Planning Application Details for - R-2019-0427-FFM
Official consultation has expired
Condition number
Condition Details
1
The development shall not be begun later than the expiration of THREE YEARS from the date of this permission.
REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2
The development hereby permitted shall be carried out in accordance with the following approved plans:
Drawing No. STDC-SCW-XX-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SCW-XX-PLA-0002 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-NEZ-WA-PLA-0006 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-MR-PLA-0004 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0007 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-NEZ-WA-PLA-0005 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-LA-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-SB-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0006 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-NEZ-WA-PLA-0004 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-NEZ-WA-PLA-0003 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0005 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0004 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0003 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-MR-PLA-0003 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-WA-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-MR-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0001 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-WA-PLA-0002 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-MR-PLA-0002 received by the Local Planning Authority on 01/07/19
Drawing No. STDC-SIZ-GP-PLA-0002 received by the Local Planning Authority on 01/07/19
REASON: To accord with the terms of the planning application.
3
With the exception of soils used to level ground required to host the temporary storage mounds hereby approved, all soils placed into the temporary storage mounds shall be used in operations associated with ground preparation and remediation works within 10 years of the date of planning permission.
REASON: In the interests of amenity
4
The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy (June 2019, wood) and consistent with the layout identified in STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.
? The storage mounds must be sited exclusively in Flood Zone 1
REASON: To prevent flood flows from being displaced and prevent increased risk of flooding elsewhere.
5
The works carried out will be in accordance with the Flood Risk Assessment and Drainage Strategy Doc ref. 41825-WOOD-XX-XX-RP-OW-0001_A_P01 including all appendices dated 01/07/2019.
REASON: To prevent increased risk of flooding
6
The approved remediation scheme must be carried out in accordance with its terms unless otherwise agreed in writing by the Local Planning Authority.
The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works.
Following completion of measures identified in the approved remediation scheme, a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning
Authority.
REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
7
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be prepared and submitted to and approved in writing to the Local Planning Authority.
Following completion of measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority.
REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. and part d conditions onto any planning permission which may be granted:
8
None of the soils placed into the temporary storage mounds hereby approved shall be transported upon the public highway network unless an assessment of the impacts of transporting soils upon the public highway network is prepared, submitted to and approved by the Local Planning Authority. Any such assessment shall include a transportation management scheme that identifies mitigation measures required to manage the movement of soils on the public highway network. Thereafter, any such transportation on the public highway shall be carried out in accordance with the approved transport management scheme.
REASON: In order to ensure no adverse impacts arise on local amenity or the safe and effective operation of the public highway.
9
Prior to the final use of the soils in the implementation of this planning permission, further Ecological Assessment(s) shall be carried out and submitted to the Local Planning Authority in respect of those areas where the soils are to be used for ground preparation and remediation works. The Assessmen (s) shall include up-to-date surveys that identify any priority habitats, ecological networks or protected and priority species. If significant harm to biodiversity cannot be avoided as a result of the final use of the soils, appropriate mitigation including by way of on or off-site compensatory provision, shall be identified in the Ecological Assessment and carried out within the timescales set out in the approved Assessment.
REASON: In the interests of conserving biodiversity.
10
Prior to the deposition of earth in any area that has been identified in the Ecology report (ID: INCA 201920) as supporting or potentially supporting reptiles, a reptile mitigation strategy should be prepared, submitted to and approved by the local planning authority and any necessary actions resulting from that implemented in accordance with the strategy.
REASON: In the interests of preventing harm to protected species
11
Prior to commencement of the movement of earth associated with the formation of the approved temporary storage mounds or its final use, a Construction and Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be adhered to throughout the implementation of the permission. . The Plan shall provide details of the following;
i) The parking of vehicles for site operatives and visitors;
ii) Loading and unloading of plant and materials;
iii) Storage of plant and materials used in constructing the temporary storage mounds;
iv)Measures to control the spread of dirt and debris on the private road network;
v) Methods of demolition of any structures to be demolished in order to form the approved temporary storage mounds;
vi) Measures to control the emission of noise, dust and vibration during the formation of the temporary storage mounds. .
vii) A scheme for recycling/disposing of waste resulting from demolition works that are required to form the approved temporary storage mounds.
