{include:Teesworks - keywords - menu}
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:18: and Cleveland Coast Special Protection Area (SPA) and the Teesmouth and
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:20: ─ The Main Site is not located near any Groundwater Source Protection
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:31: Cleveland Coast Special Protection Area (SPA), an internationally designated
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:41: Air Quality in the Tees Valley 2012 – 2015’ (Tees Valley Environmental Protection
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:47:6.44 There are no groundwater Source Protection Zones or Drinking Water Protected
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:50: Regulations’) provide for the ecological designation and protection of 'European
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:50: sites', the protection of 'European protected species', and the adaptation of planning
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:50: and other controls for the protection of European Sites.
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:53: solely relying on the legal protection of a habitat or species to characterise ecological
EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:62: criteria that have been established for the protection of human health (e.g. air quality
EN010103-001063-NZT DCO 6.4.27 ES Vol III Appendix 12J GCN Report.pdf:4: The great crested newt is afforded legal protection through its inclusion on
EN010103-001063-NZT DCO 6.4.27 ES Vol III Appendix 12J GCN Report.pdf:4: breeding, sheltering or protection.
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:3: SPA Special Protection Areas
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:26: and investors will have no protection or
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:26: achieved by the Applicant reducing the width of protections provided for in Part 26 of Schedule
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:28: easements. As the pipes and supporting or unnecessary positions within the protection
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:29: protection. themselves and other operators, with an
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:29: that protections that may be appropriate for
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:29: There is a very real risk that dual protections for
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:29: should receive the same or similar protections
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:30: 7. Second, further or alternatively, para 308(1) The Applicants note that this protection is
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:34: and the area that is to be subject to the New protection for NTG, including the provision of
EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:49: protection.
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:3: RSPB Royal Society for the Protection of Birds
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:3: SPA Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:15: sites the same level of protection as SPAs and SACs.
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:60: armouring / scour protection would result in permanent loss of subtidal sandflat.
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:60: head, the introduction of rock armouring / scour protection (with an expected
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:61: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:61: wave direction. The outer edge of the scour protection will incorporate a slope that
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:61: To minimise the effect of the protection works on hydrodynamic conditions and
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:61: circular footprint for the proposed scour protection therefore follows this design
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:61: 1:2 or less) will be incorporated into the design and the height of the protection
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:63: exceed the 3 µg/m3 Critical Level of relevance for the general protection of
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:72: protection of harbour porpoise, indicates the maximum distance for significant
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:81: introduction of a small volume of rock armouring / scour protection due to the Proposed
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:88: York Moors Special Protection Area Site Code: UK9006161 Online. Available
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:89: Cleveland Coast Special Protection Area (TIN172) Online. Available at:
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:128: Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:129: Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:130: Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:131: Special Protection Area
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:133: that scour protection will be required to prevent erosion of seabed around the outfall
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:133: seabed will be covered by the rock armour scour protection. The use of rock armour as a
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:133: form of scour protection is proposed for the alternative new outfall only. It is not
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:133: protection on the seabed are based on expert engineering judgement and knowledge of
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: direction. The outer edge of the scour protection will incorporate a slope that transitions
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: The grading of the scour protection is likely to be similar to that used for marine cable
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: protection in situations where cables cannot be buried (i.e. at crossing points with other
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: cables or pipelines). To minimise the effect of the protection works on hydrodynamic
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:134: circular footprint for the proposed scour protection therefore follows this design
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: Preliminary sizing of rock armour for scour protection around the base of the Teesside
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: scour protection at the outfall location.
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: turbulence and depth of scour around the outer edge of the scour protection will also be
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: be incorporated into the design and the height of the protection above the seabed should
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: locally raised seabed. If the wave crests passing over the submerged scour protection are
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: scour protection and the use of shallow side slopes to transition from the seabed to the
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:135: around the perimeter of the rock armour protection. A worst-case footprint can therefore
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:136: waves from a range of directions, a circular footprint for the scour protection should be
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:136: In conclusion, if the recommendations for design of the outfall scour protection as
EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:136: Any effects resulting from the scour protection will then be limited to local, small-scale
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:4:41. Protection of interests
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK)
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK)
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6:PART 23 PART 22 — FOR THE PROTECTION OF HUNTSMAN
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 2423 — FOR THE PROTECTION OF NAVIGATOR TERMINALS
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 2524 — FOR THE PROTECTION OF NORTHUMBRIAN WATER
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 2625 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:6: PART 2726 — FOR THE PROTECTION OF NORTH TEES LIMITED,
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre-
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:34:Protection of interests
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:34: Environmental Protection Act 1990 (c.43).
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:43: (ii) cathodic protection posts;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:45: (vi) works for the protection of buildings and land;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:46: (b) the approximate number and location of cathodic protection posts and marker posts; and
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:47: (b) the approximate number and location of cathodic protection posts and marker posts.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:47: (b) the approximate number and location of cathodic protection posts and marker posts.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:48:Landscaping and biodiversity protection management and enhancement
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:48:biodiversity protection plan for that part has been submitted to and approved by the relevant
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:52: Environmental Protection Act 1990(48a);
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:52: Environmental Protection Act 1990; and
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:53:must commence until a scheme of protection and mitigation measures has been submitted to and,
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:54:Protection of highway surfaces
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:55: (e) any necessary measures for the temporary protection of carriageway surfaces, the
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:55: protection of statutory undertakers’ plant and equipment, and any temporary removal of
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:61: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:61: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:62:subject to such reasonable conditions as may be required for the protection or alteration of
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:63:specified works or the alteration or protection of any apparatus.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:86: (vii) the deposit of rock armour protection;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:96: (iv) the deposit of rock armour protection;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:96: (vii) the deposit of rock armour protection;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:106: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:106: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:108:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:109:with, the inspection, removal, alteration or protection of any apparatus or the construction of any
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:110: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:110: 12.—(1) For the protection of any operator, the following provisions have effect, unless
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:112: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:112: 17. For the protection of National Grid as referred to in this Part of this Schedule the following
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:113:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus:
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:113:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:115:maintenance and protection of alternative apparatus in substitution for apparatus to be removed,
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:115:Retained apparatus: protection of electricity undertaker
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:116:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:116:Retained apparatus: protection of gas undertaker
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:117:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:118:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:120:22(2) or National Grid makes requirements for the protection or alteration of apparatus under
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:120:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:121: FOR THE PROTECTION OF AIR PRODUCTS PLC
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:121: 33. For the protection of Air Products the following provisions have effect, unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:122:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:123:alteration or protection of any apparatus or the construction of any new apparatus which may be
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:124: FOR THE PROTECTION OF CATS NORTH SEA LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:124: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:126: testing the effectiveness of the repairs and cathodic protection and any further works or
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:127:removal, alteration or protection of any CATS pipeline which may be required in consequence of
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:127: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:127: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:130:may require to be made for the alteration or otherwise for the protection of the apparatus, or for
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:131:removal, alteration or protection of any apparatus or the construction of any new apparatus which
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:133: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:133: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:135:Cathodic protection testing
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:135: (a) the authorised development might interfere with the cathodic protection forming part of
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:135: (b) the Exolum operations might interfere with the proposed or existing cathodic protection
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:135:measures for providing or preserving cathodic protection.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:135: (i) the execution of any works under this Order including for the protection of the
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:136: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:136: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:138: FOR THE PROTECTION OF MARLOW FOODS LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:138: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:140: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:146: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:146: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:148:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:149: (a) in, or in connection with, the inspection, removal, alteration or protection of any
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:151: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:151: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:152: FOR THE PROTECTION OF PD TEESPORT LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:152: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:155: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:155: 157. For the protection of RBT, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:157: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:157: 170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:159: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:159: 178. For the protection of Sembcorp, the following provisions have effect, unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:161: (a) the inspection, removal and relaying or replacing, alteration or protection of any
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:162: with any deficiency in the expected level of protection afforded by those requirements;
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:164: FOR THE PROTECTION OF YORK POTASH
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:164: 196. The provisions of this Part apply for the protection of York Potash unless otherwise agreed
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:165:reasonable conditions as may be required for the protection or alteration of or access to any York
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:166:the alteration or protection of any apparatus.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:167: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:167: 215. For the protection of Suez, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:169: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:169: 225. For the protection of South Tees Development Corporation, Teesworks Limited and South
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:176: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:176: 256. For the protection of the Breagh Pipeline Owners, the following provisions have effect,
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:178: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:178: 264. For the protection of Teesside Windfarm, the following provisions have effect, unless
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:180: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:180: 272. For the protection of HPU, the following provisions have effect, unless otherwise agreed in
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:182: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:182: 279. For the protection of Navigator Terminals, the following provisions have effect, unless
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:183: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:183: 287. For the protection of NW, the following provisions, unless otherwise agreed in writing
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:184: “the standard protection strips” means strips of land falling within the following distances to
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:184: 289. The undertaker must not within the standard protection strips interfere with or build over
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:184:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:184:alteration or otherwise for the protection of the apparatus, or for securing access to it.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:185:the location of such assets will immediately be given to NW and afforded the same protection as
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:185: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:185: 297. For the protection of the Northern Gas Networks Limited the following provisions shall,
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:186:(retained apparatus: protection), 305 (expenses) and 306 (indemnity), this Schedule does not apply
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:188:Retained apparatus: protection
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:189:alteration or protection of any apparatus or the construction of any new apparatus which may be
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:191:Cathodic protection testing
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:191: (a) the authorised development might interfere with the existing cathodic protection forming
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:191: (b) the apparatus might interfere with the proposed or existing cathodic protection forming
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:191:cathodic protection.
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:192: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL
EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:192: 313. For the protection of the NT Group (as defined below), the following provisions have
EN010103-002619-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (clean copy).pdf:1:FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION
EN010103-002619-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (clean copy).pdf:1:255. For the protection of South Tees Development Corporation, Teesworks Limited and South Tees
EN010103-002619-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (clean copy).pdf:4:protection provided if it crosses underground facilities;
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:20: - Article 41 provides protection for statutory undertakers and others through the
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers,
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:22: include Requirements relating to landscape and biodiversity protection (4) and the
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:25: This provides protection for the street authority for the street in question. This is based on
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:28: authorised development may commence until a landscape and biodiversity protection plan
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed.
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:30: development as restrictive covenants for the protection of the underground elements of the
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:34: section 79(1) of the Environmental Protection Act 1990.
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:42: 3.8.35. Requirement 4 (Landscape and biodiversity protection management and enhancement) -
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:42: additional provision for biodiversity protection management and enhancement. It has been
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:42: protection plan to the relevant planning authority, following consultation with STDC and
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:42: protection for the landscape and biodiversity elements during construction, whilst providing
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:44: consultation with Natural England, a scheme of protection and mitigation measures has
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:45: 3.8.56. Requirement 17 (Protection of highway surfaces) - this is not a model provision. It requires
EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:50: relevant parties and protections.
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:9:Source Protection Zones
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:11:Radon Potential - Radon Protection Measures n/a
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:12:Special Protection Areas pg 52 1
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:59: Radon Potential - Radon Protection Measures
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:59: Protection Measure: No radon protective measures are necessary in the construction of new C14SW 0 1 452667
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:64: Designation Details: Special Protection Area
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:64: Special Protection Areas
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:65:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:66:Source Protection Zones
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:68:Radon Potential - Radon Protection Measures
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:69:Special Protection Areas
EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:70: Scottish Environment Protection Agency
EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:42: have a qualified (and not an absolute) protection against prosecution or civil action.
EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:48: by the Public Interest Disclosure Act 1998, which gives employees protection from
EN010103-001772-NZT DCO 9.8 - Appendix GEN.1.41c - STDC Constitution - June 2022.pdf:52: addition, if you wish to secure the protections afforded by the Public Interest
EN010103-002346-Natural England - Other- An update to the Examining Authority regarding topics to be discussed at Issue Specific Hearing 6 1.pdf:1:proposal’s industrial effluent discharge to the Teesmouth and Cleveland Coast Special Protection
EN010103-001899-NZT DCO 8.12 - Northumbrian Water Ltd SoCG (Tracked) July 2022 (D4).pdf:12: appropriate protection to NWL’s apparatus and operations.
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:3: RSPB Royal Society for the Protection of Birds
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:3: SPA Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:15: sites the same level of protection as SPAs and SACs.
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:38: concentration (critical levelCritical Level) for the protection of vegetation of 30 µgm-
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:48: associated rock armouring / scour protection would result in permanent loss of
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:64: associated rock armouring / scour protection would result in permanent loss of
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:64: around the outfall head, the introduction of rock armouring / scour protection (with
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:64: here. The footprint of the scour protection is likely to be a 10-12m diameter circle.
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:64: on the incident wave direction. The outer edge of the scour protection will
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:64: surrounding seabed levels. To minimise the effect of the protection works on
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:65: dominant flow directions. The circular footprint for the proposed scour protection
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:65: the height of the protection above the seabed should be limited to less than 1m
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:66: protection of vegetation.
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:70: (CEMP), detailing the environmental protection measures (e.g. safe materials
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:74: protection of harbour porpoise, indicates the maximum distance for significant
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:79: with the Teesmouth and Cleveland Coast Special Protection Area andSPA / Ramsar Site and any
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:88: York Moors Special Protection Area Site Code: UK9006161 Online. Available
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:90: Cleveland Coast Special Protection Area (TIN172) Online. Available at:
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:128: Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:129: Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:130: Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:131: Special Protection Area
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:133: that scour protection will be required to prevent erosion of seabed around the outfall
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:133: seabed will be covered by the rock armour scour protection. The use of rock armour as a
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:133: form of scour protection is proposed for the alternative new outfall only. It is not
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:133: protection on the seabed are based on expert engineering judgement and knowledge of
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:134: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:134: direction. The outer edge of the scour protection will incorporate a slope that transitions
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:134: The grading of the scour protection is likely to be similar to that used for marine cable
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:134: protection in situations where cables cannot be buried (i.e. at crossing points with other
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:134: cables or pipelines). To minimise the effect of the protection works on hydrodynamic
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: circular footprint for the proposed scour protection therefore follows this design
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: Preliminary sizing of rock armour for scour protection around the base of the Teesside
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: scour protection at the outfall location.
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: turbulence and depth of scour around the outer edge of the scour protection will also be
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: be incorporated into the design and the height of the protection above the seabed should
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: locally raised seabed. If the wave crests passing over the submerged scour protection are
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: scour protection and the use of shallow side slopes to transition from the seabed to the
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:135: around the perimeter of the rock armour protection. A worst-case footprint can therefore
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:136: waves from a range of directions, a circular footprint for the scour protection should be
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:136: In conclusion, if the recommendations for design of the outfall scour protection as
EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:136: Any effects resulting from the scour protection will then be limited to local, small-scale
EN010103-001595-NZT DCO 8.14 - Telefonica SoCG - May 2022.pdf:7:3.3.1 The parties agree that the protective provisions for the protection of Operators of
EN010103-001595-NZT DCO 8.14 - Telefonica SoCG - May 2022.pdf:7: the Application (Part 2, Schedule 12) provide appropriate protection for Telefonica
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 1 — Protection for electricity, gas, water and sewerage undertakers
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 2 — Protection of Network Rail Infrastructure Limited, etc.
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 3 — Protection of operators of electronic communications code
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 4 — Protection of offshore cables and pipelines
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 5 — Protection of Environment Agency
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3: PART 6 — Protection of owners and operators at Wilton
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:5: inter-platform or export cables authorised by this Order together with physical protection
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:5: measures including cable protection;
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:5: “cable protection” means measures to protect cables from physical damage and exposure due
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:5: protection systems including masts, control buildings, communications masts, back-up
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:8: “scour protection” means measures to prevent loss of seabed sediment around foundation
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:9: corrosion protection systems, fenders and maintenance equipment, helicopter transfer facilities
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:10: Protection of owners and operators at Wilton
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:13:otherwise for the temporary or permanent protection of the apparatus, or for securing access to it,
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:14: temporary or permanent protection of the owner’s or operator’s apparatus;
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:14: (a) the inspection, removal and relaying or replacing, alteration or protection of any
EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:14: deal with any deficiency in the expected level of protection afforded by those protective
EN010103-002108-NZT DCO 6.3.57 - ES Vol II Figure 11-5 PCC Site Operational Noise Levels August 2022 (D6).pdf:1: Special Protection Area
EN010103-001401-NZTDCO 6.3.52 Rev 3 ES Addendum Vol II Figure 11-1 Noise Sensitive Receptors.pdf:1: Special Protection Area
EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:36: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other
EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:66: protection, submitted to the relevant planning
EN010103-001787-NZT DCO 8.7 - Historic England SoCG - June 2022.pdf:9: in relation to access to designated wrecks (Under s.1 of the Protection of Wrecks Act
EN010103-001787-NZT DCO 8.7 - Historic England SoCG - June 2022.pdf:12: protection and management of unexpected terrestrial
EN010103-001868-NZT-ISH3-DCO-Agenda.pdf:3: o R4 Landscaping and biodiversity protection management and
EN010103-001998-NZT DCO 2.1c - Schedule of Changes to the DCO - August 2022(D5).pdf:3:biodiversity protection management and relate to parts of the authorised development which could be relevant to Sembcorp’s operations.
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:20: - Article 41 provides protection for statutory undertakers and others through the
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers,
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:22: include Requirements relating to landscape and biodiversity protection (4) and the
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:26: This provides protection for the street authority for the street in question. This is based on
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:28: authorised development may commence until a landscape and biodiversity protection plan
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed.
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:30: development as restrictive covenants for the protection of the underground elements of the
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:34: section 79(1) of the Environmental Protection Act 1990.
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:42: 3.8.36. Requirement 4 (Landscape and biodiversity protection management and enhancement) -
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:42: additional provision for biodiversity protection management and enhancement. It has been
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:42: protection plan to the relevant planning authority, following consultation with STDC and
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:42: protection for the landscape and biodiversity elements during construction, whilst providing
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:45: consultation with Natural England, a scheme of protection and mitigation measures has
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:45: 3.8.57. Requirement 17 (Protection of highway surfaces) - this is not a model provision. It requires
EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:51: relevant parties and protections.
EN010103-002355-NZT ISH5 S1.pdf:2:may contain your personal information. So the general data protection regulations do apply. Our
EN010103-002355-NZT ISH5 S1.pdf:8:part 19 of sheduled 12. And there is a new protection that explicitly requires the undertaker to submit
EN010103-002473-NZT DCO 6.3.52 - ES Vol II Figure 11-1 Noise Sensitive Receptors Nov 2022 (D12).pdf:1: Special Protection Area
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:3: SPA Special Protection Area
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:4:5.0 The Teesmouth and Cleveland Coast Special Protection Area and Ramsar ………… 915
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:7: Special Protection Area (SPA) and Ramsar site and the approach to the nutrient
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:7: Special Protection Area (SPA) and Ramsar site and the approach to the nutrient
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:20:6.05.0 THE TEESMOUTH AND CLEVELAND COAST SPECIAL PROTECTION AREA
EN010103-002323-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022 (D9).pdf:20: improve seabird protection within the SPA network.
EN010103-001858-9.11 - Applicants' Comments on Deadline 2 Submissions - June 2022(D3).pdf:3: SPA Special Protection Areas
EN010103-001858-9.11 - Applicants' Comments on Deadline 2 Submissions - June 2022(D3).pdf:25: other Parts of Schedule 12 providing protection directly for owners/operators of
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:1:the Teesmouth and Cleveland Coast Special Protection Area/Ramsar site, as well as some
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:4: Teesmouth and Cleveland Coast Special Protection Area (SPA), which is
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: b. The potential impacts of installing rock armour protection have not been
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:10:2.6.2. The potential impacts of installing rock armour protection have not been assessed in the
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:10: Bay. This includes the installation of rock armour protection to the
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:12:2.7.3. The potential impacts of installing rock armour protection have not been assessed in
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:15: for protection of ecological and human
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:17: protection,
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:20:Special Protection Areas (SPA).Any proposals that could affect them require a Habitats Regulations Assessment (HRA).
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:22:• Special Protection Areas (SPA) designated under the Habitat Regulations 2017.
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:22: same protection as if they were designated under the Habitat Regulations 2017.
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:24:Special Protection Areas (SPA’s) it does not apply to Ramsar sites, proposed SAC’s or potential SPA’s or to sites identified, or
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:41:24 The Special Protection Area (England), Potential Special Protection Area (England), Special Areas of
EN010103-001667-Natural England - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:46:The Special Protection Area is designated for the following features:
EN010103-001764-NZT DCO 9.8 - Appendix PPL.1.3c - Teesworks Design Guide - June 2022.pdf:68: protection.
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:5: • Protection of Badgers Act 1992 (as amended);
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:5: • Wild Mammals (Protection) Act 1996;
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:5: • Environmental Protection Act 1990; and
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:6: Local Plan adopted May 2018. These require the protection and
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:6: the protection and enhancement of biodiversity, including maximising
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:7: out expectations for natural environment protection and enhancement,
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:9:Committee (JNCC) Website (UK Special Protection Areas (SPA), Special
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:23: NPPF protection (e.g. value
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:26: the species and its limited legal protection.
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:34: Environmental Protection Act 1990 (c. 43). London: Her Majesty’s Stationery
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:35: Protection of Badgers Act 1992 (c. 51). London: Her Majesty’s Stationery
EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:35: Wild Mammal (Protection) Act 1996 (1996) London: Her Majesty’s Stationery
EN010103-001200-NZT DCO 6.3.52 - ES Vol II Figure 11-1 Noise Sensitive Receptors - Oct 2021 Rev.2.0.pdf:1: Special Protection Area
EN010103-001610-Sembcorp Utilities (UK) Ltd - Letter to ExA DL1 26.05.22(118743563.2) (002).pdf:3: amendments aim to improve the standard of protection in the protective provisions so that it is in
EN010103-001610-Sembcorp Utilities (UK) Ltd - Letter to ExA DL1 26.05.22(118743563.2) (002).pdf:3: establishes a precedent for the standard of protection that should apply to Wilton. Given that the
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:4: EPA The Environmental Protection Act 1990 -– an Act
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:9: SPA Special Protection Area -– strictly protected sites
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:9: birds directive. Special Protection Areas are
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:9: sites for the protection of threatened habitats
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:9: area designated for protection under the Wildlife
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:33: Protection Area and Ramsar site, or other European designated nature conservation
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:34: Teesmouth and Cleveland Coast Special Protection Area 6km Buffer Zone/Ramsar
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:95: the same protection is applied as a matter of policy, either alone or in combination
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:95: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site,
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:98: Biodiversity Protection Plan and the Construction Environment Management Plan
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:104: protection management and enhancement’.
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:105: Design’; 4 ‘Landscape and biodiversity protection management and enhancement’;
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:119: of the Environmental Protection Act (EPA) 1990, and how they may be mitigated or
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:120: for Protection of National Infrastructure.
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:126: route to its original state as close as Biodiversity Protection Plan and the CEMP that will be secured by
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:136: paragraph 2.6.5 highlights that it is not Requirement 4 ‘Landscaping and biodiversity protection and management and
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:152: protection or diversion of underground
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:154: protection (electrical or the EIA Scoping Opinion (02.04.19). Additionally, the Electric and Magnetic
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:176: the protection of
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:182: Area SPD Protection and enhance designated will not result in unacceptable impacts on other nature conversation
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:194: and protection, and where
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:234: Areas of Conservation (SAC), Special Protection Areas (SPAs), Ramsar
EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:234: e. avoid Groundwater Source Protection Zone 1 or Flood Risk Zone 3b
EN010103-001674-0006-P1A4.5NTLLET008-NTL Letter to Planning Inspectorate re Deadline 2 Written Representation NZT Project 08.06.22_.pdf:2:protection within a heavily regulated corridor where occupiers into specific covenants and
EN010103-002638-NZT DCO 8.12 - NWL SoCG - Final - Nov 2022 (D13).pdf:12: appropriate protection to NWL’s apparatus and operations.
EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf:5: SPA Special Protection Area
EN010103-002348-0006-P1A4.5NTLIKC016-NTL SUBMISSIONS AND POSITION STATEMENT ISH5 ON BEHALF OF NORTH TEES GROUP 17.10.22.pdf:3:proprietor, which ownership requires protection.
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:2:FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:2: 1. For the protection of National Grid as referred to in this Part of this Schedule the following
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:3: stopping up), 9 (retained apparatus: protection) 10 (expenses) and 11 (indemnity) of this
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:5: construction, use, maintenance and protection of alternative apparatus in substitution for
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:5: Retained apparatus: protection of electricity undertaker
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:6:Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:7: replacing, alteration or protection of any apparatus or the construction of any new or
EN010103-002729-Response from National Grid Electricity Transmission PLC EMAIL & Attachment.pdf:9: paragraph 7(2) or National Grid makes requirements for the protection or alteration of
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:6: Orsted’s proposed iv) it is not appropriate to leave the issue to the operate and the protection it
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:6: clarify why it requires include any such additional protection. proposed by Hornsea Project
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:6: protection of HP4 of its submissions at the same [REP5-025, electronic page 21 storage operator and in the
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:7: propose protections issue in this DCO [REP5-025, electronic page additional protections and
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:7: 'supplementary' protection Orsted argue is
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:7: not been made, that protections must thus be
EN010103-002232-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 7.pdf:8:the SoS, as to any protections/conditions they
EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:26: protections, will be submitted at Deadline 4.
EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:35: groundwater biodiversity protection management and
EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:39: Amongst other additional protections, STDC
EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:45: under Article 8. The Applicants’ use of the existing STDC requires suitable protection via the draft
EN010103-001234-NZT - Regulation 32 Transboundary Screening (13).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site.
EN010103-001238-Natural England Net Zero Teesside NSIP Redcar_Redacted.pdf:2: • The potential impacts of installing rock armour protection have not been assessed in the
EN010103-001238-Natural England Net Zero Teesside NSIP Redcar_Redacted.pdf:3: 1.1.1. the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site
EN010103-001238-Natural England Net Zero Teesside NSIP Redcar_Redacted.pdf:3: 1.4.2. The project includes the installation of rock armour protection at the proposed outfall
EN010103-001238-Natural England Net Zero Teesside NSIP Redcar_Redacted.pdf:5: rock armour protection to the outfall. Activities such as deposits and disposal
EN010103-001238-Natural England Net Zero Teesside NSIP Redcar_Redacted.pdf:6:4.3. Assessment of the potential impacts of installing rock armour protection within the SPA, as part
EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf:17: until a scheme of protection and mitigation measures have been
EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf:21: protection of controlled waters.
EN010103-001590-NZT DCO 8.9 - NGG SoCG - May 2022.pdf:8:3.3.4 The MOC does not include the primary protection device for the downstream
EN010103-001590-NZT DCO 8.9 - NGG SoCG - May 2022.pdf:10:4.2.6 Protective Provisions associated with protection of the National Grid existing assets
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:7: or flood protection. The ecological potential represents the degree to which the
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:14: Areas of Conservation (SAC) and Special Protection Areas (SPA), and water
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:16: level of protection as the existing EU legislation (Article 4.9).
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:20: footprint of the outfall head and associated scour protection is assumed to
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:44: been established for the protection or improvement of the site’s natural
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:44: Teesmouth and Cleveland Coast Special Protection Area (SPA) and
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:44: Protection Area (SPA) which is designated under the EU Birds Directive, and
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:47: Source Protection Zones (SPZ 1 to 3) which are likely to be affected by
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:47: Water Safeguard Zone or near any Source Protection Zones.
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:62: • Special protection areas (SPA);
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:62:WFD protected Cleveland Coast Special Protection
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:63: rock armouring / scour protection to be placed
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:69: • Special protection areas (SPA);
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:69:any WFD Special Protection Area SPA and a
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:73: and will describe the principles for the protection of the water environment
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:77: impermeable surface which provides protection to underground strata
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:78: • The positioning of rock armouring/scour protection around the outfall
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:82: / scour protection. A jack-up-barge or similar would be used during
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:83: • The installation of rock armouring / scour protection around the outfall
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:83: Annex I habitat and are also afforded national conservation protection. Soft
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:84: armouring / scour protection would result in a direct localised but permanent
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:84:9.7.60 The exact volume of rock armouring required for protection of the outfall is
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:87: itself and adjacent scour protection and rock armouring. This is anticipated
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:107: sediments that are easy to erode. Appropriate scour protection would be
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:107: and associated scour protection would be 100 m2, which is small at the scale
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:123: Protection Area/Ramsar – Evidence Pack, Natural England Technical
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:155:Teesside and Cleveland Coast Special Protection Area/Ramsar site, including parts of Tees Bay and
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:160:Tees Estuary which forms part of the Teesside and Cleveland Coast Special Protection Area and
EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:168: protection to sensitive environmental receptors within the Tees Bay and Tees Estuary the 3D
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:20: - Article 41 provides protection for statutory undertakers and others through the
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers,
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:22: protection (4) and the construction environmental management plan (16)). The
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:26: This provides protection for the street authority for the street in question. This is based on
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:28: authorised development may commence until a landscaping and biodiversity protection
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed.
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:30: development as restrictive covenants for the protection of the underground elements of the
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:34: section 79(1) of the Environmental Protection Act 1990.
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:42: 3.8.36. 3.8.38.Requirement 4 (Landscaping and biodiversity protection management and
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:42: modified to make additional provision for biodiversity protection management and
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:42: protection plan to the relevant planning authority, following consultation with STDC and
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:43: protection for the landscaping and biodiversity elements during construction, whilst
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:45: until, after consultation with Natural England, a scheme of protection and mitigation
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:45: 3.8.57. 3.8.59.Requirement 17 (Protection of highway surfaces) - this is not a model provision. It
EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:51: information on the relevant parties and protections.
EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:34: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other
EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:63: protection, submitted to the relevant planning
EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:9:determined as contaminated land under Part IIA of the Environmental Protection
EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:17:Protection of Birds (RSPB) Saltholme within the north bank area. Although the
EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:20:installed, with the positioning of rock armouring and scour protection around the
EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:20:protection (with an expected volume of 250 m3) provides artificial reef habitat that
EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:46: the information provided is considered to be too activities (including rock armour and scour protection; using a
EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:46: impacts of rock armour and scour protection. The Interestingly, based on the observed communities in the Tees Bay, we
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:21: protection mechanisms worked well to deal with the faults reported. Overall, well-versed
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:34: by increased threat from global Protection of National Infrastructure (CPNI),
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:34: Strategic priority link Infrastructure Protection.
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:52:automatic protection Delayed Auto Reclose
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:65: Violence Protection Act of 2000.
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:78:Agency, NOAA Physical Sciences Laboratory, Environmental Protection Agency, Met Office, Environment Agency and academic literature. The scenario
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:80: hardening and flood protection.
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:108:Committee members Attendance asset protection resolution, outlining our targets for net zero and
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:126: Executive Directors includes base salary only and for US-based HMRC pension protection may be offered
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:165: In particular, this includes fees for reports under section 404 of the US Public Company Accounting Reform and Investor Protection Act of 2002 (Sarbanes-Oxley),
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:198:contributions in respect of the costs of plan administration and the Pension Protection Fund (PPF) levies for most of its DB plans.
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:247:These require us to develop, maintain and it provides a level of protection for us if we need
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:252: COVID-19 pandemic, these protections were
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:256:include: the generation, transmission and distribution of electricity; and the relating to pollution, the protection of the environment, and the use and disposal
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:265: Victims of Trafficking and Violence Protection Act
EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:269: Community Protection Act (CLCPA). We are
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:34:domestic NYSE listed companies and provide investors with protections that are comparable in many respects to those established by the
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:155: of its responsible business model and its Code of Conduct, which applies energy, Well-being of people, Protection of the environment and Creating
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:197: societal impact assessment (ESHIA) and the biodiversity protection
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:253:PROTECTIONIST MEASURES AFFECTING FREE TRADE
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:253:The development of protectionist measures affecting free trade between nations may have an impact on TotalEnergies’
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:253:nations in the form of protectionist measures, trade tensions between certain contractual framework of partnerships or the operating conditions of
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:254: protection of the environment (water, air, soil, noise, protection of nature, – the renegotiation of contracts;
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:254: residents, product quality and consumer protection.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:254: reduce or call into question the protections offered by the initial legal the risk of legal proceedings and promotes an increase in the number of
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:255:of any kind, particularly corruption and influence peddling. Regulation (EU) 2016/679 relating to the protection of personal data), be
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:259:assets or operations in Cuba. related to the maintenance and protection of trademarks and designs in
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:260: to the maintenance and protection of trademarks and designs in Iran and
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:261:provided fuel payment cards to be used in TotalEnergies' service stations to the maintenance and protection of trademarks and designs in Syria
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:266: any situation that might give rise to a conflict of interest so that measures necessary, all appropriate measures to ensure the protection of its rights.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:273: regulatory protection such as Protected Area Categories I to IV as defined by the International Union for Conservation of Nature (IUCN), Ramsar areas, or natural sites listed on
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:274: When the legal provisions applicable to Activities provide less protection
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:275: policy. Specific expert teams deal with the following areas: major risks, The Security division is responsible for the protection of people,
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:275: transportation and storage, crisis management and pollution protection of people and property, by conducting analyses and offering
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:277: such as cathodic protection checks, ground or aerial surveillance or in
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:279:Water and air protection containment and reduction or elimination operations.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:279:Soil protection depollution policy based on the assessment and management of the risks
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:280: for human rights at work, protection of health, safety and security,
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:302: Frank Wall Street Reform and Consumer Protection Act of 2010, since
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:303:provide more detail about to the necessity of upholding human rights. It is protection of health and safety; prohibition and prevention of any
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:400: – Protection of the environment and biodiversity
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:400: – Protection of the environment and biodiversity
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:404: preventive measures but can also include mitigation measures. They protection checks, ground or aerial surveillance or in line inspections.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:408: segments, has four priorities: health protection strategies to be implemented. It consists of external
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:409:protection schemes (see section 5.6.1.2 of this chapter). Lifestyle risk
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:409: effective protection of all employees’ health;
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:428: – the sustainable use and protection of water and marine resources; Guidelines for Multinational Enterprises and the UN Guiding Principles on
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:428: – the protection and restoration of biodiversity and ecosystems.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:433:protection requirements. Employees receive training in the required skills communication campaigns (e.g., in-house magazines, intranet, posters).
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:435:PROTECTION OF ENVIRONMENTS
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:435:Air and water protection NOX emissions mainly concern the hydrocarbon exploration and
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:435:Soil protection
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:436: The Company’s provisions for the protection of the environment and site
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:436: as well as be dependent on, water resources, particularly when the protection for 2030. The ambition of the Company is now to reduce by
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:439:protection and discharge management); waste traceability, from Reused non-hazardous waste(b) (in kt) 206 190 240
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:445:– organize the protection of the family in the event of the death of the – for standard working hours;
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:448: organization, which has been in place since September 1, 2021, brings employment, social protection and well-being.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:456: Moreover, where local laws provide few protections for freedom of communication organization (One Com) and adapt the organization of
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:462: When government security forces are deployed to ensure the protection officers were trained by qualified personnel from the project's security
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:474: – Protection of health and safety and security at work; – be attentive to the day-to-day working conditions of their employees
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:474: suppliers, to the protection
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:477: Protection Act of 2010, since 2014, TotalEnergies has filed with the
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:552: Protection Authority – – – – 546 – – – – 546
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:570: whether there is a need for additional health protection strategies to be implemented. It
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:571: protection schemes (see section 5.6.1.2 of this chapter). Lifestyle risk awareness activities
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:571: consequence work related injuries – organize the protection of the family in the event of the death of the employee.
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:595: periodic surveys such as cathodic protection checks, ground or aerial surveillance or in line
EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:606: and crop protection, print inks as well as tires and vaccines.
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:26:Climate Leadership and Community Protection Act that the 20-year time period be used.16
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:30: ENVIRONMENTAL PROTECTION AGENCY, Oil and Natural Gas Sector: Emission Standards for New, Reconstructed, and
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:40:Protection Agency (EPA) GHG inventory estimates.41 Similarly, a assigned or allocated to single products.47,48 Sometimes,
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:190:GMEP Global Marine Environment Protection
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:228: The Global Marine Environment Protection (GMEP) Initiative is a best practices-sharing
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:239:environmental protection.
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:249: opinion-giving and advisory body of the General Director for Environmental Protection. The main task of the
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:250: Committees, which act as advisory bodies for regional directors for environmental protection. The EIA
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:252:Development), and Italy (Instituto Superiore per la Protezione e Ricerca Ambientale; Superior Institute for Environmental Protection and
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:260: protection of the environment and of human health.
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:262:decision-making process, and that a high level of environmental protection can be guaranteed once the
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:265:'The Croatian Environmental Protection Act (Zakon o zaštiti okoliša) ('O.G.' No 80/13, 153/13 and 78/15) regulates
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:296:ensuring a maximum level of environmental protection through comprehensive environmental
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:299:The WFD establishes a framework for the protection of inland surface waters, transitional waters,
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:300:ecosystem and integrated approach whereby environmental protection and sustainable use go hand in
EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: Global Marine Environment Protection, Initiative
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:3:Environmental Protection Act 1990, as amended
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:3: Protection Act appears to the Local Authority in whose area it is
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:3: Resources Act 1991 statutory protection for controlled waters (i.e.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:4: the wording of the Environmental Protection
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:6: and Cleveland Coast Special Protection Area and Ramsar
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:7:State Protection Zones SPZs, Drinking Water Protected
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:11: Protection. groundwater as a
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:13: designated site. Special Protection Area (SPA),
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:13: Protection Zones (SPZ) 1.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:20:Teesside and Cleveland Coast Special Protection Area (SPA) (as Teesmouth And Cleveland Coast
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:24: Source Protection Zones (SPZ 1 to 3) which are likely to be affected by
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:25:Source Protection None (Magic Defra)
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:25:Source Protection None (Magic Defra)
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:26:Source Protection None (Magic Defra)
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:26:Source Protection None (Magic Defra)
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:26:Source Protection None (Magic Defra)
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:31: and Tidal Flat Deposits Water Connection Corridor designations of Special Protection Area
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:32:Contamination Sherwood Sandstone CO2 Export Pipeline Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:33:Contamination Penarth Group - Water Connection Corridor Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:33:Contamination Redcar Mudstone CO2 Export Pipeline Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:33:Contamination Blown Sand and Beach Water Connection Corridor Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:33:Contamination Undifferentiated Connection Corridors Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:34:Contamination Glaciolacustrine Protection Zone.
EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:40: reseeded or otherwise covered as soon as possible. Erosion protection
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:41: protection of the marine environment of the Northeast Atlantic
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:61:arrangement is to obtain the highest possible total value for (a) Pennsylvania Department of Environmental Protection’s
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:61:between the Norwegian State and Equinor. Department of Environmental Protection. In addition, some state
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:63:protect certain species, including the Migratory Bird Treaty Act, of the country’s energy resources, including the protection of the
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:63:the Bald and Golden Eagle Protection Act and the Marine environment. In addition to the Petroleum Law, Equinor is also
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:63:Mammal Protection Act of 1972. Other statutes govern natural subject to many other laws and regulations issued by different
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:103:provide adequate protection from losses. Nigerian regulations regarding eligible expatriation of
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:103: for the protection of the environment and human health and
EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:340:disclosed), 10 (climate change mitigation) and 11 (climate • Protection of water EN010103-Advice-00010-1-FINAL_210621 - Net Zero Teeside Meeting Note.pdf:4: the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar EN010103-Advice-00010-1-FINAL_210621 - Net Zero Teeside Meeting Note.pdf:23: Cleveland Coast Special Protection Area (SPA) and HRA Report which include all those referred to by EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:6: 2011 Natural England undertook reviews on the status and extent of protection of EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:6: Cleveland Coast potential Special Protection Area (pSPA) and proposed Ramsar Site EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:6: Teesmouth and Cleveland Coast Special Protection Area (SPA) site and Ramsar EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:3: SPA Special Protection Area EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:4:6.0 The Teesmouth and Cleveland Coast Special Protection Area and Ramsar ………….. 15 EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:7: Special Protection Area (SPA) and Ramsar site and the approach to the nutrient EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:18:6.0 THE TEESMOUTH AND CLEVELAND COAST SPECIAL PROTECTION AREA EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:18: seabird protection within the SPA network. EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:35:and how this may impact the Teesside and Cleveland Coast Special Protection Area/Ramsar site, EN010103-002008-Anglo American - Responses to the ExA’s ExQ2.pdf:6: protection in the York Potash Order has been deleted on the basis EN010103-002008-Anglo American - Responses to the ExA’s ExQ2.pdf:6: Woodsmith Project since it needs no such protection from Anglo EN010103-002008-Anglo American - Responses to the ExA’s ExQ2.pdf:7: “The reciprocal protections above were intended to manage the EN010103-002008-Anglo American - Responses to the ExA’s ExQ2.pdf:7: protections provided an effective safeguard that ensured each EN010103-001465-NZT DCO 3.2 - Statement of Reasons (Tracked) - Apr 2022.pdf:94: - Protection of Existing Assets EN010103-001465-NZT DCO 3.2 - Statement of Reasons (Tracked) - Apr 2022.pdf:95: 38, 40, 42, 44, 45, - Protection of their proposed natural gas EN010103-001367-NZTDCO 6.3.21 Rev 2 ES Addendum Vol II Figure 8-9 Nutrient Nitrogen Deposition.pdf:1: Special Protection Area EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:3: SPA Special Protection Areas EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:23:6.2.34 As a further protection, Requirement 31 of Schedule 2 of the DCO prohibits any of EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:24: speculative whether such protection will be given. Whilst it is correct that those EN010103-001587-NZT DCO 8.5 - Environment Agency SoCG - May 2022.pdf:20: protection of controlled waters. EN010103-002639-NZT DCO 8.18 - CATS SoCG - Final (signed) - Nov 2022 (D13).pdf:11: ensure that the DCO includes appropriate protection for existing Infrastructure. EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:28: place in respect of the protection of apparatus and rights of EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:33: required protection of its easements, and that the Wilton Provisions EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:34: including compulsory acquisition and the protection of the Wilton EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:43: with the applicant over the protection of their interests and these EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 1 — Protection for electricity, gas, water and sewerage undertakers EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 2 — Protection of Network Rail Infrastructure Limited EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 3 — For the protection of operators of electronic communications EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 4 — Protection of offshore cables and pipelines EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 5 — For the protection of the Environment Agency EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:48: PART 6 — For the protection of owners and operators at Wilton EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:50:protection measures including cable protection; EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:50:“cable protection” means the measures to protect cables from physical damage and exposure EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:50:due to loss of seabed sediment. The range of remedial cable protection parameters and EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:51:protection systems including masts, control buildings, communications masts, back-up EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:54: “scour protection” means measures to prevent loss of seabed sediment around foundation EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:54: access and rest platforms, access ladders, boat access systems, corrosion protection systems, EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:55: For the protection of owners and operators at Wilton EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:59: otherwise for the temporary or permanent protection of the apparatus, or for securing access to EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:59: potential lack of suitable temporary or permanent protection of the owner’s or operator’s EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:59: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:59: to deal with any deficiency in the expected level of protection afforded by those EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:66: HPA Health Protection Agency EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:67: RSPB Royal Society for the Protection of Birds EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:67: SPA Special Protection Area EN010103-001234-NZT - Regulation 32 Transboundary Screening (2).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:51: vegetation protection. EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:56: (defined in section 34 of the Environmental Protection Act 1990 (Ref 4.1) and EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:57: Environmental Protection Act 1990 (Ref 4.1) and The Waste (England and EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:70:Ref 4.1 The Stationary Office, Environmental Protection Act 1990, 1990 EN010103-001234-NZT - Regulation 32 Transboundary Screening (7).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:3: subject to international Special Protection Area (SPA) and Ramsar site EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:53: reporting, protection, and management of unexpected terrestrial EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:59:vegetation protection. EN010103-001334-NZTDCO 6.3.12 Rev 2 ES Addendum Vol II Figure 7-1 Local Plan Areas.pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-001334-NZTDCO 6.3.12 Rev 2 ES Addendum Vol II Figure 7-1 Local Plan Areas.pdf:1: N 4 Special Protection Areas (SPA) EN010103-002477-NZT DCO 6.3.56 - ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening) Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf:1: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf:7: (a) the inspection, removal and relaying or replacing, alteration or protection EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf:7: of protection afforded by those requirements; EN010103-001202-NZT DCO 6.3.54 - ES Vol II Figure 11-3 CO2 Gathering Network Construction - Oct 2021 Rev.2.0.pdf:1: Special Protection Area EN010103-001394-NZTDCO 6.3.57 Rev 3 ES Addendum Vol II Figure 11-5 PCC Site Operational Noise Levels.pdf:1: Special Protection Area EN010103-001903-NZT DCO 8.18 - CATS SoCG (Tracked) July 2022 (D4).pdf:11: ensure that the DCO includes appropriate protection for existing Infrastructure. EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:8: Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:9:Source Protection Zones EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:12:Special Protection Areas EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:16: Radon Potential - Radon Protection Measures EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:16: Protection Measure: No radon protective measures are necessary in the construction of new E1NW 0 1 459210 EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:18: Designation Details: Special Protection Area EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:19:Source Protection Zones EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:21:Radon Potential - Radon Protection Measures EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:22:Special Protection Areas EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:23: Scottish Environment Protection Agency EN010103-000959-NZT DCO 6.3.54 ES Vol II Figure 11-3 CO2 Gathering Network Construction.pdf:1: Special Protection Area EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:3: draft protective provisions Protection Agreement and EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:3: and Asset Protection private Protective Provisions EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:4: proportionate protection for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:4: An asset protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:5: Exploration 1 – Owner 4, 5c, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:5: Company, LLC and/or (b) 199, 202a, 6, 9b, Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:5: 303, 315, 320, 331, normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:5: 469, 470, 472, 473, adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:7: 2 10, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:7: (b) 122, 123, 125, Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: and/or (b) 367, 374 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: 1 – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:8: and/or 5c, 6, 9 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:9: 145, 147, 152, 156, normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:9: 171, 171b, 172, adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:13: private Protective Provisions adequate protection . EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:13: adequate protection. confirmation that CF Fertiliser EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:13: Petroleum 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: Production (U.K.) 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:14: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:15: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:15: Limited 2 476, 479, 482, 3b, 4, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:15: 540b, 540c 5a, 5b, Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:16: 458a, 459, 467, normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:16: 487, 488, 489, 493, adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:16: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:16: and/or (b) 279, 283, 296 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:16: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: Company Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: Limited 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:17: and/or (b) 374 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:18: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:18: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:19: 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:19: and/or (b) Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:20: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:20: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: Environmental 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: Services Limited and/or (b) Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: Limited 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:21: and/or (b) Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:22: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:22: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:22: Teesside Limited 1 – Owner 6, 9b, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:22: and/or (b) 19, 374 9f, 10 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:22: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: Biofuels Teesside 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: Holding Limited 2 330, 333 6, 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:23: Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: Environmental 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: Limited and/or (b) 279, 296, 348, Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:24: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:25: 1. Inclusion of protection for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:26: protection in the DCO should be EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:26: provide protection for Huntsman as EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:26: agree that protection for other EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:26: consider that the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:26: requires protection. EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:27: require this protection. To the EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:29: the protection of Huntsman in its EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:29: level of protection. EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:29: Polymers Limited 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:29: and/or (b) 124a, 124b, Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:30: 139, 141, 142, normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:30: 166, 169, 171, adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:32: Services (UK) 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:32: Limited and/or (b) 174c Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:32: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:32: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:32: Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:33: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:33: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:33: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:33: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:33: and/or (b) Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:34: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:34: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:34: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:34: and/or (b) 274, 279 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: Chemical UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: Limited and/or (b) 138a Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:35: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:36: the protections included in Part 4 are EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:37: the protections included in Part 4 are EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: Petroleum UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:40: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:41: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:41: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:44: Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:44: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:44: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:44: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:44: Networks Limited 1 – Owner 6, 9b, Protection Agreement and private contact with Northern Gas responded to comments EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:45: Protection Agreement prior to EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:45: Processing 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:45: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:46: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:46: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:48: Category 263, 280, 285, 302, provisions also provide protection for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:49: Limited 1 – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part 2, Openreach Limited however EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:49: and/or 369, 375, 391, 392, 6, 7, 8, Schedule 12) for the protection of no response has been EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:50: Limited 2 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:50: (b) 223 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: Limited 2 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:51: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:52: Limited 2 6, 9b, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:52: (b) 142a, 158a, 10 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:52: 166b, 167, 168, normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:52: 183, 184, 185, adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:54: the Protection of 1 – Owner 10 adjacent to the existing pipeline EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:55: UK Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:55: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:55: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:56: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:57: 1. Inclusion of protection for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:57: protection in the DCO should be EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:57: the protection proposed is EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:58: the Order limits requires protection. EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:60: the protection of Sabic in its draft EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:60: protection. EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:62: Transportation 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:62: Limited and/or (b) 190a, 199 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:62: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:62: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:64: Energy Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:64: and/or (b) Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:65: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:65: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:72: REP8-057 appropriate protection. With respect EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:81: 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:81: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:81: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:81: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: Specialties UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: Limited and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: Energy Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:82: and/or (b) - Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: adequate protection is in place for EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: Limited 1 – Owner 330, 333 5c, 6, protection in the draft DCO (Part 1, EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: and/or 10 Schedule 12) for the protection of EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: normally caught by the protection EN010103-002741-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - March 2023.pdf:83: adequate protection is in place for EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:4:Source Protection Zones EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:10:Source Protection Zones EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:12:Radon Potential - Radon Protection Measures n/a EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:13:Special Protection Areas EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:37: Authority: Scottish Environment Protection Agency, Head Office EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:72: Radon Potential - Radon Protection Measures EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:72: Protection Measure: No radon protective measures are necessary in the construction of new D10SE 0 1 457795 EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:103: Designation Details: Special Protection Area EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:104:Scottish Environment Protection Agency - Head Office January 1998 Not Applicable EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:104:Source Protection Zones EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:106:Radon Potential - Radon Protection Measures EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:107:Special Protection Areas EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:108: Scottish Environment Protection Agency EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:109: 4 Scottish Environment Protection Agency - Head Office Telephone: EN010103-Advice-00001-2-TNZT - 200318 - Meeting note 18 March 2020.pdf:2:The pipelines for the Project cross the Teesmouth and Cleveland Coast Special Protection EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:4: protection under Schedule 5 of the Wildlife and Countryside Act 1981 (as EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:4: when taken together, results in a level of protection that prohibits the EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:4: purposes of breeding, sheltering or protection. EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf:9: STDC note that the protective provisions for the protection of PD Teesport Limited EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf:13: development taking place at the site, STDC will need to be satisfied that sufficient protections EN010103-001380-NZTDCO 6.3.40 Rev 2 ES Addendum Vol II Figure 10-14 Sensitive Land Use.pdf:1: Special Protection Area EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:8: or flood protection. The ecological potential represents the degree to which the EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:15: Areas of Conservation (SAC) and Special Protection Areas (SPA), and water EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:17: level of protection as the existing EU legislation (Article 4.9). EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:21: footprint of the outfall head and associated scour protection is assumed to EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:40: Protection Area (SPA) which is designated under the EU Birds Directive, and EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:42: Source Protection Zones (SPZ 1 to 3) which are likely to be affected by EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:42: Water Safeguard Zone or near any Source Protection Zones. EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:54: • Special protection areas (SPA); EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:54:protected area Cleveland Coast Special Protection Area EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:55: protection to be placed around the outfall head. EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:60: • Special protection areas (SPA); EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:60:WFD protected Protection Area SPA and a Eutrophic Coastal EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:64: and will describe the principles for the protection of the water environment EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:67: impermeable surface which provides protection to underground strata EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:69: • The positioning of rock armouring/scour protection around the outfall EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:71: installation of rock armour / scour protection. A jack-up-barge or similar would EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:72: • The installation of rock armouring / scour protection around the outfall EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:72: Annex I habitat and are also afforded national conservation protection. Soft EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:72: armouring / scour protection would result in a direct localised but permanent EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:73:9.7.48 The exact volume of rock armouring required for protection of the outfall is EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:75: of seabed beneath the outfall head itself and adjacent scour protection and EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:89: sediments that are easy to erode. Appropriate scour protection would be EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:89: and associated scour protection would be 100 m2, which is small at the scale EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:129: Teesmouth and Cleveland Coast Special Protection Area (SPA). The SPA EN010103-001387-NZTDCO 6.3.54 Rev 3 ES Addendum Vol II Figure 11-3 CO2 Gathering Network Construction.pdf:1: Special Protection Area EN010103-001387-NZTDCO 6.3.54 Rev 3 ES Addendum Vol II Figure 11-3 CO2 Gathering Network Construction.pdf:2: Special Protection Area EN010103-001387-NZTDCO 6.3.54 Rev 3 ES Addendum Vol II Figure 11-3 CO2 Gathering Network Construction.pdf:3: Special Protection Area EN010103-002106-NZT DCO 6.3.55 - ES Vol II Figure 11-4a CO2 Export Pipeline Construction August 2022 (D6).pdf:1: Special Protection Area EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:5: area designated for protection under the Wildlife EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:43: Protection consultation report complies with the be used to identify anyone (such as EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:43: Data Protection Act 1998 and names and contact information, EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:110: The protection of/impacts on existing utility assets/apparatus, pipelines and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:136: Wildlife Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:137: Wildlife Protection Extremely keen to support environmental plans to EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:156: protection management and enhancement’ of the draft DCO and Biodiversity Plan EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:156: protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:156: and Cleveland Coast Special Protection Area (SPA)/Ramsar EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:156: Protection Plan (Requirement 4) and a Construction EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:156: implementation of the mitigation measures in the CEMP. protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:161: protection, whilst also increasing fossil fuel EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:165: the biodiversity protection, mitigation and Assessment EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:165: protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:166: protection. misunderstandings related to alternative licence’ (Draft DCO, EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:167: NYM SAC/SPA which lies at around 7km from which sets out the biodiversity protection, Indicative Landscape EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:168: appropriate) produced. protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:176: protection for retained apparatus, including NGET/NGG land of the extinguishment of rights EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:176: appropriate protection and further discussion EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:181: • Natural England notes and welcomes the significant effect on the integrity of the Site of protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:182: biodiversity protection, mitigation and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:183: Provide detailed comments on the PEI Report, As confirmed in the response to STDC, after the protection and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:184: the Proposed Development as set out in the PEI anticipated. Appropriate tree protection measures EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:184: Woodland Creation and from aerial measures for protection and enhancement with with the DCO EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:188: protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:193: • A DEFRA Biodiversity Metric 2.0 assessment which sets out the biodiversity protection, Strategy (Document EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:194: the Applicants becomes a member of INCA and protection and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:199: Protection Agreement, which will be progressed by EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:205: Require all rights of access and protection of in respect of the interface with Northern Works Plans EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:210: the Wilton Site and its corridors. pipelines with anodic and/or cathodic protection or EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:210: spacing and protection, including proper EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:210: and equipment. Appropriate protection systems or EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:218: and require appropriate protection of its megawatt Seal Sands Power Station. RWE has EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:220: diversion, relocation or protection measures EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:256: with the requirements of the General Data Protection Regulation. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:327: reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:380: will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:420: 2 Consultation by the stated date for receipt requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:437: requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:494:Protection of Birds Potton Road EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:515:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:521:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:527:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:533:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:539:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:543:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:547:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:587:affect the protection or expansion of forests and woodlands (Planning Act 2008). EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:588:Ancient Woodland Sites (PAWS) should be treated equally in terms of the protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:609:Protection Area (SPA) and Ramsar site during construction and operation and has the potential to EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:617:In respect of existing NGET and NGG Infrastructure, both will require appropriate protection for EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:617:NGET’s & NGG’s apparatus, both will require appropriate protection and further EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:620: • No protective measures including the installation of concrete slab protection shall be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:628:Our policy covering our approach to Data Protection complies with UK law accordingly implemented, including that required by the EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:628:EU General Data Protection Regulation (GDPR 2016), and can be accessed via our Privacy Notice and Legal Notice listed on our EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:635:It is noted that this is a National Infrastructure Project that lies directly adjacent a Special Protection Area and Site of EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:641:Data Protection Regulation and the Data Protection Act 2018. To find out how the Council EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:647: out in the South Tees Area SPD; Principle STDC7 - Natural Environmental Protection and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:664: SABIC's pipes, for example the effect of their apparatus on cathodic protection. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:666: for the protection of operators such as SABIC. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:667: order to develop a suitable set of protections for inclusion in the Application. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:670: cathodic protection or electric trace heating which can be affected by electric EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:670: those existing pipelines and/or their associated protection and/or control EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:670: and/or are protected by easement strips which provide a level of protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:672:Protection Required for Sembcorp EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:704:your obligation under the current data protection legislation to process personal data EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:730:care to comply with the requirements of the General Data Protection Regulation. It EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:742: requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:756:requirements of the General Data Protection Regulation. It is important that you read our EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:760:requirements of the General Data Protection Regulation. It is important that you read our EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:764: General Data Protection Regulation. It is important that you EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:766:will take reasonable care to comply with the requirements of the General Data Protection Regulation. It is important EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:795: General Data Protection Regulations. It is important that you read the Privacy Notice that forms part of EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:799:Site of Special Scientific Interest (‘SSSI’)/Special Protection Area (‘SPA’). EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:803:near to the Project Site including the Special Protection Area/Ramsar site through which the CO2 export EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:804:requirements of the General Data Protection Regulations. It is EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:838:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:846:ENVIRONMENTAL PROTECTION (Centre) EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:847: Applicants in accordance with the Data Protection Act 1998 and the EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:847: General Data Protection Regulation and used solely in connection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:848: record and these will be held securely by the Applicants in accordance with the Data Protection Act 1998 EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:848: and the General Data Protection Regulation and used solely in connection with the consultation process and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:849: record and these will be held securely by the Applicants in accordance with the Data Protection Act 1998 EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:849: and the General Data Protection Regulation and used solely in connection with the consultation process and EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:851: Applicants in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used solely in connection with the consultation process and subsequent DCO application EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:891:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:898:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:916:23a National Grid Gas The Company plantprotection@cadentgas.com 8 EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:921:43 National Grid The Company plantprotection@cadentgas.com 8 EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:987: Protection of Tees EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1027:your obligation under the current data protection legislation to process personal data EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1031:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1035:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1039:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1044:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1048:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1051:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1087:affect the protection or expansion of forests and woodlands (Planning Act 2008). EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1088:Ancient Woodland Sites (PAWS) should be treated equally in terms of the protection EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1108:data protection legislation or for litigation. If you have a Freedom of Information/Environmental Information EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1116:appropriate protection for retained apparatus including compliance with relevant standards for EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1116:NGET’s & NGG’s apparatus, both will require appropriate protection and further EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1119: • No protective measures including the installation of concrete slab protection shall be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1130:Powergrid will require all rights of access and protection of assets to remain uninterrupted and a clear undertaking EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1166:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1179:Data Protection Regulation. It is important that you read our Privacy Notice: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1190:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1194:Protection Regulation. It is important that you read our Privacy Notice which can be found at: EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1211:your obligation under the current data protection legislation to process personal data EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1214:General Data Protection Regulation. It is important that you read our Privacy Notice which can be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1217:General Data Protection Regulation. It is important that you read our Privacy Notice which can be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1220:General Data Protection Regulation. It is important that you read our Privacy Notice which can be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1223:General Data Protection Regulation. It is important that you read our Privacy Notice which can be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1226:General Data Protection Regulation. It is important that you read our Privacy Notice which can be EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1230:will take reasonable care to comply with the requirements of the General Data Protection Regulation. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1233:will take reasonable care to comply with the requirements of the General Data Protection Regulation. EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1236:will take reasonable care to comply with the requirements of the General Data Protection Regulation. EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf:17: must commence until a scheme of protection and mitigation EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf:20: protection of controlled waters. EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:7: requirements for protection of retained vegetation (e.g. during vehicle EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:7: movements and construction/re-instatement works), soil protection and EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:13: the positioning of rock armouring/scour protection around the outfall EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:15: across the Teesmouth and Cleveland Coast Special Protection Area EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:19: corrosion protection preparation and coating (including structural steel EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:19: work supports) and installation of cathodic protection; EN010103-000930-NZT DCO 6.3.21 ES Vol II Figure 8-9 Nutrient Nitrogen Deposition.pdf:1: Special Protection Area EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:20: - Article 41 provides protection for statutory undertakers and others through the EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers, EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:22: include Requirements relating to landscaping landscape and biodiversity protection EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:26: This provides protection for the street authority for the street in question. This is based on EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:28: protection plan for that part has been submitted to and approved by the relevant planning EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:29: landscape and biodiversity protection plan must include details of any tree or hedgerows EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:30: development as restrictive covenants for the protection of the underground elements of the EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:35: sufficient protection against the matters that may constitute “statutory nuisances” under EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:35: section 79(1) of the Environmental Protection Act 1990. EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:42: 3.8.36. Requirement 4 (Landscaping Landscape and biodiversity protection management and EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:42: been modified to make additional provision for biodiversity protection management and EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:42: biodiversity protection plan to the relevant planning authority, following consultation with EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:43: protection for the landscaping landscape and biodiversity elements during construction, EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:45: consultation with Natural England, a scheme of protection and mitigation measures has EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:45: 3.8.57. Requirement 17 (Protection of highway surfaces) - this is not a model provision. It requires EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:51: information on the relevant parties and protections. EN010103-001972-North Tees CAH.pdf:2: unregulated pipe with no basis for control and protection within a heavily regulated corridor. EN010103-002326-NZT DCO 9.40 - Applicants' Response to SWQ CA.2.19 Oct 2022 (D9).pdf:3: SPA Special Protection Areas EN010103-002406-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked).pdf:14: Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar site and Site EN010103-001402-NZTDCO 6.3.53 Rev 3 ES Addendum Vol II Figure 11-2 PCC Site Piling Construction Phase.pdf:1: Special Protection Area EN010103-002286-NZT DCO 8.3 - STDC SoCG (Tracked) - Sept 2022(D8).pdf:34: biodiversity protection management and STDC maintains its position of seeking an EN010103-002286-NZT DCO 8.3 - STDC SoCG (Tracked) - Sept 2022(D8).pdf:40: Amongst other additional protections, STDC EN010103-002286-NZT DCO 8.3 - STDC SoCG (Tracked) - Sept 2022(D8).pdf:49: outfall is dependent on resolving technical STDC requires suitable protection via the draft EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:63: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:65: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:73: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:74: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:75: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:80: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:80: 1 43a Temporary Useover 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:87: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:88: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:92: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:93: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:94: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:104: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:106: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:107: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:110: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf:110: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001711-Environment Agency - Responses to the ExA’s ExQ1.pdf:7: groundwater management, protection and EN010103-001711-Environment Agency - Responses to the ExA’s ExQ1.pdf:7: available at Groundwater protection EN010103-001711-Environment Agency - Responses to the ExA’s ExQ1.pdf:8: ter-protection) EN010103-001373-NZTDCO 6.3.19 Rev 2 ES Addendum Vol II Figure 8-7 Annual Mean NOx Process Contribution.pdf:1: Special Protection Area EN010103-001506-TEXT_Prelim1_NetZeroTeesside_10052022.pdf:2:data protection regulations apply. The planning inspector its practice is to retain and publish recordings EN010103-002105-NZT DCO 6.3.54 - ES Vol II Figure 11-3 CO2 Gathering Network Construction August 2022 (D6).pdf:1: Special Protection Area EN010103-000972-NZT DCO 6.3.48 ES Vol II Figure 10-22 Redcar and Cleveland Local Plan Areas.pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-000972-NZT DCO 6.3.48 ES Vol II Figure 10-22 Redcar and Cleveland Local Plan Areas.pdf:1: N 4 Special Protection Areas (SPA) EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:31: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:59: protection, submitted to the relevant planning EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:5: SPA Special Protection Area EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:19: RCBC and STBC are asked to confirm whether this is an appropriate distance for protection of EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:20: Teesmouth and Cleveland Coast Ramsar, Special Protection Area (SPA) and Site of Special EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:39: basis for control and protection? EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:51: How will this be secured through the DCO to ensure protection of Infrastructure, safety and the EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:76: associated scour protection (of no more than 100m2) used in the assessment of the water EN010103-002249-NZT DCO 9.37 - Justification of Corridor Widths - Sept 2022(D8).pdf:3: SPA Special Protection Areas EN010103-002249-NZT DCO 9.37 - Justification of Corridor Widths - Sept 2022(D8).pdf:20: extent of the apparatus, and in some instances include protection strips either side EN010103-002249-NZT DCO 9.37 - Justification of Corridor Widths - Sept 2022(D8).pdf:20:2.6.2 Protection strips may be required for apparatus to secure physical separation EN010103-002249-NZT DCO 9.37 - Justification of Corridor Widths - Sept 2022(D8).pdf:20: The protection strip will ensure the Applicants can control activity in close proximity EN010103-001680-_DOC_174215057(1)_Written Representation of HUNTSMAN POLYURETHANES (UK) LIMITED.pdf:1:1.4 Subject to the proper protection of their undertakings, HPU do not object in principle to the EN010103-001680-_DOC_174215057(1)_Written Representation of HUNTSMAN POLYURETHANES (UK) LIMITED.pdf:3: If compulsory acquisition powers were used without protection or qualification, HPU would be EN010103-002285-NZT DCO 8.3 - STDC SoCG (Clean) - Sept 2022(D8).pdf:34: biodiversity protection management and STDC maintains its position of seeking an EN010103-002285-NZT DCO 8.3 - STDC SoCG (Clean) - Sept 2022(D8).pdf:40: The Applicants have made substantial updates to Amongst other additional protections, STDC EN010103-002285-NZT DCO 8.3 - STDC SoCG (Clean) - Sept 2022(D8).pdf:47: under Article 8. The Applicants’ use of the existing STDC requires suitable protection via the draft EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:65: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:66: 1 34a Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:74: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:75: 1 39a Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:76: 1 39b Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:81: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:82: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:88: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:89: 2 47a Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:94: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:95: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:96: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:106: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:108: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:109: 2 63a Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:112: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf:112: 2 66a Temporary Use Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:13: Teesmouth and Cleveland Coast Special Protection EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:18: to water environment protection: CIRIA documents and EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:27: required for active fire protection. EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:33: and a land quality monitoring planSite Protection and EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:39: protections afforded and to reinforce the role of the EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:53: as well as the Centre for the Protection of National EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:55: Measures for the protection of workers from potential EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:55: administrative controls, personal protection EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:85: also enable sufficient time to implement protection EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:86: scour protection would need to be installed around the EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:3: SPA Special Protection Area EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:4:5.0 The Teesmouth and Cleveland Coast Special Protection Area and Ramsar ……………. 9 EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:7: Special Protection Area (SPA) and Ramsar site and the approach to the nutrient EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:7: Special Protection Area (SPA) and Ramsar site and the approach to the nutrient EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:20:6.05.0 THE TEESMOUTH AND CLEVELAND COAST SPECIAL PROTECTION AREA EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:20: improve seabird protection within the SPA network. EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:46:and how this may impact the Teesside and Cleveland Coast Special Protection Area/Ramsar site, EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:192:Teesside and Cleveland Coast Special Protection Area/Ramsar site, including parts of Tees Bay and EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:197:Tees Estuary which forms part of the Teesside and Cleveland Coast Special Protection Area and EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:205: protection to sensitive environmental receptors within the Tees Bay and Tees Estuary the 3D EN010103-002651-SABIC Protective Provisions 1.pdf:1: b. The protection of underground assets which are not affected here; and EN010103-002651-SABIC Protective Provisions 1.pdf:1: with the protective provisions and it is therefore they who most need their protection. EN010103-002651-SABIC Protective Provisions 1.pdf:4: FOR THE PROTECTION OF SABIC EN010103-002651-SABIC Protective Provisions 1.pdf:6: assessment of the protection of underground assets and which study must provide for EN010103-002651-SABIC Protective Provisions 1.pdf:6: assessment of the protection of underground assets and which study must provide for EN010103-002651-SABIC Protective Provisions 1.pdf:13:Further protection in relation to the exercise of powers under the Order EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: Schedule 12 (Part 4) For the protection of Air Deletion of paragraphs within protective provisions for the benefit of Air Products Plc which were a EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: Schedule 12 (Part 5) For the protection of Various provisions have been amended, to reflect the positions agreed between the undertaker and EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: Schedule 12 (Part 7) For the protection of Various provisions have been amended, to reflect the negotiations between the undertaker and EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: cathodic protection and to provide for the payment of Exolum’s reasonable expenses in relation to EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: Schedule 12 (Part 16) For the protection of The protective provisions have been updated to take into account the negotiations between the parties EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:6: of the apparatus and operations which are now encompassed. The protections in relation to works EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:7: Schedule 12 (Part 19) For the protection of The protective provisions have been substantially updated to incorporate a process to govern whether EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:8: Schedule 12 (Part 20) For the protection of the It has been agreed that the protective provisions are amended so that they are for the benefit of the EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:8: Schedule 12 (Part 25) For the protection of New protective provisions have been inserted for the benefit of Northumbrian Water, rather than it EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:9: Schedule 12 (Part 26) For the protection of New protective provisions have been inserted for the benefit of Northern Gas Networks Limited, rather EN010103-001889-NZT DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4).pdf:9: Schedule 12 (Part 27) For the protection of New protective provisions have been inserted for the benefit of the North Tees Group. These ensure EN010103-001399-NZTDCO 6.3.62 Rev 3 ES Addendum Vol II Figure 15-3 Statutory Designated Sites.pdf:1: Special Protection Area EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:20: operation, maintenance, and protection of the apparatus. EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:30: protection of PD Teesport Limited define “the PD Teesport EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:34: regeneration of Teesworks, and contrary to the Local Plan. Whilst sufficient protection in order to allow the Secretary of State EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:36: site, STDC will need to be satisfied that sufficient protections are in EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:3: The Regulations provide for the designation and protection of 'European sites', the EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:3: protection of 'European protected species', and the adaptation of planning and other EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:3: controls for the protection of European Sites. EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:5:Wildlife and Countryside Act 1981 Part 1 of the WCA affords general protection to all species of wild bird, and specific ✓ ✓ ✓ ✓ EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:5:(as amended) (WCA) protection to flora and fauna listed in Schedules 1 (birds protected by special penalties), 5 EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:5: • damage, destroy or obstruct places used for shelter or protection by wild animals EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:5: WCA, that are occupying places of shelter and protection (e.g. bats and great crested EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:6: including provisions to change SSSIs and providing increased powers for their protection EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:6: protection for threatened species. The provisions make certain offences 'arrestable', EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:7:Protection of Badgers Act 1992 Makes it an offence to kill or take a badger, to cruelly ill-treat a badger, or to interfere with ✓ - - - EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:7:Wild Mammals (Protection) Act This Act provides provisions to protect any mammals not protected by the Animal Welfare ✓ - - - EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:7:Environmental Protection Act 1990 Section 33 The Environmental Protection Act, 1990 (EPA 1990) contains a number of legal ✓ ✓ ✓ - EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:8: Protection Act 1990 (Duty of Care) Regulations 1991 (as amended). EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:12: ensure healthy, functioning marine ecosystems and protection of marine habitats and species. Applications EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:14: Policy N4: Biodiversity Sets out policy support for protection and enhancement of biodiversity and ecological features as a result of EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:14: Conservation process, with appropriate protection and enhancement measures incorporated into the design of EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:14: Cleveland Coast Special Protection Area (SPA), and nationally designated sites, habitats and species. The EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:14: policy also sets out protection of ecological features of particular value as wildlife corridors such as river EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:15:Redcar and Cleveland South Development Principle Sets out expectations for natural environment protection and enhancement, including the requirement to EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:15: 1. The Council will preserve, restore and re-create priority habitats alongside the protection and recovery EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:18: Protection Area and Ramsar) and other existing resources alongside the provision of new resources. EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:18: restoration and re-creation of priority habitats, ecological networks and the protection and recovery of EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:22: Environmental Protection Act 1990 (SI 1990 c. 43) Online. Available from: EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:22: https://www.gov.uk/guidance/ancient-woodland-and-veteran-trees-protection- EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:22: Protection of Badgers Act 1992 (SI 1992 c. 51) Online. Available from: EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:23: Wild Mammals (Protection) Act 1996 (SI 1996 c. 3) Online. Available from: EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf:7: such protection. While there still remain a number of key protections which EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf:13: between the Parties but also contain the outstanding key protections which NSMP EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf:13:4.8.1.1. Protections to benefit NSMP Group: NSMP require the indemnity to be provided to EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf:13: have agreed is a fundamental protection required by NSMP. In addition the EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:6: 191a, 202c, 218, 232a, a draft Asset Protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:7: Exploration 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:7: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:7: 137, 142, 142b, 143, caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:7: 171, 176, 176b, 185, adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:9: Plc 2 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:9: 138a, 141a protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:10: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:10: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:11: 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:11: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:11: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:11: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:12: 1 – Owner 450, 112 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:12: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:12: 185, 190, 191, 191a, caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:12: 31, 315, 316, 319, 320, adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:18: Petroleum 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:18: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: Production 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:19: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: 502, 504, 505, 510, caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:22: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:23: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:23: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:23: Company 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:23: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:24: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:24: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:24: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:24: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:24: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:25: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:27: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:27: Occupier 161, 163 protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:27: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:27: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:28: Environmental 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:28: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:29: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:29: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:29: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:29: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:29: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:30: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:32: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:32: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:33: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:33: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:33: Biofuels 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:33: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:34: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:34: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:34: Holding Limited 2 333 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:34: (b) - protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:35: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:35: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:35: Environmental 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:35: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:35: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:36: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:36: Polymers 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:36: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:37: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:37: 281, 284, 285, 286, 3, adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:39: provide protection for One- EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:40: Services (UK) 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:40: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:40: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:40: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:44: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:44: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:44: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:45: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:46: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:46: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:46: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:46: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:51: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:51: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:51: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:51: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:52: Chemical UK 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:52: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:52: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:52: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:56: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:56: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:56: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:57: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:57: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:57: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:57: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:57: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:58: Plc 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:58: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:59: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:59: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:59: Networks 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:59: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:59: 147, 148, 151, 152, protection is in place for the EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:60: Processing 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:60: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:60: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:60: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:64: provide protection for One- EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:67: Limited 2 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:67: protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:68: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:68: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:71: Limited 2 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:71: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:71: 191b, 192, 194, 91, 92, caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:71: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:73: the Protection of 1 – Owner land adjacent to the existing EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:73: UK Plc 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:73: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:74: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:74: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:78: Transportation 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:78: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:78: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:78: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:80: Energy Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:80: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:81: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:81: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:89: Liquids 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:90: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:90: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:90: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:93: Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:93: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:93: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:93: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:94: Specialties UK 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:94: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:95: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:95: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:95: Energy Limited 1 – Owner protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:95: Occupier protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:96: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:96: adequate protection is in EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:96: Limited 1 – Owner 333 protection in the draft DCO EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:96: Occupier (b) - protection of electricity, gas, EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:97: caught by the protection EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf:97: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:6: 252, 253, 253a, 278, a draft Asset Protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:6: Exploration 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:6: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:7: 137, 142, 142b, 143, caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:7: 171, 176, 176b, 185, adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:9: Plc 2 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:9: 138a, 141a protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:9: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:9: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:10: 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:10: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:11: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:11: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:11: 1 – Owner 450, 112 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:11: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:12: 185, 190, 191, 191a, caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:12: 31, 315, 316, 319, 320, adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:17: Petroleum 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:17: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:18: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:18: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:18: Production 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:18: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:19: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:19: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:21: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:21: protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:21: 502, 504, 505, 510, caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:21: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: Company 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:22: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:23: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:23: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:23: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:23: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:23: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:24: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:25: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:25: Occupier 161, 163 protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:26: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:26: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:27: Environmental 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:27: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:27: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:27: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:28: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:28: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:28: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:28: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:31: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:31: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:31: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:32: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:32: Biofuels 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:32: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:32: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:32: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: Holding Limited 2 333 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: (b) - protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: Environmental 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:33: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:34: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:34: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:35: Polymers 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:35: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:35: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:35: 281, 284, 285, 286, 3, adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:37: provide protection for One- EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:37: Services (UK) 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:37: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:38: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:38: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:41: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:42: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:42: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:42: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:43: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:43: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:44: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:44: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:48: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:48: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: Chemical UK 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:49: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:53: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:53: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:53: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:54: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:54: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:54: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:54: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:54: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:55: Plc 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:55: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: Networks 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: 147, 148, 151, 152, protection is in place for the EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: Processing 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:56: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:57: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:57: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:60: provide protection for One- EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:63: Limited 2 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:63: protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:64: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:64: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:66: Limited 2 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:66: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:67: 191b, 192, 194, 91, 92, caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:67: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:68: the Protection of 1 – Owner land adjacent to the existing EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:69: UK Plc 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:69: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:69: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:69: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:73: Transportation 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:73: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:74: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:74: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:75: Energy Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:75: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:76: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:76: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:84: Liquids 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:84: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:84: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:84: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:87: Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:87: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:87: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:88: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:88: Specialties UK 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:88: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:89: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:89: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:89: Energy Limited 1 – Owner protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:89: Occupier protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:90: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:90: adequate protection is in EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:90: Limited 1 – Owner 333 protection in the draft DCO EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:90: Occupier (b) - protection of electricity, gas, EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:91: caught by the protection EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf:91: adequate protection is in EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:4:SPA Special Protection Area EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:16: Sembcorp 24 inch gas pipeline protection EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:16: metre protection strip as Sembcorp whilst EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:16: protection strip within the Sembcorp EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:22:DCO.2.2 Applicants R3(7) refers to the approximate number and location Cathodic protection, in essence, utilises an EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:22: of cathodic protection posts and marker posts forming electric field in order to address the risk of buried EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:23: (UK) Ltd another pipeline with cathodic protection then the EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:23: cathodic protection equipment change then an EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:12:promote the preservation, restoration and re-creation of priority habitats, ecological networks and the protection EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:38:UK Legal Protection EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:38:Approximately 50 species of invertebrate species in Britain receive legal protection through Schedule 5 of the EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:38:Wildlife and Countryside Act 1981 (as amended). About half receive limited protection; for example it is illegal EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:4:41. Protection of interests EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 22 — FOR THE PROTECTION OF HUNTSMAN EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 23 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 24 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:6: PART 26 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:34:Protection of interests EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:42: (ii) cathodic protection posts; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:44: (vi) works for the protection of buildings and land; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:46: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:46: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:47:Landscaping and biodiversity protection management and enhancement EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:47:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:51: Environmental Protection Act 1990(a); EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:51: Environmental Protection Act 1990; and EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:52:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:53:Protection of highway surfaces EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:54: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:54: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:60: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:60: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:61:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:62:specified works or the alteration or protection of any apparatus. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:85: (vii) the deposit of rock armour protection; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:95: (iv) the deposit of rock armour protection; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:95: (vii) the deposit of rock armour protection; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:104: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:104: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:106:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:107:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:108: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:108: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:110: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:110: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:111:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:111:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:113:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:113:Retained apparatus: protection of electricity undertaker EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:114:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:114:Retained apparatus: protection of gas undertaker EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:115:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:116:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:118:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:118:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:119: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:119: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:120:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:121:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:122: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:122: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:124: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:125:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:125: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:125: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:128:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:129:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:131: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:131: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:133:Cathodic protection testing EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:133: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:133: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:133:measures for providing or preserving cathodic protection. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:133: (i) the execution of any works under this Order including for the protection of the EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:134: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:134: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:136: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:136: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:138: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:144: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:144: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:146:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:147: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:149: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:149: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:150: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:150: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:153: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:153: 157. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:155: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:155: 170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:157: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:157: 178. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:159: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:160: with any deficiency in the expected level of protection afforded by those requirements; EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:162: FOR THE PROTECTION OF YORK POTASH EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:162: 196. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:163:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:164:the alteration or protection of any apparatus. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:165: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:165: 215. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:167: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:167: 225. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:174: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:174: 256. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:176: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:176: 264. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:178: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:178: 272. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:180: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:180: 279. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:181: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:181: 287. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:182: “the standard protection strips” means strips of land falling within the following distances to EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:182: 289. The undertaker must not within the standard protection strips interfere with or build over EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:182:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:182:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:183:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:183: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:183: 297. