User Tools

Site Tools


teesworks_-_keywords_-_conceptual

{include:Teesworks - keywords - menu}

1911South-Tees-Master-Plan-Nov-19.2.pdf:3:02.09 Utilities Infrastructure 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.01 Introduction

1911South-Tees-Master-Plan-Nov-19.2.pdf:3:03.03 Stakeholders and Interest Groups 07.01 South Industrial Zone Development Overview 11.05 Conceptual Energy Plans 13.10 Collaboration with Major Industrial Operators

1911South-Tees-Master-Plan-Nov-19.2.pdf:96:5.04 Conceptual Massing Views (for illustrative purposes)

1911South-Tees-Master-Plan-Nov-19.2.pdf:97:5.05 North Industrial Zone Illustrative Plan (Conceptual)

1911South-Tees-Master-Plan-Nov-19.2.pdf:98:Plots sited in the NI Zone were initially conceptually sized based off of real-world facilities, these have

1911South-Tees-Master-Plan-Nov-19.2.pdf:103:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual)

1911South-Tees-Master-Plan-Nov-19.2.pdf:111:been conceptually allocated for large contract fabrication, be retained for ongoing landfill operations and in time,

1911South-Tees-Master-Plan-Nov-19.2.pdf:114: 7.04 South Industrial Zone Illustrative Plan (Conceptual)

1911South-Tees-Master-Plan-Nov-19.2.pdf:121:8.02 Central Industrial Zone Illustrative Plan (Conceptual)

1911South-Tees-Master-Plan-Nov-19.2.pdf:150:11.05 Conceptual Energy Plans

1911South-Tees-Master-Plan-Nov-19.2.pdf:150:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy

R-2021-0674-NM-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

EA MLA_2020_00506 22 February 2021 OFFICIAL.pdf:4: • a conceptual model of the site indicating sources, pathways and receptors

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:57: Conceptual model of estuary

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:57: Conceptual model of estuary

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:Table 6-3: Preliminary Conceptual Model 24

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:273:6 Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:276:Table 6-3: Preliminary Conceptual Model

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2021-0830-CD-DECISION NOTICE 0684.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf:10:conceptual ground model for the development plot which has been used to assess if the remedial

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 7

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:13:2.6 Conceptual Site Model

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:14:Figure 3 - Conceptual Site Model

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:31:material considered within the conceptual site model.

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:41: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0422-CD-0422.pdf:1:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0422-CD-0422.pdf:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0422-CD-Officer Report 0422.pdf:2:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0422-CD-Officer Report 0422.pdf:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:20:Based on the spread of the above observations the impacts are conceptualised to be related the South Bank

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:22:The detailed conceptualisation of the GE Plot is covered under the SBC environmental site assessment report

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:22:2021d). Following a review of the GE Plot data the conceptual site model is considered to be the same and as

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:30:have a significant potential to migrate onto site. The monitoring data is in line with this conceptualisation as

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:31:into account influencing factors (such as atmospheric pressure and weather conditions) and the conceptual site

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:41:• Review the conceptual site model (CSM) and assess if the conclusions relating to human health and

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:3:4 Conceptual Site Model ………………………………………………………………………………………………. 6

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:9:4 Conceptual Site Model

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:10:A conceptual model has been developed based upon the known condition of the land. This seeks to

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:10:identified which will include each source/pathway/receptor component of the conceptual model. The

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:10:For the purposes of a piling risk assessment the conceptual model is characterised by identification of

R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf:11:Table 5.2 provides a Preliminary Conceptual Model showing the hazard (source), pathway and receptor,

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf:1: ESTON ROAD WIDENED RE-ALIGNED ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf:1: ESTON ROAD ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf:1: ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2020-0685-ESM-EA R_2020_0685_ESM 4 March 2021 OFFICIAL.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0685-ESM-OFFICER REPORT.pdf:9:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0685-ESM-OFFICER REPORT.pdf:27:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0685-ESM-OFFICER REPORT.pdf:98: • a conceptual model of the site indicating sources, pathways and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:4:2002 Conceptual model of estuary processes. ABPmer, 2002

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:7: Conceptual model of estuary

R-2020-0685-ESM-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:Table 6-3: Preliminary Conceptual Model 24

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:27:6 Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:30:Table 6-3: Preliminary Conceptual Model

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:22:6.24 The RS incorporates a conceptual model and environmental risk assessment to evaluate the

R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:23: undertaken to better define and update the conceptual model. All phases of remediation works

R-2019-0427-FFM-MGE03867.pdf:1:The strategy also provides an overall conceptual model for the major potential

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:3:The strategy also provides an overall conceptual model for the major potential

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:3:3. Conceptual Model & Environmental Risk Assessment 81

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:3:3.1 Conceptual Model 81

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:38: Conceptual Site Model

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:38: The report presented a conceptual model, which identified the following potential contamination

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:81:3. Conceptual Model & Environmental Risk

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:81:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:81:3.1 Conceptual Model

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:3:3. Conceptual Model & Environmental Risk Assessment 79

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:3:3.1 Conceptual Model 79

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:36: Conceptual Site Model

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:36: The report presented a conceptual model, which identified the following potential contamination

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:79:3. Conceptual Model & Environmental Risk

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:79:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:79:3.1 Conceptual Model

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:82:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2021-0166-FFM-Environmental Risk Assessment.pdf:4:2 SUMMARY OF PRELIMINARY CONCEPTUAL SITE MODEL ………………………….. 3

R-2021-0166-FFM-Environmental Risk Assessment.pdf:4:2.3 Preliminary Conceptual Site Model ……………………………………………………………………………………….4

R-2021-0166-FFM-Environmental Risk Assessment.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 27

R-2021-0166-FFM-Environmental Risk Assessment.pdf:7:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site

R-2021-0166-FFM-Environmental Risk Assessment.pdf:8:2 Summary of Preliminary Conceptual Site Model

R-2021-0166-FFM-Environmental Risk Assessment.pdf:9:2.3 Preliminary Conceptual Site Model

R-2021-0166-FFM-Environmental Risk Assessment.pdf:10: Figure 2: Preliminary Conceptual Site Model Area A

R-2021-0166-FFM-Environmental Risk Assessment.pdf:11: Figure 3: Preliminary Conceptual Site Model Area B

R-2021-0166-FFM-Environmental Risk Assessment.pdf:32:5 Updated Conceptual Site Model

R-2021-0166-FFM-Environmental Risk Assessment.pdf:33: Figure 10: Update Conceptual Site Model foe SSI3 Area A

R-2021-0166-FFM-Environmental Risk Assessment.pdf:34: Figure 10: Update Conceptual Site Model foe SSI3 Area B

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:4:2 PRELIMINARY CONCEPTUAL SITE MODEL…………………………………………………. 3

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:4:2.3 Site Conceptualisation ………………………………………………………………………………………………………….4

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:4: Conceptual Site Model……………………………………………………………………………………………………….14

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:7:geotechnical development constraints identified by the site condition report within the conceptual site model

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:8:2 Preliminary Conceptual Site Model

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:9:2.3 Site Conceptualisation

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:10: Figure 2: Updated Conceptual Site Model Area A

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:11: Figure 3: Updated Conceptual Site Model Area B

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:17: 3. Formation of conceptual site model and preliminary risk assessment;

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:17: 5. Review of conceptual site model and risk assessment;

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:17: 7. Final review of conceptual site model and risk assessment to determine the potential for future

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:17:The methodology outlined above provides several opportunities to refine the conceptual site model and to

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:17:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:19: Conceptual Site Model

R-2021-0166-FFM-Ground Remediation Options Report.pdf:7:report and the development constraints identified by the geotechnical risk assessment within the conceptual

R-2021-0166-FFM-Ground Remediation Options Report.pdf:9:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation

R-2021-0166-FFM-Ground Remediation Options Report.pdf:26:considered within the conceptual site model.

