report 0684.pdf:79:of minor adverse significance.

R-2020-0684-ESM-Officer Report 0684.pdf:83:temporary and minor beneficial.

R-2020-0684-ESM-Officer Report 0684.pdf:84:No mitigation measures are required. The residual impact would be of minor

R-2020-0684-ESM-Officer Report 0684.pdf:90:human health would be negligible to minor adverse in significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:12:and VC2A did not contain any concentrations of contaminants above Action Level 2. Minor exceedances

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:12:within Tees Dock. Though showing signs of minor contamination, it was determined that the ‘soft’ sediments

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:impact is of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:21:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:22:minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:22:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:considered to be medium, the overall impact is of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:25:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:overall impact is of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26:No mitigation measures are required. The residual impact is predicted to be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:10:nature and scale (e.g. minor change of use application or conversions to existing buildings, minor residential

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:10:developments etc.) and, as such, there is no pathway for in-combination effects due to the minor nature of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:14: Inter Terminals Jetty 1 involves minor ‘top-side’ works to the existing Infrastructure at Jetty

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:19: at Metals Recovery operations associated with ground remediation and preparation of scheme, the works are very minor in nature and no

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:24:Ramsar site features. Given the very minor extent of the potentially-affected habitat in terms of the SPA-

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:24:the north bank of the Tees would be beneficial in that the resulting minor increases in deposition may help

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:noise due to regular maintenance dredging, means that impacts on fish are considered to be of minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:27:impacts on waterbirds within the local area from construction or operation phase noises would be minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:29:minor adverse, at worst. When considering the impacts in the terms of the functioning, distribution and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:30:features. However, as outlined in Section 29.5.6, the minor disturbance impacts on North Tees Mudflat

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:34:combined plumes is expected to be minor.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:35:prism of the estuary will be minor (0.8% increase) and is not deemed to be a cause of significant estuary-

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:10:means that the layer in question has previously been designated as both minor and non-aquifer in different

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:1:Could significantly impact the hydromorphology of any the existing estuary bed, this will be minor and highly localised. Alterations to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:26: Hydrodynamic modelling for NGCT concluded that the effect of construction on tidal propagation will be minor, with no change in elevation of either high or low water

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:26: downstream of the site of the proposed scheme. A minor increase in the level of low water of the order of 2mm (at low water on spring tides) was predicted at the site of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:increased SSC would be minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:While the anticipated impact is minor, the following mitigation measure, proposed to reduce the potential for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:29:implementation of this measure, the residual impact is predicted to be of minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:32:minor adverse. A residual impact of negligible significance is predicted at the other sensitive intertidal

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:34:Given the above, it is anticipated that visual disturbances from dredging operations would have a minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:35:residual impact is minor adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:35:concludes that there may be a minor adverse effect as a result of the dredging leading to fish moving away

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:waterbirds, SPA / Ramsar site qualifying features, minor increases in deposition are predicted to have a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:invertebrate prey to birds feeding on the mudflats . The predicted minor accretion of sediment at North Tees

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:designated as both minor and non-aquifer in different locations due to the variable characteristics of the rock

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:22: Approximately 400m north west there was a minor (Category 3) pollution incident of

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:Minor or cosmetic harm

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:722:Minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: sediment plume modelling, an impact of minor adverse significance is predicted with regard to

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24: within the proposed berth pocket; this is predicted to result in a minor beneficial impact.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:25: worst-case impact of minor adverse predicted.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:25:5.25 Following the mitigation outlined above, a worst-case impact of minor adverse is predicted for

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:25: supporting habitat are expected to be minor adverse.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: and short-lived. As such, impacts on prey resources and foraging are predicted to be minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: With mitigation in place, disturbance impacts are predicted to be minor adverse, at worst.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: of such effects, any residual impact is predicted to be minor.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: only result in a minor adverse effect on juvenile fish.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:26: only a minor adverse impact is predicted. A review of potential impacts from land-based piling

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: ecological receptors and minor adverse significance to human health. This is on the basis that

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: strategy. With implementation of mitigation measures, the residual impacts are of minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:28: operation are predicted to be minor beneficial to controlled waters and negligible to human

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: minor beneficial impact on the local economy by creating new construction (and supply chain)

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30: jobs and a temporary, short-term and minor beneficial effect in relation to economic output (as

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:32:6.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: High Major Major Moderate Minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Medium Major Moderate Minor Minor

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Low Moderate Minor Minor Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Negligible Minor Negligible Negligible Negligible

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:10: Minor unlikely to be material considerations in the decision making process.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:11:terms). In addition, whilst minor impacts are not significant in their own right, it is important to distinguish

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:HER. With appropriate mitigation, the residual impact will be reduced to minor adverse and not significant

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:predicted to be of minor adverse significance. It is proposed that this protocol would be formalised in a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:on the river bed will be of very minor magnitude and that, where this occurs in the river channel or at jetties,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:will result in some disturbance to the existing estuary bed, but this will be minor and highly localised and not

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:22: sustained in light of sea level rise. This could be considered a minor beneficial impact to

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:would be negligible to minor adverse significance.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:11: • Green corridors such as minor valleys and former railway lines provide links between urban areas

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:19:scheme will result in the loss of areas of rough grassland and scattered scrub and require minor alteration

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:19:magnitude and incur a minor negligible adverse significance of effect.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:proposed scheme footprint ranges between minor moderate adverse to minor adverse. In terms of EIA

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:is minor adverse. In terms of EIA these effects are not significant.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:22:in views from the site of the transporter bridge is minor adverse. In terms of EIA the effect is not significant.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:medium adverse. The assessment of the significance of effect in the views is minor moderate adverse.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:significance of effect in the view is minor negligible adverse and not significant.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:23:significance of effect in the view is minor negligible adverse. In terms of EIA these effects are not

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:the existing estuary bed, this will be minor and highly localised and thus is not of significant concern. The

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:82:very minor magnitudes, in areas covering the same spatial extent as the sediment plumes. Where this

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:91:reach that is modelled to experience some minor change in baseline hydrodynamics (i.e. the reach local to

R-2021-0405-FFM-DECISION NOTICE.pdf:4:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: 0.0 Comments Minor changes

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: Comments Minor changes

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: Comments Minor changes

R-2019-0468-FF-Decision Notice_R20190468FF.pdf:3: • 12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:This comprises of four main structures and one minor building which can be

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:In total there are four main structures and one minor building that are to be considered for

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:pumphouses located at South Bank. This comprises of four main structures and one minor building which

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:3: 02 July 2022 JM Minor updates to text, discussion of historic GI added.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:3: 03 July 2022 JM Minor updates to text and figures

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:3: 04 August 2020 JM Minor updates following SQP review

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:15: Land Impact Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:15: Land Impact - Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:19: classified as minor aquifers -

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:19: formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:19: These have only a minor value

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:24:contaminants capable of leaching at concentrations above the screening criteria, they are generally only minor

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:41: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:51: Mild Exposure to human health unlikely to Equivalent to EA Category 3 pollution incident Minor or short lived damage to aquatic or other

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:51: Minor No measurable effects on humans Equivalent to insubstantial pollution incident with no Equivalent to insubstantial pollution incident

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:52: Minor Very Low Risk Very Low Risk Low Risk Low Risk

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:52: that this harm if realised would normally be mild or minor.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:106: Incident Identification: 32506 Land Impact: Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:106: Incident Identification: 721753 Land Impact: Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:108: These are generally aquifers formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:108: These are generally aquifers formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:109: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:109: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:110: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:111: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14: Land Impact - Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: classified as minor aquifers -

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:18: These have only a minor value

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:22:contaminants capable of leaching at concentrations above the screening criteria, they are generally only minor

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88: Incident Identification: 32506 Land Impact: Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88: Incident Identification: 721753 Land Impact: Category 3 (Minor)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:90: These are generally aquifers formerly classified as minor aquifers

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:91: Undifferentiated general these layers have previously been designated as both minor and non-aquifer

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:92: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:93: (undifferentiated) In general these layers have previously been designated as both minor and non-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:19:In addition to the above, cohesive Made Ground (generally described as soft to very stiff clay containing minor

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:82: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:3: Minor changes to DoWCoP discussion and updates to

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:3: Minor updates to monitoring and maintenance plan and

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:3: 05 August 2022 JM Minor changes to text

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:9: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:14: • Cohesive Made Ground: Generally described as soft to very stiff clay containing minor

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:47: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:53: 2 -Minor impact on future site operation

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:53: 3 -Very Minor Operational Requirement (e.g. Monitoring Only)

R-2021-1058-NM-Decision 0270.pdf:6:  12 weeks of the date of this notice for a householder application/minor commercial

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:5: stillage, see Figure 4 overleaf. Occasionally, minor works will be carried out on the MPs and TPs whilst

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:10: they will then be transferred across the site to a storage location. Minor works to the blades may be

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:11: appropriate ventilation and minor works may be undertaken.