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:184:(retained apparatus: protection), 305 (expenses) and 306 (indemnity), this Schedule does not apply EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:186:Retained apparatus: protection EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:187:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:189:Cathodic protection testing EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:189: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:189: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:189:cathodic protection. EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:190: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:190: 313. For the protection of the NT Group (as defined below), the following provisions have EN010103-001486-NZT-ASI-itinerary.pdf:2: • Safety glasses/light eyewear protection EN010103-001486-NZT-ASI-itinerary.pdf:3:10:30 Drive to Royal Society for the Protection of Birds (RSPB) Salthome for comfort break EN010103-001598-NZT DCO 8.17 - Air Products SoCG - May 2022.pdf:7: appropriate protection to Air Products Plc’s apparatus and operations. EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf:16: must commence until a scheme of protection and mitigation EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf:19: protection of controlled waters. EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:4: protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:4: Occupier 158a, 166a, 171a, protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:4: 469, 470, 472, 473, by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:5: 142, 142b, 143, 144, considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:8: 10, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:8: 135, 138a, 141a protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:9: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:9: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:9: – Owner 6, 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:9: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:9: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:10: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:10: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:10: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:10: 169, 171, 171b, 172, by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:10: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:15: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:16: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:16: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: 5c, 6, 8, protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: 459, 467, 469, 470, by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: 489, 493, 495, 496, considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:17: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:18: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:18: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:18: Company Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:18: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:19: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:20: – Owner 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:20: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:21: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:21: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:22: Environmental – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:22: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:22: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:22: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:22: Limited – Owner 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:23: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:23: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:23: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:23: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:23: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:24: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: (b) - protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: Environmental – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:25: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:26: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:26: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:27: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:27: Occupier 138a, 141a, 142a, protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:27: 165, 166, 169, 171, by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:27: 185, 185b, 190, 190b, considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:30: provide protection for One-Dyas EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:30: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:30: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:30: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: Plc – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:31: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:32: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:32: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: Chemical UK – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:33: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:34: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:34: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:38: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:38: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:38: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:38: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:39: Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:39: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:39: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:39: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:40: Plc – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:40: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:41: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:41: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:41:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants are EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:41: provisions and asset protection which the EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:42: Processing Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:42: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:42: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:42: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:46: 533, 416, 431, 508, protection for One-Dyas UK as EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:46: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part written are writing EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:46: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of Limited and an EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: Limited protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: Limited protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:48: protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:49: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:49: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:49: Limited 6, 9b, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:49: 171a, 176a, 183a, protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:50: 184, 185, 185b, 186, by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:50: 191b, 191d, 192, 194, considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:52: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:53: UK Plc – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:53: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:53: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:53: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:56: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:56: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:56: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:56: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:58: Energy Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:58: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:58: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:58: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:75: – Owner 6, 10 protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:75: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:75: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:75: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: Specialties UK – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: Energy Limited – Owner protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:76: Occupier protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:77: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:77: considered adequate protection EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:77: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:77: Occupier (b) - protection of electricity, gas, EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:78: by the protection offered by EN010103-002244-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Sept 2022(D8).pdf:78: considered adequate protection EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:4: objectives, including the protection and enhancement of the natural EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:5: Local Plan adopted May 2018. These require the protection and EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:5: protection and enhancement of biodiversity, including maximising EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:5: out expectations for natural environment protection and enhancement, EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:6:15.2.11 Eaton et al. (2015), summarised by the Royal Society for the Protection of EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:6: of low conservation priority. These species still receive full protection through EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:8: protection during construction are included in the Framework Construction EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:13:British Trust for Ornithology, the Royal Society for the Protection of Birds and the Joint Nature Conservation Committee (the EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:18: the Protection of Birds (RSPB) in March 2020 with a follow up meeting in EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:19:Saltholme Royal Society for the Protection of Birds EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:23: • Are afforded elevated levels of protection under the WCA (Schedule 1 EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:59: environmental protection legislation during both construction and operation EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:61: environmental protection legislation during both construction and operation EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:61: protection and legal compliance. Appendix 5A: Framework CEMP (ES EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:65: permanent rock armour/scour protection on the seabed (for either EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:100: Coast potential Special Protection Area (pSPA) and Ramsar. March 2018 EN010103-001514-TEXT_ISH2_Session1_NetZeroTeeside_11052022.pdf:7:cable protection communication, sorry, telecommunication equipment. That is the specifics for this EN010103-001514-TEXT_ISH2_Session1_NetZeroTeeside_11052022.pdf:9:and we're looking for potentially for greater protection through protected provisions which we can come EN010103-001583-NZT DCO 8.1 - RCBC SoCG - May 2022.pdf:14: Protection Area 6km Buffer Zone/Ramsar Site & EN010103-001583-NZT DCO 8.1 - RCBC SoCG - May 2022.pdf:15: STDC7 – Natural Environmental Protection and EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:3: 278, 281, 286, 303, protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:4: Occupier 160, 161, 163, 164, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:4: 320, 331, 345, 347, by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:4: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:5: 10, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:5: 135, 138a, 141a protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:6: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:6: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:6: – Owner 6, 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:6: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:6: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:7: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:7: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:7: Occupier (b) 12a, 134, 142a, 10 protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:7: 152, 156, 157, 158, by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:7: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:12: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:13: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:13: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:13: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:13: 5c, 6, 8, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:14: 459, 467, 469, 470, by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:14: 489, 493, 495, 496, considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:14: Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:14: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: Company Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:15: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:16: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:16: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:16: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:16: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:17: – Owner 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:17: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:17: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:17: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:18: Environmental – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:18: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:19: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:19: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:19: Limited – Owner 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:19: Occupier 159, 160, 161, 163 protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:19: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: Occupier 154, 159, 160, 161, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:20: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:21: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:21: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:21: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:21: (b) - protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: Environmental – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:22: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:23: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:23: Occupier 124e, 12a, 138a, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:23: 165, 166, 169, 171, by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:23: 185, 190, 191, 191a, considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:25: provide protection for One-Dyas EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: Plc – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:26: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:27: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:27: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:27: Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:27: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:27: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:28: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:28: Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:28: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: Chemical UK – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:29: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: Petroleum UK – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:33: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:34: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:34: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:35: Plc – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:35: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:35: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:35: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:36:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:36: 144, 147, 148, 151, provisions and asset protection agreement during EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:36: Processing Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:36: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:37: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:37: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:40: 510, 533, 416, 431, protection for One-Dyas UK as EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:41: Limited protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:41: protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:41: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:41: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: Limited protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: Limited 6, 9b, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:42: 140, 142a, 154, 158a, protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:43: 168, 170, 171, 171b, by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:43: 188, 189, 190, 191, considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:45: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:45: UK Plc – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:46: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:46: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:46: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:48: Transportation – Owner 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:48: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:49: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:49: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:51: Energy Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:51: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:51: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:51: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:67: – Owner 6, 10 protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:67: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:67: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:67: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: Specialties UK – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: Energy Limited – Owner protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:68: Occupier protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:69: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:69: considered adequate protection EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:69: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:69: Occupier (b) - protection of electricity, gas, EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:70: by the protection offered by EN010103-001989-NZT DCO 9.5 - Compulsory Acquisition Schedule August 2022(D5).pdf:70: considered adequate protection EN010103-001205-NZT DCO 6.3.57 - ES Vol II Figure 11-5 PCC Site Operation Noise Levels - Oct 2021 Rev.2.0.pdf:1: Special Protection Area EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:3: SPA Special Protection Areas EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:10: Environmental Protection Act 1990(1); EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:10: (contaminated land) of the Environmental Protection Act 1990; EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:18: These protections require the Applicants to submit works details for approval prior EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:18: affected parties in the linkline corridor to put appropriate protections in place and EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:23: Applicants, and in addition via the protection provided as a user of Seal Sands Rd EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:23: under Schedule 12, Part 13 of the dDCO REP5-002 (provisions for the protection of EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:44: Protection and Deemed Marine Licences EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:45: protection could be provided by EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:46: Paragraphs 6 to 8 of Part 6 (as set out in Schedule 13) provide protection for DBCB to ensure that DBCB does not find EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:59: England Special Protection Area (SPA) documentation. EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:63: HE.2.2 Historic Protection of military remains - EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:63: places’ under the Protection of EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:69: the protection of the Beverley EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:97: Environment river basin catchment conditions Authority on 16th March 2022 identified that Hornsea Mere Special Protection EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:100: Natural Scenarios in the marine DMLs (REP4-050) in relation to Smithic Bank rock protection will be submitted EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:101: and for cable protection across EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:101: Smithic Bank rock protection.“ EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:101: Bank cable protection MDS and EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:126: consultation. Given the number of vehicular movements that would arise, it is feasible on Birkhill Wood as well as avoiding the tree root protection zones. This distance has EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:147: Wood. This avoids any impact on the root protection area of the outermost trees EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:191:APPENDIX A2. PROTECTIVE PROVISIONS FOR THE PROTECTION OF TGLP AND EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:192: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING AND TEESSIDE EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:192:1. For the protection of TGLP and TGPP, the following provisions have effect, unless EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:5: protection was provided from Heugh Gun Battery 26 of 69 EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:8: Cleveland Heritage Coast,’ where protection of character is EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:9: Special Protection Area (SPA), Ramsar Site and EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:3: SPA Special Protection Areas EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:10: appropriate protection for NTG’s interests. EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:10: the Applicants on 16th August do provide protection for land within the Order Limits. EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:12:4.1.11 Protection of NTG assets and operations, including its land interests and EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:12: protective provisions provide adequate protection for the concerns outlined by NTG EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:14: protection already provided for under the approval of works details mechanisms in EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:14: of the draft Order REP12-003 for the protection of Sembcorp. EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:15: of protective provisions for the protection of NWL, which are provided for at Part 25 EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:15: alteration or otherwise for the protection of the apparatus, or for securing access to EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:17: position as to why such protections are neither justified, nor necessary, in this EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:31:10.2.2 NSMP paragraphs 3.2.1 & 3.2.2 “Protection of Access” EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:31: operations elsewhere in the Order limits and beyond, protection is still in place, but EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:31: providing the same level of protection that is required for relevant works package A EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:32: management plan is a key required protection for NSMP “given that the access road EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:32: consider these provisions provide appropriate protection for NSMP whilst ensuring EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:33: protection itself, as has been explained by the Applicants above in response to EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:33: protection for its operations in Teesside (including ensuring the Proposed EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:33:10.2.15 The Applicants do not agree that the protection in the DCO should be expanded to EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:33: protection proposed is adequate to protect the interests / assets identified as having EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:35: maintaining appropriate protection. EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:37: appropriate and provides suitable protection – in addition to all the other measures EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:47: PROTECTION PROVIDED (e)the longitudinal slope of propose. EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:48: sufficient protection EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:52: 18. This protection is already proposed work it is proposed by STDC in the first EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:52: compared to the relevant work it is replacing, protection to STDC than the EN010103-002510-NZT DCO 8.3 - STDC SoCG (Clean) - Nov 2022 (D12).pdf:34: biodiversity protection management and approval function over the same requirements in EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:30: services and utilities; and works for the protection of buildings and land; EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:45: ensure protection of Infrastructure installed as part of the Project EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:46: operation, maintenance and protection of the apparatus. Such an EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:68:STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:81: protection for statutory undertakers’ assets. Accordingly, the Applicants EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:83: DCOs for the protection of electricity, gas, water and sewerage undertakers. EN010103-001633-220601 ESP Utilities Group Ltd.pdf:2:Plant Protection Team EN010103-002429-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 11.pdf:3: protective provisions for the benefit and protection of Hornsea Four. As such, Hornsea Four’s EN010103-002429-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 11.pdf:7: protections. There is no transparency in the storage permit process and whilst there may be the EN010103-002429-Orsted Hornsea Project Four Limited - Comments on any other information submitted at Deadline 11.pdf:7: issues and propose protections with the advisors to the decision maker. Appropriate mitigations EN010103-002604-Climate Emergency Policy and Planning (CEPP) - Other- Final submission.pdf:3: should take into account the environmental protection objectives established at EN010103-001544-Stockton Borough Council - Local Impact Reports (LIRs) from Local Authorities.pdf:6: Coast Special Protection Area and Ramsar) and other existing resources alongside EN010103-001544-Stockton Borough Council - Local Impact Reports (LIRs) from Local Authorities.pdf:6: the protection and recovery of priority species. EN010103-001544-Stockton Borough Council - Local Impact Reports (LIRs) from Local Authorities.pdf:8: protection and recovery of priority species. EN010103-001926-Trinity House.pdf:2:Our policy covering our approach to Data Protection complies with UK law, including the Data Protection Act 2018 EN010103-001926-Trinity House.pdf:2:(incorporating the General Data Protection Regulation), and associated legislation, and can be accessed via our Privacy Notice EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:13: Teesmouth and Cleveland Coast Special Protection Area (SPA)/Ramsar and EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:3: RSPB Royal Society for the Protection of Birds EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:3: SPA Special Protection Area EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:5: Special Protection Area (SPA) / Ramsar, which is designated both for breeding birds EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:14: sites the same level of protection as SPAs and SACs. EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:36: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:60: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:64: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:72: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:82: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-000960-NZT DCO 6.3.55 ES Vol II Figure 11-4a CO2 Export Pipeline Construction.pdf:1: Special Protection EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:29: and utilities; and works for the protection of buildings and land; EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:44: ensure protection of Infrastructure installed as part of the Project EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:45: and protection of the apparatus. Such an approach has precedent EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:66: STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:79: included at Schedule 12 of the draft DCO, which provide adequate protection EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:80: DCOs for the protection of electricity, gas, water and sewerage undertakers. EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:92: - Protection of Existing Assets EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:93: 44, 45, 46, 56, 57, - Protection of their proposed natural gas EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:10: Teesmouth and Cleveland Coast Special Protection Area (SPA), proposed SPA EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:30:4.4.2 Paras 6.44 Source Protection Zones (SPZs), The Scoping Report states that there are no SPZs, Drinking Water EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:55: the protection of human health (e.g. air quality). EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:73:for wildlife to also include wider natural capital benefits such as flood protection, EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:80:Plant Protection Team EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:82:Infrastructure Projects (NSIPS)) that are likely to affect the protection or expansion of forests EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:82:(PAWS) should be treated equally in terms of the protection afforded to ancient woodland. It EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:83:the protection afforded to ancient woodland in the National Planning Policy EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:83:Paragraph 2.56 – “The Government is committed to providing appropriate protection to EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:86:will also support increased protection of existing trees and forests. … Beyond the economic EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:86:of ancient woodland and veteran trees. We are committed to ensuring stronger protection of EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:90:The Council’s Public Protection section has confirmed that noise and air quality EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:91:Information will be handled in accordance with the General Data Protection EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:109: • No protective measures including the installation of concrete slab protection shall be installed EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:109: • Impact protection slab should be laid between the cable and pipeline if cable crossing is EN010103-002734-Response from CATS North Sea Limited.pdf:2:3.4 CNSL submit that further protections should be included within the protective provisions to avoid those EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:20: - Article 41 provides protection for statutory undertakers and others through the EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:21: pipe and cable protection equipment and telecommunications equipment, and to EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:21: include aerial markers, cathodic protection test posts and field boundary markers, EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:22: include Requirements relating to landscaping and biodiversity protection (4) and the EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:26: This provides protection for the street authority for the street in question. This is based on EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:28: authorised development may commence until a landscaping and biodiversity protection EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed. EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:30: development as restrictive covenants for the protection of the underground elements of the EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:34: section 79(1) of the Environmental Protection Act 1990. EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:42: 3.8.38. Requirement 4 (Landscaping and biodiversity protection management and enhancement) EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:42: additional provision for biodiversity protection management and enhancement. It has been EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:42: protection plan to the relevant planning authority , following consultation with STDC and EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:42: protection for the landscaping and biodiversity elements during construction, whilst EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:45: until, after consultation with Natural England, a scheme of protection and mitigation EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:45: 3.8.59. 3.8.56.Requirement 17 (Protection of highway surfaces) - this is not a model provision. It EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:51: information on the relevant parties and protections. EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:3: SPA Special Protection Areas EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:11: include procedures for the reporting, protection and management of EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:25: scour protection. EN010103-002349-15431_393333 EN010103 Natural England update to ExA for ISH6 on Nutrient Neutrality - 17 October 2022.pdf:1:proposal’s industrial effluent discharge to the Teesmouth and Cleveland Coast Special Protection EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: consequence of this is that NSMP do not gain significant protection through the requirements that have EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: NSMP’s operations. Against that background, the only protection that our clients have within the DCO EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: are wholly inadequate. It cannot be right that the protection afforded to the owner of such a nationally EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: affect” the Plant. Acceptance of controls and protections for NSMP well below that threshold must be EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: protection in terms of the delivery of the works related to the Project. Against that background, we EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: Protection of access EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: road to NSMP’s nationally significant site, this is a key required protection for NSMP. EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: adequate protection. We have explained NSMP’s reasons for amending this in various past EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: 3.2.4 The indemnity protection in the current protective provisions is insufficient. As mentioned in EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: indemnity protection to cover an indemnified person’s group is industry standard and EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:7: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING AND TEESSIDE EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:7:1. For the protection of TGLP and TGPP, the following provisions have effect, unless EN010103-002359-NZT ISH5 S3.pdf:2:proposed development and that the parties have adequate protection in relation to the exercise of those EN010103-002359-NZT ISH5 S3.pdf:3:on the protective provisions and indeed the associated Asset Protection Agreement during the EN010103-002359-NZT ISH5 S3.pdf:6:that. And we say that the provision says drafted provide appropriate protection. So I don't have any EN010103-002359-NZT ISH5 S3.pdf:11:appropriate entities and the relative protection of those. And finally, just a general point in the protection EN010103-002359-NZT ISH5 S3.pdf:11:because obviously, the protection might be provided and the protective provisions, but we have some EN010103-002476-NZT DCO 6.3.55 - ES Vol II Figure 11-4a CO2 Export Pipeline Construction Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:3: 1 – Owner 10 parties on the protective protection from Air Products. The EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:4: protection agreement EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:4: Exploration 1 – Owner 4, 5c, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:4: Occupier 142a, 158a, 166a, 10 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:5: 467, 469, 470, caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:5: 137, 142, 142b, adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:9: 2 10, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:9: 135, 138a, 141a 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:10: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:10: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:10: 1 – Owner 6, 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:10: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:11: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:11: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:11: 1 – Owner 403, 450, 112 2b, 3a, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:11: Occupier (b) 12a, 142a, 10 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:11: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:12: 190, 190b, 191, adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:18: Petroleum 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:18: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: Production (U.K.) 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:19: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:20: Limited 2 471, 476, 479, 3b, 4, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:20: 5c, 6, 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:21: 467, 469, 470, caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:21: 493, 495, 496, adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:21: Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:21: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:22: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:22: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:22: Company Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:22: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:23: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:23: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:23: Limited 1 – Owner 6, 10 protection in the draft DCO EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:23: Occupier protection of electricity, gas, EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:24: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:24: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:25: 1 – Owner 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:25: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:25: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:25: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:26: Environmental 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:26: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:27: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:27: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:27: Limited 1 – Owner 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:27: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:28: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:28: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:28: Teesside Limited 1 – Owner 6, 9b, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:28: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:29: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:29: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:29: Biofuels Teesside 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:29: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:30: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:30: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:30: Holding Limited 2 330, 333 6, 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:30: (b) - 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:30: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:31: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:31: Environmental 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:31: Occupier 362, 363, 367, 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:31: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:31: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:32: Polymers Limited 1 – Owner 6, 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:33: Occupier 12a, 138a, 141a, 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:33: 171b, 172, 174, caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:33: 191, 191a, 191d, adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:37: also provide protection for EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:37: Services (UK) 1 – Owner 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:37: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:37: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:38: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:38: Plc 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:38: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:38: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:38: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:39: Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:39: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:39: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:39: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:40: Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:40: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:41: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:41: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:41: Chemical UK 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:41: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:42: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:42: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:49: Petroleum UK 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:49: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:50: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:50: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:50: Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:50: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:51: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:51: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:52: Plc 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:52: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:53: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:53: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:53: Networks Limited 1 – Owner 6, 9b, in contact with Northern Gas protection responded to comments EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:53: 26, 30, 31, 343, and asset protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:54: have returned comments on Asset Protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:54: Processing 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:54: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:55: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:55: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:59: 416, 431, 508, 535 protection for One-Dyas UK EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:59: Limited 1 – Owner 341, 346, 361, 3a, 5c, included protection in the written to Openreach EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:59: Occupier 391, 392, 396, 9a, 10 12) for the protection of response has been EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:61: Limited 2 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:61: 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:62: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:62: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:62: Limited 2 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:62: 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:62: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:63: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:63: Limited 2 6, 9b, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:63: 166a, 171a, 176a, 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:63: 185, 185b, 186, caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:63: 192, 194, 91, 92, adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:67: the Protection of 1 – Owner 10 of land adjacent to the 168 EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:67: UK Plc 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:67: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:68: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:68: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:71: Transportation 1 – Owner 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:71: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:72: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:72: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:74: Energy Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:74: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:75: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:75: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:95: 1 – Owner 6, 10 included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:95: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:95: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:95: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:96: Specialties UK 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:96: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:96: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:97: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:97: Energy Limited 1 – Owner included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:97: Occupier 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:97: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:97: adequate protection is in EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:98: Limited 1 – Owner 330, 333 5c, 6, included protection in the EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:98: Occupier (b) - 12) for the protection of EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:98: caught by the protection EN010103-002420-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11).pdf:98: adequate protection is in EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:83:complete and is the main protection for Port Clarence EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:83:protection of the industrial complexes near Seal Sands and will also prevent Port Clarence flooding from the north EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:86: of “personal data” under the Data Protection Act 1998 but we consider that we will EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:88:Freedom of Information Act, Data Protection Act or for litigation. Email messages and EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:89:defences (that when erected create a wall with the same standard of protection as the EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:89:show the effect of the new defences and their increased standard of protection. We do not EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:7: 191a, 202c, 218, 232a, a draft Asset Protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:8: Exploration 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:8: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:8: 137, 142, 142b, 143, caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:8: 171, 176, 176b, 185, adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:11: Plc 2 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:11: 138a, 141a protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:11: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:12: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:13: 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:13: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:14: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:14: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:14: 1 – Owner 450, 112 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:14: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:14: 185, 190, 191, 191a, caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:15: 31, 315, 316, 319, 320, adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:22: Petroleum 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:22: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:23: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:23: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:23: Production 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:23: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:24: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:24: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:26: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:26: protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:27: 502, 504, 505, 510, caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:27: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:27: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:27: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:28: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:28: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:28: Company 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:28: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:29: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:29: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:29: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:29: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:30: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:30: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:32: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:32: Occupier 161, 163 protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:33: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:33: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:34: Environmental 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:34: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:35: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:35: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:35: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:35: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:36: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:36: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:39: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:40: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:40: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:40: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:40: Biofuels 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:40: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:41: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:41: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:42: Holding Limited 2 333 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:42: (b) - protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:42: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:42: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:43: Environmental 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:43: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:43: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:43: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:45: Polymers 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:45: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:45: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:45: 281, 284, 285, 286, 3, adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:48: provide protection for One- EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:49: Services (UK) 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:49: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:49: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:49: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:54: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:54: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:55: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:55: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:56: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:56: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:57: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:57: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:63: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:63: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:63: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:63: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:64: Chemical UK 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:64: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:64: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:64: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:69: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:69: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:70: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:70: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:70: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:70: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:71: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:71: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:72: Plc 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:72: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:73: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:73: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:73: Networks 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:73: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:73: 147, 148, 151, 152, protection is in place for the EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:74: Processing 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:74: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:74: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:75: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:79: provide protection for One- EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:83: Limited 2 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:83: protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:84: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:84: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:87: Limited 2 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:87: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:88: 191b, 192, 194, 91, 92, caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:88: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:90: the Protection of 1 – Owner land adjacent to the existing EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:91: UK Plc 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:91: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:91: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:91: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:96: Transportation 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:96: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:97: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:97: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:99: Energy Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:99: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:99: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:99: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:110: Liquids 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:110: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:111: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:111: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:114: Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:114: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:115: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:115: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:116: Specialties UK 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:116: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:116: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:117: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:117: Energy Limited 1 – Owner protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:117: Occupier protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:118: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:118: adequate protection is in EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:118: Limited 1 – Owner 333 protection in the draft DCO EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:118: Occupier (b) - protection of electricity, gas, EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:119: caught by the protection EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf:119: adequate protection is in EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:24: and protection of the environment, including the protection of human health, for the public benefit. EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:54: concerning the protection of the environment and human health.” EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:105:(including under the Freedom of Information Act 2000 (FOIA), the Data Protection Act 2018 EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:105:(DPA), General Data Protection Regulation (GDPR) and the Environmental Information EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:199: 5. On 16 November 1972 the General Conference of UNESCO adopted the Convention Concerning the Protection of EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:208: “Subject to the detailed policies and protections in this NPS, and the legal constraints set out in EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:213: i. giving precedence to the protection of the World Heritage Site and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:214: protection, conservation, presentation and transmission to future generations of the cultural and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:214: To ensure that effective and active measures are taken for the protection, conservation and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:214: life of the community and to integrate the protection of that heritage into comprehensive planning EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:214: protection, conservation and presentation of the cultural and natural heritage with an appropriate EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:215: necessary for the identification, protection, conservation, presentation and rehabilitation of this EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:215: protection, conservation and presentation of the cultural and natural heritage and to encourage EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:215: states that a property “must also meet the conditions of integrity and authenticity and must have an adequate protection and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:215: and intactness of the natural and/or cultural heritage and its attributes” (para. 88). Paragraph 96 states that “Protection and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:221: (2) Whether the mitigation strategy, and its effectiveness in the protection of WHS archaeology, is appropriate; EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:240: between the protection against harm of a WHS or its assets and other objectives and benefits and, if judged appropriate, to EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:240: give preference to the latter. The Convention does not prescribe an absolute requirement of protection which can never be EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:244: the NPSNN for the protection of heritage assets and their settings. Nor has the court been shown any assessment by IP2, EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:248: and there is the objective inter alia to take effective and active measures for its “protection, conservation, presentation and EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:248: well as in findings by the Panel which the SST has accepted. These criticisms are reinforced by the protection given to the EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:255: there are now sufficient provisions for the protection of the historic environment in the dDCO. It is Historic England's view EN010103-000892-NZT DCO 6.2.6 ES Vol I Chapter 6 Alternatives and Design Evolution.pdf:8: Protection Area (SPA) /Ramsar site; and EN010103-002652-Huntsman Protective Provisions.pdf:1: b. The protection of underground assets which are not affected here; and EN010103-002652-Huntsman Protective Provisions.pdf:1: with the protective provisions and it is therefore they who most need their protection. EN010103-002652-Huntsman Protective Provisions.pdf:4: FOR THE PROTECTION OF HUNTSMAN EN010103-002652-Huntsman Protective Provisions.pdf:6: assessment of the protection of underground assets and which study must provide for EN010103-002652-Huntsman Protective Provisions.pdf:6: assessment of the protection of underground assets and which study must provide for EN010103-002652-Huntsman Protective Provisions.pdf:12:Further protection in relation to the exercise of powers under the Order EN010103-001597-NZT DCO 8.16 - Network Rail SoCG - May 2022.pdf:6:consultations held 12th Rail Asset Protection and Property Teams. EN010103-001597-NZT DCO 8.16 - Network Rail SoCG - May 2022.pdf:7: DM to NR – issuing Asset protection questionnaire to EN010103-001597-NZT DCO 8.16 - Network Rail SoCG - May 2022.pdf:9:3.3 Basic Asset Protection Agreement EN010103-001597-NZT DCO 8.16 - Network Rail SoCG - May 2022.pdf:9: The Applicants have engaged with Network Rails Asset protection team and confirm EN010103-001962-c 16 May 2022.pdf:3: the need for protective provisions to be included in the NZT DCO for the benefit and protection of EN010103-001962-c 16 May 2022.pdf:8: protective provisions for the protection of the Hornsea Four offshore Wind set out the position of Hornsea Four on the need for protective provisions, EN010103-001962-c 16 May 2022.pdf:9:Hornsea Four Offshore Wind Farm DCO are for the benefit and protection EN010103-001962-c 16 May 2022.pdf:10: It is appropriate that the NZT DCO should contain reciprocal protections for EN010103-001962-c 16 May 2022.pdf:10: for their benfit and protection. EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:23: - Article 41 provides protection for statutory undertakers and others through EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:23: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:25: cables, pipe and cable protection equipment and telecommunications EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:25: equipment, and to include aerial markers, cathodic protection test posts and field EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:25: protection (4) and the construction environmental management plan (16)). The EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:30: to sub-paragraph 11(1). This provides protection for the street authority for the EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:33: landscaping and biodiversity protection plan for that part has been submitted to and EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:33: the Order specifies that the landscaping and biodiversity protection plan must EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:35: protection of the underground elements of the Proposed Development would EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:40: under the Environmental Protection Act 1990, if the statutory nuisance is created in EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:40: The Applicants consider that the Requirements provide sufficient protection against EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:40: Environmental Protection Act 1990. EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:50:3.8.393.8.38 Requirement 4 (Landscaping and biodiversity protection management and EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:50: modified to make additional provision for biodiversity protection management and EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:51: biodiversity protection plan to the relevant planning authority prior to commencing EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:51: appropriate protection for the landscaping and biodiversity elements during EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:53: England, a scheme of protection and mitigation measures has been submitted to and EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:54:3.8.573.8.56 Requirement 17 (Protection of highway surfaces) - this is not a model provision. EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:59: (Document Ref. 3.2) for more information on the relevant parties and protections. EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:9: holt protection than banks featuring wooded habitats. EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: Otter receives full protection under Section 9 of the Wildlife and Countryside Act 1981 (as amended) EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: taken together, results in a level of protection that prohibits the intentional, deliberate or reckless: EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: sheltering or protection; and EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: amended) and is afforded protection under Section 9 parts 9(1)(2)(4) and (5) of the Act, making it an EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: their shelter or protection; EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:12: It is generally regarded that a place of shelter or protection includes a network of active burrows EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:5:41. Protection of interests EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 3 — FOR THE PROTECTION OF NATIONAL GRID EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 4 — FOR THE PROTECTION OF NATIONAL GRID GAS PLC EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6:PART 4PART 5 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 56 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 67 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 78 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:6: PART 89 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 910 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1011 — FOR THE PROTECTION OF NETWORK RAIL EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1112 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1213 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1314 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1415 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1516 — FOR THE PROTECTION OF SABIC UK EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1617 — FOR THE PROTECTION OF THE SEMBCORP PIPELINE EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1718 — FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1819 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 1920 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2021 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2122 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2223 — FOR THE PROTECTION OF HUNTSMAN EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2324 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2425 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2526 — FOR THE PROTECTION OFNORTHERN GAS NETWORKS LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2627 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:7: PART 2728 — FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:9: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:9: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:12: Schedule 12 of the Order (for the protection of Anglo American); EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:35:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:35:Protection of interests EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:35: Environmental Protection Act 1990 (c.43). EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:43: (ii) cathodic protection posts; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:45: (vi) works for the protection of buildings and land; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:46: (b) the number and location of cathodic protection posts and marker posts; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:47: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:47: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:48:Landscape and biodiversity protection management and enhancement EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:48:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:52: Environmental Protection Act 1990(a); EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:52: Environmental Protection Act 1990; and EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:54:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:55:Protection of highway surfaces EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:55: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:55: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:63: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:63: 1. For the protection of the NZT Undertaker, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:69:alteration or protection of the NZT Specified Works. EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:92: (vii) the deposit of rock armour protection; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:104: (vii) the deposit of rock armour protection; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:115: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:115: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:117:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:118:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:119: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:119: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:120:FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:120: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:122:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:122:protection of gas undertaker), 26 ), 25 (expenses) and 27 26 (indemnity) of this Schedule which EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:123:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:124:Retained apparatus: protection of electricity undertaker EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:125:protection of the apparatus, or for securing access to it, and National Grid will be entitled to watch EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:125:Retained apparatus: protection of gas undertaker EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:126:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:126:or in connection with, the inspection, removal, relaying or replacing, alteration or protection of EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129:by the undertaker pursuant to this Part must be sent to National Grid Plant Protection at EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129:plantprotection@nationalgrid.com paragraph 24 must be submitted as follows “Please sign up and EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129:submit your enquiry to . The asset protection team will then respond to your EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129:assetprotection@nationalgrid.com” or such other address as National Grid may from time to time EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129: FOR THE PROTECTION OF NATIONAL GRID GAS PLC AS GAS EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:129: 32. For the protection of National Grid Gas as referred to in this Part of this Schedule the EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:132:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:133:National Grid Gas for the alteration or otherwise for the protection of the apparatus, or for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:133:protection of any apparatus or the construction of any new or alternative apparatus which may be EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:135:paragraph 37(2) or National Grid Gas makes requirements for the protection or alteration of EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:136:your enquiry to . The asset protection team will then respond to your query. EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:136:Any issues with your query, you can contact them directly at assetprotection@nationalgrid.com” EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:136: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:136: 47.33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:138:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:138:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:140: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:140: 58.44. For the protection of CATS, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:141: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:142:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:143: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:143: 71.57. For the protection of CF Fertilisers, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:145:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:147:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:148: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:148: 88.74. For the protection of Exolum, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:151:Cathodic protection testing EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:151: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:151: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:151:measures for providing or preserving cathodic protection. EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:151: (i) the execution of any works under this Order including for the protection of the EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:152: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:152: 96.82. For the protection of INEOS, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:154: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:154: 104.90. For the protection of Marlow Foods, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:155: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:162: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:162: 131.117. For the protection of Northern Powergrid (Northeast) Plc the following provisions have EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:164:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:164: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:166: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:166: 150.135. For the protection of NPL, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:168: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:168: 158.143. For the protection of PD Teesport, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:170: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:170: 171.156. For the protection of RBT, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:174: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS UK LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:174: 186.169.For the protection of Sabic, the The following provisions of this Schedule have effect EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:176: assessment of the protection of underground assets and which study must provide for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:176: assessment of the protection of underground assets and which study must provide for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:182:with the approval of plans, inspection of any works or protection of the Sabic pipeline, which may EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:183:Further protection in relation to the exercise of powers under the Order EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:183: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:187: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:188: with any deficiency in the expected level of protection afforded by those requirements; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:190: FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:190: 227.197. For the protection of Anglo American the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:198:the approval of plans, inspection of any Specified Works or the alteration or protection of the EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:200: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:200: 245.204. For the protection of Suez, the following provisions have effect, unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:202: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:202: 255.214. For the protection of South Tees Development Corporation, Teesworks Limited and EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:204: sufficient protection provided if it crosses underground facilities; EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:211: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:211: 286.245. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:213: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:213: 294.253. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:215: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:215: 303.261.For the protection of HPU, the The following provisions of this Schedule have effect EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:218: assessment of the protection of underground assets and which study must provide for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:218: assessment of the protection of underground assets and which study must provide for EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:223:with the approval of plans, inspection of any works or protection of the HPU operations, which EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:224:Further protection in relation to the exercise of powers under the Order EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:224: FOR THE PROTECTION OF NAVIGATOR TERMINALS SEAL SANDS EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:224: 329.270. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:226: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:226: 337.278. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:227: “the standard protection strips” means strips of land falling within the following distances to EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:227: 339.280. The undertaker must not within the standard protection strips interfere with or build EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:227:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:227:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:228:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:228:for the protection or alteration of apparatus, the undertaker must use all reasonable endeavours to EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:229: FOR THE PROTECTION OFNORTHERN GAS NETWORKS LIMITED EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:229: 349.290. For the protection of the Northern Gas Networks Limited the following provisions EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:229:streets), 297 356 (retained apparatus: protection), 298 357 (expenses) and 299 358 (indemnity), EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:231:Retained apparatus: protection EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:232:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235:Cathodic protection testing EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235:cathodic protection. EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:235: 365.306. For the protection of the NT Group (as defined below), the following provisions have EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:237: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING AND , EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:237: 370.311. For the protection of TGLP and , TGPP and NGPL, the following provisions have EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:4:Source Protection Zones EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:8: Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:9:Source Protection Zones EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:12:Special Protection Areas pg 77 1 EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Radon Potential - Radon Protection Measures EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new G9NE 0 1 456850 EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Radon Potential - Radon Protection Measures EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new G10SW 0 1 457183 EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Radon Potential - Radon Protection Measures EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new G6NW 0 1 457183 EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:89: Designation Details: Special Protection Area EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:89: Special Protection Areas EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:90:Source Protection Zones EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:92:Radon Potential - Radon Protection Measures EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:93:Special Protection Areas EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:94: Scottish Environment Protection Agency EN010103-002672-STDC - Preferred PPs End of Examination CLEAN - 10 Nov 2022.pdf:1:FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002672-STDC - Preferred PPs End of Examination CLEAN - 10 Nov 2022.pdf:1:255. For the protection of South Tees Development Corporation, Teesworks Limited and South Tees EN010103-002672-STDC - Preferred PPs End of Examination CLEAN - 10 Nov 2022.pdf:4:protection provided if it crosses underground facilities; EN010103-001718-Redcar Bulk Terminal Limited - Responses to the ExA’s ExQ1.pdf:8: as any other customer of RBT, with the negotiated contractual protections within the EN010103-000063-Acknowledgement of S46 Notification.pdf:2:your obligation under the current data protection legislation to process personal data EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:29: The CA100+ resolution, which includes safeguards such as protections for commercially confidential and competitively sensitive information, is on EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:62: Tier 1 and tier 2 and procedures, security protection tools, EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:67: cyber security standards, security protection tools, ongoing detection EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:227:protection, general health, safety, climate change and environmental claims and allegations of exposures of third parties to toxic substances, such as EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:323: environmental, health and safety protection, fuel specifications and EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:324:Environmental Protection Agency (EPA) regulations aimed at limiting passenger cars and light trucks covering model years (MY) 2021 EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:326:• The Endangered Species Act (ESA) and Marine Mammal Protection Act in 2019 concluded that the WFD is broadly fit for purpose. Future EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:326: rules reducing the scope of habitat protections. EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:327:• The Convention for the Protection of the Marine Environment of the EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:45: the information provided is considered to be too activities (including rock armour and scour protection; using a EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:45: impacts of rock armour and scour protection. The Interestingly, based on the observed communities in the Tees Bay, we EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:2: level of protection required. Furthermore, Sembcorp’s Deed of Easement only EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:4:owned by the grantor. Northumbrian Water protection as others. EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:4:monitoring associated with Comments on D9 of protection as others. EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:7:will have no protection or harm are assertions and good faith with regard to EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:11:ever require to cover any basic levels of protection a EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:16:throughout the process addressed the approach to sufficient protection in the EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:20: Provisions for the Protection of North Tees Limited, North Tees Rail Limited and EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:22: infrastructural base in the pipeline corridor that simply needs protection along EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:22: essential for NTG to have adequate protection in relation to third parties accessing land EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:23: compromised protection to provide a degree of certainty both to NTG and those deriving EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:24: belief that NTG should not have the same protections as Sembcorp. It is NTG’s position EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:26: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:26: For the protection of NT Group (as defined below) the provisions of this Part have effect for the benefit EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:31: © the inspection, removal and relaying or replacing, alteration or protection of any apparatus or the EN010103-002649-NTL Letter to Planning Inspectorate Deadline 13 Various matters EN010103 07.11.22v2.pdf:32: the expected level of protection afforded by those requirements; EN010103-002574-NZT DCO 6.3.21 - ES Vol II Figure 8-9 Nutrient Nitrogen Deposition Nov 2022 (D12).pdf:1: Special Protection Area EN010103-001896-NZT DCO 8.11 - Northern Powergrid SoCG (Clean) - July 22 (D4).pdf:10: & 26th March to 3rd May access and protection of assets to remain uninterrupted EN010103-001896-NZT DCO 8.11 - Northern Powergrid SoCG (Clean) - July 22 (D4).pdf:14: for the protection of NPg’s operations and assets. These discussions are ongoing, EN010103-002320-NZT DCO 9.34 - Updated List of Developments (Tacked) Oct 2022 (D9).pdf:14: Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar site and Site EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:9: is that the protections in Part 19 of Schedule 12 of the DCO submitted at Deadline 4 provide robust protection to EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:10: 4 provide equivalent protections to Sembcorp as set out above in respect of STDC. The Applicants have continued to EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:16: o R4 Landscaping and biodiversity protection management and EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:22: that would be (and could be) included by way of powers and protections in its own DCO is entirely absent. Ørsted EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:22: In short, the decision on HP4’s DCO will deal comprehensively with the issue of whether and if so what protection is EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:23: risk it suggests that project would be exposed to without reciprocal protection through the NZT DCO. As such, the EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:74:2 Clause 1 – Interpretation and Definitions This is protection afforded to TCE as a signatory to the agreement, in the EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:74: However, the effect of this protection is specific to the terms of the IA and EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:74: so to the extent the IA were disapplied, no protection from its terms would EN010103-001895-NZT DCO 8.2 - STBC SoCG (Tracked) July 2022(D4) -.pdf:2: SPA Special Protection Area EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:3:Table 14C-1: Summary of protection measures in place for marine mammals likely EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:4: • A description of legislation related to the protection of marine mammal EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:5: conservation protection by various pieces of European and national EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:5: Directive) as European Protected Species (EPS) requiring strict protection. EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:6: (Phoca vitulina) are afforded protection under Annex II of the Habitats EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:6: in all UK waters in accordance with existing statutory protection for cetacean EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:7:14.2.12 Several other domestic pieces of legislation afford similar protection to all EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:7: strengthening the protection of threatened species (including cetaceans) to EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:14: conservation protection afforded to each key marine mammal receptor is EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:14:Table 14C-1: Summary of protection measures in place for marine mammals EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:26: characteristics for a haul-out site include adequate protection from land EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:26: protection from strong wind and waves (Seal Conservation Society, 2011). EN010103-001902-NZT DCO 8.18 - CATS SoCG (Clean) July 2022 (D4).pdf:11: ensure that the DCO includes appropriate protection for existing Infrastructure. EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:3: SPA Special Protection Areas EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:8: asset protection agreement. Most recently the Applicants received EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:9: that INEOS Nitriles would benefit from the protection of the draft agreement of the Heads of Terms and progress matters to legal EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:9: Electricity Transmission would benefit from the protection of the EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:10: protection of the draft Order protective provisions provided at Part 4 EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:10: would benefit from the protection of the draft Order protective EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:10: notes that the North Tees Group would benefit from the protection EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:11: benefit from the protection of the draft Order protective provisions EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:11: from the protection of the draft Order protective provisions provided negotiation due to some unsettled fee invoices that were rectified EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:1: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:1: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:2: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:2: Pond LEVEN SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:3: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:3: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:4: a in Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:4: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:5: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:5: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:6: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:6: st SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:7: L Twr Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:7: LC SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:8: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:8: o rs SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:9: Mud Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:9: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:10: WB Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:10: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:11: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:11: 11.6m SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:12: 14.9m Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:12: d SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:13: ve y Hopper SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:14: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:15: Teesside Works Dormanstown Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:15: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:16: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:16: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:17: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:17: Cooling Tower SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:18: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:18: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:19: an SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:20: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:20: 12.2m SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:21: Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:21: Cooling Tower SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:22: GVC Sembcorp Protection Corridor EN010103-002740-Applicant NZT DCO 4.20 - Sembcorp Protection Corridor PP Plans (22 March 2023).pdf:22: SEMBCORP PROTECTION CORRIDOR PROTECTIVE EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:13: operational effects will provide effective protection to EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:13: protection to designated sites and protected species, that no EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:14: effective protection to designated sites and protected species, EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:14: and Cleveland Coast Special Protection Area (SPA)/ Ramsar/ EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:17: The potential impacts of installing rock armour protection at EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:20:Biodiversity Protection, Measures to protect biodiversity during construction are set out EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:21: It is agreed that the biodiversity protection, mitigation and EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:21: DCO Requirement 4 (Landscaping and Biodiversity Protection EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:21: until a landscaping and biodiversity protection plan for that part EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:24: protection at the end of the Water Discharge Connection (Work No. 5A or 5B) EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:24: installation of rock armour protection at the end of the Water Discharge EN010103-001927-Marine Management Organisation.pdf:1:protection on the Teesmouth and Cleveland Coast SPA and Ramsar site once further information from EN010103-002035-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2:1.10 In addition, it is likely that protections will be required by NSMP in respect of their other rights within the EN010103-002439-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order.pdf:1: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002439-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order.pdf:1:225. For the protection of South Tees Development Corporation, Teesworks Limited and EN010103-002439-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order.pdf:4: kN/m2 and sufficient protection provided if it crosses underground facilities; Commented BDBP11: 11. STDC has provided this EN010103-002439-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order.pdf:5: Commented BDBP18: 18. This protection is already EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:5: • specific protection to a small number of aquatic macroinvertebrate EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:5: • specific protection for flora is listed on Schedule 8 (flora, fungi and EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:6: Special Protection Areas (SPA), Special Area of Conservation (SAC) and EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:19: statutory protection. They are all typical of habitats present within the wider EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:20: index, but do not have any statutory or non-statutory protection are relatively EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:20: protection. EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:21: statutory or non-statutory protection. EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:21: CCI index, but do not have any statutory or non-statutory protection. EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:22: but does not have any statutory or non-statutory protection. EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:23: have statutory protection. Ragged robin Lychnis flos-cuculi is listed as ‘Near EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:23: have statutory protection and the community recorded is typical of standing EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:23: have statutory protection and the community recorded is typical of standing EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:25: and has no statutory protection. EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:26: of European eel is neither enough for the protection of a site as a SSSI (Bean EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:27: species do not however have any statutory or non-statutory protection and are EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:27: to be threatened and has no statutory protection. EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:8: Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:9:Source Protection Zones EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:12:Special Protection Areas pg 12 1 EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:22: Radon Potential - Radon Protection Measures EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:22: Protection Measure: No radon protective measures are necessary in the construction of new H2SE 0 1 455000 EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:22: Radon Potential - Radon Protection Measures EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:22: Protection Measure: No radon protective measures are necessary in the construction of new H3SE 0 1 455535 EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:24: Designation Details: Special Protection Area EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:24: Special Protection Areas EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:26:Source Protection Zones EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:28:Radon Potential - Radon Protection Measures EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:29:Special Protection Areas EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:30: Scottish Environment Protection Agency EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:1:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:2: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:2:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:3:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:4:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:5:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:6:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:7:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:8: (a) the inspection, removal and relaying or replacing, alteration or protection EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:8: of protection afforded by those requirements; EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:8:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:9:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:10:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:11:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:12:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-001936-nzt ish3 s4.pdf:3:all that would be and could be included by way of powers and protections in its own order that there is EN010103-001936-nzt ish3 s4.pdf:4:protection is required for Austin's project to be able to go ahead, if it's allowed to go ahead in the EN010103-001546-Marine Management Organistation - Comments on Relevant Representations (RRs).pdf:3: • Likely loss of intertidal habitat from scour protection and propose the inclusion of EN010103-001546-Marine Management Organistation - Comments on Relevant Representations (RRs).pdf:3: Protection Area (SPA) & Ramsar Site, as well as features of the Teesmouth and EN010103-001546-Marine Management Organistation - Comments on Relevant Representations (RRs).pdf:3: • The installation of rock armour protection at the proposed outfall locations could EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001234-NZT - Regulation 32 Transboundary Screening (4).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:3: SPA Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:60: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:60: head, the introduction of rock armouring / scour protection (with an expected EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:61: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:61: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:61: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:61: circular footprint for the proposed scour protection therefore follows this design EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:61: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:62: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:70: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:84: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:85: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:123: Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:124: Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:125: Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:126: Special Protection Area EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:128: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:128: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:128: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:128: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:129: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:129: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:129: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:129: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:129: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: circular footprint for the proposed scour protection therefore follows this design EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: scour protection at the outfall location. EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: be incorporated into the design and the height of the protection above the seabed should EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:130: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:131: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:131: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:131: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-002319-NZT DCO 9.34 - Updated List of Developments (Clean) Oct 2022 (D9).pdf:14: Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar site and Site EN010103-001203-NZT DCO 6.3.55 - ES Vol II Figure 11-4a CO2 Export Pipeline Construction - Oct 2021 Rev.2.0.pdf:1: Special Protection Area EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:3: SPA Special Protection Areas EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:9: • damage, destroy or block access to their places of shelter or protection (on EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:9: • disturb them in a place of shelter or protection (on purpose or by not taking EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:9:3.1.8 It is generally regarded that a place of shelter or protection includes a network of EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:27: voles-protection-surveys-and-licences. EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:27: Projects. Available online at: https://www.gov.uk/guidance/otters-protection- EN010103-000013-EN010103_Scoping Opinion.pdf:9: Teesmouth and Cleveland Coast Special Protection Area (SPA), proposed SPA EN010103-000013-EN010103_Scoping Opinion.pdf:29:4.4.2 Paras 6.44 Source Protection Zones (SPZs), The Scoping Report states that there are no SPZs, Drinking Water EN010103-000013-EN010103_Scoping Opinion.pdf:54: the protection of human health (e.g. air quality). EN010103-000013-EN010103_Scoping Opinion.pdf:72:for wildlife to also include wider natural capital benefits such as flood protection, EN010103-000013-EN010103_Scoping Opinion.pdf:79:Plant Protection Team EN010103-000013-EN010103_Scoping Opinion.pdf:81:Infrastructure Projects (NSIPS)) that are likely to affect the protection or expansion of forests EN010103-000013-EN010103_Scoping Opinion.pdf:81:(PAWS) should be treated equally in terms of the protection afforded to ancient woodland. It EN010103-000013-EN010103_Scoping Opinion.pdf:82:the protection afforded to ancient woodland in the National Planning Policy EN010103-000013-EN010103_Scoping Opinion.pdf:82:Paragraph 2.56 – “The Government is committed to providing appropriate protection to EN010103-000013-EN010103_Scoping Opinion.pdf:85:will also support increased protection of existing trees and forests. … Beyond the economic EN010103-000013-EN010103_Scoping Opinion.pdf:85:of ancient woodland and veteran trees. We are committed to ensuring stronger protection of EN010103-000013-EN010103_Scoping Opinion.pdf:89:The Council’s Public Protection section has confirmed that noise and air quality EN010103-000013-EN010103_Scoping Opinion.pdf:90:Information will be handled in accordance with the General Data Protection EN010103-000013-EN010103_Scoping Opinion.pdf:108: • No protective measures including the installation of concrete slab protection shall be installed EN010103-000013-EN010103_Scoping Opinion.pdf:108: • Impact protection slab should be laid between the cable and pipeline if cable crossing is EN010103-000013-EN010103_Scoping Opinion.pdf:116:Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. EN010103-000013-EN010103_Scoping Opinion.pdf:119:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall EN010103-000013-EN010103_Scoping Opinion.pdf:119:addition paragraph 176 of the NPPF requires that potential Special Protection Areas, possible EN010103-000013-EN010103_Scoping Opinion.pdf:120:(Special Areas of Conservation (SAC), Special Protection Areas (SPA) and Ramsar sites) EN010103-000013-EN010103_Scoping Opinion.pdf:122:protection of the best and most versatile (BMV) agricultural land as set out in paragraph 170 of the EN010103-000013-EN010103_Scoping Opinion.pdf:123:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra EN010103-000013-EN010103_Scoping Opinion.pdf:125:With reference to the protection of the railway, the Environmental Impact Assessment should consider issues that EN010103-000013-EN010103_Scoping Opinion.pdf:137:International Commission on Non-ionizing Radiation Protection (ICNIRP). Formal advice to EN010103-000013-EN010103_Scoping Opinion.pdf:138:protection recommended by the International Commission on Radiological Protection 5 EN010103-000013-EN010103_Scoping Opinion.pdf:138: Council Directive 96/29/EURATOM laying down basic safety standards for the protection of the health of workers and the general public EN010103-000013-EN010103_Scoping Opinion.pdf:139:demonstrate compliance with UK legislation and the principles of radiation protection. This EN010103-000013-EN010103_Scoping Opinion.pdf:139: The Environment Agency (EA), Scottish Environment Protection Agency (SEPA), Northern Ireland Environment Agency, EN010103-000013-EN010103_Scoping Opinion.pdf:139:Health Protection Agency and the Food Standards Agency (FSA). EN010103-000013-EN010103_Scoping Opinion.pdf:139: HPA RCE-8, Radiological Protection Objectives for the Land-based Disposal of Solid Radioactive Wastes, February 2009 EN010103-000013-EN010103_Scoping Opinion.pdf:144:Redcar and Cleveland Borough Council Environmental Protection (Contaminated Land) EN010103-000013-EN010103_Scoping Opinion.pdf:144:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) EN010103-000013-EN010103_Scoping Opinion.pdf:151:Our policy covering our approach to Data Protection complies with UK law accordingly implemented, including that required by EN010103-000013-EN010103_Scoping Opinion.pdf:151:the EU General Data Protection Regulation (GDPR 2016), and can be accessed via our Privacy Notice and Legal Notice listed on EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:27: position of services and utilities; and works for the protection of buildings and land; EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:42: purposes for which new rights are sought, being to ensure protection of EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:43: maintenance and protection of the apparatus. Such an approach has EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:64: STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:75: which provide adequate protection for statutory undertakers’ assets. Accordingly, the EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:76: includes provisions typically included in DCOs for the protection of electricity, gas, water EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:87: - Protection of Existing Assets EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:89: 69, 70, 72, 74, 75, - Protection of their proposed natural gas EN010103-002272-NZT DCO 6.3.40 - ES Vol II Figure 10-14 Sensitive Land Use September 2022(D8).pdf:1: Special Protection Area EN010103-000893-NZT DCO 6.2.7 ES Vol I Chapter 7 Legislative Context and Planning Policy.pdf:33: • Teesmouth and Cleveland Coast Special Protection Area (SPA) 6km EN010103-000893-NZT DCO 6.2.7 ES Vol I Chapter 7 Legislative Context and Planning Policy.pdf:35: within the hierarchy. Priority will be given to the protection of EN010103-000893-NZT DCO 6.2.7 ES Vol I Chapter 7 Legislative Context and Planning Policy.pdf:36: Protection and value. All development proposals will be required to comply with EN010103-000893-NZT DCO 6.2.7 ES Vol I Chapter 7 Legislative Context and Planning Policy.pdf:38: Enhance Ecological resources within the Borough. This includes the protection, and EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf:157: for reports under section 404 of the US Public Company Accounting Reform and Investor Protection Act of 2002 (Sarbanes-Oxley), audit reports on regulatory returns and the review of interim EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf:187:The plan holds a longevity insurance contract which covers improvements in longevity, providing long-term protection to the scheme, should some pensioner EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf:187:Protection Fund (PPF) levies. Section A of NGUKPS will fund these costs from the Section’s assets. Up to 31 March 2020, National Grid was responsible EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf:187:for the costs of plan administration and the Pension Protection Fund (PPF) levies for both Sections A and B of NGUKPS and NGEG of ESPS. EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:3: SPA Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:61: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:61: head, the introduction of rock armouring / scour protection (with an expected EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:62: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:62: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:62: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:62: circular footprint for the proposed scour protection therefore follows this design EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:62: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:64: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:67: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:73: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:82: introduction of a small volume of rock armouring / scour protection due to the Proposed EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:89: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:90: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:129: Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:130: Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:131: Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:132: Special Protection Area EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:134: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:134: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:134: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:134: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:135: circular footprint for the proposed scour protection therefore follows this design EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: scour protection at the outfall location. EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: be incorporated into the design and the height of the protection above the seabed should EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:136: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:137: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:137: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:137: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:6: clarification from Orsted as to what further protection is required and on what basis. EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:6: DCO for the benefit and protection of Hornsea Project Four and, in particular, to EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:6: Four DCO are for the benefit and protection of the carbon storage licensee of the UK EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:6:3.1.5 It is appropriate that the NZT DCO should contain reciprocal protections for Hornsea EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:7: appropriate mitigations and protections. There is no transparency in the storage EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:7: protections with the advisors to the decision maker. EN010103-001987-NZT DCO 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5).pdf:7: (REP2-089 Appendix 1) setting out the protection required. EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:11: safety so they can require reasonable protection of their existing assets, but also identify EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:12: and protection if during construction or maintenance their apparatus is damaged. EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:14: order to secure the effective protection of the apparatus. This is because the management EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 1 — Protection for electricity, gas, water and sewerage undertakers EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 2 — Protection of Network Rail Infrastructure Limited, etc. EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 3 — Protection of operators of electronic communications code EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 4 — Protection of offshore cables and pipelines EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 5 — Protection of Environment Agency EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20: PART 6 — Protection of owners and operators at Wilton EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:22: inter-platform or export cables authorised by this Order together with physical protection EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:22: measures including cable protection; EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:22: “cable protection” means measures to protect cables from physical damage and exposure due EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:22: protection systems including masts, control buildings, communications masts, back-up EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:25: “scour protection” means measures to prevent loss of seabed sediment around foundation EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:26: corrosion protection systems, fenders and maintenance equipment, helicopter transfer facilities EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:27: Protection for electricity, gas, water and sewerage undertakers EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:28: Protection of owners and operators at Wilton EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:31:otherwise for the temporary or permanent protection of the apparatus, or for securing access to it, EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:32: temporary or permanent protection of the owner’s or operator’s apparatus; EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:32: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:32: deal with any deficiency in the expected level of protection afforded by those protective EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:9: RL for the Applicants confirms that a landscaping and biodiversity protection plan will be prepared as part of EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:16: • The potential effect of rock armouring/ scour protection associated with the Applicants expect to be in a position to provide an update at deadline 7. EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:21: In terms of rock armouring and scour protection, RL for the Applicants confirms that as agreed with Natural England, EN010103-001892-NZT DCO 8.1 - RCBC SoCG (Clean) July 2022 (D4).pdf:14: Protection Area 6km Buffer Zone/Ramsar Site & EN010103-001892-NZT DCO 8.1 - RCBC SoCG (Clean) July 2022 (D4).pdf:15: • STDC7 – Natural Environmental Protection and EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:13: Teesmouth and Cleveland Coast Special Protection EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:18: to water environment protection: CIRIA documents and EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:27: required for active fire protection. EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:39: protections afforded and to reinforce the role of the EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:53: as well as the Centre for the Protection of National EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:55: Measures for the protection of workers from potential EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:55: administrative controls, personal protection EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:84: also enable sufficient time to implement protection EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:86: scour protection would need to be installed around the EN010103-001635-Anglo American - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:13: which are essential for the protection of the delivery of the Woodsmith Project, EN010103-002097-NZT DCO 6.3.21 - ES Vol II Figure 8-9 Nutrient Nitrogen Deposition August 2022 (D6).pdf:1: Special Protection Area EN010103-002474-NZT DCO 6.3.53 - ES Vol II Figure 11-2 PCC Site Piling Construction Phase Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:30: services and utilities; and works for the protection of buildings and land; EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:44: ensure protection of Infrastructure installed as part of the Project EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:45: operation, maintenance and protection of the apparatus. Such an EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:67:STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:79: included at Schedule 12 of the draft DCO, which provide adequate protection EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:81: DCOs for the protection of electricity, gas, water and sewerage undertakers. EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:3: Protection of Badgers Act 1992; EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:3: Wild Mammals (Protection) Act 1996; EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:3: Environmental Protection Act 1990; and EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:4: Local Plan, adopted May 2018. These require the protection and EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:5: protection and enhancement of biodiversity, including maximising EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:5: out expectations for natural environment protection and enhancement, EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:10: implications arising from relevant legal protections. EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:12:Committee (JNCC) Protection Areas (SPA), Special Areas of EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:16:Saltholme Royal Society for the Protection of Birds EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:19:of land in those areas. It would be highly desirable to protection measures are included within the EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:35: practice and environmental protection legislation during both construction EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:36: woodland are anticipated. Appropriate tree root protection zones will be EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:52: a tool box talk would be given to clarify the legal protections afforded EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:57: Protection of Badgers Act 1992 (c. 51). London: The Stationery Office. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:3:41. Protection of interests EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:4: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 19 — FOR THE PROTECTION OF TEESWORKS EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 20 — FOR THE PROTECTION OF INEOS UK SNS LIMITEDTHE EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 25 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 26 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:5: PART 27 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:7: Act and further includes pipelines (and parts of them), aerial markers, cathodic protection test EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:7: pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:31:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(b) in relation to a EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:32:Protection of interests EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:32: Environmental Protection Act 1990 (c.43). EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:37: (ii) cathodic protection posts; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:39: (vi) works for the protection of buildings and land; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:41:Landscaping and biodiversity protection management and enhancement EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:41:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:45: Environmental Protection Act 1990(a); EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:45: Protection Act 1990; and EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:46:commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:47:Protection of highway surfaces EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:48: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:48: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:54: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:54: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:55:to such reasonable conditions as may be required for the protection or alteration of or access EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:56:specified works or the alteration or protection of any apparatus. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:78: (vii) the deposit of rock armour protection; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:88: (iv) the deposit of rock armour protection; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:88: (vii) the deposit of rock armour protection; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:98: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:98: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:100:for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:101:inspection, removal, alteration or protection of any apparatus or the construction of any new EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:102: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:102: 12.—(1) For the protection of any operator, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:103: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:103: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:105:up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: protection EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:106:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:106:Retained apparatus: protection of electricity undertaker EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:107:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:108:Retained apparatus: protection of gas undertaker EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:108:Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:109:connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:111:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:112:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:112: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:112: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:114:protection of the apparatus, or for securing access to it, and Air Products is entitled to watch and EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:114:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:117:protection of the apparatus, or for securing access to it, and Air Products is entitled to watch and EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:117:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:119: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:119: 44.53. For the protection of CATS, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:120: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:121:alteration or protection of any CATS pipeline which may be required in consequence of the EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:122: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:122: 57.62. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:124:require to be made for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:126:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:127: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:127: 74.79. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:129:Cathodic protection testing EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:130: (a) the authorised development might interfere with the cathodic protection forming part of the EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:130: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:130:providing or preserving cathodic protection. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:130: (i) the execution of any works under this Order including for the protection of the Exolum EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:131: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:131: 82.87. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:133: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:133: 90.95. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:134: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:140: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:140: 116.121. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:142:for the protection of the apparatus, or for securing access to it, and Northern Powergrid is entitled EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:142: (a) in, or in connection with, the inspection, removal, alteration or protection of any apparatus EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:145: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:145: 134.139. For the protection of NPL, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:146: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:146: 142.147. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:149: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:149: 157.162. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:151: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:151: 170.175. For the protection of Sabic, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:152: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:152: 178.183. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:155: (a) the inspection, removal and relaying or replacing, alteration or protection of any apparatus EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:156: any deficiency in the expected level of protection afforded by those requirements; EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:158: FOR THE PROTECTION OF YORK POTASH EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:158: 196.191. The provisions of this Part apply for the protection of York Potash unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:159:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:160:works or the alteration or protection of any apparatus. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:161: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:161: 215.210. For the protection of Suez, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:163: FOR THE PROTECTION OF TEESWORKS LIMITEDSOUTH TEES EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:163: 225.220. For the protection of South Tees Development Corporation, Teesworks Limited and EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:170:FOR THE PROTECTION OF INEOS UK SNS LIMITEDTHE BREAGH PIPELINE EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:170: 256.231. For the protection of INEOSthe Breagh Pipeline Owners, the following provisions have EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:172: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED AND EDF EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:172: 264.239. For the protection of Teesside Windfarm and EDF ER, the following provisions have EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:174: FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:174: 272.247. For the protection of Low Carbon, the following provisions have effect, unless otherwise EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:176: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:176: 282.257. For the protection of HPU, the following provisions have effect, unless otherwise agreed EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:178: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:178: 289.264. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:179: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:179: 297. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:180: “the standard protection strips” means strips of land falling within the following distances to EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:180: 299. The undertaker must not within the standard protection strips interfere with or build over any EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:180:the apparatus is laid in a trench) within the standard protection strips unless otherwise agreed in EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:180:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:181:of such assets will immediately be given to NW and afforded the same protection as other NW EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:181: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:181: 307. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:182:(retained apparatus: protection), 295 (expenses) and 296 (indemnity), this Schedule does not apply EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:184:Retained apparatus: protection EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:185:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187:Cathodic protection testing EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187: (b) the apparatus might interfere with the proposed or existing cathodic protection forming part EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187:cathodic protection. EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:187: 323. For the protection of the NT Group (as defined below), the following provisions have effect, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:4:41. Protection of interests EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:5: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 16 — FOR THE PROTECTION OF THE SEMBCORP PIPELINE EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 17 — FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 22 — FOR THE PROTECTION OF HUNTSMAN EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 23 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 24 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 26 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:6: PART 27 — FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:34:Protection of interests EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:42: (ii) cathodic protection posts; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:44: (vi) works for the protection of buildings and land; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:45: (b) the number and location of cathodic protection posts and marker posts; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:46: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:47: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:47:Landscape and biodiversity protection management and enhancement EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:47:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:51: Environmental Protection Act 1990(a); EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:51: Environmental Protection Act 1990; and EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:53:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:54:Protection of highway surfaces EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:54: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:54: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:61: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:61: 1. For the protection of the NZT Undertaker, the following provisions have effect, unless EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:65:alteration or protection of the NZT Specified Works. EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:88: (vii) the deposit of rock armour protection; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:99: (vii) the deposit of rock armour protection; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:109: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:109: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:111:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:112:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:113: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:113: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:115: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:115: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:116:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:116:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:118:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:118:Retained apparatus: protection of electricity undertaker EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:119:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:119:Retained apparatus: protection of gas undertaker EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:120:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:121:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:123:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:123:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:124: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:124: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:125:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:126:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:127: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:127: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:129: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:130:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:131: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:131: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:133:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:135:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:136: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:136: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:138:Cathodic protection testing EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:138: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:139: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:139:measures for providing or preserving cathodic protection. EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:139: (i) the execution of any works under this Order including for the protection of the EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:140: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:140: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:142: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:142: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:143: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:150: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:150: 117. For the protection of Northern Powergrid (Northeast) Plc the following provisions have EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:152:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:152: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:154: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:154: 135. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:156: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:156: 143. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:158: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:158: 156. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:161: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:161: 169. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:162:the approval of plans, inspection of any works or protection of the Sabic pipeline, which may be EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:163: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:166: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:166: with any deficiency in the expected level of protection afforded by those requirements; EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:169: FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:169: 197. For the protection of Anglo American the following provisions have effect, unless EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:174:the approval of plans, inspection of any Specified Works or the alteration or protection of the EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:174: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:174: 204. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:176: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:176: 214. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:183: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:183: 245. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:185: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:185: 253. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:187: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:187: 261. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:188:the approval of plans, inspection of any works or protection of the HPU operations, which may be EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:189: FOR THE PROTECTION OF NAVIGATOR TERMINALS SEAL SANDS EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:189: 270. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:191: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:191: 278. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:191: “the standard protection strips” means strips of land falling within the following distances to EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:191: 280. The undertaker must not within the standard protection strips interfere with or build over EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:191:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:192:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:192:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:193:for the protection or alteration of apparatus, the undertaker must use all reasonable endeavours to EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:193: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:193: 290. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:194:(retained apparatus: protection), 298 (expenses) and 299 (indemnity), this Schedule does not apply EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:195:Retained apparatus: protection EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:197:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:199:Cathodic protection testing EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:199: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:199: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:199:cathodic protection. EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:200: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:200: 306. For the protection of the NT Group (as defined below), the following provisions have EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:201: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING AND EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:201: 311. For the protection of TGLP and TGPP, the following provisions have effect, unless EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:3: SPA Special Protection Areas EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:13: Teesmouth and Cleveland Coast Special Protection Area (SPA) and EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:34: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:63: protection, submitted to the relevant planning EN010103-001562-NZT DCO 8.19 - CF Fertilisers UK Ltd SoCG - May 2022.pdf:9: agreement on terms that provide the appropriate protection for CFL’s operations EN010103-001562-NZT DCO 8.19 - CF Fertilisers UK Ltd SoCG - May 2022.pdf:9:3.6.2 Protections of proposed and existing Infrastructure are being offered as part of the EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:7: parties and to provide the Applicants’ final position on the protections required where provisions to EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:20: statutory undertakers have a ‘relevant or operators of mains, pipelines or cables so that the protection is not limited to EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:20: parties to whom these protections EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:20: Electronic electronic communication code communications code networks, and provide appropriate protection to ensure EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:21: provide for protections which are EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:22: National Grid Gas plc (NGG) view that the protections included in Part 4 are adequate to protect NGET and EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:22: soon as possible. The Applicants are of the view that the protections included in EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:23: Asset Protection Agreement and Protective Provisions and the parties have EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:24: also provide appropriate protection for Exolum’s operations and interests. EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:24: possession protections are not to apply (because no need for those protections EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:27: the freehold owner of operational land On 4 May 2022 NRIL provided the Applicants with a draft form Asset Protection EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:28: The DCO protective provisions provide suitable and proportionate protection to EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:28: appropriate and proportionate protection for Northern Powergrid. EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:30: apparatus and the North Tees facilities. In order to ensure adequate protection EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:30: With SABIC’s proposed protections in place, the Applicants consider that the EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:32: here, where the protective provisions with Sembcorp provide protection for EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:32: owners or operators within the pipeline corridor who have separate protection EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:32: Wilton site, and noting the significant protections proposed by the Applicants in EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:43: the North Tees facilities. In order to ensure adequate protection for HPU’s EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:44: With HPU’s proposed protections in place, the Applicants consider that the EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:44: protection proposed in the draft provisions amount to appropriate protection for EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:44: The DCO protective provisions provide suitable and proportionate protection to EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:44: build, remove or disconnect apparatus within standard protection strips unless EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:45: Networks representation and so s127 is not Provisions, with drafts of an Asset Protection Agreement and Protective EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:46: proportionate protection for the NT Group’s functions and roles as a landowner EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:46: extensive protection proposed by the Applicants in the updates provisions EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:47: careful consideration as to what protection is required and can be agreed, EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:47: in order to provide adequate protection to NSMP in this respect whilst EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:49: 5. It is likely that protections will be required in respect of NSMP’s other rights EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:49: between the protection for relevant works packages A and B, is that for B EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:50: the same level of protection as has been proposed by the EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:50: Protections set out above relating to NSMP’s site rules and regulations and EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:51: therefore considers appropriate protection is provided for NSMP interests across EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:33: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:61: protection, submitted to the relevant planning EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:3: • Protection of Wrecks Act 1973; EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:3: • Protection of Military Remains Act 1986; EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:26: Protection of Military Remains Act (PMRA) 1986 (c. 35). London: The EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:26: Protection of Wrecks Act (PWA) 1973 (c. 33). London: The Stationery EN010103-000933-NZT DCO 6.3.24 ES Vol II Figure 9-3 Ecological Designations.pdf:1: Special Protection EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:4:41. Protection of interests EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 16 — FOR THE PROTECTION OF THE SEMBCORP UTILITIES EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASHANGLO EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 22 — FOR THE PROTECTION OF HUNTSMAN EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 23 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 24 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 26 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:6: PART 27 — FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:8: Act and further includes pipelines (and parts of them), aerial markers, cathodic protection test EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:8: pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:34:Protection of interests EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:42: (ii) cathodic protection posts; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:44: (vi) works for the protection of buildings and land; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts;and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:46: (b) the approximate number and location of cathodic protection posts and marker posts.; and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:46: (b) the approximate number and location of cathodic protection posts and marker posts.; and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:47:Landscaping Landscape and biodiversity protection management and enhancement EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:47:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:51: Environmental Protection Act 1990(a); EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:51: Protection Act 1990; and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:52:commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:53:Protection of highway surfaces EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:54: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:54: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:61: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:61: 1. The provisions of this Part apply for For the protection of Net Zero Teesside the NZT EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:64:to such reasonable conditions as may be required for the protection or alteration of or access EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:66:inspection of any York Potash specified works Specified Works or the alteration or protection EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:91: (vii) the deposit of rock armour protection; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:103: (iv) the deposit of rock armour protection; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:104: (vii) the deposit of rock armour protection; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:115: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:115: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:117:for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:118:inspection, removal, alteration or protection of any apparatus or the construction of any new EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:119: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:119: 12.—(1) For the protection of any operator, the following provisions have effect, unless otherwise EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:120: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:120: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:122:up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: protection EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:123:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:124:Retained apparatus: protection of electricity undertaker EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:125:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:125:Retained apparatus: protection of gas undertaker EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:126:Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:126:connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:129:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:129:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:129: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:129: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:131:protection of the apparatus, or for securing access to it, and Air Products is entitled to watch and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:132:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:133: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:133: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:135: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:136:alteration or protection of any CATS pipeline which may be required in consequence of the EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:136: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:136: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:138:require to be made for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:140:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:142: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:142: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:144:Cathodic protection testing EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:144: (a) the authorised development might interfere with the cathodic protection forming part of the EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:144: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:144:providing or preserving cathodic protection. EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:144: (i) the execution of any works under this Order including for the protection of the Exolum EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:145: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:145: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed in EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:147: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:147: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:148: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:156: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:156: 117.116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:158:for the protection of the apparatus, or for securing access to it, and Northern Powergrid is entitled EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:158: (a) in, or in connection with, the inspection, removal, alteration or protection of any apparatus EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:160: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:160: 135.134. For the protection of NPL, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:162: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:162: 143.142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:165: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:165: 156.157. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:167: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:167: 169.170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:169:the approval of plans, inspection of any works or protection of the Sabic pipeline, which may be EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:169: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITEDTHE EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:169: 179. 178.For the protection of Sembcorp, the following provisions have effect, The provisions of EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:173: (a) the inspection, removal and relaying or replacing, alteration or protection of any apparatus EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:173: any deficiency in the expected level of protection afforded by those requirements; EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:176: FOR THE PROTECTION OF YORK POTASHANGLO AMERICAN EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:176: 197.196.The provisions of this Part apply for For the protection of York Potash Anglo American EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:180:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:182:works Specified Works or the alteration or protection of any apparatusthe Anglo American EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:182: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:182: 204.215. For the protection of Suez, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:184: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:184: 214.225. For the protection of South Tees Development Corporation, Teesworks Limited and EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:192: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:192: 245.256. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:194: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:194: 253.264. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:196: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:196: 261.272. For the protection of HPU, the following provisions have effect, unless otherwise agreed EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:197:the approval of plans, inspection of any works or protection of the HPU operations, which may be EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:198: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES SEAL EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:198: 270.279. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:199: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:199: 278.287. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:200: “the standard protection strips” means strips of land falling within the following distances to EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:200: 280.289. The undertaker must not within the standard protection strips interfere with or build over EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:200:the apparatus is laid in a trench) within the standard protection strips unless otherwise agreed in EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:201:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:201:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:202:for the protection or alteration of apparatus, the undertaker must use all reasonable endeavours to EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:202: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:202: 290.297. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:203:304 297 (retained apparatus: protection), 305 298 (expenses) and 306 299 (indemnity), this Schedule EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:205:Retained apparatus: protection EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:206:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:208:Cathodic protection testing EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:208: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:209: (b) the apparatus might interfere with the proposed or existing cathodic protection forming part EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:209:cathodic protection. EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:209: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:209: 306.313. For the protection of the NT Group (as defined below), the following provisions have EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:210: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING AND EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:210: 311. For the protection of TGLP and TGPP, the following provisions have effect, unless otherwise EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:3: SPA Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:60: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:60: head, the introduction of rock armouring / scour protection (with an expected EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:61: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:61: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:61: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:61: circular footprint for the proposed scour protection therefore follows this design EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:61: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:63: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:72: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:80: introduction of a small volume of rock armouring / scour protection due to the Proposed EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:87: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:88: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:127: Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:128: Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:129: Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:130: Special Protection Area EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:132: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:132: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:132: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:132: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:133: circular footprint for the proposed scour protection therefore follows this design EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: scour protection at the outfall location. EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: be incorporated into the design and the height of the protection above the seabed should EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:134: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:135: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:135: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:135: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-000085-Acknowledgement of s46 Notification April 2021.pdf:2:your obligation under the current data protection legislation to process personal data EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:2: EIA Environmental Protection Act EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:2: EPA Environmental Protection Act EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:14: Act 2005 (Ref. 2) as a form of statutory nuisance under the Environmental Protection EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:21: -Special Protection Area (SPA) Residential Receptors EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:45:Ref. 3 - Environmental Protection Act, 1990 EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:48: Special Protection Area EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:3: SPA Special Protection Areas EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:8: These representations are made on behalf of Air Products Public Limited Company (“APPLC”) and Air asset protection agreement with them. The Applicants will continue to work with APPLC and APRE, and hope EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:10: APPLC and APRE and the need to ensure that suitable permissions and protection is provided to the EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:11: otherwise used by APPLC and APRE and fails to ensure that APPLC and APRE are granted sufficient rights protective provisions included in the Draft Order REP2-002 provide adequate protection for APPLC / EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:12: existing Infrastructure and the method by which suitable protections will be put in place. These issues information and adequate protection/controls for APPLC / APRE. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:20: progress the necessary agreements and protective provisions, which are essential for the protection of are expected to be concluded during Examination and signed in parallel to the property agreements. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:20: however nothing has yet been agreed and, before any agreement can be reached, Anglo American await 7.4-7.5 Noted. Negotiations in relation to the protection provisions are currently progressing between EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:28: controls and protections in place to ensure the safe and continued operation of the CATS pipelines. The EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:50: 1.1 This Written Representation is submitted on behalf of HPU in respect of the Net Zero Teesside supports the principle of the DCO being made subject to the proper protection of its undertakings. As set EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:50: 1.4 Subject to the proper protection of their undertakings, HPU do not object in principle to the making transport through the existing 24” Sembcorp Gas Pipeline under the River Tees to nearby Northumbrian EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:51: adequate protection in the event that no agreement can be reached with Sembcorp. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:51: Further to the protections identified above, the Examining Authority is directed to the Applicants’ EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:52: As a further protection to HPU, the Applicants have included an indemnity in favour of HPU in the EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:53: If compulsory acquisition powers were used without protection or qualification, HPU would be The Applicants have not sought any powers in the Draft DCO REP2-002 to restrict or manage navigation EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:55: third-party operators including Sembcorp in order to secure the land rights and related protections for EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:56: Saltholme 275kV Substation (outside the red line but in close proximity so may be some impact on access protection of NGET, including in relation to its assets and access routes. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:57: that appropriate protection for the NGET Assets and OHL and any other retained apparatus is maintained EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:57: 3 NGET REGULATORY PROTECTION FRAMEWORK 3.1-3.2 Acknowledged, the Applicants intend to respect the standards and protocols listed, and work EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:58: works within the vicinity of NGET’s apparatus are not authorised or commenced unless protective and bring forward additional protections in the draft DCO to be submitted at Deadline 4. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:60: (b) that appropriate protection for Feeder Mains and AGI’s and any other retained apparatus is EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:60: 3 NGG REGULATORY PROTECTION FRAMEWORK 3.1-3.3 Acknowledged, the Applicants intend to respect the standards and protocols listed, and work EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:60: control and protection for all retained assets (including Feeder Mains and the AGI’s) and assurance that EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:62: Teesmouth and Cleveland Coast Special Protection Area (SPA), which is designated for: those screened in are set out in paragraph 5.2.2. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:66: a. The potential for process water discharges (particularly nitrogen) to have adverse effects on site An assessment of installing rock armour protection has been included in an updated Habitats EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:66: b. The potential impacts of installing rock armour protection have not been assessed in the HRA. assessment of the impacts of horizontal directional drilling (HDD) boring identified by Natural England in EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:66: impacts of installing rock armour protection, and the potential impacts of a bore collapse or drilling fluid EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:67: 2.7.3. The potential impacts of installing rock armour protection have not been assessed in the HRA. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:69: pipe with no basis for control and protection within a heavily regulated corridor where occupiers into Land Limited owned plots. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:70: NWL is negotiating its own set of Protective Provisions with the Applicant. These negotiations have been requiring NWL’s approval to works within the ‘standard protection strips’ and prior to altering, removing EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:77: customer of RBT, with the negotiated contractual protections within the Side Agreement, with the ability EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:77: interest. Terminal is required to import AILs and ensure a deliverable scheme. For the protection of RBT, EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:80: respect of the Net Zero Teesside Project DCO Application (“the Scheme”) . protective provisions, with a view to reaching agreement on the terms of those protections during the EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:81: adequate protection in the event that no agreement can be reached with Sembcorp. EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:81: Further to the protections identified above, the Examining Authority is directed to the Applicants’ EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:82: therefore, possible to give an account of consequential all losses at this stage, however they could In any case, and as a further protection to SABIC, the Applicants have included an indemnity in favour of EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:92: can require reasonable protection of their existing assets, but also identify applicable code and EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:92: have appropriate recourse and protection if during construction or maintenance their apparatus is EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:99: requires suitable protection via the draft Order to ensure that its own development proposals are not stymied by Applicants have shared with STDC the scope of this study for review and comment before it is carried out . EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:101: development across the Teesworks site and has identified additional protections in response to the concerns EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:102: 5.1.2 Requirement no. 12: Flood risk mitigation Applicants have proposed robust protections that it considers will safeguard STDC’s interests, but will continue to EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:103: 5.3.2 Requirement no. 4 – Landscaping and biodiversity protection management and enhancement EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:103: proportionate control over compulsory acquisition powers. Only this level of protection secures STDC’s interests in EN010103-001208-NZT DCO 6.4.34 - ES Vol III Appendix 15A - Oct 2021.pdf:4: Special Protection Area EN010103-001348-NZTDCO 6.3.14 Rev 2 ES Addendum Vol II Figure 8-2 Air Quality Study Area Ecological Receptors.pdf:1: E7 Special Protection Area EN010103-002410-NZT DCO - 9.46 Applicants’ Response to the ExA's Third Written Questions - Oct 2022 (D11).pdf:3: SPA Special Protection Areas EN010103-002410-NZT DCO - 9.46 Applicants’ Response to the ExA's Third Written Questions - Oct 2022 (D11).pdf:16: reporting, protection and management of unexpected archaeological EN010103-002410-NZT DCO - 9.46 Applicants’ Response to the ExA's Third Written Questions - Oct 2022 (D11).pdf:25:under the Freedom of Information Act, Data Protection Act or for litigation. Email messages and attachments sent to or from any Environment Agency address may also be accessed by someone other EN010103-000939-NZT DCO 6.3.19 ES Vol II Figure 8-7 Annual Mean NOx Process Contribution.pdf:1: Special Protection Area EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:4:Source Protection Zones EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:10:Source Protection Zones EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:12:Radon Potential - Radon Protection Measures pg 66 Yes n/a EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:13:Special Protection Areas EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Protection Measure: Basic radon protective measures are necessary in the construction of new C12NW 0 1 456000 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Protection Measure: No radon protective measures are necessary in the construction of new C12NW 0 1 455975 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Protection Measure: No radon protective measures are necessary in the construction of new C16SW 0 1 455950 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Protection Measure: No radon protective measures are necessary in the construction of new C10SE 0 1 455000 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:79: Protection Measure: No radon protective measures are necessary in the construction of new C11SE 0 1 455558 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:80: Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:80: Protection Measure: No radon protective measures are necessary in the construction of new C16SE 0 1 456175 EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:98: Designation Details: Special Protection Area EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:99:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:100:Source Protection Zones EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:102:Radon Potential - Radon Protection Measures EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:103:Special Protection Areas EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:104: Scottish Environment Protection Agency EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:15: Teesmouth and Cleveland Coast Special Protection Area (SPA); EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:17: Protection Zones that can potentially be impacted by the Proposed EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:40: the protection of breeding/ non-breeding bird species and other important EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:41: ─ installation of rock armouring / scour protection around the outfall EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:60: 1710.48 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:61: square metres of grassland Limited Protection of Birds Limited on acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:68: 9621.98 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:69: square metres of grassland, Limited Protection of Birds Limited the acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:70: square metres of grassland, Limited Protection of Birds Limited the acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:74: 1418.62 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:75: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:80: 5351.15 square metres of Limited Protection of Birds Transmission Plc acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:81: square metres of grassland Limited Protection of Birds Transmission Plc the acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:85: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:85: square metres of private Limited Protection of Birds Transmission Plc EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:86: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:94: metres of unnamed track Limited Protection of Birds Limited EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:96: 11265.03 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:97: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:99: 2006.75 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf:100: 1388.84square metres of Limited Protection of Birds Limited the acquisition type EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:3: – Owner 10 parties on the protective protection awaited from EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:4: Protection Agreement prior to EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:4: and proportion protection for EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:4: Exploration – Owner 4, 5c, 6, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:4: Occupier 142a, 158a, 166a, 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:5: 111, 113, 126, 136, by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:5: 153, 158, 166, 166b, protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:7: 10, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:7: 135, 138a, 141a 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: – Owner 6, 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:8: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:9: – Owner 403, 450, 112 2b, 3a, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:9: Occupier (b) 12a, 142a, 184a, 10 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:9: 176b, 184, 185, 190, by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:9: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:15: Petroleum – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:15: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: Production (U.K.) – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:16: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:17: Limited 476, 479, 482, 540b, 3b, 4, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:17: 5c, 6, 8, 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:17: 496, 500, 502, 504, by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:18: 540d protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:18: Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:18: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:18: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:18: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: Company Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: Limited – Owner 6, 10 protection in the draft DCO EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:19: Occupier protection of electricity, gas, EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:20: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:20: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:21: – Owner 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:21: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:21: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:21: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:22: Environmental – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:22: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:23: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:23: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:23: Limited – Owner 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:23: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:24: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:24: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:24: Teesside Limited – Owner 6, 9b, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:24: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:24: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: Biofuels Teesside – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: Holding Limited 330, 333 6, 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:25: (b) - 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:26: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:26: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:26: Environmental – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:26: Occupier 362, 363, 367, 370, 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:27: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:27: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:28: Polymers Limited – Owner 6, 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:28: Occupier 12a, 138a, 141a, 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:28: 174d, 176, 176b, by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:28: 196, 2, 202c, 20a, protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:32: provide protection for One- not be the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:32: Services (UK) – Owner 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:32: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:32: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:32: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: Plc – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:33: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:34: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:34: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:35: Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:35: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:35: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:36: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:36: Chemical UK – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:36: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:36: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:36: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:38: the protections included in EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:39: the protections included in EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:46: Petroleum UK – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:46: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:46: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:47: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:47: Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:47: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:47: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:47: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:49: Plc – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:49: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:49: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:49: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:49: Networks Limited – Owner 6, 9b, in contact with Northern Gas protection have EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:50: 31, 343, 347, 360, protection agreement on 5 response is EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:50: Protection Agreement prior to EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:50: Protection EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:51: Processing – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:51: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:51: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:51: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:55: 535 protection for One-Dyas UK as EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:55: Limited – Owner 341, 346, 361, 364, 3a, 5c, included protection in the have written to EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:55: Occupier 396, 402, 403, 414, 9a, 10 12) for the protection of Limited EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: Limited included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: Limited included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:57: 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:58: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:58: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:58: Limited 6, 9b, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:58: 166a, 171a, 176a, 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:59: 190b, 191, 191a, by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:59: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:62: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:63: UK Plc – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:63: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:63: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:64: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:67: Transportation – Owner 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:67: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:67: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:67: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:70: Energy Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:70: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:70: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:70: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:89: – Owner 6, 10 included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:89: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:90: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:90: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:90: Specialties UK – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:90: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:91: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:91: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:91: Energy Limited – Owner included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:91: Occupier 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: protection is in place for the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: Limited – Owner 330, 333 5c, 6, included protection in the EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: Occupier (b) - 12) for the protection of EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: by the protection offered by EN010103-002519-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Nov 2022 (D12).pdf:92: protection is in place for the EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:32: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:61: protection, submitted to the relevant planning EN010103-002340-NZT - Final Agendas and ASI2 Oct 2022.pdf:11: • The potential effect of rock armouring/ scour protection associated with the proposed new EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:4:41. Protection of interests EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:5: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:8:protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:8:-optic cables, pipe and cable protection telecommunications equipment and electricity EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:32:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:32:Protection of interests EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:32: Environmental Protection Act 1990 (c.43). EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:37: (ii) cathodic protection posts; EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:39: (vi) works for the protection of buildings and land; EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:42:Landscaping and biodiversity protection management and enhancement EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:42:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:46:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:47:Protection of highway surfaces EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:47: (d) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:47: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:53: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:53: 24. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:55:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:56:specified works or the alteration or protection of any apparatus. EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:83: (vii) the deposit of rock armour protection; EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:96: (iv) the deposit of rock armour protection; EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:96: (vii) the deposit of rock armour protection; EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:110: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:110: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:112:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:113:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:114: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:114: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:115: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:115: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:117:stopping up), 25 (retained apparatus: protection of electricity undertaker), 26 (retained apparatus: EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:117:protection of gas undertaker), 27 (expenses) and 28 (indemnity) of this Schedule which will apply EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:119:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:119:Retained apparatus: protection of electricity undertaker EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:120:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:121:Retained apparatus: protection of gas undertaker EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:121:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:122:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:124:23(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:125:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:125: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:125: 34. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:127:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:127:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:130:for the protection of the apparatus, or for securing access to it, and Air Products is entitled to EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:130:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:132: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:132: 54. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:134: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:134: 63. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:136: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:136: 73. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:137: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:137: 81. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:139: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:139: 89. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:140: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:147: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:147: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:149:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:149: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:152: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:152: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:153: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:153: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:155: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:155: 156. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:158: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:158: 169. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:159: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:159: 177. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:161: FOR THE PROTECTION OF YORK POTASH EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:161: 185. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:163:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:164:the alteration or protection of any apparatus. EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:164: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:164: 205. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:166: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:166: 215. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:4:Source Protection Zones EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:9:Source Protection Zones EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:12:Special Protection Areas pg 111 1 EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:38: 41 Operator: Royal Society For The Protection Of Birds B14NW 0 2 449732 EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:116: Radon Potential - Radon Protection Measures EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:116: Protection Measure: No radon protective measures are necessary in the construction of new B11NW 0 1 450422 EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:116: Radon Potential - Radon Protection Measures EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:116: Protection Measure: No radon protective measures are necessary in the construction of new B10NW 0 1 450000 EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:123: Designation Details: Special Protection Area EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:123: Special Protection Areas EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:124:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:125:Source Protection Zones EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:127:Radon Potential - Radon Protection Measures EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:128:Special Protection Areas EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:129: Scottish Environment Protection Agency EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:15:SPA Special Protection Area EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:15:USEPA US Environmental Protection Agency EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:20: suggests that no specific ground gas protection measures are required to be incorporated into the EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:25:the Teesmouth and Cleveland Coast RAMSAR, Site of Special Scientific interest (SSSI) and Special Protection EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:32:telescope drilling techniques were employed to allow the insertion of Aquifer Protection. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:89:potable water in the future. This is reaffirmed in that the site is not within or near a groundwater source protection EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:90:Based on the results the site could be classified as CS1. This provisionally indicates that no specific gas protection EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:97: Elevated concentrations of coal tar, membranes with loss of protection. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:109:corrosion protection to buried steel or allowance for steel section loss could be provided as part of the design. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:115:protection. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:122:A minimum total highway pavement construction thickness of 450mm is recommended for frost protection. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:237:commercial/industrial end use and protection of sensitive controlled water receptors. A hierarchy of controlled water EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:247:Therefore, with regard to protection of groundworkers this is considered to be an arbitrary value on which to screen the EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:254:protection of the surface water and England & Wales Drinking Water Standards (DWS) for aquifer protection. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:254:• US Environmental Protection Agency (USEPA), Risk Screening Levels, May 2020. Tap water. EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:255:The site is not within or near a groundwater source protection zone. Therefore, the use of Drinking Water Standards EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:276:Rounds 2 and 3. This is partly due to a stringent DWS criteria (United States Environmental Protection Agency Regional EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:277:the future. This is reaffirmed in that the Site is not within or near a groundwater source protection zone. Therefore, the EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:BS 8485 (BSI, 2015) states the requirements for gas protection are based on the CS score and the resulting building EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:type. These are combined to provide a gas protection score. The proposed development classifies as a Type D building EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:in accordance with Table 3 in BS 8485. The gas protection score for a Type D building constructed on a CS1 site is 0 EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:(refer to Table 4 in BS 8485). The standard provides various gas protection measures, each with their own points score EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:measures and gas resistant membranes. However, as the site is scored at 0, no protection measures are deemed to EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:281:design of appropriate in-ground protection measures following BS 8485 (BSI, 2015). EN010103-001234-NZT - Regulation 32 Transboundary Screening (9).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:4: Environmental Protection Act 1990 EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:4:11.2.1 The Environmental Protection Act 1990 (EPA), Part 3 identifies that noise (and EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:9: considered that the protection of quiet places and quiet times as well as EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:11: the protection and enhancement of valued landscapes and areas of tranquillity; EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:28: example Special Protection Areas EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:23: - Article 41 provides protection for statutory undertakers and others through EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:23: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:25: cables, pipe and cable protection equipment and telecommunications EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:25: equipment, and to include aerial markers, cathodic protection test posts and field EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:25: protection (4) and the construction environmental management plan (16)). The EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:30: to sub-paragraph 11(1). This provides protection for the street authority for the EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:33: landscaping and biodiversity protection plan for that part has been submitted to and EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:33: the Order specifies that the landscaping and biodiversity protection plan must EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:35: protection of the underground elements of the Proposed Development would EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:40: under the Environmental Protection Act 1990, if the statutory nuisance is created in EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:40: The Applicants consider that the Requirements provide sufficient protection against EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:40: Environmental Protection Act 1990. EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:49:3.8.38 Requirement 4 (Landscaping and biodiversity protection management and EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:49: modified to make additional provision for biodiversity protection management and EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:49: protection plan to the relevant planning authority prior to commencing the EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:49: protection for the landscaping and biodiversity elements during construction, whilst EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:51: protection and mitigation measures has been submitted to and approved in writing EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:52:3.8.56 Requirement 17 (Protection of highway surfaces) - this is not a model provision. It EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:57: information on the relevant parties and protections. EN010103-002351-NZT CAH3 S1.pdf:1:which the general data protection regulations apply. The planning inspectors practice is to retain and EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:3: SPA Special Protection Areas EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:29: National Grid will require appropriate protection for retained reduced the Order Limits around the Tod Point 275kV substation. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:29: National Grid will require appropriate protection and further EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:29: National Grid Infrastructure within/in close proximity to the protection of NGET’s assets. These discussions are ongoing, and the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:31: Teesside BOC AGI Protection of National Grid Assets As a EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:31: National Grid’s primary concern is to meet its statutory obligations The Applicants consider that appropriate protection for retained EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:32: works pursuant to the Order (if made) will ensure protection for EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:34: National Grid will require appropriate protection for retained EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:34: apparatus including compliance with relevant standards for works The Applicants consider that appropriate protection for retained EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:34: appropriate protection and further discussion is required on the 2021 in relation to the negotiation of protective provisions for the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:34: impact to its apparatus and rights. Further detail is set out below. protection of NGG’s assets. These discussions are ongoing, and the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:36: • Teesside BOC AGI Protection of National Grid Assets EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:37: pursuant to the Order (if made) will ensure protection for those EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:46: pipe with no basis for control and protection within a heavily Where necessary the Applicants have included protective provisions EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:47: provisions in the Draft DCO AS-136 to ensure adequate protections EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:51: ensure appropriate protection for existing Infrastructure. Following EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:54: 1.9.1 adversely affect CFL’s existing pipeline and cabling Protections of existing Infrastructure are being offered as part of the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:55: occur between the two proposed pipelines. Protections of proposed EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:59: Quorn Foods; 2.6.5 2 x 135kV electricity cables connecting Saltholme protection by way of the protective provisions in the Draft DCO [AS- EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:59: protections via those means. For the owners and operators of EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:59: of bespoke protective provisions, they will have the protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:59: DCO for the protection of electricity, gas, water and sewerage EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:60: constructions programmes. Without appropriate protections, there At this stage of the project the Applicants do not have detailed EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:61: context of critical Infrastructure which must be maintained in situ which are intended to provide the type of protections referred to by EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:61: 3.1 Aside from its existing Infrastructure, CFL has the benefit of a protective provisions to provide protection with respect to its EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:63: 5.1 The protective provisions for CFL are contained in Part 6 of relation to the negotiation of protective provisions for the protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:64: above, that requires protection and the need for CFL to be provided EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:65: and similar businesses greater protection in protective provisions. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:69: expected that these concerns can be addressed by the inclusion of provisions for the protection of INEOS Nitriles’ operations. These EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:70: to existing occupiers. Existing apparatus is proposed to have protection by way of the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:70: the DCO provides appropriate protections via those means. For the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:70: protection afforded by the standard protective provisions included in EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:70: the Draft DCO AS-136 for the protection of electricity, gas, water EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:71: Without appropriate protections, there is no guarantee that the CO2 Gathering Network Pipeline. Surveys have been undertaken by EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:72: without interruption and with a continuous right of access for protections referred to by INEOS Nitriles, in order to address EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:73: Schedule 12. The current draft fails to adequately protect INEOS, provisions for the protection of INEOS’s operations. As part of these EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:77: wish to ensure the protection of its future ability to provide an EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:78: any necessary measures for the temporary protection of EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:78: carriageway surfaces, the protection of statutory EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:81: to ensure that the consistency of supply, safe use and maintenance ensure appropriate protection is in place and that AP’s concerns are EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:81: to continue its operations safely and economically (bearing in mind asset protection agreement with AP to ensure adequate protections EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:81: vicinity of such apparatus, and protection if apparatus needs to be EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:81: appropriate protection is in place and AP’s concerns are addressed. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:82: existing Infrastructure and the method by which suitable protections no issues have been raised by the relevant local authorities or the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:105: Environmental Protection Act 1990. Solution: Reference to EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:118: Royal Society for the Protection of Birds (RSPB) Saltholme within the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:123: armouring and scour protection around the outfall head. It is EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:123: armouring / scour protection (with an expected volume of 250 m3) EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:133: The Environmental Protection (Duty of Care) Regulations 1991 for EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:137: • The potential impacts of installing rock armour protection have not EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:139: 1.1.1. the Teesmouth and Cleveland Coast Special Protection Area EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:139: 1.4.2. The project includes the installation of rock armour protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:142: 2.3.2.1. Chapter 14 Marine Ecology and Nature Conservation of the Natural England’s comments on the rock armour protection for the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:142: Bay. This includes the installation of rock armour protection to the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:144: protection within the SPA, as part of the project’s HRA. Proposed Development will meet the Environmental Permit EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:147: railway safety, the developer must liaise closely with Network Rail Protection and Property Teams including to ensure that the project EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:147: Asset Protection and Property Teams to acquire the necessary does not impact on Network Rail’s operational safety. The EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:147: including the proposed pipelines, will not have an adverse impact on 136] and which provide the necessary protection for Network Rail’s EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:147: Network Rail will be seeking protection from the exercise of The Applicants’ preference is to enter into voluntary agreements EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:147: wish to agree protection for the railway during the course of the Applicant to be adequate. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:148: alongside the railway line will require appropriate asset protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:148: to be entered into, for example, asset protection agreements, , voluntary agreement, to be in place before the commencement of EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:148: maintained at all times. In any event you must contact Network Rail’s protection team. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:148: Asset Protection Engineers as soon as possible in relation to this EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:148: AssetProtectionEastern@networkrail.co.uk. Network Rail is prepared EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:150: protection to Northern Powergrid. EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:151: to agree appropriate amendments. protection of Northern Powergrid’s operations and assets. These EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:152: southern and eastern boundaries of the Brans Sands sewage works negotiation of protective provisions for the protection of NWL’s EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:155: sufficient protection is provided in the protective provisions as set EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:155: 5 – insufficient protection is provided in the draft DCO for NWL EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:156: 6(7) – NWL requires the 300 millimetre protection zone to be EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:156: protection of apparatus is required and if so, to consider NWL's EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:169: relevant planning authority; (e) the phasing of any restoration works; negotiation of protective provisions for the protection of PDT’s EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:170: 4.1 Whilst the proposed protective provisions offer some protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:170: 4.2 Aside from PDT’s interests, there must also be protection from EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:178: the negotiation of protective provisions for the protection of EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:198: is necessary for the operation, maintenance, and protection of the EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:207: provisions for the protection of PD Teesport Limited define “the PD EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:211: regeneration of Teesworks, and contrary to the Local Plan. Whilst provide sufficient protection in order to allow the Secretary of State EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:213: will need to be satisfied that sufficient protections are in place (e.g. precedent for this approach in other DCOs for energy Infrastructure EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:245: addressed (or be shown to be negligible) within the protection will be undertaken post-DCO consent and will include appropriate EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:270:39.2.1 In terms of the additional protection Exolum requires to ensure its apparatus is EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:270: Applicants are currently negotiating protective provisions and an asset protection EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:270: agreement with Exolum to ensure adequate protections are in place in this respect. EN010103-002096-NZT DCO 6.3.20 - ES Vol II Figure 8-8 Maximum 24 hour Mean NOx Process Contribution August 2022 (D6).pdf:1: Special Protection Area EN010103-001234-NZT - Regulation 32 Transboundary Screening (12).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-002088-NZT DCO 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas August 2022 (D6).pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-002088-NZT DCO 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas August 2022 (D6).pdf:1: N 4 Special Protection Areas (SPA) EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:46: the information provided is considered to be too activities (including rock armour and scour protection; using a EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:46: impacts of rock armour and scour protection. The Interestingly, based on the observed communities in the Tees Bay, we EN010103-000005-EN010103_Scoping Report.pdf:17: and Cleveland Coast Special Protection Area (SPA) and the Teesmouth and EN010103-000005-EN010103_Scoping Report.pdf:19: ─ The Main Site is not located near any Groundwater Source Protection EN010103-000005-EN010103_Scoping Report.pdf:30: Cleveland Coast Special Protection Area (SPA), an internationally designated EN010103-000005-EN010103_Scoping Report.pdf:40: Air Quality in the Tees Valley 2012 – 2015’ (Tees Valley Environmental Protection EN010103-000005-EN010103_Scoping Report.pdf:46:6.44 There are no groundwater Source Protection Zones or Drinking Water Protected EN010103-000005-EN010103_Scoping Report.pdf:49: Regulations’) provide for the ecological designation and protection of 'European EN010103-000005-EN010103_Scoping Report.pdf:49: sites', the protection of 'European protected species', and the adaptation of planning EN010103-000005-EN010103_Scoping Report.pdf:49: and other controls for the protection of European Sites. EN010103-000005-EN010103_Scoping Report.pdf:52: solely relying on the legal protection of a habitat or species to characterise ecological EN010103-000005-EN010103_Scoping Report.pdf:61: criteria that have been established for the protection of human health (e.g. air quality EN010103-001730-Written Representation (CATS North Sea Limited).pdf:20:whether a repair is required or to reinstate the corrosion protection coating system. Please note EN010103-001730-Written Representation (CATS North Sea Limited).pdf:24:5.2 Cathodic Protection ……………………………………………………………………………………. 8 EN010103-001730-Written Representation (CATS North Sea Limited).pdf:25:7.3 Temporary Protection …………………………………………………………………………………. 9 EN010103-001730-Written Representation (CATS North Sea Limited).pdf:25:8.5 Protection of Exposed Pipeline …………………………………………………………………… 10 EN010103-001730-Written Representation (CATS North Sea Limited).pdf:30:5.2 Cathodic Protection EN010103-001730-Written Representation (CATS North Sea Limited).pdf:30: i. CATS pipelines have active cathodic protection which is monitored regularly. Where a new EN010103-001730-Written Representation (CATS North Sea Limited).pdf:30: the cathodic protection system will be adversely affected. EN010103-001730-Written Representation (CATS North Sea Limited).pdf:30: ii. Should any Cathodic Protection posts or associated apparatus have to be moved to facilitate EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:pipeline protection shall be provided. This will generally be by means of a protective reinforced EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:pipeline protection. EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:7.3 Temporary Protection EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:It may be necessary at crossing points to install temporary protection over the wayleave. Such EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:protection may, at the discretion of the CATS pipelines team, consist of the laying of steel plates of EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:The design and construction of such protection is to be approved by the CATS pipelines team. The EN010103-001730-Written Representation (CATS North Sea Limited).pdf:31:protection installed shall be maintained in good condition to the satisfaction of the CATS EN010103-001730-Written Representation (CATS North Sea Limited).pdf:32:8.5 Protection of Exposed Pipeline EN010103-001730-Written Representation (CATS North Sea Limited).pdf:37: Protection of Pipe ……………………………………………………………………………………….. 6 EN010103-001730-Written Representation (CATS North Sea Limited).pdf:41: Protection of Pipe EN010103-001730-Written Representation (CATS North Sea Limited).pdf:42:the protection of any foreign services that may be uncovered within the extent of the excavation. EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:3: which are proposed for inclusion in the dDCO for the protection of the Wilton Complex and its EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:14: safety so they can require reasonable protection of their existing assets, but also identify EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf:15: and protection if during construction or maintenance their apparatus is damaged. EN010103-002198-Report on the Implications for European Sites (RIES).pdf:5:Conservation (SACs) and candidate SACs, Special Protection Areas (SPAs), possible SACs, potential SPAs, EN010103-002198-Report on the Implications for European Sites (RIES).pdf:8: rock armour protection to the discharge outfall in Tees Bay. EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:8:outbreak of the pandemic, HEALTH Eni considers the protection of the health EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:21: Protection of human rights EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:32: coordination and centralization of protection and medical devices procurement; EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:33: protection systems for surfing the Internet and e-mail, and strengthening of monitoring following the intensive use EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:33: constant updating and alignment of the rules dedicated to the information security management and data protection; EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:41:the protection of confidentiality of corporate information in general, to promote maximum compliance, as EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:41:strategic asset to be managed in such a way as to ensure the protection of the interests of the Company, EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:46: Launched initiatives focusing on the forest’s protection, conservation and sustainable management, mainly in EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:59:protection, export, taxes and foreign exchange. The terms and condition of the leases, licenses and con- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:63:protection projects. EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:63:cooking projects; (iii) biodiversity protection programs and technical-professional training initiatives, also EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:63:through agreements with institutions and Authorities of the Country; (iv) projects of forests protection EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:66: in line with sustainable management, forest protection and biodiversity conservation. EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:66: In this scheme, Eni’s protection forest activities support national governments, local communities and EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:78: Versalis entered the market of agricultural protection, thanks to the alliance with AlphaBio Control, a re- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:78: search and development company engaged in the production of natural formulations for the protection EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:123:nal royalties and taxes on production, environmental protection commercial arrangements and granting of all necessary ad- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:126:which may induce them to intervene in the fiscal framework for obligations, environmental protection measures, control over EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:136:ats. The adoption of new technologies, such as the Internet Violations of data protection laws carry fines and expose us EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:136:evolution of architectures for increasingly interconnected sy- Data protection laws and regulations apply to Eni and its joint EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:136:issue. The Group and its service providers may not be able ch we do business. The EU General Data Protection Regulation EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:136:stem. The Group, like many companies, has been and expects Asia). Non-compliance with data protection laws could expose EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:136:future. As a result, the Group’s activities and assets could su- fected by data protection violations. Violation of data protection EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:140:perience gained managing past epidemics such as Sars-Cov-1 surveillance and protection of fragile workers; (ix) maintenance EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:140:Despite the complex context due to the health emergency, protection. In addition, it must be considered that achieving the EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:141: internal control system over financial reporting; Privacy and personal Data Protection; Transactions involving the EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:141: proved by the Board of Directors) and include sustainability as- and protection of human rights, transparency, promotion of devel- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:142: on climate change and energy transition, in workers' health and safety protection management EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:142: precaution, prevention, protection and emissions into the air, water and soil EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143: Occupational medicine for the protection of the health and safety of workers, in relation to the workplace, to occupational risk factors EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143: Emergency preparation and response with plans that put the protection of people and the environment first EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143: mixtures to ensure human health and environmental protection throughout their life cycle EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143: environmental and human rights protection, through the qualification, selection and assignment of contracts, management and monitoring EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143: Continuous updating of procedures relating to the protection of intellectual property and the identification of service/professional EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:153:mitment to consolidating and developing skills in line with new mental protection, respect and promotion of human rights and EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:154:while the commitment for the contamination remained preva- Eni considers health protection an essential requirement EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:158:enhanced to promote safety at home starting with the “Safe- ucts, radiation protection with regard to the dangers of ex- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:167:mental protection, human rights and cyber security. Eni meets the supply chain and encouraging the entire supply chain to- EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:167:enhancing the aspects of environmental protection, economic PERFORMANCE METRICS AND COMMENTS EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:170: Infrastructure interventions) and forest protection and con- developed: EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:171: ers at some relevant foreign upstream subsidiaries, which in equipped with soap for hand washing; (iii) social protection EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:172: PUBLIC-PRIVATE PARTNERSHIPS Access to water and sanitation; Health; Protection 8 - 9 - 10 - 13 - 15 - 17 EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:172: and conservation of forests and land protection; EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:175: circumstances, or to the mitigating intervention of technical and/or organizational protection systems. Accidental EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:176:AIR PROTECTION NOx: total direct emissions of nitrogen oxide due to combustion processes with air. It includes emissions of NOx from EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:259:and ensuring maximum protection of capital, manages charges. Eni’s interest rate risk management policy is to EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:3: SPA Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:37: levelCritical Level) for the protection of vegetation of 30 µgm-3. In addition, ecological EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:48: armouring / scour protection would result in direct and permanent loss of subtidal EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:48: Bay, it is considered that the introduction of rock armouring / scour protection (with EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:63: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:63: head, the introduction of rock armouring / scour protection (with an expected EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:63: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:63: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:63: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:64: circular footprint for the proposed scour protection therefore follows this design EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:64: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:65: protection of vegetation. EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:70: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:74: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:79: with the Teesmouth and Cleveland Coast Special Protection Area andSPA / Ramsar Site and any EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:88: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:89: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:128: Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:129: Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:130: Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:131: Special Protection Area EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:133: anticipated that scour protection will be required to prevent erosion of seabed around the EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:133: of the seabed will be covered by the rock armour scour protection. The use of rock armour EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:133: as a form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:133: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:134: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:134: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:134: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:134: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:134: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: circular footprint for the proposed scour protection therefore follows this design EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: suitable for scour protection at the outfall location. EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: be incorporated into the design and the height of the protection above the seabed should EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:135: scouring around the perimeter of the rock armour protection. A worst-case footprint can EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:136: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:136: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:136: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001234-NZT - Regulation 32 Transboundary Screening (1).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:30: monitoring and additional protection to prevent infections, EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: Violations of data protection laws carry fines and expose us and/or our urther information: See “Other Regulatory and EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: Data protection laws apply to Shell and its joint arrangements and associates in the vast majority We maintain a Group-wide data privacy programme, EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: of countries where we do business. Since many countries in which we operate have data protection a comprehensive governance structure and established EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: standard to data protection, across the Group and globally. The EU General Data Protection Regulation place for the last 10 years to ensure consistent levels of EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: (GDPR) forms the basis of our Binding Corporate Rules. With data privacy legislation now in force in data protection across the Group. Staff receive clear EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: Non-compliance with data protection laws could harm individuals and expose us to regulatory indirect marketing. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: to litigation from persons or entities allegedly affected by data protection violations. by Shell but not yet fully integrated into our systems. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: Violation of data protection laws is a criminal offence in some countries, and individuals can There is a requirement for newly acquired companies to EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:54:a profit of $7,950 million, compared with a loss of $2,852 million in 2020. protection, social impact, exports, taxes and foreign exchange. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:112:anti-theft protection mechanisms for key Infrastructure such as wellheads Bodo Mediation Initiative. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:154: operation of Shell’s assets and facilities, environmental protection and EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:155:Review Shell’s practices and performance relating to environment, including in particular environmental protection and greenhouse gas emissions EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:161:Review the oil and gas reserves control framework. recovery capabilities, and expanded monitoring and data protection. EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:204: anti-money laundering laws, financial crime, data protection laws and trade EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:268:20% (2020: 23%) of the overall defined liability in the UK relates to ■ Under the Pension Protection Act, US pension plans are subject EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:280:varying degrees by political, legislative, fiscal and regulatory developments, including those relating to the protection of the environment and indigenous EN010103-001525-NZTP-PM-Note-FINAL.pdf:2:3. General Data Protection Regulation EN010103-001525-NZTP-PM-Note-FINAL.pdf:2: Protection Regulation (GDPR). EN010103-002738-Applicant's Cover letter.pdf:2:The updated protective provisions refer to a plan entitled the “Sembcorp Protection Corridor EN010103-002738-Applicant's Cover letter.pdf:2:It should be noted that the new Sembcorp Protection Corridor protective provisions supporting plans EN010103-002738-Applicant's Cover letter.pdf:4: “Sembcorp Protection Corridor protective EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf:23: Risk Assessment (Document Ref. Environmental Protection Nuisance Statement (Document Ref. EN010103-002280-NZT DCO 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan September 2022(D8).pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-002280-NZT DCO 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan September 2022(D8).pdf:1: N 4 Special Protection Areas (SPA) EN010103-001898-NZT DCO 8.12 - Northumbrian Water Ltd SoCG (Clean) July 2022 (D4).pdf:12: appropriate protection to NWL’s apparatus and operations. EN010103-001713-South Tees Development Corporation - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:5: STDC requires suitable protection via the draft Order to ensure that its own development EN010103-001713-South Tees Development Corporation - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: 5.3.2 Requirement no. 4 – Landscaping and biodiversity protection management and EN010103-001713-South Tees Development Corporation - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:9: powers. Only this level of protection secures STDC’s interests in its land, and EN010103-001201-NZT DCO 6.3.53 - ES Vol II Figure 11-2 PCC Site Piling Construction Phase - Oct 2021 Rev.2.0.pdf:1: Special Protection Area EN010103-002325-NZT DCO 9.39 - Applicants' Response to ExA's RFI Oct 2022 (D9).pdf:3: SPA Special Protection Areas EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:31: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, or other EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:58: protection, submitted to the relevant planning EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:4: regulations? If not, please explain why. Seventeen. The assessments undertaken recognise and protection of Hornsea Four Offshore Wind EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:8:confirmed (paragraph 3.1.7) that it had and, if so, what protection is required for Orsted to are necessary over and above what can be EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:8:(Appendix 1 REP2-089). (At D3 the no need or justification to repeat the same in the protective provisions for the protection and EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:8:protection of HP4 when the NZT DCO EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:8: principle or in detail) any additional protection is EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:9:and propose protections with the provision within the Hornsea Project Four DCO and EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:9: obtaining some specific additional protection in the EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:9: specific gaps in the protection that can reasonably EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:9: possible to consider what additional protection EN010103-002174-Orsted Hornsea Project Four Limited - Comments on responses to the ExA’s ExQ2.pdf:9: the protection that Orsted considers to be EN010103-002382-Orsted Hornsea Project Four Limited - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings.pdf:3: the need for protective provisions to be included in the NZT DCO for the benefit and protection of EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:3:(ii) cathodic protection posts; EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:6: (vi) works for the protection of buildings and land; EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:9:Redcar and Cleveland Borough Council Environmental Protection (Nuisance and EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:15: • Environmental Protection EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:18:Environmental Protection EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:18: been considered by the Council’s environmental protection team who have provided a EN010103-002360-NZT ISH6 S1.pdf:3:As such, the planning inspectorate is subject to the General Data Protection Regulation, it's very likely EN010103-002021-Natural England - Responses to the ExA’s ExQ2.pdf:2:water quality of the Teesmouth and Cleveland Coast Special Protection Area/Ramsar site. We have also EN010103-002021-Natural England - Responses to the ExA’s ExQ2.pdf:5: concern about the potential impacts of installing rock armour installing rock armour protection have been adequately EN010103-002021-Natural England - Responses to the ExA’s ExQ2.pdf:5: protection, noting that this had not been addressed in the HRA. addressed in the HRA submitted at D3. EN010103-002021-Natural England - Responses to the ExA’s ExQ2.pdf:5: of installing rock armour protection had been included in an Natural England has clarified its stance on this matter through EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:3:Schedule 2, (Requirements), Requirement The exact number of cathodic protection posts will be determined at the detailed design phase and as EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:3:4(5) (Landscape and biodiversity protection enhancement plan approved must including monitoring measures that are in accordance with the EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:7: an update on the Applicants’ position on the protections required where necessary. EN010103-000958-NZT DCO 6.3.53 ES Vol II Figure 11-2 PCC Site Piling Construction Phase.pdf:1: Special Protection Area EN010103-001019-NZT DCO 6.4.4 ES Vol III Appendix 2A Transboundary Screening.pdf:3: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:4:41. Protection of interests EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 20 — FOR THE PROTECTION OF INEOS UK SNS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:6: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:34:Protection of interests EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:34: Environmental Protection Act 1990 (c.43). EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:39: (ii) cathodic protection posts; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:41: (vi) works for the protection of buildings and land; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:42: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:43: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:43: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:44:Landscaping and biodiversity protection management and enhancement EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:44:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:47: Environmental Protection Act 1990(a); EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:47: Environmental Protection Act 1990; and EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:49:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:50:Protection of highway surfaces EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:50: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:50: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:56: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:56: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:57:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:58:specified works or the alteration or protection of any apparatus. EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:81: (vii) the deposit of rock armour protection; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:91: (iv) the deposit of rock armour protection; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:91: (vii) the deposit of rock armour protection; EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:101: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:101: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:103:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:104:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:105: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:105: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:107: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:107: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:108:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:108:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:110:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:110:Retained apparatus: protection of electricity undertaker EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:111:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:111:Retained apparatus: protection of gas undertaker EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:112:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:113:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:115:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:115:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:116: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:116: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:117:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:118:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:121:for the protection of the apparatus, or for securing access to it, and Air Products is entitled to EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:121:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:122: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:122: 53. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:124: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:124: 62. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:127:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:128:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:130: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:130: 79. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:132: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:132: 87. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:134: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:134: 95. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:135: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:142: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:142: 121. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:143:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:144: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:146: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:146: 139. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:148: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:148: 147. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:150: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:150: 162. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:153: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:153: 175. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:154: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:154: 183. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:156: FOR THE PROTECTION OF YORK POTASH EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:156: 191. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:157:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:158:the alteration or protection of any apparatus. EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:159: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:159: 210. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:161: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:161: 220. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:163: FOR THE PROTECTION OF INEOS UK SNS LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:163: 231. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:165: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED AND EDF EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:165: 239. For the protection of Teesside Windfarm and EDF ER, the following provisions have EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:167: FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:167: 247. For the protection of Low Carbon, the following provisions have effect, unless otherwise EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:169: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:169: 257. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:171: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:171: 264. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf:17: must commence until a scheme of protection and mitigation EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf:19: protection of controlled waters. EN010103-002577-NZT DCO 6.3.24 - ES Vol II Figure 9-3 Ecological Designations Nov 2022 (D12).pdf:1: Special Protection Area EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:5: SPA Special Protection Area EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:18: improve the standard of protection in the protective EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:19: protection that should apply to Wilton. Given that EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:20: iii. protection must be included in relation to EN010103-002100-NZT DCO 6.3.24 - ES Vol II Figure 9-3 Ecological Designations August 2022 (D6).pdf:1: Special Protection Area EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:2: SPA Special Protection Area EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:30:The Chief Executive Royal Society for the Protection of Birds The Lodge Potton Road Sandy SG19 2DL Post EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:49: SPA Special Protection Area EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:126:If you need to contact the Plant Protection Team regarding your enquiry, please use the EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:126:Email: plantprotection@cadentgas.com EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:126:Plant Protection EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:126:Please ensure you have adequate virus protection before you open or detach any documents from EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:127:The contractor should contact Plant Protection before any works are carried out EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:128:contact Plant Protection. EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:128:If you require further assistance please contact the Plant Protection team via e- EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:128:mail (Plantprotection@cadentgas.com) or via the contact details at the top of EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:128:Plant Protection Team EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:148:Protection Act or for litigation. Email messages and attachments sent to or from any EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:165: reserve their right to standard protections for their apparatus including through an asset protection EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:205:be published. We will take care to comply with the requirements of the General Data Protection EN010103-002076-NZT DCO 9.30 - ISH 4 Action 9 Contaminated Land Timeline August 2022 (D6).pdf:3: SPA Special Protection Areas EN010103-001289-Hartlepool Borough Council.pdf:1:Information will be handled in accordance with the General Data Protection EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:55: square metres of unnamed Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:56: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:63: square metres of grassland, Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:64: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:65: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:69: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:70: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:75: square metres of unnamed Limited Protection of Birds Transmission Plc EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:76: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:80: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:80: square metres of private Limited Protection of Birds Transmission Plc EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:81: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:89: metres of unnamed track Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:91: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:92: square metres of grassland Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:94: metres of grassland west of Limited Protection of Birds Limited EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf:95: square metres of grassland Limited Protection of Birds Limited EN010103-001023-NZT DCO 6.4.8 ES Vol III Appendix 8C Air Quality - Amine Degradation Assessment.pdf:23: Scottish Environmental Protection Agency (SEPA) (2015). Review of amine EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:3: RSPB Royal Society for the Protection of Birds EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:3: SPA Special Protection Area EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:5: Special Protection Area (SPA) / Ramsar, which is designated both for breeding birds EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:14: sites the same level of protection as SPAs and SACs. EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:36: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:62: forecast to exceed the 3 µg/m3 critical level of relevance for the general protection EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:65: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:73: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:82: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:83: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: 3.1.3 Retention and adequate protection of all rights currently enjoyed by NSMP in relation EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:6: They are not adequate and fail to provide sufficient protection. EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:7: would be to provide adequate protection to the Gas Processing Plant and its associated EN010103-002514-NZT DCO 8.19 - CF Fertilisers Ltd SoCG (Tracked) - Nov 2022 (D12).pdf:10: agreement on terms that provide the appropriate protection for CFL’s operations EN010103-002514-NZT DCO 8.19 - CF Fertilisers Ltd SoCG (Tracked) - Nov 2022 (D12).pdf:11:3.6.2 Protections of proposed and existing Infrastructure are being offered as part of the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:7: protection of HP4 when the NZT DCO does not extend to DCO is acceptable given any effect which the proposed EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:7: protections with the advisors to the decision maker in Orsted has proposed that The Hornsea Four Offshore Wind Farm DCO EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:7: respect of the storage permit process and the related EIA include protective provisions for the benefit and protection of the carbon EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:8:It is appropriate that the NZT DCO should contain reciprocal protections EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:8: (iii) It is therefore entirely speculative whether protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:14: R v Swale Borough Council ex p Royal Society for the Protection of Birds5 Simon EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:22: protections for the carbon storage licensee by providing that Hornsea Four EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:23: (iii) It is therefore entirely speculative whether protection will be given in these EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 1 — PROTECTION FOR ELECTRICITY, GAS, WATER AND EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 2 — PROTECTION FOR OPERATORS OF ELECTRONIC EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 3A — FOR THE PROTECTION OF NATIONAL GRID EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 3B — FOR THE PROTECTION OF NATIONAL GRID GAS PLC EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 4 — PROTECTION OF RAILWAY INTERESTS EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 5 — FOR THE PROTECTION OF THE ENVIRONMENT EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 6 — FOR THE PROTECTION OF DRAINAGE AUTHORITIES EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 7 — FOR THE PROTECTION OF DOGGERBANK OFFSHORE EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 8 — FOR THE PROTECTION OF CARBON STORAGE EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 9 — FOR THE PROTECTION OF NEO ENERGY (SNS) LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 10 — FOR THE PROTECTION OF PERENCO UK LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 12 — FOR THE PROTECTION OF BRIDGE PETROLEUM 2 EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:172: PART 13 — FOR THE PROTECTION OF HARBOUR ENERGY EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:175:protection systems and access platform(s) and equipment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:175:(normally fibre optic cables) for the purpose of control, monitoring, protection or general EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:175:this Order together with cable protection; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:175:“cable protection” means physical measures for the protection of cables including but not EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:176: corrosion protection systems and access platform(s) and equipment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:176: equipment such as, J-tubes, corrosion protection systems and access platforms attached to the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:177: reconstruct and replace (including replenishment of cable protection) but does not include the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:177: equipment including J-tubes, corrosion protection systems and access platforms and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:177: differential, and may include additional equipment such as J-tubes, corrosion protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:179:equipment including J-tubes, corrosion protection systems and access platform(s) and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:180: additional skirts and associated equipment including J-tubes, corrosion protection systems and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:180: “scour protection” means measures to prevent loss of seabed sediment around any structure EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:181: J-tubes, corrosion protection systems, boat access systems, access platforms, craneage, radar, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:181: corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:184: 7.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:185:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:191:(a) As defined in Part 5 of Schedule 9 (Protection for Network Rail Infrastructure Limited). EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:208: (a) scour protection around the foundations of the offshore structures; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:209: (b) cable protection measures such as the placement of rock, split pipe system, and/or EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:209: (d) joint bays, link boxes, cable ducts, cable protection, joint protection, manholes, marker EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:209: (j) works for the benefit or protection of land affected by the authorised project; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:211: protection works; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:211: © temporary works for the benefit or protection of land or structures affected by the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212: (a) 302,180 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212: (b) 985,240 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212:such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212:such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212:as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212:structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:212:structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:213: (a) 5,625 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:213: (b) 30,625 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:213: (a) 101,250 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:213: (b) 371,250 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:213: 4. The total volume of scour protection for wind turbine generators, offshore accommodation EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:214: (b) be subject to cable protection with an area greater than 624,000 square metres. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:214: (b) be subject to cable protection with an area greater than 94,000 square metres. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:214: (b) be subject to cable protection with an area greater than 792,000 square metres. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:214: (6) The total volume of cable protection must not exceed 2,042,000 cubic metres with a EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:218:relevant planning authority, a scheme of protection and mitigation measures has been submitted to EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:221: Protection Act 1990 (c.43) and Schedule 24 to the Environment Act 1995 (c.25). EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:246: 8. Section 20 (protection for interests of tenants at will, etc.) of the 1965 Act applies with the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:255: PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:255: 1. For the protection of the affected undertakers referred to in this Part of this Schedule (save for EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:257:otherwise for the protection of the apparatus, or for securing access to it, and the affected EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:258:connection with, the inspection, removal, alteration or protection of any apparatus or the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:259: PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:259: 1. For the protection of any operator, the following provisions, unless otherwise agreed in EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:260:FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:260: 1. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:261:up), 9 (retained apparatus: protection of National Grid as electricity undertaker), 10 (expenses) and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:263:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:263:Retained apparatus: Protection of National Grid as Electricity Undertaker EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:264:(5), (6), (8) and/or (9) by National Grid for the alteration or otherwise for the protection of the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:265:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:267:7(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:267:sent to National Grid LSBUD at https://lsbud.co.uk/ or assetprotection@nationalgrid.com or such EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:268: FOR THE PROTECTION OF NATIONAL GRID GAS PLC AS GAS EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:268: 1. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:269:up), 9 (retained apparatus: protection of National Grid as gas undertaker), 10 (expenses) and 11 EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:271:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:271:Retained apparatus: protection of National Grid as Gas Undertaker EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:271:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:272:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:274:7(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:275:sent to National Grid LSBUD at https://lsbud.co.uk/ or assetprotection@nationalgrid.com or such EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:275: PROTECTION OF RAILWAY INTERESTS EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:275: “asset protection agreement” means an agreement to regulate the construction and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:277: (7) The undertaker must enter into an asset protection agreement prior to the carrying out of any EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:283: FOR THE PROTECTION OF THE ENVIRONMENT AGENCY EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:283: 1.—(1) The following provisions shall apply for the protection of the Agency unless otherwise EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:284: protection of any drainage work or the fishery or for the protection of water resources, or EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:287: FOR THE PROTECTION OF DRAINAGE AUTHORITIES EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:287: 1. The provisions of this Part have effect for the protection of the drainage authority unless EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:288: for the protection of any drainage work, for the protection of any ordinary watercourse or EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:291: FOR THE PROTECTION OF DOGGERBANK OFFSHORE WIND FARM EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:291: 1. For the protection of Doggerbank Offshore Wind Farm Project 1 Projco Limited (Company EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:294:Protection of Dogger Bank EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:294:Dogger Bank for the alteration or otherwise for the protection of the Dogger Bank authorised EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:296: FOR THE PROTECTION OF CARBON STORAGE LICENSEE EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:296: 1. For the protection of the licensee from time to time of United Kingdom Carbon Dioxide EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:301: FOR THE PROTECTION OF NEO ENERGY (SNS) LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:301: 1. For the protection of the licensee from time to time of United Kingdom Petroleum Production EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:302: FOR THE PROTECTION OF PERENCO UK LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:302: 1. For the protection of the licensee from time to time of United Kingdom Petroleum Production EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:303: FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:303: 1. For the protection of Northern Powergrid referred to in this Part of this Schedule the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:305:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:305:relaying or replacing, alteration or protection of any apparatus or the construction of any new EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:307:otherwise or Northern Powergrid makes requirements for the protection or alteration of apparatus EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:308: FOR THE PROTECTION OF BRIDGE PETROLEUM 2 LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:308: 1. For the protection of the licensee from time to time of United Kingdom Petroleum Production EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:314: FOR THE PROTECTION OF HARBOUR ENERGY LIMITED, PERENCO UK EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:314: 1. For the protection of the licensee from time to time of United Kingdom Petroleum Production EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:325: this Order together with cable protection; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:325: “cable protection” means physical measures for the protection of cables including but not EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:325: “cable protection replenishment” means the restoration to a former level or condition of cable EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:325: protection lost by natural seabed processes or human activity; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:326: corrosion protection systems and access platform(s) and equipment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:326: additional equipment such as, J-tubes, corrosion protection systems and access platforms; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:327:reconstruct and replace (including replenishment of cable protection) but does not include the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:327:seabed and associated equipment including J-tubes, corrosion protection systems and access EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:328:equipment including J-tubes, corrosion protection systems and access platform(s) and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:328:additional skirts and associated equipment including J-tubes, corrosion protection systems and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:329:J-tubes, corrosion protection systems, boat access systems, access platforms, craneage, radar, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:329:corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:332: (a) scour protection around the foundations of the offshore structures; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:332: (b) cable protection measures such as the placement of rock and/or concrete mattresses; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: (a) 302,180 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: (b) 985,240 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: (7) The total volume of scour protection material for wind turbine generator foundations must EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: (a) 5,625 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: (b) 30,625 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: 3.—(1) The total length of the cables in Work No. 1© and the volume of their cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:334: Work Length Cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:335: (f) cable protection replenishment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:336:commencement of each discrete incident of cable repair, replacement, or protection replenishment EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:337:each instance of cable repair, replacement or protection replenishment activity. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:340:(e) a scour protection management plan for the relevant stage providing details of the need, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:340: type, sources, quantity and installation methods for scour protection, which must be EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:340: burial risk assessment encompassing the identification of any cable protection that EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:340: area of cable protection exceeding 5% of navigable depth is identified, details of any EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:341: including cable protection; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:341: (iii) proposals for the volume and areas of cable protection to be used for each cable EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:341: (iv) proposals for monitoring offshore cables within that stage including cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:347:Deployment of cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:347: 26. Any cable protection authorised under this licence must be deployed within 15 years from EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:348: protection systems and access platform(s) and equipment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:349:“cable protection” means physical measures for the protection of cables including but not EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:349:“cable protection replenishment” means the restoration to a former level or condition of cable EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:349:protection lost by natural seabed processes or human activity; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:349:corrosion protection systems and access platform(s) and equipment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:349:additional equipment such as, J-tubes, corrosion protection systems and access platforms; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:350:reconstruct and replace (including replenishment of cable protection) but does not include the EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:350:seabed and associated equipment including J-tubes, corrosion protection systems and access EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:351:equipment including J-tubes, corrosion protection systems and access platform(s) and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:352: additional skirts and associated equipment including J-tubes, corrosion protection systems and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:352: J-tubes, corrosion protection systems, boat access systems, access platforms, craneage, radar, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:352: corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:356: (a) scour protection around the foundations of the offshore electrical installations; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:356: (b) cable protection measures such as the placement of rock and/or concrete mattresses; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:358:such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359:as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359:structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359:structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359: (a) 101,250 square metres excluding scour protection; and EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359: (b) 371,250 square metres including scour protection. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:359: (10) The area of scour protection material for offshore electrical installation foundations must EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:360: 2. The total length of the cables and the volume of their cable protection (including cable EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:360: Work Length Cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:360:protection when combined with the cable authorised under Work No. 1© of the deemed marine EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:360: Length Cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:360:cable protection, unless otherwise agreed in writing with the MMO— EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:361: (3) No cable protection may be employed within 350 metres seaward of MLWS tidal datum, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:361: (f) cable protection replenishment; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:363:commencement of each discrete incident of cable repair, replacement, or protection replenishment EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:363:each instance of cable repair, replacement or protection replenishment activity. EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:366:(e) a scour protection management plan for the relevant stage providing details of the need, EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:366: type, sources, quantity and installation methods for scour protection, which plan must be EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:367: burial risk assessment encompassing the identification of any cable protection that EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:367: area of cable protection exceeding 5% of navigable depth is identified, details of any EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:367: including cable protection; EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:367: (iii) proposals for the volume and areas of cable protection to be used for each cable EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:367: (iv) proposals for monitoring offshore cables within that stage including cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:373:Deployment of cable protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:373: 27. Any cable protection authorised under this licence must be deployed within 15 years from EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:374: PROTECTION OF ORSTED HORNSEA PROJECT FOUR LIMITED EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:376:Protection of Hornsea Four EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:377:paragraphs (5) and/or (7) by Hornsea Four for the alteration or otherwise for the protection EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:387: “the FFC” means the site designated as the Flamborough and Filey Coast Special protection EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:14: in section 79(1) of the 79(1) of the Environmental Protection EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:14: Environmental Protection Act Act 1990. EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:20: Cleveland Coast Special Protection Area and Ramsar site. The extent of the Ramsar site in this specific area of the application site, as well EN010103-001980-NZT DCO 8.2 - STBC SoCG - August 2022(D5) - Clean.pdf:2: SPA Special Protection Area EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:3: SPA Special Protection Areas EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:33: for protection of ecological and human health receptors? Are there any other EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:36: at the Teesmouth and Cleveland Coast Ramsar, Special Protection Area (SPA) Contribution in addition to the Background Concentration) of 67.3% is EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:37: Ramsar, Special Protection Area (SPA) and Site of Special Scientific EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:39: APP-248 suggests that the predicted environmental concentration (PEC) would NOx concentration (critical level threshold) for the protection of vegetation of EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:42: great crested newt and common lizard. its relevance to the planning system and its legal protection, as per constraints EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:43: bodies and other organisations, such as the Office for Environmental Protection. EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:44: Requirement 4 of the dDCO (Landscaping and biodiversity protection EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:44: protection plan must be developed, submitted and approved by the planning EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:45: biodiversity protection plan under limb 4) of the Requirement must also be in EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:46: biodiversity protection plan must be submitted to and approved by the relevant EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:54: protection and to ensure risks are managed / impacts avoided, and that there is EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:56: introduction of rock armouring / scour protection will provide artificial reef habitat EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:74: rise to an unregulated pipe with no basis for control and protection? EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:90: flood risk protection (which is the subject of a separate Requirement EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:97: confirmation that tables and figures in Chapter 12 have been checked for protection of controlled waters raised in the Environment Agency’s EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:97: How will this be secured through the DCO to ensure protection of Infrastructure, (certification of plans etc.). As set out in Schedule 14, the certified documents EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:111: Protection Officer at RCBC was undertaken to agree the EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:113: During Stage 2 consultation, engagement with the Environmental Protection EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:121: for Environmental Protection, and/or relate to matters which are not relevant to EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:151: However, the Applicants would highlight various protections within the Draft EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:155: outfall and associated scour protection (of no more than 100m2) used in the 10 and Schedule 11 specifying that Work No. 5B (new water discharge pipeline EN010103-001722-Air Products Plc and Air Products Renewable Energy Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:3:the need to ensure that suitable permissions and protection is provided to the existing Infrastructure. EN010103-001722-Air Products Plc and Air Products Renewable Energy Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:4:by which suitable protections will be put in place. These issues have not been considered or responded to (whether EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:20: - Article 41 provides protection for statutory undertakers and others through the EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers, EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:22: it (examples include Requirements relating to landscape and biodiversity protection EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:26: This provides protection for the street authority for the street in question. This is based on EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:28: authorised development may commence until a landscape and biodiversity protection plan EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:29: biodiversity protection plan must include details of any tree or hedgerows to be removed. EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:30: development as restrictive covenants for the protection of the underground elements of the EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:34: section 79(1) of the Environmental Protection Act 1990. EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:42: 3.8.35. 3.8.36.Requirement 4 (Landscape and biodiversity protection management and EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:42: to make additional provision for biodiversity protection management and enhancement. It EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:42: protection plan to the relevant planning authority, following consultation with STDC and EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:43: protection for the landscape and biodiversity elements during construction, whilst providing EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:45: until, after consultation with Natural England, a scheme of protection and mitigation EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:45: 3.8.56. 3.8.57.Requirement 17 (Protection of highway surfaces) - this is not a model provision. It EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:51: information on the relevant parties and protections. EN010103-001025-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 2.pdf:6: Standard of Protection EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:9:Source Protection Zones EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:12:Special Protection Areas EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:50: Radon Potential - Radon Protection Measures EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:50: Protection Measure: No radon protective measures are necessary in the construction of new B14SW 0 1 457368 EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:50: Radon Potential - Radon Protection Measures EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:50: Protection Measure: No radon protective measures are necessary in the construction of new B10NW 0 1 457368 EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:58:Source Protection Zones EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:60:Radon Potential - Radon Protection Measures EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:61:Special Protection Areas EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:62: Scottish Environment Protection Agency EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:9:Source Protection Zones EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:12:Special Protection Areas pg 65 1 EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:60: Radon Potential - Radon Protection Measures EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:60: Protection Measure: No radon protective measures are necessary in the construction of new A15SE 0 1 448038 EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:77: Designation Details: Special Protection Area EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:77: Special Protection Areas EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:78:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:78:Source Protection Zones EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:81:Radon Potential - Radon Protection Measures EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:82:Special Protection Areas EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:83: Scottish Environment Protection Agency EN010103-001199-NZT DCO 6.3.24 - ES Vol II Figure 9-3 Ecological Designations - Oct 2021 Rev.2.0.pdf:1: Special Protection Area EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:4:41. Protection of interests EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 26 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:6: PART 27 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:34:Protection of interests EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:39: (ii) cathodic protection posts; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:41: (vi) works for the protection of buildings and land; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:42: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:43: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:43: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:44:Landscaping and biodiversity protection management and enhancement EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:44:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:47: Environmental Protection Act 1990(a); EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:48: Environmental Protection Act 1990; and EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:49:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:50:Protection of highway surfaces EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:50: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:50: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:57: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:57: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:58:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:59:specified works or the alteration or protection of any apparatus. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:82: (vii) the deposit of rock armour protection; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:92: (iv) the deposit of rock armour protection; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:92: (vii) the deposit of rock armour protection; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:102: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:102: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:104:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:105:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:106: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:106: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:108: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:108: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:109:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:109:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:111:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:111:Retained apparatus: protection of electricity undertaker EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:112:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:112:Retained apparatus: protection of gas undertaker EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:113:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:114:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:116:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:116:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:117: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:117: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:118:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:119:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:120: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:120: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:122: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:123:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:123: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:123: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:126:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:127:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:129: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:129: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:131:Cathodic protection testing EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:131: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:131: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:131:measures for providing or preserving cathodic protection. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:131: (i) the execution of any works under this Order including for the protection of the EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:132: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:132: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:134: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:134: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:136: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:142: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:142: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:144:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:145: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:147: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:147: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:148: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:148: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:151: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:151: 157. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:153: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:153: 170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:155: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:155: 178. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:158: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:158: with any deficiency in the expected level of protection afforded by those requirements; EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:160: FOR THE PROTECTION OF YORK POTASH EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:160: 196. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:162:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:162:the alteration or protection of any apparatus. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:163: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:163: 215. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:165: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:165: 225. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:172: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:172: 256. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:174: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED AND EDF EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:174: 264. For the protection of Teesside Windfarm and EDF ER, the following provisions have EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:176: FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:176: 272. For the protection of Low Carbon, the following provisions have effect, unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:178: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:178: 282. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:180: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:180: 289. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:182: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:182: 297. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:182: “the standard protection strips” means strips of land falling within the following distances to EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:182: 299. The undertaker must not within the standard protection strips interfere with or build over EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:182:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:183:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:183:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:184: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:184: 307. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:184:(retained apparatus: protection), 315 (expenses) and 316 (indemnity), this Schedule does not apply EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:186:Retained apparatus: protection EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:188:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190:Cathodic protection testing EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190:cathodic protection. EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:190: 323. For the protection of the NT Group (as defined below), the following provisions have EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:11:first cohesive layer was determined. Aquifer protection was installed, comprising a bentonite pellet seal, was EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:35: (5) Aquifer protection installed between 16.75-15.60m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:36: (5) Aquifer protection installed between 16.75-15.60m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:37: (5) Aquifer protection installed between 16.75-15.60m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:38: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:39: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:40: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:41: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:42: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:43: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:56: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 16.85-14.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:57: 14.70 - 16.20 178 100 No (5) Aquifer protection installed between 16.85-14.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:58: (5) Aquifer protection installed between 16.85-14.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:59: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:60: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:61: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:62: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:63: 35.50 - 36.15 Water 100 (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:64: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:77: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 12.15-10.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:78: (5) Aquifer protection installed between 12.15-10.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:79: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:80: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:81: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:82: 26.80 - 27.40 Water 100 (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:83: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:93: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:94: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:95: per the Client instructions. (6) Aquifer protection EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:96: per the Client instructions. (6) Aquifer protection EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:97: per the Client instructions. (6) Aquifer protection EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:98: per the Client instructions. (6) Aquifer protection EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:99: per the Client instructions. (6) Aquifer protection EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:109: (5) Aquifer protection installed between 13.75-11.70m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:110: (5) Aquifer protection installed between 13.75-11.70m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:111: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:112: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:113: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:114: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:115: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:125: (5) Aquifer protection installed between 14.70-12.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:126: (5) Aquifer protection installed between 14.70-12.50m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:127: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:128: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:129: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:130: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:131: (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:142: 7.20 - 8.70 178 100 Yes Aquifer protection installed between 16.20-13.40m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:143: Aquifer protection installed between 16.20-13.40m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:144: Aquifer protection installed between 16.20-13.40m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:145: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:146: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:147: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:148: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:149: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:150: protection installed between 16.20-13.40m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:162: instructions. (6) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:163: instructions. (6) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:164: instructions. (6) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:165: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:166: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:167: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:168: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:169: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:170: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:182: Client instructions. (6) Aquifer protection installed prior EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:183: Client instructions. (6) Aquifer protection installed prior EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:184: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:185: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:186: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:187: Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:197: 5.70 - 7.20 178 100 Yes Aquifer protection installed between 15.15-13.70m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:198: Aquifer protection installed between 15.15-13.70m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:199: 18.50 - 20.00 Water 100 Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:200: Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:201: 26.30 - 27.50 Water 100 Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:202: Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:203: Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:204: Client instructions. (5) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:217:14/06/2021 4.20 4.20 178 Dry 5.70 - 7.20 178 100 Yes the Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:218: the Client instructions. (6) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:219: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:220: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:221: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:222: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:223: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:224: protection installed between 12.15-10.15m prior to EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:235: Client instructions. (8) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:236: Client instructions. (8) Aquifer protection installed EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:237: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:238: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:239: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:240: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:241: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:242: Aquifer protection installed between 14.60-13.00m EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:254: instructions. (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:255: instructions. (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:256: instructions. (5) Aquifer protection installed between EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:257: 20.40 - 21.70 Water 100 protection installed between 14.90-16.65m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:258: protection installed between 14.90-16.65m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:259: protection installed between 14.90-16.65m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:260: protection installed between 14.90-16.65m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:261: protection installed between 14.90-16.65m BGL EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:273: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:274: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:275: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:276: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:277: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:285: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:286: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:287: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:288: (5) Aquifer protection installed prior to commencing EN010103-001759-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 1 - June 2022.pdf:289: (5) Aquifer protection installed prior to commencing EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:12: armouring/scour protection EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:13: o the positioning of rock armouring/scour protection around the outfall EN010103-002522-NZT DCO 9.49 - Response to ISH6 actions Nov22(D12).pdf:3: SPA Special Protection Areas EN010103-002401-DLA Piper UK LLP - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings.pdf:4:8. Sembcorp has been consistent in its representations that it seeks PPs providing protection similar EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf:26: Fire Protection and Monitoring System. EN010103-002303-'s Deadline 5 Submission and notification to speak at ISH5 and CAH3.pdf:2: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002303-'s Deadline 5 Submission and notification to speak at ISH5 and CAH3.pdf:2:157. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:22: - Article 41 provides protection for statutory undertakers and others through EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:22: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:24: cables, pipe and cable protection equipment and telecommunications EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:24: equipment, and to include aerial markers, cathodic protection test posts and field EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:24: protection (4) and the construction environmental management plan (16)). The EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:28: to sub-paragraph 11(1). This provides protection for the street authority for the EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:32: landscaping and biodiversity protection plan for that part has been submitted to and EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:32: the Order specifies that the landscaping and biodiversity protection plan must EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:34: protection of the underground elements of the Proposed Development would EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:38: under the Environmental Protection Act 1990, if the statutory nuisance is created in EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:39: The Applicants consider that the Requirements provide sufficient protection against EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:39: Environmental Protection Act 1990. EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:47:3.8.36 Requirement 4 (Landscaping and biodiversity protection management and EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:47: modified to make additional provision for biodiversity protection management and EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:47: protection plan to the relevant planning authority prior to commencing the EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:48: protection for the landscaping and biodiversity elements during construction, whilst EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:50: protection and mitigation measures has been submitted to and approved in writing EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:50:3.8.54 Requirement 17 (Protection of highway surfaces) - this is not a model provision. It EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:56: information on the relevant parties and protections. EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf:645:the EIU, which introduces some protection and distributes the power to a number of outlets, including EN010103-001593-NZT DCO 8.12 - Northumbrian Water Ltd SoCG - May 2022.pdf:10: appropriate protection to NWL’s apparatus and operations. EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:4:2A (contaminated land) of the Environmental Protection Act 1990(a); EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:4:Environmental Protection Act 1990; and EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:4: The named reptile species are afforded legal protection through their EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:4: species their habitat does not receive legal protection under the Act. EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:12: https://www.gov.uk/guidance/reptiles-protection-surveys-and-licences EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:3: SPA Special Protection Areas EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: by Anglo American, the Applicants have deleted the “mirror” protection under EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: consent of the Applicants. This “mirror” protection in the York Potash Order has been EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: the protective provisions to secure a reciprocal protection for the benefit of Anglo EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: American as the “mirror” protection for the benefit of the Applicants to be inserted EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: in the York Potash DCO (see paragraph 3.2). As the “mirror” protection for the EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8: to retain the reciprocal protection under paragraph 193 for the benefit of the York EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:8:2.2.5 The reciprocal protections above were intended to manage the interaction between EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:9: protections provided an effective safeguard that ensured each project could control EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:9: b) The general provision sits alongside the protection under paragraph 203 which EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:11: nevertheless, be carried out in a way that provides robust protection to Anglo EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:23: Pipeline Corridor, the Applicants have included additional protections in the EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:24: Requirements 3 (detailed design), 4 (landscaping and biodiversity protection EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:25: 2008. Schedule 5 paragraph 10 (“protection of the property or interests of any EN010103-001991-NZT DCO 9.23 - Written Summary of CAH2 - August 2022(D5).pdf:8: [Post-hearing note: the Applicants are continuing to negotiate protective provisions with PD Teesport, including in relation to protections relating EN010103-001991-NZT DCO 9.23 - Written Summary of CAH2 - August 2022(D5).pdf:34:The Chief Executive Royal Society for the Protection of Birds The Lodge Potton Road Sandy SG19 2DL Post EN010103-001675-NGET Written Representation - Final 09.06.22(217466356.1)(217466902.1).pdf:3: (b) that appropriate protection for the NGET Assets and OHL and any other EN010103-001675-NGET Written Representation - Final 09.06.22(217466356.1)(217466902.1).pdf:3:3 NGET REGULATORY PROTECTION FRAMEWORK EN010103-000916-NZT DCO 6.3.5 ES Vol II Figure 3-4 Environmental Receptors within 2 km.pdf:1: ( Special Protection Area EN010103-001933-NZT ISH3 S1.pdf:2:record that can contain your personal information and switch the general data protection regulations EN010103-001933-NZT ISH3 S1.pdf:5:schedules 10 and 11. And these are about the deemed marine licences. Item six will cover protection EN010103-001933-NZT ISH3 S1.pdf:10:exclusions or preliminary works. So those protections are not affected by this definition. They apply to EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:10: (PE) and polyvinyl chloride protection against sulfate EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:17: additional protection EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:22: additional protection EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:29: alkaline pH in soil or Sulphate attack on buried additional protection EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:34: additional protection EN010103-001792-NZT DCO 2.1a - Schedule of Changes to the draft DCO - June 2022.pdf:4:(Landscaping and biodiversity protection for Issue Specific Hearing 2 (ISH2) dated 26 May 2022 REP1-036. EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:46: the information provided is considered to be too activities (including rock armour and scour protection; using a EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:46: impacts of rock armour and scour protection. The Interestingly, based on the observed communities in the Tees Bay, we EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:3: SPA Special Protection Areas EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:21: i) Can NE confirm that it is content with this approach? were Natural England, the Royal Society for the Protection of Birds EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:21: the Special Protection Area (SPA)/ Ramsar pools and lagoons and/ or and approved by the relevant planning authority must include the measures EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:22: iii) Landscaping and Biodiversity Protection Plan (R4 of dDCO [REP5- Landscape and Biodiversity Strategy is the high-level specification detailing the EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:22: title in each case. refer to Landscape and Biodiversity Protection Plan, Landscape and EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:24: potential impacts of installing rock armour protection, noting that this had not EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:24: an assessment of installing rock armour protection had been included in an EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:40: protective provisions typically included for the protection of apparatus EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:40: interests in privately owned apparatus benefit from appropriate protections EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:41: also be weighed in the balance, taking account of the protections afforded to EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:49: DCO.2.2 Applicants R3(7) refers to the approximate number and location of cathodic protection The exact no. of cathodic protection posts will be determined at the detailed EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:49: How would ‘approximate’ be determined? Should the word ‘approximate’ be location of cathodic protection posts in R3(2) (detailed design details of WN2A) EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:50: (protection of electricity, gas, water and sewerage undertakers) or Part 2 EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:50: (protection of operators of electronic communications code networks) as these EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:52: 016]. Paragraph 2.2.4 explains that the “mirror” protection in the York Potash EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: DCO have been accepted by the SoS. whether and, if so, what protection is required for Orsted to ensure that EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: NZT DCO for the benefit and protection of HP4 when the NZT DCO As a result (and relevant to sub-paragraph (ii) of this question), the EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: iv) Has Orsted sought to discuss issues and propose protections with the EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: additional protection is needed in the NZT DCO to safeguard the delivery of EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: additional protection in the NZT DCO. EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: the protection that can reasonably be achieved within the scope of the EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:57: additional protection might be justified within the NZT DCO and the EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:58: such that all of the protection that Orsted considers to be necessary EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:60: Protection Act 1990. EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:61: bore failure as this method allows protection of the off-shore area by use of a EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:62: Historic England Framework CEMP REP5-014 includes procedures for reporting, protection EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:72: its duties in respect to protection of water quality? EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:121: provide users with some protection from large variations that had not been consulted EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:132:carbon price provides an appropriate level of protection to users as it uses a visible and EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:137:developed to ensure adequate protection to the T&SCo from high impact, low probability risks, EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:137:avoidance of doubt however, the GSP will not provide protection to T&S network users from EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:137:the Supplementary Compensation Agreement (SCA) is to provide protection in the remote EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:140:provide protection where the limits of indemnity under commercial insurances are exceeded, or EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:147:be significantly offset by the protection offered by commercial insurance. Charges will also be EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:151:This allows for the protection of essential services where normal insolvency would cause EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:171: enhancement, restoration, conservation and protection of the environment, including EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:171: the protection of human health for the public benefit. EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:171: protect the interests of the public. One of its three priority areas of work is the protection EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:181: protection of health or morals, or for the protection of the rights EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:181: “Protection of property EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:222: Article 2 may require protection not only for individuals identifiable in EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:222: advance as the subject of potential harm, but also general protection for EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:222: obligations under the ECHR including the provision of general protection EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:222: protection of Convention rights; EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:223: than less, conducive to the protection of Convention rights and, in this context, to EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:223: “more effective” for, the protection of a Convention right, or to minimise climate EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:269: Protection for Carbon Dioxide EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:269:1. For the Protection of the Licensee(s) from time to time of United Kingdom Carbon Dioxide Appraisal EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:274: Protection for Carbon Dioxide EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:274:1. For the Protection of the Licensee(s) from time to time of United Kingdom Carbon Dioxide Appraisal EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:295: and protection from overrun by plant. EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf:2: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf:8: (a) the inspection, removal and relaying or replacing, alteration or protection EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf:8: of protection afforded by those requirements; EN010103-002558-NZT DCO 6.3.5 - ES Vol II Figure 3-4 Environmental Receptors within 2km Nov 2022 (D12).pdf:1: Special Protection Area EN010103-001930-NZT ISH3 S2.pdf:8:whether they provide adequate protection. So I think it's a matter for negotiation between the parties. EN010103-001930-NZT ISH3 S2.pdf:11:over works and activities that might directly affect their interests. And so the degree of protection that EN010103-001930-NZT ISH3 S2.pdf:11:engaged, for reasons that go to the protection of their interests, that is appropriately dealt with under EN010103-001930-NZT ISH3 S2.pdf:14:biodiversity protection management and enhancement? Again, cemco, HUDs comments. Rep. Three, EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:30: services and utilities; and works for the protection of buildings and land; EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:45: ensure protection of Infrastructure installed as part of the Project EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:46: operation, maintenance and protection of the apparatus. Such an EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:68:STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:80: included at Schedule 12 of the draft DCO, which provide adequate protection EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:82: DCOs for the protection of electricity, gas, water and sewerage undertakers. EN010103-002343-NTL North Tees response to WQs.pdf:3: unregulated pipe with no basis for control and protection? EN010103-001526-NZT-ExQ1.pdf:5: SPA Special Protection Area EN010103-001526-NZT-ExQ1.pdf:19: RCBC and STBC are asked to confirm whether this is an appropriate distance for protection of EN010103-001526-NZT-ExQ1.pdf:20: Teesmouth and Cleveland Coast Ramsar, Special Protection Area (SPA) and Site of Special EN010103-001526-NZT-ExQ1.pdf:39: basis for control and protection? EN010103-001526-NZT-ExQ1.pdf:51: How will this be secured through the DCO to ensure protection of Infrastructure, safety and the EN010103-001526-NZT-ExQ1.pdf:76: associated scour protection (of no more than 100m2) used in the assessment of the water EN010103-000064-S42 Letter.pdf:6:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-000064-S42 Letter.pdf:12:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-000064-S42 Letter.pdf:18:We will take reasonable care to comply with the requirements of the General Data Protection EN010103-001798-NZT DCO 9.9 - Applicants' Comments on LIRs - June 2022.pdf:7: protection; drainage and flood risk; socio-economics and conditions/requirements. EN010103-Advice-00006-1-EN010103_Section 51 Advice-00005 - Project update meeting (1).pdf:3:Areas of the Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar Site EN010103-001022-NZT DCO 6.4.7 ES Vol III Appendix 8B Air Quality - Operation Phase.pdf:4: • Special Protection Areas (SPAs), Special Areas of Conservation (SACs), EN010103-001022-NZT DCO 6.4.7 ES Vol III Appendix 8B Air Quality - Operation Phase.pdf:12: Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar EN010103-001022-NZT DCO 6.4.7 ES Vol III Appendix 8B Air Quality - Operation Phase.pdf:33: within current environmental standards for the protection of human health. EN010103-002347-0006-P1A4.5NTLIKC015-NTL SUBMISSIONS AND POSITION STATEMENT CAH3 ON BEHALF OF NORTH TEES GROUP 17.10.22.pdf:6:developers and investors will have no protection or certainty in relation to the EN010103-001234-NZT - Regulation 32 Transboundary Screening (11).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001984-NZT DCO 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Clean.pdf:12: appropriate protection to NWL’s apparatus and operations. EN010103-001946-NZT ISH4 S2.pdf:4:Environmental Protection Act. And where the preliminary risk assessment identifies the need for EN010103-001946-NZT ISH4 S2.pdf:24:and scour protection. EN010103-001946-NZT ISH4 S2.pdf:24:scalp protection associated with a new outfall head. Has there been any feedback from Natural EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:3: SPA Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:61: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:61: head, the introduction of rock armouring / scour protection (with an expected EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:62: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:62: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:62: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:62: circular footprint for the proposed scour protection therefore follows this design EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:62: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:64: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:67: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:73: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:82: introduction of a small volume of rock armouring / scour protection due to the Proposed EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:89: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:90: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:129: Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:130: Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:131: Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:132: Special Protection Area EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:134: anticipated that scour protection will be required to prevent erosion of seabed around the EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:134: of the seabed will be covered by the rock armour scour protection. The use of rock armour EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:134: as a form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:134: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:135: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:135: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:135: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:135: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:135: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: circular footprint for the proposed scour protection therefore follows this design EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: scour protection at the outfall location. EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: be incorporated into the design and the height of the protection above the seabed should EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:136: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:137: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:137: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:137: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001939-NZT ISH3 S3.pdf:17:thank you. So if we can move on to part four, which is for the protection of our products? Is there EN010103-001939-NZT ISH3 S3.pdf:17:Thank you. So you're also separately negotiating an asset protection agreements alongside protective EN010103-001939-NZT ISH3 S3.pdf:18:arguments regarding the outstanding points openly here, we are negotiating an asset protection EN010103-001939-NZT ISH3 S3.pdf:18:we consider that have been agreed between the parties and the Asset Protection Agreement haven't EN010103-001939-NZT ISH3 S3.pdf:18:the protective provisions in the TCO in parallel, the Asset Protection Agreement, which was down EN010103-001939-NZT ISH3 S3.pdf:18:in case we don't get agreement on the Asset Protection Agreement, so I'm left not having had time to EN010103-001939-NZT ISH3 S3.pdf:18:that will allow the Secretary of State to make The older with an appropriate form of protection. And if EN010103-001939-NZT ISH3 S3.pdf:19:both thought we might get there on the Asset Protection Agreement, negating the need for it, then EN010103-001939-NZT ISH3 S3.pdf:19:there's obviously we will negotiate something completely different on the asset protection side. It seems EN010103-001939-NZT ISH3 S3.pdf:21:very many issues between us on the protection provisions that are in the DCO itself, because that EN010103-001939-NZT ISH3 S3.pdf:22:27 for the protection of North tees limited. North Israel limited and North T's land limited. Don't think EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:3: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:3: sulphate Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:3: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: gas Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:4: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5:/ Redcar Iron & Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5:Anhydrite Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:5: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: C Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6:Works Provide protections EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: Provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: C provide protection EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:6: C Provide protection EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:14: operational effects will provide effective protection to EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:14: protection to designated sites and protected species, that no EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:15: effective protection to designated sites and protected species, EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:15: and Cleveland Coast Special Protection Area (SPA)/ Ramsar/ EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:19:Biodiversity Protection, Measures to protect biodiversity during construction are set out EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:20: It is agreed that the biodiversity protection, mitigation and EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:20: Requirement 4 (Landscaping and Biodiversity Protection EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:20: until a landscaping and biodiversity protection plan for that part EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:23: protection at the end of the Water Discharge Connection (Work No. 5A or 5B) EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:23: installation of rock armour protection at the end of the Water Discharge EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:87:impacts on the Internationally Designated Teesmouth and Cleveland Coast Special Protection Area and EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:88:level of relevance for the general protection of vegetation. EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:3: RSPB Royal Society for the Protection of Birds EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:3: SPA Special Protection Area EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:5: Special Protection Area (SPA) / Ramsar, which is designated both for breeding birds EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:14: sites the same level of protection as SPAs and SACs. EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:36: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:60: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:64: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:72: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:81: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:82: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:119: Special Protection Area EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:120: Special Protection EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:121: Special Protection Area EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:20: - Article 41 provides protection for statutory undertakers and others through the EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:21: pipe and cable protection equipment and telecommunications equipment, and to EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:21: include aerial markers, cathodic protection test posts and field boundary markers, EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:22: include Requirements relating to landscaping and biodiversity protection (4) and the EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:26: This provides protection for the street authority for the street in question. This is based on EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:28: authorised development may commence until a landscaping and biodiversity protection EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed. EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:30: development as restrictive covenants for the protection of the underground elements of the EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:34: section 79(1) of the Environmental Protection Act 1990. EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:42: 3.8.38. Requirement 4 (Landscaping and biodiversity protection management and enhancement) EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:42: additional provision for biodiversity protection management and enhancement. It has been EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:42: protection plan to the relevant planning authority, following consultation with STDC and EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:42: protection for the landscaping and biodiversity elements during construction, whilst EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:45: consultation with Natural England, a scheme of protection and mitigation measures has EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:45: 3.8.59. Requirement 17 (Protection of highway surfaces) - this is not a model provision. It requires EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:50: relevant parties and protections. EN010103-001870-NZT-ISH4-Environment-Agenda.pdf:4: • The potential effect of rock armouring/ scour protection associated with EN010103-001584-NZT DCO 8.2 - STBC SoCG - May 2022.pdf:2: SPA Special Protection Area EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:14:EPA The Environmental Protection Act 1990 - an Act of the Parliament of EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:14:EPS European Protected Species – species that receive full protection EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:17:ICNIRP International Commission on Non-Ionizing Radiation Protection - an EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:25:OSPAR Oslo and Paris Convention for the Protection of the Marine EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:26:pSPA Provisional Special Protection Area – see SPA for further details. EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:27:RSPB The Royal Society for the Protection of Birds – the UK’s largest nature EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29:SPA Special Protection Area - strictly protected sites classified in EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29: accordance with article 4 of the EC birds directive. Special Protection EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29: protection of threatened habitats and species. EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29:SPZ Source Protection Zone – Zones which show the level of risk to the EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:29: Special Scientific Interest, an area designated for protection under the EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:48: protection, and management of unexpected terrestrial archaeological EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:54:vegetation protection. EN010103-000923-NZT DCO 6.3.14 ES Vol II Figure 8-2 Air Quality Study Area – Ecological Receptors.pdf:1: Special Protection Area EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:11: investment as developers and investors will have no protection or certainty in EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:18:Protective Provisions for the Protection of North Tees Limited, North Tees EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:19:32. NTG’s principal objection to Part 26 is that it only offers protection for EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:19:NTG as the owner in possession requires protection for its land, for which it EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:27: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:27: For the protection of NT Group (as defined below) the provisions of this Part have effect for the benefit EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:32: © the inspection, removal and relaying or replacing, alteration or protection of any apparatus or the EN010103-002425-Deadline 11 NTG Submission Deadline 11 - Various matters.pdf:33: the expected level of protection afforded by those requirements; EN010103-002107-NZT DCO 6.3.56 - ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening) August 2022 (D6).pdf:1: Special Protection Area EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:3: SPA Special Protection Area EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:37: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:47: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:61: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:62: head, the introduction of rock armouring / scour protection (with an expected EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:62: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:62: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:62: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:62: circular footprint for the proposed scour protection therefore follows this design EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:63: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:64: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:68: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:72: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:77: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:86: Moors Special Protection Area Site Code: UK9006161 Online. Available at: EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:87: Coast Special Protection Area (TIN172) Online. Available at: EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:132: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:132: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:132: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:132: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:133: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:133: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:133: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:133: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:133: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: circular footprint for the proposed scour protection therefore follows this design EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: scour protection at the outfall location. EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: be incorporated into the design and the height of the protection above the seabed should EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:134: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:135: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:135: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:135: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:20: - Article 41 provides protection for statutory undertakers and others through the EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:20: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:21: pipe and cable protection equipment and telecommunications equipment, and to EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:21: include aerial markers, cathodic protection test posts and field boundary markers, EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:22: include Requirements relating to landscaping and biodiversity protection (4) and the EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:26: This provides protection for the street authority for the street in question. This is based on EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:28: authorised development may commence until a landscaping and biodiversity protection EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:28: biodiversity protection plan must include details of any tree or hedgerows to be removed. EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:30: development as restrictive covenants for the protection of the underground elements of the EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:34: Environmental Protection Act 1990, if the statutory nuisance is created in the course of EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:34: sufficient protection against the matters that may constitute “statutory nuisances” under EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:34: section 79(1) of the Environmental Protection Act 1990. EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:42: 3.8.36. Requirement 4 (Landscaping and biodiversity protection management and enhancement) EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:42: additional provision for biodiversity protection management and enhancement. It has been EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:42: protection plan to the relevant planning authority, following consultation with STDC and EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:42: protection for the landscaping and biodiversity elements during construction, whilst EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:44: consultation with Natural England, a scheme of protection and mitigation measures has EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:45: 3.8.57. Requirement 17 (Protection of highway surfaces) - this is not a model provision. It requires EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:50: relevant parties and protections. EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:4:41. Protection of interests EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:32:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:33:Protection of interests EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:33: Environmental Protection Act 1990 (c.43). EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:37: (ii) cathodic protection posts; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:39: (vi) works for the protection of buildings and land; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:42:Landscaping and biodiversity protection management and enhancement EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:42:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:46:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:47:Protection of highway surfaces EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:47: (d) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:47: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:53: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:53: 24. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:55:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:56:specified works or the alteration or protection of any apparatus. EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:79: (vii) the deposit of rock armour protection; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:93: (iv) the deposit of rock armour protection; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:93: (vii) the deposit of rock armour protection; EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:105: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:105: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:107:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:108:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:109: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:109: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:111: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:111: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:112:stopping up), 25 (retained apparatus: protection of electricity undertaker), 26 (retained apparatus: EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:112:protection of gas undertaker), 27 (expenses) and 28 (indemnity) of this Schedule which will apply EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:114:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:115:Retained apparatus: protection of electricity undertaker EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:116:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:116:Retained apparatus: protection of gas undertaker EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:117:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:117:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:120:23(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:120:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:120: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:120: 34. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:122:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:123:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:125:for the protection of the apparatus, or for securing access to it, and Air Products is entitled to EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:126:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:127: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:127: 54. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:129: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:129: 63. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:131: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:131: 73. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:133: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:133: 81. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:135: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:135: 89. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:136: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:143: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:143: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:145:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:145: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:148: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:148: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:149: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:149: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:151: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:151: 156. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:154: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:154: 169. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:155: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:155: 177. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:157: FOR THE PROTECTION OF YORK POTASH EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:157: 185. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:159:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:160:the alteration or protection of any apparatus. EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:161: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:161: 205. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:163: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:163: 215. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001969-c 16 May 2022.pdf:2: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001969-c 16 May 2022.pdf:2:157. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-000962-NZT DCO 6.3.57 ES Vol II Figure 11-5 PCC Site Operation Noise Levels.pdf:1: Special Protection Area EN010103-001986-NZT DCO 8.20 - Exolum Seal Sands & Exolum Riverside SoCG - August 2022(D5).pdf:10: will provide the appropriate protection to Exolum’s apparatus and operations. EN010103-001864-Deadline 3 Response (CATS North Sea Limited) 23 June 2022.pdf:2:contained in Part 5 of Schedule 12 of the draft DCO for protection of the CATS pipeline are inadequate. CNSL EN010103-002403-DLA Piper UK LLP - Responses to the ExA’s ExQ3 (if required).pdf:13: provide an appropriate level of protection. In particular, EN010103-002403-DLA Piper UK LLP - Responses to the ExA’s ExQ3 (if required).pdf:14: ExA, Sembcorp seeks a level of protection EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:3: RSPB Royal Society for the Protection of Birds EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:3: SPA Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:5: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:14: sites the same level of protection as SPAs and SACs. EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:36: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:60: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:64: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:72: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:81: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:82: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:119: Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:120: Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:121: Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:122: Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:123: Special Protection Area EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:124: Special Protection Area EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:1:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:2: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:2:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:3:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:4:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:5:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:6:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:7:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:8: (a) the inspection, removal and relaying or replacing, alteration or protection EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:8: of protection afforded by those requirements; EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:8:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:9:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:10:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:11:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf:12:- PPs for the protection of Sembcorp (PM August 2022) - WITHOUT PREJUDICE(133988695.3).docx. EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:3: SPA Special Protection Area EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:5: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:14: sites the same level of protection as SPAs and SACs. EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:37: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:47: armouring / scour protection would result in direct and permanent loss of subtidal EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:47: that the introduction of rock armouring / scour protection (with an expected volume EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:63: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:74: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:83: Moors Special Protection Area Site Code: UK9006161 Online. Available at: EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:84: Special Protection Area (TIN172) Online. Available at: EN010103-001146-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 2.pdf:4: Special Protection Area EN010103-002313-NZT DCO 8.1 - RCBC SoCG Sept 2022 (D9) - final signed.pdf:14: Protection Area 6km Buffer Zone/Ramsar Site & EN010103-002313-NZT DCO 8.1 - RCBC SoCG Sept 2022 (D9) - final signed.pdf:15: x STDC7 – Natural Environmental Protection and EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:5: • Environmental Protection Act 1990. EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:6: Local Plan adopted May 2018. These require the protection and EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:6: the protection and enhancement of biodiversity, including maximising EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:6: out expectations for natural environment protection and enhancement, EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:11:British Trust for Ornithology, the Royal Society for the Protection of Birds and the Joint Nature Conservation Committee (the EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:32: Royal Society for the Protection of Birds EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:32: breeding for a number of species afforded elevated levels of protection under EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:38: Special Protection Area (SPA); EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:38: • Are afforded elevated levels of protection under the WCA (Schedule 1 EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:60: Coast potential Special Protection Area (pSPA) and Ramsar. March 2018 EN010103-001888-CATS North Sea Limited.pdf:6: protections in place to ensure the safe and continued their Written Representa EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:5: given statutory protection that protects them from harm or forms of EN010103-002618-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (Tracked changes).pdf:1:FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002618-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (Tracked changes).pdf:1:255. For the protection of South Tees Development Corporation, Teesworks Limited and South Tees EN010103-002618-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (Tracked changes).pdf:4:protection provided if it crosses underground facilities; EN010103-002618-South Tees Development Corporation - Other- STDC’s preferred form of Protective Provisions for inclusion in the made Order (Tracked changes).pdf:5:accordance with the undertaker’s construction programme. Commented BDBP13: 13. This protection is already EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:23: - Article 41 provides protection for statutory undertakers and others through EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:23: - Articles 42 to 48 include provisions for saving rights of Trinity House; protection EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:25: cables, pipe and cable protection equipment and telecommunications EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:25: equipment, and to include aerial markers, cathodic protection test posts and field EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:25: protection (4) and the construction environmental management plan (16)). The EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:30: to sub-paragraph 11(1). This provides protection for the street authority for the EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:33: landscaping and biodiversity protection plan for that part has been submitted to and EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:33: the Order specifies that the landscaping and biodiversity protection plan must EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:35: protection of the underground elements of the Proposed Development would EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:40: under the Environmental Protection Act 1990, if the statutory nuisance is created in EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:40: The Applicants consider that the Requirements provide sufficient protection against EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:40: Environmental Protection Act 1990. EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:49:3.8.39 Requirement 4 (Landscaping and biodiversity protection management and EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:49: modified to make additional provision for biodiversity protection management and EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:50: protection plan to the relevant planning authority prior to commencing the EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:50: protection for the landscaping and biodiversity elements during construction, whilst EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:52: protection and mitigation measures has been submitted to and approved in writing EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:53:3.8.57 Requirement 17 (Protection of highway surfaces) - this is not a model provision. It EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:58: information on the relevant parties and protections. EN010103-002095-NZT DCO 6.3.19 - ES Vol II Figure 8-7 Annual Mean NOx Process Contribution August 2022 (D6).pdf:1: Special Protection Area EN010103-001871-Hartlepool Borough Council.pdf:4:Information will be handled in accordance with the General Data Protection EN010103-001871-Hartlepool Borough Council.pdf:17: HE1: Protection and Enhancement of conservation Areas EN010103-001871-Hartlepool Borough Council.pdf:17: HE12: Protection of Locally Important Buildings EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:11: • Protection of Badgers Act 1992; EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:11: • Wild Mammals (Protection) Act 1996; EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:11: • Environmental Protection Act 1990; and EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:17: species stand-offs and other protection measures). EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:17: species stand-offs and other protection measures). EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:20: • a tool box talk would be given to clarify the legal protections afforded and to EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:21: specification of tree root protection zones. EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:22:4.9.24.8.2 Associated requirements for protection of retained vegetation e.g. during EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:22: vehicle movements and construction/re-instatement works, soil protection and EN010103-001977-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked.pdf:45:Nestboxes in buildings are generally the best option, joints to increase weather protection. If you need proof EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001234-NZT - Regulation 32 Transboundary Screening (6).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-002064-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Clean.pdf:14: Protection Area 6km Buffer Zone/Ramsar Site & EN010103-002064-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Clean.pdf:15: • STDC7 – Natural Environmental Protection and EN010103-002065-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Tracked.pdf:14: Protection Area 6km Buffer Zone/Ramsar Site & EN010103-002065-NZT DCO 8.1 - RCBC SoCG - August 2022(D6) - Final - Tracked.pdf:15: • STDC7 – Natural Environmental Protection and EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:4: EPA The Environmental Protection Act 1990 - an Act of the Parliament of the EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:8: the Environmental Protection Act 1990 (the EPA 1990) in respect of statutory EN010103-001985-NZT DCO 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Tracked.pdf:12: appropriate protection to NWL’s apparatus and operations. EN010103-002483-NZT DCO 6.3.62 - ES Vol II Figure 15-3 Designated Sites Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:3: 232a, 252, 253, 253a, protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:4: Occupier 160, 161, 163, 164, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:4: 384, 397, 401, 405, by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:4: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: 10, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: 135, 138a, 141a protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: – Owner 6, 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:7: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:8: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:8: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:8: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:8: Occupier (b) 12a, 134, 142a, 10 protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:8: 165, 166, 166b, 168, by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:9: 176b, 184, 185, 190, considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:13: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:13: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:13: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:13: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:14: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:14: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:14: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:14: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:15: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:15: 5c, 6, 8, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:15: 470, 473, 475, 477, by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:15: 496, 500, 502, 504, considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: Company Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:16: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:17: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:17: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:17: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:17: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:18: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:18: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:18: – Owner 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:18: Occupier 160, 161, 163 protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:19: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:19: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:20: Environmental – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:20: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:20: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: Limited – Owner 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: Occupier 159, 160, 161, 163 protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:21: Occupier 154, 159, 160, 161, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:22: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:22: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:22: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:22: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: (b) - protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:23: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:24: Environmental – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:24: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:24: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:24: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:25: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:25: Occupier 124e, 12a, 138a, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:25: 171b, 172, 174, by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:25: 190, 190b, 191, 191a, considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:28: provide protection for One-Dyas EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:28: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:28: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: Plc – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:29: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:30: Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:30: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:30: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:30: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: Chemical UK – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:31: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:32: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:32: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:35: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:35: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:36: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:36: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:36: Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:36: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:37: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:37: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:38: Plc – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:38: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:38: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:38: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:39:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:39: 144, 147, 148, 151, provisions and asset protection agreement during EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:39: Processing Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:39: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:40: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:40: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:43: 510, 533, 416, 431, protection for One-Dyas UK as EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:43: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part are writing to EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:43: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:45: Limited protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:45: protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:46: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:46: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:46: Limited protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:46: protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: Limited 6, 9b, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: 140, 142a, 154, 158a, protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: 168, 170, 171, 171b, by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:47: 187, 188, 189, 190, considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:50: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:50: UK Plc – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:50: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:51: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:51: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:53: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:53: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:54: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:54: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:56: Energy Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:56: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:56: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:56: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:72: – Owner 6, 10 protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:72: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:73: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:73: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:73: Specialties UK – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:73: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:74: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:74: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:74: Energy Limited – Owner protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:74: Occupier protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: considered adequate protection EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: Occupier (b) - protection of electricity, gas, EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: by the protection offered by EN010103-002073-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022 (D6).pdf:75: considered adequate protection EN010103-001592-NZT DCO 8.11 - Northern Powergrid SoCG - May 2022.pdf:6: access and protection of assets to remain uninterrupted EN010103-001592-NZT DCO 8.11 - Northern Powergrid SoCG - May 2022.pdf:10: for the protection of NPg’s operations and assets. These discussions are ongoing, EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:60: 1710.48 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:61: square metres of grassland Limited Protection of Birds Limited on acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:68: 9621.98 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:69: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:70: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:74: 1418.62 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:75: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:80: 5351.15 square metres of Limited Protection of Birds Transmission Plc acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:81: square metres of grassland Limited Protection of Birds Transmission Plc the acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:85: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:85: square metres of private Limited Protection of Birds Transmission Plc EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:86: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:94: metres of unnamed track Limited Protection of Birds Limited EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:96: 11265.03 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:97: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:99: 2006.75 square metres of Limited Protection of Birds Limited acquisition type change EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf:100: square metres of grassland Limited Protection of Birds Limited the acquisition type EN010103-002352-NZT CAH3 S2.pdf:10:entirely fair way. Under the protective provisions, insofar as there is any need for further protection. The EN010103-002352-NZT CAH3 S2.pdf:14:sheduled 12 provides appropriate protection for them. Then I'll deal collectively with Telefonica, UK, EN010103-002352-NZT CAH3 S2.pdf:15:protection revisions and sign agreement most recently returned by the applicants to mpg so this is on EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:3:01.05 The Vision and Strategy for Regeneration 04.05 Environmental Protection and Enhancement 11.14 Recycling and Zero Water Strategy EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:22:and Cleveland Coast Special Protection Area (SPA), Site EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:24:linked and statutory impact assessment processes determination process, will ensure the protection and SSSI and SPA. These designations protect the for industrial development of this coastal strip. EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:24: 2.02.3 LOCAL POLICY respect and provide appropriate protection for EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:32: works have also recently been carried out in this area. and Crown land; designated a Special Protection Area. EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:34: Interest (SSSI) and Special Protection Area (SPA) and includes the large expanse of Coatham Sands. EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:56:appropriate protection within any regeneration proposals. There are four habitats within the site boundary that are restricted to) the calcareous grassland in the Redcar EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:62: • Clear synergies with neighbouring major enhancements, STDC can provide clear opportunities for • Flooding risk and flood protection EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:68:Superb Functionality and Connectivity Energy Innovation Environmental Protection and Enhancement Viable Business Model EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:68:allocations and site selection. Access and circulation and solutions, providing opportunities for a broad array affording appropriate protection to the area’s internationally struck between the best land uses and densities, for EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:81: 4.05 Environmental Protection and Enhancement EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:81:led regeneration must provide appropriate protection appropriate protection for ecological designations EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:81:environmental protection and enhancement therefore forms EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:126:(in particular ecological and landscape) protection and enhancement, EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:127:form part of the Teesmouth and Cleveland Coast SPA, other implementation of the Redcar and Cleveland Recreation while ensuring protection of environmentally and interpreted for greater public use. Central to the CCZ EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:156:collection and conveyance, detention and retention, and within the site that provides potable and fire protection effluent treatment facility with the STDC area is a major to allowing any discharge into the development’s new EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:156:management system will provide a flood protection level of quality and reduced impact on the local environment. EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:156:service that meets regulatory standards for flood protection water. The potential for use of the existing Northumbrian EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:156:completely gravity operated system will be significantly cooling water; irrigation water; fire protection requirements; EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:166:relation to environmental protection, environmental arrangements. One of the key constraints to the plan for consideration, to enable a rolling programme of level and this is something the Tees Valley Mayor is keen to EN010103-000921-NZT DCO 6.3.12 ES Vol II Figure 7-1 Local Plan Areas.pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-000921-NZT DCO 6.3.12 ES Vol II Figure 7-1 Local Plan Areas.pdf:1: N 4 Special Protection Areas (SPA) EN010103-001767-NZT DCO 9.8 - Appendix PPL.1.2b RBCB and STBC policy maps with Order Limits overlay - June 2022.pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-001767-NZT DCO 9.8 - Appendix PPL.1.2b RBCB and STBC policy maps with Order Limits overlay - June 2022.pdf:1: N 4 Special Protection Areas (SPA) EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:52: protection, and management of unexpected terrestrial archaeological EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:58:vegetation protection. EN010103-001676-NGG Written Representation - Final 09.06.22(217468170.1)(217468920.1).pdf:3: (b) that appropriate protection for Feeder Mains and AGI’s and any other EN010103-001676-NGG Written Representation - Final 09.06.22(217468170.1)(217468920.1).pdf:3:3 NGG REGULATORY PROTECTION FRAMEWORK EN010103-001676-NGG Written Representation - Final 09.06.22(217468170.1)(217468920.1).pdf:3: appropriate level of control and protection for all retained assets (including Feeder EN010103-000929-NZT DCO 6.3.20 ES Vol II Figure 8-8 Maximum 24 Hour Mean NOx Process Contribution.pdf:1: Special Protection Area EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:26: protections, will beThe Applicants submitted EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:36: biodiversity protection management and and the principles agreed between the parties, EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:37: management plan biodiversity protection management and EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:43: the inclusion of new “lift and shift” provisions. Amongst other additional protections, STDC EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:50: under Article 8. The Applicants’ use of the existing STDC requires suitable protection via the draft EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:3: 1 – Owner 10 parties on the protective protection from Air Products on EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:4: Protection Agreement prior and asset protection EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:4: protection for Air Products EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:4: Exploration 1 – Owner 4, 5c, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:5: Occupier 142a, 158a, 166a, 10 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:5: 480, 108, 111, protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:5: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:8: 2 10, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:8: 135, 138a, 141a 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:8: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:8: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:8: 1 – Owner 6, 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:9: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:9: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:9: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:9: 1 – Owner 403, 450, 112 2b, 3a, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:9: Occupier (b) 12a, 142a, 10 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:10: 171, 171b, 172, protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:10: 191a, 191d, 194, protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:16: Petroleum 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:16: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:17: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:17: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:17: Production (U.K.) 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:17: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:18: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:18: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:18: Limited 2 476, 479, 482, 3b, 4, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:18: 5c, 6, 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:19: 473, 475, 477, protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:19: 500, 502, 504, protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:19: Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:19: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:20: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:20: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:20: Company Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:20: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:21: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:21: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:21: Limited 1 – Owner 6, 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:21: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:22: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:22: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:23: 1 – Owner 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:23: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:23: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:24: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:25: Environmental 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:25: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:25: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:26: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:26: Limited 1 – Owner 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:26: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:26: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:26: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: Teesside Limited 1 – Owner 6, 9b, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: Biofuels Teesside 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:27: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:28: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:28: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:28: Holding Limited 2 330, 333 6, 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:28: (b) - 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:29: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:29: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:29: Environmental 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:29: Occupier 362, 363, 367, 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:30: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:30: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:31: Polymers Limited 1 – Owner 6, 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:31: Occupier 12a, 138a, 141a, 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:31: 174d, 176, 176b, protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:32: 194, 196, 2, 202c, protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:36: also provide protection for EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:36: Services (UK) 1 – Owner 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:36: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:36: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:36: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:37: Plc 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:37: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:37: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:37: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:37: Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:38: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:38: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:38: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:39: Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:39: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:40: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:40: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:40: Chemical UK 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:40: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:40: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:41: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:43: that the protections EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:44: protections included in Part EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:49: Petroleum UK 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:49: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:49: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:50: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:50: Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:50: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:50: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:50: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:52: Plc 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:52: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: Networks Limited 1 – Owner 6, 9b, in contact with Northern Gas protection responded to EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: 26, 30, 31, 343, and asset protection EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: Asset Protection EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:53: Protection Agreement prior EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:54: Processing 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:54: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:55: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:55: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:59: 416, 431, 508, 535 protection for One-Dyas UK EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:60: Limited 1 – Owner 341, 346, 361, 3a, 5c, included protection in the written to Openreach EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:60: Occupier 391, 392, 396, 9a, 10 12) for the protection of response has been EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:62: Limited 2 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:62: 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:62: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:62: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:62: Limited 2 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:63: 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:63: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:63: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:63: Limited 2 6, 9b, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:63: 166a, 171a, 176a, 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:64: 187, 188, 189, protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:64: 98 protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:69: the Protection of 1 – Owner 10 of land adjacent to the 168 EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:70: UK Plc 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:70: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:70: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:70: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:73: Transportation 1 – Owner 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:73: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:74: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:74: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:77: Energy Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:77: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:77: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:77: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:97: 1 – Owner 6, 10 included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:97: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:98: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:98: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:99: Specialties UK 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:99: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:99: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:99: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: Energy Limited 1 – Owner included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: Occupier 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: protection is in place for the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: Limited 1 – Owner 330, 333 5c, 6, included protection in the EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:100: Occupier (b) - 12) for the protection of EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:101: protection offered by these EN010103-002520-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - Nov 2022 (D12).pdf:101: protection is in place for the EN010103-001116-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 3.pdf:1: Special Protection Area EN010103-001116-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 3.pdf:2: Special Protection Area EN010103-001564-NZT DCO 8.22 - Marlow Foods SoCG - May 2022.pdf:7: protection for Marlow Foods’ access to its site during construction of the Proposed EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:2: FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:2: 1. For the protection of National Gas as referred to in this Part of this Schedule the following EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:3: temporary stopping up), 9 (retained apparatus: protection), 10 (expenses) and 11 EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:5: construction, use, maintenance and protection of alternative apparatus in substitution EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:5: Retained apparatus: protection of gas undertaker EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:6:Gas for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:6: relaying or replacing, alteration or protection of any apparatus or the construction of EN010103-002730-Response from National Gas Transmission PLC EMAIL & Attachment.pdf:9: under paragraph 7(2) or National Gas makes requirements for the protection or EN010103-002728-Response from North Sea Midstream Partners.pdf:2:protective provisions are fundamentally inadequate in providing protection for our clients and the key national EN010103-002728-Response from North Sea Midstream Partners.pdf:2:operated or used by our clients. In particular, the liability protection offered by the Applicant covers only the EN010103-002728-Response from North Sea Midstream Partners.pdf:2:other fundamental gaps in the liability protection offered by the Applicant, please see our clients’ written EN010103-002728-Response from North Sea Midstream Partners.pdf:2:granted, we urge you to mandate the adoption of our clients’ proposed protective provisions to provide protection EN010103-002728-Response from North Sea Midstream Partners.pdf:2:agreement, scope of the indemnity protection, minimum level of insurance cover, satisfying our client on the EN010103-002728-Response from North Sea Midstream Partners.pdf:3:representation 13-032. It is only by imposing these requirements that a base level of protection can be provided. EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:11: to be included in the Hornsea Four DCO, along with an explanation of the protection EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:189:Infield this will be the opposite. Greater pipeline protection at the windfarm interface would EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:198:between high power transmission and cathodic protection of carbon steel pipelines. This EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:209: Protection for Carbon Dioxide EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:209:1. For the Protection of the Licensee(s) from time to time of United Kingdom Carbon Dioxide Appraisal EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:3: SPA Special Protection Areas EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:35: no protection or certainty in relation to the or detail is provided in relation to potential EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:53: that have been raised by NSMP with regards to protection of their operations, EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:53: DCO (Document Ref. 2.1) at Deadline 12 provide adequate protection for NSMP to EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:53: protection has been amended. EN010103-002673-STDC - Preferred PPs End of Examination TRACK - 10 Nov 2022.pdf:1:FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002673-STDC - Preferred PPs End of Examination TRACK - 10 Nov 2022.pdf:1:255. For the protection of South Tees Development Corporation, Teesworks Limited and South Tees EN010103-002673-STDC - Preferred PPs End of Examination TRACK - 10 Nov 2022.pdf:4:protection provided if it crosses underground facilities; EN010103-002673-STDC - Preferred PPs End of Examination TRACK - 10 Nov 2022.pdf:5:accordance with the undertaker’s construction programme. Commented BDBP13: 13. This protection is already EN010103-001212-NZT DCO 1.6 - Signposting Document re Update Application Documents - Final.pdf:14: Special Protection Area and Ramsar site. Figure 3-4 Environmental EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:5: SPA Special Protection Area EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:29: protection and to absorb any seepage EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:56: 13 JNCC – Annex IV: Animal and plant species of Community interest in need of strict protection. EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:57: • Special Protection Area (SPA) with Marine Components: SPAs with Marine EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:58: protection of harbour porpoise. It lies 30km southwest of Dogger Bank SAC, designated for the EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:58: protection of Sandbanks. It lies 42km north of North Norfolk Sandbanks and Saturn Reef SAC, EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:58: designated for the protection of a series of ten main sandbanks and associated fragmented EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:58: Holderness Offshore MCZ designated for the protection of North Sea glacial tunnel valleys, EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:58: the protection of harbour porpoise. EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:75: lies within the Southern North Sea SAC (summer area) designated for the protection of harbour EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:75: area) designated for the protection of harbour porpoise. The following cetacean species EN010103-002081-NZT DCO 6.3.5 - ES Vol II Figure 3-4 Environmental Receptors within 2km August 2022 (D6).pdf:1: Special Protection Area EN010103-001378-NZTDCO 6.3.48 Rev 2 ES Addendum Vol II Figure 10-22 Redcar and Cleveland Local Plan Areas.pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-001378-NZTDCO 6.3.48 Rev 2 ES Addendum Vol II Figure 10-22 Redcar and Cleveland Local Plan Areas.pdf:1: N 4 Special Protection Areas (SPA) EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:4: protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:4: Occupier 158a, 166a, 171a, protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:5: 469, 470, 472, 473, by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:5: 142, 142b, 143, 144, considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: 10, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: 135, 138a, 141a protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: – Owner 6, 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:8: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:9: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:9: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:9: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:9: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:10: 169, 171, 171b, 172, by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:10: 191, 191a, 191d, 194, considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:15: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:15: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:15: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:15: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:16: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:16: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:16: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:16: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:17: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:17: 5c, 6, 8, protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:17: 459, 467, 469, 470, by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:17: 489, 493, 495, 496, considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: Company Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:18: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:19: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:19: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:19: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:19: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:19: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:20: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:20: – Owner 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:20: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:21: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:21: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:22: Environmental – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:22: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:22: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: Limited – Owner 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:23: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:24: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:24: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:24: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:24: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: (b) - protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:25: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:26: Environmental – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:26: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:26: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:26: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:27: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:27: Occupier 138a, 141a, 142a, protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:27: 165, 166, 169, 171, by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:27: 185, 185b, 190, 190b, considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:30: provide protection for One-Dyas EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:30: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:30: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:31: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:31: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:31: Plc – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:31: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:31: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:32: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:32: Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:32: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:32: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:32: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:33: Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:33: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:33: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:33: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:34: Chemical UK – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:34: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:34: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:34: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:39: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:39: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:39: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:39: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:40: Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:40: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:40: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:40: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:41: Plc – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:41: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:42: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:42: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:42:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants have EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:42: 152, 153, 25, 26, 30, provisions and asset protection position to respond EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:43: Processing Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:43: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:43: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:43: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:47: 533, 416, 431, 508, protection for One-Dyas UK as EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:47: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part written to EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:47: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: Limited protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: Limited protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:49: protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:50: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:50: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:50: Limited 6, 9b, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:50: 171a, 176a, 183a, protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:50: 184, 185, 185b, 186, by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:51: 191b, 191d, 192, 194, considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:54: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:55: UK Plc – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:55: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:55: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:55: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:58: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:58: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:58: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:58: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:61: Energy Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:61: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:61: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:62: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:78: – Owner 6, 10 protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:79: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:79: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:79: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: Specialties UK – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: Energy Limited – Owner protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:80: Occupier protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: considered adequate protection EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: Occupier (b) - protection of electricity, gas, EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: by the protection offered by EN010103-002318-NZT DCO 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022 (D9).pdf:81: considered adequate protection EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:26: protections, will be submitted at Deadline 4. EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:35: • Requirement no. 24: Waste management on biodiversity protection management and EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:40: Amongst other additional protections, STDC is EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:46: dependent on resolving technical matters and STDC requires suitable protection via the draft EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:4: EPA The Environmental Protection Act 1990 – an Act EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:9: SPA Special Protection Area – strictly protected sites EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:9: birds directive. Special Protection Areas are EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:9: sites for the protection of threatened habitats EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:9: area designated for protection under the Wildlife EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:33: Protection Area and Ramsar site, or other European designated nature conservation EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:34: • Teesmouth and Cleveland Coast Special Protection Area 6km Buffer Zone/Ramsar EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:92: protection is applied as a matter of policy, either alone or in combination with other EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:92: Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site, which is designated EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:95: Biodiversity Protection Plan and the Construction Environment Management Plan EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:101: landscaping will be secured by Requirement 4 ‘Landscape and biodiversity protection EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:102: Design’; 4 ‘Landscape and biodiversity protection management and enhancement’; EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:116: Environmental Protection Act (EPA) 1990, and how they may be mitigated or limited EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:117: Protection of National Infrastructure. EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:122: route to its original state as close as Biodiversity Protection Plan and the CEMP that will be secured by EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:132: paragraph 2.6.5 highlights that it is not Requirement 4 ‘Landscaping and biodiversity protection and management and EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:148: protection or diversion of underground EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:150: protection (electrical or the EIA Scoping Opinion (02.04.19). Additionally, the Electric and Magnetic EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:172: the protection of EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:178: Area SPD Protection and enhance designated will not result in unacceptable impacts on other nature conversation EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:190: and protection, and where EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:230: Areas of Conservation (SAC), Special Protection Areas (SPAs), Ramsar EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:230: e. avoid Groundwater Source Protection Zone 1 or Flood Risk Zone 3b EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:3: Protection and Enhancement EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:12: environment, contributes to habitat protection, safeguards biodiversity EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:17: protection and encourage biodiversity and long term sustainability; EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:18: To support the protection of heritage assets and the historic environment and EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:18: the protection and enhancement of landscape character. EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:37:Development Principle STDC7 - Natural Environmental Protection and EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:37: Development Principle STDC7: Natural Environmental Protection and EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:38: Protection Area (SPA). Further parts of the South Tees Area are also expected to EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:43: protection measures, such as those to protect buildings from landfill gas migration. EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:44: segregated major utilities corridor. This will give protection to existing major EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:46: stormwater management system will provide a flood protection level of service EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:46: protection of building structures and also meets government agency standards for EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:46: flood protection of roads, parking areas, and habitable buildings. EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:46: supported in respect of supply, disposal of foul water and supplies for fire protection. EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:46: Fire protection water demand; EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:52: Environmental Protection and Enhancement. EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:52: environmental enhancement and protection for this zone within a wider EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:52: built development boundary of the North Industrial Zone and any protection EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:57: protection for this zone within a wider Environment and Biodiversity Strategy. EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:3: SPA Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:60: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:60: head, the introduction of rock armouring / scour protection (with an expected EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:61: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:61: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:61: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:61: circular footprint for the proposed scour protection therefore follows this design EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:61: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:63: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:72: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:80: introduction of a small volume of rock armouring / scour protection due to the Proposed EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:87: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:88: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:127: Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:128: Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:129: Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:130: Special Protection Area EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:132: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:132: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:132: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:132: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:133: circular footprint for the proposed scour protection therefore follows this design EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: scour protection at the outfall location. EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: be incorporated into the design and the height of the protection above the seabed should EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:134: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:135: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:135: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:135: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001954-Redcar and Cleveland Council - Revised Application Guide (clean and tracked versions).pdf:5: SPA Special Protection Area EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:48: square metres of unnamed Limited Protection of Birds Limited EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:55: square metres of grassland, Limited Protection of Birds Limited EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:59: square metres of grassland Limited Protection of Birds Limited EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:64: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:68: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:69: square metres of private Limited Protection of Birds Transmission Plc EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:70: square metres of grassland Limited Protection of Birds Transmission Plc EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:78: metres of unnamed track Limited Protection of Birds Limited EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:80: square metres of grassland Limited Protection of Birds Limited EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf:82: square metres of grassland Limited Protection of Birds Limited EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:10: Protection of Badgers Act 1992; EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:10: Wild Mammals (Protection) Act 1996; EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:10: Environmental Protection Act 1990; and EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:16: species stand-offs and other protection measures). EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:18: a tool box talk would be given to clarify the legal protections afforded and to EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:19: specification of tree root protection zones. EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:20:4.8.2 Associated requirements for protection of retained vegetation e.g. during vehicle EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:20: movements and construction/re-instatement works, soil protection and handling, EN010103-001156-NZT DCO 5.12 - Landscape and Biodiversity Strategy.pdf:42:Nestboxes in buildings are generally the best option, joints to increase weather protection. If you need proof EN010103-002006-NZT-ExQ2-FINAL.pdf:4: SPA Special Protection Area EN010103-002006-NZT-ExQ2-FINAL.pdf:14: working in or near the Special Protection Area (SPA)/ Ramsar pools and lagoons and/ or EN010103-002006-NZT-ExQ2-FINAL.pdf:14: iii) Landscaping and Biodiversity Protection Plan (R4 of dDCO REP5-002); EN010103-002006-NZT-ExQ2-FINAL.pdf:15: installing rock armour protection, noting that this had not been addressed in the HRA. At D4 EN010103-002006-NZT-ExQ2-FINAL.pdf:16: the Applicants responded, indicating that an assessment of installing rock armour protection EN010103-002006-NZT-ExQ2-FINAL.pdf:26:DCO.2.2 Applicants R3(7) refers to the approximate number and location of cathodic protection posts and marker EN010103-002006-NZT-ExQ2-FINAL.pdf:27: “mirror” protection in the York Potash Order has been deleted on the basis that it serves no EN010103-002006-NZT-ExQ2-FINAL.pdf:31: benefit and protection of HP4 when the NZT DCO does not extend to the Endurance EN010103-002006-NZT-ExQ2-FINAL.pdf:31: iv) Has Orsted sought to discuss issues and propose protections with the advisors to the EN010103-002006-NZT-ExQ2-FINAL.pdf:32: Part IIA of the Environmental Protection Act 1990. EN010103-002006-NZT-ExQ2-FINAL.pdf:33: MMO protection and management of unexpected archaeological discoveries. EN010103-002006-NZT-ExQ2-FINAL.pdf:39: respect to protection of water quality? EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:9:2017 protection of surface waters bodies which fall within the Study EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:9: European Sites, the protection of EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:9: controls for the protection of EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:9:The Convention on Provides protection for endangered Species listed in Appendix II are EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:10:Wild Animals (the requirement for the strict protection EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:10:Convention) 1982 protection of Appendix II & III EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:10:Protection of the and habitats that required protection EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:13:14.3.8 There are no shellfish species which are afforded conservation protection EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:15: Special Protection Area EN010103-002593-NZT DCO 6.3.40 - ES Vol II Figure 10-14 Sensitive Land Use Nov 2022 (D12).pdf:1: Special Protection Area EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:3: protection mechanisms; EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:4:23.2.14 NPS EN-5 makes reference to health protection guidelines for public and EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:7: Commission on Non-Ionizing Radiation Protection (ICNIRP) developed EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:7: health protection guidelines in 1998 (ICNIRP, 1998) for both public and EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:11: established for the protection of human health (e.g. air quality). human health and population. EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:20:23.5.6 Measures for the protection of workers from potential EMF effects will EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:20: protection programmes, and medical surveillance in accordance with the EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:23: International Commission on Non-Ionising Radiation Protection (1998). EN010103-001392-NZTDCO 6.3.55 Rev 3 ES Addendum Vol II Figure 11-4a CO2 Export Pipeline Construction.pdf:1: Special Protection Area EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:4:Source Protection Zones EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:8: Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:9:Source Protection Zones EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:12:Special Protection Areas pg 8 1 EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:19: Radon Potential - Radon Protection Measures EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:19: Protection Measure: No radon protective measures are necessary in the construction of new I5SE 0 1 456875 EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:20: Designation Details: Special Protection Area EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:20: Special Protection Areas EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:21:Source Protection Zones EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:24:Radon Potential - Radon Protection Measures EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:25:Special Protection Areas EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:26: Scottish Environment Protection Agency EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:6: 191a, 202c, 218, 232a, a draft Asset Protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:6: Exploration 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:6: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:7: 137, 142, 142b, 143, caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:7: 171, 176, 176b, 185, adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:9: Plc 2 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:9: 138a, 141a protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:9: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:9: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:10: 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:10: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:11: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:11: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:11: 1 – Owner 450, 112 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:11: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:12: 185, 190, 191, 191a, caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:12: 31, 315, 316, 319, 320, adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:17: Petroleum 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:17: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:18: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:18: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:18: Production 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:18: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:18: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:19: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: 502, 504, 505, 510, caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:21: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:22: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:22: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:22: Company 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:22: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:23: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:25: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:25: Occupier 161, 163 protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:26: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:26: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: Environmental 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:27: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:28: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:28: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: Biofuels 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:31: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:32: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:32: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:32: Holding Limited 2 333 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:32: (b) - protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:33: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:33: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:33: Environmental 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:33: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:34: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:34: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:34: Polymers 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:34: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:35: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:35: 281, 284, 285, 286, 3, adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:37: provide protection for One- EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:38: Services (UK) 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:38: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:38: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:38: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:42: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:42: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:42: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:42: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:43: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:43: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:44: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:44: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:48: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:48: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: Chemical UK 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:49: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:53: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:53: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:54: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:55: Plc 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:55: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:56: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:56: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:56: Networks 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:56: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:56: 147, 148, 151, 152, protection is in place for the EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:57: Processing 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:57: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:57: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:57: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:60: provide protection for One- EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:64: Limited 2 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:64: protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:64: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:64: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:67: Limited 2 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:67: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:67: 191b, 192, 194, 91, 92, caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:67: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:69: the Protection of 1 – Owner land adjacent to the existing EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:69: UK Plc 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:69: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:70: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:70: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:74: Transportation 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:74: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:74: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:74: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:76: Energy Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:76: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:76: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:76: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:84: Liquids 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:84: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:85: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:85: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:87: Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:87: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:88: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:88: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:89: Specialties UK 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:89: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:89: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:89: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:90: Energy Limited 1 – Owner protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:90: Occupier protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:90: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:90: adequate protection is in EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:91: Limited 1 – Owner 333 protection in the draft DCO EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:91: Occupier (b) - protection of electricity, gas, EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:91: caught by the protection EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf:91: adequate protection is in EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:10: • Protection of Badgers Act 1992; EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:10: • Wild Mammals (Protection) Act 1996; EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:10: • Environmental Protection Act 1990; and EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:16: species stand-offs and other protection measures). EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:18: • a tool box talk would be given to clarify the legal protections afforded and to EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:20: specification of tree root protection zones. EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:20:4.8.2 Associated requirements for protection of retained vegetation e.g. during vehicle EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:20: movements and construction/re-instatement works, soil protection and handling, EN010103-001976-NZT DCO 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean.pdf:43:Nestboxes in buildings are generally the best option, joints to increase weather protection. If you need proof EN010103-002422-NZT DCO 9.47 - Sensitivity Assessment of Construction Programme - Oct 2022 (D11).pdf:3: SPA Special Protection Areas EN010103-002475-NZT DCO 6.3.54 - ES Vol II Figure 11-3 CO2 Gathering Network Construction Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002725-Response from INEOS Energy.pdf:1: We can confirm that, following fruitful discussions to ensure suitable protections are in place for our EN010103-001354-NZTDCO 6.3.24 Rev 3 ES Addendum Vol II Figure 9-3 Ecological Designations.pdf:1: Special Protection EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:19: and associated Infrastructure, including cathodic protection posts, marker posts and EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:13: Teesmouth and Cleveland Coast Special Protection Area (SPA)/Ramsar and EN010103-002025-Environment Agency - Responses to the ExA’s ExQ2.pdf:6: Part IIA of the Environmental Protection Act 1990. EN010103-002025-Environment Agency - Responses to the ExA’s ExQ2.pdf:6: Land” under Part 2A of the Environmental Protection EN010103-002025-Environment Agency - Responses to the ExA’s ExQ2.pdf:9:protection of water quality? EN010103-001894-NZT DCO 8.2 - STBC SoCG (Clean) July 2022(D4) -.pdf:2: SPA Special Protection Area EN010103-000067-Acknowledgement of s46 notification Dec 2020.pdf:2:your obligation under the current data protection legislation to process personal data EN010103-001816-Anglo American - Comments on the Applicants’ dDCO.pdf:3: the draft DCO for the protection of York Potash (Part 17 of Schedule 12) by way EN010103-002435-Redcar Bulk Terminal Limited - Comments on any other information submitted at Deadline 11.pdf:3: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002435-Redcar Bulk Terminal Limited - Comments on any other information submitted at Deadline 11.pdf:3:157. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-001393-NZTDCO 6.3.56 Rev 3 ES Addendum Vol II Figure 11-4b CO2 Export Pipeline Construction (with Screening).pdf:1: Special Protection Area EN010103-002113-NZT DCO 6.3.62 - ES Vol II Figure 15-3 Designated Sites August 2022 (D6).pdf:1: Special Protection Area EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:29:Protection Regulation. It is important that you read our Privacy Notice EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:36: General Data Protection Regulation. It is important that you EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:40:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:48:ENVIRONMENTAL PROTECTION (Centre) EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:49: Applicants in accordance with the Data Protection Act 1998 and the EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:49: General Data Protection Regulation and used solely in connection EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:50: record and these will be held securely by the Applicants in accordance with the Data Protection Act 1998 EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:50: and the General Data Protection Regulation and used solely in connection with the consultation process and EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:51: record and these will be held securely by the Applicants in accordance with the Data Protection Act 1998 EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:51: and the General Data Protection Regulation and used solely in connection with the consultation process and EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:53: Applicants in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used solely in connection with the consultation process and subsequent DCO application EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:61:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:98:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:103:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:118:in accordance with the Data Protection Act 1998 and the General Data Protection Regulation and used EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:135:General Data Protection Regulation. It is important that you read our Privacy Notice EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:138: to comply with the requirements of the General Data Protection (which will not apply to emergency service vehicles or EN010103-000957-NZT DCO 6.3.52 ES Vol II Figure 11-1 Noise Sensitive Receptors.pdf:1: Special Protection EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:13: operational effects will provide effective protection to EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:13: protection to designated sites and protected species, that no EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:14: effective protection to designated sites and protected species, EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:14: and Cleveland Coast Special Protection Area (SPA)/ Ramsar/ EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:17: The potential impacts of installing rock armour protection at EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:20:Biodiversity Protection, Measures to protect biodiversity during construction are set out EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:20: It is agreed that the biodiversity protection, mitigation and EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:20: Requirement 4 (Landscaping and Biodiversity Protection EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:21: until a landscaping and biodiversity protection plan for that part EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:12:Environmental Protection Agency; ICES = International Council for the Exploration of the Sea EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:18: based on the protection of pristine environments and species which may EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:21:14.3.22 No species afforded conservation protection were recorded during the EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:37: subsequent ingestion, which can provide a degree of protection to some EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:37:14.4.17 No species afforded conservation protection were recorded during the EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:41: Canadian sediment quality guidelines for the protection of aquatic life. In: EN010103-001920-Stockton on Tees Borough Council-ExQ1-editable-version.pdf:2: RCBC and STBC are asked to confirm whether this is an appropriate distance for protection of EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:14: operational effects will provide effective protection to EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:14: protection to designated sites and protected species, that no EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:15: effective protection to designated sites and protected species, EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:15: and Cleveland Coast Special Protection Area (SPA)/ Ramsar/ EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:18: The potential impacts of installing rock armour protection at EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:21:Biodiversity Protection, Measures to protect biodiversity during construction are set out EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:21: It is agreed that the biodiversity protection, mitigation and EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:21: Requirement 4 (Landscaping and Biodiversity Protection EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:22: until a landscaping and biodiversity protection plan for that part EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:35: Energy and Industrial Strategy (BEIS), the Centre for Protection of National Infrastructure (CPNI) and the EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:48: resilience of the network to threats, focusing on protection of specific EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:65:Trafficking and Violence Protection Act 2000 and, for our UK suppliers, a new Ethics Business Management Standard which provides a EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:66: • Audit Committee Report (our due diligence) – pages 76 – 81. same consistent and high level of protection for their own safety. EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:69:Community Protection Act (CLCPA). We will also leverage these grid frequency, which could increase disruption to our assets and our EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:103: protection may be offered lump sum life assurance EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:146: for reports under section 404 of the US Public Company Accounting Reform and Investor Protection Act of 2002 (Sarbanes-Oxley), audit reports on regulatory returns and the review of interim EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:176: The plan holds a longevity insurance contract which covers improvements in longevity, providing long-term protection to the scheme, should some pensioner EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:176: Up to 31 March 2020, National Grid was responsible for the costs of plan administration and the Pension Protection Fund (PPF) levies for both Sections A EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:182: longevity, providing long-term protection in the event that members live longer than expected; EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:237:Potentially hazardous activities that arise in connection with our business relating to pollution, the protection of the environment, and the use and disposal EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:247:Slavery Act 2015, Trafficking and Violence Protection Act 2000 and, for on pages 150 – 152, note 21 borrowing on pages 161 – 163 and where EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:248:protection performance. pilot projects with the intention of obtaining operational knowledge and EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:274:Environmental Protection Agency (EPA) as sites of significant contamination (Superfund sites). The EPA has the authority to force EN010103-001599-NZT DCO 8.18 - CATS SoCG - May 2022.pdf:10: ensure that the DCO includes appropriate protection for existing Infrastructure. EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: protection for NSMP, as emphasised in our previous submissions. Given this, NSMP cannot EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: has provided a satisfactory level of protection in this respect (subject to our other comments EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: protection to just the works to be undertaken on plots 103, 105, 106 or 108, or access in EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: NSMP operations contained within a second package of works, the level of protection is not EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:2: implications of the works relating to the Project, NSMP require industry standard protections EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: Applicants and a third party. The protections set out in the protective provisions must EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: is not correct that the negotiated protections should cease once construction of the Project EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: submission at paragraph 3.2.5 (REP12-167), the scope of the protection in the protective EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: practice to ensure that indemnity protection extends to all of these parties in such EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: broader definition can be used for the provisions where the protection of these categories of EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: protection is not needed by these categories of persons. EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:7: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING, EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:7:370. For the protection of TGLP, TGPP and NGPL, the following provisions have effect, unless EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:15: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING, EN010103-002615-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:15:370. For the protection of TGLP, TGPP and NGPL, the following provisions have effect, unless EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:7: 191a, 202c, 218, 232a, a draft Asset Protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:8: Exploration 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:8: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:8: 137, 142, 142b, 143, caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:8: 171, 176, 176b, 185, adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:11: Plc 2 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:11: 138a, 141a protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:11: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:12: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:13: 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:13: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:14: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:14: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:14: 1 – Owner 450, 112 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:14: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:14: 185, 190, 191, 191a, caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:15: 31, 315, 316, 319, 320, adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:22: Petroleum 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:22: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:22: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:22: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:23: Production 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:23: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:23: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:23: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:26: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:26: protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:27: 502, 504, 505, 510, caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:27: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:27: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:27: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:28: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:28: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:28: Company 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:28: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:29: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:29: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:29: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:29: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:29: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:30: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:32: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:32: Occupier 161, 163 protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:33: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:33: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:34: Environmental 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:34: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:35: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:35: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:35: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:35: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:36: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:36: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:39: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:39: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:40: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:40: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:40: Biofuels 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:40: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:41: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:41: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:41: Holding Limited 2 333 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:41: (b) - protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:42: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:42: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:42: Environmental 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:42: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:43: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:43: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:44: Polymers 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:44: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:45: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:45: 281, 284, 285, 286, 3, adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:47: provide protection for One- EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:48: Services (UK) 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:48: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:49: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:49: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:53: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:54: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:54: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:54: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:56: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:56: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:56: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:56: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:62: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:62: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:63: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:63: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:63: Chemical UK 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:63: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:64: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:64: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:69: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:69: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:69: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:69: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:69: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:70: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:70: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:70: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:72: Plc 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:72: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:72: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:72: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:73: Networks 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:73: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:73: 147, 148, 151, 152, protection is in place for the EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:73: Processing 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:73: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:74: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:74: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:78: provide protection for One- EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:82: Limited 2 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:83: protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:83: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:83: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:86: Limited 2 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:86: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:87: 191b, 192, 194, 91, 92, caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:87: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:89: the Protection of 1 – Owner land adjacent to the existing EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:90: UK Plc 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:90: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:91: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:91: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:95: Transportation 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:95: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:96: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:96: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:98: Energy Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:98: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:99: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:99: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:109: Liquids 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:109: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:110: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:110: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:113: Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:113: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:114: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:114: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:115: Specialties UK 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:115: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:116: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:116: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:116: Energy Limited 1 – Owner protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:116: Occupier protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:117: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:117: adequate protection is in EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:117: Limited 1 – Owner 333 protection in the draft DCO EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:117: Occupier (b) - protection of electricity, gas, EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:118: caught by the protection EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf:118: adequate protection is in EN010103-002573-NZT DCO 6.3.20 - ES Vol II Figure 8-8 Maximum 24 hour Mean NOx Process Contribution Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-001687-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:4: appropriate mitigations and protections. EN010103-001589-NZT DCO 8.8 - NGET - SoCG - May 2022.pdf:10:4.2.5 Protective Provisions associated with protection of the National Grid existing assets EN010103-001481-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final.pdf:17: and associated Infrastructure, including cathodic protection posts, marker posts and EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:14: Teesmouth and Cleveland Coast Special Protection EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:19: to water environment protection: CIRIA documents and EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:28: required for active fire protection. EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:40: protections afforded and to reinforce the role of the EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:54: as well as the Centre for the Protection of National EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:56: Measures for the protection of workers from potential EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:56: administrative controls, personal protection EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:85: also enable sufficient time to implement protection EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:87: scour protection would need to be installed around the EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:10:and Management, 15 - Special Protection Area (SPA)/Ramsar and the Teesmouth and Cleveland Coast Site of Special No. 8 EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:14:Water Resources protection: CIRIA documents and British Standards Institute documents detailed in Chapter 9. environmental management plan EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:22: active fire protection. EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:31:Terrestrial Ecology and a tool box talk would be given to clarify the legal protections afforded and to reinforce the Requirement 15: Protected species EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:42: well as the Centre for the Protection of National Infrastructure (CPNI) EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:43: Measures for the protection of workers from potential EMF effects will therefore include EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:43: engineering and administrative controls, personal protection programmes, and medical EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:69: disseminate the warnings. They should also enable sufficient time to implement protection DCO Schedule 2 (Document Ref. 2.1): EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:70:Assessment Appropriate scour protection would need to be installed around the diffuser head to minimise Requirement 16: Construction EN010103-001875-Redcar and Cleveland Borough Council.pdf:5: SPA Special Protection Area EN010103-001875-Redcar and Cleveland Borough Council.pdf:20:2.3 The bank described here is physically afford protection to the shore and EN010103-001875-Redcar and Cleveland Borough Council.pdf:38: for their protection is the statutory EN010103-001875-Redcar and Cleveland Borough Council.pdf:41: surfacing materials presents an required to achieve their protection and EN010103-001875-Redcar and Cleveland Borough Council.pdf:46: more so, and the continued protection The adoption of a coherent and EN010103-001875-Redcar and Cleveland Borough Council.pdf:74: protection through the formulation and appearance, but spoil the look of the EN010103-001875-Redcar and Cleveland Borough Council.pdf:82: continued protection of its elements is preserve and enhance them. EN010103-001875-Redcar and Cleveland Borough Council.pdf:124: continued protection as a conservation EN010103-001875-Redcar and Cleveland Borough Council.pdf:128:5 The conservation area is subject to LDF Core Strategy Policy CS22 for the protection and EN010103-001875-Redcar and Cleveland Borough Council.pdf:150: Continued protection as a conservation EN010103-001198-NZT DCO 6.3.5 - ES Vol II Figure 3-4 Environmental Receptors within 2 km - Oct 2021 Rev.2.0.pdf:1: ! Special Protection Area EN010103-001719-Redcar Bulk Terminal Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:5: as any other customer of RBT, with the negotiated contractual protections within the EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:2:Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:5:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:5:addition paragraph 176 of the NPPF requires that potential Special Protection Areas, possible EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:6:(Special Areas of Conservation (SAC), Special Protection Areas (SPA) and Ramsar sites) EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:8:protection of the best and most versatile (BMV) agricultural land as set out in paragraph 170 of the EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:9:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:11:With reference to the protection of the railway, the Environmental Impact Assessment should consider issues that EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:23:International Commission on Non-ionizing Radiation Protection (ICNIRP). Formal advice to EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:24:protection recommended by the International Commission on Radiological Protection 5 EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:24: Council Directive 96/29/EURATOM laying down basic safety standards for the protection of the health of workers and the general public EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25:demonstrate compliance with UK legislation and the principles of radiation protection. This EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25: The Environment Agency (EA), Scottish Environment Protection Agency (SEPA), Northern Ireland Environment Agency, EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25:Health Protection Agency and the Food Standards Agency (FSA). EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25: HPA RCE-8, Radiological Protection Objectives for the Land-based Disposal of Solid Radioactive Wastes, February 2009 EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:30:Redcar and Cleveland Borough Council Environmental Protection (Contaminated Land) EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:30:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:37:Our policy covering our approach to Data Protection complies with UK law accordingly implemented, including that required by EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:37:the EU General Data Protection Regulation (GDPR 2016), and can be accessed via our Privacy Notice and Legal Notice listed on EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:4:Source Protection Zones EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:9:Source Protection Zones EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:12:Special Protection Areas EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:19: Radon Potential - Radon Protection Measures EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:19: Protection Measure: No radon protective measures are necessary in the construction of new D13NW 0 1 454658 EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:20: Designation Details: Special Protection Area EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:21:Source Protection Zones EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:23:Radon Potential - Radon Protection Measures EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:24:Special Protection Areas EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:25: Scottish Environment Protection Agency EN010103-002405-NZT DCO - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean).pdf:14: Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar site and Site EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:3: included in the Net Zero Teesside DCO, along with an explanation of the protection sought. EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:5: application of mitigations/protections. Hornsea Four is in the process of finalizing a report on the EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8:5.6 Policy WIND1 provides strong support for the implementation and protection of Round 3 offshore EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:9: as a whole is considered. Given the clear support for and protection of Round 3 offshore wind EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:9: of possible protections and mitigations and an assessment of the overall acceptability of the EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:9: proposals with and without those protections and mitigations, must be carried out so that a decision EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:10: consider the relevant issues and to apply appropriate mitigations and protections. There is no EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:10: protections with the advisors to the decision maker. EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:15: FOR THE PROTECTION OF ORSTED HORNSEA PROJECT EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:15:1. For the protection of Hornsea Four, unless otherwise provided for in this Schedule or otherwise agreed EN010103-001686-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:18: including without prejudice protection of the integrity of search and rescue corridors; EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:17: 4.20 Sembcorp Protection - 22 March 2023 – EN010103-001571-NZT DCO 8.29 - INEOS UK SNS Ltd SoCG - May 2022.pdf:9: order to provide appropriate protection for the Breagh Pipeline (and Breagh Pipeline EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:4:Source Protection Zones EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:9:Source Protection Zones EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:11:Radon Potential - Radon Protection Measures n/a EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:12:Special Protection Areas pg 80 1 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F12SW 0 1 455975 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F4SW 0 1 456000 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F10SE 0 1 455000 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F11SE 0 1 455529 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F10SE 0 1 455000 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:81: Protection Measure: No radon protective measures are necessary in the construction of new F11SE 0 1 455529 EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:92: Designation Details: Special Protection Area EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:92: Special Protection Areas EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:94:Source Protection Zones EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:96:Radon Potential - Radon Protection Measures EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:97:Special Protection Areas EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:98: Scottish Environment Protection Agency EN010103-001974-Exolum Seal Sands.pdf:1:The Promoter amended the provisions for the protection of Exolum at Schedule 12 Part 7 (“Part 7”) EN010103-001974-Exolum Seal Sands.pdf:1:not provide sufficient protection to Exolum. EN010103-001974-Exolum Seal Sands.pdf:2: PART 7 FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001974-Exolum Seal Sands.pdf:2:74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001974-Exolum Seal Sands.pdf:4:78. Cathodic protection testing EN010103-001974-Exolum Seal Sands.pdf:4: (a) the authorised development might interfere with the cathodic protection forming EN010103-001974-Exolum Seal Sands.pdf:4: protection forming part of the authorised development, EN010103-001974-Exolum Seal Sands.pdf:5: implement measures for providing or preserving cathodic protection. EN010103-001974-Exolum Seal Sands.pdf:5: (i) the execution of any works under this Order including for the protection of EN010103-001974-Exolum Seal Sands.pdf:7: PART 7 FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001974-Exolum Seal Sands.pdf:7:74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001974-Exolum Seal Sands.pdf:9:78. Cathodic protection testing EN010103-001974-Exolum Seal Sands.pdf:9: (a) the authorised development might interfere with the cathodic protection forming EN010103-001974-Exolum Seal Sands.pdf:9: protection forming part of the authorised development, EN010103-001974-Exolum Seal Sands.pdf:10: implement measures for providing or preserving cathodic protection. EN010103-001974-Exolum Seal Sands.pdf:10: (i) the execution of any works under this Order including for the protection of EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:4: EPA The Environmental Protection Act 1990 - an Act EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:8: SPA Special Protection Area - strictly protected sites EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:8: birds directive. Special Protection Areas are EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:8: sites for the protection of threatened habitats EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:9: area designated for protection under the Wildlife EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:31: Protection Area and Ramsar site, or other European designated nature conservation EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:32: • Teesmouth and Cleveland Coast Special Protection Area 6km Buffer Zone/Ramsar EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:82: protection is applied as a matter of policy, either alone or in combination with other EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:82: Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site, which is designated EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:85: Biodiversity Protection Plan and the Construction Environment Management Plan EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:92: landscaping will be secured by Requirement 4 ‘Landscape and biodiversity protection EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:92: Design’; 4 ‘Landscape and biodiversity protection management and enhancement’; EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:107: Environmental Protection Act (EPA) 1990, and how they may be mitigated or limited EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:107: Protection of National Infrastructure. EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:113: route to its original state as close as Biodiversity Protection Plan and the CEMP that will be secured by EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:123: paragraph 2.6.5 highlights that it is not Requirement 4 ‘Landscaping and biodiversity protection and management and EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:139: protection or diversion of underground EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:141: protection (electrical or the EIA Scoping Opinion (02.04.19). Additionally, the Electric and Magnetic EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:163: the protection of EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:168: SPD Protection and enhance designated will not result in unacceptable impacts on other nature conversation EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:179: and protection, and where EN010103-001280-Rule 6 Letter.pdf:12:can contain personal information to which the UK General Data Protection EN010103-001280-Rule 6 Letter.pdf:43: protection; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:4:41. Protection of interests EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:5: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:8:protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:8:optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:32:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:32:Protection of interests EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:32: Environmental Protection Act 1990 (c.43). EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:37: (ii) cathodic protection posts; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:39: (vi) works for the protection of buildings and land; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:42:Landscaping and biodiversity protection management and enhancement EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:42:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:46:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:47:Protection of highway surfaces EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:47: (d) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:47: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:53: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:53: 24. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:55:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:56:specified works or the alteration or protection of any apparatus. EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:79: (vii) the deposit of rock armour protection; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:93: (iv) the deposit of rock armour protection; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:93: (vii) the deposit of rock armour protection; EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:105: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:105: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:107:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:108:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:109: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:109: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:111: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:111: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:112:stopping up), 25 (retained apparatus: protection of electricity undertaker), 26 (retained apparatus: EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:112:protection of gas undertaker), 27 (expenses) and 28 (indemnity) of this Schedule which will apply EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:114:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:115:Retained apparatus: protection of electricity undertaker EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:116:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:116:Retained apparatus: protection of gas undertaker EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:117:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:117:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:120:23(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:120:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:120: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:120: 34. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:122:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:123:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:125:for the protection of the apparatus, or for securing access to it, and Air Products is entitled to EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:126:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:127: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:127: 54. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:129: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:129: 63. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:131: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:131: 73. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:133: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:133: 81. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:135: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:135: 89. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:136: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:143: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:143: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:145:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:145: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:148: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:148: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:149: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:149: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:151: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:151: 156. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:154: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:154: 169. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:155: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:155: 177. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:157: FOR THE PROTECTION OF YORK POTASH EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:157: 185. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:159:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:160:the alteration or protection of any apparatus. EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:161: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:161: 205. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:163: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:163: 215. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001234-NZT - Regulation 32 Transboundary Screening (8).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:3: SPA Special Protection Area EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:6: Special Protection Area (SPA) / Ramsar, which is designated both for breeding birds EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:14: sites the same level of protection as SPAs and SACs. EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:15: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:37: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:47: associated rock armouring / scour protection would result in direct and permanent EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:47: protection (with an expected volume of 250 m3) provides artificial reef habitat that EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:63: exceed the 3 µg/m3 critical level of relevance for the general protection of EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:74: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:83: Moors Special Protection Area Site Code: UK9006161 Online. Available at: EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:10:Source Protection Zones EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:12:Radon Potential - Radon Protection Measures n/a EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:13:Special Protection Areas pg 98 1 EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:108: Radon Potential - Radon Protection Measures EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:108: Protection Measure: No radon protective measures are necessary in the construction of new F3NW 0 1 450660 EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:108: Radon Potential - Radon Protection Measures EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:108: Protection Measure: No radon protective measures are necessary in the construction of new F2NW 0 1 450000 EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:111: Designation Details: Special Protection Area EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:111: Designation Details: Special Protection Area EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:111: Special Protection Areas EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:112:Source Protection Zones EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:115:Radon Potential - Radon Protection Measures EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:116:Special Protection Areas EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:117: Scottish Environment Protection Agency EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:18: and associated Infrastructure, including cathodic protection posts, marker posts and EN010103-Advice-00009-1-210419 - Net Zero Teesside FINAL with draft docs feedback.pdf:15: 79(1) Environmental Protection Act 1990, the same question will apply to those EN010103-Advice-00009-1-210419 - Net Zero Teesside FINAL with draft docs feedback.pdf:22: to be given the same protection as if they were a designated habitat EN010103-001915-NZT DCO 9.20 - Applicants response to Orsted HP4 D3 Submission July 2022 (D4).pdf:24: suggests that their protective provisions “provide adequate protection for the NEP Project. EN010103-001915-NZT DCO 9.20 - Applicants response to Orsted HP4 D3 Submission July 2022 (D4).pdf:44: demands of the public interest of the community and the protection of the individual's EN010103-002643-NZT DCO 9.51 - Applicants' Response to ExA's RFI dated 2 Nov 2022 - Nov 22 (D13).pdf:3: SPA Special Protection Areas EN010103-001234-NZT - Regulation 32 Transboundary Screening (10).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:3: • Environmental Protection Act 1990; EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:4: Local Plan adopted May 2018. These require the protection and EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:4: protection and enhancement of biodiversity, including maximising EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:5: out expectations for natural environment protection and enhancement, EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:10: implications arising from relevant legal protections. EN010103-002565-NZT DCO 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas Nov 2022 (D12).pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-002565-NZT DCO 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas Nov 2022 (D12).pdf:1: N 4 Special Protection Areas (SPA) EN010103-002611-Redcar Bulk Terminal Limited - Comments on any other information submitted at Deadline 12.pdf:2: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002611-Redcar Bulk Terminal Limited - Comments on any other information submitted at Deadline 12.pdf:2:171. For the protection of RBT, the following provisions have effect, unless otherwise agreed EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:4: protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:4: Occupier 158a, 166a, 171a, protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:4: 469, 470, 472, 473, by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:5: 142, 142b, 143, 144, considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:7: 10, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:7: 135, 138a, 141a protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:8: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:8: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:8: – Owner 6, 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:8: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: 169, 171, 171b, 172, by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:9: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:14: protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:15: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:15: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: 5c, 6, 8, protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: 459, 467, 469, 470, by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: 489, 493, 495, 496, considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:16: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:17: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:17: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:17: Company Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:17: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:18: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:19: – Owner 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:19: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:20: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:20: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: Environmental – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: Limited – Owner 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:21: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:22: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:22: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:22: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:22: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:23: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: (b) - protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: Environmental – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:24: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:25: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:25: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:26: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:26: Occupier 138a, 141a, 142a, protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:26: 165, 166, 169, 171, by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:26: 185, 185b, 190, 190b, considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: provide protection for One-Dyas EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: Plc – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:29: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:30: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:30: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:30: Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:30: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:31: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:31: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:31: Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:31: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: Chemical UK – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:32: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:36: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:36: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:37: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:37: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:37: Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:37: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:37: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:38: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:39: Plc – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:39: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:39: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:39: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:40:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants are EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:40: 152, 153, 25, 26, 30, provisions and asset protection before Deadline 9. EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:40: Processing Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:40: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:41: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:41: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:44: 533, 416, 431, 508, protection for One-Dyas UK as EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:44: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part written to EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:44: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: Limited protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: Limited protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:46: protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:47: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:47: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:47: Limited 6, 9b, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:47: 171a, 176a, 183a, protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:48: 184, 185, 185b, 186, by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:48: 191b, 191d, 192, 194, considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:50: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:51: UK Plc – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:51: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:51: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:51: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:54: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:54: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:54: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:54: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:56: Energy Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:56: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:56: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:56: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:72: – Owner 6, 10 protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:72: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:73: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:73: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: Specialties UK – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: Energy Limited – Owner protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:74: Occupier protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: considered adequate protection EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: Occupier (b) - protection of electricity, gas, EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: by the protection offered by EN010103-002243-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) - Sept 2022(D8).pdf:75: considered adequate protection EN010103-001982-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Clean.pdf:34: biodiversity protection management and STDC maintains its position of seeking an EN010103-001982-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Clean.pdf:39: Amongst other additional protections, STDC EN010103-001982-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Clean.pdf:46: under Article 8. The Applicants’ use of the existing STDC requires suitable protection via the draft EN010103-002572-NZT DCO 6.3.19 - ES Vol II Figure 8-7 Annual Mean NOx Process Contribution Nov 2022 (D12).pdf:1: Special Protection Area EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:2:protection EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:2:So For one refers to landscaping and biodiversity protection plan. Is there clarity between different EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:2:documents that are referenced here, there's reference to a to a landscaping biodiversity Protection EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:9:provisions. And two of those are for the protection of particular types of statutory undertakers. So that's EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:9:protection of particular named entities. So that's parts three to 19. And in addition to those, which you EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:11:protection in those protective provisions so that it's in line with a previous DCO that dealt with impacts EN010103-001516-TEXT_ISH2_Session2_NetZeroTeeside_11052022.pdf:11:deals with the degree and standard of protection that should apply to the Wilson site. And given that the EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:28: position of services and utilities; and works for the protection of buildings and land; EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:43: purposes for which new rights are sought, being to ensure protection of EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:44: maintenance and protection of the apparatus. Such an approach has EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:65: STDC7 South Tees Area SPD Natural Environmental Protection and EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:76: which provide adequate protection for statutory undertakers’ assets. Accordingly, the EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:77: includes provisions typically included in DCOs for the protection of electricity, gas, water EN010103-002103-NZT DCO 6.3.52 - ES Vol II Figure 11-1 Noise Sensitive Receptors August 2022 (D6).pdf:1: Special Protection Area EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:1: Provisions for the Protection of North Tees Limited, North Tees Rail Limited and EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:3: infrastructural base in the pipeline corridor that simply needs protection along EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:3: essential for NTG to have adequate protection in relation to third parties accessing land EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:4: compromised protection to provide a degree of certainty both to NTG and those deriving EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:5: belief that NTG should not have the same protections as Sembcorp. It is NTG’s position EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:7: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:7: For the protection of NT Group (as defined below) the provisions of this Part have effect for the benefit EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:12: © the inspection, removal and relaying or replacing, alteration or protection of any apparatus or the EN010103-002465-NTL Letter to Planning Inspectorate Deadline 12 various EN010103 01.11.22.pdf:13: the expected level of protection afforded by those requirements; EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:5: Environmental Protection Act 1990(a); EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:5: land) of the Environmental Protection Act 1990; and (ii) a verification plan, EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers EN010103-002039-South Tees Development Corporation - Responses to the ExA’s ExQ2.pdf:18: RCBC location of cathodic protection posts and marker of concern, as STDC is being consulted on EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:2: SPA Special Protection Area EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:12: Cables installation where the method of protection is telecommunications, offshore wind farms and electricity buried. EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:12: should take account of protection measures for where possible, to meet the needs of the sector while enabling co- EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:12: Where burial or protection measures are not EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:16: shipping and the UK economy overall, and affording protection to EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:20: Fisheries including spawning, nursery and feeding grounds, their life. NEFISH-3 recognises that the protection of habitats and Conservation of the ES APP-096 reports that though there are EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:27: ensure continued protection of the site and and increased storm activity. Climate change may result in marine EN010103-001861-9.14 - Assessment against North East Marine Plan - June 2022(D3).pdf:29: marine management and protection of biodiversity or viable 093] states “that potential noise of a tonal, impulsive or intermittent EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:6: 191a, 202c, 218, 232a, a draft Asset Protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:6: Exploration 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:6: Occupier 161, 163, 164, 199, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:7: 137, 142, 142b, 143, caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:7: 171, 176, 176b, 185, adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:9: Plc 2 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:9: 138a, 141a protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:9: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:9: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:10: 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:11: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:11: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:11: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:11: 1 – Owner 450, 112 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:11: Occupier (b) 12a, 134, 142a, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:12: 185, 190, 191, 191a, caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:12: 31, 315, 316, 319, 320, adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: Petroleum 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: Production 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:18: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:19: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:19: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:21: Limited 2 476, 479, 482, 540b, protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:21: protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:21: 502, 504, 505, 510, caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: Company 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:22: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:23: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:23: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:23: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:23: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:24: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:24: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:26: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:26: Occupier 161, 163 protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:26: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:26: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:27: Environmental 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:27: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: Occupier 160, 161, 163 protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:28: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:31: Teesside Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:31: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: Biofuels 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:32: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:33: Holding Limited 2 333 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:33: (b) - protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:33: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:33: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:34: Environmental 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:34: Occupier 363, 367, 370, 373, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:34: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:34: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:35: Polymers 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:35: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:35: 202c, 20a, 21, 218, 22, caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:35: 281, 284, 285, 286, 3, adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:37: provide protection for One- EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:38: Services (UK) 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:38: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:39: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:39: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:42: Matthey Plc 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:42: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:43: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:43: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:44: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:44: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:44: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:44: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: Chemical UK 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:49: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:50: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:50: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: Petroleum UK 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:54: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:55: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:55: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:56: Plc 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:56: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:56: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:56: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:57: Networks 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:57: Occupier 159, 160, 161, 163, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:57: 147, 148, 151, 152, protection is in place for the EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:57: Processing 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:57: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:58: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:58: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:61: provide protection for One- EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:64: Limited 2 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:64: protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:65: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:65: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:67: Limited 2 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:67: 142a, 154, 158a, 159, protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:68: 191b, 192, 194, 91, 92, caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:68: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:69: the Protection of 1 – Owner land adjacent to the existing EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:70: UK Plc 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:70: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:70: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:71: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:74: Transportation 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:74: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:75: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:75: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:76: Energy Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:76: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:77: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:77: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:85: Liquids 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:85: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:86: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:86: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:88: Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:88: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:89: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:89: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:90: Specialties UK 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:90: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:90: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:90: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: Energy Limited 1 – Owner protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: Occupier protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: adequate protection is in EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: Limited 1 – Owner 333 protection in the draft DCO EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:91: Occupier (b) - protection of electricity, gas, EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:92: caught by the protection EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf:92: adequate protection is in EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:2: SPA Special Protection Area EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:23: Interest, Special Protection Area and Ramsar site for its use by birds. It EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:5: flammable gas, toxic gas and leak detection, fire protection systems and EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:9:A commitment to comply with the Control of The fire protection strategy for the Proposed EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:11: protection of the environment. EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:23: protection systems will be EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:25: protection systems will be EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:36: Protection of National EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:39: walls, concrete coating, cathodic protection or additional protection, which EN010103-000888-NZT DCO 6.2.3 ES Vol I Chapter 3 Description of the Existing Environment.pdf:5:Special Protection Area (SPA)1 Document Ref. 5.13 EN010103-000888-NZT DCO 6.2.3 ES Vol I Chapter 3 Description of the Existing Environment.pdf:9: Protection Zones (SPZ 1 to 3) that can potentially be impacted by the EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:52: protection, and management of unexpected terrestrial archaeological EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:58:vegetation protection. EN010103-002567-NZT DCO 6.3.14 - ES Vol II Figure 8-2 Air Quality Study Area - Ecological Receptors Nov 2022 (D12).pdf:1: E7 Special Protection Area EN010103-001943-NZT CAH2 S2.pdf:6:just a test of necessity. So it's a lower level of protection. And EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:4:41. Protection of interests EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 26 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:6: PART 27 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:34:Protection of interests EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:41: (ii) cathodic protection posts; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:43: (vi) works for the protection of buildings and land; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:44: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:46:Landscaping and biodiversity protection management and enhancement EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:46:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:50: Environmental Protection Act 1990(a); EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:50: Environmental Protection Act 1990; and EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:51:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:52:Protection of highway surfaces EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:53: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:53: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:59: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:59: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:60:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:61:specified works or the alteration or protection of any apparatus. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:84: (vii) the deposit of rock armour protection; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:94: (iv) the deposit of rock armour protection; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:94: (vii) the deposit of rock armour protection; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:104: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:104: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:106:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:107:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:108: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:108: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:110: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:110: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:111:stopping up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:111:protection of gas undertaker), 26 (expenses) and 27 (indemnity) of this Schedule which will apply EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:113:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:113:Retained apparatus: protection of electricity undertaker EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:114:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:114:Retained apparatus: protection of gas undertaker EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:115:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:116:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:118:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:118:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:119: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:119: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:120:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:121:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:122: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:122: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:124: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:125:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:125: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:125: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:128:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:129:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:131: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:131: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:133:Cathodic protection testing EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:133: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:133: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:133:measures for providing or preserving cathodic protection. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:133: (i) the execution of any works under this Order including for the protection of the EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:134: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:134: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:136: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:136: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:138: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:144: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:144: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:146:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:147: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:149: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:149: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:150: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:150: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:153: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:153: 157. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:155: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:155: 170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:157: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:157: 178. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:159: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:160: with any deficiency in the expected level of protection afforded by those requirements; EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:162: FOR THE PROTECTION OF YORK POTASH EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:162: 196. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:163:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:164:the alteration or protection of any apparatus. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:165: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:165: 215. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:167: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:167: 225. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:174: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:174: 256. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:176: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:176: 264. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:178: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:178: 272. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:180: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:180: 279. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:181: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:181: 287. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:182: “the standard protection strips” means strips of land falling within the following distances to EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:182: 289. The undertaker must not within the standard protection strips interfere with or build over EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:182:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:182:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:183:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:183: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:183: 297. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:184:(retained apparatus: protection), 305 (expenses) and 306 (indemnity), this Schedule does not apply EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:186:Retained apparatus: protection EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:187:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:189:Cathodic protection testing EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:189: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:189: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:189:cathodic protection. EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:190: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:190: 313. For the protection of the NT Group (as defined below), the following provisions have EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:4:Source Protection Zones EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:10:Source Protection Zones EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:12:Radon Potential - Radon Protection Measures n/a EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:13:Special Protection Areas EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:32: Radon Potential - Radon Protection Measures EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:32: Protection Measure: No radon protective measures are necessary in the construction of new H5SE 0 1 454793 EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:32: Radon Potential - Radon Protection Measures EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:32: Protection Measure: No radon protective measures are necessary in the construction of new H5SE 0 1 455000 EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:34: Designation Details: Special Protection Area EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:35:Source Protection Zones EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:38:Radon Potential - Radon Protection Measures EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:39:Special Protection Areas EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:40: Scottish Environment Protection Agency EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:4: protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:4: Occupier 158a, 166a, 171a, protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:4: 469, 470, 472, 473, by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:5: 142, 142b, 143, 144, considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:7: 10, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:7: 135, 138a, 141a protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:8: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:8: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:8: – Owner 6, 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:8: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:8: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:9: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:9: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:9: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:9: 169, 171, 171b, 172, by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:9: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:14: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:14: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:15: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:15: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:15: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:15: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:15: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:16: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:16: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:16: 5c, 6, 8, protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: 459, 467, 469, 470, by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: 489, 493, 495, 496, considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:17: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: Company Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:18: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:19: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:19: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:20: – Owner 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:20: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:20: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:20: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:21: Environmental – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:21: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: Limited – Owner 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:22: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:23: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:24: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:24: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:24: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:24: (b) - protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:24: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:25: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:25: Environmental – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:25: Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:25: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:25: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:26: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:26: Occupier 138a, 141a, 142a, protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:26: 165, 166, 169, 171, by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:27: 185, 185b, 190, 190b, considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:29: provide protection for One-Dyas EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:29: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:30: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:30: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:30: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:30: Plc – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:30: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:31: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:32: Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:32: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:32: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:33: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:33: Chemical UK – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:33: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:33: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:33: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:38: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:39: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:39: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:40: Plc – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:40: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:40: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:41: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:41:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants have EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:41: 152, 153, 25, 26, 30, provisions and asset protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:41: Processing Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:41: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:42: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:42: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:45: 533, 416, 431, 508, protection for One-Dyas UK as EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:46: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part written to EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:46: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:47: Limited protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:47: protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: Limited protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:48: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:49: Limited 6, 9b, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:49: 171a, 176a, 183a, protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:49: 184, 185, 185b, 186, by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:49: 191b, 191d, 192, 194, considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:52: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:53: UK Plc – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:53: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:53: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:53: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:56: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:56: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:56: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:56: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:58: Energy Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:58: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:59: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:59: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:75: – Owner 6, 10 protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:75: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:75: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:76: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:76: Specialties UK – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:76: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: Energy Limited – Owner protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: Occupier protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: considered adequate protection EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:77: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:78: Occupier (b) - 10 protection of electricity, gas, EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:78: by the protection offered by EN010103-002317-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean Oct 2022 (D9).pdf:78: considered adequate protection EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:7: or flood protection. The ecological potential represents the degree to which the EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:14: Areas of Conservation (SAC) and Special Protection Areas (SPA), and water EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:20: protection is assumed to be no more than 100 m2, and would be located at EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:42: been established for the protection or improvement of the site’s natural EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:43: Teesmouth and Cleveland Coast Special Protection Area (SPA) and EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:43: Protection Area (SPA) which is designated under the EU Birds Directive, and EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:45: Source Protection Zones (SPZ 1 to 3) which are likely to be affected by EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:45: Water Safeguard Zone or near any Source Protection Zones. EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:59: • Special protection areas (SPA); EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:61: rock armouring / scour protection to be placed EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:66: • Special protection areas (SPA); EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:67:any WFD Special Protection Area SPA and a EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:70: and will describe the principles for the protection of the water environment EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:74: impermeable surface which provides protection to underground strata EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:75: • The positioning of rock armouring/scour protection around the outfall EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:79: and installation of rock armour / scour protection. A jack-up-barge or similar EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:80: • The installation of rock armouring / scour protection around the outfall EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:80: Annex I habitat and are also afforded national conservation protection. Soft EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:80: armouring / scour protection would result in a direct localised but permanent EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:81:9.7.60 The exact volume of rock armouring required for protection of the outfall is EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:83: scour protection and rock armouring. This is anticipated to be an area of 100 EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:102: sediments that are easy to erode. Appropriate scour protection would be EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:102: and associated scour protection would be 100 m2, which is small at the scale EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:117: Protection Area/Ramsar – Evidence Pack, Natural England Technical EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:149:Teesside and Cleveland Coast Special Protection Area/Ramsar site, including parts of Tees Bay and EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:154:Tees Estuary which forms part of the Teesside and Cleveland Coast Special Protection Area and EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:162: protection to sensitive environmental receptors within the Tees Bay and Tees Estuary the 3D EN010103-001981-NZT DCO 8.2 - STBC SoCG - August 2022(D5) - Tracked.pdf:2: SPA Special Protection Area EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:12:14.3.5 South Gare breakwater is an area of coastal protection located to the north EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:13: study area, including those listed for protection under the Habitats Directive EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:22: based on the protection of pristine environments and species which may EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:33: Canadian sediment quality guidelines for the protection of aquatic life. In: EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:34: the Protection of Aquatic Life. Online Available at: EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:34: for-the-Protection-of-Aquatic-Life 22/11/2019. EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:51: present, likely due to protection from breakwater, EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:56:54.6230, -01.0985 Lower pipeline protection has enabled the settlement of EN010103-002090-NZT DCO 6.3.14 - ES Vol II Figure 8-2 Air Quality Study Area - Ecological Receptors August 2022 (D6).pdf:1: E7 Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:3: SPA Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:38: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:47: armouring / scour protection would result in permanent loss of subtidal sandflat. The EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:61: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:61: head, the introduction of rock armouring / scour protection (with an expected EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:62: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:62: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:62: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:62: circular footprint for the proposed scour protection therefore follows this design EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:62: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:63: exceed the 3 µg/m3 Critical Level of relevance for the general protection of EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:67: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:71: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:85: York Moors Special Protection Area Site Code: UK9006161 Online. Available EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:86: Cleveland Coast Special Protection Area (TIN172) Online. Available at: EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:124: Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:125: Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:126: Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:127: Special Protection Area EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:129: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:129: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:129: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:129: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:130: circular footprint for the proposed scour protection therefore follows this design EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: scour protection at the outfall location. EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: be incorporated into the design and the height of the protection above the seabed should EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:131: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:132: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:132: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:132: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:2: EIA Environmental Protection Act EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:2: EPA Environmental Protection Act EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:14: Act 2005 (Ref. 2) as a form of statutory nuisance under the Environmental Protection EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:21: -Special Protection Area (SPA) Residential Receptors EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:50:Ref. 3 - Environmental Protection Act, 1990 EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:53: Special Protection EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:4:41. Protection of interests EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 19 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 20 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 26 — FOR THE PROTECTION OF NORTHERN GAS NETWORKS EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:6: PART 27 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:8: Act and further includes pipelines (and parts of them), aerial markers, cathodic protection test EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:8: pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:34:Protection of interests EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:41: (ii) cathodic protection posts; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:43: (vi) works for the protection of buildings and land; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:44: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:45: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:46:Landscaping and biodiversity protection management and enhancement EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:46:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:49: Environmental Protection Act 1990(43a); EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:49: Protection Act 1990; and EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:51:commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:52:Protection of highway surfaces EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:52: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:52: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:59: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:59: 1. The provisions of this Part apply for the protection of Net Zero Teesside unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:60:to such reasonable conditions as may be required for the protection or alteration of or access EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:61:specified works or the alteration or protection of any apparatus. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:84: (vii) the deposit of rock armour protection; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:94: (iv) the deposit of rock armour protection; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:94: (vii) the deposit of rock armour protection; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:104: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:104: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:106:for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:107:inspection, removal, alteration or protection of any apparatus or the construction of any new EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:108: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:108: 12.—(1) For the protection of any operator, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:109: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:109: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:111:up), 24 (retained apparatus: protection of electricity undertaker), 25 (retained apparatus: protection EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:112:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:113:Retained apparatus: protection of electricity undertaker EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:114:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:114:Retained apparatus: protection of gas undertaker EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:115:Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:115:connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:118:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:118:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:118: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:118: 33. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:120:protection of the apparatus, or for securing access to it, and Air Products is entitled to watch and EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:121:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:122: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:122: 44. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:123: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:125:alteration or protection of any CATS pipeline which may be required in consequence of the EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:125: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:125: 57. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:127:require to be made for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:129:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:130: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:130: 74. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:133:Cathodic protection testing EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:133: (a) the authorised development might interfere with the cathodic protection forming part of the EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:133: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:133:providing or preserving cathodic protection. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:133: (i) the execution of any works under this Order including for the protection of the Exolum EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:134: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:134: 82. For the protection of INEOS, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:136: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:136: 90. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:137: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:143: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:143: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:145:for the protection of the apparatus, or for securing access to it, and Northern Powergrid is entitled EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:146: (a) in, or in connection with, the inspection, removal, alteration or protection of any apparatus EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:148: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:148: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:149: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:149: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:152: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:152: 157. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:154: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:154: 170. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:156: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:156: 178. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:159: (a) the inspection, removal and relaying or replacing, alteration or protection of any apparatus EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:159: any deficiency in the expected level of protection afforded by those requirements; EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:161: FOR THE PROTECTION OF YORK POTASH EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:161: 196. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:163:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:163:the alteration or protection of any apparatus. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:164: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:164: 215. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:166: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:166: 225. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:173: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:173: 256. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:176: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED AND EDF EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:176: 264. For the protection of Teesside Windfarm and EDF ER, the following provisions have effect, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:177: FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:177: 272. For the protection of Low Carbon, the following provisions have effect, unless otherwise EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:180: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:180: 272.282. For the protection of HPU, the following provisions have effect, unless otherwise agreed EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:181: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:181: 279.289. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:183: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:183: 287.297. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:183: “the standard protection strips” means strips of land falling within the following distances to EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:183: 289.299. The undertaker must not within the standard protection strips interfere with or build over EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:183:the apparatus is laid in a trench) within the standard protection strips unless otherwise agreed in EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:184:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:184:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:185: FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:185: 297.307. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:185:314 304 (retained apparatus: protection), 315 305 (expenses) and 316 306 (indemnity), this Schedule EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:187:Retained apparatus: protection EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:189:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191:Cathodic protection testing EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191: (b) the apparatus might interfere with the proposed or existing cathodic protection forming part EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191:cathodic protection. EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:191: 313.323. For the protection of the NT Group (as defined below), the following provisions have EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:14: operational effects will provide effective protection to EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:14: protection to designated sites and protected species, that no EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:15: effective protection to designated sites and protected species, EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:15: and Cleveland Coast Special Protection Area (SPA)/ Ramsar/ EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:18: The potential impacts of installing rock armour protection at EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:21:Biodiversity Protection, Measures to protect biodiversity during construction are set out EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:21: It is agreed that the biodiversity protection, mitigation and EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:21: Requirement 4 (Landscaping and Biodiversity Protection EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:22: until a landscaping and biodiversity protection plan for that part EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:33:domestic NYSE listed companies and provide investors with protections that are comparable in many respects to those established by the EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:154: of its responsible business model and its Code of Conduct, which applies energy, Well-being of people, Protection of the environment and Creating EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:196: societal impact assessment (ESHIA) and the biodiversity protection EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:252:PROTECTIONIST MEASURES AFFECTING FREE TRADE EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:252:The development of protectionist measures affecting free trade between nations may have an impact on TotalEnergies’ EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:252:nations in the form of protectionist measures, trade tensions between certain contractual framework of partnerships or the operating conditions of EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:253: protection of the environment (water, air, soil, noise, protection of nature, – the renegotiation of contracts; EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:253: residents, product quality and consumer protection. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:253: reduce or call into question the protections offered by the initial legal the risk of legal proceedings and promotes an increase in the number of EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:254:of any kind, particularly corruption and influence peddling. Regulation (EU) 2016/679 relating to the protection of personal data), be EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:258:assets or operations in Cuba. related to the maintenance and protection of trademarks and designs in EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:259: to the maintenance and protection of trademarks and designs in Iran and EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:260:provided fuel payment cards to be used in TotalEnergies' service stations to the maintenance and protection of trademarks and designs in Syria EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:265: any situation that might give rise to a conflict of interest so that measures necessary, all appropriate measures to ensure the protection of its rights. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:272: regulatory protection such as Protected Area Categories I to IV as defined by the International Union for Conservation of Nature (IUCN), Ramsar areas, or natural sites listed on EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:273: When the legal provisions applicable to Activities provide less protection EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:274: policy. Specific expert teams deal with the following areas: major risks, The Security division is responsible for the protection of people, EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:274: transportation and storage, crisis management and pollution protection of people and property, by conducting analyses and offering EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:276: such as cathodic protection checks, ground or aerial surveillance or in EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:278:Water and air protection containment and reduction or elimination operations. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:278:Soil protection depollution policy based on the assessment and management of the risks EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:279: for human rights at work, protection of health, safety and security, EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:301: Frank Wall Street Reform and Consumer Protection Act of 2010, since EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:302:provide more detail about to the necessity of upholding human rights. It is protection of health and safety; prohibition and prevention of any EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:399: – Protection of the environment and biodiversity EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:399: – Protection of the environment and biodiversity EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:403: preventive measures but can also include mitigation measures. They protection checks, ground or aerial surveillance or in line inspections. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:407: segments, has four priorities: health protection strategies to be implemented. It consists of external EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:408:protection schemes (see section 5.6.1.2 of this chapter). Lifestyle risk EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:408: effective protection of all employees’ health; EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:427: – the sustainable use and protection of water and marine resources; Guidelines for Multinational Enterprises and the UN Guiding Principles on EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:427: – the protection and restoration of biodiversity and ecosystems. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:432:protection requirements. Employees receive training in the required skills communication campaigns (e.g., in-house magazines, intranet, posters). EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:434:PROTECTION OF ENVIRONMENTS EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:434:Air and water protection NOX emissions mainly concern the hydrocarbon exploration and EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:434:Soil protection EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:435: The Company’s provisions for the protection of the environment and site EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:435: as well as be dependent on, water resources, particularly when the protection for 2030. The ambition of the Company is now to reduce by EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:438:protection and discharge management); waste traceability, from Reused non-hazardous waste(b) (in kt) 206 190 240 EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:444:– organize the protection of the family in the event of the death of the – for standard working hours; EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:447: organization, which has been in place since September 1, 2021, brings employment, social protection and well-being. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:455: Moreover, where local laws provide few protections for freedom of communication organization (One Com) and adapt the organization of EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:461: When government security forces are deployed to ensure the protection officers were trained by qualified personnel from the project's security EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:473: – Protection of health and safety and security at work; – be attentive to the day-to-day working conditions of their employees EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:473: suppliers, to the protection EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:476: Protection Act of 2010, since 2014, TotalEnergies has filed with the EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:551: Protection Authority – – – – 546 – – – – 546 EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:569: whether there is a need for additional health protection strategies to be implemented. It EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:570: protection schemes (see section 5.6.1.2 of this chapter). Lifestyle risk awareness activities EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:570: consequence work related injuries – organize the protection of the family in the event of the death of the employee. EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:594: periodic surveys such as cathodic protection checks, ground or aerial surveillance or in line EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:605: and crop protection, print inks as well as tires and vaccines. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:4:41. Protection of interests EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 4 — FOR THE PROTECTION OF NATIONAL GRID GAS PLC EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 5 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 6 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 7 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 8 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 9 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 10 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:5: PART 11 — FOR THE PROTECTION OF NETWORK RAIL EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 12 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 13 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 14 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 15 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 16 — FOR THE PROTECTION OF SABIC UK EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 17 — FOR THE PROTECTION OF THE SEMBCORP PIPELINE EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 18 — FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 19 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 20 — FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 21 — FOR THE PROTECTION OF THE BREAGH PIPELINE EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 22 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 25 — FOR THE PROTECTION OF NORTHUMBRIAN WATER EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 26 — FOR THE PROTECTION OFNORTHERN GAS NETWORKS LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 27 — FOR THE PROTECTION OF NORTH TEES LIMITED, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:6: PART 28 — FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:8: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:8: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:11: of the Order (for the protection of Anglo American); EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:34:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:34:Protection of interests EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:34: Environmental Protection Act 1990 (c.43). EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:42: (ii) cathodic protection posts; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:44: (vi) works for the protection of buildings and land; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:45: (b) the number and location of cathodic protection posts and marker posts; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:46: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:46: (b) the number and location of cathodic protection posts and marker posts; and EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:47:Landscape and biodiversity protection management and enhancement EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:47:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:51: Environmental Protection Act 1990(a); EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:51: Environmental Protection Act 1990; and EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:53:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:54:Protection of highway surfaces EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:54: (e) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:54: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:62: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:62: 1. For the protection of the NZT Undertaker, the following provisions have effect, unless EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:68:alteration or protection of the NZT Specified Works. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:91: (vii) the deposit of rock armour protection; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:102: (vii) the deposit of rock armour protection; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:112: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:112: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:114:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:115:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:116: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:116: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:117:FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:117: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:120:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:121:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:122:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:124:22(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:124:enquiry to The asset protection team will then respond to your query. Any EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:124:issues with your query, you can contact them directly at assetprotection@nationalgrid.com” or EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:125: FOR THE PROTECTION OF NATIONAL GRID GAS PLC AS GAS EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:125: 32. For the protection of National Grid Gas as referred to in this Part of this Schedule the EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:127:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:128:National Grid Gas for the alteration or otherwise for the protection of the apparatus, or for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:129:protection of any apparatus or the construction of any new or alternative apparatus which may be EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:131:paragraph 37(2) or National Grid Gas makes requirements for the protection or alteration of EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:131:your enquiry to The asset protection team will then respond to your query. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:131:Any issues with your query, you can contact them directly at assetprotection@nationalgrid.com” EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:132: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:132: 47. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:133:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:134:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:135: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:135: 58. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:137: testing the effectiveness of the repairs and cathodic protection and any further works or EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:138:removal, alteration or protection of any CATS pipeline which may be required in consequence of EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:138: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:138: 71. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:141:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:142:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:144: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:144: 88. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:146:Cathodic protection testing EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:146: (a) the authorised development might interfere with the cathodic protection forming part of EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:146: (b) the Exolum operations might interfere with the proposed or existing cathodic protection EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:146:measures for providing or preserving cathodic protection. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:146: (i) the execution of any works under this Order including for the protection of the EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:147: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:147: 96. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:149: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:149: 104. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:151: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:157: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:157: 131. For the protection of Northern Powergrid (Northeast) Plc the following provisions have EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:159:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:159: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:162: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:162: 150. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:163: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:163: 158. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:166: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:166: 171. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:169: FOR THE PROTECTION OF SABIC PETROCHEMICALS UK LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:171: assessment of the protection of underground assets and which study must provide for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:172: assessment of the protection of underground assets and which study must provide for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:177:Further protection in relation to the exercise of powers under the Order EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:178: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:182: (a) the inspection, removal and relaying or replacing, alteration or protection of any EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:182: with any deficiency in the expected level of protection afforded by those requirements; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:184: FOR THE PROTECTION OF ANGLO AMERICAN EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:184: 227. For the protection of Anglo American the following provisions have effect, unless EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:192:the approval of plans, inspection of any Specified Works or the alteration or protection of the EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:194: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:194: 245. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:196: FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:196: 255. For the protection of South Tees Development Corporation, Teesworks Limited and South EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:199: sufficient protection provided if it crosses underground facilities; EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:205: FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:205: 286. For the protection of the Breagh Pipeline Owners, the following provisions have effect, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:207: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:207: 294. For the protection of Teesside Windfarm, the following provisions have effect, unless EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:209: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:211: assessment of the protection of underground assets and which study must provide for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:211: assessment of the protection of underground assets and which study must provide for EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:217:Further protection in relation to the exercise of powers under the Order EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:217: FOR THE PROTECTION OF NAVIGATOR TERMINALS SEAL SANDS EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:217: 329. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:219: FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:219: 337. For the protection of NW, the following provisions, unless otherwise agreed in writing EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:220: “the standard protection strips” means strips of land falling within the following distances to EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:220: 339. The undertaker must not within the standard protection strips interfere with or build over EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:220:(where the apparatus is laid in a trench) within the standard protection strips unless otherwise EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:220:alteration or otherwise for the protection of the apparatus, or for securing access to it. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:221:the location of such assets will immediately be given to NW and afforded the same protection as EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:221:for the protection or alteration of apparatus, the undertaker must use all reasonable endeavours to EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:222: FOR THE PROTECTION OFNORTHERN GAS NETWORKS LIMITED EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:222: 349. For the protection of the Northern Gas Networks Limited the following provisions shall, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:222:(retained apparatus: protection), 357 (expenses) and 358 (indemnity), this Schedule does not apply EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:224:Retained apparatus: protection EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:225:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228:Cathodic protection testing EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228: (a) the authorised development might interfere with the existing cathodic protection forming EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228: (b) the apparatus might interfere with the proposed or existing cathodic protection forming EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228:cathodic protection. EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228: FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:228: 365. For the protection of the NT Group (as defined below), the following provisions have EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:230: FOR THE PROTECTION OF TEESSIDE GAS & LIQUIDS PROCESSING, EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:230: 370. For the protection of TGLP, TGPP and NGPL, the following provisions have effect, unless EN010103-002469-NZT DCO 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan Nov 2022 (D12).pdf:1: N 4 6km Special Protection Areas (SPA) EN010103-002469-NZT DCO 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan Nov 2022 (D12).pdf:1: N 4 Special Protection Areas (SPA) EN010103-001390-NZTDCO 6.3.5 Rev 3 ES Addendum Vol II Figure 3-4 Environmental Receptors within 2km.pdf:1: Special Protection Area EN010103-000949-NZT DCO 6.3.40 ES Vol II Figure 10-14 Sensitive Land Use.pdf:1: Special Protection Area EN010103-001549-Orsted Hornsea Project Four Limited - Post-hearing submissions including written summaries of oral case put at any of the hearings held on 10 and 11 May 2022 1.pdf:12: the Net Zero Teesside DCO for the benefit and protection of Hornsea Project Four Offshore Windfarm. .. 3 EN010103-001549-Orsted Hornsea Project Four Limited - Post-hearing submissions including written summaries of oral case put at any of the hearings held on 10 and 11 May 2022 1.pdf:13: DCO for the benefit and protection of Hornsea Project Four Offshore EN010103-001549-Orsted Hornsea Project Four Limited - Post-hearing submissions including written summaries of oral case put at any of the hearings held on 10 and 11 May 2022 1.pdf:14: benefit and protection of Hornsea Four, as follows: EN010103-001549-Orsted Hornsea Project Four Limited - Post-hearing submissions including written summaries of oral case put at any of the hearings held on 10 and 11 May 2022 1.pdf:16: the benefit and protection of Hornsea Four. These EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:47: / scour protection around the EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:60: • presence of manifolds, rock protection achieve complete awareness of EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:62: • presence of manifolds, rock protection established to help ensure minimisation EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:66:JNCC, 2020a. Resource Hub: Special Protection Areas (SPAs) with marine EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:69: Special Protection Area EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:71: SSSI Special Protection Area EN010103-002342-NZT ExQ3 final.pdf:13: contaminated land under Part IIA of the Environmental Protection Act 1990. EN010103-002342-NZT ExQ3 final.pdf:14: for reporting, protection and management of unexpected archaeological discoveries. EN010103-001800-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 2.pdf:13: protection: see e.g. Van Marle v The Netherlands (1986) 8 EHRR 483. In Breyer the Court EN010103-001800-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 2.pdf:17: of the protection of the individual's fundamental rights. EN010103-001800-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 2.pdf:19: statute, have long been hedged about by the common law with protections. EN010103-001800-Orsted Hornsea Project Four Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 2.pdf:19: These protections are not absolute but take the form of interpretative EN010103-001234-NZT - Regulation 32 Transboundary Screening (14).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site. EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:3: have subsequently followed up by and Asset Protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:4: 218, 232a, 252, representatives had a productive call are well progressed. The last Protection Agreement and EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:4: of the Asset Protection Agreement emails since then seeking EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:4: protection for Air Products Agreement and private EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:4: proportionate protection for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:4: An asset protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:5: Exploration 1 – Owner 4, 5c, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:5: Company, LLC and/or (b) 199, 202a, 6, 9b, Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:5: 303, 315, 320, 331, normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:5: 469, 470, 472, 473, adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:7: 2 10, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:7: (b) 122, 123, 125, Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: and/or (b) 367, 374 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: 1 – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:8: and/or 5c, 6, 9 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:9: 145, 147, 152, 156, normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:9: 171, 171b, 172, adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:14: An update will be provided before adequate protection. Fertilisers have now indicated EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:14: to the DCO and a response is adequate protection . EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: Petroleum 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: Limited and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: Production (U.K.) 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:15: Limited and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:16: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:16: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:16: Limited 2 476, 479, 482, 3b, 4, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:16: 540b, 540c 5a, 5b, Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:17: 458a, 459, 467, normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:17: 487, 488, 489, 493, adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:17: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:17: and/or (b) 279, 283, 296 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: Company Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:18: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:19: Limited 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:19: and/or (b) 374 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:19: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:19: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:20: 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:20: and/or (b) Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:21: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:21: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:22: Environmental 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:22: Services Limited and/or (b) Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:22: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:22: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: Limited 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: and/or (b) Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: Teesside Limited 1 – Owner 6, 9b, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:23: and/or (b) 19, 374 9f, 10 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: Biofuels Teesside 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: Limited and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:24: Holding Limited 2 330, 333 6, 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:25: Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:25: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:25: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:25: Environmental 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:25: Limited and/or (b) 279, 296, 348, Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:26: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:26: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:27: 1. Inclusion of protection for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:27: protection in the DCO should be EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:27: provide protection for Huntsman as EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:27: agree that protection for other EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:27: consider that the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:28: requires protection. EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:29: require this protection. To the EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:30: the protection of Huntsman in its EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:30: level of protection. EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:30: Polymers Limited 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:30: and/or (b) 124a, 124b, Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:31: 139, 141, 142, normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:31: 166, 169, 171, adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: provide protection for One-Dyas UK EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: Services (UK) 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: Limited and/or (b) 174c Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:35: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:36: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:36: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:36: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:36: and/or (b) Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:36: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:37: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:37: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:37: and/or (b) 274, 279 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: Chemical UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: Limited and/or (b) 138a Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:38: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:40: are of the view that the protections EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:42: the protections included in Part 4 are EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:46: Petroleum UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:46: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:47: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:47: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:47: Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:47: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:48: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:48: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51:52 Northern Gas REP1-013 Category Yes (a) - 2a, 5c, (d) Negotiations relating to Asset An asset protection The Applicants have EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: Networks Limited 1 – Owner 6, 9b, Protection Agreement and private agreement is being responded to comments EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:51: Asset Protection Agreement EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:52: protection agreement on 5 asset protection agreement Examination but the EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:52: agreement of the Asset Protection 13 October 2022. Despite the protect Northern Gas EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:52: Networks, but the Applicant Protection Agreement prior EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:53: Processing 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:53: Limited and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:53: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:53: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:57: Category 263, 280, 285, 302, provisions also provide protection for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:58: Limited 1 – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part 2, Openreach Limited however EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:58: and/or 369, 375, 391, 392, 6, 7, 8, Schedule 12) for the protection of no response has been EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:59: 2 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:60: Limited (b) 223 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:60: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:60: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:60: Limited 2 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:60: (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: Limited 2 6, 9b, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: (b) 142a, 158a, 10 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: 166b, 167, 168, normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:61: 183, 184, 185, adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:65: the Protection of 1 – Owner 10 adjacent to the existing pipeline EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:65: UK Plc 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:65: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:66: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:66: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:67: 1. Inclusion of protection for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:67: protection in the DCO should be EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:67: the protection proposed is EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:68: the Order limits requires protection. EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:70: the protection of Sabic in its draft EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:70: protection. EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:72: Transportation 1 – Owner 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:72: Limited and/or (b) 190a, 199 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:72: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:72: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:75: Energy Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:75: and/or (b) Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:75: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:75: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:85: appropriate protection. With respect EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:95: 1 – Owner 6, 10 protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:95: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:96: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:96: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:96: Specialties UK 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:97: Limited and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:97: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:97: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:97: Energy Limited 1 – Owner protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:97: and/or (b) - Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: adequate protection is in place for EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: Limited 1 – Owner 330, 333 5c, 6, protection in the draft DCO (Part 1, EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: and/or 10 Schedule 12) for the protection of EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: normally caught by the protection EN010103-002742-Applicant NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) - March 2023.pdf:98: adequate protection is in place for EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:3: – Owner 10 parties on the protective protection awaited from EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:4: protection EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:5: Exploration – Owner 4, 5c, 6, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:5: Occupier 158a, 166a, 171a, 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:5: 111, 113, 126, 136, by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:5: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:8: 10, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:8: 135, 138a, 141a 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:8: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: – Owner 6, 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: – Owner 403, 450, 112 2b, 3a, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:9: Occupier (b) 12a, 142a, 184a, 10 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:10: 176b, 184, 185, 190, by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:10: 232a, 252, 253, protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:17: Petroleum – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:17: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:17: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:17: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:18: Production (U.K.) – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:18: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:18: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:18: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:19: Limited 476, 479, 482, 540b, 3b, 4, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:19: 5c, 6, 8, 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:19: 483, 485, 486, 487, by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:19: 522, 524, 525, 526, protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: Company Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:20: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:21: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:21: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:21: Limited – Owner 6, 10 protection in the draft DCO EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:21: Occupier protection of electricity, gas, EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:22: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:22: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:23: – Owner 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:23: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:23: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:23: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:24: Environmental – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:24: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:25: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:25: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:25: Limited – Owner 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:25: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: Teesside Limited – Owner 6, 9b, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:26: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: Biofuels Teesside – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: Holding Limited 330, 333 6, 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:27: (b) - 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:28: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:28: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:28: Environmental – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:28: Occupier 362, 363, 367, 370, 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:29: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:29: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:30: Polymers Limited – Owner 6, 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:30: Occupier 12a, 138a, 141a, 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:30: 174d, 176, 176b, by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:30: 196, 2, 202c, 20a, protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:33: provide protection for One- of the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:33: Services (UK) – Owner 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:34: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:34: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:34: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:34: Plc – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:34: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:35: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:35: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:35: Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:35: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:35: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:36: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: Chemical UK – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:37: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:38: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:38: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:45: Petroleum UK – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:45: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:45: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:45: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:46: Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:46: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:46: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:46: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:48: Plc – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:48: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:48: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:48: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:48: Networks Limited – Owner 6, 9b, in contact with Northern Gas protection have EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:49: 31, 343, 347, 360, protection agreement on 5 response is EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:49: 26, Schedule 12) at Deadline 4 Protection EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:49: Processing – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:49: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:50: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:50: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:54: 535 protection for One-Dyas UK as EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:54: Limited – Owner 341, 346, 361, 364, 3a, 5c, included protection in the have written to EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:54: Occupier 396, 402, 403, 414, 9a, 10 12) for the protection of Limited EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:55: Limited included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:55: 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:56: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:56: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:56: Limited included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:56: 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:57: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:57: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:57: Limited 6, 9b, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:57: 166a, 171a, 176a, 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:57: 190b, 191, 191a, by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:58: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:60: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:61: UK Plc – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:61: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:61: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:61: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:64: Transportation – Owner 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:64: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:65: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:65: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:67: Energy Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:67: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:67: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:67: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:86: – Owner 6, 10 included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:86: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:86: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:87: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:87: Specialties UK – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:87: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: Energy Limited – Owner included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: Occupier 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:88: protection is in place for the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:89: Limited – Owner 330, 333 5c, 6, included protection in the EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:89: Occupier (b) - 12) for the protection of EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:89: by the protection offered by EN010103-002419-NZT DCO 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11).pdf:89: protection is in place for the EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:1:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:2: protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:2: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:2: Occupier 158a, 166a, 171a, protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:2: 469, 470, 472, 473, by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:2: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:4: 10, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:4: 135, 138a, 141a protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:4: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: – Owner 6, 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:5: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:6: 169, 171, 171b, 172, by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:6: 191, 191a, 191d, 194, considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:10: Petroleum Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:10: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: Production (U.K.) – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:11: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:12: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:12: 5c, 6, 8, protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:12: 459, 467, 469, 470, by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:12: 489, 493, 495, 496, considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: Company Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:13: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:14: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:14: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:14: Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:14: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:15: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:15: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:15: – Owner 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:16: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:16: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:16: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:17: Environmental – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:17: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:17: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: Limited – Owner 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: Limited – Owner 6, 9b, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:18: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:19: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:19: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:19: Biofuels Teesside – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:19: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: (b) - protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:20: Environmental – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:21: Limited Occupier 362, 363, 367, 370, protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:21: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:21: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:22: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:22: Occupier 138a, 141a, 142a, protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:22: 165, 166, 169, 171, by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:22: 185, 185b, 190, 190b, considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: provide protection for One-Dyas EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: Services (UK) – Owner 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:25: – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:26: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:26: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:26: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:26: Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:26: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:27: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:27: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:27: Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:27: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: Chemical UK – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:28: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:32: Petroleum UK – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:32: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:32: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:33: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:33: Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:33: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:33: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:33: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:34: Plc – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:34: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:35: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:35: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:35:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:35: 31, 343, 347, 360, 98 provisions and asset protection agreement during EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:36: Processing Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:36: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:36: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:36: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:39: 533, 416, 431, 508, protection for One-Dyas UK as EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:40: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part writing to EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:40: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:41: Limited protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:41: protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: Limited protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:42: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:43: Limited 6, 9b, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:43: 171a, 176a, 183a, protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:43: 184, 185, 185b, 186, by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:43: 191b, 191d, 192, 194, considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:45: the Protection of – Owner 10 land adjacent to the existing entry, 168 EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:46: UK Plc – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:46: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:46: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:46: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:49: Transportation – Owner 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:49: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:49: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:49: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:51: Energy Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:51: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:51: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:51: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:67: – Owner 6, 10 protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:67: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:67: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:67: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:68: Specialties UK – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:68: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:68: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:68: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: Energy Limited – Owner protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: Occupier protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: considered adequate protection EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:69: Occupier (b) - protection of electricity, gas, EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:70: by the protection offered by EN010103-002182-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Clean).pdf:70: considered adequate protection EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: PART 1 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: PART 2 — FOR THE PROTECTION OF CANAL AND RIVER TRUST EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: PART 3 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8: PART 4 — FOR THE PROTECTION OF OPERATORS OF EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:36:approximately 0.3km in length, including cathodic protection posts and marker posts, running EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:39: services and utilities; and works for the protection of buildings and land; EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:65: (6) Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) applies with the EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:75: 3. Except for paragraphs 8 (retained apparatus protection) and 9 (retained apparatus EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:75:protection), 10 (expenses) and 11 (indemnity) of this Schedule which will apply in respect of the EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:78:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:90: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:90: 34. For the protection of the utility undertakers referred to in this part of this Schedule, the EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:136:Resources Wales; and (iii) the Scottish Environment Protection Agency; EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:150: or forms of protection of a similar nature or having equivalent or similar effect to any of EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:411: procedures which provide adequate protection against conflicts of interest which EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:423: procedures which provide adequate protection against conflicts of interest which EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:585: Confidentiality and data protection ___ 11 EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:591:Confidentiality and data protection EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:591:Protection Act 2018 and the Environmental Information Regulations 2004). EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:592:We will process your personal data in accordance with all applicable data protection laws. See EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:619:in the CfD AR4, in order to provide fair and proportionate protection to Generators in respect of EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:619:QCiL protection is not available to Generators in respect of a Foreseeable Change in Law 26. EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:46: the information provided is considered to be too activities (including rock armour and scour protection; using a EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:46: impacts of rock armour and scour protection. The Interestingly, based on the observed communities in the Tees Bay, we EN010103-002294-ExA Q2 Historic England.pdf:3: Framework CEMP REP5-014 includes procedures for reporting, protection and management of unexpected archaeological EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:1: FOR THE PROTECTION OF THE SEMBCORP PIPELINE CORRIDOR EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:7: (a) the inspection, removal and relaying or replacing, alteration or protection EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf:7: of protection afforded by those requirements; EN010103-000996-NZT DCO 6.3.62 ES Vol II Figure 15-3 Designated Sites.pdf:1: Special Protection Area EN010103-002478-NZT DCO 6.3.57 - ES Vol II Figure 11-5 PCC Site Operational Noise Levels Nov 2022 (D12).pdf:1: Special Protection Area EN010103-002380-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:3: Protection of access EN010103-002380-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: protection. While the Project is likely to be effected largely within the Order limits, the close EN010103-002380-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: 3.1.5 A related issue is the indemnity protection in the Protective Provisions. If NSMP suffer losses EN010103-002380-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf:4: the protection of rights which are crucial to the operation and maintenance of a site which is EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:4:Source Protection Zones EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:10:Source Protection Zones EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:12:Radon Potential - Radon Protection Measures n/a EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:13:Special Protection Areas pg 27 1 EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:37: Radon Potential - Radon Protection Measures EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:37: Protection Measure: No radon protective measures are necessary in the construction of new E4SW 0 1 448503 EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:40: Designation Details: Special Protection Area EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:40: Special Protection Areas EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:41:Source Protection Zones EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:44:Radon Potential - Radon Protection Measures EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:45:Special Protection Areas EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:46: Scottish Environment Protection Agency EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:23: cathodic protection posts will be determined at the detailed design EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:42: Applicants provided comments on the protective provisions and asset protection EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:45: PP in the DCO, as drafted, provide protection with respect to Suez land within the EN010103-Advice-00002-1-TNZT - 200318 - Meeting note 18 March 2020.pdf:2:The pipelines for the Project cross the Teesmouth and Cleveland Coast Special Protection EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:3: RSPB Royal Society for the Protection of Birds EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:3: SPA Special Protection Area EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:15: sites the same level of protection as SPAs and SACs. EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:37: level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:47: armouring / scour protection would result in direct and permanent loss of subtidal EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:47: considered that the introduction of rock armouring / scour protection (with an EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:62: armouring / scour protection would result in permanent loss of subtidal sandflat. EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:63: head, the introduction of rock armouring / scour protection (with an expected EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:63: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:63: wave direction. The outer edge of the scour protection will incorporate a slope that EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:63: To minimise the effect of the protection works on hydrodynamic conditions and EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:63: circular footprint for the proposed scour protection therefore follows this design EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:64: 1:2 or less) will be incorporated into the design and the height of the protection EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:65: forecast to exceed the 3 µg/m3 critical level of relevance for the general protection EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:70: (CEMP), detailing the environmental protection measures (e.g. safe materials EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:74: protection of harbour porpoise, indicates the maximum distance for significant EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:79: with the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site and any EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:88: Moors Special Protection Area Site Code: UK9006161 Online. Available at: EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:89: Coast Special Protection Area (TIN172) Online. Available at: EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:134: that scour protection will be required to prevent erosion of seabed around the outfall EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:134: seabed will be covered by the rock armour scour protection. The use of rock armour as a EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:134: form of scour protection is proposed for the alternative new outfall only. It is not EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:134: protection on the seabed are based on expert engineering judgement and knowledge of EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:135: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:135: direction. The outer edge of the scour protection will incorporate a slope that transitions EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:135: The grading of the scour protection is likely to be similar to that used for marine cable EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:135: protection in situations where cables cannot be buried (i.e. at crossing points with other EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:135: cables or pipelines). To minimise the effect of the protection works on hydrodynamic EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: circular footprint for the proposed scour protection therefore follows this design EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: Preliminary sizing of rock armour for scour protection around the base of the Teesside EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: scour protection at the outfall location. EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: turbulence and depth of scour around the outer edge of the scour protection will also be EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: be incorporated into the design and the height of the protection above the seabed should EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: locally raised seabed. If the wave crests passing over the submerged scour protection are EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: scour protection and the use of shallow side slopes to transition from the seabed to the EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:136: around the perimeter of the rock armour protection. A worst-case footprint can therefore EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:137: waves from a range of directions, a circular footprint for the scour protection should be EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:137: In conclusion, if the recommendations for design of the outfall scour protection as EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:137: Any effects resulting from the scour protection will then be limited to local, small-scale EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:4:41. Protection of interests EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:5: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:8:protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:8:optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:32:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(a) in relation to a EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:32:Protection of interests EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:32: Environmental Protection Act 1990 (c.43). EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:37: (ii) cathodic protection posts; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:39: (vi) works for the protection of buildings and land; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:42:Landscaping and biodiversity protection management and enhancement EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:42:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:46:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:47:Protection of highway surfaces EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:47: (d) any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:47: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:53: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:53: 24. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:55:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:56:specified works or the alteration or protection of any apparatus. EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:78: (vii) the deposit of rock armour protection; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:87: (iv) the deposit of rock armour protection; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:87: (vii) the deposit of rock armour protection; EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:96: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:96: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:98:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:99:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:100: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:100: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:101: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:101: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:103:stopping up), 25 (retained apparatus: protection of electricity undertaker), 26 (retained apparatus: EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:103:protection of gas undertaker), 27 (expenses) and 28 (indemnity) of this Schedule which will apply EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:105:maintenance and protection of alternative apparatus in substitution for apparatus to be removed, EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:105:Retained apparatus: protection of electricity undertaker EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:106:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:107:Retained apparatus: protection of gas undertaker EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:107:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:108:in connection with, the inspection, removal, relaying or replacing, alteration or protection of any EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:110:23(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:111:National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:111: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:111: 34. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:113:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:113:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:116:for the protection of the apparatus, or for securing access to it, and Air Products is entitled to EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:116:alteration or protection of any apparatus or the construction of any new apparatus which may be EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:118: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:118: 54. For the protection of CATS, the following provisions have effect, unless otherwise agreed in EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:120: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:120: 63. For the protection of CF Fertilisers, the following provisions have effect, unless otherwise EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:122: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:122: 73. For the protection of Exolum, the following provisions have effect, unless otherwise agreed EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:123: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:123: 81. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:125: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:125: 89. For the protection of Marlow Foods, the following provisions have effect, unless otherwise EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:126: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:133: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:133: 116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid Limited EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:135:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:135: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:138: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:138: 134. For the protection of NPL, the following provisions have effect, unless otherwise agreed in EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:139: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:139: 142. For the protection of PD Teesport, the following provisions have effect, unless otherwise EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:141: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:141: 156. For the protection of RBT, the following provisions have effect, unless otherwise agreed in EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:144: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:144: 169. For the protection of Sabic, the following provisions have effect, unless otherwise agreed in EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:145: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:145: 177. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:147: FOR THE PROTECTION OF YORK POTASH EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:147: 185. The provisions of this Part apply for the protection of York Potash unless otherwise agreed EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:149:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:150:the alteration or protection of any apparatus. EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:150: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:150: 205. For the protection of Suez, the following provisions have effect, unless otherwise agreed in EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:152: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:152: 215. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001897-NZT DCO 8.11 - Northern Powergrid SoCG (Tracked) - July 22 (D4).pdf:10: & 26th March to 3rd May access and protection of assets to remain uninterrupted EN010103-001897-NZT DCO 8.11 - Northern Powergrid SoCG (Tracked) - July 22 (D4).pdf:14: for the protection of NPg’s operations and assets. These discussions are ongoing, EN010103-002511-NZT DCO 8.3 - STDC SoCG (Tracked) - Nov 2022 (D12).pdf:36: biodiversity protection management and between the parties, STDC maintains its position EN010103-002511-NZT DCO 8.3 - STDC SoCG (Tracked) - Nov 2022 (D12).pdf:44: to protect STDC’s interests but are continuing to Amongst other additional protections, STDC EN010103-002511-NZT DCO 8.3 - STDC SoCG (Tracked) - Nov 2022 (D12).pdf:53: the Applicants anticipate that this matter has requires suitable protection via the draft Order EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:3: SPA Special Protection Areas EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:15: This supplements the broader protections for apparatus to be replaced and EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:15: to Sembcorp, as well as indemnity protection should they cause any disruption to EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:16: note that they have included protection in the draft DCO (Part 2, Schedule 12) [REP6- EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:16: 002] for the protection of operators of electronic communications code networks, EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:25: draft DCO submitted at Deadline 4 REP4-002. The protections include the EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:27: protection. EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:28: the 'supplementary' protection Orsted argue is necessary. It is also noted that EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:28: protections must thus be secured in the NZT DCO. Those applications must EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:28: protections/conditions they consider appropriate and necessary to include in EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:30: Applicants are confident that adequate protection can be provided for, and will seek EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:30: with sufficient protection to mitigate the impact on its facilities. With regards to EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:30: REP6-122 include protection for NSMP pipelines. NSMP will also benefit from EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:30: protections included in parts 13 and 20 of Schedule 12 of the dDCO REP6-002. The EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:31: additional protections for the benefit of STDC in the dDCO at Deadline 4 REP4-002. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:32:NYSE listed companies and provide investors with protections that are comparable in many respects to those established by the NYSE EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:179:protection of the planet, peace and prosperity. On the strength of their Within this context, the Group strives to act as an agent for positive EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:179: protection of the nature on which humanity depends; EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:234: Protectionist measures affecting free trade perhaps delay their execution, as was the case, for example, in Denmark EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:234: The development of protectionist measures affecting EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:234: nations highlighted by the development of protectionist measures Group has production, including Nigeria, which is one of the main EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:235:export or re-export of a number of goods and services, and hinder the reduce or challenge the protections offered by the initial legal framework EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:235:are subject to increasingly stringent laws governing the protection of EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:235:the environment (water, air, soil, noise, protection of nature, waste EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:235:product quality and consumer protection. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:236: subsidiary level to cope with emergency situations may not make it Regulation (EU) 2016/679 with regard to the protection of personal data), EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:240: in 2021 to Iranian authorities related to the maintenance and protection EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:240: reasonable endeavors to evacuate Rhum NGL from the St Fergus Terminal maintenance and protection of trademarks and designs in this country. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:240: maintenance and protection of trademarks and designs in this country. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:244: various existing alert channels. all appropriate measures to ensure the protection of its rights. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:251:(3) Sensitive natural environments include, in particular, remarkable or highly vulnerable natural areas, such as the Arctic, as well as areas covered by significant regulatory protection EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:253:legal provisions applicable to Activities provide less protection than the multi-lateral agencies at Group level. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:253: The Security division is responsible for the protection of people, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:253:Code of Conduct. Its chairman, who reports to the Chairman and protection of people and property, by conducting analyses and offering EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:257: for human rights at work, protection of health, safety and security, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:258: of workers under the age of 15, except where local law provides for greater protection for the child. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:263:conducted and approved by the Ugandan and Tanzanian authorities experts to integrate the best practices for the protection of chimpanzees, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:272: violations. Approximately 100 audits of at-risk suppliers are conducted Wall Street Reform and Consumer Protection Act of 2010, since 2014, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:273:protection of health and safety; prohibition and prevention of any employees of the Group, lawyers and operational staff, enabled participants EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:357:laws and regulations, the local content of investments, protection The principal steps in conducting land acquisitions are as follows: EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:358: enhancing the protection of Murchison Falls National Park (including the Group outlined in May 2020. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:359: mitigation measures described in the assessment; particularly in terms of biodiversity protection and land acquisition. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:359: – Work on women’s rights and their protection; the Group. EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:362: – arrange for the protection of family members in the event of the (PEC), both open to employees of the Group’s French companies that EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:369:voluntary part-time workers. Moreover, where local laws provide few protections for freedom of EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:370: 2019, one focusing on workplace protection and the other on gender both at the local level and Group-wide. The most recent survey, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:375:that meets regularly to discuss key health issues relating to the Group’s effective protection of all employees’ health; EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:375:activities. It decides whether there is a need for additional health protection – centralizing initially the procurement and distribution of consumables EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:377:protection requirements. Employees receive training in the required skills campaigns (e.g., in-house magazines, intranet, posters). EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:379:The Group’s provisions for the protection of the environment and site 5 EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:381:regulatory); waste storage (soil protection and discharge management); EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:396: potential impacts may also have consequences for the livelihood of association with others, to promote and to strive for the protection and EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:396: When government security forces are deployed to ensure the protection within entities considered most at risk was also carried out in 2020 within EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:404: well as its support for the Conservatoire du Littoral coastal protection EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:405:areas: respect for human rights at work; the protection of health, security mapping is the result of methodological work carried out with support EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:406: qualification process; Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:468: Protection Authority – – 328 – – – – 328 EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:497: issues relating to the Group’s activities. It decides whether there is a need for additional health protection strategies EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:497: – arrange for the protection of family members in the event of the employee’s death, via insurance that provides EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:3:41. Protection of interests EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 2 — FOR THE PROTECTION OF OPERATORS OF EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 4 — FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 5 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 6 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 7 — FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 8 — FOR THE PROTECTION OF INEOS NITRILES (UK) EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 9 — FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 10 — FOR THE PROTECTION OF NETWORK RAIL EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 11 — FOR THE PROTECTION OF NORTHERN POWERGRID EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:4: PART 12 — FOR THE PROTECTION OF NPL WASTE MANAGEMENT EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 13 — FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 14 — FOR THE PROTECTION OF REDCAR BULK TERMINAL EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 15 — FOR THE PROTECTION OF SABIC UK EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 16 — FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 17 — FOR THE PROTECTION OF YORK POTASH EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 18 — FOR THE PROTECTION OF SUEZ RECYCLING AND EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 19 — FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 20 — FOR THE PROTECTION OF INEOS UK SNS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 21 — FOR THE PROTECTION OF TEESSIDE WINDFARM EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 22 — FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 23 — FOR THE PROTECTION OF HUNTSMAN EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5: PART 24 — FOR THE PROTECTION OF NAVIGATOR TERMINALS EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:7: protection test posts, field boundary markers, transformer rectifier kiosks, electricity and fibre- EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:7: optic cables, pipe and cable protection telecommunications equipment and electricity cabinets; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:32:aggrieved by statutory nuisances) of the Environmental Protection Act 1990(39a) in relation to a EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:32:Protection of interests EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:32: Environmental Protection Act 1990 (c.43). EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:37: (ii) cathodic protection posts; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:39: (vi) works for the protection of buildings and land; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:40: (b) the approximate number and location of cathodic protection posts and marker posts; and EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:41: (b) the approximate number and location of cathodic protection posts and marker posts. EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:42:Landscaping and biodiversity protection management and enhancement EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:42:biodiversity protection plan for that part has been submitted to and approved by the relevant EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:45: Environmental Protection Act 1990(a); EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:45: Environmental Protection Act 1990; and EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:47:must commence until a scheme of protection and mitigation measures has been submitted to and, EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:48:Protection of highway surfaces EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:48: (e) (d)any necessary measures for the temporary protection of carriageway surfaces, the EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:48: protection of statutory undertakers’ plant and equipment, and any temporary removal of EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:55: FOR THE PROTECTION OF NET ZERO TEESSIDE POWER LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:55: 241. The provisions of this Part apply for the protection of Net Zero Teesside unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:57:subject to such reasonable conditions as may be required for the protection or alteration of EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:58:specified works or the alteration or protection of any apparatus. EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:80: (vii) the deposit of rock armour protection; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:91: (iv) the deposit of rock armour protection; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:91: (vii) the deposit of rock armour protection; EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:101: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:101: 1. For the protection of the utility undertakers referred to in this Part of this Schedule, the EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:103:otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:104:with, the inspection, removal, alteration or protection of any apparatus or the construction of any EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:105: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:105: 12.—(1) For the protection of any operator, the following provisions have effect, unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:106: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:106: 17. For the protection of National Grid as referred to in this Part of this Schedule the following EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:108:stopping up), 25 24 (retained apparatus: protection of electricity undertaker), 26 25 (retained EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:108:apparatus: protection of gas undertaker), 27 26 (expenses) and 28 27 (indemnity) of this Schedule EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:110:use, maintenance and protection of alternative apparatus in substitution for apparatus to be EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:110:Retained apparatus: protection of electricity undertaker EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:111:(6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:112:Retained apparatus: protection of gas undertaker EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:112:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:113:or in connection with, the inspection, removal, relaying or replacing, alteration or protection of EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:115:23(222(2) or National Grid makes requirements for the protection or alteration of apparatus under EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:116:to National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:116: FOR THE PROTECTION OF AIR PRODUCTS PLC EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:116: 33.34. For the protection of Air Products the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:118:the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:118:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:121:otherwise for the protection of the apparatus, or for securing access to it, and Air Products is EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:121:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:123: FOR THE PROTECTION OF CATS NORTH SEA LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:123: 53.54. For the protection of CATS, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:125: FOR THE PROTECTION OF CF FERTILISERS UK LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:125: 62.63. For the protection of CF Fertilisers, the following provisions have effect, unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:127:may require to be made for the alteration or otherwise for the protection of the apparatus, or for EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:129:removal, alteration or protection of any apparatus or the construction of any new apparatus which EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:130: FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:130: 79.73. For the protection of Exolum, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:132: FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:132: 87.81. For the protection of INEOS, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:134: FOR THE PROTECTION OF MARLOW FOODS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:134: 95.89. For the protection of Marlow Foods, the following provisions have effect, unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:135: FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCURE LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:142: FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:142: 121.116. For the protection of Northern Powergrid (Northeast) Plc and Northern Powergrid EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:144:otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:144: (a) in, or in connection with, the inspection, removal, alteration or protection of any EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:147: FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:147: 139.134. For the protection of NPL, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:148: FOR THE PROTECTION OF PD TEESPORT LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:148: 147.142. For the protection of PD Teesport, the following provisions have effect, unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:151: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:151: 162.156. For the protection of RBT, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:153: FOR THE PROTECTION OF SABIC UK PETROCHEMICALS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:153: 175.169. For the protection of Sabic, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:154: FOR THE PROTECTION OF SEMBCORP UTILITIES (UK) LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:154: 183.177. For the protection of Sembcorp, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:156: FOR THE PROTECTION OF YORK POTASH EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:156: 191.185. The provisions of this Part apply for the protection of York Potash unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:158:reasonable conditions as may be required for the protection or alteration of or access to any York EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:159:works or the alteration or protection of any apparatus. EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:160: FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:160: 210.205. For the protection of Suez, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:162: FOR THE PROTECTION OF TEESWORKS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:162: 220.215. For the protection of Teesworks Limited, the following provisions have effect, unless EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:164: FOR THE PROTECTION OF INEOS UK SNS LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:164: 231. For the protection of INEOS, the following provisions have effect, unless otherwise agreed EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:166: FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED AND EDF EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:166: 239. For the protection of Teesside Windfarm and EDF ER, the following provisions have EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:168: FOR THE PROTECTION OF LOW CARBON LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:168: 247. For the protection of Low Carbon, the following provisions have effect, unless otherwise EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:170: FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:170: 257. For the protection of HPU, the following provisions have effect, unless otherwise agreed in EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:171: FOR THE PROTECTION OF NAVIGATOR TERMINALS NORTH TEES EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:171: 264. For the protection of Navigator Terminals, the following provisions have effect, unless EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:22: building size, gas protection measures may not be required. However, EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:22: surface protection, sacrificial layers and / or enhanced concrete quality. EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:68:Radon Potential - Radon Protection Measures No radon protective measures are necessary in the construction of new dwellings EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:69:Radon Potential - Radon Protection Measures No radon protective measures are necessary in the construction of new dwellings EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:69:Radon Potential - Radon Protection Measures No radon protective measures are necessary in the construction of new dwellings EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:70:Radon Potential - Radon Protection Measures No radon protective measures are necessary in the construction of new dwellings EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:70:Radon Potential - Radon Protection Measures Basic radon protective measures are necessary in the construction of new EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:71:Radon Potential - Radon Protection Measures No radon protective measures are necessary in the construction of new dwellings EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:71:Radon Potential - Radon Protection Measures Basic radon protective measures are necessary in the construction of new EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:72: at or above the Action Level, basic radon protection measures are required. EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:76:Source Protection Zones None (Magic Defra) EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:76:Source Protection Zones None (Magic Defra) EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:77:Source Protection Zones None (Magic Defra) EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:77:Source Protection Zones None (Magic Defra) EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:78:Source Protection Zones None (Magic Defra) EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:111: for crop protection, pharmaceutical and performance chemicals EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:199:Special Protection Areas Teesmouth And Cleveland Coast 2G195 EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:199:Special Protection Areas Teesmouth And Cleveland Coast 2I5 EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:216: Protection and reinstatement of existing natural resources should be EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:218: Aquifer. The site is not within an Environment Agency Source Protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:218: Mitigation for protection of groundwater is warranted where there are active EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:248: suitable hygiene facilities would provide adequate protection and no other EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:249: coatings, having cathodic protection or by use of stainless steel-clad rebar. EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:251: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:251: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:251: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:252: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:253: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:253: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:253: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:253: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:254: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:255: Provide protections EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:256: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:256: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:256: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:256: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:256: Provide protection EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:263: Corrosion of polyethylene (PE) and additional protection against sulfate attack. EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:267: resulting in a reduction in concrete additional protection against sulfate attack if EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:270: resulting in a reduction in concrete additional protection against sulfate attack if EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:274: resulting in a reduction in concrete additional protection against sulfate attack if EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:277: resulting in a reduction in concrete additional protection against sulfate attack if EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:4: • Environment Protection Act 1990; EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:5: under the WFD and source protection zones (SPZ) around potable EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:7: the provision of clean air and water; protection and enhancement of habitats, EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:9: process, with appropriate protection and enhancement measures EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:9: the Teesmouth and Cleveland Coast Special Protection Area/Ramsar EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:25: vegetation. Could be realigned or channelised with hard bank protection, EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:25: high degree of flow regulation and bank protection, and probable strategic EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:28: head and associated scour protection is assumed to be no more than 100 m2, EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:30: (which is included within local SSSI and Special Protection Area (SPA) EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:58: standard of protection as the surrounding defences). These are privately EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:64: under EU (e.g. Teesmouth and Cleveland Coast Special Protection Area, bathing EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:68: and will describe the principles for the protection of the water environment EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:71: • The positioning of rock armouring/scour protection around the outfall EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:73: the Contractor will implement more stringent protection measures. This is EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:79: / scour protection. A jack-up-barge or similar would be used during EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:82: outfall head itself and adjacent scour protection and rock armouring. This is EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:90: scour protection in the form of rock armour around the diffuser is therefore EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:90: protection will be undertaken post-DCO consent and will include appropriate EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:102:Potential impacts on Tees Coastal Waterbody Negligible Slight adverse (not Scour protection Slight adverse (not EN010103-001141-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 3.pdf:36: beds, gravel, rock, and boulders which provide protection from predators. EN010103-000961-NZT DCO 6.3.56 ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening).pdf:1: Special Protection EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:4:Source Protection Zones EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:8: Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:10:Source Protection Zones EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:12:Radon Potential - Radon Protection Measures n/a EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:13:Special Protection Areas pg 199 1 EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:134: Radon Potential - Radon Protection Measures EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:134: Protection Measure: No radon protective measures are necessary in the construction of new G6SE 0 1 453077 EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:212: Designation Details: Special Protection Area EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:212: Designation Details: Special Protection Area EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:212: Special Protection Areas EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:214:Source Protection Zones EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:216:Radon Potential - Radon Protection Measures EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:217:Special Protection Areas EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:218: Scottish Environment Protection Agency EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:1:Table 8-1: National Air Quality Strategy Objectives (NAQS) - Protection of Human EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:1:Table 8-2: Critical Levels (CL) - Protection of Vegetation and Ecosystems …………. 8-3 EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:3:Table 8-1: National Air Quality Strategy Objectives (NAQS) - Protection of EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:3:8.2.6 The critical levels for the protection of vegetation and ecosystems are set out EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:4:Table 8-2: Critical Levels (CL) - Protection of Vegetation and Ecosystems EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:4: to the environment, to ensure a high level of protection of the environment as EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:6:8.2.17 The EALs applicable for this assessment for the protection of human health EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:6: Regulations 2017 (the 2017 Regulations) provide for the protection of EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:6: (SACs) designated pursuant to the Habitats Directive, Special Protection EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:12: Special Protection Areas (SPAs), Special Areas of Conservation (SACs), EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:21: management and objectives are set for the protection of human health). EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:25:England Teesmouth and Cleveland Coast Special Protection Natural England on 14th EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:28: protection of vegetation and ecosystems only, and therefore they have been EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:42: protection of the marine environment of the Northeast Atlantic EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:62:arrangement is to obtain the highest possible total value for (a) Pennsylvania Department of Environmental Protection’s EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:62:between the Norwegian State and Equinor. Department of Environmental Protection. In addition, some state EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:64:protect certain species, including the Migratory Bird Treaty Act, of the country’s energy resources, including the protection of the EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:64:the Bald and Golden Eagle Protection Act and the Marine environment. In addition to the Petroleum Law, Equinor is also EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:64:Mammal Protection Act of 1972. Other statutes govern natural subject to many other laws and regulations issued by different EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:104:provide adequate protection from losses. Nigerian regulations regarding eligible expatriation of EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:104: for the protection of the environment and human health and EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:341:disclosed), 10 (climate change mitigation) and 11 (climate • Protection of water
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:5: Environmental Protection Act 1990; and
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:8: contained 1,150 species and 65 habitats requiring special protection.
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:8: the Redcar & Cleveland Local Plan relates to the protection of the marine
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:8: environment and important sites for biodiversity including Special Protection
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:11: protection around the new outfall head
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:13: OSPAR refers to the Oslo and Paris Convention for the protection of the marine environment of the North-East Atlantic
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:23:protection of migratory fish species from removes) a suite of potential effects on
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:27:rock armouring / scour protection. We would like measures would be considered, as appropriate,
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:29: Cleveland Coast SSSI. These sites are designated for the protection of
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:32:14.4.26 South Gare Breakwater is an area of coastal protection made of rock armour
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:35:14.4.38 No species afforded conservation protection were recorded during the subtidal
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:44: accordance with these environmental protection principles. These measures
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:52: the installation of rock armouring / scour protection around the new
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:52: rock armouring / scour protection. The exact footprint of the temporary and
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:53: and scour protection around the outfall head. It is expected that permanent
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:53: exact volume of rock armouring required for the protection of a replacement
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:54: introduction of rock armouring / scour protection (with an expected volume of
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:56: the installation of rock armouring / scour protection around the new
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:78: ‘Level B Harassment’ under the US Marine Mammal Protection Act (MMPA)
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:83: distributions (Mineur et al., 2012). The rock armouring / scour protection to be
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:84: provides a level of protection to their vital organs meaning they are reasonably
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:98: rock armouring / scour protection may present an obstruction on the seabed
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:99: outfall head and subsequent protection in the form of rock armouring / scour
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:99: protection in the Tees Bay. As a worst-case scenario, this area would be less
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:99: the outfall head and subsequent rock armouring / scour protection, would
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:99: and diffuser and surrounding rock armouring / scour protection would be
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:100:14.6.251 It is considered that the introduction of rock armouring / scour protection
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:107: I habitat and is also afforded national conservation protection. Further
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:115: Canadian sediment quality guidelines for the protection of aquatic life. In:
EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:121: Coast potential Special Protection Area (pSPA) and Ramsar Online.
EN010103-001207-NZT DCO 6.4.20 - ES Vol III Appendix 12C -Oct 2021.pdf:1: Special Protection Area
EN010103-001207-NZT DCO 6.4.20 - ES Vol III Appendix 12C -Oct 2021.pdf:2: Special Protection Area
EN010103-001234-NZT - Regulation 32 Transboundary Screening (5).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site.
EN010103-002418-NZT DCO 7.13a - Notification of Further Proposed Changes - Oct 2022 (D11).pdf:3: SPA Special Protection Areas
EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:37: the Teesmouth and Cleveland Coast Special Protection Area (SPA, SSSI and
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:3: RSPB Royal Society for the Protection of Birds
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:3: SPA Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:6: lies directly adjacent to the Teesmouth and Cleveland Coast Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:15: sites the same level of protection as SPAs and SACs.
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:16: (Natural England, 2015a). This was done to improve seabird protection within the
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:37: Level) for the protection of vegetation of 30 µgm-3. In addition, ecological studies
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:46: armouring / scour protection would result in permanent loss of subtidal sandflat. The
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:60: armouring / scour protection would result in permanent loss of subtidal sandflat.
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:60: head, the introduction of rock armouring / scour protection (with an expected
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:61: footprint of the scour protection is likely to be a 10-12m diameter circle. The circular
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:61: wave direction. The outer edge of the scour protection will incorporate a slope that
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:61: To minimise the effect of the protection works on hydrodynamic conditions and
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:61: circular footprint for the proposed scour protection therefore follows this design
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:61: 1:2 or less) will be incorporated into the design and the height of the protection
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:62: exceed the 3 µg/m3 Critical Level of relevance for the general protection of
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:66: (CEMP), detailing the environmental protection measures (e.g. safe materials
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:72: protection of harbour porpoise, indicates the maximum distance for significant
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:81: introduction of a small volume of rock armouring / scour protection due to the Proposed
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:88: York Moors Special Protection Area Site Code: UK9006161 Online. Available
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:89: Cleveland Coast Special Protection Area (TIN172) Online. Available at:
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:129: Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:130: Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:131: Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:132: Special Protection Area
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:133: scour protection will be required to prevent erosion of seabed around the outfall diffuser
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:133: will be covered by the rock armour scour protection. It is not recommended to place rock
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:133: protection on the seabed are based on expert engineering judgement and knowledge of
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: The footprint of the scour protection is likely to be a 10-12m diameter circle. The circular
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: direction. The outer edge of the scour protection will incorporate a slope that transitions
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: The grading of the scour protection is likely to be similar to that used for marine cable
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: protection in situations where cables cannot be buried (i.e. at crossing points with other
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: cables or pipelines). To minimise the effect of the protection works on hydrodynamic
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: circular footprint for the proposed scour protection therefore follows this design
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:134: Preliminary sizing of rock armour for scour protection around the base of the Teesside
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: scour protection at the outfall location.
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: turbulence and depth of scour around the outer edge of the scour protection will also be
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: be incorporated into the design and the height of the protection above the seabed should
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: locally raised seabed. If the wave crests passing over the submerged scour protection are
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: scour protection and the use of shallow side slopes to transition from the seabed to the
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:135: around the perimeter of the rock armour protection. A worst-case footprint can therefore
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:136: waves from a range of directions, a circular footprint for the scour protection should be
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:136: In conclusion, if the recommendations for design of the outfall scour protection as
EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:136: Any effects resulting from the scour protection will then be limited to local, small-scale
EN010103-002295-Natural England.pdf:1:potential impact on the Teesmouth and Cleveland Coast Special Protection Area and Ramsar site.
EN010103-001206-NZT DCO 6.3.62 - ES Vol II Figure 15-3 Designated Sites - Oct 2021 Rev.2.0.pdf:1: Special Protection Area
EN010103-001508-TEXT_CAH1_Session1_NetZeroTeeside_11052022.pdf:11:matters are still capable of resolution through further changes and other protections in the DCO. And
EN010103-001508-TEXT_CAH1_Session1_NetZeroTeeside_11052022.pdf:12:protections that might be needed to avoid those harms. I don't believe that the underlying question of
EN010103-001508-TEXT_CAH1_Session1_NetZeroTeeside_11052022.pdf:12:the protection is proportionate, and that it is secured in a way that either both parties are happy with
EN010103-001234-NZT - Regulation 32 Transboundary Screening (3).pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site.
EN010103-002609-Natural England - Any further information requested by the ExA under Rule 17 of the Examination Rules.pdf:2:ensures adverse effects on the Teesmouth and Cleveland Coast Special Protection Area and
EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:9:Special Protection Area (SPA) areas. Further details are provided in the integrated georeferenced database
EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf:24:present with the groundwater that may be tidally influenced. However, corrosion protection to buried steel could
EN010103-001366-NZTDCO 6.3.20 Rev 2 ES Addendum Vol II Figure 8-8 Maximum 24 Hour Mean NOx Process Contribution.pdf:1: Special Protection Area
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:12: Teesmouth and Cleveland Coast Special Protection
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:17: to water environment protection: CIRIA documents and
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:26: required for active fire protection.
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:38: protections afforded and to reinforce the role of the
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:52: as well as the Centre for the Protection of National
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:54: Measures for the protection of workers from potential
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:54: administrative controls, personal protection
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:83: also enable sufficient time to implement protection
EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:85: scour protection would need to be installed around the
EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:16: • The positioning of rock armouring / scour protection around the outfall head;
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:55: square metres of unnamed Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:56: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:63: square metres of grassland, Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:64: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:65: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:69: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:70: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:75: square metres of unnamed Limited Protection of Birds Transmission Plc
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:76: square metres of grassland Limited Protection of Birds Transmission Plc
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:80: square metres of grassland Limited Protection of Birds Transmission Plc
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:80: square metres of private Limited Protection of Birds Transmission Plc
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:81: square metres of grassland Limited Protection of Birds Transmission Plc
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:89: metres of unnamed track Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:91: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:92: square metres of grassland Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:94: metres of grassland west of Limited Protection of Birds Limited
EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf:95: square metres of grassland Limited Protection of Birds Limited
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:3:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:3: 232a, 252, 253, 253a, protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:4: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:4: Occupier 158a, 166a, 171a, protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:4: 469, 470, 472, 473, by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:4: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:6: 10, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:6: 135, 138a, 141a protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:6: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:6: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: – Owner 6, 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:7: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:8: 165, 166, 166b, 168, by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:8: 184, 185, 190, 190b, considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:12: Petroleum Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:12: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: Production (U.K.) – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:13: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:14: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:14: 5c, 6, 8, protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:14: 459, 467, 469, 470, by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:14: 489, 493, 495, 496, considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:15: Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:15: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:15: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:15: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:15: Company Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:16: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:16: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:16: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:16: Limited – Owner 6, 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:16: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:17: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:17: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:17: – Owner 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:17: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:18: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:18: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:19: Environmental – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:19: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:19: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:19: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: Limited – Owner 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: Limited – Owner 6, 9b, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:20: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:21: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:21: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:21: Biofuels Teesside – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:21: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:21: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: (b) - protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: Environmental – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:22: Occupier 362, 363, 367, 370, protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:23: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:23: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:24: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:24: Occupier 138a, 141a, 142a, protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:24: 165, 166, 169, 171, by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:24: 185, 185b, 190, 190b, considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:27: provide protection for One-Dyas
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:27: Services (UK) – Owner 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:27: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:27: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:27: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: Plc – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:28: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:29: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:29: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:29: Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:29: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:30: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:30: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:30: Chemical UK – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:30: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:30: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:31: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:34: Petroleum UK – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:34: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:34: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:34: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:35: Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:35: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:35: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:35: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:36: Plc – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:36: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:37: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:37: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:37:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:37: 31, 343, 347, 360, 98 provisions and asset protection agreement during
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:38: Processing Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:38: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:38: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:38: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:41: 533, 416, 431, 508, protection for One-Dyas UK as
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:42: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part writing to
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:42: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:43: Limited protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:43: protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:44: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:44: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:44: Limited protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:44: protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:44: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:45: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:45: Limited 6, 9b, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:45: 171a, 176a, 183a, protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:45: 184, 185, 185b, 186, by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:45: 191b, 191d, 192, 194, considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:47: the Protection of – Owner 10 land adjacent to the existing entry, 168
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:48: UK Plc – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:48: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:48: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:48: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:51: Transportation – Owner 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:51: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:51: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:51: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:53: Energy Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:53: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:54: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:54: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:69: – Owner 6, 10 protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:69: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:69: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:70: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:70: Specialties UK – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:70: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:70: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: Energy Limited – Owner protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: Occupier protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: considered adequate protection
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:71: Occupier (b) - protection of electricity, gas,
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:72: by the protection offered by
EN010103-002072-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) August 2022 (D6).pdf:72: considered adequate protection
EN010103-001797-NZT DCO 9.10 - Applicants' Comments on Deadline 1 submissions - June 2022.pdf:3:SPA Special Protection Areas
EN010103-001797-NZT DCO 9.10 - Applicants' Comments on Deadline 1 submissions - June 2022.pdf:15: to be included within the Net Zero Teeside DCO for the benefit and protection of
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:1:2 Air Products Plc RR-21B Category 1 No (a) - 6, 9b, (d) Negotiations between parties An asset protection Yes - REP1-020 A response is
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:2: and asset protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:2: Exploration – Owner 4, 5c, 6, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:2: Occupier 158a, 166a, 171a, protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:2: 469, 470, 472, 473, by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:2: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:4: 10, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:4: 135, 138a, 141a protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: – Owner 6, 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:5: – Owner 403, 450, 112 2b, 3a, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:6: Occupier (b) 12a, 142a, 184a, 10 protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:6: 169, 171, 171b, 172, by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:6: 191, 191a, 191d, 194, considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:10: Petroleum Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:10: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: Production (U.K.) – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:11: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:12: Limited 476, 479, 482, 540b, 3b, 4, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:12: 5c, 6, 8, protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:12: 459, 467, 469, 470, by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:12: 489, 493, 495, 496, considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:13: Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:13: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:13: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:13: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:13: Company Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:14: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:14: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:14: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:14: Limited – Owner 6, 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:14: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:15: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:15: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:16: – Owner 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:16: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:16: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:16: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:17: Environmental – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:17: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:17: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: Limited – Owner 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: Limited – Owner 6, 9b, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:18: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:19: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:19: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:19: Biofuels Teesside – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:19: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: Holding Limited 330, 333 6, 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: (b) - protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:20: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:21: Environmental – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:21: Occupier 362, 363, 367, 370, protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:21: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:21: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:22: Polymers Limited – Owner 6, 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:22: Occupier 138a, 141a, 142a, protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:22: 165, 166, 169, 171, by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:22: 185, 185b, 190, 190b, considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:25: provide protection for One-Dyas
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:25: Services (UK) – Owner 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:25: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:25: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:25: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: Plc – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:26: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:27: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:27: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:27: Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:27: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:28: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:28: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:28: Chemical UK – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:28: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:28: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:29: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:32: Petroleum UK – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:32: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:32: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:32: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:33: Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:33: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:33: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:33: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:34: Plc – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:34: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:35: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:35: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:35:52 Northern Gas REP1-013 Category 1 Yes (a) - 2a, 5c, (d) The Applicants have been in An asset protection Yes – REP1-013 The Applicants await
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:35: 31, 343, 347, 360, 98 provisions and asset protection agreement during
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:36: Processing Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:36: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:36: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:36: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:39: 533, 416, 431, 508, protection for One-Dyas UK as
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:40: Limited – Owner 341, 346, 361, 364, 3a, 5c, protection in the draft DCO (Part writing to
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:40: Occupier 396, 402, 403, 414, 9a, 10 protection of operators of and an update will
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:41: Limited protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:41: protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: Limited protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:42: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:43: Limited 6, 9b, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:43: 171a, 176a, 183a, protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:43: 184, 185, 185b, 186, by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:43: 191b, 191d, 192, 194, considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:45: the Protection of – Owner 10 land adjacent to the existing 168
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:46: UK Plc – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:46: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:46: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:46: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:49: Transportation – Owner 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:49: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:49: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:49: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:51: Energy Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:51: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:51: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:51: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:67: – Owner 6, 10 protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:67: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:67: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:67: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:68: Specialties UK – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:68: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:68: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:68: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: Energy Limited – Owner protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: Occupier protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: considered adequate protection
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: Limited – Owner 330, 333 5c, 6, protection in the draft DCO (Part
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:69: Occupier (b) - protection of electricity, gas,
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:70: by the protection offered by
EN010103-002181-NZT DCO 9.5 - Compulsory Acquisition Schedule Sept 2022(D7) (Tracked).pdf:70: considered adequate protection
EN010103-002298-'s Legal Opinion.pdf:8: protection of the environment and of nature conservation sites of the highest
EN010103-002298-'s Legal Opinion.pdf:10: public/general interest served by the measure and the protection of the affected
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:3: SPA Special Protection Area
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:4:5.0 The Teesmouth and Cleveland Coast Special Protection Area and Ramsar ………….. 15
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:6: Special Protection Area (SPA) and Ramsar site;
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:15:5.0 THE TEESMOUTH AND CLEVELAND COAST SPECIAL PROTECTION AREA
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:15: seabird protection within the SPA network.
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:36:and how this may impact the Teesside and Cleveland Coast Special Protection Area/Ramsar site,
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:182:Teesside and Cleveland Coast Special Protection Area/Ramsar site, including parts of Tees Bay and
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:187:Tees Estuary which forms part of the Teesside and Cleveland Coast Special Protection Area and
EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:195: protection to sensitive environmental receptors within the Tees Bay and Tees Estuary the 3D
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:20: will either be above ground or tunnel. Protection will be installed within the
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:20: Protection of adjacent assets and
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:65: Protection (OEP) has been brought into effect but is yet to receive its
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:69: Cleveland Coast Special Protection Area and Ramsar are assessed within
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:77: Protection (OEP) has been brought into effect but is yet to receive its
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:78: Special Protection Areas. As a matter of policy, the following should be given
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:78: the same protection as sites covered by the Habitat’s Regulations: potential
EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:78: Special Protection Areas and possible Special Areas of Conservation; listed
EN010103-002324-NZT DCO 9.38 - Applicants' Comments on Deadline 8 Submissions Oct 2022 (D9).pdf:3: SPA Special Protection Areas
EN010103-002324-NZT DCO 9.38 - Applicants' Comments on Deadline 8 Submissions Oct 2022 (D9).pdf:9: Site Protection and Monitoring Plan (SPMP). This was communicated to the EA at the
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:62: 1 34 New Rights over 405.26 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:64: 1 34a Temporary Use of 1305.21 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:72: 1 39 New Rights over 3352.89 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:73: 1 39a Temporary Use of 4772.73 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:74: 1 39b Temporary Use of 1489.86 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:79: 1 43 New Rights over 304.51 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:79: 1 43a Temporary Use over 1114.11 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:86: 2 47 New Rights over 1193.49 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:87: 2 47a Temporary Use of 4157.65 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:91: 2 53 Temporary Use of 1497.61 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:92: 2 54 Temporary Use of 166.04 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:93: 2 55 Temporary Use of 319.88 Sembcorp Utilities (UK) Limited Royal Society for the Protection National Grid Electricity
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:103: 2 61 New Rights over 46.71 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:105: 2 63 New Rights over 2503.46 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:106: 2 63a Temporary Use of 8761.58 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:108: 2 66 New Rights over 53.93 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf:109: 2 66a Temporary Use of 1388.84 Sembcorp Utilities (UK) Limited Royal Society for the Protection ICI Chemicals & Polymers
EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:48: Spoil management, and protection from high rainfall events;
EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:56: - providing protection from damaging
EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:3: SPA Special Protection Areas
EN010103-002438-South Tees Development Corporation - Other- STDC’s Final Summary of Outstanding Objections and Closing Submissions.pdf:5: 3.7.2 Requirement no. 4 – Landscaping and biodiversity protection management and
EN010103-002438-South Tees Development Corporation - Other- STDC’s Final Summary of Outstanding Objections and Closing Submissions.pdf:9: place on STDC’s land. Without such protection, and in the absence of agreement on
EN010103-002438-South Tees Development Corporation - Other- STDC’s Final Summary of Outstanding Objections and Closing Submissions.pdf:11: seeking the same level of protection from Anglo American at Schedule 3 to the DCO [REP8-
EN010103-002438-South Tees Development Corporation - Other- STDC’s Final Summary of Outstanding Objections and Closing Submissions.pdf:11: is reasonable and proportionate for STDC to receive the same level of protection from
EN010103-001916-NZT DCO 9.21 - Notification of Further Proposed Changes and Update on Remaining Optionality July 2022 (D4).pdf:3: SPA Special Protection Areas
EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:14: protection measures are
EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:14: measures for protection
EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:18: Cleveland Coast Special Protection Area (SPA) site and Ramsar site. Ridge
EN010103-002409-NZT DCO - 9.45 Written Summary of Oral Submission for ISH6 - Oct 2022 (D11).pdf:6: • The potential effect of rock armouring / scour protection associated with
EN010103-002409-NZT DCO - 9.45 Written Summary of Oral Submission for ISH6 - Oct 2022 (D11).pdf:6: Special Protection Area (SPA) and Ramsar site in the Habitats Regulations
EN010103-002409-NZT DCO - 9.45 Written Summary of Oral Submission for ISH6 - Oct 2022 (D11).pdf:10: Potential effects of rock armouring and scour protection:
EN010103-002409-NZT DCO - 9.45 Written Summary of Oral Submission for ISH6 - Oct 2022 (D11).pdf:10: protection associated with the proposed new outfall head on the SPA/Ramsar is assessed in Section 4.2.49 in the
EN010103-001234-NZT - Regulation 32 Transboundary Screening.pdf:2: Protection Area (SPA), potential SPA (pSPA) and Ramsar site.
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:4:Source Protection Zones
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:8: the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh equivalents) and Local Authorities; and highlights
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:8: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature Reserve data (derived from Ordnance
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:9:Source Protection Zones
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:11:Radon Potential - Radon Protection Measures n/a
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:12:Special Protection Areas
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:35: Radon Potential - Radon Protection Measures
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:35: Protection Measure: No radon protective measures are necessary in the construction of new A10NE 0 1 455000
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:36: Radon Potential - Radon Protection Measures
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:36: Protection Measure: No radon protective measures are necessary in the construction of new A12NW 0 1 455936
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:36: Radon Potential - Radon Protection Measures
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:36: Protection Measure: No radon protective measures are necessary in the construction of new A12NW 0 1 455936
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:44:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:44:Source Protection Zones
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:47:Radon Potential - Radon Protection Measures
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:48:Special Protection Areas
EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:49: Scottish Environment Protection Agency
EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:3: are largely part copied from the protective provisions incorporated for the protection of Sembcorp
EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:4: Wilton Complex). In addition, the Sembcorp gas pipeline(s) protection strip, as well as
EN010103-002464-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 21.pdf:4: shows the Sembcorp gas pipeline protection strip in the north west.