R-2022-0494-FFM-21089271_1.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2022-0494-FFM-21089271_1.pdf:9:2 Site Conceptualisation

R-2021-0855-CD-ApplicationFormRedacted.pdf:3: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0855-CD-61586_01 - Covering Leter - 05.10.21.PDF:1: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0855-CD-Decision Notice.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources,

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in

R-2021-0855-CD-Officer report.pdf:1:• a conceptual model of the site indicating sources, pathways and receptors

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..29

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:8:The aim of this site condition reports is to use the available information to develop a conceptual site model for

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:9:2 Site Conceptualisation

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:25:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:25:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:35:3.8 Conceptual Site Model

R-2021-1048-FFM-Officer Report 1048.pdf:4:- a conceptual model of the site indicating sources, pathways and receptors

R-2021-1048-FFM-Officer Report 1048.pdf:11:The Preliminary Conceptual Site Model and Preliminary Qualitative Risk

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:11: • Site Conceptual model specific to the Net Zero site and covering any off

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:11: • The site conceptual model and risk assessment should take into

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:22: ensure the most accurate and robust conceptual site model can be derived for the site. “

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:24: undertaken which clearly demonstrate the movement of in terms of the conceptual site model to identify consistency of behaviour within groundwater, plans need not

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:25:Site Conceptual model specific to the Net Zero sic site and

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:26:The site conceptual model and risk assessment should take Where preferential pathways are identified within the remediation area they will be appropriately managed

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:31: (conceptualised as the source) and these conditions have existed for at least 50 years, and on the majority of

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:2: report including schematic site conceptual model and Detailed Quantitative Risk Assessment (DQRA) –

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:2: the most recent schematic site conceptual model and

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:5: contamination has been observed within controlled review of the conceptual site model in Section 5.

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:7: schematic site conceptual model which highlights the most recent schematic site conceptual model and

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:11: investigation interpretative report including schematic site conceptual

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:13:• The submitted information does not provide a schematic site conceptual

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL……………………………………………….. 19

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:7:• Development of a conceptual site model (CSM) in line with UK regulatory information.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:25:7 Preliminary Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:25:geo-environmental conceptual site model (CSM).

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:3: investigation interpretative report including schematic site conceptual

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:5:• The submitted information does not provide a schematic site conceptual

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf:1: - a conceptual model of the site indicating sources, pathways and receptors

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:5:Preliminary Conceptual Site Model ……………………………………………………………………………………. 5-4

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:16:The interpretive report and executive summary includes a conceptual site model as well as an

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:30:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:30:Preliminary Conceptual Site Model

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:30:using a risk based approach. Risks are evaluated according to the site specific conceptual site model that

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:31:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:32:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:33:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:34:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:35: A desk study with a groundwater constraints assessment and conceptual model would be

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ……………………………………………….. 18

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:7: Development of a conceptual site model (CSM) in line with UK regulatory information.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:24:7 Preliminary Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:24:geo-environmental conceptual site model (CSM).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 8

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:9:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:14:2.6 Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:14:wider landholding and is documented in Arcadis 2018a. As part of this study a conceptual site model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:16: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:33:material considered within the conceptual site model.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:40: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:8:3 Initial Conceptual Site Model ……………………………………………………………………………………………………. 25

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:8:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 42

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:9:Figure 9 Conceptual Site Model Cross Section

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:13:conceptual understanding of the Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:28:3 Initial Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:31:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:32:site and as such they have been retained here as the underlying conceptual model used in their development

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:32:is consistent with the conceptual site model for this Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:32: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:45:5 Review of Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:45:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:53:have been conceptualised as presented in Figure 9.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:61:defined using the Site investigation data available at the present time. Modifications to the conceptual model,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:83: MADE GROUND CONCEPTUAL PHYSICAL

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:27: The source-pathway-receptor model is a conceptual risk model employed by 6 Alpha across all projects

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:8:3 Initial Conceptual Site Model ……………………………………………………………………………………………………. 27

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:8:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 44

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:9:Figure 9 Conceptual Site Model Cross Section

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:13:conceptual understanding of the Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:30:3 Initial Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:33:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:34:site and as such they have been retained here as the underlying conceptual model used in their development

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:34:is consistent with the conceptual site model for this Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:34:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:47:5 Review of Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:47:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:55:have been conceptualised as presented in Figure 9.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:63:defined using the Site investigation data available at the present time. Modifications to the conceptual model,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:88: MADE GROUND CONCEPTUAL PHYSICAL

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:5:Preliminary Conceptual Site Model …………………………………………………………………………………….. 5‐6

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:18: includes a conceptual site

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:38:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:38:Preliminary Conceptual Site Model

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:38:using a risk based approach. Risks are evaluated according to the site specific conceptual site model that

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:39: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:40:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:41:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:42:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:8:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 31

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:8:Figure 6 Conceptual Site Model Cross Section

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:11:including the existing conceptual site model, as a secondary line of supporting evidence for Site conditions. The

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:12:conceptual understanding of the Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:27:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:28:site and as such they have been retained here as the underlying conceptual model used in their development

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:28:is consistent with the conceptual site model for this Site.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:28: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:40:5 Review of Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:40:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:48:have been conceptualised as presented in Figure 6.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:56:defined using the Site investigation data available at the present time. Modifications to the conceptual model,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:69: MADE GROUND CONCEPTUAL PHYSICAL

R-2021-1048-FFM-MGE04767 Cont Land Response.pdf:2:The Preliminary Conceptual Site Model and Preliminary Qualitative Risk Assessment

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ……………………………………………….. 18

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:7: Development of a conceptual site model (CSM) in line with UK regulatory information.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:7 Preliminary Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:geo-environmental conceptual site model (CSM).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 8

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:9:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:14:2.6 Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:14:landholding and is documented in Arcadis 2018a. As part of this study a conceptual site model (CSM)

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:16:Figure 3 - Conceptual Site Model

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:34:material considered within the conceptual site model.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:43: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf:2:Detailed Conceptual Site Model Review and Risk Assessment (10035117-AUK-XX-

R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf:2:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site

R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf:3:Following on from addendum report the Detailed Conceptual Site Model Review

COMPLIANCE OFFFICER REPORT.pdf:2:Detailed Conceptual Site Model Review and Risk Assessment (10035117-AUK-XX-

COMPLIANCE OFFFICER REPORT.pdf:2:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site

COMPLIANCE OFFFICER REPORT.pdf:3:Following on from addendum report the Detailed Conceptual Site Model Review

MGE04321 Cont Land.pdf:1:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site

MGE04321 Cont Land.pdf:2: Following on from addendum report the Detailed Conceptual Site Model Review

Phase II ESA.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

Phase II ESA.pdf:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..29

Phase II ESA.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

Phase II ESA.pdf:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

Phase II ESA.pdf:9:2 Site Conceptualisation

Phase II ESA.pdf:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

Phase II ESA.pdf:35:3.8 Conceptual Site Model

Phase II ESA.pdf:54:5 Updated Conceptual Site Model

Phase II ESA.pdf:72: Outline Conceptual Site Model - Commercial Industrial End Use

Phase II ESA.pdf:74: Outline Conceptual Site Model - Commercial Industrial End Use

10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:3:3. Conceptual Site Model 12

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:3:7. Updated Conceptual Model 32

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:5:Table 3-3 - Conceptual Site Model 15

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:5:Table 7-1 - Updated Conceptual Model 33

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:6: Conceptual Site Model based on knowledge of the scheme in line with LCRM;

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:6: Conceptual Model based on results of investigation; and;

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:12:3. Conceptual Site Model

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:12:(LC:RM) 13 document. The assessment involves the development of a Conceptual Site Model (CSM) which

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:15:Table 3-3 - Conceptual Site Model

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:32:7. Updated Conceptual Model

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:33:Table 7-1 - Updated Conceptual Model

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:1:Detailed Conceptual Site Model Review and Risk

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:5:7 REFINED CONCEPTUAL SITE MODEL……………………………………………………….. 18

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:6:Figure 6 Conceptual Site Model

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:7 Refined Conceptual Site Model

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6.