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: 0.0 Comments Minor changes

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: Comments Minor changes

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: Comments Minor changes

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF:121: Determination of minor elements - As,

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:32: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:41: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:55: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:65: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:65: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:66: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF:138: Determination of minor elements - As,

R-2021-0879-FF-Decision Notice.pdf:3:  12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:122: Minor Very low risk Very low risk Low Risk Low Risk

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:122: realised would normally be mild or minor.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:50: Determination of minor elements - As,

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:7: Minor amendments to the method of works (“Red Penning”) will be conducted

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:1:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:2:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:3:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:5:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:7:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:8:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:10:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:11: 1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:12:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:13:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:14:1 – Minor accident (First Aid) 2 – Major accident (RIDDOR) 3 – Fatality 1 - Low 2 – Medium 3 – High

R-2022-0343-ESM-Decision Notice.pdf:4:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0411-FFM-Decision 0411.pdf:10:  12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Low Some measurable change in attributes, quality Minor short-term benefit to, or addition

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: or vulnerability; minor loss of, or alteration to, of, one (maybe more) key

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Negligible Very minor loss or detrimental alteration to one Very minor temporary benefit to or

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Negligible No change Negligible Negligible or Negligible or Minor

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Minor

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Low No change Negligible or Negligible or Minor Minor or

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Minor Moderate

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Medium No change Negligible or Minor Moderate Moderate or

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Minor Major

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: High No change Minor Minor or Moderate or Major or

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:7: Very high No change Minor Moderate or Major or Substantial

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: temporary or minor chronic harm to human health; or a severe temporary or localised

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: • Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: design of the project. For example, minor adverse effects could include: the potential for

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: temporary slight/minor harm to human health; localised reduction in the quality of any

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: minor beneficial effect could include: slight improvement in human health (or slight reduction

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:8: in existing human health risk factors; a minor local scale improvement in the quality of any

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:14:9.5.5 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.9 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.15 On this the basis, the level of effect is considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:16:9.5.21 On this basis, the level of effect is considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:16:9.5.30 On this basis, the level of effect is considered to be up to minor beneficial, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:17:9.5.34 On this basis, the level of effect is considered to be up to minor beneficial, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:17: minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:18: considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: considered to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: users and groundwater would be up to minor beneficial.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: would be negligible to minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: CoCP, site Negligible Minor adverse Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Mobilisation of CoCP, site Negligible Minor adverse Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23:Groundwater – Tidal CoCP, site Low Minor adverse Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Direct damage to geology CoCP, site Negligible Minor adverse Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23:Human Health – Mobilisation of Validation report, Up to Medium Up to Minor Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:24: Mobilisation of Validation report, Up to Medium Up to Minor Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:24: Very High Dermal exposure, vapours Environmental permit Negligible Minor adverse Not significant

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:24:Cleveland Coast High Negligible Minor adverse Not significant

R-2020-0411-FFM-Figure 6.9 Tree and Shrub Schedule.pdf:1: Vnc mn Vinca minor Lesser Periwinkle 1L C 20%

R-2020-0411-FFM-SEC8563 Redcar EfW Outfall Pipe Phase 1 Note_Final_20.10.29(1).pdf:14:Salad burnet Sanguisorba minor

R-2020-0411-FFM-Appendix 13.1 Archaeological Desk Based Assessment - Formatted.pdf:2:formed a minor element of the 19th century industrial landscape of the South Gare and River Tees. However,

R-2020-0411-FFM-Appendix 13.1 Archaeological Desk Based Assessment - Formatted.pdf:13: formed a minor element of the local industrial landscape from the late 19th Century until the 1960s.

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Low (Minor) 3.0 to 4.9

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11:12.2.4 For the purpose of this assessment, any effects with a significance level of minor or less are

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Negligible None Negligible Minor

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Minor Minor

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Negligible or Negligible or Minor or

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Low None Minor

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Minor Minor Moderate

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Medium None Minor Moderate

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Minor Major

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Minor or Moderate or Major or

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: High None Minor

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:11: Very high None Minor Substantial

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:12:12.2.13 In the future baseline, there would be a minor increase in road traffic flows due to natural growth;

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:14: breeding season) would result in a minor, potentially moderate, adverse effect. It is considered that

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:15: sensitivity of these sites is lower, such that at worse, minor adverse effects would result. In

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:15: minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:16:12.5.12 Overall, it is predicted that a negligible impact on high sensitivity receptors would result in a minor

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:19:12.9.3 A low impact on the, at times, high sensitivity receptor would result in a minor to moderate adverse

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:19: Ramsar site are lower, with a lower associated noise impact and lower adverse effect (minor to

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:19: lower, such that during this period at worst minor adverse effects would result. In addition, some

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:20: With the implementation of these measures the level of effect would reduce to minor adverse

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:20:12.2 A negligible impact on the high sensitivity receptor would result in a minor adverse effect, which is

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:21:Teesmouth and High Disturbance from Piling sheath to Low Minor adverse Not significant

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:21:Teesmouth and High Disturbance from the - Negligible Minor adverse Not significant

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:21:Teesmouth and High Disturbance from - Up to low Minor or Moderate Not significant

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:9: • Minor: these beneficial or adverse effects may be raised as local factors. They are unlikely to

R-2020-0411-FFM-Non Technical Summary.pdf:15: • Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely

R-2020-0411-FFM-Non Technical Summary.pdf:16: Minor Adverse. There would also be direct effects of a Negligible Adverse significance upon the

R-2020-0411-FFM-Non Technical Summary.pdf:17: other proposed developments would be viewed in combination as a minor addition to the urban

R-2020-0411-FFM-Non Technical Summary.pdf:19: off-site receptors with regards to flood risk and hydrology is expected to be Minor Adverse and

R-2020-0411-FFM-Non Technical Summary.pdf:19: minor adverse which is not significant.

R-2020-0411-FFM-Non Technical Summary.pdf:19: construction impacts in relation to hydrology and flood risk, and therefore are at worse minor

R-2020-0411-FFM-Non Technical Summary.pdf:20: considered to have the potential for a minor adverse impact to receptors during the construction

R-2020-0411-FFM-Non Technical Summary.pdf:22: minor to moderate adverse effect at the nearest part of the nearest ecologically sensitive area, the

R-2020-0411-FFM-Non Technical Summary.pdf:22: Reserve site would be lower, with a lower associated noise impact and lower adverse effect (minor

R-2020-0411-FFM-Non Technical Summary.pdf:22: the Nature Reserve site is lower, such that during this period, at worst, minor adverse effects

R-2020-0411-FFM-Non Technical Summary.pdf:22:5.7.7 Noise from operation of the Redcar Energy Centre would result in at worse a minor adverse effect,

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:7: Medium Receptor is of minor value with small levels of contribution to the local, regional or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:8: Low Some measurable change in attributes, quality or vulnerability; minor loss of, or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:8: Minor benefit to, or addition of, one (maybe more) key characteristics, features or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:8: Negligible Very minor loss or detrimental alteration to one or more characteristics, features or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:8: Very minor benefit to or positive addition of one or more characteristics, features or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Negligible No change Negligible Negligible or Negligible or Minor

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Minor Minor

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Low No change Negligible or Negligible or Minor Minor or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Minor Minor Moderate

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Medium No change Negligible or Minor Moderate Moderate or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Minor Major

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: High No change Minor Minor or Moderate or Major or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: Very high No change Minor Moderate or Major or Substantial

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9:8.2.29 The overall significance of an effect is expressed as negligible, minor, moderate, major or

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: • Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:9: to be significant. Any effect that is minor or below is not significant.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:20:8.5.9 On this basis, the level of the effect is assessed as minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:20:8.5.14 On this basis, the level of the effect is assessed as minor adverse, which is not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:21: integration of construction measures adopted in would be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:22: to impermeable areas would lead to a minor increase in flood risk.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:22:8.6.9 On this basis, the level of effect is assessed as minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:22: considered to be low adverse. On this basis, the level of effect would be minor adverse, which is

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:23: impacts in relation to hydrology and flood risk, and therefore, are at worse minor adverse and

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:24: permeability surfacing on the site. The effect is considered to be of minor adverse significance.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:24: identified to minimise potential impacts. The effect is considered to be of minor adverse

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:24: maintenance phase in relation to the proposed development are therefore considered to be minor

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:24: watercourses are considered to be of minor adverse significance, which is not significant.