EN010103-001721-Air Products Plc and Air Products Renewable Energy Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:1: the impact on AP’s existing Infrastructure and the method by which suitable protections
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:3: SPA Special Protection Area
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:3: SPZ Source Protection Zone for groundwater
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:5: Special Protection Area (SPA) / Ramsar, which is designated both for breeding birds
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:11: permeability Mercia Mudstone provide protection to the Sherwood Sandstone
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:28: overlying low-permeability superficial deposits. There are no source protection
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:34: (CEMP), detailing the environmental protection measures (e.g. safe materials
EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:39: and provide protection to the Sherwood Sandstone aquifer. Both strata are of
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:6: 191a, 202c, 218, 232a, a draft Asset Protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:7: Exploration 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:7: Occupier 161, 163, 164, 199, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:7: 137, 142, 142b, 143, caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:7: 171, 176, 176b, 185, adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:9: Plc 2 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:9: 138a, 141a protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:10: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:10: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:11: 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:11: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:11: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:11: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:12: 1 – Owner 450, 112 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:12: Occupier (b) 12a, 134, 142a, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:12: 185, 190, 191, 191a, caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:12: 31, 315, 316, 319, 320, adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:18: Petroleum 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:18: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: Production 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:19: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: Limited 2 476, 479, 482, 540b, protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: 502, 504, 505, 510, caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:22: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:23: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:23: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:23: Company 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:23: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:24: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:24: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:24: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:24: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:24: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:25: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:27: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:27: Occupier 161, 163 protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:27: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:27: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:28: Environmental 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:28: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:29: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:29: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:29: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:29: Occupier 160, 161, 163 protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:29: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:30: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:32: Teesside Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:32: Occupier 159, 160, 161, 163, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:33: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:33: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:33: Biofuels 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:33: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:34: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:34: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:34: Holding Limited 2 333 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:34: (b) - protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:35: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:35: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:35: Environmental 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:35: Occupier 363, 367, 370, 373, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:35: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:36: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:36: Polymers 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:36: Occupier 124e, 12a, 138a, 141a, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:37: 202c, 20a, 21, 218, 22, caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:37: 281, 284, 285, 286, 3, adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:39: provide protection for One-
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:40: Services (UK) 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:40: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:40: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:40: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:44: Matthey Plc 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:44: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:44: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:45: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:46: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:46: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:46: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:46: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:51: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:51: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:51: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:51: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:52: Chemical UK 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:52: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:52: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:52: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:56: Petroleum UK 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:56: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:56: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:57: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:57: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:57: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:57: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:57: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:58: Plc 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:58: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:59: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:59: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:59: Networks 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:59: Occupier 159, 160, 161, 163, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:59: 147, 148, 151, 152, protection is in place for the
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:60: Processing 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:60: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:60: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:60: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:64: provide protection for One-
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:67: Limited 2 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:67: protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:68: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:68: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:70: Limited 2 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:70: 142a, 154, 158a, 159, protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:71: 191b, 192, 194, 91, 92, caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:71: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:72: the Protection of 1 – Owner land adjacent to the existing
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:73: UK Plc 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:73: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:74: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:74: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:77: Transportation 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:78: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:78: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:78: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:80: Energy Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:80: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:80: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:80: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:89: Liquids 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:89: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:89: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:90: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:92: Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:92: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:93: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:93: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:94: Specialties UK 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:94: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:94: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:94: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: Energy Limited 1 – Owner protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: Occupier protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: adequate protection is in
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: Limited 1 – Owner 333 protection in the draft DCO
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:95: Occupier (b) - protection of electricity, gas,
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:96: caught by the protection
EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf:96: adequate protection is in
EN010103-002104-NZT DCO 6.3.53 - ES Vol II Figure 11-2 PCC Site Piling Construction Phase August 2022 (D6).pdf:1: Special Protection Area
EN010103-001993-NZT DCO 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5).pdf:3: SPA Special Protection Areas
EN010103-001993-NZT DCO 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5).pdf:17: protection plan must be submitted to and
EN010103-001893-NZT DCO 8.1 - RCBC SoCG (Tracked) July 2022 (D4).pdf:14: Protection Area 6km Buffer Zone/Ramsar Site &
EN010103-001893-NZT DCO 8.1 - RCBC SoCG (Tracked) July 2022 (D4).pdf:15: • STDC7 – Natural Environmental Protection and
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:11: Conservation Importance (SNCI), Special Protection Area (SPA), Ramsar Site and Teesmouth
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:17:the landscape by ensuring its continued protection and conservation for future generations.
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:17:• Ensure continued special protection, and conservation, of valuable estuarine marshes
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:17:• Supplement the protection of the landscape through the promotion of the estuarine marshes as
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:21:harbour walls provide coastal protection. Hadrian’s Wall World Heritage Site follows the river Tyne through Newcastle, meeting the
EN010103-001778-NZT DCO 9.8 - Appendix DLV.1.7 LCA Extracts - June 2022.pdf:23: MCA is also home to common and grey seals and protection was provided from Heugh Gun Battery
EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:8: are limited pathways for contact with contaminated soil. Protection
EN010103-002284-NZT DCO 8.2 - STBC SoCG - Sept 2022(D8) - final signed.pdf:2: SPA Special Protection Area
EN010103-001204-NZT DCO 6.3.56 - ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening) - Oct 2021 Rev.2.0.pdf:1: Special Protection Area
EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf:18: must commence until a scheme of protection and mitigation
EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf:20: protection of controlled waters.
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:11: Requirement 4(1) correctly specifies that a “landscaping and biodiversity protection
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:11: the plan submitted pursuant to paragraph 4(1) (the protection plan) needs to be in
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:11: strategy” encompasses measures for protection but also management and
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:11: enhancement. Accordingly both the “protection plan” under paragraph 4(1) and the
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:22: where appropriate from the respect of Work No 9); 4 ‘Landscaping and biodiversity protection management and
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:23: These include Requirements 4(1) to (3) ‘Landscape and biodiversity protection
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:23: species’; 16 ‘Construction environmental management plan’; 17 ‘Protection of highway
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:24: biodiversity protection management and enhancement’ (also requires the replacement of
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:33: Provisions Two are for the protection of particular types of statutory undertakers (Electricity, Gas,
EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:33: To understand the need to obtain (Part 2)). 17 are for the protection of particular named entities (Parts 3 to 19).
EN010103-001945-NZT ISH4 S1.pdf:4:As such, the planning inspectorate is subject to the General Data Protection Regulation. It's very
EN010103-001941-NZT CAH2 S1.pdf:2:can contain your personal information and to which the general data protection regulations apply.
EN010103-001941-NZT CAH2 S1.pdf:28:also, on the back of that to progress, the site agreement and protection provisions that are still under
EN010103-002726-Response from Redcar Bulk Terminal Limited.pdf:8: FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED
EN010103-002726-Response from Redcar Bulk Terminal Limited.pdf:8:171. For the protection of RBT, the following provisions have effect, unless otherwise agreed in
EN010103-001596-NZT DCO 8.15 - Vodafone and Cornerstone SoCG - May 2022.pdf:7:3.3.1 The parties agree that the protective provisions for the protection of Operators of
EN010103-001596-NZT DCO 8.15 - Vodafone and Cornerstone SoCG - May 2022.pdf:7: the Application (Part 2, Schedule 12) provide appropriate protection for Vodafone
EN010082-000572-National Grid response to DL7.pdf:1:ensure appropriate protection for the retained apparatus is maintained during and after
EN010082-000274-Internal Examination Library (2).pdf:16: Cleveland Coast Special Protection Area
EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:3:EPA Environmental Protection Act
EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:33: significant effect on a European site, or any site to which the same protection is applied as a
EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:41: energy NSIP, possible sources of nuisance under Section 79(1) of the Environmental Protection
EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:51: • height, position, insulation and protection (electrical or mechanical relating the effects of ‘EMFs in respect of the electricity connection in accordance with guidance
EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:10: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of the
EN010082-000012-Scoping Opinion.pdf:12: Protection Area (SPA) and Special Area of Conservation (SAC),
EN010082-000012-Scoping Opinion.pdf:33: would be awarded the same level of protection as a SPA. The
EN010082-000012-Scoping Opinion.pdf:40: (SCIs), Special Areas of Conservation (SACs) and candidate SACs, Special Protection
EN010082-000012-Scoping Opinion.pdf:41: protection as European sites: possible SACs (pSACs); potential SPAs
EN010082-000012-Scoping Opinion.pdf:42: NCB the DCO requirements which will provide protection for the SSSI
EN010082-000012-Scoping Opinion.pdf:44: establishes a framework for the protection of inland surface waters
EN010082-000012-Scoping Opinion.pdf:67:Teesmouth Special Protection Area
EN010082-000012-Scoping Opinion.pdf:67:the Teesmouth Special Protection Area (SPA). Details of this proposed expansion
EN010082-000012-Scoping Opinion.pdf:87:sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall within the
EN010082-000012-Scoping Opinion.pdf:87:the National Planning Policy Framework requires that potential Special Protection Areas, possible
EN010082-000012-Scoping Opinion.pdf:88:(Special Areas of Conservation, Special Protection Areas and Ramsar sites)
EN010082-000012-Scoping Opinion.pdf:91:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra
EN010082-000012-Scoping Opinion.pdf:96:phase of the above application. Our response focuses on health protection issues
EN010082-000012-Scoping Opinion.pdf:97:Health Protection Scientist
EN010082-000012-Scoping Opinion.pdf:103:In March 2004, the National Radiological Protection Board, NRPB (now part of PHE),
EN010082-000012-Scoping Opinion.pdf:103:published by the International Commission on Non-ionizing Radiation Protection
EN010082-000012-Scoping Opinion.pdf:106: ‘contaminated land’ under Part 2A of the Environmental Protection Act
EN010082-000012-Scoping Opinion.pdf:109:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
EN010082-000012-Scoping Opinion.pdf:110:Redcar and Cleveland Borough Council Environmental Protection (Contamination)
EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:7: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000361-Appendix A - DCO 6.3.14_Tees CCPP_ES_Annex H_HRA_UPDATED 230418.pdf:2:Special Areas of Conservation (cSACs), Special Protection Areas (SPAs), possible SACs (pSACs), potential SPAs (pSPAs)
EN010082-000361-Appendix A - DCO 6.3.14_Tees CCPP_ES_Annex H_HRA_UPDATED 230418.pdf:9: o Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000361-Appendix A - DCO 6.3.14_Tees CCPP_ES_Annex H_HRA_UPDATED 230418.pdf:14: albifrons and common tern; and Protection
EN010082-000361-Appendix A - DCO 6.3.14_Tees CCPP_ES_Annex H_HRA_UPDATED 230418.pdf:24:Teesmouth and Cleveland Coast Special Protection Area and Ramsar site and
EN010082-000188-EN010082-6.2.17-ES Chapter 17-Mitigation Schedule-Final-November 2017.pdf:5: protection to carriageway surfaces (if necessary),
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:9: • Tees and Cleveland Coast Special Protection Area (“SPA”);
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:11:protections that may be required. The Secretary of State therefore has no reason to
EN010082-000379-6.2.5 - Tees CCPP - ES Chapter 5 Project Description - tracked Rev 2 with figures.pdf:16: authorities, including identification of suitable routes, temporary protection to
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:27: environment, to ensure a high level of protection of the environment as a
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:27: of species protection. The Directive protects over 1,000 animals and
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:28:3.3.20. The Birds Directive is a comprehensive scheme of protection for all wild
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:28: the protection of habitats for endangered as well as migratory species. It
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:28: requires classification of areas as Special Protection Areas (SPAs)
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:29: Special Protection Areas (SPAs) designated pursuant to the Birds
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:31: countryside protection and National Parks; and Public Rights of Way
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:31:3.4.6. National Parks and AONBs have statutory protection in order to conserve
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:31: protection and management of SSSIs.
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:32: protection is afforded through the development management process as
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:32: Environmental Protection Act 1990
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:32:3.4.15. S79(1) of the Environmental Protection Act 1990 identifies a number of
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:33: protection to waterbodies and water resources from abstraction
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:38: Environmental protection;
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:38:4.3.3. The Environmental Protection (Nuisance) consultee requested that
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:38:4.3.4. The Environmental Protection (Contamination) consultee requested the
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:47: against standards and guidelines for the protection of human health (ES
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:47: and levels for the protection of sensitive ecology (ES Table 7.4). The
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:79: prevent a creeping background and to offer a level of protection for
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:92: Special Protection Areas (SPAs), possible SACs, potential SPAs, Ramsar sites,
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:94: protection as if they were a designated habitat site.
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:119: and any protections that may require and as such NGET are satisfied that
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:127: proceed. These leases will cover NGET rights and any protections that
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:147: Cleveland Coast Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:157:pSPA Potential Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:157:SPA Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:165: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000654-TEES Final Recommendation Report and Errata.pdf:166:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-Advice-00004-1-Tees CCPP note of site visit and meeting on 2 March 2017.pdf:3:the proposed extension of the Teesmouth and Cleveland Coast Special Protection Area
EN010082-Advice-00004-1-Tees CCPP note of site visit and meeting on 2 March 2017.pdf:3:Government policy would be awarded the same level of protection as a SPA.
EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:8: Nuisance and Protection Act 1990 (EPA 1990) and how they can be mitigated or
EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:19: Policy ED6 for the protection of employment areas. With regards to emerging
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:10: Groundwater Directive 80/68/EEC) 93 WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:12: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:22: identification of suitable routes, temporary protection to
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:31: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:34: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:6:Environmental Protection as follows: I note a scoping report has been submitted in support of this application to provide
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:11: under the Water Framework Directive and source protection zones (SPZs)
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:12: Environmental Protection The Contaminated Land Statutory Guidance
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:13: Contaminated Land Environmental Protection Act 1990; however,
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:13: Environmental Protection Act 1990 (’the 1990
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:13: Protection Act 1990 (’Part 2A’) which
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:13: 80/68/EEC) (Water Protection Zones); Part 2A EPA 1990
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:18: in the hydrologic cycle (drainage, flood protection, assimilation of
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:19: regulating service in the hydrologic cycle e.g. in terms of flood protection
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:19: businesses, or is important in terms of national resource protection
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:32: groundwater Source Protection Zone (SPZ) of any type. The UK EA no
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:34: Protection Zone (SPZ) of any type. The UK EA no longer update the Water
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:36: abstraction licences, safeguard zones or source protection zones in the region
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:37: Special Protection Area (SPA)
EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:41:6.117 The Tees Estuary is a Special Protection Area (SPA) under the Habitats
EN010082-000274-Internal Examination Library.pdf:16: Cleveland Coast Special Protection Area
EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:3: • Teesmouth and Cleveland Coast Special Protection Area
EN010082-000432-244690 EN010082 Natural England Written Representations Tees CCPP - Final.pdf:3:Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar Site;
EN010082-000432-244690 EN010082 Natural England Written Representations Tees CCPP - Final.pdf:7: Cleveland Coast Special Protection Area (SPA) response includes the questions asked by the
EN010082-000432-244690 EN010082 Natural England Written Representations Tees CCPP - Final.pdf:7: Special Protection Area (SPA) and Ramsar site
EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:9:14.18 NPS EN-5 makes reference to health protection guidelines for public and
EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:9: Radiation Protection (ICNIRP) developed health protection guidelines in 1998
EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:19: (2) Europa DG Health and Consumer Protection available at
EN010082-000267-TEES CCPP Section 55 Acceptance of Applications Checklist Final.pdf:14: have had regard to responses received are environmental protection issues raised by
EN010082-000267-TEES CCPP Section 55 Acceptance of Applications Checklist Final.pdf:16: Protection Act 1990 (statutory nuisances) and if so how
EN010082-000210-EN010082-6.3.20-ES Annex L-CEMP-Final-November 2017.pdf:11: obtrusive glare, practice and environmental protection in detailed in detailed CEMP.
EN010082-000210-EN010082-6.3.20-ES Annex L-CEMP-Final-November 2017.pdf:12: controlled waters) if Environmental Protection Act 1990
EN010082-000482-National Grid Representation D3.pdf:1:ensure appropriate protection for the retained apparatus is maintained during and after
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:10: Groundwater Directive 80/68/EEC) WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:11: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:22: routes, temporary protection to carriageway surfaces (if necessary), statutory undertakers’ plant and
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:28: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:31: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000274-Internal Examination Library (3).pdf:16: Cleveland Coast Special Protection Area
EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:10: protection of employment areas. Policy CS4 will be replaced by Policy LS4
EN010082-000556-7.4 - Tees CCPP - Environment Agency SoCG - DRAFT UNSIGNED - 22.08.18.pdf:7: Cleveland Special Protection Area ‘HRA’ APP-076).
EN010082-000556-7.4 - Tees CCPP - Environment Agency SoCG - DRAFT UNSIGNED - 22.08.18.pdf:10: sites (Special Areas of Conservation (‘SACs’), Special Protection Areas (‘SPAs’) and Ramsar sites),
EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:11: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of the
EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:6: 9. —(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000651-Tees CCPP HRA FINAL April 2019 (1).pdf:4: • Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000651-Tees CCPP HRA FINAL April 2019 (1).pdf:5: extend beyond the boundaries of the pSPA. The purpose of the extension is afford the sa me protection to habitats
EN010082-000651-Tees CCPP HRA FINAL April 2019 (1).pdf:7: extent of the pSPA boundries. The pSPA affords protection to the same species as the
EN010082-000651-Tees CCPP HRA FINAL April 2019 (1).pdf:8:6.9 Due to the overlap in location and the overlap in the protection afforded to SAC habitats
EN010082-000405-8.10 - Tees CCPP - Updated Mitigation Table.pdf:2: protection to carriageway surfaces (if necessary),
EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:2: SPA Special Protection Area
EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:8: requires that potential Special Protection Document Ref: 6.3.12). Any effects on the
EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:8: Date: 07 July 2017 Cleveland Coast Special Protection Area Ref: 6.3.12).
EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:11: • Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site, 3.9 km NW
EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:20: Special Protection Area (SPA), the PC is 0.301 ug/m3, which is 1.003% PC/CL. This is incorrectly
EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:9: Protection Zone (SPZ) of any type. The UK EA no longer make Water
EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:16: exceedances of the Project Site’s Site Protection and Monitoring
EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf:27: Protection Zone (SPZ) of any type. The groundwater resources at the Project
EN010082-000555-8.50 - Tees CCPP - Applicant's Comments on Responses to the ExA's SWQs - Deadline 6 - FINAL - 22.08.18.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000555-8.50 - Tees CCPP - Applicant's Comments on Responses to the ExA's SWQs - Deadline 6 - FINAL - 22.08.18.pdf:3:SPA Special Protection Area
EN010082-000651-Tees CCPP HRA FINAL April 2019.pdf:4: • Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000651-Tees CCPP HRA FINAL April 2019.pdf:5: extend beyond the boundaries of the pSPA. The purpose of the extension is afford the sa me protection to habitats
EN010082-000651-Tees CCPP HRA FINAL April 2019.pdf:7: extent of the pSPA boundries. The pSPA affords protection to the same species as the
EN010082-000651-Tees CCPP HRA FINAL April 2019.pdf:8:6.9 Due to the overlap in location and the overlap in the protection afforded to SAC habitats
EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:9: of the Environmental Protection Act 1990 (as amended)
EN010082-000340-TEES - 180412 - Note of Unaccompanied Site Inspection 14 March 2018docx.pdf:2:designated as both a Special Protection Area and a Ramsar site and
EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (1).pdf:11:Significant Effects Report REP1-001 consider the Teesmouth and Cleveland Coast Special Protection
EN010082-000438-North York Moors SPA citation.pdf:1: Special Protection Area (SPA)
EN010082-000438-North York Moors SPA citation.pdf:1:been recommended has a Special Protection Area because of the site’s European Ornithological
EN010082-000438-North York Moors SPA citation.pdf:1:North York Moors was classified as a Special Protection Area on 12 May 2000.
EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:2:SPA Special Protection Area
EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:8: Plc NATIONAL GRID ELECTRICITY INFRASTRUCTURE IN THE VICINITY OF THE leases will cover NGET rights and any protections that it may require and, as such, NGET is satisfied that it does not
EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:8: provisions to be put in place to ensure appropriate protection for the retained apparatus is
EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:11: 2.1.1. Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar Site;
EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:13: Royal Mail therefore wishes to ensure the protection of its future ability to provide an diversions/ 1,700 MWe CCGT. It is notable, however, that this road is part of the Strategic Road Network and designed to carry
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:3:SPA Special Protection Area
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:9:Q1.1.10 Applicant Whilst acknowledging that the majority of land uses to the north of the The air quality standards and guidelines for the protection of sensitive human receptors apply at all off-site locations. On this basis, the
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:10: assessment, taking account of the IAQM guidance which defines ‘Screening risk site. Therefore, these measures will be suitable for the protection of all sensitive receptors, irrespective of distance from the
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:12: they are effective and the extent to which they have been relied upon in the In terms of enforcement, the local authority have powers under the Environmental Protection Act 1990 to issue abatement notices for
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:13: scope of surveys. Reference is made to ‘off-site effects on the Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Ramsar site’ (ES
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:13: Protection Area (SPA) and Ramsar site’ ES Table 9.1. Coast, which had a proposed extension, which NE wanted to highlight to the Applicant. This was to make sure the assessment included
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:49: how the International Commission on Non-Ionising Radiation Protection Project, there will be no new EMF effects associated with their use for the Project.
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:50: site and comply fully with the International Commission on Non-Ionizing Radiation Protection (ICNIRP) Guidelines.
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:50: (Table 15.1) APP-057, in response to the comments of National Grid it is site and comply fully with the International Commission on Non-Ionizing Radiation Protection (ICNIRP) Guidelines.
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:51: 15.3) and operation (Table 15.4) APP-056. together. The operational area would be segregated from the construction area for the protection of workers and the integrity of the
EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:52: suitable routes, temporary protection to carriageway surfaces (if necessary), statutory undertakers’ plant and equipment. The
EN010082-000651-Tees CCPP HRA FINAL April 2019 (2).pdf:4: • Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000651-Tees CCPP HRA FINAL April 2019 (2).pdf:5: extend beyond the boundaries of the pSPA. The purpose of the extension is afford the sa me protection to habitats
EN010082-000651-Tees CCPP HRA FINAL April 2019 (2).pdf:7: extent of the pSPA boundries. The pSPA affords protection to the same species as the
EN010082-000651-Tees CCPP HRA FINAL April 2019 (2).pdf:8:6.9 Due to the overlap in location and the overlap in the protection afforded to SAC habitats
EN010082-000571-Natural England's Response to DL7.pdf:2:1. Designation of Teesmouth and Cleveland Coast as a proposed Special Protection Area (pSPA), proposed Ramsar
EN010082-000502-8.13 - Tees CCPP - Figure C3.1.pdf:2: Special Protection Area (SPA)
EN010082-000478-Applicant’s Comments on the Environment Agency’s Written Representations D3.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000478-Applicant’s Comments on the Environment Agency’s Written Representations D3.pdf:3:SPA Special Protection Area
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:3:pSPA Potential Special Protection Area
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:3:SPA Special Protection Area
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:27:Data Protection Applicants should ensure the consultation The contact information (telephone numbers
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:27: report complies with the Data Protection and email addresses) of consultees have been
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:60: Principal Environmental Protection Officer on 27 June 2017. The email is provided at Appendix
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:72: Hazardous Gas Protection System will be provided as integral elements of the gas
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:83: Protection developer will be using as a baseline land condition
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:83: At the present time the Environmental Protection Team lish the location of NSRs around the Site, and to focus
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:86: Would hazardous Substances Consent be needed? The forced ventilation and a Hazardous Gas Protection System
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:99: Environmental Protection team visited the Wilton International site. Together with Sembcorp
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:280: your obligation under the Data Protection Act 1998 to process personal data fairly and
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:289: accordance with the Data Protection Act 1998 and will be used solely in connection with the consultation
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:327: Redcar and Cleveland Borough Council - Environmental Protection 1 of 2
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:327: R&CBC Environmental Protection
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:327: The Environmental Protection Team has reviewed the Preliminary Environmental
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:328: Redcar and Cleveland Borough Council - Environmental Protection 2 of 2
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:328: At the present time the Environmental Protection Team have no areas of concern
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:328: Environmental Protection
EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:357: to: Tees CCPP Consultation, c/o Sembcorp Utilities UK Post: Tees Combined Cycle Power Plant Project, c/o Sembcorp in accordance with the Data Protection Act 1998
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:10: Groundwater Directive 80/68/EEC) WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:11: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:22: identification of suitable routes, temporary protection to
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:29: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:33: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:9: • Tees and Cleveland Coast Special Protection Area (“SPA”);
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:11:protections that may be required. The Secretary of State therefore has no reason to
EN010082-000529-National grid.pdf:2:ensure appropriate protection for the retained apparatus is maintained during and after
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisa
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including nois
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so fo
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:10: Groundwater Directive 80/68/EEC) WRA 1991 (Water Protection Zones); Part 2A EPA 1990 an
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that wa
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:22: identification of suitable routes, temporary protection to
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:31: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP.
EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:35: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:3: • Teesmouth and Cleveland Coast Special Protection Area
EN010082-000440-North York Moors SPA Map.pdf:1: Special Protection Areas England © Natural England
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:6: Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:7:Redcar and Cleveland Borough Council Environmental Protection (Contamination)
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:8: • Environmental Protection
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:10:9.19. The Council's Environmental Protection Section have raised no objection to
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:10:Environmental Protection
EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:11: Council’s environmental protection section who have advised that during
EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:16: environmental protection objectives
EN010082-000562-Report on the Implications for European Sites.pdf:5:Conservation (SACs) and candidate SACs, Special Protection Areas (SPAs), possible SACs, potential SPAs,
EN010082-000562-Report on the Implications for European Sites.pdf:9: Special Protection Area (SPA) Sandwich tern (passage)
EN010082-000562-Report on the Implications for European Sites.pdf:9: proposed Special Protection Area existing SPA with the addition
EN010082-000562-Report on the Implications for European Sites.pdf:10: with UK Government policy and should be given the same protection as if
EN010082-000562-Report on the Implications for European Sites.pdf:10: A possible extension to the Teesmouth and Cleveland Coast Special Protection Area (TIN172) (2015) on-line:
EN010082-000202-EN010082-6.3.12-ES Annex G1-Effects of Air Quality-Final-November 2017.pdf:23: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site and
EN010082-000373-6.2.5 - Tees CCPP - ES Chapter 5 - Project Description - clean Rev 2 with figures.pdf:16: authorities, including identification of suitable routes, temporary protection to
EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:16: authorities, including identification of suitable routes, temporary protection to
EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:3:SPA Special Protection Area
EN010082-000207-EN010082-6.3.17-ES Annex I2-Draft Construction Traffic Management Plan-Final-November 2017.pdf:12: suitable routes, temporary protection to carriageway surfaces (if necessary),
EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000489-Applicant's response to the council's late D2 submission.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000489-Applicant's response to the council's late D2 submission.pdf:3:SPA Special Protection Area
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:5: Agency/Natural Resources Wales and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:5: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:6:Source Protection Zones
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:8:Radon Potential - Radon Protection Measures n/a n/a n/a
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:9:Special Protection Areas
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:36: Authority: Scottish Environment Protection Agency, Head Office
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:59: Radon Potential - Radon Protection Measures
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:59: Protection Measure: No radon protective measures are necessary in the construction of new A6NE 0 2 456527
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:85:Middlesbrough Council - Public Protection and Planning November 2013 Annual Rolling Update
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:85:Scottish Environment Protection Agency - Head Office January 1998 Not Applicable
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:86:Source Protection Zones
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:88:Radon Potential - Radon Protection Measures
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:89:Special Protection Areas
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:90: Scottish Environment Protection Agency
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:91: 5 Scottish Environment Protection Agency - Head Office Telephone: 01786 457700
EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:95:Source Protection Zones
EN010082-000367-Tees CCPP - Non-Material Change - Consultation Notice.pdf:3: Sembcorp in accordance with the Data Protection Act 1998.
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:27: environment, to ensure a high level of protection of the environment as a
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:27: of species protection. The Directive protects over 1,000 animals and
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:28:3.3.20. The Birds Directive is a comprehensive scheme of protection for all wild
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:28: the protection of habitats for endangered as well as migratory species. It
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:28: requires classification of areas as Special Protection Areas (SPAs)
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:29: Special Protection Areas (SPAs) designated pursuant to the Birds
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:31: countryside protection and National Parks; and Public Rights of Way
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:31:3.4.6. National Parks and AONBs have statutory protection in order to conserve
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:31: protection and management of SSSIs.
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:32: protection is afforded through the development management process as
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:32: Environmental Protection Act 1990
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:32:3.4.15. S79(1) of the Environmental Protection Act 1990 identifies a number of
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:33: protection to waterbodies and water resources from abstraction
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:38: Environmental protection;
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:38:4.3.3. The Environmental Protection (Nuisance) consultee requested that
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:38:4.3.4. The Environmental Protection (Contamination) consultee requested the
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:47: against standards and guidelines for the protection of human health (ES
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:47: and levels for the protection of sensitive ecology (ES Table 7.4). The
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:79: prevent a creeping background and to offer a level of protection for
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:92: Special Protection Areas (SPAs), possible SACs, potential SPAs, Ramsar sites,
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:94: protection as if they were a designated habitat site.
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:119: and any protections that may require and as such NGET are satisfied that
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:127: proceed. These leases will cover NGET rights and any protections that
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:147: Cleveland Coast Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:157:pSPA Potential Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:157:SPA Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:165: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:166:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:3:SPA Special Protection Area
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:9: construction mitigation is proposed through the Construction however enforcement under the Environmental Protection Act, for
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:18:1.9.1 Paragraph 8.8 of the Environmental Statement (ES) APP-050 The Environmental Protection Team has reviewed the Preliminary RCBC response to this question relates to the Preliminary Environmental Impact Report
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:19: At the present time the Environmental Protection Team have no areas of
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:19: 2017 (Table 8.1) APP-050 that anything above a 3dB(A) increase level of protection for nearby residential receptors. (Application Document Ref: 8.6) submitted at Deadline 2 of the Examination.
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:19:1.9.7 Draft DCO Req. 20 (2)(e) requires details of any works and This question has also been highlighted by the Environmental Protection Please refer to the Applicant’s Response to Examining Authority’s Written Questions
EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:20:1.9.14 In paragraph F1.3 of Annex F2 APP-072 it is stated that it is not Environmental Protection do not agree with this point as it would be Please refer to the Applicant’s Response to Examining Authority’s Written Questions
EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:12: if they do occur, thereby making it possible to ensure a high level of protection
EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:22: protection system are provided as integral elements of the gas turbine
EN010082-000653-Tees CCPP - Correspondence received after the close of Examination.pdf:11:Significant Effects Report REP1-001 consider the Teesmouth and Cleveland Coast Special Protection
EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000350-Placeholder for ExA's Written Questions.pdf:8: on the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site’ ES Table 9.1.
EN010082-000350-Placeholder for ExA's Written Questions.pdf:45: Commission on Non-Ionising Radiation Protection (ICNIRP) guidelines to prevent the effects of
EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:7: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000481-National Grid Cover letter.pdf:1:Please ensure you have adequate virus protection before you open or detach any
EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:7: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000316-TEES - Final Rule 6 letter.pdf:9: Radiation Protection (ICNIRP) guidelines
EN010082-000316-TEES - Final Rule 6 letter.pdf:23: the draft DCO APP-005 for the protection of the interests,
EN010082-000316-TEES - Final Rule 6 letter.pdf:25: protection of the interests, statutory role and functions of NGET or
EN010082-000483-Natural England D3 Submission.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar
EN010082-000483-Natural England D3 Submission.pdf:1:Protection Area and Ramsar site and has no objection.
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:2: the protection of human health and sensitive ecology. The baseline air quality
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:6: Parts of the National Park are designated as the North York Moors Special Protection Area (SPA) and Special and SSSIs. The assessment includes
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:9: Teesmouth Special Protection Area. We wish to inform the operator/applicant that there is a proposed The extension to the SPA has been
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:9: expansion of the Teesmouth Special Protection Area (SPA). Details of this proposed expansion to the SPA are considered.
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:10: Protection Area (SPA), the PC is 0.301 µg/m3, which is 1.003% PC/CL. This is incorrectly classed as <1% in the presented in PEIR Annex H was
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:13: standards and protection of natural habitats; sets
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:14: Regulations 2010 (3). This Directive requires the protection of certain sites
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:14: including Special Areas of Conservation (SACs), Special Protection Areas
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:14: • air quality standards (AQS) for NO x (annual mean) for the protection of
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:17: Environmental Protection Act 1990
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:17:7.36 Section 79(1) of the Environmental Protection Act 1990 (EPA 1990) states:
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:18: and guidelines for the protection of human health, and when considering
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:18: operational emissions, critical loads and levels for the protection of sensitive
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:19:Table 7.3 Air Quality Criteria for the Protection of Human Health
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:19: Assessment Criteria for the Protection of Sensitive Ecological Receptors
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:28: Loads’ (CLs) set for the protection of sites designated under the Habitats
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:29:7.82 The air quality standards and guidelines for the protection of sensitive human
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:30: • European designated sites: Special Protection Areas (SPAs), Special Areas
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:34: Wetlands Special Protection Area (SPA)
EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:41: SSSI Special Protection Area (SPA)
EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:7:9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act 1990
EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:7:Protection Act 1990) does not apply where the consent relates to the use of premises by the undertaker for
EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:10: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of the
EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:13: protection of the interests, statutory role and functions of NGET or other electricity, gas, water or
EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:3:SPA Special Protection Area
EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:8: As the permitting process is separate from the DCO process, limit values than those in legislation to provide protection for the
EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:13: 75m is the lowest stack height at which impacts on sensitive protection of the environment.
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:5: Framework requires that potential Special Protection Areas…… should be Any effects on the Teesmouth & Cleveland Coast pSPA
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:6: Coast Special Protection Area (SPA) and Ramsar site
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:8: Government policy would be awarded the same level of protection as a SPA. The (avocet and common tern).
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:10: the Teesmouth Special Protection Area (SPA). Details of this proposed expansion bring the SPA around 200m closer at its nearest point (in
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:13: of wild birds in Europe by introducing a general framework of protection.
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:13: Special Protection Areas (SPAs) for rare or vulnerable species listed in Annex I
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14: protection for these habitats and species of European importance. Included
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14: protection for species listed on Annex IV of the Directive (referred to as
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14: designation and protection of ‘European Sites’, the protection of ‘European
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14: protection of European Sites. This legislation is the principal means by which
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14:9.24 The WCA is the major legal instrument for wildlife protection in the UK, and
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14:9.26 Wild animals listed in Schedule 5 of the Act are subject to specific protection
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:14: protection;
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:15: listed on Schedule 1. It also provides a level of protection to plants listed in
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:15:9.28 Part III of the CRoW Act deals specifically with wildlife protection and nature
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:15: protection of designated SSSIs. In addition, it increases the legal protection of
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:21: Protection Area The proposed expansion to the SPA (pSPA) will only
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:21: Coast Special Protection (79/409/EEC) by supporting populations of European
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:22:Special Protection Area (79/409/EEC) by supporting populations of European
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:25: Wetlands Special Protection Area (SPA)
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:28: Badger The Protection of 2 km Formerly found in Wilton Woods
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:31: Protection Area
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:31: Coast Special Protection Area
EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:31: Protection Area
EN010082-000391-7 5 - Tees CCPP - SoCG with National Grid - Signed_Redacted.pdf:7: proceed. These leases will cover NGET rights and any protections that they may require and as such
EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:11: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of the
EN010082-000197-EN010082-6.3.7-ES Annex D4-Waste Management Plan-Final-November 2017.pdf:5: protection and conservation of the environment across land,
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:10: Groundwater Directive 80/68/EEC) 93 WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:12: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:22: identification of suitable routes, temporary protection to
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:31: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:34: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000274-Internal Examination Library (1).pdf:16: Cleveland Coast Special Protection Area
EN010082-000461-Teesmouth & Cleveland Coast SPA.pdf:1: Special Protection Area (SPA)
EN010082-000461-Teesmouth & Cleveland Coast SPA.pdf:1:The Teesmouth and Cleveland Coast Special Protection Area is a wetland of European
EN010082-000461-Teesmouth & Cleveland Coast SPA.pdf:2:1) Teesmouth and Cleveland Coast was classified as a Special Protection Area on 15 August
EN010082-000400-8 27 - Mike Gent email_Redacted.pdf:1:Environmental Protection
EN010082-000403-6.3.17 - Tees CCPP - Annex I2-Draft Construction Traffic Management Plan - UPDATED.pdf:13: suitable routes, temporary protection to carriageway surfaces (if necessary),
EN010082-000415-8.20 - Natural England letter.pdf:1: Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site through
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:7: 4th November Site Protection and Monitoring Programme, prepared internally, ref:
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:8:The site is not located within a designated Source Protection Zone. There are no
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:11:A Site Protection and Monitoring Plan was prepared by PX Ltd (former site owners) in
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:11:of the Site Protection and Monitoring Programme for Teesside Power Station dated February
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:16:A Site Protection and Monitoring Plan was prepared by PX Ltd (former site owners) in
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:16:presented in the Application Site Protection and Monitoring Plan (SPMP) Report (dated
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:19: ‘limits’ presented in the Application Site Protection and Monitoring Plan (SPMP) Report
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:30: x a Site Protection and Monitoring Plan was prepared by PX Ltd (former site owners)
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:30:of the Site Protection and Monitoring Programme for Teesside Power Station dated February
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:34: The site is not located within a designated Source Protection Zone. There are no groundwater
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:39:well locations were generally positioned on concrete to ensure protection of the monitoring
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:48:Under Part 2A of the Environmental Protection Act 1990 Section 78A(2), “contaminated
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:50:protection of human health in relation to a commercial end use. No further discussion or
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:59:According to the Site Protection and Monitoring Plan (February 2007), biannual groundwater
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:64: The site is not located within a designated Source Protection Zone. There are no groundwater
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:69: and ‘limits’ presented in the Application Site Protection and Monitoring Plan (SPMP)
EN010082-000196-EN010082-6.3.6-ES Annex D3-Site Condition Report-Final-November 2017.pdf:99:Environmental Protection Act 1990 and based on the principles of risk assessment,
EN010082-000429-Copy of EXA Questions 1.pdf:21:enforcement under the Environmental Protection Act, for Statutory Nuisance can be taken.
EN010082-000429-Copy of EXA Questions 1.pdf:33:The Environmental Protection Team has reviewed the Preliminary Environmental Information Report (PEIR) volume 1, volume 2 and the PEIR Non-technical
EN010082-000429-Copy of EXA Questions 1.pdf:33:At the present time the Environmental Protection Team have no areas of concern which we wish to raise. A review of the CEMP upon receipt will be undertaken
EN010082-000429-Copy of EXA Questions 1.pdf:34:This level was suggested to prevent a creeping background and to offer a level of protection for nearby residential receptors.
EN010082-000429-Copy of EXA Questions 1.pdf:35:This question has also been highlighted by the Environmental Protection and detailed in the point above.
EN010082-000429-Copy of EXA Questions 1.pdf:35:Environmental Protection do not agree with this point as it would be contributing to a creeping background which has already been agreed with the applicant to
EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:10: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of the
EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:48: accordance with the Data Protection Act 1998 and will be used solely in connection with the consultation
EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000639-190218 - Tees CCPP - SoS Letter - FINAL_Redacted.pdf:3:Significant Effects Report REP1-001 consider the Teesmouth and Cleveland Coast Special Protection
EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:4: EPA Environmental Protection Act 1990
EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:5: ICNIRP International Commission on Non-Ionizing Radiation Protection
EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:8: SPA Special Protection Area
EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:8: SPZ Source Protection Zone
EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of premises
EN010082-000203-EN010082-6.3.13-ES Annex G2-Ecological Appraisal_Final.pdf:11:In addition to the protection afforded to all nesting birds through the Wildlife & Countryside Act
EN010082-000203-EN010082-6.3.13-ES Annex G2-Ecological Appraisal_Final.pdf:12:(1981), as amended, Little Ringed Plover receive additional protection through being listed under
EN010082-000444-North-York-Moors-SPA-CO.pdf:1: North York Moors Special Protection Area
EN010082-000444-North-York-Moors-SPA-CO.pdf:2:These Conservation Objectives are set for each bird feature for a Special Protection Area (SPA). Where
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:2: the protection of human health and sensitive ecology. The baseline air quality
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:6: of the National Park are designated as the North York Moors Special Protection Area (SPA) and Special Area of and SSSIs. The assessment includes
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:9: Teesmouth Special Protection Area. We wish to inform the operator/applicant that there is a proposed expansion The extension to the SPA has been
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:9: of the Teesmouth Special Protection Area (SPA). Details of this proposed expansion to the SPA are available on considered.
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:10: Protection Area (SPA), the PC is 0.301 µg/m3, which is 1.003% PC/CL. This is incorrectly classed as <1% in the presented in PEIR Annex H was
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:13: standards and protection of natural habitats; sets
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:14: Regulations 2010 (4). This Directive requires the protection of certain sites
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:14: including Special Areas of Conservation (SACs), Special Protection Areas
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:15: • air quality standards (AQS) for NO x (annual mean) for the protection of
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:17: Environmental Protection Act 1990
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:17:7.36 Section 79(1) of the Environmental Protection Act 1990 (EPA 1990) states:
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:18: and guidelines for the protection of human health, and when considering
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:18: operational emissions, critical loads and levels for the protection of sensitive
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:19:Table 7.3 Air Quality Criteria for the Protection of Human Health
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:19: Assessment Criteria for the Protection of Sensitive Ecological Receptors
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:28: Loads’ (CLs) set for the protection of sites designated under the Habitats
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:29:7.82 The air quality standards and guidelines for the protection of sensitive human
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:30: • European designated sites: Special Protection Areas (SPAs), Special Areas
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:34: Wetlands Special Protection Area (SPA)
EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:41: SSSI Special Protection Area (SPA)
EN010082-000500-8.8 - Tees CCPP - Figure 9.1.pdf:2: Special Protection Area (SPA)
EN010082-000563-TEES - 180905 Rule 17 and publication of RIES.pdf:2: Protection Area (pSPA), proposed Ramsar site and enlarged Site of
EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:9: Environmental Protection Act 1990
EN010082-000651-Tees CCPP HRA FINAL April 2019 (3).pdf:4: • Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000651-Tees CCPP HRA FINAL April 2019 (3).pdf:5: extend beyond the boundaries of the pSPA. The purpose of the extension is afford the sa me protection to habitats
EN010082-000651-Tees CCPP HRA FINAL April 2019 (3).pdf:7: extent of the pSPA boundries. The pSPA affords protection to the same species as the
EN010082-000651-Tees CCPP HRA FINAL April 2019 (3).pdf:8:6.9 Due to the overlap in location and the overlap in the protection afforded to SAC habitats
EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:6: 9. —(1) Where proceedings are brought under section 82(1) of the Environmental Protection
EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000205-EN010082-6.3.15-ES Annex H-HRA-Final-November 2017.pdf:3: Special Areas of Conservation (cSACs), Special Protection Areas (SPAs), possible SACs (pSACs), potential SPAs (pSPAs)
EN010082-000205-EN010082-6.3.15-ES Annex H-HRA-Final-November 2017.pdf:10: o Teesmouth and Cleveland Coast Special Protection Area (SPA);
EN010082-000205-EN010082-6.3.15-ES Annex H-HRA-Final-November 2017.pdf:12: Wetlands Special Protection Area (SPA)
EN010082-000205-EN010082-6.3.15-ES Annex H-HRA-Final-November 2017.pdf:14:west of the Project albifrons and common tern; and Special Protection
EN010082-000205-EN010082-6.3.15-ES Annex H-HRA-Final-November 2017.pdf:23: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site and
EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:10: improve approaches to the planning, management and protection of
EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:11: • CS25 and DP9 – policy concerned with the protection and enhancement of
EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:18: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, due
EN010082-000604-NG Letter to PINS Teeside CCGT 061018_Redacted.pdf:1:connections and protection of existing assets.
EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:10: improve approaches to the planning, management and protection of
EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:11: • CS25 and DP9 – policy concerned with the protection and enhancement of
EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:18: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, due
EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:3: • Teesmouth and Cleveland Coast Special Protection Area
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:25: identification of suitable routes, temporary protection to carriageway surfaces
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:40: to achieve a high level of protection of the environment as a whole from the
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:54: Special Protection Area (SPA)
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:61: land under Part 2A of the Environmental Protection Act 1990.
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:61: The Environmental Protection Act 1990, Part I is the legislative tool to control
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:62: III of the Environmental Protection Act 1990 were the traditional means of
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:64:The site is not located within 500 m of a Source Protection Zone (SPZ) or any
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:71: Pike Special Protection Area (SPA)
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:73: Coast Special Protection (79/409/EEC) by supporting populations of European
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:74:Special Protection Area (79/409/EEC) by supporting populations of European
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:78: Teesmouth and Cleveland Coast Special Protection Area;
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:90: Special Protection Area (SPA)
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:91: Environmental Protection Group.
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:92: standards and guidelines for the protection of human health, and critical loads
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:92: and critical level for the protection of sensitive habitats to assess the
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:115:Protection Area and Ramsar site, due to their importance for waterfowl.
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:131:SPA Special Protection Area
EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:131:SPZ Source Protection Zone
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:9: • Tees and Cleveland Coast Special Protection Area (“SPA”);
EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:11:protections that may be required. The Secretary of State therefore has no reason to
EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:9: improve approaches to the planning, management and protection of
EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:10: • CS25 and DP9 – policy concerned with the protection and enhancement of
EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:17: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, due
EN010082-000578-8.58 - Tees CCPP - Deadline 7 Submission 2 - Cover Letter - FINAL - 26.09.18.pdf:1: Designation of Teesmouth and Cleveland Coast as a proposed Special Protection Area (‘pSPA’),
EN010082-000584-8.64 - Tees CCPP - CCR Memo.pdf:4: fire protection and monitoring system
EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:3: protection for the environment and human health. A tighter emission limit value may require the
EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:11: provided there is sufficient protection of the environment.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:10: Groundwater Directive 80/68/EEC) WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:11: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:22: identification of suitable routes, temporary protection to
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:30: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:33: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000076-Section 46 Acknowledgement.pdf:2:your obligation under the Data Protection Act 1998 to process personal data fairly and
EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:9: improve approaches to the planning, management and protection of
EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:10: • CS25 and DP9 – policy concerned with the protection and enhancement of
EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:17: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, due
EN010082-000215-EN010082-5.9-Statutory Nuisance Statement-Final-November 2017.pdf:4:(Statutory nuisances and inspections therefor) of the Environmental Protection
EN010082-000215-EN010082-5.9-Statutory Nuisance Statement-Final-November 2017.pdf:6: Protection Act 1990 (the ‘EPA 1990’). If such a nuisance could occur, the
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:14: Protection Area (SPA) and Special Area of Conservation (SAC),
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:35: would be awarded the same level of protection as a SPA. The
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:42: (SCIs), Special Areas of Conservation (SACs) and candidate SACs, Special Protection
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:43: protection as European sites: possible SACs (pSACs); potential SPAs
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:44: NCB the DCO requirements which will provide protection for the SSSI
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:46: establishes a framework for the protection of inland surface waters
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:69:Teesmouth Special Protection Area
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:69:the Teesmouth Special Protection Area (SPA). Details of this proposed expansion
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:89:sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall within the
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:89:the National Planning Policy Framework requires that potential Special Protection Areas, possible
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:90:(Special Areas of Conservation, Special Protection Areas and Ramsar sites)
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:93:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:98:phase of the above application. Our response focuses on health protection issues
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:99:Health Protection Scientist
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:105:In March 2004, the National Radiological Protection Board, NRPB (now part of PHE),
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:105:published by the International Commission on Non-ionizing Radiation Protection
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:108: ‘contaminated land’ under Part 2A of the Environmental Protection Act
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:111:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:112:Redcar and Cleveland Borough Council Environmental Protection (Contamination)
EN010082-000288-EN010082-4.12-Nationally Designated Sites Within 15km-Rev 2-January 2018.pdf:1: AND COMMON SPECIAL PROTECTION AREAS (SPA)
EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000457-Tees & Hartlepool Foreshore and Wetlands SSSI - Citation.pdf:1:under the Ramsar Convention and as a Special Protection Area under the European
EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:10: the Environmental Protection Act 1990 in respect of noise, if the noise relates to the use of
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:8:Air Quality Environmental Protection Act 1990 Creates the main regulatory controls over ‘statutory nuisance’ including smoke, fumes, gases, dust,
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:9: Environmental Protection Act 1990 (ss.79-82) (as Provides controls over ‘statutory nuisance’ including noise emitted from premises so as to be
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:10: Environmental Protection Act 1990 It is a statutory nuisance to cause a watercourse to be so foul or obstructed that it is prejudicial to
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:10: Groundwater Directive 80/68/EEC) WRA 1991 (Water Protection Zones); Part 2A EPA 1990 and associated regulations.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Environmental Protection Act 1990 (Part II) Applies to ‘controlled waste’, comprising both hazardous and non- hazardous waste.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Environmental Protection Act 1990, Section 34. Sets out duty of care provisions.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Environmental Protection (Duty of Care) Places a duty of care on waste producers to ensure that waste is handled correctly
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Waste Management, the Duty of Care, A Code of This code of practice is imposed by the Environmental Protection Act 1990.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Pollution prevention guidance prepared by the EA The guidance covers a range of water environment protection matters of direct relevance to the
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11:Archaeology and Ancient Monuments and Archaeological Areas Act Offers legal protection to designated heritage assets.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:11: Conservation of Wild Birds(the ‘Birds Directive’) for the identification and classification of Special Protection Areas (SPAs).
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:12: Wildlife and Countryside Act 1981 (as amended) Offers protection to specified animals and plants including great crested newts, bats and badgers.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:12: Protection of Badgers Act 1992 Makes it an offence to kill or injure a badger or to interfere with badgers’ sets.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:22: identification of suitable routes, temporary protection to
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:30: light spill and light trespass to impact good practice and environmental protection legislation e.g. CEMP. CEMP.
EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:33: controlled waters) if not stored and waste duty of care in Section 34 of the Environmental Protection
EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:9: • Tees and Cleveland Coast Special Protection Area (“SPA”);
EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:11:protections that may be required. The Secretary of State therefore has no reason to
EN010082-000408-8.13 - Tees CCPP - Figure C3.1.pdf:2: Special Protection Area (SPA)
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:27: environment, to ensure a high level of protection of the environment as a
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:27: of species protection. The Directive protects over 1,000 animals and
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:28:3.3.20. The Birds Directive is a comprehensive scheme of protection for all wild
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:28: the protection of habitats for endangered as well as migratory species. It
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:28: requires classification of areas as Special Protection Areas (SPAs)
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:29: Special Protection Areas (SPAs) designated pursuant to the Birds
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:31: countryside protection and National Parks; and Public Rights of Way
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:31:3.4.6. National Parks and AONBs have statutory protection in order to conserve
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:31: protection and management of SSSIs.
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:32: protection is afforded through the development management process as
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:32: Environmental Protection Act 1990
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:32:3.4.15. S79(1) of the Environmental Protection Act 1990 identifies a number of
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:33: protection to waterbodies and water resources from abstraction
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:38: Environmental protection;
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:38:4.3.3. The Environmental Protection (Nuisance) consultee requested that
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:38:4.3.4. The Environmental Protection (Contamination) consultee requested the
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:47: against standards and guidelines for the protection of human health (ES
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:47: and levels for the protection of sensitive ecology (ES Table 7.4). The
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:79: prevent a creeping background and to offer a level of protection for
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:92: Special Protection Areas (SPAs), possible SACs, potential SPAs, Ramsar sites,
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:94: protection as if they were a designated habitat site.
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:119: and any protections that may require and as such NGET are satisfied that
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:127: proceed. These leases will cover NGET rights and any protections that
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:147: Cleveland Coast Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:157:pSPA Potential Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:157:SPA Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:165: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:166:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (2).pdf:11:Significant Effects Report REP1-001 consider the Teesmouth and Cleveland Coast Special Protection
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:2: the protection of human health and sensitive ecology. The baseline air quality
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:6: of the National Park are designated as the North York Moors Special Protection Area (SPA) and Special Area of and SSSIs. The assessment includes
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:9: Teesmouth Special Protection Area. We wish to inform the operator/applicant that there is a proposed expansion The extension to the SPA has been
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:9: of the Teesmouth Special Protection Area (SPA). Details of this proposed expansion to the SPA are available on considered.
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:10: Protection Area (SPA), the PC is 0.301 µg/m3, which is 1.003% PC/CL. This is incorrectly classed as <1% in the presented in PEIR Annex H was
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:13: standards and protection of natural habitats; sets
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:14: Regulations 2010 (4). This Directive requires the protection of certain sites
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:14: including Special Areas of Conservation (SACs), Special Protection Areas
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:15: • air quality standards (AQS) for NOx (annual mean) for the protection of
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:17: Environmental Protection Act 1990
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:17:7.36 Section 79(1) of the Environmental Protection Act 1990 (EPA 1990) states:
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:18: and guidelines for the protection of human health, and when considering
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:18: operational emissions, critical loads and levels for the protection of sensitive
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:19:Table 7.3 Air Quality Criteria for the Protection of Human Health
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:19: Assessment Criteria for the Protection of Sensitive Ecological Receptors
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:28: Loads’ (CLs) set for the protection of sites designated under the Habitats
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:29:7.82 The air quality standards and guidelines for the protection of sensitive human
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:30: • European designated sites: Special Protection Areas (SPAs), Special Areas
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:34: Wetlands Special Protection Area (SPA)
EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:40: SSSI Special Protection Area (SPA)
EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (3).pdf:11:Significant Effects Report REP1-001 consider the Teesmouth and Cleveland Coast Special Protection
EN010082-000390-7 4 - Tees CCPP - SoCG with Environment Agency - DRAFT (2).pdf:6: Cleveland Special Protection Area ‘HRA’ – Application Document Ref:
EN010082-000390-7 4 - Tees CCPP - SoCG with Environment Agency - DRAFT (2).pdf:11: framework for it should be agreed with the EA to ensure environmental protection during the plant
EN010082-000019-Scoping Report.pdf:23: identification of suitable routes, temporary protection to carriageway surfaces
EN010082-000019-Scoping Report.pdf:38: to achieve a high level of protection of the environment as a whole from the
EN010082-000019-Scoping Report.pdf:52: Special Protection Area (SPA)
EN010082-000019-Scoping Report.pdf:59: land under Part 2A of the Environmental Protection Act 1990.
EN010082-000019-Scoping Report.pdf:59: The Environmental Protection Act 1990, Part I is the legislative tool to control
EN010082-000019-Scoping Report.pdf:60: III of the Environmental Protection Act 1990 were the traditional means of
EN010082-000019-Scoping Report.pdf:62:The site is not located within 500 m of a Source Protection Zone (SPZ) or any
EN010082-000019-Scoping Report.pdf:69: Pike Special Protection Area (SPA)
EN010082-000019-Scoping Report.pdf:71: Coast Special Protection (79/409/EEC) by supporting populations of European
EN010082-000019-Scoping Report.pdf:72:Special Protection Area (79/409/EEC) by supporting populations of European
EN010082-000019-Scoping Report.pdf:76: Teesmouth and Cleveland Coast Special Protection Area;
EN010082-000019-Scoping Report.pdf:88: Special Protection Area (SPA)
EN010082-000019-Scoping Report.pdf:89: Environmental Protection Group.
EN010082-000019-Scoping Report.pdf:90: standards and guidelines for the protection of human health, and critical loads
EN010082-000019-Scoping Report.pdf:90: and critical level for the protection of sensitive habitats to assess the
EN010082-000019-Scoping Report.pdf:113:Protection Area and Ramsar site, due to their importance for waterfowl.
EN010082-000019-Scoping Report.pdf:129:SPA Special Protection Area
EN010082-000019-Scoping Report.pdf:129:SPZ Source Protection Zone
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:27: environment, to ensure a high level of protection of the environment as a
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:27: of species protection. The Directive protects over 1,000 animals and
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:28:3.3.20. The Birds Directive is a comprehensive scheme of protection for all wild
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:28: the protection of habitats for endangered as well as migratory species. It
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:28: requires classification of areas as Special Protection Areas (SPAs)
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:29: Special Protection Areas (SPAs) designated pursuant to the Birds
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:31: countryside protection and National Parks; and Public Rights of Way
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:31:3.4.6. National Parks and AONBs have statutory protection in order to conserve
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:31: protection and management of SSSIs.
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:32: protection is afforded through the development management process as
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:32: Environmental Protection Act 1990
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:32:3.4.15. S79(1) of the Environmental Protection Act 1990 identifies a number of
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:33: protection to waterbodies and water resources from abstraction
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:38: Environmental protection;
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:38:4.3.3. The Environmental Protection (Nuisance) consultee requested that
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:38:4.3.4. The Environmental Protection (Contamination) consultee requested the
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:47: against standards and guidelines for the protection of human health (ES
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:47: and levels for the protection of sensitive ecology (ES Table 7.4). The
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:79: prevent a creeping background and to offer a level of protection for
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:92: Special Protection Areas (SPAs), possible SACs, potential SPAs, Ramsar sites,
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:94: protection as if they were a designated habitat site.
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:119: and any protections that may require and as such NGET are satisfied that
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:127: proceed. These leases will cover NGET rights and any protections that
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:147: Cleveland Coast Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:157:pSPA Potential Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:157:SPA Special Protection Area
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:165: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:166:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000569-Additional submission from the EA.pdf:2:under the Freedom of Information Act, Data Protection Act or for
EN010082-000464-Teesmouth-and-Cleveland-Coast-SPA-V2.pdf:1: Teesmouth and Cleveland Coast Special Protection Area
EN010082-000464-Teesmouth-and-Cleveland-Coast-SPA-V2.pdf:2:These Conservation Objectives are set for each bird feature for a Special Protection Area (SPA). Where
EN010082-000471-Copy of EXA Questions Updated.pdf:2: adopted, why does the CEMP not specify what those minimum measures enforcement under the Environmental Protection Act, for Statutory Nuisance can be taken.
EN010082-000471-Copy of EXA Questions Updated.pdf:9: The Environmental Protection Team has reviewed the Preliminary Environmental Information Report (PEIR) volume 1, volume 2 and the PEIR Non-technical
EN010082-000471-Copy of EXA Questions Updated.pdf:9: At the present time the Environmental Protection Team have no areas of concern which we wish to raise. A review of the CEMP upon receipt will be undertaken
EN010082-000471-Copy of EXA Questions Updated.pdf:9:1.9.4 background noise level would not be acceptable. This level was suggested to prevent a creeping background and to offer a level of protection for nearby residential receptors.
EN010082-000471-Copy of EXA Questions Updated.pdf:10:1.9.7 This question has also been highlighted by the Environmental Protection and detailed in the point above.
EN010082-000471-Copy of EXA Questions Updated.pdf:10: Scenario 2. Environmental Protection do not agree with this point as it would be contributing to a creeping background which has already been agreed with the applicant to
EN010082-000176-EN010082-6.2.5-ES Chapter 5 -Project Description-Final-November 2017.pdf:16: authorities, including identification of suitable routes, temporary protection to
EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of premises
EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:3: • Teesmouth and Cleveland Coast Special Protection Area
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:15: European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA)
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:15: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site and has
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:37: Sembcorp in accordance with the Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:39: proposed building height changes via post with the Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:40: Sembcorp in accordance with the Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:43: Sembcorp in accordance with the Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:48: Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:54: Data Protection Act 1998.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:75:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:75:Protection Area and Ramsar site and has no objection.
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:80:Please ensure you have adequate virus protection before you open or detach any
EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:82:ensure appropriate protection for the retained apparatus is maintained during and after
EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:3:ICNIRP International Commission on Non-Ionising Radiation Protection
EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:3:SPA Special Protection Area
EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:8: Protection Area (pSPA), proposed Comment on the implications for the Habitats Regulations Assessment (HRA) consultation process about the proposals. Additional interest features included ruff and five other wintering
EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:6: 9.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:7:Environmental Protection Act 1990) does not apply where the consent relates to the use of
EN010082-000605-NATIONAL GRID ADDITIONAL SUBMISSION EMAIL.pdf:1:These leases will cover NGET rights and any protections that they may require
TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:18:money and resources devoted to crop protection or reactive nutritional This year the Company has demonstrated POLY4’s support for quality
TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:22:blending flexibility and margin protection. Both of these strategies are described as world-class. We did some work for the 2015 BMO Farm-
TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:34: • Environmental protection and improvement;
TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:42:Environmental Protection Scheme for the ASEAN potash project in
TR030002-000772-York Potash Ltd.pdf:10:Environmental Protection
TR030002-001873-Decision holding letter (2).pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:5:SPA Special Protection Area
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:7: sites (Special Areas of Conservation (SACs) and Special Protection Areas (SPAs)) and Ramsar sites.
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:10: SACs and to give protection to habitats and species listed in the Directive as being threatened or of
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:10: species, paying particular attention to the protection of wetlands of international importance. Together
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:83: transmits wave energy through to the shore protection behind the proposed quay. The proposed shore
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:83: protection has similar reflection characteristics to the existing shoreline and, therefore, the modelling
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:112: protection of ecosystems (30µg.m-3) on sections of Lockwood Hills (E1), Liverton Moor (E3) and
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:114: objective for the protection of ecosystems (30µg.m-3) at the transect points that are closest to the A171
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:116: for the protection of ecosystems (30µg.m-3) at all of the ecological receptors identified.
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:123: the integrity of the habitats for which the North York Moors SAC is afforded its protection.
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:124: afforded its protection.
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:137: Special Protection Areas
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:138: Lady Special Protection Areas
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:139: Special Protection Areas
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:144: North York Moors Special Protection Area
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:145:These conservation objectives are set for each bird feature for a Special Protection Area (SPA). Where
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:148: Teesmouth and Cleveland Coast Special Protection Area
TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:149:These conservation objectives are set for each bird feature for a Special Protection Area (SPA). Where
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:18:3.2.3 There are no groundwater Source Protection Zones (SPZs) within the site boundary, or in the vicinity of
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:20: Environmental Protection Act 1990 (as amended) including inert waste, general and biodegradable
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:21: Cleveland Coast Special Protection Area (SPA) is located approximately 1.4km from site. This SPA
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:38:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:42: Agency and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:42: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:43: Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:44: Radon Potential - Radon Protection Measures n/a n/a
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:45: Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:101: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:101: Protection Measure: No radon protective measures are necessary in the construction of new A10NE 0 2 455000
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:101: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:101: Protection Measure: No radon protective measures are necessary in the construction of new A11NE 0 2 455738
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:104:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:105:Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:106:Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:107: Scottish Environment Protection Agency
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:122:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:126: Agency and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:126: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:127: Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:128: Radon Potential - Radon Protection Measures n/a n/a
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:129: Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:176: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:176: Protection Measure: No radon protective measures are necessary in the construction of new B10SW 0 3 457384
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:179:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:181:Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:182:Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:183: Scottish Environment Protection Agency
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:198:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:202: Agency and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:202: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:203: Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:204: Radon Potential - Radon Protection Measures n/a n/a
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:205: Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Protection Measure: No radon protective measures are necessary in the construction of new C2NE 0 2 455000
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Protection Measure: No radon protective measures are necessary in the construction of new C3NW 0 2 455335
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Protection Measure: No radon protective measures are necessary in the construction of new C2SE 0 2 455000
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:217: Protection Measure: No radon protective measures are necessary in the construction of new C3SW 0 2 455335
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:219:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:221:Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:222:Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:223: Scottish Environment Protection Agency
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:238:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:242: Agency and the Scottish Environment Protection Agency; it also incorporates data from Natural England (and the Scottish and Welsh
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:242: Site of Special Scientific Interest, National Nature Reserve, Ramsar, Special Protection Area, Special Conservation Area, Marine Nature
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:243: Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:244: Radon Potential - Radon Protection Measures n/a n/a
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:245: Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:250: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:250: Protection Measure: No radon protective measures are necessary in the construction of new D1SW 0 2 456902
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:250: Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:250: Protection Measure: No radon protective measures are necessary in the construction of new D1SW 0 2 456902
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:251:Source Protection Zones
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:253:Radon Potential - Radon Protection Measures
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:254:Special Protection Areas
TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:255: Scottish Environment Protection Agency
TR030002-000468-Section 6 App 6.2 Land Quality Generic Risk Assessment.pdf:47: Depth Bottom Diameter Protection Installed
TR030002-000499-Section 17 App 17.1 Flood Risk Assessment.pdf:11: potential impacts to coastal protection and flood defence has been made with reference to the NPS for
TR030002-000499-Section 17 App 17.1 Flood Risk Assessment.pdf:16: to PINS. It identified the potential impacts of the proposed scheme on coastal protection and flood
TR030002-000499-Section 17 App 17.1 Flood Risk Assessment.pdf:20:4.6.3 The Environment Agency Groundwater Source Protection Zones (SPZ) map indicates that there are no
TR030002-000499-Section 17 App 17.1 Flood Risk Assessment.pdf:24: 2m above current high water levels, affording the same level of protection from both fluvial and tidal
TR030002-000695-150820 TR030002 National Grid.pdf:1:A set of more detailed protective provisions to regulate the protection of its apparatus are expected
TR030002-001873-Decision holding letter (3).pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:27:34. Protection of Interests
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:28: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:28: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:28: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:28: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:28: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:33:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:50: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:50: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:51:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:51:Protection of Interests
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:61:protection measures within buildings then these must be agreed with the local planning authority
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:63: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:63: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:65: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:65: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:67: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:67: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:67: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:68: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:69: protection of the conveyor structure
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:70: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:71: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:71: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:73: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:75: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:77: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:77: for the protection of the conveyor
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:81: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:81: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:90: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:97: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:97: 1. For the protection of National Grid referred to in this Schedule the following provisions
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:97: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:99:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:99:Retained apparatus: protection
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:100:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:100:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:103:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:104:Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA and the registered office of
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:105: FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:108: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:116: PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:116:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:118:Tees Port Authority may make for the protection of—
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:118: environmental protection.
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:123: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:134:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:148:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000872-York Potash Ltd 1.pdf:4: Sembcorp lease (referred to in paragraph 3 Appendix 1 to Document 8.10). The protection
TR030002-000872-York Potash Ltd 1.pdf:4: with anything like the protection now afforded to the pipeline by the protective provisions
TR030002-000872-York Potash Ltd 1.pdf:27:Widely used ignition probabilities in Layer of Protection Analysis are:
TR030002-000872-York Potash Ltd 1.pdf:28:11.3 Design or placement of protection for the pipeline from vehicles (Fault tree Ref 20)
TR030002-000872-York Potash Ltd 1.pdf:28:Considered to be an issue if a human error is made in the protection design, setting it out, or in
TR030002-000872-York Potash Ltd 1.pdf:29:But also consider that if the pipeline is exposed, there will be protection provided for it in the terms of
TR030002-000872-York Potash Ltd 1.pdf:29:protection would be sufficient
TR030002-000872-York Potash Ltd 1.pdf:29:the location or design of the protection)
TR030002-000872-York Potash Ltd 1.pdf:29:Delayed ignition and a VCE = 0.5 (widely used value in Layer of Protection Analysis)
TR030002-000872-York Potash Ltd 1.pdf:29:Damage to pipeline Cathodic Protection system - negligible frequency compared to other causes
TR030002-000872-York Potash Ltd 1.pdf:30: protection layers in Layers of Protection Analysis, Feb 2015
TR030002-000872-York Potash Ltd 1.pdf:33: protection fails 0 01 AND
TR030002-000872-York Potash Ltd 1.pdf:34: pipeline protection, or traffic
TR030002-000872-York Potash Ltd 1.pdf:35: protection fails 0.01 AND
TR030002-000872-York Potash Ltd 1.pdf:36: pipeline protection, or traffic
TR030002-000872-York Potash Ltd 1.pdf:37: protection fails 0.01 AND
TR030002-000872-York Potash Ltd 1.pdf:38: pipeline protection, or traffic
TR030002-000439-ES Section 4 Approach to EIA.pdf:5: the MMO and the Royal Society for the Protection of Birds (RSPB)), that provided an update on
TR030002-000740-Huntsman response to first written questions.pdf:2:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000018-Examination Library (4).pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library (4).pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:7:The constructability notes include reference to protection during the operational phase with regard to maintenance activities including the
TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:7:protection of dropped objects. In addition the protective provisions in Schedule 9 have been expanded to respond to points made in the
TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:7:protection of their undertakings the Objectors do not object in principle to the making of the Order.” It is clear from that paragraph that
TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:7:the pipeline corridor which imposes a safe system of working. The restrictions and protections involved are not affected by the provisions
TR030002-000759-Document 8.3 Applicants Response to Written Representations.pdf:7:of the Order and the Applicant’s activities within the pipeline corridor will be subject to those restrictions and protections under the terms
TR030002-000460-Section 3 App 3.1 Waste management.pdf:10: Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance
TR030002-000460-Section 3 App 3.1 Waste management.pdf:12: accept controlled waste as defined by Section 75 of the Environmental Protection Act 1990 (as
TR030002-000460-Section 3 App 3.1 Waste management.pdf:12: a protection geotextile which was overlain by 1.0m of subsoil and topsoil. A surface water drainage
TR030002-000460-Section 3 App 3.1 Waste management.pdf:34: • groundwater Source Protection Zones 1 or 2;
TR030002-000460-Section 3 App 3.1 Waste management.pdf:34: Proposed or Special Protection Area (pSPA or SPA) in England and Wales), Ramsar site or a Site of
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:4:(PROTECTIVE PROVISIONS FOR THE PROTECTION OF ASSETS
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:6:The Environmental Protection Team of RCBC would agree with the Inspector’s
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:6:The Environmental Protection Team would agree that draft Requirement 6 shall be
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:11:The Environmental Protection Team of RCBC is satisfied that the majority of the
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:11:operational phases of the development. However, the Environmental Protection
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:11:The Environmental Protection Team would also require clarification on what
TR030002-000713-Redcar and Cleveland Borough Council (Response to the Examining Authority's First Written Questions).pdf:11:calculations. The Environmental Protection Team should also be notified of any
TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:8: Canadian Sediment Quality Guidelines for the Protection of Aquatic Life (CCME, 2002).
TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:13:for the protection of aquatic life: Summary tables. Update. In: Canadian environmental quality
TR030002-000874-151222 TR030002 Tata Steel & RBT confirmation of applicant's submisison to D7.pdf:2: FOR THE PROTECTION OF REDULCAR BULK TERMINAL
TR030002-000412-ExA Second Round Questions.pdf:4:Article 34 and Schedules 7-11 Protection of interests
TR030002-000412-ExA Second Round Questions.pdf:5:Article 34 and Schedules 7-11 Protection of interests
TR030002-000412-ExA Second Round Questions.pdf:10:Bran Sands Lagoon enhancement and protection of marine mammals so that the
TR030002-000412-ExA Second Round Questions.pdf:11:Teesmouth and Cleveland Coast Special Protection Area (SPA)
TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:7:assemblage for which the Teesmouth and Cleveland Coast Special Protection Area
TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:77:protection through inclusion in Schedule 5 of the Wildlife and Countryside Act 1981
TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:78:structure or place which it uses for shelter or protection; or obstruct access to any
TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:79:protection under UK and European legislation being present is discussed within this
TR030002-000423-Doc 5.2 Funding Statement.pdf:17:7.14 As protection for any interests which are to be compulsorily acquired the
TR030002-000421-Doc 1.6 Issues and Document Tracker.pdf:12:Section 79(1) of Environmental Protection Act 1990 Statement (re This has been revised to refer to the reduced order limits and cross
TR030002-000801-Document 6.8B - Governance Tracker.pdf:21:Section 17 – Coastal protection and flood defence
TR030002-000877-151229 TR030002 INEOS submission.pdf:1: for the Protection of the Pipeline Corridor and Protected Crossings” (the Objectors’ Deadline 6
TR030002-000877-151229 TR030002 INEOS submission.pdf:4: protection of the existing pipeline corridor pipeline corridor over the years; however, it was never envisaged by the Objectors
TR030002-000877-151229 TR030002 INEOS submission.pdf:4: protection provided for the existing pipes under exercise of the powers sought by the Applicant in the Order, which go far beyond the
TR030002-000877-151229 TR030002 INEOS submission.pdf:4: exercised to their fullest extent if the stronger protection sought by the Objectors did
TR030002-000877-151229 TR030002 INEOS submission.pdf:5:protections will apply if Order powers are exercised.
TR030002-000877-151229 TR030002 INEOS submission.pdf:6: No specific programmed pipelines protection against compulsory acquisition would apply, thus reversing
TR030002-000877-151229 TR030002 INEOS submission.pdf:7:protections it is offering, by amending the definition of “pipeline” to link it
TR030002-000877-151229 TR030002 INEOS submission.pdf:7:development) the protection of the Protective Provisions.
TR030002-000877-151229 TR030002 INEOS submission.pdf:8:being subject to an “unknown right”, and being excluded from protection
TR030002-000877-151229 TR030002 INEOS submission.pdf:8:able to benefit from this protection as proposed pipelines. The onus will
TR030002-000877-151229 TR030002 INEOS submission.pdf:8:“pipeline” and the protection afforded by the Protective Provisions
TR030002-000877-151229 TR030002 INEOS submission.pdf:9: further curtail the broad protection of the Objector’s starting position by
TR030002-000877-151229 TR030002 INEOS submission.pdf:9: grafting the protections they are seeking onto those proposed by the
TR030002-000877-151229 TR030002 INEOS submission.pdf:10: watercourses is not felt to be than the protection of pipelines.
TR030002-000877-151229 TR030002 INEOS submission.pdf:10: appropriate. The protection of these
TR030002-000877-151229 TR030002 INEOS submission.pdf:11: be consistent and provide adequate protection to other owners and
TR030002-000877-151229 TR030002 INEOS submission.pdf:12: necessary. In particular the Applicant recorded their rights before the protection against compulsory
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:3:34. Protection of Interests
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:25:Protection of Interests
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:34:rise to the need to consider gas protection measures within buildings then these must be set a
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:37: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:38: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:38: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:39: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:39: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:39: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:40: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:41: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:41: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:43: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:43: requirements for the protection
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:44: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:44: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:45: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:45: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:46: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:47: for the protection of the conveyor
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:50: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:50: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:61: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:68: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:68: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:68: 3. Except for protection), 8 (expenses) and 9 (indemnity)8
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:70:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:70:Retained apparatus: protection
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:71:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:72:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:74:75(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:75:Grid Plant Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA and the registered
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:77: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:77: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:80: assessment of the protection of underground assets and which study shall provide for
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:80: assessment of the protection of underground assets and which study shall provide for
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:80: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:82: existing cathodic protection of the pipes must be hand dug. asset; and
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:83:pipeline corridorwill require the protection of the cats pipeline.
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:84: cathodic protection and any further works or testing shown by that testing to be reasonably
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:84:the cats pipeline cathodic protection system, the undertaker shall be responsible for the cost of
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:89: Further protection in relation to the exercise of powers under the Order
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:90: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:95: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:97:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:97:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:99:Tees Port Authority may make for the protection of—
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:99: protection.
TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:104: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:13: compensation for the protection of any interests which are to be compulsorily
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:16: Article 34 (Protection of interests)
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:23: Schedule 7 (Provisions for the Protection of Network Rail)
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:23: needs the protection of compulsory acquisition to compulsorily acquire the
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:23: Schedule 8 (Provisions for the Protection of National Grid)
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:23: accordingly provisions for the protection of those power lines have been included
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:24: protection of the existing pipeline corridor overseen by Sembcorp. The legal
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:24: Protective Provisions in Schedule 9 go far beyond the level of protection provided
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:24: Schedule 10 (Provisions for the Protection of Assets Bridged/Oversailed
TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:24: Schedule 11 (Provisions for the Protection of the Tees Port Authority)
TR030002-000470-Section 6 App 6.4 CEMP.pdf:14: agreed controls, protection and mitigation measures (including those in the CEMP) are in
TR030002-000470-Section 6 App 6.4 CEMP.pdf:29: Section 17 – Coastal protection and flood defence
TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:8: breach of data protection.
TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:11:Data Protection Act 1998
TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:11: Protection Act 1998 and that the addresses within the draft Consultation Report or
TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:13:content with the level of protection the provision offers. The applicant may wish to
TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:13:Article 36 – protection of interests of Statutory Undertakers
TR030002-000751-Document 1.4B Document List.pdf:8:Environmental Protection
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:33: protection, and wherever possible enhancement, of the features of the
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:36: known as the Teesmouth and Cleveland Coast Special Protection
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:39: Priority will be given to the protection and enhancement of the landscape character
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:41: a) Protection of the integrity of the European sites in and near the Borough.
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:41: Cleveland Coast Ramsar site and Special Protection Area, protected
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:41: Special Protection Area (and Special Area of Conservation) to the
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:42: enhanced. Particular protection will be given to the character and special features
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:42: settings require special protection from inappropriate development.
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:42: protection of this historic landscape will continue in the LDF.
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:45: buildings and scheduled monuments. The level of protection will
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:56:Protection Area and Ramsar site, and other European sites, either alone or in
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:65: APPENDIX E: Redcar and Cleveland Special Protection Areas 43
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:69: supports the protection and enhancement of the Borough’s biodiversity and
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:69: supports the protection and enhancement of the Borough’s landscape based
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:69: supports the protection and enhancement of the built and historic environment
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: for their botanical, wildlife or other intrinsic value. Their protection also assists in
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: between habitats, for species movement and migration. Protection and enhancement
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: Protection Areas (SPA), or Special Areas of Conservation (SAC), and are given
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: statutory protection. Within the Borough the following sites have international
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: protection: the Teesmouth and Cleveland Coast SPA, which is also a ‘RAMSAR’
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:70: most valued wildlife sites and are given statutory protection under the Wildlife and
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:72: These Regulations provide the protection of 'important' countryside hedgerows (ie
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:76: quality landscape in visual terms are that countryside protection can be based on
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:99:protection for locally-valued countryside. It also promotes enhancement where possible.
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:99:PPS 9 advocates protection and enhancement:
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:107:APPENDIX E: Redcar and Cleveland Special Protection Areas
TR030002-000734-York Potash Limited (SoCG & Appendices 1-8).pdf:109:Redcar and Cleveland Borough Council (2005) Guidance Note. The Protection of Hedgerows
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:47: Coast Special Protection Area (SPA) and Ramsar site.
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:102: the Foundation will be run for the benefit of • Environmental protection and
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:173: enable further protection of the environment. economy and social life be positive
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:173: n't know should be providing the environment has reasonable protection. From my principle principle the impact
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:178:8071681 Supportive In favour Undecided/do It would be largely down to the protection of the local environment. The
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:181: n't know n't know Dales. But only if there were full protections put in place not to damage the
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:182: be positive protection me
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:182: Please with environmantal protection measures implemented
TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:190: apprenticeships. There protection/habitat opinion generally must with the local
TR030002-000696-PD Teesport Limited 1.pdf:3: approval can be given subject to reasonable requirements for the protection of the
TR030002-000696-PD Teesport Limited 1.pdf:5: FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-000696-PD Teesport Limited 1.pdf:5:the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000696-PD Teesport Limited 1.pdf:7:may make for the protection of—
TR030002-000696-PD Teesport Limited 1.pdf:7: protection.
TR030002-000696-PD Teesport Limited 1.pdf:11: (b) for the safety of navigation or for the protection of works in the river, should in the reasonable
TR030002-000696-PD Teesport Limited 1.pdf:17: approval can be given subject to reasonable requirements for the protection of the
TR030002-000459-ES Section 24 References.pdf:1: protection of aquatic life: Summary tables. Update In: Canadian environmental quality guidelines, 1999,
TR030002-000459-ES Section 24 References.pdf:2:Environmental Protection Act and Coast Protection Act requirements.
TR030002-000459-ES Section 24 References.pdf:7:Environmental Protection Department.