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model,

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-MGE04321 Cont Land.pdf:1:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site

R-2021-0100-CD-MGE04321 Cont Land.pdf:2: Following on from addendum report the Detailed Conceptual Site Model Review

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:1:Detailed Conceptual Site Model Review and Risk

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:5:7 REFINED CONCEPTUAL SITE MODEL……………………………………………………….. 18

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:6:Figure 6 Conceptual Site Model

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:7 Refined Conceptual Site Model

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6.

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2021-0100-CD-Phase II ESA.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2021-0100-CD-Phase II ESA.pdf:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..29

R-2021-0100-CD-Phase II ESA.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2021-0100-CD-Phase II ESA.pdf:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2021-0100-CD-Phase II ESA.pdf:9:2 Site Conceptualisation

R-2021-0100-CD-Phase II ESA.pdf:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0100-CD-Phase II ESA.pdf:35:3.8 Conceptual Site Model

R-2021-0100-CD-Phase II ESA.pdf:54:5 Updated Conceptual Site Model

R-2021-0100-CD-Phase II ESA.pdf:72: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0100-CD-Phase II ESA.pdf:74: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:3:3. Conceptual Site Model 12

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:3:7. Updated Conceptual Model 32

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:5:Table 3-3 - Conceptual Site Model 15

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:5:Table 7-1 - Updated Conceptual Model 33

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:6: Conceptual Site Model based on knowledge of the scheme in line with LCRM;

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:6: Conceptual Model based on results of investigation; and;

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:12:3. Conceptual Site Model

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:12:(LC:RM) 13 document. The assessment involves the development of a Conceptual Site Model (CSM) which

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:15:Table 3-3 - Conceptual Site Model

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:32:7. Updated Conceptual Model

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:33:Table 7-1 - Updated Conceptual Model

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 4

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:10:2.5 Conceptual Site Model

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:26:material considered within the conceptual site model.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:5:3. Conceptual Model & Environmental Risk Assessment 81

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:5:3.1 Conceptual Model 81

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:8:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:40: Conceptual Site Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:40: The report presented a conceptual model, which identified the following potential contamination

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:83:3. Conceptual Model & Environmental Risk

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:83:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:83:3.1 Conceptual Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:327:Preliminary Conceptual Site Model …………………………………………………………………………………….. 5‐1

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:404:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:404:Preliminary Conceptual Site Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:405:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:406: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:407:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:408: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:409:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:410: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:411:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:413:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:415:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:417:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:421:The table below describes the main risks highlighted by the conceptual site model and describes the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:599: conceptual model of the site and its surroundings, and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:600: • to collect data to reduce the uncertainties in the conceptual model presented within the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:600:the conceptual site model for each area has been reviewed together with the source characteristics to

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:600: • resolve any uncertainties in the conceptual site model, and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:603:conceptual model for the site detailed with the Supplementary Phase I Report (Ref. 4) and Supplementary

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:604: • confirm the ground and groundwater aspect within the conceptual site model.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:604: • confirm the ground and groundwater aspect within the conceptual site model.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:641: guidance, which in this case has involved development of a conceptual model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807:2. REDCAR SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 4

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807: 2.5 Conceptual Site Model 6

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807:3. LACKENBY SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 10

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807: 3.4 Conceptual Model 11

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807:4. CLEVELAND SITE - CONCEPTUAL MODEL AN D RISK

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:807: 4.5 Conceptual Site Model 16

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:808:Figure 4 Conceptual Site Model, Redcar

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:808:Figure 7 Conceptual Site Model, Lackenby

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:808:Figure 10 Conceptual Site Model, Cleveland

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:809: development of a conceptual model for the three sites representing the relationship

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:811: conditions, a Conceptual Model identifying potential pollutant linkages and the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:812: 2. REDCAR SITE - CONCEPTUAL MODEL AND RISK

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:814: 2.5 Conceptual Site Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:818: 3. LACKENBY SITE - CONCEPTUAL MODEL AND RISK

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:819: 3.4 Conceptual Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:819: Our Conceptual Site Model for the Lackenby Site is described below with a

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:822: 4. CLEVELAND SITE - CONCEPTUAL MODEL AND RISK

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:824: 4.5 Conceptual Site Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:824: Our Conceptual Site Model for the Cleveland Site is described below with a

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:838: Figure 4 Conceptual Site Model, Redcar

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:839: Figure 4 - Conceptual Site Model,

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:844: Figure 7 Conceptual Site Model, Lackenby

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:845: Figure 7 - Conceptual Site Model,

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:850: Figure 10 Conceptual Site Model, Cleveland

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:851: Figure 10 - Conceptual Site Model,

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:893:more uniform water table condition across other sites, local Summary Conceptual Site Model

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:898:Summary Conceptual Site Model migration of shallow groundwater and the SSSI.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:8: the baseline conditions. The Conceptual Site Model (CSM) presented in the Outline Remedial

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:43: 5 CSM Conceptual Site Model

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:31:G4.31 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0357-OOM-Energy and Utilities Strategy.pdf:10: The masterplan discusses conceptual energy plans based on renewable and natural

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:131: The conceptual understanding of the overall groundwater functioning of the site is for

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:131: The conceptual understanding of the overall groundwater functioning of the site is for

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf:1: ESTON ROAD ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf:1: ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf:1: ESTON ROAD WIDENED RE-ALIGNED ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..11

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 20

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:9:2 Site Conceptualisation

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:17:3.8 Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:26:5 Updated Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:33: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:37: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:5:3.8 Conceptual Site Model ……………………………………………………………………………………………………….. 11

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 20

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:9:2 Site Conceptualisation

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:17:3.8 Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:26:5 Updated Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:33: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:37: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:4:2.7 Conceptual Site Model ……………………………………………………………………………………………….. 6

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:7:the geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:12:2.7 Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:12:The ESA for shallow soils developed a conceptual site model (CSM) based on ground investigation

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:30:material considered within the conceptual site model.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:40: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:5:3.9 Conceptual Site Model ……………………………………………………………………………………………………….. 17

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 31

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:9:2 Site Conceptualisation

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:17:Conceptual Site Model (CSM).