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:26:Temporary Medium Risk to site users and Temporary Low Adverse Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:26: Mitigation measures Low Adverse Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:26: Mitigation measures Low Adverse Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:26: Alteration of surface water Designed in Negligible Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:27: Designed in Low Adverse Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:27: Decommissioning Negligible Minor Adverse Not significant

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:27: Measures including Low Adverse Minor Adverse Not significant

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9: • Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely to

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9:4.5.29 The terms minor, moderate, major and substantial apply to either beneficial or adverse effects.

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9: Negligible No change Negligible Negligible or Negligible or Minor Minor

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9: Minor

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9: Low No change Negligible or Negligible or Minor Minor or

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:9: Minor Minor Moderate

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:10: Medium No change Negligible or Minor Moderate Moderate or

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:10: Minor Major

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:10: High No change Minor Minor or Moderate or Major Major or

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:10: Very high No change Minor Moderate or Major or Substantial Substantial

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:76: more than minor adverse on the Application Site and its immediate surrounding local area, with

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:78: because, although there would still be some minor obstruction to the views and the introduction of

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:78: between no change in effect, and minor adverse. As such, the assessed effects are not significant

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:89: therefore considered to be negligible, and as such, the level of effect is assessed as minor

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:92: groundwater during construction are assessed to be minor adverse, and thus not significant.

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:92: negligible. Furthermore, the level of effect is considered to be minor adverse, which is not

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:92: users and groundwater would be up to minor beneficial.

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:92: would be negligible to minor adverse, which is not significant.

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:7: road and minor road network in Great Britain. The latest information available covers 2018.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:17: • minor; and

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:33: road and minor road network in Great Britain. The latest information available covers 2018.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:9: negligible, minor, moderate or major. Effects could be either beneficial or adverse.;

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:10: Medium Receptor has minor capacity to accommodate physical or chemical changes or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:10: benefit from minor changes (Beneficial).

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:10: gain a very minor benefit from changes (Beneficial).

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: Low Some measurable change in attributes, quality or vulnerability; minor loss of, or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: Minor benefit to, or addition of, one (maybe more) key characteristics, features or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: Negligible Very minor loss or detrimental alteration to one or more characteristics, features or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: Very minor benefit to or positive addition of one or more characteristics, features or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: described as negligible, minor, moderate or major. Effects are considered to be significant under

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: the 2017 EIA Regulations where the effect is classified as being of ‘major’, ‘moderate’, or ‘minor’

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:11: • Minor: effects which may be raised as local issues, but which are unlikely to be of importance

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Negligible No change Negligible Negligible or Negligible or Minor

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Minor Minor

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Low No change Negligible or Negligible or Minor Minor or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Minor Minor Moderate

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Medium No change Negligible or Minor Moderate Moderate or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: Minor Major

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:12: High No change Minor Minor or Moderate or Major or

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:24: and Cleveland Coast SPA/Ramsar and associated species, resulting in a minor or moderate level

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:24: of effect. The difference between the significance of effect being either minor or moderate will

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:24: undertaken in the breeding season the significance of effect would be minor adverse whereas if

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:24: associated species resulting in a level of effect of minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:25: bird species and the low magnitude of impact the level of effect is considered to be minor adverse,

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:26: minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:26: sensitivity of the receptor is high and the level of effect is considered minor adverse, which is not

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:26: minor adverse, which is .

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:27: high sensitivity Teesmouth and Cleveland Coast SPA and associated species, resulting in a minor

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:27: minor adverse effect, which is not significant.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: Cleveland Coast SPA/Ramsar are negligible and the level of effect is predicted to be minor

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: low magnitude and the level of effect is predicted to be minor adverse, which is not significant.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Disturbance Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Disturbance Not required Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: provide visual screening for ground level works; Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Pollution Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Dust Pollution CoCP to be prepared post consent Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Not Required Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Not Required Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33: Not required Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33:Saltmarsh and Dune Habitats High Not required Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:33:Coast SSSI and associated High Not required Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: Disturbance non-breeding season for waterbirds when sensitivity Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: As for construction Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: Pollution As for construction Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 10 Transport.pdf:6: Negligible Very minor loss of capability for movement along and across transport corridors, very

R-2020-0411-FFM-Chapter 10 Transport.pdf:6: minor loss of access to key facilities and very minor loss of highway safety. Very minor

R-2020-0411-FFM-Chapter 10 Transport.pdf:6: Very minor increase in capability for movement along and across transport corridors,

R-2020-0411-FFM-Chapter 10 Transport.pdf:6: very minor increase in access to key facilities and very minor increase in highway

R-2020-0411-FFM-Chapter 10 Transport.pdf:6: safety. Very minor decreases in delays to travellers (beneficial).

R-2020-0411-FFM-Chapter 10 Transport.pdf:7:10.2.40 For the purpose of this assessment, any effects with a significance level of minor or less are

R-2020-0411-FFM-Chapter 10 Transport.pdf:7: Negligible Negligible Negligible or minor Negligible or minor Minor

R-2020-0411-FFM-Chapter 10 Transport.pdf:7: Low Negligible or minor Negligible or minor Minor Minor or moderate

R-2020-0411-FFM-Chapter 10 Transport.pdf:7: Medium Negligible or minor Minor Moderate Moderate or major

R-2020-0411-FFM-Chapter 10 Transport.pdf:7: High Minor Minor or moderate Moderate or major Major

R-2020-0411-FFM-Chapter 10 Transport.pdf:8: road and minor road network in Great Britain. The latest information available covers 2018.

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:84: Incident Identification: 124998 Land Impact: Category 3 (Minor)

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:86: Undifferentiated In general these layers have previously been designated as both minor and non-

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:86: generally aquifers formerly classified as minor aquifers

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:7: Low Minor loss or addition of or alteration to Minor change in baseline i.e., pre-

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:7: Negligible Very minor loss or addition of or alteration Very slight change in baseline i.e., pre-

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: provides a choice of level of effects, e.g., minor or moderate, the assessor has exercised

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Negligible No change Negligible Negligible or Negligible or Minor

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Minor Minor

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Low No change Negligible or Negligible or Minor Minor or

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Minor Minor Moderate

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Medium No change Negligible or Minor Moderate Moderate or

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Minor Major

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: High No change Minor Minor or Moderate or Major or

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: Very high No change Minor Moderate or Major or Substantial

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: the six-point scale shown in the above matrix (substantial, major, moderate, minor, negligible or no

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:9: Minor Where proposed changes would be at Where proposed changes to views,

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:12: • Green corridors such as minor valleys and former railway lines provide inks between urban

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:28: magnitude of impact to the existing site, resulting in a minor adverse significance of effect on the

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:29:6.5.14 During the construction phase, construction activity including minor demolition works, the use of

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:34: minor obstruction to the views and the introduction of a new element may be noticed, the overall

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:34:6.6.32 Overall, there would be a minor change to the pre-development view, where change would be

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:34: pre-change circumstances. There would be a low magnitude of impact and a minor adverse

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:35: resulting in a minor adverse significance of effect at winter year 1.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:36: Overall, there would be a negligible magnitude of impact, resulting in a minor adverse

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:37: development would not be considered significant. Effects are considered to be minor adverse at

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:38: duration of the phase, with the minor exception of the proposed vegetation having reached

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:41: with the proposed development. The proposed development would make a minor contribution to

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:42: viewed in combination as a minor addition to the urban and industrial fabric of Redcar.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:45: Negligible Direct effects; demolition and Temporary Medium Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:45: be a minor change in baseline

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:47: Medium Indirect effects; very minor addition Permanent Negligible Negligible Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:48: VP3: South Gare Medium Medium range, views to large As above Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:48: VP4: England High Medium range, proposals would As above Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:49: Course minor obstruction and new stack

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:49:VP5: Marsh Farm High Medium range, mostly screened As above Low Minor Adverse Not Significant Marsh Farm residential

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:49: VP8: England High Medium range, mostly open view As above Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:49: VP9: England High Medium range, open view from As above Low Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:50: VP10: England High Long range, open view toward As above Negligible Minor Adverse Not Significant

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:50: VP12: Eston Nab High Long range, elevated view from As above Negligible Minor Adverse Not Significant

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:5: • 12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:2: Minor amendments to Signature: Signature: Signature:

R-2022-0176-CD-2015-10 Section 36 Consent (Memo).pdf:2:In addition a number of minor drafting changes are made (for example to ensure

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:3: of Minor Alteration to Development January 2010 and as further revised

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:20:Environmental Statement Addendum Assessment of Minor Alteration to

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:21: the Environmental Statement Addendum Assessment of Minor

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:7:  12 weeks of the date of this notice for a householder application/minor commercial

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:97: II. Appendix 0/2: Contract specific minor alterations to existing

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:100:APPENDIX 0/2: CONTRACT - SPECIFIC MINOR ALTERATIONS TO EXISTING

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:101: 0/2 Contract Specific Minor Alterations to Existing Clauses, Tables and Figures included in

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24:Low (1) May occur in time. However, hazard exists infrequently or hazardous event Low ( 1) Hazard resulting in minor injury requiring first aid treatment only.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24:occurs very infrequently. Low expectation of occurrence Minor consequential loss potential to both individual and organisation.