REASON: In the interests of neighbour amenity and maintaining good Air Quality
12
Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.
Name
Date Letter Sent
Expiry Date
Business Growth Team
04/07/2019
25/07/2019
Cleveland Police ALO - Steve Cranston
04/07/2019
25/07/2019
Councillor S Jeffrey (SOUTH BANK)
04/07/2019
25/07/2019
Councillor Sandra Smith (SOUTH BANK)
04/07/2019
25/07/2019
Engineering Team (Highways)
04/07/2019
25/07/2019
Engineers (Local Lead Flood Authority)
04/07/2019
25/07/2019
Environment Agency
09/07/2019
26/08/2019
Environmental Protection Team
04/07/2019
25/07/2019
Health & Safety-Food (Food Team)
04/07/2019
25/07/2019
Natural England
04/07/2019
25/07/2019
Network Rail
04/07/2019
25/07/2019
Northern Gas Network
04/07/2019
25/07/2019
Place Investment Team
04/07/2019
25/07/2019
Address
Date Sent
Date Reconsulted
Expiry Date
MARSH FARM HOUSE
TOD POINT ROAD
WARRENBY
REDCAR
TS10 5BE
09/07/2019
30/07/2019
STEEL HOUSE
LACKENBY WORKS
TRUNK ROAD
REDCAR
09/07/2019
30/07/2019
REDCAR BULK TERMINAL LTD
LACKENBY WORKS
TRUNK ROAD
REDCAR
TS6 7RP
09/07/2019
30/07/2019
C H BRIGGS PLANT LTD
TOD POINT ROAD
WARRENBY
REDCAR
TS10 5BE
09/07/2019
30/07/2019
1 BESSEMER COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7EB
09/07/2019
30/07/2019
UNIT 5
STAPYLTON COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BL
09/07/2019
30/07/2019
UNIT 4
STAPYLTON COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BJ
09/07/2019
30/07/2019
D&A SYSTEMS
UNIT 6
STAPYLTON COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BL
09/07/2019
30/07/2019
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
MIDDLESBROUGH
TS6 7BJ
09/07/2019
30/07/2019
UNIT 2
BESSEMER COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7EB
09/07/2019
30/07/2019
UNIT 3
BESSEMER COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7EB
09/07/2019
30/07/2019
BRITANNIA HOUSE
JOHN BOYLE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6TY
09/07/2019
30/07/2019
TITAN TRAILERS
HOLDEN CLOSE
GRANGETOWN
MIDDLESBROUGH
TS6 7AL
09/07/2019
30/07/2019
EVERGREEN HOUSE
JOHN BOYLE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6TY
09/07/2019
30/07/2019
L AND C SECURITY STORAGE
SMITHS DOCK ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UJ
09/07/2019
30/07/2019
L AND C SKIP HIRE
SMITHS DOCK ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UJ
09/07/2019
30/07/2019
NET 3
GROUND FLOOR
CLEVELAND HOUSE
ESTON ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UA
09/07/2019
30/07/2019
FIRST FLOOR
CLEVELAND HOUSE
ESTON ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UA
09/07/2019
30/07/2019
A AND P
DOCKSIDE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UZ
09/07/2019
30/07/2019
PICKERINGS PLANT LTD
JOHN BOYLE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6TY
09/07/2019
30/07/2019
TEES R E P BIOMASS POWER STATION
TEES DOCK ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6AF
09/07/2019
30/07/2019
MBH LTD
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
09/07/2019
30/07/2019
CM PRESTON
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
09/07/2019