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:23:3.9 Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:37:5 Updated Conceptual Site Model

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:46: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:47: Updated Conceptual Site Model - Commercial Industrial End Use

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:17: further site investigation and risk assessment in order to further inform the CSM (conceptual

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:40: 5 CSM Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:12: guidance, which in this case has involved development of a conceptual model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179:2. REDCAR SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 4

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179: 2.5 Conceptual Site Model 6

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179:3. LACKENBY SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 10

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179: 3.4 Conceptual Model 11

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179:4. CLEVELAND SITE - CONCEPTUAL MODEL AN D RISK

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:179: 4.5 Conceptual Site Model 16

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:180:Figure 4 Conceptual Site Model, Redcar

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:180:Figure 7 Conceptual Site Model, Lackenby

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:180:Figure 10 Conceptual Site Model, Cleveland

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:181: development of a conceptual model for the three sites representing the relationship

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:183: conditions, a Conceptual Model identifying potential pollutant linkages and the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:184: 2. REDCAR SITE - CONCEPTUAL MODEL AND RISK

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:186: 2.5 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:190: 3. LACKENBY SITE - CONCEPTUAL MODEL AND RISK

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:191: 3.4 Conceptual Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:191: Our Conceptual Site Model for the Lackenby Site is described below with a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:194: 4. CLEVELAND SITE - CONCEPTUAL MODEL AND RISK

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:196: 4.5 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:196: Our Conceptual Site Model for the Cleveland Site is described below with a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:210: Figure 4 Conceptual Site Model, Redcar

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:211: Figure 4 - Conceptual Site Model,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:216: Figure 7 Conceptual Site Model, Lackenby

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:217: Figure 7 - Conceptual Site Model,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:222: Figure 10 Conceptual Site Model, Cleveland

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:223: Figure 10 - Conceptual Site Model,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:266:more uniform water table condition across other sites, local Summary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:271:Summary Conceptual Site Model migration of shallow groundwater and the SSSI.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1415:2 SUMMARY OF PRELIMINARY CONCEPTUAL SITE MODEL ………………………….. 3

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1415:2.3 Preliminary Conceptual Site Model ……………………………………………………………………………………….4

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1416:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 27

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1418:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1419:2 Summary of Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1420:2.3 Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1421: Figure 2: Preliminary Conceptual Site Model Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1422: Figure 3: Preliminary Conceptual Site Model Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1443:5 Updated Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1444: Figure 10: Update Conceptual Site Model foe SSI3 Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1445: Figure 10: Update Conceptual Site Model foe SSI3 Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1489:2 SITE CONCEPTUALISATION ……………………………………………………………………….. 3

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1489:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:3.9 Conceptual Site Model ………………………………………………………………………………………………………..27

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:4.9 Conceptual Site Model ………………………………………………………………………………………………………..39

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1494:The aim of this site condition reports is to use the available information to develop a conceptual site model for

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1495:2 Site Conceptualisation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1511:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1511:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1519:3.9 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1521:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1521:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1531:4.9 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587:2 PRELIMINARY CONCEPTUAL SITE MODEL…………………………………………………. 3

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587:2.3 Site Conceptualisation ………………………………………………………………………………………………………….4

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587: Conceptual Site Model……………………………………………………………………………………………………….14

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1590:geotechnical development constraints identified by the site condition report within the conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1591:2 Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1592:2.3 Site Conceptualisation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1593: Figure 2: Updated Conceptual Site Model Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1594: Figure 3: Updated Conceptual Site Model Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 3. Formation of conceptual site model and preliminary risk assessment;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 5. Review of conceptual site model and risk assessment;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 7. Final review of conceptual site model and risk assessment to determine the potential for future

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600:The methodology outlined above provides several opportunities to refine the conceptual site model and to

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1602: Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1625:report and the development constraints identified by the geotechnical risk assessment within the conceptual

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1627:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1662:3. Conceptual Model & Environmental Risk Assessment 81

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1662:3.1 Conceptual Model 81

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1665:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1697: Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1697: The report presented a conceptual model, which identified the following potential contamination

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:3. Conceptual Model & Environmental Risk

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:3.1 Conceptual Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1881:The strategy also provides an overall conceptual model for the major potential

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:34:F4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:29: Outline the conceptual model, addressing The main site of interest is an open watercourse to the east

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:5:7 CONCEPTUAL SITE MODEL AND RISK ASSESSMENT ………………………………. 11

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:6:Figure 5: Conceptual Site Model and Risk Assessment

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:17:7 Conceptual Site Model and Risk Assessment

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:17:The Conceptual Site Model (CSM) and Environmental Risk Assessment for remediation works is presented

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:32: Conceptual Site Model & Risk Assessment

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:1:Please find below the outline requirements and conceptual design for the Water Treatment to support

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:1:This document sets out the requirement for and conceptual design specification for a water treatment

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:4:2 SITE CONCEPTUALISATION ……………………………………………………………………….. 3

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:3.9 Conceptual Site Model ………………………………………………………………………………………………………..27

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:4.9 Conceptual Site Model ………………………………………………………………………………………………………..39

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:9:The aim of this site condition reports is to use the available information to develop a conceptual site model for

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:10:2 Site Conceptualisation

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:26:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:26:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:34:3.9 Conceptual Site Model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:36:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:36:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:46:4.9 Conceptual Site Model

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 7

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:2.6 Conceptual Site Model

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:14:Figure 3 - Conceptual Site Model

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:31:material considered within the conceptual site model.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:41: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 4

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:10:2.5 Conceptual Site Model

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:26:material considered within the conceptual site model.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:3.8 Conceptual Site Model ……………………………………………………………………………………………………….. 29

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:9:2 Site Conceptualisation

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:35:3.8 Conceptual Site Model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:54:5 Updated Conceptual Site Model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:4: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0439-CD-officer report.pdf:2:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0439-CD-officer report.pdf:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0439-CD-0439 Contam .pdf:1:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0439-CD-0439 Contam .pdf:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 5

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:2.6 Conceptual Site Model

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:12:Figure 3 - Conceptual Site Model

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:32:material considered within the conceptual site model.

R-2021-0943-CD-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:45: receptor approach to refine the existing conceptual site model (CSM); and,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:47:  a conceptual model of the site indicating sources, pathways and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:185: o a conceptual model of the site indicating

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:45: receptor approach to refine the existing conceptual site model (CSM); and,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:47:  a conceptual model of the site indicating sources, pathways and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:157: o a conceptual model of the site indicating

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:1:Detailed Conceptual Site Model Review and Risk

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:5:7 REFINED CONCEPTUAL SITE MODEL……………………………………………………….. 18

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:6:Figure 6 Conceptual Site Model

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:7 Refined Conceptual Site Model

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6.

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0318-FFM-EP CL.pdf:1:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline

R-2020-0318-FFM-EP CL.pdf:1:Conceptual Site Model Review and Risk assessment has indicated that, with the

R-2020-0318-FFM-Phase II ESA.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0318-FFM-Phase II ESA.PDF:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..29

R-2020-0318-FFM-Phase II ESA.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2020-0318-FFM-Phase II ESA.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2020-0318-FFM-Phase II ESA.PDF:9:2 Site Conceptualisation

R-2020-0318-FFM-Phase II ESA.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0318-FFM-Phase II ESA.PDF:35:3.8 Conceptual Site Model

R-2020-0318-FFM-Phase II ESA.PDF:54:5 Updated Conceptual Site Model

R-2020-0318-FFM-Phase II ESA.PDF:72: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0318-FFM-Phase II ESA.PDF:74: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0318-FFM-officer report.pdf:8:and Detailed Conceptual Site Model Review and Risk Assessment (Arcadis)

R-2020-0318-FFM-officer report.pdf:8:Detailed Conceptual Site Model Review and Risk assessment has indicated

R-2020-0318-FFM-officer report.pdf:13:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:13:2.6 Conceptual Site Model

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:38:material considered within the conceptual site model.

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:8:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:2.6 Conceptual Site Model

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:and Arcadis 2021e (which form part of the South Bank Western Area) developed conceptual site

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:14:Figure 3 - Conceptual Site Model

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:31:material considered within the conceptual site model.