R-2021-0465-FFM-Decision Notice 0465.pdf:5: 12 weeks of the date of this notice for a householder application/minor commercial

R-2021-0152-CD-Officer report _R20210152CD.pdf:3:would result in a minor-moderate adverse significance of effect on these

R-2021-0152-CD-Officer report _R20210152CD.pdf:3:unchanged as a minor-moderate beneficial effect as there is no additional

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:54: also predicts surface water ponding and minor flow routes around the roundabout

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:102: present in relatively minor quantities can be discounted at this stage;

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:102: • Incidents which could have relatively minor consequences, regardless of the

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:103: are considered to be relatively minor (1 m3 of 100% glycol), and treatment of the

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:103: expected to be relatively minor (approximately a small number of tonnes present

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:104: would be relatively minor and there is a low potential for a major accident. Other

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:118: Development as the design and layout is still being refined, and minor changes are

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:118: assessment methodologies (major, moderate, minor and negligible). For the purpose

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:121: • minor – slight, very short or highly localised effect of no significant consequence;

R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf:9:Q. I’m just a small contractor, this minor job isn’t worth pursuing if enquiries are expensive?

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:14: resulting in a limited or minor increase in demand on

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:15:Low Human Health: Slight reversible short-term effects to human Minor impact on feature or

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: Very High Substantial Substantial Moderate Minor

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: High Substantial Moderate Minor Negligible

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: Medium Moderate Minor Negligible Negligible

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: Low Minor Negligible Negligible Negligible

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:28: that the horizon has variable characteristics allowing it to function as both a minor and non

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:39: earthworks resulting in a limited or minor increase in demand on waste management

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:39:H5.20 Soil/materials disposal required following earthworks resulting in a limited or minor increase in

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:43: likely to be impacts of Minor Adverse significance for construction workers and Negligible

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:44: significance of the impacts identified is considered to be Minor Adverse / Negligible and Not

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:26: Complex 23.05.2018 R/2014/0626/FFM to allow for minor material amendments to the approved

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:29: 9 Minor 3 beneficial

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:29:3 Minor – slight, very short or highly localised effects

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:30: 11 Minor10 adverse

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:30: P02 / 3 December 2020 Minor edits requested by John McNicholas and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:30: P03 / 11 December 2020 Minor edits requested by John McNicholas and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:45: blue-green networks and minor watercourses with a catchment of less than 5km 2) the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:22:and appearing to be minor shunt type collisions. No collisions involving

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:56: for the occupier, for employees to bring bicycles in for servicing and minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:60:a minor reduction in car mode share and is based on traffic increasing in the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:98: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:283: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:44: proposed development. This increase affects only non-residential receptors, is only minor and

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:47: vantage point in the area) during construction. All other effects are anticipated to be minor or

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:47: development will form a minor component in the overall visible landscape and may not have a

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:50: Eston Road junction. All other effects will be reduced to minor or negligible and not significant.

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:53: groundwater, the built environment and landscape will all be of minor adverse / negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:13: minor, moderate or substantial. An assessment is then made on whether the effects are

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:19: reduced from those in the current budgets. However, given the very minor adverse contribution

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:21: the annual emissions from Redcar and Cleveland as a whole. This i s a minor adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:25:J7.3 However, it is not considered that these minor adverse emiss ions will compromise the ability of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:25:J7.7 It is not considered that the minor adverse emissions during operation will compromise the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:26: Atmosphere/ Total Minor adverse Design to reduce material quantities Minor adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:26: Atmosphere/ Total Minor adverse Reduce future maintenance with Minor adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:12: Minor Changes to key archaeological materials, such that the asset is slightly

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:12: Negligible Very minor changes to archaeological materials or setting.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: Magnitude of Change No Negligible Minor Moderate Substantial No Change

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: High Neutral Minor Moderate Substantial Substantial High

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: Medium Neutral Negligible Minor Moderate Substantial Medium

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: Low Neutral Negligible Negligible Minor Moderate Low

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: Negligible Neutral Negligible Negligible Negligible Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: the effect on the receptor will be Neutral, Negligible, Minor, Moderate or Substantial. Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:13: Minor Adverse The development partly satisfies the subject environmental obje ctive but fails to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:14: Minor Beneficial The development satisfies the subject environmental objective and contributes to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:22: Minor Adverse. This is not considered significant in EIA terms. Table K7.1 below looks at the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:22: Eston Iron Works remains Medium Minor Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:22: Open Hearth furnaces remains Low Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:22: Cleveland Steel Works blast furnace bases Medium Minor Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:22: Cleveland Steel Works other remains Low Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:23: deposits would ensure impacts are no greater than Minor Adverse which is not significant in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:23: Eston Iron Substantial Substantial Adverse Archaeological Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:23: Cleveland Substantial Substantial Adverse Archaeological Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19:F3.40 If the impact descriptor is Negligible or Slight (Minor), this is considered to not have a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: Moderate, Minor and Negligible/Neutral and reference to these terms are included in the below

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 75% or less of objective Negligible Negligible Slight (Minor) Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 76-94% of objective Negligible Slight (Minor) Moderate Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: (Minor)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 10-20% of hourly mean NO2 threshold Small Slight (Minor)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:20: significant effect and a ‘Negligible’ or ‘Slight’ (Minor) impact will not result in a significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:34: As stated in paragraph F3.44, where the impact is Negligible or Slight (Minor) then the overall

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: Complex 23.05.2018 R/2014/0626/FFM to allow for minor material amendments to the approved

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:30: 9 Minor 3 beneficial

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:30:3 Minor – slight, very short or highly localised effects

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:31: 11 Minor10 adverse

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:36:a CTMP and phased construction programme, any impacts would be minor and therefore the severance or

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:38: therefore considered to be Minor Adverse. This is considered Not Significant.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:40: Medium increase in traffic flow should not affect the Moderate Minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:40: Medium the increase in traffic flow should not affect Minor Minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:40: High non-motorised users to cross at the Minor Minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:41: Greystones Roundabout High Moderate Minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:41: location is therefore considered to be Minor Adverse as the crossing facility is already signalised to

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:41: Therefore, the effects on pedestrian and cyclist amenity at this location is considered to be Minor

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:41: be Minor Adverse. This considered Not Significant

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:41: increase in traffic is therefore considered to be Minor Adverse. This is considered Not Significant.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:14: Minor The size and scale of change are considered small due to the extent and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:16: on a minor road will tend to have limited importance. A viewpoint that is visited or used by a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:19: Minor The proposed development forms a minor component of the landscape

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:20: Minor Beneficial Complement the character of the receiving landscape.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:20: Minor Adverse The proposed development may detract slightly from, or not quite fit

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Alternatively, a minor magnitude of change on a highly sensitive

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Minor Beneficial The proposed development would cause a perceptible improvement in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: experience a minor/ moderate magnitude of change that is beneficial in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Minor Adverse The proposed development would cause a perceptible deterioration in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: experience a minor/ moderate magnitude of change and one which is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: a minor magnitude of change on a highly sensitive receptor or a major

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:22: EIA terms. Those classified as Minor or Negligible are likely to be Not Significant in EIA terms.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Minor Minor Minor Minor to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Moderate Minor Moderate* Moderate* to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Substantial Minor to Moderate* to Substantial*

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:26: 9 Green corridors such as minor valleys and former railway lines provide links between urban

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:29:L4.30 To the north, the landscape is low lying with minor topographical changes created by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39:L5.13 Combining all of these criteria, it is considered that there will be a Minor Beneficial level of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39: LCZ 1 - Industrial Low Minor Minor beneficial Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39: is likely that construction would result in a minor shift away from baseline conditions and would

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40: experience indirect, minor adverse effects during construction, and in the operational stage.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40:L5.18 Due to the scale size and permanence of the proposed development, this would result in a minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40: change is therefore considered to be Minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40:L5.19 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40: LCZ 2 - Urban Low Minor Minor Adverse Indirect, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:42: L5.39 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:42: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse Indirect, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:43:L5.52 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44: LCZ 9 – Urban Green Low-Medium Moderate Minor Adverse Indirect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44: VP1 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: minor component in the overall view, and its influence on the receptor may be missed.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: L5.62 The skyline is altered in a minor way as the proposed development partially fills in the view of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: L5.65 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: L5.66 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: VP2 Road Users Minor Minor Adverse Direct,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: visibility of which may be increased in winter months. The skyline is altered in a very minor way,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: and existing building designs. The proposed development forms a minor component of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45:L5.72 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45:L5.73 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46: VP3 Road Users Minor Minor Adverse Direct,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46:L5.78 Based on the above assessment, the magnitude of change is therefore considered to be Minor-