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:15: • Teesmouth and Cleveland Coast Special Protection Area
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:30: • Coastal protection and flood defence
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:38:Coastal protection and flood defence (see Scoping Report
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:44: the NCB the DCO requirements which will provide protection for
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:71: Protection (Duty of Care) Regulations 1991 and implement the waste hierarchy,
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:75: &box_FPLplantprotection_conx, FPLplantprotection@fulcrum.co.uk
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:75:FPLplantprotection@fulcrum.co.uk
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:92:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:92:paragraph 118 of the National Planning Policy Framework requires that potential Special Protection
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:92:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites)
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:96:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:107:phase of the above application. Our response focuses on health protection issues
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:114:In March 2004, the National Radiological Protection Board, NRPB (now part of PHE),
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:114:published by the International Commission on Non-ionizing Radiation Protection
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:114:http://www.dh.gov.uk/en/Publichealth/Healthprotection/DH_4089500
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:116: ‘contaminated land’ under Part 2A of the Environmental Protection Act
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:141: Plant Protection
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:141: E-mail: plantprotection@nationalgrid.com
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:141:enquiry / consultation to our Land and Development Asset Protection Team for further
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:142:If you require further assistance please contact the National Grid Plant Protection team via e-mail (click here) or
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:142:National Grid Plant Protection Team
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:143: ● Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:148: Plant Protection
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:148: E-mail: plantprotection@nationalgrid.com
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:148:enquiry / consultation to our Land and Development Asset Protection Team for further
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:149:If you require further assistance please contact the National Grid Plant Protection team via e-mail (click here) or
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:149:National Grid Plant Protection Team
TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:150: ● Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:13: 300mm thick clay layer, overlain by a high density polythene geomembrane, a protection geotextile and
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:27: Wind turbines and associated foundations and scour protection measures;
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:27: Offshore collector and converter stations and associated foundations, and scour protection
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:27: and scour protection measures;
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:52: 2. Confirm the interest features of the Teesmouth and Cleveland Coast Special Protection Area (SPA)
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:117: Special Protection Area (SPA)
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:119: Teesmouth and Cleveland Coast Special Protection Area
TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:120:These Conservation Objectives are set for each bird feature for a Special Protection Area (SPA). Where
TR030002-000697-Natural England 3.pdf:1: Teesmouth and Cleveland Coast Special Protection Area
TR030002-000697-Natural England 3.pdf:2:These Conservation Objectives are set for each bird feature for a Special Protection Area (SPA). Where
TR030002-000566-Doc 7.1 Planning Statement.pdf:27: the need to ensure adequate protection is given to the
TR030002-000566-Doc 7.1 Planning Statement.pdf:27: and Cleveland Coast Special Protection Area (SPA), a European-
TR030002-000566-Doc 7.1 Planning Statement.pdf:30: 13. Coastal protection and flood defence;
TR030002-000566-Doc 7.1 Planning Statement.pdf:41: 8. Provide high standards of protection for the natural environment;
TR030002-000566-Doc 7.1 Planning Statement.pdf:44: European site, or on any site to which the same protection is applied as
TR030002-000566-Doc 7.1 Planning Statement.pdf:46: coastal protection measures, which could result in direct effects on the
TR030002-000566-Doc 7.1 Planning Statement.pdf:50: the protection to wildlife that can be achieved through acoustic
TR030002-000566-Doc 7.1 Planning Statement.pdf:53: protection of their assets (e.g.
TR030002-000566-Doc 7.1 Planning Statement.pdf:55: adequate protection is given to the
TR030002-000566-Doc 7.1 Planning Statement.pdf:65: put in place to ensure their protection prior to the dredging works taking
TR030002-000566-Doc 7.1 Planning Statement.pdf:76: employment, impact on the environment and climate change, protection
TR030002-000566-Doc 7.1 Planning Statement.pdf:81:environmental protection and improvement, advancing citizenship and community development and
TR030002-000566-Doc 7.1 Planning Statement.pdf:82:7.88 Policy at all levels seek to ensure the protection, conservation and,
TR030002-000566-Doc 7.1 Planning Statement.pdf:83: protection is applied as a matter of policy, either alone or in combination
TR030002-000566-Doc 7.1 Planning Statement.pdf:85: (Special Areas of Conservation (SACs) and Special Protection Areas
TR030002-000566-Doc 7.1 Planning Statement.pdf:89: Protection of Birds. Interventions could be made to the habitat
TR030002-000566-Doc 7.1 Planning Statement.pdf:89: dredging, dock construction and flood or coastal protection measures.
TR030002-000566-Doc 7.1 Planning Statement.pdf:89: 4. Coastal protection and flood defence; and also includes
TR030002-000566-Doc 7.1 Planning Statement.pdf:103: Special Protection Areas, and is defined in Regulation 8 of the
TR030002-000566-Doc 7.1 Planning Statement.pdf:121: ● the following wildlife sites should be given the same protection as
TR030002-000566-Doc 7.1 Planning Statement.pdf:121: - potential Special Protection Areas and possible Special Areas
TR030002-000566-Doc 7.1 Planning Statement.pdf:121: adverse effects on European sites, potential Special Protection
TR030002-000566-Doc 7.1 Planning Statement.pdf:127: ● Policy CS10 (‘Environmental Protection and Enhancement’)
TR030002-000566-Doc 7.1 Planning Statement.pdf:132: 17 ‘Coastal Protection and Flood
TR030002-000566-Doc 7.1 Planning Statement.pdf:133: Environmental protection policies Environmental Statement
TR030002-000467-Section 6 App 6.1 Land quality investigation meeting note.pdf:3:Source Protection Zone. Given the industrial history of the site and environs, it is anticipated that
TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:10: (transitional water body). protection, navigation and the quay line. It is currently at Moderate Ecological Potential
TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:14: Heavily Modified (Flood Protection, Navigation, Quayline)
TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:16: Heavily Modified (coastal protection)
TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:30: Install suitable bed and bank protection adjacent to water courses to minimise the chance of
TR030002-001873-Decision holding letter.pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated.pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:4:34. Protection of Interests
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:5: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:25:Protection of Interests
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:34:rise to the need to consider gas protection measures within buildings then these must be set a
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:37: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:37: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:38: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:38: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:39: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:39: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:39: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:40: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:41: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:42: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:43: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:43: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:44: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:45: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:46: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:46: for the protection of the conveyor
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:49: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:49: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:59: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:66: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:66: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:66: 3. Except for protection),) and 8 (expenses) and 9 (indemnity)
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:68:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:68:Retained apparatus: protection
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:69:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:70:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:72:75(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:73:Grid Plant Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA and the registered
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:75: FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:78: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:82:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:82:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:84:Tees Port Authority may make for the protection of—
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:84: protection.
TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:89: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000438-ES Section 3 Project description_2 of 2.pdf:63: x Relatively low amounts of excavation x Route would require protection from
TR030002-000710-York Potash Limited (Document 6.8A).pdf:22:Section 17 – Coastal protection and flood defence
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:3: FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED CROSSINGS
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:3: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:6: assessment of the protection of underground assets and which study shall provide for individual
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:6: assessment of the protection of underground assets and which study shall provide for individual
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:7: the cats pipeline cathodic protection system and the proposed remedial works.
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:8: cathodic protection of the pipes; and
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:9: (2) Any construction works above the buried sections of the cats pipeline will require the protection
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:10: effectiveness of the repairs and cathodic protection and any further works or testing shown by
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:10: damage to the cats pipeline cathodic protection system, the undertaker shall undertake any
TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:16: Further protection in relation to the exercise of powers under the Order
TR030002-000018-Examination Library.pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library.pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-000725-York Potash Limited (Document 6.10).pdf:16: agreed controls, protection and mitigation measures (including those in the CEMP) are in
TR030002-000110-130729 York Potash meeting - Minutes of the meeting with key statutory bodies.pdf:4: important principle of protection for the environment. It is a system established over
TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:10:protection of private interests (ER 8.9.19-23). He is satisfied also that there is no realistic
TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:11:52. In paragraph 4 of Schedule 7 (for the protection of Network Rail) the Secretary of
TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:11:53. In paragraph 2 of Schedule 9 (for the protection of the pipeline corridor and protected
TR030002-000276-National Grid.pdf:1:protection of National Grid's assets. The agreement is in final form and it is hoped will be executed
TR030002-000453-ES Section 18 Infrastructure.pdf:3:Network Rail will seek to obtain certain assurances and protections in connection included in the Draft DCO.
TR030002-000453-ES Section 18 Infrastructure.pdf:3:asset protection or other required agreements as are identified once further details
TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:17: UK Parliament, 1990; The Environmental Protection Act 1990;
TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:17: The Environmental Protection Act 1990 (as amended by the Clean Neighbourhoods and
TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:22: UK Parliament, 1990; The Environmental Protection Act 1990 (as amended by the Clean
TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:82: UK Parliament, 1990; The Environmental Protection Act 1990 (as amended by the Clean
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:4: location and protection of assets/services in the land. Clearly, Plots 9 and 10 (at RBT) are
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:4: without the protection of Schedules 9 and 10 and there is currently no general provision within
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:6: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:6: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:9: assessment of the protection of underground assets and which study shall provide for
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:9: assessment of the protection of underground assets and which study shall provide for
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:9: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:11: existing cathodic protection of the asset; and
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:12: protection of the cats pipeline.
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:13: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:13:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:17: Further protection in relation to the exercise of powers under the Order
TR030002-000420-Doc 1.4 Document List.pdf:8:Environmental Protection
TR030002-000721-York Potash Limited.pdf:7:“Tees Estuary Habitat a strategy to identify the habitat protection and
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:1: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND PROTECTED CROSSINGS
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:3: in the Order land it should benefit from the full protection of the Protective Provisions.
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:3: and they should not be expected to accept a lesser degree of protection simply
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:3: (a) For underground pipelines the Applicant’s provisions limit the protection to works
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:3: protections they are seeking. In particular, the Objectors are keen to ensure that
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:3: the pipeline itself be “physically affected” may not secure this protection.
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:4: form of protection, which was for approval to be sought for “protected
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:4: the Secretary of State accepts that proposed pipelines will benefit from protection,
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:4: asset in question. In particular, the Objectors are seeking protection where works
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:6: wish to see the protections set out in sub paragraphs 3(1)(a) and 3(3) included in the
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:11: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:11: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:15: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:17: existing cathodic protection of the asset; and
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:17:protection of the cats pipeline.
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:19: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:19:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:24: Further protection in relation to the exercise of powers under the Order
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:32: Objectors with any protection, whilst the power to extinguish or override their rights
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:33: regard to Article 1 of the First Protocol of EHCR (protection of property).
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:35: apparatus does not benefit from this enhanced protection. Although, as a matter
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:37: therefore afforded the additional protection of Sections 127 and 138 of the
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:37: of protection indeed should be afforded to their interests.
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:44: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:44: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:48: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:50: existing cathodic protection of the asset; and
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:50:protection of the cats pipeline.
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:51: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:52:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000861-SABIC UK Petrochemicals Limited.PDF:57: Further protection in relation to the exercise of powers under the Order
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:1: for the Protection of the Pipeline Corridor and Protected Crossings” (the Objectors’ Deadline 6
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:4: protection of the existing pipeline corridor pipeline corridor over the years; however, it was never envisaged by the Objectors
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:4: protection provided for the existing pipes under exercise of the powers sought by the Applicant in the Order, which go far beyond the
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:4: exercised to their fullest extent if the stronger protection sought by the Objectors did
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:5:protections will apply if Order powers are exercised.
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:6: No specific programmed pipelines protection against compulsory acquisition would apply, thus reversing
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:7:protections it is offering, by amending the definition of “pipeline” to link it
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:7:development) the protection of the Protective Provisions.
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:8:being subject to an “unknown right”, and being excluded from protection
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:8:able to benefit from this protection as proposed pipelines. The onus will
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:8:“pipeline” and the protection afforded by the Protective Provisions
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:9: further curtail the broad protection of the Objector’s starting position by
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:9: grafting the protections they are seeking onto those proposed by the
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:10: watercourses is not felt to be than the protection of pipelines.
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:10: appropriate. The protection of these
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:11: be consistent and provide adequate protection to other owners and
TR030002-000882-151229 TR030002 Huntsman Submission.pdf:12: necessary. In particular the Applicant recorded their rights before the protection against compulsory
TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:15: the planning system does everything it can to 2.5 Although the protection of national parks
TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:58:stakeholders to understand how it might invest in • advance environmental protection and
TR030002-000445-ES Section 10 Terrestrial ecology.pdf:6:10.3.7 Great crested newts (a species which is afforded protection by both British and European law) use
TR030002-000445-ES Section 10 Terrestrial ecology.pdf:7: which are afforded special protection, such as barn owls and kingfishers) within the scheme
TR030002-000445-ES Section 10 Terrestrial ecology.pdf:8: spaces, which offer some form of protection for either individual bats or small numbers of bats.
TR030002-000769-York Potash Ltd (2).pdf:4:34. Protection of Interests
TR030002-000769-York Potash Ltd (2).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000769-York Potash Ltd (2).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000769-York Potash Ltd (2).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000769-York Potash Ltd (2).pdf:5: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000769-York Potash Ltd (2).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000769-York Potash Ltd (2).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000769-York Potash Ltd (2).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000769-York Potash Ltd (2).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000769-York Potash Ltd (2).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000769-York Potash Ltd (2).pdf:25:Protection of Interests
TR030002-000769-York Potash Ltd (2).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000769-York Potash Ltd (2).pdf:36: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:36: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:37: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:37: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:38: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:38: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:38: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:39: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:40: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:41: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:42: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:42: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:43: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:44: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:45: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:45: for the protection of the conveyor
TR030002-000769-York Potash Ltd (2).pdf:48: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000769-York Potash Ltd (2).pdf:48: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000769-York Potash Ltd (2).pdf:57: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000769-York Potash Ltd (2).pdf:64: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000769-York Potash Ltd (2).pdf:64: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000769-York Potash Ltd (2).pdf:64: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000769-York Potash Ltd (2).pdf:66:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000769-York Potash Ltd (2).pdf:66:Retained apparatus: protection
TR030002-000769-York Potash Ltd (2).pdf:67:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000769-York Potash Ltd (2).pdf:67:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000769-York Potash Ltd (2).pdf:70:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000769-York Potash Ltd (2).pdf:72: FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000769-York Potash Ltd (2).pdf:75: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000769-York Potash Ltd (2).pdf:79:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000769-York Potash Ltd (2).pdf:79:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000769-York Potash Ltd (2).pdf:81:Tees Port Authority may make for the protection of—
TR030002-000769-York Potash Ltd (2).pdf:81: protection.
TR030002-000769-York Potash Ltd (2).pdf:86: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:1: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND PROTECTED CROSSINGS
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:3: in the Order land it should benefit from the full protection of the Protective Provisions.
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:3: and they should not be expected to accept a lesser degree of protection simply
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:3: (a) For underground pipelines the Applicant’s provisions limit the protection to works
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:3: protections they are seeking. In particular, the Objectors are keen to ensure that
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:3: the pipeline itself be “physically affected” may not secure this protection.
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:4: form of protection, which was for approval to be sought for “protected
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:4: the Secretary of State accepts that proposed pipelines will benefit from protection,
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:4: asset in question. In particular, the Objectors are seeking protection where works
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:6: wish to see the protections set out in sub paragraphs 3(1)(a) and 3(3) included in the
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:11: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:11: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:15: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:17: existing cathodic protection of the asset; and
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:17:protection of the cats pipeline.
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:19: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:19:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:24: Further protection in relation to the exercise of powers under the Order
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:32: Objectors with any protection, whilst the power to extinguish or override their rights
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:33: regard to Article 1 of the First Protocol of EHCR (protection of property).
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:35: apparatus does not benefit from this enhanced protection. Although, as a matter
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:37: therefore afforded the additional protection of Sections 127 and 138 of the
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:37: of protection indeed should be afforded to their interests.
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:44: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:44: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:48: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:50: existing cathodic protection of the asset; and
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:50:protection of the cats pipeline.
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:51: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:52:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:57: Further protection in relation to the exercise of powers under the Order
TR030002-000689-York Potash Ltd (4).pdf:6: protection in excess of the current protection contained in the Deed
TR030002-000689-York Potash Ltd (4).pdf:8:b. For example the Order would allow the Applicant temporarily which is dealing with the specific protection of the pipelines
TR030002-000689-York Potash Ltd (4).pdf:9: protection against extinguishment. Reasons submitted with the application (Document 5.1).
TR030002-000689-York Potash Ltd (4).pdf:10: operations are to be afforded proper protection. This is acquisition powers in relation to unknown rights. This is
TR030002-000689-York Potash Ltd (4).pdf:14:protective provisions still provide the essential protections required to ensure that there will be no unacceptable impact on the operation
TR030002-000689-York Potash Ltd (4).pdf:17: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000689-York Potash Ltd (4).pdf:17: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000689-York Potash Ltd (4).pdf:20: assessment of the protection of underground assets and which study shall provide for
TR030002-000689-York Potash Ltd (4).pdf:20: assessment of the protection of underground assets and which study shall provide for
TR030002-000689-York Potash Ltd (4).pdf:20: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000689-York Potash Ltd (4).pdf:21: existing cathodic protection of the pipesasset; and
TR030002-000689-York Potash Ltd (4).pdf:22:protection of the cats pipeline.
TR030002-000689-York Potash Ltd (4).pdf:23: the costs of testing the effectiveness of the repairs and cathodic protection and any further
TR030002-000689-York Potash Ltd (4).pdf:24:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000689-York Potash Ltd (4).pdf:28: Further protection in relation to the exercise of powers under the Order
TR030002-000689-York Potash Ltd (4).pdf:30: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000689-York Potash Ltd (4).pdf:30: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000689-York Potash Ltd (4).pdf:32: assessment of the protection of underground assets and which study shall provide for
TR030002-000689-York Potash Ltd (4).pdf:32: assessment of the protection of underground assets and which study shall provide for
TR030002-000689-York Potash Ltd (4).pdf:33: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000689-York Potash Ltd (4).pdf:34: existing cathodic protection of the asset; and
TR030002-000689-York Potash Ltd (4).pdf:35:protection of the cats pipeline.
TR030002-000689-York Potash Ltd (4).pdf:36: the costs of testing the effectiveness of the repairs and cathodic protection and any further
TR030002-000689-York Potash Ltd (4).pdf:36:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000689-York Potash Ltd (4).pdf:40: Further protection in relation to the exercise of powers under the Order
TR030002-000689-York Potash Ltd (4).pdf:43: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000689-York Potash Ltd (4).pdf:49: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:14:effects on the integrity of the Teesmouth (Special Protection Area) SPA
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:16:that the implications of such a conveyor crossing in terms of impact protection
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:17:protection behind the quay. A highly localised strip of increased wave height is
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:17:Environmental Protection
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:17:8.59 The Council’s Environmental Protection Team has considered the
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:17:DCO. Environmental Protection officers advise that noise levels from the
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:17:8.60 The Environmental Protection Team would also require clarification on
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:18:predicted noise calculations. The Environmental Protection Team should also
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:18:8.63 Consideration has been given by the Environmental Protection team to
TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:18:between RCBC (Environmental Protection) and Royal HaskoningDHV
TR030002-000461-Section 3 App 3.2 Option study report.pdf:13: Protection from flooding and loss of flooded volume in the order of 75,000m3. This
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:13: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:13: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:14: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:15: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:16: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:16: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:17: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:17: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:18: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:19: requirements for the protection of
TR030002-000422-Doc 5.1 Statement of Reasons.pdf:34: protection of the individuals’ rights.
TR030002-000018-Examination Library (5).pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library (5).pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:2: x CS10: Environmental protection and enhancement.
TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:2: Sands area will be integrated with the protection and enhancement of biodiversity, geodiversity
TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:2: Protection Act (FEPA) and Coast Protection Act (CPA) requirements (Cefas, 2004).
TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:2: x The Salmon and Freshwater Fisheries Act 1975 which is aimed at the protection of freshwater
TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:4:The Salmon and Freshwater Fisheries Act 1975 is aimed at the protection of freshwater fish, with a strong focus on salmon Sections 1
TR030002-000883-151231 TR030002 CATS Parties Submission.pdf:5: protections that exist between the pipeline operators to be sufficient for the applicant’s
TR030002-000883-151231 TR030002 CATS Parties Submission.pdf:10:The level of risk mitigation that can be 7.4 to 7.15 5.4 PPs form a single layer of protection – identification of the location of the CATS
TR030002-000883-151231 TR030002 CATS Parties Submission.pdf:10:separate and subsequent human errors are occur places greater risk mitigation on a single human layer of protection than
TR030002-000883-151231 TR030002 CATS Parties Submission.pdf:10: the protections afforded to the CATS pipeline by the PPs
TR030002-000883-151231 TR030002 CATS Parties Submission.pdf:10: organisations in justifying any more than a single layer of protection as
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:2:34. Protection of interests
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: SCHEDULE 10 — FOR THE PROTECTION OF ASSET OWNERS AND
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: PART 1 — FOR THE PROTECTION OF ASSETS BRIDGED OR
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:3: SCHEDULE 11 — FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:7:“tidal work” (subject to paragraph 2 of Schedule 11 (for the protection of the Tees Port
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:23: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:23: of, and paragraph 15 of Schedule 3 to, the Environmental Protection Act 1990 (c. 25). There are other amendments to
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:24:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:24:Protection of interests
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:33:protection measures within buildings, these must be agreed with the local planning authority and
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:35: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:36: requirements for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:36: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:36: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:37: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:37: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:38: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:38: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:39: restrictions for the protection of the conveyor
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:42: 8. Section 20(d) (protection for interests of tenants at will etc) of the 1965 Act applies with the
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:51: FOR THE PROTECTION OF NETWORK RAIL
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:58: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:58: 1. For the protection of National Grid referred to in this Schedule the following provisions,
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:58: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) which apply in
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:60:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:60:Retained apparatus: protection
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:61:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:62:or protection of any apparatus or the construction of any new or alternative apparatus which may
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:64:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:65: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:66: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:69: assessment of the protection of underground assets and which study must provide for
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:69: assessment of the protection of underground assets and which study must provide for
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:69: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:71: existing cathodic protection of the asset; and
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:71: (2) Any construction works above the buried sections of the cats pipeline require the protection
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:72: and cathodic protection and any further works or testing shown by that testing to be
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:73:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:77:Further protection in relation to the exercise of powers under the Order
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:78: FOR THE PROTECTION OF ASSET OWNERS AND OTHERS
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:78: FOR THE PROTECTION OF ASSETS BRIDGED OR OVERSAILED
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:84: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:84: FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:85:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:87:Tees Port Authority may make for the protection of—
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:87: environmental protection.
TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:91: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000564-Doc 6.8 Governance Tracker.pdf:21:Section 17 – Coastal protection and flood defence
TR030002-000722-York Potash Limited 4.pdf:3: FLOWS, LAND QUALITY, COASTAL PROTECTION AND FLOOD DEFENCE AND WATER
TR030002-000722-York Potash Limited 4.pdf:4: conservation interests, biodiversity, water quality and flows, land quality, coastal protection
TR030002-000722-York Potash Limited 4.pdf:10: Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian
TR030002-000722-York Potash Limited 4.pdf:13: implementation of a Tees Estuary Habitat Strategy report to identify the habitat protection and
TR030002-000722-York Potash Limited 4.pdf:15: Protection (FEPA) and Coast Protection Act (CPA) requirements;
TR030002-000722-York Potash Limited 4.pdf:15: The Salmon and Freshwater Fisheries Act 1975 which is aimed at the protection of
TR030002-000722-York Potash Limited 4.pdf:18:8. COASTAL PROTECTION AND FLOOD DEFENCE
TR030002-000722-York Potash Limited 4.pdf:18: protection and flood defence, during the construction, operation and decommissioning phase
TR030002-000841-151214 TR030002 MMO - Response to ExA's questions.pdf:5: The MMO is content that the drafted DCO and DML set out its provisions and mitigation for protection of the marine environment. In
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:1: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND PROTECTED CROSSINGS
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:3: in the Order land it should benefit from the full protection of the Protective Provisions.
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:3: and they should not be expected to accept a lesser degree of protection simply
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:3: (a) For underground pipelines the Applicant’s provisions limit the protection to works
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:3: protections they are seeking. In particular, the Objectors are keen to ensure that
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:4: the pipeline itself be “physically affected” may not secure this protection.
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:4: form of protection, which was for approval to be sought for “protected
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:4: the Secretary of State accepts that proposed pipelines will benefit from protection,
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:4: asset in question. In particular, the Objectors are seeking protection where works
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:7: wish to see the protections set out in sub paragraphs 3(1)(a) and 3(3) included in the
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:11: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:11: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:14: assessment of the protection of underground assets and which study shall provide for
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:15: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:17: existing cathodic protection of the asset; and
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:17:protection of the cats pipeline.
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:19: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:19:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:24: Further protection in relation to the exercise of powers under the Order
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:32: Objectors with any protection, whilst the power to extinguish or override their rights
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:33: regard to Article 1 of the First Protocol of EHCR (protection of property).
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:35: apparatus does not benefit from this enhanced protection. Although, as a matter
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:37: therefore afforded the additional protection of Sections 127 and 138 of the
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:37: of protection indeed should be afforded to their interests.
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:44: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:44: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:47: assessment of the protection of underground assets and which study shall provide for
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:48: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:50: existing cathodic protection of the asset; and
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:50:protection of the cats pipeline.
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:51: and cathodic protection and any further works or testing shown by that testing to be
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:52:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:57: Further protection in relation to the exercise of powers under the Order
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:1:17 COASTAL PROTECTION AND FLOOD DEFENCE
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:1:17.1.1 This section of the ES describes the existing environment in relation to coastal protection and flood
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:1:17.2.1 The assessment of potential impacts to coastal protection and flood defence has been made with
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:5: consultation under Section 42 of the Planning Act 2008 of relevance to coastal protection and flood
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:6: regard to coastal protection and flood defence
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:9: protection and flood defence associated with the proposed scheme is provided within Section 4. The
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:9: effects on coast protection, flood defence, tidal, fluvial and pluvial (surface water) flood risk and site
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:11: above, there are many informal defences which provide a range of levels of protection, such as sand
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:12:17.4.16 The principal issue in relation to coastal protection and flood defence is whether the proposed scheme
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:13:17.5.1 The principal issue in relation to coastal protection and flood defence is whether the proposed scheme
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:15: open quay structure is predicted to fully transmit wave energy through to the shore protection behind
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:15: the proposed quay. The shore protection would have similar reflection characteristics to the existing
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:16: energy through to the shore protection behind the quay. The solid quay structure has higher reflection
TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:17:proposed protection from tidal
TR030002-000738-York Potash Limited 3.pdf:5:Cleveland Coast Special Protection Area (SPA) and Ramsar site, it is agreed Document 6.5 (Appendices to ES)
TR030002-000738-York Potash Limited 3.pdf:7: Protection Area (SPA) and Ramsar site.
TR030002-000738-York Potash Limited 3.pdf:9: Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian
TR030002-000738-York Potash Limited 3.pdf:12: Tees Estuary Habitat Strategy report to identify the habitat protection and enhancement
TR030002-000738-York Potash Limited 3.pdf:13:6.5. The Teesmouth and Cleveland Coast Special Protection Area (SPA) is of European importance
TR030002-000864-151216 TR030002 York Potash Ltd - Document 8.8 - Applicants Comments on ExA DCO.pdf:3: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE
TR030002-000730-Applicant response to First Questions - Appendix 5.pdf:19: Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance
TR030002-000730-Applicant response to First Questions - Appendix 5.pdf:28: A groundwater Source Protection Zones 1 or 2; or
TR030002-000730-Applicant response to First Questions - Appendix 5.pdf:28: SAC) and Proposed or Special Protection Area (pSPA or SPA) in England and Wales), Ramsar site
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:15: hydrology, coastal protection and flooding
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:38: interest features. European sites are afforded protection under the Conservation of Habitats and Species Regulations 2010,
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:38: Special Protection Area SPA) which is a European site. The site is also listed as Teesmouth and Cleveland Coast Ramsar
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:38: HRA process, and a competent authority should have regard to NE’s advice. Special Protection Areas (SPAs) are classified
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:40: • The Royal Society for the Protection of Birds; and
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:43: Piling: The Salmon and Freshwater Fisheries Act 1975 (SAFFA) is legislation aimed at the protection of freshwater fish, with
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:43: protection of migratory fish. Monitoring of sediment levels needs to be agreed to allow for background and threshold levels
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:45: interfaces with the railway network, Network Rail will seek to obtain certain assurances and protections in connection with
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:45: this scheme. In particular, it has been identified that there will be a Basic Asset Protection Agreement in respect of the initial
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:45: that the promoter will enter into any other such asset protection or other required agreements as are identified once further
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:45: precedented. It includes, for example, protection from compulsory acquisition of Network Rail's land, whether temporary or
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:45: boundary will require to be maintained at all times. Network Rail's Asset Protection teams will need to be fully consulted
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:47: repair and maintenance of it.5) Construction (including protection of existing apparatus during construction) - The Harbour
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:48: and which require protection. By way of example, our client's leases refer to protection strips which affect land above, below
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:48: relating to construction, excavation or raising or lowering the existing level of the surface of the protection strip. The
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:48: particular covenants concerning each protection strip are set out in the leases which our client holds and it would urge you
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:48: to review these as these need to be complied with for the protection of the Breagh Pipeline.
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:48: construct within the protection strip, rights to maintain the Breagh Pipeline, rights of access to the protection strip and the
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:49: lateral support and rights on reasonable prior notice to enter the protection strip for the purpose of walking the line of the
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:59: Environmental Protection Comments:
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:59: as an informative that discussions take place with officers from the Environmental Protection team to ensure that the
TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:59: development will need to consider the impact on the SSSI and Special Protection Area.
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated (1).pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:2:15.2.4 Designated and non-designated heritage assets are given protection under the NPPF. Provision for the
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:2: Protection of Wrecks Act (1973): Section One
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:2: Protection of Wrecks Act (1973): Section Two
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:2:15.2.6 This section provides protection for wrecks that are designated as dangerous due to their contents and
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:3: Particular protection will be given to the character and special features of: a) Conservation areas; b)
TR030002-000450-ES Section 15 Archaeology and heritage.pdf:3: heritage and the urban environment’ which also covers provision for and the protection of heritage and
TR030002-000492-Section 13 App 13.1 Air quality assessment methodology.pdf:7: Conservation (SACs) and Special Protection Areas (SPAs), consideration should be given as to
TR030002-000492-Section 13 App 13.1 Air quality assessment methodology.pdf:43: States Environmental Protection Agency (US EPA). It is widely used in the UK for regulatory and
TR030002-000492-Section 13 App 13.1 Air quality assessment methodology.pdf:44: Teesmouth and Cleveland Coast Special Protection Area (SPA); and,
TR030002-000492-Section 13 App 13.1 Air quality assessment methodology.pdf:44:4.3.1 Critical levels are provided for the protection of vegetation and ecosystems and correspond to the
TR030002-000410-ExA First Round Questions.pdf:1:protection and Flood defence …………………………………………………………… 19
TR030002-000410-ExA First Round Questions.pdf:4:Electricity and Tees Port authority and other enterprises in relation to protection
TR030002-000410-ExA First Round Questions.pdf:9:Article 34 and Schedules 7-11 Protection of interests
TR030002-000410-ExA First Round Questions.pdf:9:protection of Network Rail Infrastructure Limited have been agreed. Please
TR030002-000410-ExA First Round Questions.pdf:19:protection and Flood defence (WRF)
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:5:5.4 All notes contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:6:5.5 BP design standards or industry design standards will be followed in dealing with protection of their
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:6:7.1 A key concern is the protection of the buried assets. A lifting study will be developed looking at the issues
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:7:7.5 Any construction works above the buried pipeline will require the protection of the pipeline. This could be
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:7: require the protection of the pipeline from falling objects. This would be over the full width of the
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:7: looking at the issues of protecting assets below the ground (i.e. protection mats etc.) and determining the
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9: protection (i.e. temporary propping). Any additional protection will be subject to the approval of BP.
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9:8.7 The BP CATS pipeline is protected with a cathodic protection system. A functional test/survey will be
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9: Representative. The monitoring will identify any changes to the cathodic protection system and possible
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9: damage from construction activities. During the operational phase the cathodic protection will continue to
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9: be monitored by BP to test the effectiveness of the cathodic protection system and to test for stray
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9: mitigation and/or modifications to the cathodic protection are to be implemented such as the installation
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:9:8.8 The locations of the cathodic protection system test positions will be added to the construction drawings
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:13:2.3 Temporary Protection
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:13:It may be necessary at crossing points to install temporary protection over the wayleave. Such protection
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:13:construction of such protection is to be approved by the BP representative. The protection installed shall
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:13:4 Protection of Exposed Pipeline
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:14:11 Protection of Pipe
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:15:protection of any foreign services that may be uncovered within the extent of the excavation.
TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf:18:Protection
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:2:34. Protection of interests
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: SCHEDULE 10 — FOR THE PROTECTION OF ASSET OWNERS AND
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: PART 1 — FOR THE PROTECTION OF ASSETS BRIDGED OR
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:3: SCHEDULE 11 — FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:7: “tidal work” (subject to paragraph 2 of Schedule 11 (for the protection of the Tees Port
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:23: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:23:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:23:Protection of interests
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:23: of, and paragraph 15 of Schedule 3 to, the Environmental Protection Act 1990 (c. 25). There are other amendments to
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:32:protection measures within buildings, these must be agreed with the local planning authority and
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:34: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:35: requirements for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:35: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:35: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:36: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:36: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:37: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:37: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:38: restrictions for the protection of the conveyor
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:41: 8. Section 20(d) (protection for interests of tenants at will etc.) of the 1965 Act applies with the
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:53: FOR THE PROTECTION OF NETWORK RAIL
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:60: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:60: 1. For the protection of National Grid referred to in this Schedule the following provisions,
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:60: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) which apply in
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:62:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:62:Retained apparatus: protection
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:63:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:64:or protection of any apparatus or the construction of any new or alternative apparatus which may
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:66:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:68: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:68: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:71: assessment of the protection of underground assets and which study must provide for
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:71: assessment of the protection of underground assets and which study must provide for
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:71: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:73: existing cathodic protection of the asset; and
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:74: (2) Any construction works above the buried sections of the cats pipeline require the protection
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:75: and cathodic protection and any further works or testing shown by that testing to be
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:75:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:79:Further protection in relation to the exercise of powers under the Order
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:82: FOR THE PROTECTION OF ASSET OWNERS AND OTHERS
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:82: FOR THE PROTECTION OF ASSETS BRIDGED OR OVERSAILED
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:87: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:88: FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:88:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:90:Tees Port Authority may make for the protection of—
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:90: environmental protection.
TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:95: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000764-Redcar and Cleveland Borough Council.pdf:2:The Environmental Protection Team agrees with the applicants comments that the
TR030002-000764-Redcar and Cleveland Borough Council.pdf:2:assessment for all phases of the development as it offers more protection to
TR030002-000764-Redcar and Cleveland Borough Council.pdf:2:Council Environmental Protection Team
TR030002-000764-Redcar and Cleveland Borough Council.pdf:3:Redcar and Cleveland Environmental Protection Team: “I would re-iterate the
TR030002-000764-Redcar and Cleveland Borough Council.pdf:4:Environmental Protection Team would require further information outlining what
TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:19: the planning system does everything it can to 2.5 Although the protection of national parks
TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:62:stakeholders to understand how it might invest in • advance environmental protection and
TR030002-000777-York Potash Ltd (9).pdf:6:“Tees Estuary Habitat a strategy to identify the habitat protection and
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:2:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:6:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:12: therefore provides them with no protection, whilst the power to extinguish or override
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:14: also bound to have regard to Article 1 of the First Protocol of EHCR (protection of
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:14: 5.4.3 These special protections are necessary because such undertakings provide a service
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:23: or side agreement for the protection of the Objectors, it is not considered that the
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:24: 6.13.1 Protective provisions for the Protection of the Pipeline Corridor have been included in
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:24: 6.13.4 The protections are stated to apply to “all pipes within the pipeline corridor”. The
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:24: the protection is unclear and should be defined by reference to those parts of the Order
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: their apparatus. Consultation would seem a very weak protection: the Objectors
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: 6.13.17 In Paragraph 13 protection is provided in respect of excavations in the direct vicinity of
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: that Baseline cathodic protection testing and installation of continuous monitoring
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:27: 6.13.28 In short the proposed protections are considered to be wholly inadequate.
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:27: underground the conveyor on this location, as well as the need to secure access and protection
TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:32: 168. The only effective means of protection is by compulsory purchase. As a housing
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:3:34. Protection of Interests
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may maintain the authorised
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:25:Protection of Interests
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:37: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:38: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:38: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:41: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:41: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:43: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:43: requirements for the protection
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:44: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:44: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:46: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:47: for the protection of the conveyor
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:50: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:50: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:60: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:67: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:67: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:67: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:69:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:69:Retained apparatus: protection
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:70:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:70:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:73:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:75: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:75: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:78: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:80: existing cathodic protection of the asset; and
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:80:protection of the cats pipeline.
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:82: cathodic protection and any further works or testing shown by that testing to be reasonably
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:82:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:86: Further protection in relation to the exercise of powers under the Order
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:88: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:93: FOR THE PROTECTION OF REDULARREDCAR BULK TERMINAL
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:94:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:94:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:96:Tees Port Authority may make for the protection of—
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:96: protection.
TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:101: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-001856-Examining Authority’s Recommendation Report.pdf:13: Protection Area (SPA) and Ramsar site, this issue is more fully
TR030002-001856-Examining Authority’s Recommendation Report.pdf:20: the Protective Provisions in Schedules 9 and 10 for the protection of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:23: strict system of species protection. The directive protects over 1000
TR030002-001856-Examining Authority’s Recommendation Report.pdf:24:3.5.2 The Birds Directive is a comprehensive scheme of protection for all
TR030002-001856-Examining Authority’s Recommendation Report.pdf:24: great emphasis on the protection of habitats for endangered as well as
TR030002-001856-Examining Authority’s Recommendation Report.pdf:24: Protection Areas (SPAs) comprising all the most suitable territories for
TR030002-001856-Examining Authority’s Recommendation Report.pdf:25:Special Protection Areas (SPAs), potential SPAs; Sites of Community Importance (SCIs); listed or proposed
TR030002-001856-Examining Authority’s Recommendation Report.pdf:27:3.6.5 A National Park has statutory protection in order to conserve and
TR030002-001856-Examining Authority’s Recommendation Report.pdf:28: contains measures for the protection and management of SSSIs.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:28:3.6.11 The Act is divided into four parts: Part l relating to the protection of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:28: provisions for the protection and management of SSSIs.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:31: environmental protection are also considered, the last in relation to
TR030002-001856-Examining Authority’s Recommendation Report.pdf:35: issues, environmental protection against noise nuisance,
TR030002-001856-Examining Authority’s Recommendation Report.pdf:39: environmental protection including of heritage assets and enhance
TR030002-001856-Examining Authority’s Recommendation Report.pdf:47: than in relation to the protection of assets of other commercial
TR030002-001856-Examining Authority’s Recommendation Report.pdf:50: SO2 concentrations would be below critical levels for protection of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:52: Teesmouth and Cleveland Coast Special Protection Area
TR030002-001856-Examining Authority’s Recommendation Report.pdf:59: the quay works would provide some protection against tidal flooding of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:59: of the Environmental Protection Act 1990 to take steps to investigate
TR030002-001856-Examining Authority’s Recommendation Report.pdf:60: of the Environmental Protection Act 1990 (EPA1990) Document 6.2
TR030002-001856-Examining Authority’s Recommendation Report.pdf:71: the DCO intended to provide protection for the Tees Port Authority.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:74: not directly of interest to the Centre for the Protection of National
TR030002-001856-Examining Authority’s Recommendation Report.pdf:78: Schedules 9 and 10 for the protection of the pipeline corridor and
TR030002-001856-Examining Authority’s Recommendation Report.pdf:78: protected crossings and the protection of assets bridged/over-sailed
TR030002-001856-Examining Authority’s Recommendation Report.pdf:83: a surrounding buffer zone, nor any groundwater protection zones.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:84: deterioration and protection and enhancement of the status of aquatic
TR030002-001856-Examining Authority’s Recommendation Report.pdf:96: the EMP in respect to the protection of waterbirds from operational
TR030002-001856-Examining Authority’s Recommendation Report.pdf:102: Protective Provisions in Schedule 11 for the Protection of the Tees Port
TR030002-001856-Examining Authority’s Recommendation Report.pdf:119: protection being provided for the 'pipeline corridor' within the
TR030002-001856-Examining Authority’s Recommendation Report.pdf:120: made and to be made to the Protective Provisions for the protection of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:123: the Protection of National Grid Electricity are set out in Schedule 8 to
TR030002-001856-Examining Authority’s Recommendation Report.pdf:125: enter into an asset protection agreement and for an easement to be
TR030002-001856-Examining Authority’s Recommendation Report.pdf:136: representations states that 'subject to the proper protection of their
TR030002-001856-Examining Authority’s Recommendation Report.pdf:138: protection for future pipelines cannot be open ended and, as the
TR030002-001856-Examining Authority’s Recommendation Report.pdf:139: provisions of Article 30(12) would reinforce the protection afforded to
TR030002-001856-Examining Authority’s Recommendation Report.pdf:139: with the applicant that general protection for the Wilton complex
TR030002-001856-Examining Authority’s Recommendation Report.pdf:140: greater degree of protection to the asset owners and operators of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:145:8.7.71 The Centre for Protection of National Infrastructure (CPNI) classifies
TR030002-001856-Examining Authority’s Recommendation Report.pdf:146: single layer of protection in the correct identification of the location of
TR030002-001856-Examining Authority’s Recommendation Report.pdf:148: this corridor and the existing protections offered by the deed of grant
TR030002-001856-Examining Authority’s Recommendation Report.pdf:152: across the parcels that require protection the areas are primarily
TR030002-001856-Examining Authority’s Recommendation Report.pdf:162: protection for:
TR030002-001856-Examining Authority’s Recommendation Report.pdf:162: parties they are intended to provide protection for. The very small
TR030002-001856-Examining Authority’s Recommendation Report.pdf:185:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-001856-Examining Authority’s Recommendation Report.pdf:195:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-001856-Examining Authority’s Recommendation Report.pdf:213: CPNI Centre for Protection of National Infrastructure
TR030002-001856-Examining Authority’s Recommendation Report.pdf:213: EPA1990 Environmental Protection Act 1990
TR030002-001856-Examining Authority’s Recommendation Report.pdf:214: SPA Special Protection Area
TR030002-001856-Examining Authority’s Recommendation Report.pdf:218:34. Protection of Interests
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001856-Examining Authority’s Recommendation Report.pdf:219: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-001856-Examining Authority’s Recommendation Report.pdf:239: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
TR030002-001856-Examining Authority’s Recommendation Report.pdf:239:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-001856-Examining Authority’s Recommendation Report.pdf:239: Environmental Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this
TR030002-001856-Examining Authority’s Recommendation Report.pdf:240:Protection of Interests
TR030002-001856-Examining Authority’s Recommendation Report.pdf:249:protection measures within buildings then these must be agreed with the local planning authority
TR030002-001856-Examining Authority’s Recommendation Report.pdf:252: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:252: requirements for the protection
TR030002-001856-Examining Authority’s Recommendation Report.pdf:253: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:253: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:254: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:255: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:256: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:256: for the protection of the conveyor
TR030002-001856-Examining Authority’s Recommendation Report.pdf:259: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-001856-Examining Authority’s Recommendation Report.pdf:259: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-001856-Examining Authority’s Recommendation Report.pdf:271: FOR THE PROTECTION OF NETWORK RAIL
TR030002-001856-Examining Authority’s Recommendation Report.pdf:278: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-001856-Examining Authority’s Recommendation Report.pdf:278: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-001856-Examining Authority’s Recommendation Report.pdf:278: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-001856-Examining Authority’s Recommendation Report.pdf:280:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-001856-Examining Authority’s Recommendation Report.pdf:280:Retained apparatus: protection
TR030002-001856-Examining Authority’s Recommendation Report.pdf:281:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-001856-Examining Authority’s Recommendation Report.pdf:282:or protection of any apparatus or the construction of any new or alternative apparatus which may
TR030002-001856-Examining Authority’s Recommendation Report.pdf:284:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-001856-Examining Authority’s Recommendation Report.pdf:286: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-001856-Examining Authority’s Recommendation Report.pdf:286: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-001856-Examining Authority’s Recommendation Report.pdf:289: assessment of the protection of underground assets and which study shall provide for
TR030002-001856-Examining Authority’s Recommendation Report.pdf:289: assessment of the protection of underground assets and which study shall provide for
TR030002-001856-Examining Authority’s Recommendation Report.pdf:289: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-001856-Examining Authority’s Recommendation Report.pdf:291: existing cathodic protection of the asset; and
TR030002-001856-Examining Authority’s Recommendation Report.pdf:292:protection of the cats pipeline.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:293: and cathodic protection and any further works or testing shown by that testing to be
TR030002-001856-Examining Authority’s Recommendation Report.pdf:293:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-001856-Examining Authority’s Recommendation Report.pdf:297: Further protection in relation to the exercise of powers under the Order
TR030002-001856-Examining Authority’s Recommendation Report.pdf:299: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-001856-Examining Authority’s Recommendation Report.pdf:304: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-001856-Examining Authority’s Recommendation Report.pdf:306:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-001856-Examining Authority’s Recommendation Report.pdf:306:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:308: Tees Port Authority may make for the protection of—
TR030002-001856-Examining Authority’s Recommendation Report.pdf:308: environmental protection.
TR030002-001856-Examining Authority’s Recommendation Report.pdf:313: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:4:34. Protection of Interests
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:11:provisions for the protection of the Tees Port Authority) the undertaker may maintain the authorised
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:25: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:25: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:26:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:26:Protection of Interests
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:35:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:38: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:41: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:42: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:42: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:44: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:44: requirements for the protection
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:46: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:46: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:47: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:48: for the protection of the conveyor
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:51: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:51: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:61: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:68: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:68: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:68: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:70:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:70:Retained apparatus: protection
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:71:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:71:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:74:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:76: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:76: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:79: assessment of the protection of underground assets and which study shall provide for
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:79: assessment of the protection of underground assets and which study shall provide for
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:79: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:81: existing cathodic protection of the pipesasset; and
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:82:protection of the cats pipeline.
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:83: including the costs of testing the effectiveness of the repairs and cathodic protection and
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:83:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:88: Further protection in relation to the exercise of powers under the Order
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:89: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:94: FOR THE PROTECTION OF REDULAR BULK TERMINAL
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:96:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:96:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:98:Tees Port Authority may make for the protection of—
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:98: protection.
TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:103: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:5: while in use are now allayed, even if the points of express limitation. Tata is therefore afforded protection from any kind of interference
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:10: (b) any cathodic protection, coating or special wrapping of the apparatus; and oxy gen and nitrogen pipes, HV cables, Gas Main,
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:14: technical assessment of the protection of underground assets and which study shall
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:14: technical assessment of the protection of underground assets and which study shall
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:14: protection system and the proposed remedial works. Comment IG15: Why lim ited j ust to cats?
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:16: existing cathodic protection of the pipesaffected asset; and
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:17: protection of the cats pipeline. Comment IG19: Why only cats?
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:19: including the costs of testing the effectiveness of the repairs and cathodic protection
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:19: development to ascertain any change or damage to the cats pipeline cathodic protection Comment IG22: Is this unique to the cats
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:23: necessary protection exists in the remainder of the
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:25:Further protection in relation to the exercise of powers under the Order
TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:26: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000714-Marine Management Organisation.pdf:14:Protective provisions for the protection of the Tees Port Authority
TR030002-000018-Examination Library (3).pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library (3).pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:4:34. Protection of Interests
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:11:provisions for the protection of the Tees Port Authority) the undertaker may maintain the authorised
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:25: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:25: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:26:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:26:Protection of Interests
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:35:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:41: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:42: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:42: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:44: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:44: requirements for the protection
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:45: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:45: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:46: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:46: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:47: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:48: for the protection of the conveyor
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:51: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:51: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:61: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:68: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:68: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:68: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:70:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:70:Retained apparatus: protection
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:71:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:71:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:74:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:76: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:76: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:79: assessment of the protection of underground assets and which study shall provide for
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:79: assessment of the protection of underground assets and which study shall provide for
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:79: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:81: existing cathodic protection of the asset; and
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:81:protection of the cats pipeline.
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:83: cathodic protection and any further works or testing shown by that testing to be reasonably
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:83:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:87: Further protection in relation to the exercise of powers under the Order
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:89: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:94: FOR THE PROTECTION OF REDULAR BULK TERMINAL
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:95:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:95:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:97:Tees Port Authority may make for the protection of—
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:97: protection.
TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:102: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000455-ES Section 20 Landscape and visual environment.pdf:1:20.2.1 The existing landscape within and surrounding the Wilton site is not subject to protection at the highest
TR030002-000455-ES Section 20 Landscape and visual environment.pdf:2: the protection and enhancement of the landscape character and natural beauty of the North
TR030002-000711-Applicants Response to First Questions.pdf:10: in relation to protection of pipelines and
TR030002-000711-Applicants Response to First Questions.pdf:23:DCO Network Rail Article 34 and Schedules 7-11 Protection
TR030002-000711-Applicants Response to First Questions.pdf:23: National Grid states that the provisions for the protection Protective provisions in respect of Network Rail were
TR030002-000711-Applicants Response to First Questions.pdf:49: Coastal protection and flood defence (Section 17.4 of
TR030002-000711-Applicants Response to First Questions.pdf:60: Water quality, Coastal protection and Flood defence
TR030002-000711-Applicants Response to First Questions.pdf:72: would need to collect to undertake the studies/mitigation measures (e.g. gas protection
TR030002-000711-Applicants Response to First Questions.pdf:76: protection and enhancement opportunities and priorities
TR030002-000711-Applicants Response to First Questions.pdf:86: identify the location of the visual fencing habitat protection measures.
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:1: Protection Act 1990 Statement (Re
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:3: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:3:STATEMENT RELATING TO THE ENVIRONMENTAL PROTECTION ACT 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:4: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:5: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:5: (statutory nuisances and inspections therefor) of the Environmental Protection
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:5: statement relating to the Environmental Protection Act 1990 makes reference
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:6: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:7: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:8: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:9: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:10: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:10: below the critical levels for the protection of vegetation and ecosystems
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:11: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:12: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:13: Statement relating to section 79(1) Environmental Protection Act 1990
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:3:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:9: therefore provides them with no protection, whilst the power to extinguish or override
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:11: also bound to have regard to Article 1 of the First Protocol of EHCR (protection of
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:11: 5.4.3 These special protections are necessary because such undertakings provide a service
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:20: or side agreement for the protection of the Objectors, it is not considered that the
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:21: 6.13.1 Protective provisions for the Protection of the Pipeline Corridor have been included in
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:21: 6.13.4 The protections are stated to apply to “all pipes within the pipeline corridor”. The
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:21: the protection is unclear and should be defined by reference to those parts of the Order
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: their apparatus. Consultation would seem a very weak protection: the Objectors
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: 6.13.17 In Paragraph 13 protection is provided in respect of excavations in the direct vicinity of
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: that Baseline cathodic protection testing and installation of continuous monitoring
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:24: 6.13.28 In short the proposed protections are considered to be wholly inadequate.
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:24: underground the conveyor on this location, as well as the need to secure access and protection
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:29: 168. The only effective means of protection is by compulsory purchase. As a housing
TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:102:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000018-Examination Library (2).pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library (2).pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:16: payment of compensation for the protection of any interests
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:20: Article 34 (Protection of interests)
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:28: Schedule 7 (Provisions for the Protection of Network Rail)
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:28: Schedule 8 (Provisions for the Protection of National Grid)
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:28: lines and accordingly provisions for the protection of those
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:28: Schedule 10 (Provisions for the Protection of Assets
TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:29: Schedule 11 (Provisions for the Protection of the Tees Port
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:3:APPENDIX 1: DEPENDENCY OF LAYER OF PROTECTION 17
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:7:5.2 The Government agency, Centre for Protection of National Infrastructure (CPNI), sets limits
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:10:7.6 It is the CATS Parties’ position that the PPs form a single layer of protection for the CATS
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:11: this basis, the protections afforded to the CATS pipeline by the PPs are appropriate and
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:12: management system and standard operating procedures cannot be claimed as a protection
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:12: for a protection layer because they define requirements for the conduct of activities and
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:12: page 117). On this basis, to claim a second layer of protection as a result of the multiple
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:12: foregoing discussion, only if layers of protection are truly independent can full credit be taken
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:13: determining the dependency of layers of protection in Preventing the propagation of error
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:13:7.15 In conclusion, the CATS Parties consider that the PPs present a single layer of protection in
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:16: question the value of the protections offered in Schedule 9.
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:18:APPENDIX 1: DEPENDENCY OF LAYER OF PROTECTION
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:18: dependency of layers of protection.
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:18: lead to separate layers of protection having dependency on one another
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:18: separate layers of protection
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:22: mitigation that can be claimed for layers of protection with high dependency. This value is 0.5
TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:22: (page 589). Therefore, the probability that additional layers of protection with high
TR030002-000709-SABIC UK Petrochemicals Limited 1.pdf:1: The Protective Provisions in Schedule 9 are the relevant protections which are being
TR030002-000709-SABIC UK Petrochemicals Limited 1.pdf:2: Consideration is also being given to the terms of the Dogger Bank protections and the
TR030002-000403-North Yorkshire County Council.pdf:3:Information Act, the Data Protection Act or the Environmental Information
TR030002-000735-Applicant response to First Questions - Appendix 4.pdf:11: within Flood Zones 2 or 3 with a higher risk of flooding. Protection from
TR030002-000735-Applicant response to First Questions - Appendix 4.pdf:23:5.14 The tunnel requires protection from flooding for a design flood level of 3m
TR030002-000449-ES Section 14 Noise and vibration.pdf:5:14.2.12 Objective 7, Protection from Pollution 2.80 of the SBC Local Plan (SBC, 1997) states:
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:3:34. Protection of Interests
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:25:Protection of Interests
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:37: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:38: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:39: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:40: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:41: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:42: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:44: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:44: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:45: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:46: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:47: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:48: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:48: for the protection of the conveyor
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:51: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:51: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:62: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:69: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:69: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:69: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:71:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:71:Retained apparatus: protection
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:72:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:72:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:75:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:77: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:77: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:80: existing cathodic protection of the pipes within the pipeline corridor or as may be
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:82: testing the effectiveness of the repairs and cathodic protection and any further works or
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:86: Further protection in relation to the exercise of powers under the Order
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:88: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:93:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:93:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:95:Tees Port Authority may make for the protection of—
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:95: protection.
TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:100: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-001873-Decision holding letter (1).pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-000739-TATA Steel UK Limited and Others.pdf:20: protection under the DCO.
TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:19:Sir/Madam National Grid Plant Protection Block 1 Floor 1 Brick Kiln Street Hinckley
TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:38: and hydrology, coastal protection and
TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:296: • Coastal Protection and Flood Risk
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:6: 5.13 Coastal protection and flood defence 80
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:8: RSPB Royal Society for the Protection of Birds
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:8: SPA Special Protection Area
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:17: comprise Special Protection Area’s (SPA), as designated under Council Directive
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:20: • Provide high standards of protection for the natural environment.
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:40: • Royal Society for the Protection of Birds (RSPB).
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:49:Protection Act 1990 (as amended) including inert waste, general and biodegradable
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:57: • Canadian Sediment Quality Guidelines for the Protection of Aquatic Life (CCME,
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:70: species for which it is afforded protection (e.g. noise, presence and lighting
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:79: Protection UK in their guidance document Development Control: Planning for Air Quality
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:88:5.13 Coastal protection and flood defence
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:88: are many informal defences which provide a range of levels of protection, such as sand
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:89: The principal environmental issue in relation to coastal protection and flood defence is
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:89: appendix to the ES. The results of the FRA will be used to inform the coastal protection
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:100: • Coastal protection and flood defence.
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:101: Some areas require special protection under European legislation. The WFD therefore
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:108:protection and • Flood risk to the site and other areas within the estuary. commencement to ensure the deli
TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:109: guidelines for the protection of aquatic life: Summary tables. Update. In: Canadian
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:1:DCO 2.4 Article 34 and Schedules 7-11 Protection of interests
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:3: “unknown rights”, the latter not benefitting from protection against
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:3: protection. This is because many of SABIC and Huntsman’ rights in
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:8: FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED CROSSINGS ETC.
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:8: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:12: cathodic protection of the relevant pipelines; and
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:14: effectiveness of the repairs and cathodic protection and any further works or testing shown by
TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:19: Further protection in relation to the exercise of powers under the Order
TR030002-000448-ES Section 13 Air quality.pdf:4: Core Strategy Policy 10 (CS10) – Environmental Protection and Enhancement
TR030002-000448-ES Section 13 Air quality.pdf:4: Sands area, will be integrated with the protection and enhancement of biodiversity, geodiversity and
TR030002-000448-ES Section 13 Air quality.pdf:6: loads for ecosystem protection from atmospheric nitrogen
TR030002-000448-ES Section 13 Air quality.pdf:8: x Environmental Protection UK (EPUK) (2010) Development Control: Planning for Air Quality
TR030002-000448-ES Section 13 Air quality.pdf:8: Objectives for PM10 have been set for the protection of human health, and the term PM10 is used in this
TR030002-000448-ES Section 13 Air quality.pdf:18: exposure, set at concentrations that provide protection to all members of society, including more
TR030002-000448-ES Section 13 Air quality.pdf:35: predicted to be below the critical levels for the protection of vegetation and ecosystems for both
TR030002-000771-York Potash Ltd (3).pdf:4:34. Protection of Interests
TR030002-000771-York Potash Ltd (3).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000771-York Potash Ltd (3).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000771-York Potash Ltd (3).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000771-York Potash Ltd (3).pdf:5: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000771-York Potash Ltd (3).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000771-York Potash Ltd (3).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000771-York Potash Ltd (3).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000771-York Potash Ltd (3).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000771-York Potash Ltd (3).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000771-York Potash Ltd (3).pdf:25:Protection of Interests
TR030002-000771-York Potash Ltd (3).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000771-York Potash Ltd (3).pdf:36: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:36: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:37: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:37: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:38: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:38: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:38: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:39: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:40: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:41: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:42: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:42: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:43: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:44: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:45: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:45: for the protection of the conveyor
TR030002-000771-York Potash Ltd (3).pdf:48: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000771-York Potash Ltd (3).pdf:48: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000771-York Potash Ltd (3).pdf:57: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000771-York Potash Ltd (3).pdf:64: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000771-York Potash Ltd (3).pdf:64: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000771-York Potash Ltd (3).pdf:64: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000771-York Potash Ltd (3).pdf:66:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000771-York Potash Ltd (3).pdf:66:Retained apparatus: protection
TR030002-000771-York Potash Ltd (3).pdf:67:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000771-York Potash Ltd (3).pdf:67:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000771-York Potash Ltd (3).pdf:70:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000771-York Potash Ltd (3).pdf:71:Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA and the registered office of
TR030002-000771-York Potash Ltd (3).pdf:72: FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000771-York Potash Ltd (3).pdf:75: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000771-York Potash Ltd (3).pdf:79:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000771-York Potash Ltd (3).pdf:79:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000771-York Potash Ltd (3).pdf:81:Tees Port Authority may make for the protection of—
TR030002-000771-York Potash Ltd (3).pdf:81: protection.
TR030002-000771-York Potash Ltd (3).pdf:86: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:32: pollution incidents, groundwater source protection zones and aquifer
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:39:Species Protection Recorded near
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:39:Eurasian badger Protection of Badgers Act (1992) Cloughton; Burniston;
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:41: no superficial deposit aquifer classification. There is no Source Protection Zone (SPZ)
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:52: no superficial deposit aquifer classification. There is no Source Protection Zone (SPZ)
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:61: Species Protection Recorded near
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:61: Eurasian badger Protection of Badgers Act (1992) Sleights; Ruswarp
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:63: no superficial deposit aquifer classification. There is no Source Protection Zone (SPZ)
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:75: no superficial deposit aquifer classification. There is no Source Protection Zone (SPZ)
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:84: Species Protection Recorded near
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:85: Species Protection Recorded near
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:85: Eurasian badger Protection of Badgers Act (1992) Little beck Wood;
TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:86: classification. There is no Source Protection Zone (SPZ) within the area boundary.
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:18: have the highest status of protection in relation to landscape and scenic
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:21: and scenic beauty. These areas have the highest status of protection in
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:26: from employing around 360 people, it is also responsible for the protection
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:44: (SAC), Special Protection Area (SPA), Ramsar and a Site of Special Scientific Interest (SSSI). A
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:48: continues to attach great weight to the protection of the special qualities of national parks but the
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:72: advance environmental protection and improvement including by enhancing the local
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:91: mining activities with underground aquifers and source protection zones, given the associated risk
TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:91: ii. Special Protection Areas;
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:14: compensation for the protection of any interests which are to be compulsorily
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:17: Article 34 (Protection of interests)
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:23: Schedule 7 (Provisions for the Protection of Network Rail)
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:24: needs the protection of compulsory acquisition to compulsorily acquire the
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:24: Schedule 8 (Provisions for the Protection of National Grid)
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:24: accordingly provisions for the protection of those power lines have been included
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:24: Schedule 10 (Provisions for the Protection of Assets Bridged/Oversailed
TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:24: Schedule 11 (Provisions for the Protection of the Tees Port Authority)
TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf:7: 2. Confirm the interest features of the Teesmouth and Cleveland Coast Special Protection Area (SPA)
TR030002-000018-Examination Library (1).pdf:5:APP-015 Doc 6.2 Section 79(1) of Environmental Protection Act 1990
TR030002-000018-Examination Library (1).pdf:15:APP-245 Section 17: Coastal Protection and Flood Defence
TR030002-001873-Decision holding letter (4).pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-000868-CATS Parties - young lady report.pdf:8: the protection of pipelines from surface vessel interaction.
TR030002-000868-CATS Parties - young lady report.pdf:31: ‘Over-pressure protection is to be provided on the discharge side of all pumps.
TR030002-000868-CATS Parties - young lady report.pdf:34: concrete protection had been removed at the point of contact, and impact damage was
TR030002-000868-CATS Parties - young lady report.pdf:35: • Concrete protection placed over valves.
TR030002-000868-CATS Parties - young lady report.pdf:58:2008/109 Coordinate a review of the Risk Assessment process for the protection of
TR030002-000865-York Potash Limited.pdf:12:Environmental Protection
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:5:5.4 All notes contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:6:5.5 BP design standards or industry design standards will be followed in dealing with protection of their
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:6:7.1 A key concern is the protection of the buried assets. A lifting study will be developed looking at the issues
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:7:7.5 Any construction works above the buried pipeline will require the protection of the pipeline. This could be
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:7: require the protection of the pipeline from falling objects. This would be over the full width of the
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:7: looking at the issues of protecting assets below the ground (i.e. protection mats etc.) and determining the
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9: protection (i.e. temporary propping). Any additional protection will be subject to the approval of BP.
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9:8.7 The BP CATS pipeline is protected with a cathodic protection system. A functional test/survey will be
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9: Representative. The monitoring will identify any changes to the cathodic protection system and possible
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9: damage from construction activities. During the operational phase the cathodic protection will continue to
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9: be monitored by BP to test the effectiveness of the cathodic protection system and to test for stray
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9: mitigation and/or modifications to the cathodic protection are to be implemented such as the installation
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:9:8.8 The locations of the cathodic protection system test positions will be added to the construction drawings
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:13:2.3 Temporary Protection
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:13:It may be necessary at crossing points to install temporary protection over the wayleave. Such protection
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:13:construction of such protection is to be approved by the BP representative. The protection installed shall
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:13:4 Protection of Exposed Pipeline
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:14:11 Protection of Pipe
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:15:protection of any foreign services that may be uncovered within the extent of the excavation.
TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf:18:Protection
TR030002-000731-Network Rail.pdf:1:By way of update, Network Rail is in discussions with the promoter regarding the other protections
TR030002-000731-Network Rail.pdf:1:currently working towards reaching agreement on those protections in advance of the compulsory
TR030002-000731-Network Rail.pdf:1:“The Explanatory Memorandum (APP-004) states that the provisions for the protection of Network
TR030002-000680-150709 TR030002 Network Rail's s 56 representation.pdf:1:be necessary for the promoter to enter into the required asset protection agreements for those
TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:1: Special Protection Areas (SPA) and potential SPAs, Ramsar sites, actual and potential Sites of
TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:2: o protection of the integrity of the European sites in and near the Borough; and,
TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:2:9.2.7 Policy CS10 outlines SBC’s policy with regard to environmental protection and enhancement. The
TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:2: development throughout the Borough will be integrated with the protection and enhancement of
TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:12:9.4.27 WeBS is a partnership between the BTO, the Royal Society for the Protection of Birds (RSPB) and the
TR030002-000443-ES Section 8 Marine ecology.pdf:1: SACs, Special Protection Areas (SPA) and potential SPAs, Ramsar sites, actual and potential
TR030002-000443-ES Section 8 Marine ecology.pdf:2: o protection of the integrity of the European sites in and near the Borough;
TR030002-000443-ES Section 8 Marine ecology.pdf:33: x Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site;
TR030002-000443-ES Section 8 Marine ecology.pdf:34: principal wildlife resource but their designation is non-statutory and their only protection comes via the
TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:7: retaining structure within the subway for flood protection purposes, closure of the A1085 for a
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:14: abstraction points or Special Protection Zones (SPZs) present within the study area. The WFD quality
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:22:2.14 Coastal protection and flood defence
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:22: energy through to the shore protection behind the quay. A highly localised strip of increased wave
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:35: (Special Areas of Conservation (SACs) and Special Protection Areas (SPAs)) and Ramsar sites. In this
TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:37: An impact of negligible significance on coastal protection and flood defence.
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated (3).pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:2:Environmental Protection Act
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:3: x Environment Agency Groundwater Protection: Principles and Practice, Version 1.1 (2013).
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:7: Source Protection Zone (SPZ) 1 / 2).
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:17:6.4.33 There are no groundwater Source Protection Zones (SPZ) within the development footprint or within the
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:32: accept controlled waste as defined by Section 75 of the Environmental Protection Act 1990 (as
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:35: a protection geotextile which was then overlain by 1.0m of subsoil and topsoil. A surface water
TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:46: and if deemed necessary gas protection measures would be incorporated within the building to sever
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated (5).pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:8:SPA Special Protection Area
TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:10: Protection Areas (SPAs)) and Ramsar sites. LSE is, in this context, any effect that may be reasonably
TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:13: SACs and to give protection to habitats and species listed in the Directive as being threatened or of
TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:13: species, paying particular attention to the protection of wetlands of international importance. Together
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:4: 5.13 Coastal protection and flood defence 80
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:6: RSPB Royal Society for the Protection of Birds
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:6: SPA Special Protection Area
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:15: comprise Special Protection Area’s (SPA), as designated under Council Directive
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:18: • Provide high standards of protection for the natural environment.
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:38: • Royal Society for the Protection of Birds (RSPB).
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:47:Protection Act 1990 (as amended) including inert waste, general and biodegradable
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:55: • Canadian Sediment Quality Guidelines for the Protection of Aquatic Life (CCME,
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:68: species for which it is afforded protection (e.g. noise, presence and lighting
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:77: Protection UK in their guidance document Development Control: Planning for Air Quality
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:86:5.13 Coastal protection and flood defence
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:86: are many informal defences which provide a range of levels of protection, such as sand
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:87: The principal environmental issue in relation to coastal protection and flood defence is
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:87: appendix to the ES. The results of the FRA will be used to inform the coastal protection
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:98: • Coastal protection and flood defence.
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:99: Some areas require special protection under European legislation. The WFD therefore
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:106:protection and • Flood risk to the site and other areas within the estuary. commencement to ensure the deli
TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:107: guidelines for the protection of aquatic life: Summary tables. Update. In: Canadian
TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:63: These would incorporate check dams and erosion protection to attenuate flows
TR030002-000826-York Potash Ltd (2).pdf:15: protection of marine mammals so that the primary also required to be approved by the MMO (see requirement 9).
TR030002-000826-York Potash Ltd (2).pdf:16: Protection Area (SPA)
TR030002-000826-York Potash Ltd (2).pdf:47:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000826-York Potash Ltd (2).pdf:58:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000826-York Potash Ltd (2).pdf:64:5.4 All notes contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000826-York Potash Ltd (2).pdf:65:5.5 BP design standards or industry design standards will be followed in dealing with protection of their
TR030002-000826-York Potash Ltd (2).pdf:65:7.1 A key concern is the protection of the buried assets. A lifting study will be developed looking at the issues
TR030002-000826-York Potash Ltd (2).pdf:66:7.5 Any construction works above the buried pipeline will require the protection of the pipeline. This could be
TR030002-000826-York Potash Ltd (2).pdf:66: require the protection of the pipeline from falling objects. This would be over the full width of the
TR030002-000826-York Potash Ltd (2).pdf:66: looking at the issues of protecting assets below the ground (i.e. protection mats etc.) and determining the
TR030002-000826-York Potash Ltd (2).pdf:68: protection (i.e. temporary propping). Any additional protection will be subject to the approval of BP.
TR030002-000826-York Potash Ltd (2).pdf:68:8.5 The BP CATS pipeline is protected with a cathodic protection system. A functional test/survey will be
TR030002-000826-York Potash Ltd (2).pdf:68: Representative. The monitoring will identify any changes to the cathodic protection system and possible
TR030002-000826-York Potash Ltd (2).pdf:68: damage from construction activities. During the operational phase the cathodic protection will continue to
TR030002-000826-York Potash Ltd (2).pdf:68: be monitored by BP to test the effectiveness of the cathodic protection system and to test for stray
TR030002-000826-York Potash Ltd (2).pdf:68: mitigation and/or modifications to the cathodic protection are to be implemented such as the installation
TR030002-000826-York Potash Ltd (2).pdf:68:8.6 The locations of the cathodic protection system test positions will be added to the construction drawings
TR030002-000826-York Potash Ltd (2).pdf:73:5.4 All notes contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000826-York Potash Ltd (2).pdf:73:5.5 BP design standards or industry design standards will be followed in dealing with protection of their
TR030002-000826-York Potash Ltd (2).pdf:74:7.1 A key concern is the protection of the buried assets. A lifting study will be developed looking at the issues
TR030002-000826-York Potash Ltd (2).pdf:75:7.5 Any construction works above the buried pipeline will require the protection of the pipeline. This could be
TR030002-000826-York Potash Ltd (2).pdf:75: require the protection of the pipeline from falling objects. This would be over the full width of the
TR030002-000826-York Potash Ltd (2).pdf:75: looking at the issues of protecting assets below the ground (i.e. protection mats etc.) and determining the
TR030002-000826-York Potash Ltd (2).pdf:76: protection (i.e. temporary propping). Any additional protection will be subject to the approval of BP.
TR030002-000826-York Potash Ltd (2).pdf:77:8.5 The BP CATS pipeline is protected with a cathodic protection system. A functional test/survey will be
TR030002-000826-York Potash Ltd (2).pdf:77: Representative. The monitoring will identify any changes to the cathodic protection system and possible
TR030002-000826-York Potash Ltd (2).pdf:77: damage from construction activities. During the operational phase the cathodic protection will continue to
TR030002-000826-York Potash Ltd (2).pdf:77: be monitored by BP to test the effectiveness of the cathodic protection system and to test for stray
TR030002-000826-York Potash Ltd (2).pdf:77: mitigation and/or modifications to the cathodic protection are to be implemented such as the installation
TR030002-000826-York Potash Ltd (2).pdf:77:8.6 The locations of the cathodic protection system test positions will be added to the construction drawings
TR030002-000826-York Potash Ltd (2).pdf:83:feature of the Teesmouth and Cleveland Coast Special Protection Area (SPA).
TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf:6:enhancement and protection of marine mammals so that the
TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf:7:Teesmouth and Cleveland Coast Special Protection Area Teesmouth and Cleveland Coast Special Protection Area (SPA)
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:3:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:9: therefore provides them with no protection, whilst the power to extinguish or override
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:11: also bound to have regard to Article 1 of the First Protocol of EHCR (protection of
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:11: 5.4.3 These special protections are necessary because such undertakings provide a service
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:20: or side agreement for the protection of the Objectors, it is not considered that the
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:21: 6.13.1 Protective provisions for the Protection of the Pipeline Corridor have been included in
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:21: 6.13.4 The protections are stated to apply to “all pipes within the pipeline corridor”. The
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:21: the protection is unclear and should be defined by reference to those parts of the Order
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: their apparatus. Consultation would seem a very weak protection: the Objectors
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: 6.13.17 In Paragraph 13 protection is provided in respect of excavations in the direct vicinity of
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: that Baseline cathodic protection testing and installation of continuous monitoring
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:24: 6.13.28 In short the proposed protections are considered to be wholly inadequate.
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:24: underground the conveyor on this location, as well as the need to secure access and protection
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:29: 168. The only effective means of protection is by compulsory purchase. As a housing
TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:102:3.1 Subject to the proper protection of their undertakings, the Objectors do not object in principle to
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:1:DCO 2.4 Article 34 and Schedules 7-11 Protection of interests
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:3: “unknown rights”, the latter not benefitting from protection against
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:3: protection. This is because many of SABIC and Huntsman’ rights in
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:8: FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED CROSSINGS ETC.
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:8: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:12: cathodic protection of the relevant pipelines; and
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:14: effectiveness of the repairs and cathodic protection and any further works or testing shown by
TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:19: Further protection in relation to the exercise of powers under the Order
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:3:34. Protection of Interests
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may maintain the authorised
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:25:Protection of Interests
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:37: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:38: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:38: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:39: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:39: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:39: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:40: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:41: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:41: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:43: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:43: requirements for the protection
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:44: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:44: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:45: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:45: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:46: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:47: for the protection of the conveyor
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:50: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:50: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:60: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:67: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:67: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:67: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:69:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:69:Retained apparatus: protection
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:70:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:70:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:73:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:75: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:75: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:79: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:80: existing cathodic protection of the pipesasset; and
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:81:protection of the cats pipeline.
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:82: including the costs of testing the effectiveness of the repairs and cathodic protection and
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:83:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:87: Further protection in relation to the exercise of powers under the Order
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:89: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:95: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:96:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:96:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:98:Tees Port Authority may make for the protection of—
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:98: protection.
TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:103: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:13: • Teesmouth and Cleveland Coast Special Protection Area
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:28: • Coastal protection and flood defence
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:36:Coastal protection and flood defence (see Scoping Report
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:42: the NCB the DCO requirements which will provide protection for
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:69: Protection (Duty of Care) Regulations 1991 and implement the waste hierarchy,
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:73: &box_FPLplantprotection_conx, FPLplantprotection@fulcrum.co.uk
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:73:FPLplantprotection@fulcrum.co.uk
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:90:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:90:paragraph 118 of the National Planning Policy Framework requires that potential Special Protection
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:90:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites)
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:94:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:105:phase of the above application. Our response focuses on health protection issues
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:112:In March 2004, the National Radiological Protection Board, NRPB (now part of PHE),
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:112:published by the International Commission on Non-ionizing Radiation Protection
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:112:http://www.dh.gov.uk/en/Publichealth/Healthprotection/DH_4089500
TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:114: ‘contaminated land’ under Part 2A of the Environmental Protection Act
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:7: protection in relation to landscape and scenic beauty. The test is
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:37: including Special Protection Areas/Special Areas of Conservation
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:37: Monuments; Source Protection Zones; Principal Aquifers; Flood Risk
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:37: Protection Area.
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:61: which have the highest status of protection in relation to landscape and
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:83: National Parks…which have the highest status of protection in relation to
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:83: separate appraisal is undertaken in respect of the protection of the special
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:86: “Provide an appropriate level of protection to legally protected sites and
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:90: Protection Area (SPA). The proposed scheme is not directly connected
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:109: adopted will, therefore, contribute towards the protection and enhancement
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:131: “Provide an appropriate level of protection to legally protected sites and
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:131:2.10 Development Policy 1 focuses on environmental protection. To conserve and
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:137: Assessment. Priority will be given to the protection and enhancement of the
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:137: “Protection of the integrity of the European sites in and near the
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:145: the following wildlife sites should be given the same protection as
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:145: o potential Special Protection Areas and possible Special Areas of
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:146: adverse effects on European sites, potential Special Protection
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:146: land under Part IIA of the Environmental Protection Act 1990” (paragraph 121).
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:146: which have the highest status of protection in relation to landscape and scenic
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:150: scenic beauty. These areas have the highest status of protection in relation to
TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:153: to be considered against Development Policy 1 Environmental Protection.
TR030002-000774-York Potash Ltd (5).pdf:1:3. Network Rail being a statutory undertaker, has a certain protection under the Planning Act
TR030002-000275-P D Teesport Limited.pdf:1:for the protection of P D Teesport as now agreed between the parties, we would be
TR030002-000275-P D Teesport Limited.pdf:5: FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-000275-P D Teesport Limited.pdf:5:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000275-P D Teesport Limited.pdf:7:Tees Port Authority may make for the protection of—
TR030002-000275-P D Teesport Limited.pdf:7: environmental protection.
TR030002-000275-P D Teesport Limited.pdf:12: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:17:Special Protection Area
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:31: Protection Area (SPA) and Site of Special Scientific Interest (SSSI).
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:46: Special Protection Area (SPA) and RAMSAR sites. This relationship
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:49: 13 Coastal protection and flood defence;
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:63: Cleveland Coast Special Protection Area (SPA) European designated
TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:63: as important issues for discussion to ensure the protection of migratory
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated (4).pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:15: compensation for the protection of any interests which are to be compulsorily
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:18: Article 34 (Protection of interests)
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:24: Schedule 7 (Provisions for the Protection of Network Rail)
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:24: Network Rail the Applicant needs the protection of compulsory acquisition to
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:24: Schedule 8 (Provisions for the Protection of National Grid)
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:24: accordingly provisions for the protection of those power lines have been included
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:25: Schedule 10 (Provisions for the Protection of Assets Bridged/Oversailed
TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:25: Schedule 11 (Provisions for the Protection of the Tees Port Authority)
TR030002-000837-Redcar and Cleveland Borough Council - Deadline 4 Submission.pdf:2:Environmental Protection colleagues have responded as follows: “We are satisfied
TR030002-000837-Redcar and Cleveland Borough Council - Deadline 4 Submission.pdf:2:Environmental Protection colleagues have responded as follows: “We are satisfied
TR030002-000837-Redcar and Cleveland Borough Council - Deadline 4 Submission.pdf:5:Environmental Protection colleagues have advised that they are satisfied that there
TR030002-001875-The York Potash Harbour Facilities Draft Amendment Order Final Validated (2).pdf:3: (8) In paragraphs 7(3) and 19(3)(a) of Schedule 11 (for the protection of Tees Port Authority),
TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:4: 2.14 Coastal protection and flood defence……………………………………………………………………………. 50
TR030002-000483-Section 12 App 12.3 Construction Traffic Management Plan.pdf:166: Steel post and rail edge protection to the concrete retaining walls above the brick arch. A visual
TR030002-000483-Section 12 App 12.3 Construction Traffic Management Plan.pdf:189:Please ensure you have adequate virus protection before you open or detach
TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:36: site which is designated as a Special Area of Conservation (SAC), Special Protection Area (SPA), Ramsar
TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:182: Foresight - the US Environmental Protection Agency future risks to the Environment No Does not go to 2060 and does not focus on UK
TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:189:All printed publications and literature produced by Fera are subject to Crown copyright protection unless otherwise
TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16: Fire B 4 4 4 4 8.0 Protection Authority (CICPA) A 1 1 1 1 1.0
TR030002-000773-York Potash Ltd (4).pdf:9: amendments and any required protection could be secured through the protective
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:4:34. Protection of Interests
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:5: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:5: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:5: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:5: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:5: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:25:Protection of Interests
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:36: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:36: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:37: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:37: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:38: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:38: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:38: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:39: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:40: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:41: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:42: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:42: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:43: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:44: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:45: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:45: for the protection of the conveyor
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:48: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:48: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:57: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:64: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:64: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:64: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:66:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:66:Retained apparatus: protection
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:67:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:67:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:70:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:71:Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA and the registered office of
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:72: FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:75: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:79:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:79:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:81:Tees Port Authority may make for the protection of—
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:81: protection.
TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:86: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000676-Doc 7.2 - Summary of Proposals Document.pdf:14: and hydrology, coastal protection and
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:2: x Directive 91/676/EC concerning the protection of waters against pollution caused by nitrates
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:2:7.2.4 As set out in Section 2, the WFD is a key piece of European legislation relating to the protection of
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:7:Protection Area (SPA) qualifying features*.
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:9: x Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:12: the protection of pristine environments. In the absence of suitable alternatives, however, it has become
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:16: protection, navigation and quay line works that are present within it and is currently classified as having
TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:16: modified water body due to coastal protection works. The water body is currently classified as having
TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:93: such as principal aquifers and Source Protection Zones”.
TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:112: The primary consideration of any mining operation is the immediate protection of employees
TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:128: protection pillar Additional means of egress and provision of new
TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:186: leaves a roof beam of 2 m of halite (or potash) for protection. As described earlier,
TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:198: • Coastal Protection – it will be necessary to demonstrate that polyhalite mining
TR030002-000700-North Yorkshire County Council.pdf:2:Information Act, the Data Protection Act or the Environmental Information
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:17:protections which are being offered to the Objectors. submitted by these parties (Document 8.3).