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources,

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:80: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources,

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:80: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf:2: Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf:3: Refined Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:4:2 Site Conceptualisation ………………………………………………………………………………………………………………. 4

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:4:6 Refined Conceptual Site Model ………………………………………………………………………………………………… 25

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:6:written by 3rd parties) were reviewed and the information incorporated into the Conceptual Site Model. Data was

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:6:The conceptual site model and the relevant 3rd party reports are detailed in:

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:7:building in order to refine the conceptual site model previously developed for the site and undertake a generic

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:2 Site Conceptualisation

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:A detailed analysis of the site conceptualisation can be found in Arcadis 2018a [Redcar Steelworks-AUK-XX-

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:Table 1: Site Conceptualisation summary

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:11:Groundwater is present within the Made Ground and Superficial Deposits, and is conceptualised to be in the

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:12:off-site contaminant sources and generated a conceptual site model.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:12:contamination, separate from the rail sidings source conceptualised in Arcadis 2018a.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13:Including the sources conceptualised in Arcadis 2018a, four main sources of contamination are conceptualised

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13: footprint is conceptualised; and,

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13: source at the former substation is conceptualised.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:15: • Shallow groundwater has been identified within the Made Ground, this is conceptualised to be perched

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:15: are anticipated to be at least 5m thick, and the conceptualised upward head of water are thought to limit

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:17:3.7 Conceptual Site Model

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:25:Superficial Deposits (anticipated to be at least 5.0m thick) and conceptualised upward head of pressure which

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:26:Based on this conceptualisation, the risk posed from the exceedances of DWS for iron, boron, sulphate, and

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:28:atmospheric pressure and weather conditions) and the conceptual site model. This then allows a characteristic

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:29:6 Refined Conceptual Site Model

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:31:conceptualised attenuation, and dilution along the pathway, and the likely limited interaction between the

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:33:Arcadis (2020). Grangetown Prairie Area, Former Steelworks, Redcar: Detailed Conceptual Site Model

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 4

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:10:2.5 Conceptual Site Model

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:26:material considered within the conceptual site model.

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:4: environmental conditions underlying the site and to refine the Conceptual Site Model (CSM)

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:8:Figure 2 – Conceptual Site Model – Cross Section

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:11:site. This report will help refine the present conceptual site model (CSM) and define any potential risks posed

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:12: refine the existing conceptual site model (CSM); and,

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:18:gradient. Figure 2 includes a simplified profile of the geological conditions, alongside a conceptual cross-

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:23:zone and aquifer have been conceptualised as presented in Figure 2.

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:30:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:33: MADE GROUND CONCEPTUAL PHYSICAL

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:4: pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:7: detailed conceptual review of any areas assessed in future needs to be undertaken. In

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:first a detailed conceptual review of any areas assessed in future needs to be undertaken. In particular,

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:39:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:40:Redcar Steelworks site where Made Ground is a single source. However, first a detailed conceptual review of

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:65: MADE GROUND CONCEPTUAL PHYSICAL

EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf:4: • a conceptual model of the site indicating sources, pathways and receptors

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:57: Conceptual model of estuary

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:Table 6-3: Preliminary Conceptual Model 24

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:273:6 Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:276:Table 6-3: Preliminary Conceptual Model

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:57: Conceptual model of estuary

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:57: Conceptual model of estuary

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

R-2020-0684-ESM-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2020-0684-ESM-Officer Report 0684.pdf:9:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Officer Report 0684.pdf:27:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Officer Report 0684.pdf:98: • a conceptual model of the site indicating sources, pathways and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:Table 6-3: Preliminary Conceptual Model 24

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:27:6 Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:30:Table 6-3: Preliminary Conceptual Model

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:4:2002 Conceptual model of estuary processes. ABPmer, 2002

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:7: Conceptual model of estuary

R-2021-0405-FFM-0405.pdf:1:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0405-FFM-0405.pdf:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0405-FFM-OFFICER REPORT.pdf:6:accuracy of the conceptual site model, contaminant distribution and the

R-2021-0405-FFM-OFFICER REPORT.pdf:7:addressing these data gaps, the Conceptual Site Model and Remediation

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 5

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:2.6 Conceptual Site Model

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:12:Figure 3 - Conceptual Site Model

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:32:material considered within the conceptual site model.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL……………………………………………….. 20

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:7:• Development of a conceptual site model (CSM) in line with Land Contamination Risk Management 2021).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:26:7 Preliminary Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:26:land contamination conceptual site model (CSM).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ……………………………………………….. 18

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:7: Development of a conceptual site model (CSM) in line with UK regulatory information.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:7 Preliminary Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:geo-environmental conceptual site model (CSM).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:8:3 Initial Conceptual Site Model ……………………………………………………………………………………………………. 28

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:8:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 45

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:9:Figure 9 Conceptual Site Model Cross Section

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:15:conceptual understanding of the Site.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:32:3 Initial Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:35:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:site and as such they have been retained here as the underlying conceptual model used in their development

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:is consistent with the conceptual site model for this Site.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:49:5 Review of Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:49:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:57:have been conceptualised as presented in Figure 9.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:65:defined using the Site investigation data available at the present time. Modifications to the conceptual model,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:105: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 9

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:10:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:2.6 Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:landholding and is documented in Arcadis 2018a. As part of this study a conceptual site model (CSM)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:17:Figure 3 - Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:35:material considered within the conceptual site model.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:49: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:13:2.6 Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:38:material considered within the conceptual site model.

R-2021-0879-FF-Officer report.pdf:2:  Detailed Conceptual Site Model Review and Risk Assessment

R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:4:• Detailed Conceptual Site Model Review and Risk Assessment prepared by Arcadis.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:3:3.1 Conceptual Model 89

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:6: Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:42: Conceptual Site Model

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:42: The report presented a conceptual model, which identified the following potential contamination

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:3. Conceptual Model & Environmental Risk

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:3.1 Conceptual Model

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:3.8 Conceptual Site Model ……………………………………………………………………………………………………….. 29

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:9:2 Site Conceptualisation

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:35:3.8 Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:54:5 Updated Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:4: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the

R-2020-0411-FFM-Non Technical Summary.pdf:26: extreme weather events. The conceptual surface water drainage strategy for the proposed

R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf:4: extreme weather events. The conceptual surface water drainage strategy for the proposed

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:2: conceptual surface water drainage strategy for the project has been designed to take into account

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:22: example, future flood risk and resilience to extreme weather events. The conceptual surface water

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3:3 OUTLINE CONCEPTUAL SITE MODEL ……………………………………………………………………………. 11

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3: 3.3 Outline Conceptual Site Model …………………………………………………………………………………. 12

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:4:Table 10 – Outline Conceptual Site Model ……………………………………………………………………………………. 13

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:5:Outline Conceptual Site Model

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3 OUTLINE CONCEPTUAL SITE MODEL

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:18:3.3 Outline Conceptual Site Model

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:19:Table 10 – Outline Conceptual Site Model

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:13: • a conceptual model of the Site indicating

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 7

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:2.6 Conceptual Site Model

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:14:Figure 3 - Conceptual Site Model

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:31:material considered within the conceptual site model.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:41: Outline Conceptual Site Model - Commercial Industrial End Use

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:3: CSM Conceptual Site Model

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:65: Site. A conceptual site model (CSM) will be developed for the land potentially

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:4: 1 Appendix H1: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: baseline conditions. The Conceptual Site Model (CSM) presented in the Detailed Conceptual

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: 1 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: Detailed Conceptual Site Model and Risk Assessment Arcadis 2020 H1 and the Remediation