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46:L5.79 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46: VP4 Overbridge Users Minor-Moderate Minor Adverse Direct,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:47:L5.84 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:47: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:47:L5.88 The proposed development will form a minor component in the overall visible landscape and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: down onto the proposed development. The proposed development has minor visibility due to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49: Industrial development within the context of the view. The skyline has minor alterations from

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49:L5.101 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49:L5.102 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49: VP14 Footpath Users - Minor Minor Adverse – Not Direct.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49:L5.107 The skyline is altered in a minor way, filling in gaps between the few buildings visible on the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49:L5.108 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49:L5.109 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:49: VP15 Footpath Users - Minor Minor Adverse – Not Direct.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50:L5.113 The skyline is altered in a very minor way, filling in gaps between existing industrial chimneys

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: and existing building designs. The proposed development forms a minor component of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP1 Footpath Users - Minor Moderate Adverse - Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP2 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP3 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: VP4 Overbridge Users Minor-Moderate Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: Vp13 Footpath Users - Minor Minor Adverse Direct. Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: Vp14 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: LCZ 1 - Industrial Low Minor Minor Beneficial – Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: LCZ 2 - Urban Low Minor Minor Adverse – Indirect, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: LCZ 6 – Eston Medium-High Moderate Minor Adverse – Indirect, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: LCZ 9 – Urban Low-Medium Moderate Minor Adverse – Indirect, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: VP1 Footpath Users - Minor Moderate Adverse - Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: VP2 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: VP3 Road Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: VP4 Overbridge Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: VP5 Road Users Moderate Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:54: VP13 Footpath Users - Minor Minor Adverse Direct. Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:54: VP14 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:55: Viewpoint 1 during construction and operation. All other effects are anticipated to be Minor or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:55: LCZ 1 - Impact of Minor Beneficial – Not Buildings to be Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:55: LCZ 2 - Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:56: LCZ 6 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:57: LCZ 9 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:57: VP2 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:58: VP3 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:58: VP4 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:58: VP5 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:59: VP13 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:59: VP14 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:13: blue-green networks and minor watercourses with a catchment of less than 5 km2) the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:19: 2 The magnitude (severity) of the effect (major, moderate, minor, no change) (Table G3.3)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:21: Minor reduction in resource availability

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:21: Minor Results in minor impact on feature, with Measurable reduction in groundwater

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:22: for minor damage to property and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:22: assessment of significance. Where 'Substantial', 'Moderate', 'Minor' or ‘Negligible’ is referenced

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:23: Major Substantial Substantial Substantial Moderate Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:23: Moderate Substantial Substantial Moderate Minor Neutral/

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:23: of change Minor Moderate Moderate Minor Neutral/ Neutral/

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:23: in many cases be considered as ‘blurred’. Where the level of effect is considered to be minor or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:23: However, depending on the receptor being considered, it is possible that some potentially minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:33: layer in question has previously been designated as both minor and non-aquifer in different

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:41: would be minor.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:42: be minor. The receptor sensitivity of the Cleveland and Lackenby Channels, Holme Beck

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:43: to be minor, due to the commitment to adhere to the measures included in the CEMP during the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:43: magnitude of the effect of excavation on groundwater flow is deemed to be minor. Alongside a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:43: to be of minor magnitude without embedded mitigation. With the implementation of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:43: Outline Remediation Strategy and CEMP, this would reduce but still be of minor magnitude.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:44: water flows during the operation phase is considered to be minor. The receptor sensitivity of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:44: potential magnitude of change for groundwater flows during operation is minor. The site is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:44: magnitude of change for groundwater quality during operation is minor, and the level of effect

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:50: construction phase is considered to be minor and so the effect of the improvements to the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:50: of change will be minor, so the level of effect is therefore Negligible Adverse, and Not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:51:G7.10 Overall, any effects on groundwater quality are likely to be of minor magnitude of change, given

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:51: residual effects is considered to be minor. The receptor sensitivity of the Cleveland and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:51: aquifers is low, and the magnitude of the change will be minor, so the level of effect is therefore

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:51: and its potential for mobilisation. This should result in a minor magnitude of change from the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:51: implementation of the mitigation measures and result in Minor Beneficial effect which is Not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:57: Water Quality - Minor Adverse and Not Any Surface water Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: Pollution from Negligible Beneficial and The SWMP will include Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: Pollution from Negligible Beneficial and The SWMP will include Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: to a common list of criteria, including: Substantial, Moderate, Minor, Negligible or Neutral.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: Minor 1.0 to 2.9

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: 2 For areas exposed to higher noise levels (above SOAEL), a Minor impact (1dB or greater) is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:29: considered as a minor impact. This is Not Significant.

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:12: perceptible change in traffic flows which would have a Minor Adverse effect on severance. This

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:12: between a Substantial Adverse and Minor Adverse effect on driver and bus user delay due to an

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:12: perceptible increase in traffic on two routes is identified to result in Negligible to Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:13:5.4 Other minor habitat elements are plantation woodland, scrub and a short, open section of the

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:13:5.9 The proposed development would result in a permanent Minor Adverse effect on Breeding

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: (Minor Adverse impacts) and pollution from spillages and a reduction in contamination of

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: impacts: for groundwater, the impacts on flows would remain Minor Adverse and Not

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: Significant and the impacts on groundwater quality are considered to be Minor Beneficial, both

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:19: embedded mitigation, this is expected to result in a Minor Adverse impact on construction

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:19:H1.4 The implementation of these measures will result in Minor Adverse or Negligible (and Not

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:22: ability of the UK to meet its national targets. The development is assessed as Minor Adverse and

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:22: as Minor Adverse and Not Significant for operational stage.

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:23: effects ranging from Negligible to Minor Adverse/Minor Beneficial. There will be a Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:23: considered to be Not Significant, with effects ranging from Negligible to Minor Adverse.

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:25:13.5 With mitigation (described below), this is expected to result in a Minor Adverse impact on the

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:25:13.10 The implementation of these measures will result in Minor Adverse or Negligible (and Not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:14: Minor The consumption of one or more materials would be between 1-5% by volume of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:14: No change Negligible Minor Moderate Major

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:14: Very high Neutral Minor Moderate Substantial Substantial

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:14: High Neutral Minor Moderate Moderate Substantial

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:14: Medium Neutral Negligible Minor Moderate Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:6: Minor Adverse (Not Significant) effects on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:7: Ground Conditions and Minor Adverse (Not Significant) effect on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:7: Climate Change Minor Adverse (Not Significant) effects on the atmosphere/climate.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:7: Below Ground Heritage Minor Adverse (Not Significant) effects on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:7: Minor Adverse (Not Significant) effect on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:8: Water Management and Minor Beneficial (Not Significant) effects on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:8: Climate Change Minor Adverse (Not Significant) effects on the atmosphere/climate.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:8: Impact Minor Beneficial (Not Significant) effects on LCZ 1 - Industrial

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:8: Minor adverse (Not Significant) effects on:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:10: reference is made to Minor or Negligible ‘insignificant’ residual effects where relevant. The EIA

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:10: Minor or Negligible Adverse and Not Significant or Substantial Beneficial (Significant) or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:11: RED - adverse effect; GREEN - beneficial effect; ( ) - Minor/Negligible non-significant effect; X no/neutral

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:18: International 139/VC permission R/2014/0626/FFM to allow for minor material 23.05.2018 permission relates to the York

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:30: Nesting birds Minor Adverse and Not Moderate Adverse and Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:30: Brown Hare Minor Adverse and Not Moderate Adverse and Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:30: Common Toad Minor Adverse and Not Moderate Adverse and Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:30: Grayling butterfly Minor Adverse and Not Substantial Adverse and Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:43: effects in terms of groundwater are deemed to be Minor Beneficial and Not Significant in terms

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:43: of groundwater pollution / contamination, Minor Adverse and Not Significant for groundwater

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:46: than those in the current budgets. However, given the overall Minor Adverse contribution of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:47:N5.75 Whilst individual sites are expected to have a Minor Adverse (Not Significant)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:48: percentage impact of 1.03% on the regional landfill capacity. This is considered to be a minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:49: considered to be minor. The overall significance is considered to be Negligible (Not Significant).