30/07/2019
TARMAC J PARKER
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
09/07/2019
30/07/2019
G AND S RENTALS
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
09/07/2019
30/07/2019
HERRING LTD
TRUCK TECH LTD
STAPYLTON STREET
GRANGETOWN
09/07/2019
30/07/2019
DAVID FOX TRANSPORT
JOHN BOYLE ROAD
SOUTH BANK
TS6 6TY
09/07/2019
30/07/2019
1D VAUGHAN COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BJ
09/07/2019
30/07/2019
CITY ELECTRICAL FACTORS
UNIT 7 AND 9
STAPYLTON COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BL
09/07/2019
30/07/2019
ARIA FOODS LTD
2A VAUGHAN COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7BJ
09/07/2019
30/07/2019
VANTECH
POCHIN ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 7AT
09/07/2019
30/07/2019
MATERIALS PROCESSING INSTITUTE
TEESSIDE TECHNOLOGY CENTRE
ESTON ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6US
09/07/2019
30/07/2019
CLEVELAND HOUSE
ESTON ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UA
09/07/2019
30/07/2019
SCOTT BROS RECYCLING LTD
HOLDEN CLOSE
GRANGETOWN
MIDDLESBROUGH
TS6 7AH
09/07/2019
30/07/2019
TARMAC WORKS
TEESPORT
TEES DOCK ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UF
09/07/2019
30/07/2019
HANSON CEMENT
TEESPORT
TEES DOCK ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UF
09/07/2019
30/07/2019
TAM SERVICES
TEES OFFSHORE BASE
DOCKSIDE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UZ
09/07/2019
30/07/2019
STONETECH CLEVELAND LTD
UNIT 4
BESSEMER COURT
GRANGETOWN
MIDDLESBROUGH
TS6 7EB
09/07/2019
30/07/2019
E WIRING NORTHERN LTD
W S HOUSE
STAPYLTON STREET
GRANGETOWN
MIDDLESBROUGH
TS6 7BH
09/07/2019
30/07/2019
TOTAL BOLT SOLUTIONS LTD
JOHN BOYLE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6TY
09/07/2019
30/07/2019
ABNORMAL LOAD ENGINEERING LTD
TEESPORT COMMERCE PARK
DOCKSIDE ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UZ
09/07/2019
30/07/2019
ALBADEN SERVICES LTD
TEESPORT
TEES DOCK ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6UE
09/07/2019
30/07/2019
MR MORTON
SMITHS DOCK ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UJ
09/07/2019
30/07/2019
CIVIC AMENITIES SITE
TOD POINT ROAD
WARRENBY
REDCAR
TS10 5BE
09/07/2019
30/07/2019
HECKETT MULTISERVE (UK) LTD
TEESPORT
TEES DOCK ROAD
GRANGETOWN
MIDDLESBROUGH
TS6 6TN
09/07/2019
30/07/2019
I AND L SCRAPYARD
SMITHS DOCK ROAD
SOUTH BANK
MIDDLESBROUGH
TS6 6UJ
09/07/2019
30/07/2019
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
Size
Date
Application Form | ||
---|---|---|
kb | 01/07/2019 | |
kb | 01/07/2019 | |
Plans and Supporting Documentation | ||
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 01/07/2019 | |
kb | 24/07/2019 | |
Superseded Plans/Documentation | ||
kb | 01/07/2019 | |
Consultee Responses | ||
kb | 05/07/2019 | |
kb | 17/07/2019 | |
kb | 23/07/2019 | |
kb | 25/07/2019 | |
kb | 30/07/2019 | |
kb | 06/08/2019 | |
kb | 06/08/2019 | |
kb | 08/08/2019 | |
kb | 23/08/2019 | |
Neighbour representations | ||
kb | 19/07/2019 | |
kb | 12/08/2019 | |
Decision Notice | ||
kb | 27/09/2019 | |
Application Documents | ||
kb | 26/09/2019 |