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17:H3.17 The Detailed Conceptual Site Model and Risk Assessment Arcadis 2020 Appendix H1

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:31: Arcadis 2020) is provided on Figure 4 within the Arcadis Detailed Conceptual Site Model

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:31: Conceptual Site Model Review and Risk Assessment A rcadis 2020 H1. Concentrations of PAH

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:46: 5 CSM Conceptual Site Model

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:34:G4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:36:G4.45 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:9: Groundsure report have been used to establish the baseline conditions. The Conceptual Site

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:40: 3 CSM Conceptual Site Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..11

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 20

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:9:2 Site Conceptualisation

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:17:3.8 Conceptual Site Model

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:26:5 Updated Conceptual Site Model

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:33: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:34: Outline Conceptual Site Model - Commercial Industrial End Use

171019South-Tees-Master-Plan-19-Nov-17.pdf:3:02.10 Watercourses and Flood Mapping 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.02 Adoption of the Master Plan

171019South-Tees-Master-Plan-19-Nov-17.pdf:3:03.01 Master Planning Process 07 South Industrial Zone 11.05 Conceptual Energy Plans

171019South-Tees-Master-Plan-19-Nov-17.pdf:94:5.04 Conceptual Massing Views (for illustrative purposes)

171019South-Tees-Master-Plan-19-Nov-17.pdf:95:5.05 North Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:96:Plots sited in the NI Zone have been conceptually sized based off of real-world facilities. While plot sizes represented

171019South-Tees-Master-Plan-19-Nov-17.pdf:101:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:108: from the proximity to the river afforded by the SIZ and from been conceptually allocated for large contract fabrication, could accommodate photovoltaic arrays, wind turbines

171019South-Tees-Master-Plan-19-Nov-17.pdf:110: 7.04 South Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:117:8.02 Central Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:146:11.05 Conceptual Energy Plans

171019South-Tees-Master-Plan-19-Nov-17.pdf:146:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy

0-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]:1418:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1419:2 Summary of Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1420:2.3 Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1421: Figure 2: Preliminary Conceptual Site Model Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1422: Figure 3: Preliminary Conceptual Site Model Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1443:5 Updated Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1444: Figure 10: Update Conceptual Site Model foe SSI3 Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1445: Figure 10: Update Conceptual Site Model foe SSI3 Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1489:2 SITE CONCEPTUALISATION ……………………………………………………………………….. 3

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1489:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:3.9 Conceptual Site Model ………………………………………………………………………………………………………..27

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1490:4.9 Conceptual Site Model ………………………………………………………………………………………………………..39

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1494:The aim of this site condition reports is to use the available information to develop a conceptual site model for

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1495:2 Site Conceptualisation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1511:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1511:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1519:3.9 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1521:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1521:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1531:4.9 Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587:2 PRELIMINARY CONCEPTUAL SITE MODEL…………………………………………………. 3

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587:2.3 Site Conceptualisation ………………………………………………………………………………………………………….4

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1587: Conceptual Site Model……………………………………………………………………………………………………….14

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1590:geotechnical development constraints identified by the site condition report within the conceptual site model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1591:2 Preliminary Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1592:2.3 Site Conceptualisation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1593: Figure 2: Updated Conceptual Site Model Area A

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1594: Figure 3: Updated Conceptual Site Model Area B

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 3. Formation of conceptual site model and preliminary risk assessment;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 5. Review of conceptual site model and risk assessment;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600: 7. Final review of conceptual site model and risk assessment to determine the potential for future

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600:The methodology outlined above provides several opportunities to refine the conceptual site model and to

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1600:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1602: Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1625:report and the development constraints identified by the geotechnical risk assessment within the conceptual

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1627:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1662:3. Conceptual Model & Environmental Risk Assessment 81

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1662:3.1 Conceptual Model 81

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1665:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1697: Conceptual Site Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1697: The report presented a conceptual model, which identified the following potential contamination

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:3. Conceptual Model & Environmental Risk

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1740:3.1 Conceptual Model

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1881:The strategy also provides an overall conceptual model for the major potential

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:34:F4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:29: Outline the conceptual model, addressing The main site of interest is an open watercourse to the east

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:5:7 CONCEPTUAL SITE MODEL AND RISK ASSESSMENT ………………………………. 11

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:6:Figure 5: Conceptual Site Model and Risk Assessment

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:17:7 Conceptual Site Model and Risk Assessment

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:17:The Conceptual Site Model (CSM) and Environmental Risk Assessment for remediation works is presented

R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:32: Conceptual Site Model & Risk Assessment

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:1:Please find below the outline requirements and conceptual design for the Water Treatment to support

R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:1:This document sets out the requirement for and conceptual design specification for a water treatment

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:4:2 SITE CONCEPTUALISATION ……………………………………………………………………….. 3

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:3.9 Conceptual Site Model ………………………………………………………………………………………………………..27

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:5:4.9 Conceptual Site Model ………………………………………………………………………………………………………..39

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:9:The aim of this site condition reports is to use the available information to develop a conceptual site model for

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:10:2 Site Conceptualisation

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:26:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:26:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:34:3.9 Conceptual Site Model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:36:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:36:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:46:4.9 Conceptual Site Model

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3:3 OUTLINE CONCEPTUAL SITE MODEL ……………………………………………………………………………. 11

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3: 3.3 Outline Conceptual Site Model …………………………………………………………………………………. 12

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:4:Table 10 – Outline Conceptual Site Model ……………………………………………………………………………………. 13

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:5:Outline Conceptual Site Model

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3 OUTLINE CONCEPTUAL SITE MODEL

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:18:3.3 Outline Conceptual Site Model

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:19:Table 10 – Outline Conceptual Site Model

R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:17:The updated conceptual model produced by Solmek following the ground investigation assigned the

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 7

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:2.6 Conceptual Site Model

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:14:Figure 3 - Conceptual Site Model

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:31:material considered within the conceptual site model.

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:41: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 4

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:10:2.5 Conceptual Site Model

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:26:material considered within the conceptual site model.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:3.8 Conceptual Site Model ……………………………………………………………………………………………………….. 29

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:9:2 Site Conceptualisation

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:35:3.8 Conceptual Site Model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:54:5 Updated Conceptual Site Model

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:4: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0439-CD-officer report.pdf:2:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0439-CD-officer report.pdf:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0439-CD-0439 Contam .pdf:1:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0439-CD-0439 Contam .pdf:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 5

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:2.6 Conceptual Site Model

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:12:Figure 3 - Conceptual Site Model

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:32:material considered within the conceptual site model.

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:250: source-pathway-receptor conceptual model, which highlights whether there is any potential pathway

R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:11: source-pathway-receptor conceptual model, which highlights whether there is any potential pathway

R-2021-0943-CD-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:45: receptor approach to refine the existing conceptual site model (CSM); and,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:47:  a conceptual model of the site indicating sources, pathways and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:185: o a conceptual model of the site indicating

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:45: receptor approach to refine the existing conceptual site model (CSM); and,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:47:  a conceptual model of the site indicating sources, pathways and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:157: o a conceptual model of the site indicating

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:1:Detailed Conceptual Site Model Review and Risk

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:5:7 REFINED CONCEPTUAL SITE MODEL……………………………………………………….. 18

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:6:Figure 6 Conceptual Site Model

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:7 Refined Conceptual Site Model

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6.