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:50: indicates that, with a CTMP and phased construction programme, any impacts would be Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:51: Moderate Adverse effect is forecast on the A66 and Normanby Road, with a Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:51: 16 Minor material amendment - no effect on VERs

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:57: • For areas exposed to higher noise levels (above SOAEL), a minor impact (1dB or greater) is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:66: Negligible impact at most receptor locations and Slight (Minor) Adverse at five receptor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:66: R20), the A1085 and Kirkleatham Lane respectively). Negligible and Slight (Minor Adverse)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:67: If a value of 0.4µg/m3 is assumed that the impact at the two receptors becomes Slight (Minor)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:68: Where the impact is Negligible or Slight (Minor) Adverse then the overall effect of the proposed

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:69: Minor Adverse and Not Significant for ground water, and for surface water the impact on

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:71: considered to be Minor. Consequently, the overall significance is considered to be Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:71: applications within the region (such as the Tier 1 applications) have Minor impacts, a similar

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:72: Minor impacts a similar influence could be anticipated from Tier 2 schemes. Therefore, the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:72: as the Tier 1 applications, have Minor impacts a similar influence could be anticipated from Tier

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:10: 3 Minor – Effects on VERs of Local importance;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:11: considered to be significant, whilst Minor, Negligible and Neutral effects are considered to be

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:28: development. As a result there will be a permanent, Minor Adverse effect on nesting birds.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:28: development. As a result there will be a permanent, Minor Adverse effect on brown hare.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:28: development. As a result there will be a permanent, Minor Adverse effect on Common Toad.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:28: proposed development. As a result there will be a permanent, Minor Adverse effect on Grayling

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:29: Nesting birds Minor Adverse and Not Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:29: Brown Hare Minor Adverse and Not Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:29: Common Toad Minor Adverse and Not Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:29: Grayling butterfly Minor Adverse and Not Significant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:36: Nesting birds Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:36: Brown Hare Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:36: Common Toad Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:36: Grayling Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:37:D10.6 There will be the loss of a small number of specific VERs of minor significance, as set out in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:37: Table 8.1. As these are of minor significance they do not require like-for-like compensation but

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:13: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:13: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:13: Minor Where the proposed development could be expected to result in a small, very short or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:13: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:13: Medium Moderate to Moderate Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:14: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:29: adverse. The significance of effects is assessed as being substantial, moderate, minor or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:10: • Minor – effects which will be slight or very localised;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:10: • Minor – effects which will be slight or very localised or only effect receptors that are defined

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:19: indicates that, with a CTMP, any impacts would be minor and therefore the severance or

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:21: the permanent effect will therefore be minor adverse. This is not considered to be a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:22: Proposed site Medium Minor Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:22: High junction operates within capacity Minor Moderate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: Medium increase in traffic flow should not affect the Moderate Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: Lane Medium the increase in traffic flow should not affect Minor Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: amenity at this location is therefore considered to be permanent, Minor Adverse as the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:24: Minor Adverse as the crossing facility is already signalised to mitigate the impact on non-

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:25: and could have a Minor Adverse effect on accidents and safety. This is Not Significant.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:25: junction and appearing to be minor shunt type collisions. The proposed development will add

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:27: effects will be Minor or Negligible and Not Significant.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:27: Eston Road Minor adverse Travel Planning measures to be introduced to Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:27: A66/Normanby Moderate Review of traffic signals to see if junction operation Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:27: A66/Tees Dock Moderate Junction improvements are expected to be Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: A1085 Trunk Moderate Travel Planning measures to be introduced to Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: A174/ Moderate Junction improvements are expected to be Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: A66/Eston Road Minor adverse Travel Planning measures to be introduced to Minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: A66/Church Minor adverse Travel Planning measures to be introduced to Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: A66/Normanby Minor adverse Review of traffic signals to see if junction operation Negligible

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:29: Eston Road Minor, Division can occur within None identified – Eston Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:30: A66 / Moderate, As Junction performance Junction operation will be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:30: A66/Tees Moderate, Junction performance Junction operation will be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:30: A1085 Moderate, Junction performance Junction operation will be Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:30: A174/ Moderate, Junction performance Junction improvements Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:30: A66/Eston Minor, Potential accidents Wider travel planning Minor Adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:31: A66/Church Minor, Potential accidents Wider travel planning Negligible –the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:31: A66/Norma Minor, Previous accident trend Travel Planning measures Negligible - the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:16: Complex to allow for minor material amendments Potash project and it is located at

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: marine side applicati and other minor Infrastructure along the Lichfields to STDC in November 2020 and the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:28: 3 Minor3 beneficial

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:28: 5 Minor3 adverse

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:28: 3 Minor - slight, very short or highly localised effects

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:39: A GENERAL, RELATIVELY MINOR CUT/FILL

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:48: 12 weeks of the date of this notice for a householder application/minor commercial

R-2023-0277-CD-DECISION NOTICE.pdf:5: 12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:14: Minor The consumption of one or more materials would be between 1-5% by volume of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:14: No change Negligible Minor Moderate Major

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:14: Very high Neutral Minor Moderate Substantial Substantial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:14: High Neutral Minor Moderate Moderate Substantial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:15: Medium Neutral Negligible Minor Moderate Moderate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:6: Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:7: Ground Conditions and Remediation Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:7: Climate Change Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:7: Below Ground Heritage Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:8: Minor Adverse (Not Significant) effect on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:8: Minor Beneficial (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:9: Climate Change Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:9: Landscape and Visual Impact Minor Beneficial (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:9: Minor Adverse (Not Significant) effects on:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:11: reference is made to Minor or Negligible ‘insignificant’ residual effects where relevant. The EIA

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:11: predicted, the residual effects of the development are either Minor or Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:12: RED - adverse effect; GREEN - beneficial effect; ( ) - Minor/Negligible non-significant effect; X no/neutral

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:20: International 139/VC permission R/2014/0626/FFM to allow for minor material 23.05.2018 permission relates to the York

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:22: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Bats Minor Adverse No change

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Breeding Birds Minor Adverse No change

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Brown Hare Minor Adverse and Not Significant Moderate Adverse and Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Common Toad Minor Adverse and Not Significant Moderate Adverse and Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Other Minor Adverse and Not Significant Moderate Adverse and Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: European Eel Minor Adverse and Not Significant No change

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Open Mosaic Minor Adverse and Significant Moderate Adverse and Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:32: Dune Grassland Minor Adverse and Not Significant No change

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:45: the cumulative effects in terms of groundwater are deemed to be Minor Beneficial and Not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:48: than those in the current budgets. However, given the overall Minor Adverse contribution of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:49:N5.73 Whilst individual sites are expected to have a Minor Adverse (Not Significant)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:50: percentage impact of 1.03% on the regional landfill capacity. This is considered to be a minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:50: considered to be minor. The overall significance is considered to be Negligible (Not Significant).

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:52: indicates that, with a CTMP and phased construction programme, any impacts would be Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:52: Moderate Adverse effect is forecast on the A66 and Normanby Road, with a Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:53: 16 Minor material amendment - no effect on VERs

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:59: • For areas exposed to higher noise levels (above SOAEL), a minor impact (1dB or greater) is

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:68: Negligible impact at most receptor locations and Slight (Minor) Adverse at five receptor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:68: R20), the A1085 and Kirkleatham Lane respectively). Negligible and Slight (Minor Adverse)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:69: If a value of 0.4µg/m3 is assumed that the impact at the two receptors becomes Slight (Minor)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:70: Where the impact is Negligible or Slight (Minor Adverse) then the overall effect of the proposed

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:71: Minor Beneficial and Not Significant in terms of groundwater pollution / contamination for all

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:74: considered to be Minor. Consequently, the overall significance is considered to be Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:74: applications within the region (such as the Tier 1 applications) have Minor impacts, a similar

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:74: Minor impacts a similar influence could be anticipated from Tier 2 schemes. Therefore, the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:74: as the Tier 1 applications, have Minor impacts a similar influence could be anticipated from Tier

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:14: blue-green networks and minor watercourses with a catchment of less than 5 km2) the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:20: 2 The magnitude (severity) of the effect (major, moderate, minor, no change) (Table

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:22: Minor reduction in resource availability

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:23: Minor Results in minor impact on feature, with Measurable reduction in groundwater

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:23: for minor damage to property and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:23: assessment of significance. Where 'Substantial', 'Moderate' or 'Minor' is referenced as a level of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:24: Major Substantial Substantial Substantial Moderate Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:24: Moderate Substantial Substantial Moderate Minor Neutral/

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:24: of change Minor Moderate Moderate Minor Neutral/ Neutral/

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:24: considered to be minor or less, these are generally not deemed significant in terms of the EIA

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:24: some potentially minor effects could be judged as significant in terms of the EIA Regulations,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:28: Minor culverts drain into Dabholm Beck, likely used to drain run-off from the A1085. The

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:28: catchments of two minor watercourses which contribute the Dabholm Beck before its confluence

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:29: is largely constrained in the channel of The Fleet except minor sections along the channel bank

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:29: areas: Tod Point Road which bounds the site to the north and two minor access roads – one

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:35: both minor and non-aquifer in different locations due to the variable characteristics of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:36: minor aquifers.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:45: would be minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:46: be minor. The receptor sensitivity of Ash Gill Beck is Very Low and so the effect would be

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: to be minor, due to the commitment to adhere to the measures included in the CEMP during the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: magnitude of the effect of excavation on groundwater flow is deemed to be minor. Alongside a

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: deemed to be minor. As such, the level of effect is therefore Moderate Adverse and thus

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: to be of minor magnitude without embedded mitigation. With the implementation of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: CEMP, this would reduce but still be of minor magnitude. Alongside a receptor sensitivity

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:47: quality is deemed to be minor. As such, the level of effect is therefore Moderate Adverse and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:48: surface water flows during the operation phase is considered to be minor but there is an

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:48: flows is minor. The site is located near the River Tees, a very significant groundwater discharge

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:48: recharge is deemed to be minor. As such, the level of effect is therefore Moderate Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:49: magnitude of change for groundwater quality during operation is minor, and the level of effect

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:49: quality is deemed to be minor. As such, the level of effect is therefore Moderate Beneficial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:57: is low, and the magnitude of the change will be minor, so the level of effect is therefore

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:58:G7.16 Overall, any effects on groundwater quality are likely to be of minor magnitude of change, given

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:59: the magnitude of the change will be minor, so the level of effect is therefore Negligible Adverse,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:59: and its potential for mobilisation. This will result in a minor magnitude of change from the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:59: implementation of the mitigation measures and result in Minor Beneficial effect which is Not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:59: minor (beneficial). As such, the level of effect is therefore Moderate Beneficial and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:67: Pollution from Negligible Beneficial and Remediation strategy and Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:67: / Glacial Pollution from Negligible Beneficial and Remediation strategy and Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:10: • Minor – effects which will be slight or very localised;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:10: • Minor – effects which will be slight or very localised or only effect receptors that are defined

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:16: West Coatham Lane Medium Minor road with direct frontages and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:19: professional judgement indicates that, with a CTMP, any impacts would be minor and therefore

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:21: permanent effect will therefore be Minor Adverse. This is considered to be Not Significant.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:22: Medium Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:22: High Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: (North of Medium Minor Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: Medium Minor Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:23: and cyclist amenity along this route is considered to be Minor Adverse. There is an

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:26: A174 / Greystone Moderate Junction improvements are expected to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:26: A1085 / A1042 Moderate Junction operation will be reviewed to see if Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:26: A1085 Trunk Minor adverse N/A Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:27: Minor adverse N/A Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: Division can occur within None identified – Eston Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:28: Trunk Minor adverse between local businesses access into the site access the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:29: A174 / Moderate Junction performance Junction improvements Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:29: A1085 / Moderate Junction performance Junction operation will be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:29: Trunk Road Minor adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:12: earthworks resulting in a limited or minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:13: Low Human Health: Slight reversible short-term Minor impact on feature or

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:14: Very High Substantial Substantial Moderate Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:14: High Substantial Moderate Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:14: Medium Moderate Minor Negligible Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:14: Low Minor Negligible Negligible Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25: important source of base flow to rivers. These are generally aquifers formerly classified as minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25: variable characteristics allowing it to function as both a minor and non‐aquifer in different

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25:H4.44 A Groundwater Vulnerability Zone Minor Aquifer (High) is recorded along the northern

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25: perimeter of the site. This means a minor aquifer is in an area where it is able to easily transmit

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:33: earthworks resulting in a limited or minor increase in demand on waste management

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:33: be of Minor Adverse significance which is considered ‘Not Significant’ in terms of this EIA

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:37: workers of Minor Adverse significance and impacts on nearby residents of Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:38: significance of the impacts identified is considered to be Minor Adverse / Negligible and Not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:38: Construction Exposure to Substantial Adverse: Remediation / Minor Adverse:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:39: Built Soil/materials Minor Adverse and Not Minimisation of Negligible and Not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:39: limited or minor Highfield Landfill

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: to a common list of criteria, including: Substantial, Moderate, Minor, Negligible or Neutral.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: Minor 1.0 to 2.9

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: 2 For areas exposed to higher noise levels (above SOAEL), a Minor impact (1dB or greater) is

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:11: effects are expected to be Not Significant. The assessment shows a Minor Adverse (and Not

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:11: A1085 / A1042 Kirkleatham Lane junction. Minor Adverse (and Not Significant) effects are also

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:13:5.9 The proposed development would result in a permanent Minor Adverse effect on; Bats,

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:13:5.10 The proposed development would result in a temporary Minor Adverse effect on the Fleet

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: These impacts are considered to be Negligible to Minor Adverse and Not Significant for surface

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:18: considered to be Minor Beneficial, both of which would be Not Significant.

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:20: embedded mitigation, this is expected to result in a residual Minor Adverse impact on

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:20:8.19 As noted above, the implementation of these measures will result in Minor Adverse or Negligible

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:23: ability of the UK to meet its national targets. The development is assessed as Minor Adverse and

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:23: as Minor Adverse and Not Significant for operational stage.

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:24: effects ranging from Negligible to Minor Adverse/Minor Beneficial. There will be a Moderate

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:24: Significant, with effects ranging from Negligible to Minor Adverse.

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:26:12.5 With mitigation (described below), this is expected to result in a Minor Adverse effect on the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:12: Minor Changes to key archaeological materials, such that the asset is slightly

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:12: Negligible Very minor changes to archaeological materials or setting.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Magnitude of Change No Negligible Minor Moderate Substantial No

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: High Neutral Minor Moderate Substantial Substantial High

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Medium Neutral Negligible Minor Moderate Substantial Medium

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Low Neutral Negligible Negligible Minor Moderate Low

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Negligible Neutral Negligible Negligible Negligible Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: the effect on the receptor will be Neutral, Negligible, Minor, Moderate or Substantial. Moderate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Minor Adverse The development partly satisfies the subject environmental objective but fails to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:14: Minor Beneficial The development satisfies the subject environmental objective and contributes to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:21: Duck Decoy Low Moderate Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:21: World War II Low Moderate Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: offsets the negative effect, to have a residual effect that is between Negligible and Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: Coatham Iron Works blast furnace bases Medium Minor Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: Redcar Iron Works blast furnace bases Medium Minor Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: Duck Decoy Low Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: World War II defensive structures Low Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:24: Medieval salterns Medium Minor Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: significant archaeological features and deposits would ensure impacts are no greater than Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: Coatham Remediation and Substantial Adverse Archaeological Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: Redcar Iron Remediation and Substantial Adverse Archaeological cleaning, Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: Duck Decoy Remediation and Minor Adverse Archaeological Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: World War Remediation and Minor Adverse Archaeological evaluation Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:25: Medieval Remediation and Moderate Adverse Archaeological evaluation Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:26: Complex 23.05.2018 R/2014/0626/FFM to allow for minor material amendments to the approved

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:29: 9 Minor 3 beneficial

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:29:3 Minor – slight, very short or highly localised effects

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:30: 11 Minor10 adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:14: Minor The size and scale of change are considered small due to the extent and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:17: on a minor road will tend to have limited importance. A viewpoint that is visited or used by a

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:19: Minor The proposed development forms a minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Minor Beneficial Complement the character of the receiving landscape.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Minor Adverse The proposals may detract slightly from, or not quite fit the distinctive

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Alternatively, a minor magnitude of change on a highly sensitive

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: Minor Beneficial The proposed development would cause a perceptible improvement in

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:21: experience a minor/ moderate magnitude of change that is beneficial in

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:22: Minor Adverse The proposed development would cause a perceptible deterioration in

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:22: experience a minor/ moderate magnitude of change and one which is

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:22: a minor magnitude of change on a highly sensitive receptor or a major

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:22: EIA terms. Those classified as Minor or Negligible are likely to be Not Significant in EIA terms

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Minor Minor Minor Minor to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Moderate Minor Moderate* Moderate* to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: Substantial Minor to Moderate* to Substantial*

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:26: 9 Green corridors such as minor valleys and former railway lines provide links between urban