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0318-FFM-EP CL.pdf:1:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline

R-2020-0318-FFM-EP CL.pdf:1:Conceptual Site Model Review and Risk assessment has indicated that, with the

R-2020-0318-FFM-Phase II ESA.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0318-FFM-Phase II ESA.PDF:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..29

R-2020-0318-FFM-Phase II ESA.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2020-0318-FFM-Phase II ESA.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2020-0318-FFM-Phase II ESA.PDF:9:2 Site Conceptualisation

R-2020-0318-FFM-Phase II ESA.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2020-0318-FFM-Phase II ESA.PDF:35:3.8 Conceptual Site Model

R-2020-0318-FFM-Phase II ESA.PDF:54:5 Updated Conceptual Site Model

R-2020-0318-FFM-Phase II ESA.PDF:72: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0318-FFM-Phase II ESA.PDF:74: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0318-FFM-officer report.pdf:8:and Detailed Conceptual Site Model Review and Risk Assessment (Arcadis)

R-2020-0318-FFM-officer report.pdf:8:Detailed Conceptual Site Model Review and Risk assessment has indicated

R-2020-0318-FFM-officer report.pdf:13:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:13:2.6 Conceptual Site Model

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:38:material considered within the conceptual site model.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:3:Development of a Conceptual Site Model

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:3: humans, ecosystems, buildings, etc.). Based on this information a Conceptual Site Model (CSM) has been

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:3: pollutants' and 'significant pollutant linkages' within a 'contaminant-pathway-receptor' conceptual

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:31:14.125. The Conceptual Site Model and preliminary risk assessment has identified potential sources of

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:5:The Conceptual Site Model (CSM) and preliminary risk assessment has identified potential sources

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:8:7.1 Conceptual site model 36

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:9:  Development of a Conceptual Site Model (CSM) and Preliminary Environmental Risk

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:37:7.1 Conceptual site model

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:37:The Conceptual Site Model (CSM) and plausible contaminant linkages are defined below based on

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:41:The Conceptual Site Model and preliminary risk assessment has identified potential sources of

R-2023-0291-ESM-SOL_23_P016_GLR ES Vol 3 Exec Summary.pdf:20:11.2. The Conceptual Site Model and preliminary risk assessment has identified potential sources of

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:8:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:2.6 Conceptual Site Model

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:and Arcadis 2021e (which form part of the South Bank Western Area) developed conceptual site

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:14:Figure 3 - Conceptual Site Model

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:31:material considered within the conceptual site model.

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources,

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:80: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources,

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:80: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf:2: Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf:3: Refined Conceptual Site Model - Commercial Industrial End Use

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:4:2 Site Conceptualisation ………………………………………………………………………………………………………………. 4

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:4:6 Refined Conceptual Site Model ………………………………………………………………………………………………… 25

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:6:written by 3rd parties) were reviewed and the information incorporated into the Conceptual Site Model. Data was

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:6:The conceptual site model and the relevant 3rd party reports are detailed in:

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:7:building in order to refine the conceptual site model previously developed for the site and undertake a generic

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:2 Site Conceptualisation

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:A detailed analysis of the site conceptualisation can be found in Arcadis 2018a [Redcar Steelworks-AUK-XX-

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8:Table 1: Site Conceptualisation summary

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:11:Groundwater is present within the Made Ground and Superficial Deposits, and is conceptualised to be in the

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:12:off-site contaminant sources and generated a conceptual site model.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:12:contamination, separate from the rail sidings source conceptualised in Arcadis 2018a.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13:Including the sources conceptualised in Arcadis 2018a, four main sources of contamination are conceptualised

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13: footprint is conceptualised; and,

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:13: source at the former substation is conceptualised.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:15: • Shallow groundwater has been identified within the Made Ground, this is conceptualised to be perched

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:15: are anticipated to be at least 5m thick, and the conceptualised upward head of water are thought to limit

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:17:3.7 Conceptual Site Model

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:25:Superficial Deposits (anticipated to be at least 5.0m thick) and conceptualised upward head of pressure which

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:26:Based on this conceptualisation, the risk posed from the exceedances of DWS for iron, boron, sulphate, and

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:28:atmospheric pressure and weather conditions) and the conceptual site model. This then allows a characteristic

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:29:6 Refined Conceptual Site Model

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:31:conceptualised attenuation, and dilution along the pathway, and the likely limited interaction between the

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:33:Arcadis (2020). Grangetown Prairie Area, Former Steelworks, Redcar: Detailed Conceptual Site Model

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 4

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:10:2.5 Conceptual Site Model

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:26:material considered within the conceptual site model.

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:4: environmental conditions underlying the site and to refine the Conceptual Site Model (CSM)

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:8:Figure 2 – Conceptual Site Model – Cross Section

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:11:site. This report will help refine the present conceptual site model (CSM) and define any potential risks posed

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:12: refine the existing conceptual site model (CSM); and,

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:18:gradient. Figure 2 includes a simplified profile of the geological conditions, alongside a conceptual cross-

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:23:zone and aquifer have been conceptualised as presented in Figure 2.

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:30:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:33: MADE GROUND CONCEPTUAL PHYSICAL

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:4: pathway-receptor approach to refine the existing conceptual site model (CSM);

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:6: changes have been made to the conceptual understanding of this area, and no additional

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:7: detailed conceptual review of any areas assessed in future needs to be undertaken. In

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:9:Figure 4 – Conceptual Site Model – Cross Section

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:29:first a detailed conceptual review of any areas assessed in future needs to be undertaken. In particular,

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:39:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:40:Redcar Steelworks site where Made Ground is a single source. However, first a detailed conceptual review of

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:65: MADE GROUND CONCEPTUAL PHYSICAL

EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf:4: • a conceptual model of the site indicating sources, pathways and receptors

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:57: Conceptual model of estuary

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:250:Table 6-3: Preliminary Conceptual Model 24

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:273:6 Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:276:Table 6-3: Preliminary Conceptual Model

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:57: Conceptual model of estuary

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:54:2002 Conceptual model of estuary processes. ABPmer, 2002

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:57: Conceptual model of estuary

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual

R-2020-0684-ESM-DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin

R-2020-0684-ESM-Officer Report 0684.pdf:9:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Officer Report 0684.pdf:27:• a conceptual model of the site indicating sources, pathways and receptors

R-2020-0684-ESM-Officer Report 0684.pdf:98: • a conceptual model of the site indicating sources, pathways and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:4:Table 6-3: Preliminary Conceptual Model 24

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:27:6 Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:30:Table 6-3: Preliminary Conceptual Model

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:4:2002 Conceptual model of estuary processes. ABPmer, 2002

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:7: Conceptual model of estuary

R-2021-0405-FFM-0405.pdf:1:of the conceptual site model, contaminant distribution and the requirements of the

R-2021-0405-FFM-0405.pdf:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be

R-2021-0405-FFM-OFFICER REPORT.pdf:6:accuracy of the conceptual site model, contaminant distribution and the

R-2021-0405-FFM-OFFICER REPORT.pdf:7:addressing these data gaps, the Conceptual Site Model and Remediation

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 5

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:2.6 Conceptual Site Model

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:12:Figure 3 - Conceptual Site Model

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:32:material considered within the conceptual site model.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL……………………………………………….. 20

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:7:• Development of a conceptual site model (CSM) in line with Land Contamination Risk Management 2021).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:26:7 Preliminary Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:26:land contamination conceptual site model (CSM).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ……………………………………………….. 18

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:7: Development of a conceptual site model (CSM) in line with UK regulatory information.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:7 Preliminary Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:geo-environmental conceptual site model (CSM).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:8:3 Initial Conceptual Site Model ……………………………………………………………………………………………………. 28

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:8:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 45

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:9:Figure 9 Conceptual Site Model Cross Section

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:15:conceptual understanding of the Site.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:32:3 Initial Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:35:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:site and as such they have been retained here as the underlying conceptual model used in their development

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:is consistent with the conceptual site model for this Site.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:36:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:49:5 Review of Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:49:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:57:have been conceptualised as presented in Figure 9.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:65:defined using the Site investigation data available at the present time. Modifications to the conceptual model,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:105: MADE GROUND CONCEPTUAL PHYSICAL

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 9

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:10:conceptual site model (CSM) for the contract area in order to develop the final remediation technology

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:2.6 Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:landholding and is documented in Arcadis 2018a. As part of this study a conceptual site model (CSM)

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:17:Figure 3 - Conceptual Site Model

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:35:material considered within the conceptual site model.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:49: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:4:2.6 Conceptual Site Model……………………………………………………………………………………………….. 7

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:13:2.6 Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:38:material considered within the conceptual site model.