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:38: considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:38:L5.15 Combining all of these criteria, it is considered that there will be a Minor Beneficial level of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:38: LCZ 1 - Industrial Low Minor Minor beneficial Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:38: whole, it is likely that construction would result in a minor shift away from baseline conditions,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39: experience indirect, Minor Adverse effects during construction, and in the operational stage.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39:L5.20 Due to the scale size and permanence of the proposed development, this would result in a minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39: change is therefore considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39:L5.21 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:39: LCZ 2 - Urban Low Minor Minor Adverse Indirect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40: The magnitude of change is therefore considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40:L5.36 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:41: LCZ 5 – Coatham Medium-High Minor Minor Adverse Indirect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:41:L5.41 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:41: LCZ 6 – Eston High Moderate Minor Adverse Indirect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:42:L5.54 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:42: LCZ 9 – Urban Low-Medium Moderate Minor Adverse Indirect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:43:L5.58 The proposed development will form a minor component in the overall visible landscape and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:43:L5.59 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:43: VP1 Footpath Users Minor Moderate Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44:L5.65 Based on the above assessment, the magnitude of change is therefore considered to be Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44:L5.66 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44: VP4 Rail overbridge Minor - Minor Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:44:L5.70 The proposed development will form a minor component in the overall visible landscape and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45:L5.76 The assessment of the magnitude of change is therefore considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45:L5.77 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:45: VP7 Footpath Users Minor Minor Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46:L5.86 The assessment of the magnitude of change is therefore considered to be minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46: VP10 Footpath Users Minor Moderate Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:46:L5.91 The assessment of the magnitude of change is therefore considered to be minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:47: VP12 Footpath Users Minor Moderate Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:47: down onto the proposed development. The proposed development has minor visibility due to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: Industrial development within the context of the view. The skyline has minor alterations from

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48:L5.103 Based on the above assessment, the magnitude of change is therefore considered to be Minor.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48:L5.104 Combining all of these criteria, it is considered that there will be a Minor Adverse level of effect,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP14 Footpath Users Minor Minor Adverse Direct,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP1 Footpath Users Minor Moderate Adverse - Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP4 Rail overbridge Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP7 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP10 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: VP11 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:48: Vp13 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: LCZ 1 - Industrial Low Minor Minor Beneficial – Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: LCZ 2 - Urban Low Minor Minor Adverse – Indirect, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: LCZ 6 – Eston Hills Medium-High Moderate Minor Adverse – Indirect, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: LCZ 9 – Urban Low-Medium Moderate Minor Adverse – Indirect, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP1 Footpath Users Minor Moderate Adverse - Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP4 Rail overbridge Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP7 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:50: VP10 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: VP11 Footpath Users Minor Moderate Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:51: VP13 Footpath Users Minor Minor Adverse Direct, Permanent

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:52: operation. All other effects are anticipated to be Minor or Negligible (and Not Significant). There

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:52: LCZ 1 - Impact of Minor beneficial – Not Buildings to be Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:52: LCZ 2 - Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:53: LCZ 6 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:54: LCZ 9 – Impact of Minor Adverse – Buildings to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:54: VP4 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:56: VP13 Impact of Minor Adverse Buildings to be Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:13: Beneficial A positive and/or advantageous effect to a Minor, Moderate or Substantial magnitude.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:13: Adverse A negative and/or disadvantageous effect to Minor, Moderate or Substantial magnitude.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:13: Minor Where the proposed development could be expected to result in a small, very short or

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:13: High Substantial Moderate to Minor to Moderate Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:13: Medium Moderate to Moderate Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:14: Low Minor to Moderate Minor Negligible to Minor Negligible

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:30: Adverse. The magnitude of effects is assessed as being Substantial, Moderate, Minor or

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:16: Complex to allow for minor material amendments Potash project and it is located at

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: marine side applicati and other minor Infrastructure along the Lichfields to STDC in November 2020 and the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:28: 3 Minor 3 beneficial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:28: 5 Minor3 adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:28: 3 Minor - slight, very short or highly localised effects

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:48: for the occupier, for employees to bring bicycles in for servicing and minor

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:52:a minor reduction in car mode share and is based on traffic increasing in the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:90: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:119: Assumed distribution based on similar minor arms of neighbouring junctions

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:120: Assumed distribution based on similar minor arms of neighbouring junctions

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:239: internal road from 3m shared surfaces on minor roads up to 2m+2m segregated facilities on

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:10: 3 Minor – Effects on VERs of Local importance;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:11: considered to be Significant, whilst Minor, Negligible and Neutral effects are considered to be

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:28: development. As a result, there would be a permanent, Minor Adverse effect on bats.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:28: development. As a result, there will be a permanent, Minor Adverse effect on breeding birds.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:28: development. As a result, there will be a permanent, Minor Adverse effect on Brown Hare.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:28: development. As a result, there will be a permanent, Minor Adverse effect on Common Toad.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:29: development. As a result, there will be a permanent, Minor Adverse effect on invertebrates.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:29: Minor Adverse Effect on European Eels.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:29: development. As a result, there will be a permanent, Minor Adverse effect on the Open Mosaic

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:29: will be a permanent, Minor Adverse effect on Dune Grassland.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Bats Minor Adverse Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Breeding birds Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Brown Hare Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Common Toad Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Other Invertebrates (Odonata) Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: European Eel Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Open Mosaic Habitats Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:30: Dune Grassland Minor Adverse and Not Significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Breeding birds Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Bats Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Brown Hare Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Common Toad Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Other Loss of habitat Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: European Eel Temporary Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:39: Dune Grassland Removal during Not applicable Minor Adverse Not applicable Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:40: iii The loss of an area of 3.04ha of Open Mosaic Habit, which will have a Minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:40: vi The loss of an area of 0.51ha of Dune Grassland, which will have a Minor Adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19:F3.41 If the impact descriptor is Negligible or Slight (Minor), this is considered to not have a

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: Moderate, Minor and Negligible/Neutral and reference to these terms are included in brackets

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 75% or less of objective Negligible Negligible Slight (Minor) Moderate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 76-94% of objective Negligible Slight (Minor) Moderate Moderate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 95-102% of objective Slight (Minor) Moderate Moderate Substantial

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:19: 10-20% of hourly mean NO2 threshold Small Slight (Minor)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:20: significant effect and a ‘Negligible’ or ‘Slight’ (Minor) impact will not result in a significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:34: As stated in paragraph F3.3, where the impact is Negligible or Slight (Minor) then the overall

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:13: minor, moderate or substantial. An assessment is then made on whether the effects are

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:20: reduced from those in the current budgets. However, given the minor adverse contribution of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:21: the annual emissions from Redcar and Cleveland as a whole. This is a minor adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:26:J7.3 However, it is not considered that these minor adverse emissions will compromise the ability of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:26:J7.7 It is not considered that the minor adverse emissions during operation will compromise the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:27: Atmosphere/ Total Minor adverse 1. Design to reduce material Minor adverse

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:27: Atmosphere/ Total Minor adverse 7. Reduce future maintenance Minor adverse

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:10: minor adverse, temporary effect on the environment and require no mitigation

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:16:• Minor amendments to the boundary to address mapping errors and anomalies

R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:4: • 12 weeks of the date of this notice for a householder application/minor commercial

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:32: River. The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: exception of one minor building in the south west of the area. Access roads continued to be shown in the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:55: Some minor developments associated with Grangetown residential areas. The South Tees Railway Line

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: The stretch of the River Tees to the north of the area is tidal. There are other minor surface waters courses

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:65: other minor watercourses enter the wider study area from the south in the western area. The Cleveland Channel

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:66: Hydrological The surface water sensitivity is low. There are minor surface waters which cross the area, and discharge to the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Mild Exposure to Equivalent to EA Category Minor or short lived damage to Minor damage to Exposure could lead to slig

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:221: Minor No Equivalent to insubstantial Equivalent to insubstantial Repairable effects The loss of plants in a land

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: Minor Very low risk Very low risk Low Risk Low Risk

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:222: realised would normally be mild or minor.

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:8: minor adverse, temporary effect on the environment and require no mitigation

R-2023-0227-CD-TV-XX-ZZ-DR-L-P003_F_Tree_Planting_and_Grass_Mixes.pdf:1: 1.5 RHINANTHUS minor Yellow Rattle 10 SALIX caprea Goat Willow 20-40cm (h) Bareroot 1m 1+0 transplant, branched Middlesbrough, Redcar & Cleveland, and Stockton Unitary Authorities and

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:39: be minimal and short-term. It is not considered likely that these minor

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:2: 2 14/02/2022 Minor corrections to Table 8 and Table 11 SMN RSF

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:11: from thermal treatment facilities is typically a very minor pathway and is typically very small relative

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:11: a minor contributor to the total risk.

171019South-Tees-Master-Plan-19-Nov-17.pdf:52:At RBT the main source of flood risk originates from towards Dormanstown. As with the Teardrop site The risk at some isolated points. Minor improvements to

171019South-Tees-Master-Plan-19-Nov-17.pdf:62:relatively minor improvements, avoiding the need for major