R-2021-0879-FF-Officer report.pdf:2:  Detailed Conceptual Site Model Review and Risk Assessment

R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:4:• Detailed Conceptual Site Model Review and Risk Assessment prepared by Arcadis.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:3:3.1 Conceptual Model 89

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:6: Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:42: Conceptual Site Model

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:42: The report presented a conceptual model, which identified the following potential contamination

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:3. Conceptual Model & Environmental Risk

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:89:3.1 Conceptual Model

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:3.8 Conceptual Site Model ……………………………………………………………………………………………………….. 29

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 48

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR)

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:9:2 Site Conceptualisation

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:35:3.8 Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:54:5 Updated Conceptual Site Model

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:2: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF:4: Outline Conceptual Site Model - Commercial Industrial End Use

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the

R-2020-0411-FFM-Non Technical Summary.pdf:26: extreme weather events. The conceptual surface water drainage strategy for the proposed

R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf:4: extreme weather events. The conceptual surface water drainage strategy for the proposed

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:2: conceptual surface water drainage strategy for the project has been designed to take into account

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:22: example, future flood risk and resilience to extreme weather events. The conceptual surface water

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3:3 OUTLINE CONCEPTUAL SITE MODEL ……………………………………………………………………………. 11

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:3: 3.3 Outline Conceptual Site Model …………………………………………………………………………………. 12

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:4:Table 10 – Outline Conceptual Site Model ……………………………………………………………………………………. 13

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:5:Outline Conceptual Site Model

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3 OUTLINE CONCEPTUAL SITE MODEL

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:18:3.3 Outline Conceptual Site Model

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:19:Table 10 – Outline Conceptual Site Model

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:13: • a conceptual model of the Site indicating

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:2: • a conceptual model of the site indicating sources, pathways and receptors

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:4:2.6 Conceptual Site Model ……………………………………………………………………………………………….. 7

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:2.6 Conceptual Site Model

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:14:Figure 3 - Conceptual Site Model

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:31:material considered within the conceptual site model.

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:41: Outline Conceptual Site Model - Commercial Industrial End Use

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:3: CSM Conceptual Site Model

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:65: Site. A conceptual site model (CSM) will be developed for the land potentially

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:4: 1 Appendix H1: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: baseline conditions. The Conceptual Site Model (CSM) presented in the Detailed Conceptual

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: 1 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:16: Detailed Conceptual Site Model and Risk Assessment Arcadis 2020 H1 and the Remediation

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17:H3.17 The Detailed Conceptual Site Model and Risk Assessment Arcadis 2020 Appendix H1

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:31: Arcadis 2020) is provided on Figure 4 within the Arcadis Detailed Conceptual Site Model

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:31: Conceptual Site Model Review and Risk Assessment A rcadis 2020 H1. Concentrations of PAH

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:46: 5 CSM Conceptual Site Model

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:34:G4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:3: conceptual site model (CSM). The specific objectives of this GQRA comprised:

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:6:3 Conceptual Site Model …………………………………………………………………………………………………………….. 18

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:6:5 Review of Conceptual Site Model …………………………………………………………………………………………….. 28

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:7:Figure 6 Conceptual Site Model Cross Section

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:10:Conceptual Site Model (CSM) to identify if changes to the Remedial Strategy adopted for the wider Site are

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:11:the basis for the conceptual understanding of the Site.

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:11:beneath these additional areas are in line with the current site-wide conceptual site model (CSM). The specific

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:20:3 Conceptual Site Model

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:23:planned industrial development, this conceptualisation is likely a conservative assumption.

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:24:site and as such they have been retained here as the underlying conceptual model used in their development

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:24:is consistent with the conceptual site model for this Site.

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:24:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:30:5 Review of Conceptual Site Model

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:30:6 includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:42: MADE GROUND CONCEPTUAL PHYSICAL

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:36:G4.45 The conceptual understanding of the overall groundwater functioning of the site is for direct

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:9: Groundsure report have been used to establish the baseline conditions. The Conceptual Site

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:40: 3 CSM Conceptual Site Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3. Conceptual Model & Environmental Risk Assessment 89

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:3:3.1 Conceptual Model 89

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6:  Conceptual Model and Environmental Risk Evaluation (Section 3);

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Conceptual Site Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: The report presented a conceptual model, which identified the following potential contamination

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3. Conceptual Model & Environmental Risk

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:89:3.1 Conceptual Model

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:4:2 SITE CONCEPTUALISATION……………………………………………………………………….. 3

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:5:3.8 Conceptual Site Model ………………………………………………………………………………………………………..11

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:5:5 UPDATED CONCEPTUAL SITE MODEL ……………………………………………………… 20

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:9:2 Site Conceptualisation

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:17:3.8 Conceptual Site Model

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:26:5 Updated Conceptual Site Model

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:33: Outline Conceptual Site Model - Commercial Industrial End Use

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:34: Outline Conceptual Site Model - Commercial Industrial End Use

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:3:5 Conceptual Site Model ……………………………………………………………………………………………………………………… 9

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:3: 5.1 Conceptual site model …………………………………………………………………………………………………………….. 9

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:9: 5 Conceptual Site Model

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:9: 5.1 Conceptual site model

R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:10: Figure 1: Conceptual Site Model – Exposure Pathways

171019South-Tees-Master-Plan-19-Nov-17.pdf:3:02.10 Watercourses and Flood Mapping 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.02 Adoption of the Master Plan

171019South-Tees-Master-Plan-19-Nov-17.pdf:3:03.01 Master Planning Process 07 South Industrial Zone 11.05 Conceptual Energy Plans

171019South-Tees-Master-Plan-19-Nov-17.pdf:94:5.04 Conceptual Massing Views (for illustrative purposes)

171019South-Tees-Master-Plan-19-Nov-17.pdf:95:5.05 North Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:96:Plots sited in the NI Zone have been conceptually sized based off of real-world facilities. While plot sizes represented

171019South-Tees-Master-Plan-19-Nov-17.pdf:101:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:108: from the proximity to the river afforded by the SIZ and from been conceptually allocated for large contract fabrication, could accommodate photovoltaic arrays, wind turbines

171019South-Tees-Master-Plan-19-Nov-17.pdf:110: 7.04 South Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:117:8.02 Central Industrial Zone Illustrative Plan (Conceptual)

171019South-Tees-Master-Plan-19-Nov-17.pdf:146:11.05 Conceptual Energy Plans

171019South-Tees-Master-Plan-19-Nov-17.pdf:146:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy

teesworks_-_keywords_-_conceptual.txt · Last modified: 2024/04/02 18:09 by 127.0.0.1