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:18:protections and the extent (if any) to the terms of the Dogger
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:18:Bank protections and the extent (if any) to which it is appropriate
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:20:schedule 10 (PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:20:The Environmental Protection Team of RCBC would agree with the
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:21:The Environmental Protection Team would agree that draft
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:24:The Environmental Protection Team of RCBC is satisfied that the The CEMP does include reference to use of barriers around static
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:24:However, the Environmental Protection the mitigation measures that were taken into account in the
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:24:The Environmental Protection Team would also require percussive piling for the quay construction during either the daytime
TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:25:calculations. The Environmental Protection Team should also be on residential receptors during the evening/night-time identified in the
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:1: for the Protection of the Pipeline Corridor and Protected Crossings” (the Objectors’ Deadline 6
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:4: protection of the existing pipeline corridor pipeline corridor over the years; however, it was never envisaged by the Objectors
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:4: protection provided for the existing pipes under exercise of the powers sought by the Applicant in the Order, which go far beyond the
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:4: exercised to their fullest extent if the stronger protection sought by the Objectors did
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:5:protections will apply if Order powers are exercised.
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:6: No specific programmed pipelines protection against compulsory acquisition would apply, thus reversing
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:7:protections it is offering, by amending the definition of “pipeline” to link it
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:7:development) the protection of the Protective Provisions.
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:8:being subject to an “unknown right”, and being excluded from protection
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:8:able to benefit from this protection as proposed pipelines. The onus will
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:8:“pipeline” and the protection afforded by the Protective Provisions
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:9: further curtail the broad protection of the Objector’s starting position by
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:9: grafting the protections they are seeking onto those proposed by the
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:10: watercourses is not felt to be than the protection of pipelines.
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:10: appropriate. The protection of these
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:11: be consistent and provide adequate protection to other owners and
TR030002-000880-151229 TR030002 SABIC Submissions.pdf:12: necessary. In particular the Applicant recorded their rights before the protection against compulsory
TR030002-000873-151222 TR030002 York Potash Ltd - Response to Tata Steel and RBT submission for D6.pdf:1: FOR THE PROTECTION OF REDULCAR BULK TERMINAL
TR030002-000781-151103 TR030002 P D Teesport Limited - Response to second round of questions.pdf:3: Article 34 and Schedules 7-11 Protection of Interests
TR030002-000784-151105 TR030002 MMO - Response to ExA Q2.pdf:5: protection of marine mammals so that the The Brans Sands Lagoon Enhancement plan sits with the MMO along with the
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:8: the protection of the existing pipeline corridor overseen by Sembcorp. The legal
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:8: Schedule 9 go far beyond the level of protection provided for the existing pipes under the
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:11: appropriate. The protection of these features
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:16:FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:16: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:19: assessment of the protection of underground assets and which study shall provide for individual
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:19: assessment of the protection of underground assets and which study shall provide for individual
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:19: ascertain any change or damage to the cats pipeline cathodic protection system and the proposed
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:21: cathodic protection of the asset; and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:22: (2) Any construction works above the buried sections of the cats pipeline will require the protection
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:23: in doing so including the costs of testing the effectiveness of the repairs and cathodic protection
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:23:ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker shall
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:28: Further protection in relation to the exercise of powers under the Order
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:33: safety and protection for personnel plant pipelines and other equipment likely to be
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:34: (D) the Environmental Protection Act 1990 and the Environment Art, 1995; and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:37: FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:37: (f) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:40: assessment of the protection of underground assets and which study shall provide for individual
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:40: of the protection of underground assets and which study shall provide for individual lift plans;
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:40: any change or damage to the cats pipeline cathodic protection system and the proposed remedial
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:42: cathodic protection of the asset; and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:42: (2)Any construction works above the buried sections of the cats pipeline will require the protection of the
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:43: doing so including the costs of testing the effectiveness of the repairs and cathodic protection and
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:44:ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker shall
TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:48: Further protection in relation to the exercise of powers under the Order
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:4:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:4:Any construction works above the linklines will require the protection of the linklines. This could be
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:5:Protection of linklines from the crane jib and slung loads will be accomplished by the careful siting and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:5:existing linklines foundations, as this may identify the need for additional protection (i.e. temporary
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:5:propping). Any additional protection will be subject to the approval of asset owners/operator.
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:10:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:10:Any construction works above the linklines will require the protection of the linklines. This could be
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:11:Protection of linklines from the crane jib and slung loads will be accomplished by the careful siting and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:11:existing linklines foundations, as this may identify the need for additional protection (i.e. temporary
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:11:propping). Any additional protection will be subject to the approval of asset owners/operator.
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:15:All contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:16:dealing with protection of their asset; these standards will be sought prior to undertaking the design
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:16:A major concern is the protection of the buried assets should a load be dropped giving rise to the
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:17:Any construction works above the buried pipelines will require the protection of the pipelines. This could
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:18:additional protection (i.e. temporary propping). Any additional protection will be subject to the approval of
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:22:All contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:23:followed in dealing with protection of their asset; these standards will be sought prior to undertaking the
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:23:A major concern is the protection of the buried assets should a load be dropped giving rise to the
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:24:Any construction works above the buried pipeline will require the protection of the pipeline. This could be
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:24:require the protection of the pipeline from falling objects. This would be over the full width of the
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:24:looking at the issues of protecting assets below the ground (i.e. protection mats etc.) and determining the
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:25:additional protection (i.e. temporary propping). Any additional protection will be subject to the approval of
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:30:All contain similar advice and guidance on the protection of pipeline easements from traffic and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:30:dealing with protection of their asset; these standards will be sought prior to undertaking the design
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:31:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:31:Any construction works above the linklines will require the protection of the above ground pipelines. This
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:32:Protection of linklines from the crane jib and slung loads will be accomplished by the careful siting and
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:32:may identify the need for additional protection (i.e. temporary propping) subject to approval of asset
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:32:Similar to working over pipelines, a major concern is the protection of the buried assets should a load be
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:33:Any construction works above the buried pipelines will require the protection of the pipelines. This could
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:34:additional protection (i.e. temporary propping). Any additional protection will be subject to the approval of
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:40:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:50:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:56:A major concern is the protection of the assets should a load be dropped, giving rise to the potential for
TR030002-000390-North Yorkshire County Council.pdf:2:Information Act, the Data Protection Act or the Environmental Information
TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:1: European sites comprise Special Protection Areas (SPA), as designated under Council Directive
TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:4: x Provide high standards of protection for the natural environment.
TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:5: x Policy CS23 provides protection to green areas, and where appropriate, enhancement of such
TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:7:2.7.14 Policy CS10 outlines SBC’s policy with regard to environmental protection and enhancement. The
TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:7: development throughout the Borough will be integrated with the protection and enhancement of
TR030002-000881-Document 1.4G - Document List.pdf:10:Environmental Protection
TR030002-001871-Natural England consultation response - Proposed non-material change to York Potash Harbour Facilities Order, Redcar.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area and Ramsar site
TR030002-001871-Natural England consultation response - Proposed non-material change to York Potash Harbour Facilities Order, Redcar.pdf:1:not have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area
TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf:16: agreed controls, protection and mitigation measures (including those in the CEMP) are in
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:3: [The protection of bat roosts is
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:3: S.9 used for shelter or protection or
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:3: S.9 used for shelter or protection or
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:4: species. with section 34 of the Environmental Protection Act 1990.
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:5: Site Designation Legislation Protection G
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:5: Special Protection EC Directive on the conservation of
TR030002-000478-Section 10 App 10.1 Terrestrial ecology legislation.pdf:5: These sites are given protection 01/2005) (the joint Circular).
TR030002-000249-York Potash_RIES_25 Nov 2015.pdf:5:possible SACs; Special Protection Areas (SPAs), potential SPAs; Sites of Community Importance (SCIs); listed
TR030002-000351-Section 55 Checklist.pdf:16: matters set out in section 79(1) of the Environmental Protection
TR030002-000351-Section 55 Checklist.pdf:16: A ‘Section 79(1) of Environmental Protection Act 1990 Statement (Re
TR030002-000351-Section 55 Checklist.pdf:18: (iii) water bodies in a river basin management plan, together with Special Protection Areas; and
TR030002-000351-Section 55 Checklist.pdf:19: Chapter 17: Coastal Protection and Flood Defence.
TR030002-000351-Section 55 Checklist.pdf:25: - excepted because its publication would adversely affect the protection
TR030002-000744-Huntsman Polyurethanes (UK) Limited.pdf:1: The Protective Provisions in Schedule 9 are the relevant protections which are being
TR030002-000744-Huntsman Polyurethanes (UK) Limited.pdf:2: Consideration is also being given to the terms of the Dogger Bank protections and the
TR030002-000688-York Potash Ltd (2).pdf:9:Environmental Protection
TR030002-000059-140113_TR030002_late scoping responses.pdf:7: Plant Protection
TR030002-000059-140113_TR030002_late scoping responses.pdf:7: E-mail: plantprotection@nationalgrid.com
TR030002-000059-140113_TR030002_late scoping responses.pdf:7:enquiry / consultation to our Land and Development Asset Protection Team for further
TR030002-000059-140113_TR030002_late scoping responses.pdf:8:If you require further assistance please contact the National Grid Plant Protection team via e-mail (click here) or
TR030002-000059-140113_TR030002_late scoping responses.pdf:8:National Grid Plant Protection Team
TR030002-000059-140113_TR030002_late scoping responses.pdf:9: ● Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
TR030002-000059-140113_TR030002_late scoping responses.pdf:13: Plant Protection
TR030002-000059-140113_TR030002_late scoping responses.pdf:13: E-mail: plantprotection@nationalgrid.com
TR030002-000059-140113_TR030002_late scoping responses.pdf:13:enquiry / consultation to our Land and Development Asset Protection Team for further
TR030002-000059-140113_TR030002_late scoping responses.pdf:14:If you require further assistance please contact the National Grid Plant Protection team via e-mail (click here) or
TR030002-000059-140113_TR030002_late scoping responses.pdf:14:National Grid Plant Protection Team
TR030002-000059-140113_TR030002_late scoping responses.pdf:15: ● Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
TR030002-000762-Tata Steel UK Limited and others.pdf:6:should be incorporated to the extent to which they are relevant and provide greater protection than the
TR030002-000762-Tata Steel UK Limited and others.pdf:7:Article 34 and Schedules 7-11 Protection of interests
TR030002-000494-Section 15 App 15.1 Archaeology desk based appraisal.pdf:14:3.3.1 Designated and non-designated heritage assets are given protection under the National Planning
TR030002-000494-Section 15 App 15.1 Archaeology desk based appraisal.pdf:14: Particular protection will be given to the character and special features of: a) Conservation areas; b)
TR030002-000701-Environment Agency.pdf:8: FLOWS, LAND QUALITY, COASTAL PROTECTION AND FLOOD DEFENCE AND WATER
TR030002-000701-Environment Agency.pdf:9: conservation interests, biodiversity, water quality and flows, land quality, coastal protection
TR030002-000701-Environment Agency.pdf:15: Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian
TR030002-000701-Environment Agency.pdf:18: implementation of a Tees Estuary Habitat Strategy report to identify the habitat protection and
TR030002-000701-Environment Agency.pdf:20: Protection (FEPA) and Coast Protection Act (CPA) requirements;
TR030002-000701-Environment Agency.pdf:20: The Salmon and Freshwater Fisheries Act 1975 which is aimed at the protection of
TR030002-000701-Environment Agency.pdf:23:8. COASTAL PROTECTION AND FLOOD DEFENCE
TR030002-000701-Environment Agency.pdf:23: protection and flood defence, during the construction, operation and decommissioning phase
TR030002-000434-ES Contents_index.pdf:7:17 COASTAL PROTECTION AND FLOOD DEFENCE …………………………………………. 623
TR030002-000434-ES Contents_index.pdf:28:Section 17 Coastal protection and flood defence
TR030002-000434-ES Contents_index.pdf:28: regard to coastal protection and flood defence
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:3:34. Protection of Interests
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:4: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:10:provisions for the protection of the Tees Port Authority) the undertaker may maintain the authorised
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:25:Protection of Interests
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:36: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:37: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:37: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:42: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:42: requirements for the protection
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:43: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:43: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:44: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:44: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:45: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:46: for the protection of the conveyor
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:49: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:49: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:59: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:66: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:66: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:66: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:68:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:68:Retained apparatus: protection
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:69:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:69:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:72:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:74: FOR THE PROTECTION OF PIPELINE CORRIDOR AND
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:74: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:77: cathodic protection of the pipes; and
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:78: effectiveness of the repairs and cathodic protection and any further works or testing shown
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:82: Further protection in relation to the exercise of powers under the Order
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:83: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:87:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:87:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:89:Tees Port Authority may make for the protection of—
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:89: protection.
TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:94: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:27:Works to trees with Tree Protection Orders.
TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:169:10.3.4 The Tees Estuary water body has been designated as Heavily Modified for flood protection and
TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:172: lighting causing construction phase at Harbour facilities, MTS Portal Special Protection Area (SPA) and
TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:226: measures would be put in place for the protection of protected species for the NGCT development, a
TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:251: dredging on European sites (in this case the Teesmouth and Cleveland Coast Special Protection Area
TR030002-000495-Section 15 App 15.2 Northern Gateway Archaeological Appraisal.pdf:15: located north of Tees Mouth has been afforded official protection. In addition to
TR030002-000896-160113_TR030002_Response to Examining Authority's Rule 8.pdf:13:Environmental Protection
TR030002-000458-ES Section 23 Impact interrelationships.pdf:6:Section 17 - Coastal protection and flood defence
TR030002-000458-ES Section 23 Impact interrelationships.pdf:6:Sections 5 and 6 – which can drive changes in flood defence) have been identified with regard to coastal protection
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:6: Source Protection Zones, and areas of functional floodplain in the search for suitable
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:7: ii Special Protection Areas; and
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:8: and ground water protection zones and nearby urban areas create further restrictions
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:12: direct route would suggest an intermediate site within the European-level protection
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:26: European-level environmental protection or involve development that is
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:27: constraints to development, including North York Moors Special Protection
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:59: within Source Protection Zones (SPZ) should be protected from physical
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:59: are given the highest priority of protection due to these having the shortest
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:59: Groundwater Protection: Policy and Practice, EA, 2012).
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:59: principal aquifers and Source Protection Zones” (NLP emphasis). Areas
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:59: aquifers, Source Protection Zones, and areas of functional floodplain in the
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:64: areas that benefit from international-level policy protection are an appropriate
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:64: 1 Special Protection Areas; and
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:64: North Yorkshire area that benefit from national policy protection are then
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:64: considered. The level of policy protection is identified, and the implications on
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:65: North York Moors Special Protection Areas and Special Areas
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:65: England. It is afforded European-level protection as a Special Protection
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:65:6.9 The priority in these protected areas is on protection, management and
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:65: protection, and acknowledging the likelihood of impact on prevailing site
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:67: of Outstanding Beauty, which have the highest status of protection in relation
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:67: policy protection in recognition of its prevailing environmental characteristics.
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:68: protection in heritage terms. The NPPF states that substantial harm to, or total
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:68: protection is more subjective and would require a case-by-case detailed
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:73: policy protection. The approach at this stage of the ASA is to exclude the
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:81: and Burniston; and the town of Scarborough; the source protection zone; and
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:81: aquifer and ground water protection zones and nearby urban areas create
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:94: Saved Policy E1 (‘Protection of Open Countryside’) is therefore applicable in
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:97:7.86 The significant number of heritage assets in the area and high level protection
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:99: settlements; and it is acceptable in terms of other polices for the protection of
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:115: these sites are afforded European-level protection in recognition of their
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:117: afforded the highest level of protection with priority given to local aims and
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:118: Cliff areas. The areas are afforded the highest level of protection in
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:132: afforded European-level protection status (SPA/SAC/SSSI).
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:148: The site is free from any additional planning policy protection.
TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:150: with underground aquifers and source protection zones, given the associated
TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf:8: 2. Confirm the interest features of the Teesmouth and Cleveland Coast Special Protection Area (SPA)
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:1:DCO 2.4 Article 34 and Schedules 7-11 Protection of interests
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:3: “unknown rights”, the latter not benefitting from protection against
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:3: protection. This is because many of SABIC and Huntsman’ rights in
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:8: FOR THE PROTECTION OF PIPELINE CORRIDOR AND PROTECTED CROSSINGS ETC.
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:8: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:12: cathodic protection of the relevant pipelines; and
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:14: effectiveness of the repairs and cathodic protection and any further works or testing shown by
TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:19: Further protection in relation to the exercise of powers under the Order
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:14: compensation for the protection of any interests which are to be compulsorily
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:17: Article 34 (Protection of interests)
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:24: Schedule 7 (Provisions for the Protection of Network Rail)
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:24: Applicant needs the protection of compulsory acquisition to compulsorily acquire
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:24: Schedule 8 (Provisions for the Protection of National Grid)
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:24: accordingly provisions for the protection of those power lines have been included
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:25: protection of the existing pipeline corridor overseen by Sembcorp. The legal
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:25: Protective Provisions in Schedule 9 go far beyond the level of protection provided
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:25: Schedule 10 (Provisions for the Protection of Assets Bridged/Oversailed
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:26: Schedule 11 (Provisions for the Protection of the Tees Port Authority)
TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:26: however the amendment to the final paragraph of the protection provision was not
TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf:22: through to the shore protection behind the proposed quay. The shore protection would have similar
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:2:34. Protection of Interests
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:3: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:3: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:3: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:3: SCHEDULE 10 — FOR THE PROTECTION OF ASSETS
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:3: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:9:provisions for the protection of the Tees Port Authority) the undertaker may maintain the
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:23: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:23: Environmental Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:24:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:24:Protection of Interests
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:34:protection measures within buildings then these must be agreed with the local planning authority
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:36: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:37: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:37: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:38: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:38: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:38: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:39: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:40: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:40: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:42: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:42: requirements for the protection
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:43: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:43: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:44: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:45: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:46: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:46: for the protection of the conveyor
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:49: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:49: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:61: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:68: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:68: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:68: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:70:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:70:Retained apparatus: protection
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:71:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:72:or protection of any apparatus or the construction of any new or alternative apparatus which may
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:74:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:76: FOR THE PROTECTION OF PIPELINE CORRIDOR AND this draft DCO but may be subject
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:76: (f) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:79: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:80: existing cathodic protection of the asset; and
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:81:protection of the cats pipeline.
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:82: including the costs of testing the effectiveness of the repairs and cathodic protection and
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:82:development to ascertain any change or damage to the cats pipeline cathodic protection system,
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:86: Further protection in relation to the exercise of powers under the Order
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:88: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED is appended to this draft DCO.
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:93:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:93:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:95: Tees Port Authority may make for the protection of—
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:95: environmental protection.
TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:100: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000477-Section 9 App 9.2 Waterbird data.pdf:1:Species in red are cited as part of the interest of the Special Protection Area
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:4:34. Protection of Interests
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:5: SCHEDULE 7 — PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:5: SCHEDULE 8 — PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:5: SCHEDULE 9 — PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:5: SCHEDULE 10 — PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:5: SCHEDULE 11 — PROTECTIVE PROVISIONS FOR THE PROTECTION
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:9:provisions for the protection of the Tees Port Authority) the undertaker may at any time maintain
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:21: 33. —(1) Where proceedings are brought under section 82(1) of the Environmental Protection
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:21:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:21:Protection of Interests
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:21: Environmental Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:31: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:32: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:39: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:45: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:45: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:46: 3. Except for protection), 8 (expenses) and 9 (indemnity) of this
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:47: protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:47: Retained apparatus: protection
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:48:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:49: in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:51: 7(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:52: post to National Grid Plant Protection, Brick Kiln Street, Hinckley, Leicestershire LE10 ONA
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:53: FOR THE PROTECTION OF PIPELINE CORRIDOR
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:55: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:58: FOR THE PROTECTION OF THE TEES PORT AUTHORITY
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:59:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:60:Tees Port Authority may make for the protection of—
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:60: © the performance of any of its functions connected with environmental protection.
TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:64: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-000698-Natural England 1.pdf:5: Protection Areas (‘SPAs’) for the purposes of the EU Habitats and
TR030002-000698-Natural England 1.pdf:10: general system of protection for all their wild birds, prohibiting the deliberate
TR030002-000698-Natural England 1.pdf:10: the objectives of this Article’. It requires that ‘outside these protection
TR030002-000698-Natural England 1.pdf:10: areas for protection as SACs pursuant to articles 3 and 4 of the Habitats
TR030002-000698-Natural England 1.pdf:13: the environment shall aim at a high level of protection, and shall be based
TR030002-000698-Natural England 1.pdf:13: protection. The Habitats Directive therefore requires that Member
TR030002-000698-Natural England 1.pdf:15: for the protection, either in the same area or elsewhere, of an adequate
TR030002-000698-Natural England 1.pdf:16: reserve and is of national importance. There is no additional protection for
TR030002-000698-Natural England 1.pdf:17: protection.
TR030002-000698-Natural England 1.pdf:17:3.6.5. Article 16 of the Habitats Directive provides that this strict protection may be
TR030002-000698-Natural England 1.pdf:17: fact: ‘such protection requires that individuals be prevented in advance
TR030002-000698-Natural England 1.pdf:18: but also to implement concrete and specific protection measures that are
TR030002-000698-Natural England 1.pdf:18: protection must enable the effective avoidance of deterioration or
TR030002-000698-Natural England 1.pdf:18: Strict protection must be enforced even if the population of the species is
TR030002-000698-Natural England 1.pdf:20:g. Guidance document on the strict protection of animal species of
TR030002-000698-Natural England 1.pdf:25: for the protection of SPA birds during construction, but there are also noise
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:3:34. Protection of Interests
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: SCHEDULE 7 — FOR THE PROTECTION OF NETWORK RAIL
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: SCHEDULE 8 — FOR THE PROTECTION OF NATIONAL GRID
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: SCHEDULE 9 — FOR THE PROTECTION OF THE PIPELINE CORRIDOR
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: PART 1 — FOR THE PROTECTION OF ASSETS
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: PART 2 — FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:4: SCHEDULE 11 — PROTECTED PROVISIONS FOR THE PROTECTION OF
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:24: 33.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:24: Protection Act 1990 (c. 25). There are other amendments to the 1974 Act which are not relevant to this Order.
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:25:itself constitute a defence to proceedings under section 82 of the Environmental Protection Act
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:25:Protection of Interests
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:34:monitoring in accordance with the approved scheme gives rise to the need to consider gas protection
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:37: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:38: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:39: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:40: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:41: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:41: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:43: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:43: requirements for the protection
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:44: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:44: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:45: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:45: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:46: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:47: for the protection of the conveyor
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:50: 8. Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) shall apply with the
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:50: 9. Section 22 of the 1965 Act (protection of acquiring authority’s possession where by
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:60: FOR THE PROTECTION OF NETWORK RAIL
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:67: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:67: 1. For the protection of National Grid referred to in this Schedule the following provisions will,
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:67: 3. Except for paragraphs 7 (retained apparatus: protection) and 8 (expenses) of this Schedule
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:69:protection of alternative apparatus in substitution for apparatus to be removed, those facilities and
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:69:Retained apparatus: protection
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:70:National Grid for the alteration or otherwise for the protection of the apparatus, or for securing
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:70:in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:73:5(2) or National Grid makes requirements for the protection or alteration of apparatus under
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:75: FOR THE PROTECTION OF THE PIPELINE CORRIDOR AND
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:75: (b) any cathodic protection, coating or special wrapping of the apparatus; and
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:78: assessment of the protection of underground assets and which study shall provide for
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:78: development to ascertain any change or damage to the cats pipeline cathodic protection
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:80: existing cathodic protection of the asset; and
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:80:protection of the cats pipeline.
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:82: cathodic protection and any further works or testing shown by that testing to be reasonably
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:82:to ascertain any change or damage to the cats pipeline cathodic protection system, the undertaker
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:86: Further protection in relation to the exercise of powers under the Order
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:88: FOR THE PROTECTION OF ASSETS BRIDGED/OVERSAILED
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:93: FOR THE PROTECTION OF REDCAR BULK TERMINAL
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:94:PROTECTED PROVISIONS FOR THE PROTECTION OF THE TEES
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:94:undertaker and the Tees Port Authority, have effect for the protection of the Tees Port Authority.
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:96:Tees Port Authority may make for the protection of—
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:96: protection.
TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:101: (b) for the safety of navigation or for the protection of works in the river, should in the
TR030002-001873-Decision holding letter (5).pdf:3: Teesmouth and Cleveland Coast Special Protection Area and Ramsar site,
TR030002-000716-DEA UK SNS Limited (DEA Response to First Written Questions).pdf:1: The Protective Provisions in Schedule 9 are the relevant protections which are being
TR030002-000716-DEA UK SNS Limited (DEA Response to First Written Questions).pdf:2: Consideration is also being given to the terms of the Dogger Bank protections and the
TR030002-000417-Doc 1.5 s55 Checklist.pdf:17: Section 17 – Coastal protection and flood defence
TR030002-000417-Doc 1.5 s55 Checklist.pdf:20:(f) a statement whether the proposal engages one or more Doc 6.2 (Section 79(1) of the Environmental Protection Act
TR030002-000417-Doc 1.5 s55 Checklist.pdf:20: Environmental Protection Act 1990 (statutory nuisances) by the applicant and concludes at paragraph 3.1 :
TR030002-000417-Doc 1.5 s55 Checklist.pdf:29: protection of the environment to which the information relates
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4:the pipeline survey but which are they are implemented, will have the benefit of the protection of those controls as
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4: lesser degree of protection simply because the Applicant has chosen to route its
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4: protection for the pipelines concerned. However, the protection offered by the
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4: protective provisions in Schedule 9 go way beyond the protection currently afforded
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4: current area in respect of which those pipelines have protection. The ability to
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:4: approve the works details (as defined) goes far beyond the normal protection
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:5: In relation to paragraph 3.2.6© the protection afforded by the 25 metre distance
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:16:protective provisions in Schedule 9 of the DCO provide even more protection for the pipelines.
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:17:protection (see Document 8.11 paragraph 5.3).
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:17:Multiple, including independent, layers of protection exist in Schedule 9, such as:-
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:17: protection by fencing (Para 11)
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:19: greater protection.
TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:25:rules and company guidelines, HSE requirements must be detailed LOPA (Layer of Protection Analysis) to classify Safety
I&BPB6776R001F01_NGCT scoping document.pdf:6: The footprint of the NGCT is located adjacent to the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site. Natural
I&BPB6776R001F01_NGCT scoping document.pdf:8: Coastal protection and flood defence impact tidal flood risk at or immediately adjacent to the proposed scheme footprint, beyond that described in the 2006 ES. As the landside elements of
I&BPB6776R001F01_NGCT scoping document.pdf:9: The main major accident / natural disaster which could affect the proposed scheme is tidal flooding. The findings from the coastal protection / flood
NGCT_Final_ES at KK with figs.pdf:3: land drainage, flood and coastal protection, commercial and
NGCT_Final_ES at KK with figs.pdf:5: 5.4.1 Protection of the natural and built environment 155
NGCT_Final_ES at KK with figs.pdf:12:22 COASTAL PROTECTION AND FLOOD DEFENCE 422
NGCT_Final_ES at KK with figs.pdf:22:CPA Coast Protection Act
NGCT_Final_ES at KK with figs.pdf:22:FEPA Food and Environment Protection Act
NGCT_Final_ES at KK with figs.pdf:24:RSPB Royal Society for the Protection of Birds
NGCT_Final_ES at KK with figs.pdf:24:SPA Special Protection Area
NGCT_Final_ES at KK with figs.pdf:24:TVEPG Tees Valley Environmental Protection Group
NGCT_Final_ES at KK with figs.pdf:24:US EPA United States Environmental Protection Agency
NGCT_Final_ES at KK with figs.pdf:29:Source Protection Zones Defined by the Environment Agency. These zones show
NGCT_Final_ES at KK with figs.pdf:29:Special Protection Area SPAs are designated under the EU Directive on
NGCT_Final_ES at KK with figs.pdf:33: • Applications under the Food and Environment Protection Act 1985 (FEPA)/the
NGCT_Final_ES at KK with figs.pdf:33: Coast Protection Act 1949 (CPA) to dispose of dredged material below the level
NGCT_Final_ES at KK with figs.pdf:34: • Coastal protection and flood defence (Section 22);
NGCT_Final_ES at KK with figs.pdf:35: status of the Teesmouth and Cleveland Coast Special Protection Area (SPA)
NGCT_Final_ES at KK with figs.pdf:47: ‘Birds Directive’) provides for the protection of wild birds through the designation
NGCT_Final_ES at KK with figs.pdf:47: of Special Protection Areas (SPA). In addition, Council Directive 92/43/EEC on
NGCT_Final_ES at KK with figs.pdf:47: ‘European sites’ and consequently the protections afforded to European sites
NGCT_Final_ES at KK with figs.pdf:55: coastal ornithology, marine archaeology, land drainage, flood and coastal protection,
NGCT_Final_ES at KK with figs.pdf:109: suitable vehicle collision protection barriers/kerbs around the base).
NGCT_Final_ES at KK with figs.pdf:127: • Protection and enhancement of the environment;
NGCT_Final_ES at KK with figs.pdf:132: Coast Special Protection Area (SPA) and Ramsar site; the Seaton Dunes and
NGCT_Final_ES at KK with figs.pdf:135: to the protection of the historic environment.
NGCT_Final_ES at KK with figs.pdf:136: • Effective protection of the environment; and,
NGCT_Final_ES at KK with figs.pdf:137: Protection Act 1990.
NGCT_Final_ES at KK with figs.pdf:141: respect to coastal protection and flood defence. The following issues have been
NGCT_Final_ES at KK with figs.pdf:142: integrating different types of transport; the integration of transport and the protection
NGCT_Final_ES at KK with figs.pdf:143: encourage more freight to be carried by rail and water and to give better protection to
NGCT_Final_ES at KK with figs.pdf:144: in PPG 20, in relation to the protection of important nature conservation sites, deep
NGCT_Final_ES at KK with figs.pdf:148: through the protection of rail connections and to consider opportunities for new
NGCT_Final_ES at KK with figs.pdf:148: made in order to encourage the protection of sites and routes which could be critical
NGCT_Final_ES at KK with figs.pdf:149: • Safeguard land for port use where necessary, whilst ensuring the protection of sites
NGCT_Final_ES at KK with figs.pdf:151: ensuring the protection of sites of nature conservation importance and features of
NGCT_Final_ES at KK with figs.pdf:156: 5. The protection of the area’s environment is an important objective of the Structure
NGCT_Final_ES at KK with figs.pdf:164: New roads and highway improvements; environmental protection and improvements
NGCT_Final_ES at KK with figs.pdf:165: Flood Risk in the Borough. The policy states that flood protection and prevention
NGCT_Final_ES at KK with figs.pdf:165: will not be permitted in areas at risk from flooding unless suitable flood protection
NGCT_Final_ES at KK with figs.pdf:177: PROTECTION OF THE NATURAL AND BUILT ENVIRONMENT
NGCT_Final_ES at KK with figs.pdf:177: Protection of To protect and enhance biodiversity and geodiversity The environmental impacts of the proposal are fully addressed within this Environmental Northern Gateway
NGCT_Final_ES at KK with figs.pdf:177: Protection of the To protect and enhance the quality and distinctiveness of the area’s The proposal will result in a visual effect on the local area, but does not introduce a new Northern Gateway
NGCT_Final_ES at KK with figs.pdf:178: Protection of Key To preserve, protect and enhance buildings, sites, features and There are no such sites or features at or in the immediate vicinity of the proposed development Northern Gateway
NGCT_Final_ES at KK with figs.pdf:178: Protection of To reduce adverse impacts on global communities This objective is not relevant for the proposed development. -
NGCT_Final_ES at KK with figs.pdf:178: Protection of Air To ensure good air quality for all in Middlesbrough There are no significant predicted impacts on air quality, noise or lighting associated with the Northern Gateway
NGCT_Final_ES at KK with figs.pdf:178: Protection of Water To protect and improve the quality of all controlled waters Water quality issues are largely associated with the construction phase and have been fully Northern Gateway
NGCT_Final_ES at KK with figs.pdf:184:5.4.1 Protection of the natural and built environment
NGCT_Final_ES at KK with figs.pdf:184:Protection of biodiversity and geodiversity
NGCT_Final_ES at KK with figs.pdf:184:Protection of the urban and rural landscape
NGCT_Final_ES at KK with figs.pdf:184:Protection of key built, historical or archaeological interest and cultural heritage
NGCT_Final_ES at KK with figs.pdf:185:Protection of communities from hazardous activities and adverse impacts of
NGCT_Final_ES at KK with figs.pdf:185:Protection of air quality
NGCT_Final_ES at KK with figs.pdf:185:Protection of water quality and water resources
NGCT_Final_ES at KK with figs.pdf:271: 1. In accordance with the Environmental Protection Act 1990, for contaminated
NGCT_Final_ES at KK with figs.pdf:272: land, as defined in Part IIA of the Environmental Protection Act 1990.
NGCT_Final_ES at KK with figs.pdf:274: Protection Zone. Therefore the underlying groundwater is not considered to be a
NGCT_Final_ES at KK with figs.pdf:274: Coast Ramsar site and Special Protection Area and the South Gare and Coatham
NGCT_Final_ES at KK with figs.pdf:276: Protection Zone. Therefore the underlying groundwater is not considered to be a
NGCT_Final_ES at KK with figs.pdf:279: Protection Zone. Therefore the underlying groundwater is not considered to be a
NGCT_Final_ES at KK with figs.pdf:307: Interest (SSSI) and National Nature Reserves (NNR), Special Protection Area
NGCT_Final_ES at KK with figs.pdf:332: • Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar
NGCT_Final_ES at KK with figs.pdf:355: although some protection is afforded by the breakwaters. Nevertheless, passing
NGCT_Final_ES at KK with figs.pdf:358: protection, and since it may be in use only intermittently, a roost retains such
NGCT_Final_ES at KK with figs.pdf:383: official protection. In addition to the site of wrecked vessels, the assessment
NGCT_Final_ES at KK with figs.pdf:412: protection of the amenity of the nearest residents.
NGCT_Final_ES at KK with figs.pdf:431:Objectives for the protection of human health
NGCT_Final_ES at KK with figs.pdf:432:Objectives for the protection of vegetation and ecosystems (prescribed in Air Quality Limit Values (England)
NGCT_Final_ES at KK with figs.pdf:433: Protection Group (TVEPG) to coordinate the review and assessment of air
NGCT_Final_ES at KK with figs.pdf:437: using the United States Environmental Protection Agency (US EPA) model
NGCT_Final_ES at KK with figs.pdf:451:22 COASTAL PROTECTION AND FLOOD DEFENCE
NGCT_Final_ES at KK with figs.pdf:453: level rise. To the north the proposed site is provided with additional protection
NGCT_Final_ES at KK with figs.pdf:477: Environment Protection Act is made on the basis of this scenario. However, the
NGCT_Final_ES at KK with figs.pdf:508:COASTAL PROTECTION AND FLOOD DEFENCE
NGCT_Final_ES at KK with figs.pdf:538:CCME (2001a). Canadian sediment quality guidelines for the protection of aquatic
Appendix 1Teesport HRO.pdf:6: 16.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
Appendix 1Teesport HRO.pdf:6: itself constitute a defence to proceedings under section 82 of the Environmental Protection
20171212 MMO Letter with additional comments Teesport Scoping.pdf:1: protection and alongside any subsequent planning application in order that
20171212 MMO Letter with additional comments Teesport Scoping.pdf:1: protection and near a flood defence structure, in a flood plain or on or near a
MLA_2020_00079-APPLICATION-FORM.pdf:3:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any
MLA_2020_00079-APPLICATION-FORM.pdf:9:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent
IBPB8270R001F01_EIA REPORT(2).pdf:5:20 COASTAL PROTECTION AND FLOOD DEFENCE 206
IBPB8270R001F01_EIA REPORT(2).pdf:42:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required
IBPB8270R001F01_EIA REPORT(2).pdf:45: • Provide high standards of protection for the natural environment.
IBPB8270R001F01_EIA REPORT(2).pdf:78: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council
IBPB8270R001F01_EIA REPORT(2).pdf:79:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable
IBPB8270R001F01_EIA REPORT(2).pdf:103: the interests of protection of controlled
IBPB8270R001F01_EIA REPORT(2).pdf:103: approved Method Statement above. interests of protection of Controlled
IBPB8270R001F01_EIA REPORT(2).pdf:104: Protection Areas (SPA) and potential SPAs, Ramsar sites,
IBPB8270R001F01_EIA REPORT(2).pdf:143: Potential Special Protection Area
IBPB8270R001F01_EIA REPORT(2).pdf:152:WeBS is a partnership between the BTO, the Royal Society for the Protection of Birds (RSPB) and the
IBPB8270R001F01_EIA REPORT(2).pdf:157: Potential Special Protection Area
IBPB8270R001F01_EIA REPORT(2).pdf:165:North Gare Sands and Bran Sands are relatively exposed areas of intertidal, although some protection is
IBPB8270R001F01_EIA REPORT(2).pdf:213:20 COASTAL PROTECTION AND FLOOD DEFENCE
IBPB8270R001F01_EIA REPORT(2).pdf:213:scheme is likely to impact coastal protection and flood defence.
IBPB8270R001F01_EIA REPORT(2).pdf:213:the potential effects on coastal protection and flood defence relate to potential changes in tidal flood risk at,
IBPB8270R001F01_EIA REPORT(2).pdf:214:Table 20.1 Summary of comments in the MMO’s Scoping Opinion with regard to coastal protection and
IBPB8270R001F01_EIA REPORT(2).pdf:214:protection and flood defence associated with the proposed scheme is provided within Section 5.
IBPB8270R001F01_EIA REPORT(2).pdf:216:level at the proposed scheme footprint is in excess of this level, providing suitable protection against the
IBPB8270R001F01_EIA REPORT(2).pdf:229:protection and flood defence associated with the proposed scheme is provided within Section 5.
IBPB8270R001F01_EIA REPORT(2).pdf:240: • The port has an ongoing asset protection programme in place - a scheme of works to ensure
IBPB8270R001F01_EIA REPORT(2).pdf:241: has an ongoing asset protection programme, which ensures that Infrastructure and sea
IBPB8270R001F01_EIA REPORT(2).pdf:245:proposed scheme is tidal flooding. The findings from the coastal protection / flood defence assessment,
IBPB8270R001F01_EIA REPORT(2).pdf:279:Habitats Directive and promote the protection of flora, fauna and habitats. SPAs are designated under the
IBPB8270R001F01_EIA REPORT(2).pdf:279:definition of European sites and, consequently, the protections afforded to European sites under the Habitats
IBPB8270R001F01_EIA REPORT(2).pdf:295:Ramsar site (titled: A possible extension to the Teesmouth and Cleveland Coast Special Protection Area)
IBPB8270R001F01_EIA REPORT(2).pdf:306:for the Protection of Aquatic Life
IBPB8270R001F01_EIA REPORT(2).pdf:314:interests of protection of Controlled Waters.
IBPB8270R001F01_EIA REPORT(2).pdf:314:interests of protection of Controlled Waters.
IBPB8270R001F01_EIA REPORT(2).pdf:324: 5.7 Coastal protection and flood defence
IBPB8270R001F01_EIA REPORT(2).pdf:327: protection and alongside any subsequent planning application in order that
IBPB8270R001F01_EIA REPORT(2).pdf:327: protection and near a flood defence structure, in a flood plain or on or near a
IBPB8270R001F01_EIA REPORT(2).pdf:333: only, and the principle is not specifically linked to Special Protection
IBPB8270R001F01_EIA REPORT(2).pdf:335: Coastal protection and flood defence:
IBPB8270R001F01_EIA REPORT(2).pdf:405: • Canadian Sediment Quality Guidelines for the Protection of Aquatic Life (CCME, 2002).
IBPB8270R001F01_EIA REPORT(2).pdf:430: • The metric does not change the protection afforded to biodiversity: existing levels of
IBPB8270R001F01_EIA REPORT(2).pdf:430: protection afforded to protected species and to habitats are not affected by the use of this metric.
IBPB8270R001F01_EIA REPORT(2).pdf:431:sites (namely the Teesmouth and Cleveland Coast potential Special Protection Area (pSPA) and Ramsar
IBPB8270R001F01_EIA REPORT(2).pdf:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal
IBPB8270R001F01_EIA REPORT(2).pdf:631:these have been withdrawn, they still provide good reference material for protection of water courses
IBPB8270R001F01_EIA REPORT(2).pdf:642: Heavily modified water body and for what use Yes (Flood Protection, Navigation Ports and Harbours)
IBPB8270R001F01_EIA REPORT(2).pdf:643: Heavily modified water body and for what use Yes (Coastal Protection, Flood Protection, Navigation Ports and Harbours)
20220302_EIA_Consent_Decision_Response MLA202000079.pdf:6:Species Regulations 2017 (“Habitats Regulations”) as Special Protection Areas
20220302_EIA_Consent_Decision_Response MLA202000079.pdf:9:Royal Society for the Protection No comments. No action required.
20220302_EIA_Consent_Decision_Response MLA202000079.pdf:10:Special Protection Area (SPA) and in close proximity to the Teesmouth and
20220302_EIA_Consent_Decision_Response MLA202000079.pdf:19:the applicant’s coastal protection / flood defence assessment, address this risk and
20220302_EIA_Consent_Decision_Response MLA202000079.pdf:23:protection but enable a substantial working window for percussive piling activity.
20220208 Northern Gateway MLA202000079 Notice to Natural England.pdf:1:The Project is located within the Teesmouth and Cleveland Coast Special Protection Area
2008 Teesport HRO.pdf:6: 16.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
2008 Teesport HRO.pdf:6: itself constitute a defence to proceedings under section 82 of the Environmental Protection
I&BPB8270MM001F0.1.pdf:4: 5.7 Coastal protection and flood defence
IBPB8270R001F01_EIA REPORT.pdf:5:20 COASTAL PROTECTION AND FLOOD DEFENCE 206
IBPB8270R001F01_EIA REPORT.pdf:42:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required
IBPB8270R001F01_EIA REPORT.pdf:45: • Provide high standards of protection for the natural environment.
IBPB8270R001F01_EIA REPORT.pdf:78: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council
IBPB8270R001F01_EIA REPORT.pdf:79:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable
IBPB8270R001F01_EIA REPORT.pdf:103: the interests of protection of controlled
IBPB8270R001F01_EIA REPORT.pdf:103: approved Method Statement above. interests of protection of Controlled
IBPB8270R001F01_EIA REPORT.pdf:104: Protection Areas (SPA) and potential SPAs, Ramsar sites,
IBPB8270R001F01_EIA REPORT.pdf:143: Potential Special Protection Area
IBPB8270R001F01_EIA REPORT.pdf:152:WeBS is a partnership between the BTO, the Royal Society for the Protection of Birds (RSPB) and the
IBPB8270R001F01_EIA REPORT.pdf:157: Potential Special Protection Area
IBPB8270R001F01_EIA REPORT.pdf:165:North Gare Sands and Bran Sands are relatively exposed areas of intertidal, although some protection is
IBPB8270R001F01_EIA REPORT.pdf:213:20 COASTAL PROTECTION AND FLOOD DEFENCE
IBPB8270R001F01_EIA REPORT.pdf:213:scheme is likely to impact coastal protection and flood defence.
IBPB8270R001F01_EIA REPORT.pdf:213:the potential effects on coastal protection and flood defence relate to potential changes in tidal flood risk at,
IBPB8270R001F01_EIA REPORT.pdf:214:Table 20.1 Summary of comments in the MMO’s Scoping Opinion with regard to coastal protection and
IBPB8270R001F01_EIA REPORT.pdf:214:protection and flood defence associated with the proposed scheme is provided within Section 5.
IBPB8270R001F01_EIA REPORT.pdf:216:level at the proposed scheme footprint is in excess of this level, providing suitable protection against the
IBPB8270R001F01_EIA REPORT.pdf:229:protection and flood defence associated with the proposed scheme is provided within Section 5.
IBPB8270R001F01_EIA REPORT.pdf:240: • The port has an ongoing asset protection programme in place - a scheme of works to ensure
IBPB8270R001F01_EIA REPORT.pdf:241: has an ongoing asset protection programme, which ensures that Infrastructure and sea
IBPB8270R001F01_EIA REPORT.pdf:245:proposed scheme is tidal flooding. The findings from the coastal protection / flood defence assessment,
IBPB8270R001F01_EIA REPORT.pdf:279:Habitats Directive and promote the protection of flora, fauna and habitats. SPAs are designated under the
IBPB8270R001F01_EIA REPORT.pdf:279:definition of European sites and, consequently, the protections afforded to European sites under the Habitats
IBPB8270R001F01_EIA REPORT.pdf:295:Ramsar site (titled: A possible extension to the Teesmouth and Cleveland Coast Special Protection Area)
IBPB8270R001F01_EIA REPORT.pdf:306:for the Protection of Aquatic Life
IBPB8270R001F01_EIA REPORT.pdf:314:interests of protection of Controlled Waters.
IBPB8270R001F01_EIA REPORT.pdf:314:interests of protection of Controlled Waters.
IBPB8270R001F01_EIA REPORT.pdf:324: 5.7 Coastal protection and flood defence
IBPB8270R001F01_EIA REPORT.pdf:327: protection and alongside any subsequent planning application in order that
IBPB8270R001F01_EIA REPORT.pdf:327: protection and near a flood defence structure, in a flood plain or on or near a
IBPB8270R001F01_EIA REPORT.pdf:333: only, and the principle is not specifically linked to Special Protection
IBPB8270R001F01_EIA REPORT.pdf:335: Coastal protection and flood defence:
IBPB8270R001F01_EIA REPORT.pdf:405: • Canadian Sediment Quality Guidelines for the Protection of Aquatic Life (CCME, 2002).
IBPB8270R001F01_EIA REPORT.pdf:430: • The metric does not change the protection afforded to biodiversity: existing levels of
IBPB8270R001F01_EIA REPORT.pdf:430: protection afforded to protected species and to habitats are not affected by the use of this metric.
IBPB8270R001F01_EIA REPORT.pdf:431:sites (namely the Teesmouth and Cleveland Coast potential Special Protection Area (pSPA) and Ramsar
IBPB8270R001F01_EIA REPORT.pdf:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal
IBPB8270R001F01_EIA REPORT.pdf:631:these have been withdrawn, they still provide good reference material for protection of water courses
IBPB8270R001F01_EIA REPORT.pdf:642: Heavily modified water body and for what use Yes (Flood Protection, Navigation Ports and Harbours)
IBPB8270R001F01_EIA REPORT.pdf:643: Heavily modified water body and for what use Yes (Coastal Protection, Flood Protection, Navigation Ports and Harbours)
Appendix 1Teesport HRO.pdf:6: 16.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection
Appendix 1Teesport HRO.pdf:6: itself constitute a defence to proceedings under section 82 of the Environmental Protection
PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:3:8.15 Coastal protection and flood defence 11
PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:9: • Coastal protection and flood defence.
PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:12:Protection Area (pSPA), Ramsar site and Site of Special Scientific Interest (SSSI). The understanding of
PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:15:8.15 Coastal protection and flood defence
PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:tidal flooding. However, as described in Section 8.15, the impacts on coastal protection and flood defence
Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:6:Species Regulations 2017 (“Habitats Regulations”) as Special Protection Areas
Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:9:Royal Society for the Protection No comments. No action required.
Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:10:Special Protection Area (SPA) and in close proximity to the Teesmouth and
Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:19:the applicant’s coastal protection / flood defence assessment, address this risk and
Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:23:protection but enable a substantial working window for percussive piling activity.
MLA_2021_00215-Licence Document (Marine)-20.pdf:7:sheet piled wall is removed scour protection will be placed
MLA_2021_00215-APPLICATION-FORM.pdf:4:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any
MLA_2021_00215-APPLICATION-FORM.pdf:9:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:6:SPA Special Protection Area
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:20:Special Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:21:legislative protection of wildlife in Great Britain and requires that any operations within or adjacent to a Site
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:21:This duty covers the protection, enhancement and restoration of habitats and species. Section 41 of the
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:21:Part 5 of the MCAA provides a framework for the designation and protection of Marine Conservation Zones
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:36:of the NERC Act 2006, with salmon, sea lamprey and river lamprey afforded additional protection as Annex
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:48:Natural England (2019) Teesmouth and Cleveland Coast potential Special Protection Area (pSPA) and
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:48:Natural England (2018) Departmental Brief: Teesmouth and Cleveland Coast potential Special Protection
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:65: Teesmouth and Cleveland Coast Special Protection
MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:72: Heavily modified water body and for what use Yes –flood protection, and navigation, ports and harbours
MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:1:being removed. Once the existing sheet piled wall is removed scour protection will be placed within the
MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:2: Once the existing sheet piled wall is removed scour protection
MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:5: SCOUR PROTECTION ON BERM TO BE
MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf:7: PROTECTION - SEE NOTE 4 APPROX. LOCATION OF PROTECTION - SEE NOTE 4
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:6:SPA Special Protection Area
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:20:Special Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:21:legislative protection of wildlife in Great Britain and requires that any operations within or adjacent to a Site
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:21:This duty covers the protection, enhancement and restoration of habitats and species. Section 41 of the
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:21:Part 5 of the MCAA provides a framework for the designation and protection of Marine Conservation Zones
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:36:of the NERC Act 2006, with salmon, sea lamprey and river lamprey afforded additional protection as Annex
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:48:Natural England (2019) Teesmouth and Cleveland Coast potential Special Protection Area (pSPA) and
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:48:Natural England (2018) Departmental Brief: Teesmouth and Cleveland Coast potential Special Protection
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:65: Teesmouth and Cleveland Coast Special Protection
MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:72: Heavily modified water body and for what use Yes –flood protection, and navigation, ports and harbours
MLA_2015_00334-APPLICATION-FORM.pdf:3:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any
MLA_2015_00334-APPLICATION-FORM.pdf:7:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent
502 - Waste FD MASTER.pdf:6: • Shore protection - wrong sediment type;
3 EIS Appendices (3).pdf:33: Slope Protection
3 EIS Appendices (3).pdf:33:0.90 LAT ( -1.95 AOD) MLWS EDGE PROTECTION TO
3 EIS Appendices (3).pdf:41: Teesmouth and Cleveland Coast Special Protection Area (S.P.A.) and
3 EIS Appendices (3).pdf:41: Teesmouth and Cleveland Coast Special Protection Area (S.P.A.) and
3 EIS Appendices (3).pdf:52:Most large ships are currently dismantled in Asia, but health and safety protection for
3 EIS Appendices (3).pdf:52:workers and environmental protection standards there are, by the standards of the
3 EIS Appendices (3).pdf:55:and other environmental protection measures and have inadequate health and safety
3 EIS Appendices (3).pdf:62: accept that the obligation for environmental and worker protection in ship
3 EIS Appendices (3).pdf:63:acceptable standards of health, safety and environmental protection.
3 EIS Appendices (3).pdf:63:workforce health and safety and environmental protection. However, they disagreed over
3 EIS Appendices (3).pdf:63:safety and environmental protection, none were satisfactory:
3 EIS Appendices (3).pdf:64:dismantled is that the level of health and safety protection for the workers and the
3 EIS Appendices (3).pdf:64:environmental protection at ship dismantling facilities meet the highest standards; as
3 EIS Appendices (3).pdf:65:standards of health, safety and environmental protection.
3 EIS Appendices (3).pdf:67: internationally acceptable standards of health, safety and environmental protection.
3 EIS Appendices (3).pdf:67: dismantled is that the level of health and safety protection for the workers and the
3 EIS Appendices (3).pdf:67: environmental protection at ship dismantling facilities meet the highest standards;
3 EIS Appendices (3).pdf:68: to the highest standards of health, safety and environmental protection. (Paragraph
3 EIS Appendices (3).pdf:93: boundaries of Special Protection Areas (SPA), RAMSAR Sites, National Nature Reserves
3 EIS Appendices (3).pdf:94: Protection Area (SPA) (Figure A14.1). The boundary of the SPA and Ramsar Site is mid
3 EIS Appendices (3).pdf:95: The main wildlife interest of the TERRC site lies in the birds of the adjacent Special Protection
3 EIS Appendices (3).pdf:103: which affords them protection under Section 9, as amended by the Countryside and Right of
3 EIS Appendices (3).pdf:103: scheduled animal for shelter or protection, or disturb any animal occupying such a structure or
3 EIS Appendices (3).pdf:104: Protection Area.
502 - Waste FD MASTER(2).pdf:6: • Shore protection - wrong sediment type;
ASC-001-00006 A Seaton Channel MMO Application 2015.pdf:1: SPA SPECIAL PROTECTION AREA ABLE Seaton Channel
Licence Document (Marine).pdf:12: To avoid disturbing the protected feeding Special Protection Area (SPA) birds.
1911South-Tees-Master-Plan-Nov-19.2.pdf:3:01.05 The Vision and Strategy for Regeneration 04.05 Environmental Protection and Enhancement 11.14 Recycling and Zero Water Strategy
1911South-Tees-Master-Plan-Nov-19.2.pdf:22:and Cleveland Coast Special Protection Area (SPA), Site
1911South-Tees-Master-Plan-Nov-19.2.pdf:24:linked and statutory impact assessment processes determination process, will ensure the protection and SSSI and SPA. These designations protect the for industrial development of this coastal strip.
1911South-Tees-Master-Plan-Nov-19.2.pdf:24: 2.02.3 LOCAL POLICY respect and provide appropriate protection for
1911South-Tees-Master-Plan-Nov-19.2.pdf:32: works have also recently been carried out in this area. and Crown land; designated a Special Protection Area.
1911South-Tees-Master-Plan-Nov-19.2.pdf:34: Interest (SSSI) and Special Protection Area (SPA) and includes the large expanse of Coatham Sands.
1911South-Tees-Master-Plan-Nov-19.2.pdf:56:appropriate protection within any regeneration proposals. There are four habitats within the site boundary that are restricted to) the calcareous grassland in the Redcar
1911South-Tees-Master-Plan-Nov-19.2.pdf:62: • Clear synergies with neighbouring major enhancements, STDC can provide clear opportunities for • Flooding risk and flood protection
1911South-Tees-Master-Plan-Nov-19.2.pdf:68:Superb Functionality and Connectivity Energy Innovation Environmental Protection and Enhancement Viable Business Model
1911South-Tees-Master-Plan-Nov-19.2.pdf:68:allocations and site selection. Access and circulation and solutions, providing opportunities for a broad array affording appropriate protection to the area’s internationally struck between the best land uses and densities, for
1911South-Tees-Master-Plan-Nov-19.2.pdf:81: 4.05 Environmental Protection and Enhancement
1911South-Tees-Master-Plan-Nov-19.2.pdf:81:led regeneration must provide appropriate protection appropriate protection for ecological designations
1911South-Tees-Master-Plan-Nov-19.2.pdf:81:environmental protection and enhancement therefore forms
1911South-Tees-Master-Plan-Nov-19.2.pdf:126:(in particular ecological and landscape) protection and enhancement,
1911South-Tees-Master-Plan-Nov-19.2.pdf:127:form part of the Teesmouth and Cleveland Coast SPA, other implementation of the Redcar and Cleveland Recreation while ensuring protection of environmentally and interpreted for greater public use. Central to the CCZ
1911South-Tees-Master-Plan-Nov-19.2.pdf:156:collection and conveyance, detention and retention, and within the site that provides potable and fire protection effluent treatment facility with the STDC area is a major to allowing any discharge into the development’s new
1911South-Tees-Master-Plan-Nov-19.2.pdf:156:management system will provide a flood protection level of quality and reduced impact on the local environment.
1911South-Tees-Master-Plan-Nov-19.2.pdf:156:service that meets regulatory standards for flood protection water. The potential for use of the existing Northumbrian
1911South-Tees-Master-Plan-Nov-19.2.pdf:156:completely gravity operated system will be significantly cooling water; irrigation water; fire protection requirements;
1911South-Tees-Master-Plan-Nov-19.2.pdf:166:relation to environmental protection, environmental arrangements. One of the key constraints to the plan for consideration, to enable a rolling programme of level and this is something the Tees Valley Mayor is keen to
R-2021-0674-NM-DECISION NOTICE.pdf:5: such that a continued standard of protection will be provided throughout
MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf:2: Name of NSN site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf:2: Name of NSN site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
354204 MLA_2020_00506 - South Bank Wharf dredge Middlesbrough 5.07.2021 (1).pdf:1:Protection Area (SPA) and adjacent to Teesmouth and Cleveland Coast Ramsar Site.
MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:3: Name of N2K site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
354204 MLA_2020_00506 - South Bank Wharf dredge Middlesbrough 5.07.2021.pdf:1:Protection Area (SPA) and adjacent to Teesmouth and Cleveland Coast Ramsar Site.
360368 NE response to MMO MLA202000506 and MLA202000507 HRA 30.07.2021.pdf:1:Protection Area (SPA) and adjacent to Teesmouth and Cleveland Coast Ramsar Site.
MLA202000506 and MLA202000507 Draft HRA (2).pdf:3: Name of NSN site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:2: protection as Annex II species in the EU Habitats Directive.
PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:1:Table 1.1 Relevant marine licence conditions relating to the protection of migratory fish (taken from marine licence L/2021/00333/1)
PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:While Condition 5.2.10 lists protection of tern foraging habitat as the reason for its requirement, it is linked
MLA_2020_00506_1 South Bank Wharf Variation Response FINAL 392938.pdf:2:Protection Area (SPA) and adjacent to Teesmouth and Cleveland Coast Ramsar Site.
MLA_2020_00506_1 South Bank Wharf Variation Response FINAL 392938.pdf:2:Teesmouth and Cleveland Coast Special Protection Area (SPA) and Teesmouth and Cleveland Coast
MLA202000506 and MLA202000507 Draft HRA.pdf:3: Name of NSN site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:28:good reference material for protection of water courses when working in and around water. STDC would
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:29: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:29:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:40: • Provide high standards of protection for the natural environment.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:53: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:144: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:145:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:170: under Part IIA of the Environmental Protection Act
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:170:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:170:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:172:regulatory controls for the protection of water resources, including the quality standards expected for
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:172:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:172:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:173: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990:
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:173: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:174: Details of aquifers, Source Protection Zones
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:179: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:179: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008);
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:181:protection.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:185:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990).
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:185:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:185:The Town Country Planning Act and the Environmental Protection Act do not consider future uses.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:191: Protection Areas (SPA) and potential SPAs, Ramsar sites,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:217: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:218: Legislation Level of protection Species included Details
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:218: Conservation of Small protection of specific areas, monitoring, research,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:218: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:218: the Protection of the Marine species and declining species in the north-east Atlantic. These
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:218: Phocoena on the conservation and protection of marine
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:219: Legislation Level of protection Species included Details
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:222:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:224:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:224:provide the same level of protection for more than 12nm offshore.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:224:and necessary legislative and administrative measures to ensure the protection of seal species. The
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:224:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:224:protection was afforded to protect harbour and grey seal year-round along the east coast of England.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:249: • Protection of Badgers Act 1992;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:250:value, secondary or supporting value, social value, economic value, legal protection and multi-functional
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:257: LWS 4.7 km This is afforded protection as an Ancient Woodland.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:266:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:271: Special Protection Area (SPA): Teesmouth and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:274:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:276:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:305:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:309: protection of these species during critical migration periods. This assessment of consequent impacts on
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:311:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:312:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4).
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:312:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:314:require protection and guides the OSPAR Commission in setting priorities for future conservation and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:314:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:315:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:329:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:355:that all crashed aircraft in military service are automatically protected under the Protection of Military
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:362:Environmental Protection Act 1990
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:362:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:370: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:380: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: loads for ecosystem protection from atmospheric
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: consultation Environmental Protection department to discuss
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: Protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: Scoping Protection department at
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: received August Protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: RCBC The environmental protection department
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382: Protection set out in this Section is acceptable.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:382:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:398:landscapes within the member states and encourages their protection, management and planning. The UK
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:399:and local level will be afforded additional protection commensurate with their status. Wherever possible,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:400:the South Tees Area. These include the protection of heritage assets and the historic environment and the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:400:protection and enhancement of landscape character.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:405:Special Protection Area Yes Yes
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:408: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:421: • Impacts to coastal / tidal protection and flood defence.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:426:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:432:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:433:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:434:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:436:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:439: • support the expansion and protection of the port and logistics sector;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:523: Special Protection Area (SPA) Tees Legend
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:526: Yes (Coastal Protection, Flood
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:526: Heavily modified water body and for Yes (Flood Protection, Navigation Ports
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:526: protection, Navigation, Ports and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:541:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:541:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:592:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:593:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control:
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:593:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:595:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL:
19Neurotoxicity of Polychlorinated Biphenyls and Related Organohalogens - nihms-1526851.pdf:17: exposure, is decreased neuroprotection because of reduced levels of circulating estrogen
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:36:Special Protection Area (SPA) and Ramsar site.
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:215: SPA Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:217: habitats and wild species to a ‘favourable conservation status’, introducing protection for
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:217: Conservation (SACs) and Special Protection Areas (SPAs). In the UK, the Habitats and the
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:217: designations under Oslo and Paris (OSPAR) Convention for the Protection of the Marine
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:217: species and habitats allows setting priorities to further conservation and protection of marine
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:217: species for the protection of the UK’s biological resources, under the Convention on
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:219: SPA = Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:233: (OSPAR, 2021), which allows setting priorities for further conservation and protection of
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:327: Joint Nature Conservation Committee JNCC. (2020, 3 December). Special Protection Areas –
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:327: overview. https://jncc.gov.uk/our-work/special-protection-areas-overview/#spa-classification-
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:328: Natural England NE. (2019). Teesmouth and Cleveland Coast potential Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:447: Cleveland Coast Special Protection Area (SPA) citation (or supporting documentation
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:good reference material for protection of water courses when working in and around water. STDC would
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:29: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:29:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:40: • Provide high standards of protection for the natural environment.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:53: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:144: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:145:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170: under Part IIA of the Environmental Protection Act
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:regulatory controls for the protection of water resources, including the quality standards expected for
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:173: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990:
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:173: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:174: Details of aquifers, Source Protection Zones
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:179: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:179: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008);
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:181:protection.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990).
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:The Town Country Planning Act and the Environmental Protection Act do not consider future uses.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:191: Protection Areas (SPA) and potential SPAs, Ramsar sites,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:217: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Legislation Level of protection Species included Details
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Conservation of Small protection of specific areas, monitoring, research,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: the Protection of the Marine species and declining species in the north-east Atlantic. These
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Phocoena on the conservation and protection of marine
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:219: Legislation Level of protection Species included Details
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:222:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:provide the same level of protection for more than 12nm offshore.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:and necessary legislative and administrative measures to ensure the protection of seal species. The
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:protection was afforded to protect harbour and grey seal year-round along the east coast of England.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:249: • Protection of Badgers Act 1992;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:250:value, secondary or supporting value, social value, economic value, legal protection and multi-functional
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:257: LWS 4.7 km This is afforded protection as an Ancient Woodland.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:266:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:271: Special Protection Area (SPA): Teesmouth and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:274:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:305:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:309: protection of these species during critical migration periods. This assessment of consequent impacts on
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:311:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:312:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4).
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:312:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:314:require protection and guides the OSPAR Commission in setting priorities for future conservation and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:314:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:315:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:355:that all crashed aircraft in military service are automatically protected under the Protection of Military
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:362:Environmental Protection Act 1990
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:362:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:380: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: loads for ecosystem protection from atmospheric
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: consultation Environmental Protection department to discuss
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Scoping Protection department at
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: received August Protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: RCBC The environmental protection department
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Protection set out in this Section is acceptable.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:398:landscapes within the member states and encourages their protection, management and planning. The UK
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:399:and local level will be afforded additional protection commensurate with their status. Wherever possible,
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:the South Tees Area. These include the protection of heritage assets and the historic environment and the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:protection and enhancement of landscape character.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:405:Special Protection Area Yes Yes
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:408: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:421: • Impacts to coastal / tidal protection and flood defence.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:426:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:432:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:433:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:434:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:436:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:439: • support the expansion and protection of the port and logistics sector;
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:523: Special Protection Area (SPA) Tees Legend
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: Yes (Coastal Protection, Flood
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: Heavily modified water body and for Yes (Flood Protection, Navigation Ports
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: protection, Navigation, Ports and
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:592:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control:
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European
MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:595:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL:
MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:6:Salmon, sea lamprey and river lamprey are afforded further legal protections as Annex II species in the
MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:8:Certain migratory diadromous fish species are provided additional legal protections by being listed in
MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:11:Protection Area (SPA), as well as adjacent to the Teesmouth and Cleveland Coast Ramsar site. These
MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf:3: Name of NSN site: Teesmouth and Cleveland Coast Special Protection Area (SPA) - UK9006061
PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:18:can be protected during the life of the project (Cooper and Gane, 2016). An effective form of protection can
PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:21:protection and respectful treatment of human remains.
PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:21:the legal protection of the Protection of Military Remains Act 1986. Any finds that are suspected of being
PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:1:Table 1.1 Relevant marine licence conditions relating to the protection of migratory fish (taken from marine licence L/2021/00333/1)
PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:While Condition 5.2.10 lists protection of tern foraging habitat as the reason for its requirement, it is linked
MLA_2020_00506-APPLICATION-FORM.pdf:3:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any
MLA_2020_00506-APPLICATION-FORM.pdf:7:Cleveland Coast Special Protection Area (SPA) and Ramsar site. However, the effects
MLA_2020_00506-APPLICATION-FORM.pdf:9:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area (SPA)
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:The existing riverbank comprises a tidal defence, providing protection during a tidal event within the Tees
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:riverbank providing a revised defence line and continued protection during an extreme event, both now and
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9:2.2.3 Environmental Protection Act 1990 Part II – Controlled Waste and Duty of
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9:Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance with
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:59: would meet the HSE’s land use planning advice criteria in regard to public protection.
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:60: Protection
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:62:seabirds (i.e. the site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Site
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:Redcar and Cleveland Borough Council Environmental Protection Contamination
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:84:reply to it public if asked to under the Freedom of Information Act, Data Protection Act or for
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:84:Protection Act or for litigation. Email messages and attachments sent to or from any
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:249:3.2.2 Groundwater Source Protection Zones 10
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:249:5.2 CORUS UK LTD. First phase reporting of the site protection and monitoring
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:251:Secondary B Aquifer. The site does not lay on a Source Protection Zone (SPZ) and there are no
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Part 2A of The Environmental Protection Act (1990); and,
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Defra ‘Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance’,
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Environment Agency (EA) GP3 ‘Groundwater Protection: Policy and Practice’ and,
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:255: • CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:255: • CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring Programme;
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:259:reported within ‘Teesside Works Site Protection and Monitoring Programme (‘SPMP’)’ by Corus 2008. The
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:protection measures (described in BRE, 2001) in the construction of new buildings, conversions or
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:estimated to be at or above the Action Level). Therefore, radon protection measures are not required within
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:3.2.2 Groundwater Source Protection Zones
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:Groundwater Source Protection Zones (SPZs) are defined around abstraction boreholes used for potable
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:Cleveland Coast Special Protection Area (SPA), Ramsar site and Site of Special Scientific Interest (SSSI).
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:271:5.2 CORUS UK LTD. First phase reporting of the site protection and
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:286: • Consideration should be given to protection of potable water supply pipes following UK Water
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:287: 11 CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:287: 13 CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114: Protection Act 1990, ecosystems environment
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180:The majority of risk controls are aimed at the protection third party property such as overhead cables
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:Scientific Interest (SSSI), Special Areas of Conservation (SAC) and Special Protection Areas (SPA),
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350:Protection Zone5.
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350: DEFRA Magic Map. Online. Source Protection Zones: Available at: https://magic.defra.gov.uk/MagicMap.aspx
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:361: • support the expansion and protection of the port and logistics sector.
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:373:proposed quay would provide suitable protection against the 0.5% (1 in 200) and 0.1% (1 in 1,000) annual
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:374:Whilst the proposed quay wall will provide protection throughout the lifetime of the proposed scheme it is
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:375:upstream within the tidal estuary, it will receive a greater level of protection from tidal inundation than the
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:376:Whilst the finished quay wall and hardstanding levels provide protection from an extreme tidal event (e.g. 1
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:377: ensures that the proposed quay provides continued protection against the 1 in 200-year and 1 in
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:380: the definition of “personal data” under the Data Protection Act 1998
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:382:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:36:Special Protection Area (SPA) and Ramsar site.
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:215: SPA Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:217: habitats and wild species to a ‘favourable conservation status’, introducing protection for
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:217: Conservation (SACs) and Special Protection Areas (SPAs). In the UK, the Habitats and the
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:217: designations under Oslo and Paris (OSPAR) Convention for the Protection of the Marine
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:217: species and habitats allows setting priorities to further conservation and protection of marine
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:217: species for the protection of the UK’s biological resources, under the Convention on
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:219: SPA = Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:233: (OSPAR, 2021), which allows setting priorities for further conservation and protection of
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:327: Joint Nature Conservation Committee JNCC. (2020, 3 December). Special Protection Areas –
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:327: overview. https://jncc.gov.uk/our-work/special-protection-areas-overview/#spa-classification-
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:328: Natural England NE. (2019). Teesmouth and Cleveland Coast potential Special Protection Area
MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:447: Cleveland Coast Special Protection Area (SPA) citation (or supporting documentation
operationmanual_v2.0.pdf:1: U.S. Environmental Protection Agency
operationmanual_v2.0.pdf:2:of the Office of Pollution Prevention and Toxics, U.S. Environmental Protection Agency (U.S.
operationmanual_v2.0.pdf:2:of all Offices/Divisions in the Environmental Protection Agency, nor does the mention of trade
operationmanual_v2.0.pdf:5:Environmental Protection Agency (EPA) since 1981 to predict the aquatic toxicity of new
operationmanual_v2.0.pdf:6:U.S. Environmental Protection Agency
operationmanual_v2.0.pdf:38:Method (May 1994 Draft). Prepared for Robert S. Boethling, U.S. Environmental Protection
operationmanual_v2.0.pdf:38:Boethling, U.S. Environmental Protection Agency, Office of Pollution Prevention and Toxics,
operationmanual_v2.0.pdf:39:EPA U.S. Environmental Protection Agency
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0830-CD-DECISION NOTICE 0684.pdf:5: such that a continued standard of protection will be provided throughout
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: and legislation in respect of biodiversity protection and enhancement by:
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:11: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-ZZ-RP-C-0006-S4-P01-Asset_Maintenance_Plan.pdf:9: Edge protection is formed of a 0.2m concrete upstand to help retain vehicle/plant and
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: EDGE PROTECTION CONTINUES EXTENT OF REINFORCED EDINBURGH
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: PROTECTION 1.1m HIGH 1m HIGH POST &
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: PROTECTION 1.1m HIGH Details 1 of 4
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: 8.00 1m HIGH EDGE PROTECTION TO CONSIST OF BOX CULVERT
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: 3.5m WIDE VEHICULAR ACCESS TRACK GABION BASKET RETAINING WALL KEE KLAMP HANDRAIL EDGE PROTECTION
R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf:1: 1.2m HIGH EDGE PROTECTION
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:1: Impact Assessment, Protection
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:3: 1.3 Root Protection Areas (RPAs) ……………………………………………………………………………………. 5
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:3: 1.4 Tree Protection Orders (TPOs) …………………………………………………………………………………… 5
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:3:4 General Advice for Tree Protection ……………………………………………………………………………….. 10
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4: 6.5 Root Protection Areas (RPAs) ………………………………………………………………………………….. 14
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4:8 Tree Protection Scheme ………………………………………………………………………………………………. 19
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4: 8.6 Protective barriers and ground protection ………………………………………………………………… 21
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4: Alternative tree protection barrier ……………………………………………………………………………………… 21
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4: Ground protection ……………………………………………………………………………………………………………. 21
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:4: 8.7 Tree Protection Plan ………………………………………………………………………………………………. 22
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:therefore tree protection by arboricultural methodology, barriers and ground protection should be
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:Specifications for tree protection barriers and ground protection are provided, along with general
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:advice on tree retention. Tree protection and methodology shall be deployed where indicated on
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:the Tree Protection Plan.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:1.3 Root Protection Areas (RPAs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:The Root Protection Areas (RPA’s) of all trees surveyed were calculated and recorded in the Tree
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:1.4 Tree Protection Orders (TPOs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:7:information for the retention and protection of trees on the development site.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:8:of birds and roosting sites of bats. Nesting birds and bats are afforded protection under The Wildlife
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:8:affords additional protection to all UK bat species. Significant tree works should be avoided during
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:8:The Hedgerow Regulations 1997 provide protection by prohibiting the removal of countryside
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:10:4 GENERAL ADVICE FOR TREE PROTECTION
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:10:barriers at the extent of that hard surface, since the surface itself will afford protection to tree
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:14:6.5 Root Protection Areas (RPAs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:15:Root protection areas have only been calculated for those trees found within the vicinity of the
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19:8 TREE PROTECTION SCHEME
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19:of the development. Tree protection should be installed as per the Tree Protection Plan and
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19:Successful implementation of tree protection measures and long-term tree retention depends on co-
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19: • all requirements of this Tree Protection Scheme are adhered to;
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19: • All personnel working on the site are made aware of the tree protection plan and
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:19: • The tree protection measures are left in place until the construction phase of development is
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20: protection measures.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20:If any breach of the approved tree protection measures occurs:
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20: • Equipment, signage, fencing, tree protection barriers, materials, components, vehicles or
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20: to trees shall not take place within, or close to a Root Protection Area (RPA).
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20:No alterations or variations shall be made to the approved tree protection measures without written
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20: 1. Installation of tree protection barriers and temporary ground protection in areas indicated
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:20: 3. Removal of the remaining ground protection and barriers.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:8.6 Protective barriers and ground protection
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:laid out in accordance with the Tree Protection Plan. The appended notice should be used to create
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:all weather notices that must be added to the tree protection barriers or suitable intervals. For this
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:site, the existing boundary fence may be used as a tree protection barrier. In the event of any panel
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:Alternative tree protection barrier
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:Ground protection
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21:The ground protection might comprise one of the following:
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:21: protection boards placed on top of a compression-resistant layer (e.g. 150 mm depth of
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:22: 8.7 Tree Protection Plan
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:23:To avoid disturbance to the physical protection of the trees, it is essential to make allowance for and
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:23:are most susceptible to damage as a result of the development. Tree protection should be installed
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:23:as per the Tree Protection Plan and contractors should be mindful of vehicular movement over RPAs
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:24: the RPAs. If this is unavoidable, ground protection should be installed to the RPAs*
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:24:to be retained can be mitigated with tree works, landscaping, protective barriers, ground protection
R-2022-0816-FFM-PN 0816.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf:16: • Medium: areas that offer some groundwater protection. Intermediate between high
R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:4: (Policy LS4/ED6), within the 6km Special Protection Area (‘SPA’) buffer zone (Policy N4) and
R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:8:appropriate protection and enhancement measures incorporated into the design of development
R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:8:The approach is similarly echoed in Development Principle STDC 7 (Natural Environmental Protection
R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:10:of trees that will be removed with the proposed development, and the types of protection measures that
R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:11:• Landscape Demolition and Protection Plan (ref: STDC_HWY-ATK-LDC-SHPR-DR-CH-000042),
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:3: 1.3 Root Protection Areas (RPAs) ……………………………………………………………………………………. 5
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:3: 1.4 Tree Protection Orders (TPOs) …………………………………………………………………………………… 5
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:3:4 General Advice for Tree Protection ……………………………………………………………………………….. 10
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:4: 6.5 Root Protection Areas (RPAs) ………………………………………………………………………………….. 14
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:therefore tree protection by arboricultural methodology, barriers and ground protection should be
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:Specifications for tree protection barriers and ground protection are provided, along with general
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:advice on tree retention. Tree protection and methodology shall be deployed where indicated on
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:the Tree Protection Plan.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:1.3 Root Protection Areas (RPAs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:The Root Protection Areas (RPA’s) of all trees surveyed were calculated and recorded in the Tree
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:1.4 Tree Protection Orders (TPOs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:7:information for the retention and protection of trees on the development site.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:8:of birds and roosting sites of bats. Nesting birds and bats are afforded protection under The Wildlife
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:8:affords additional protection to all UK bat species. Significant tree works should be avoided during
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:8:The Hedgerow Regulations 1997 provide protection by prohibiting the removal of countryside
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:10:4 GENERAL ADVICE FOR TREE PROTECTION
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:10:barriers at the extent of that hard surface, since the surface itself will afford protection to tree
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:14:6.5 Root Protection Areas (RPAs)
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:15:Root protection areas have only been calculated for those trees found within the vicinity of the
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:19:which are to be retained therefore tree protection by arboricultural methodology, barriers and
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:19:ground protection should be implemented throughout the works.
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:19:General specifications for tree protection barriers and ground protection are provided, along with
R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:19:Assessment, Method Statement and Protection Plan.
R-2022-0816-FFM-CON LAND 0816.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0816-FFM-0816.pdf:1:complete protection of any protected species and associated habitat. A site meeting for assurance would be useful.
R-2022-0816-FFM-220831_ HRA for Steel House Park and Ride_INCA_RevA (002).pdf:4: • Special Protection Areas (SPA). These are designated under Article 3 (2) of the Birds
R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: STDC land boundary Approx. 5m tree protection zone STEEL HOUSE PARK & RIDE
R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: Demolition and protection for the proposed drainage route LIMERICK R
R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: Drainage route to existing watercourse AND PROTECTION
R-2022-0816-FFM-INCA2022-42 EcIA Steel House Park and Ride.pdf:3:Coast (T&CC) Special Protection Area (SPA), Ramsar site and SSSI. The Local Planning Authority
R-2022-0816-FFM-INCA2022-42 EcIA Steel House Park and Ride.pdf:6:which are afforded the same level of protection in policy terms in respect of new development as
R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000040_C01.pdf:1: B Benches type and no. tbc at detailed design stage Approx. 5m tree protection zone DORMANSTOWN Project
R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf:6: Authority prior to the occupation of each building on site. Any protection measures or gas
R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf:11:The site does not lie in a Radon protection area.
R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf:12:Give the above a remedial strategy comprising capping for the protection of human health is considered
R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf:13:The above is considered a minimum thickness for protection of human health. Should deep rooting
R-2022-0515-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0515-CD-COMPLIANCE OFFICER REPORT.pdf:4:protection team.
R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2022-0515-CD-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0754-FFM-Officer Report 0754.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0754-FFM-Officer Report 0754.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0754-FFM-Officer Report 0754.pdf:8:environmental protection officers who have raised no objection to the principle
R-2021-0754-FFM-Officer Report 0754.pdf:11: protection of sites of ecological value in accordance with policies SD4
R-2021-0754-FFM-Decision Notice 0754.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2021-0754-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0754-FFM-Network Rail comments.pdf:1:Asset Protection Eastern
R-2021-0754-FFM-Network Rail comments.pdf:1:assetprotectioneastern@networkrail.co.uk.
R-2021-0754-FFM-EP NU.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0754-FFM-371465 Natural England Response Letter REF R.2021.0754.FF Land East of Dockside Road, South Bank.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context(2).pdf:2: bodies, water impoundment and protection of water resources.
Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context(2).pdf:3: Environment Agency ('EA') Principles and Practice for the Protection of Groundwater
Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context.pdf:2: bodies, water impoundment and protection of water resources.
Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context.pdf:3: Environment Agency ('EA') Principles and Practice for the Protection of Groundwater
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:3: gas protection measures;
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:4: 2 EA, Groundwater protection technical guidance, 2017 (ref 9.45);
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:4: 3 EA, The Environment Agency’s approach to groundwater protection, 2018 (ref 9.46);
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:5: protection measures appropriate to protect buildings and future site users from landfill gas
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:5: accumulation of ground gas in confined spaces. The ground gas protection measures would be
Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:6: relation to the protection of buried concrete against sulphate attack.
Environmental Statement, Chapter G Water Management and Flooding Section 6 mitigation.pdf:1: 1 Environment Agency (EA) Principles and Practice for the Protection of Groundwater
Environmental Statement, Chapter G Water Management and Flooding Section 6 mitigation.pdf:6: Protection Act 1990.
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:23: protection, ports, harbours and recreation are reducing available habitat
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:23: Listed physical modifications are coast and flood protection use;
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:24: WFD water stipulates that ecological protection should apply to
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: otherwise identified as requiring special protection under any EU instrument
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: providing for the protection of surface water and groundwater or for the
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: (i)areas designated for the protection of economically significant aquatic species
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: (iv)areas designated for the protection of habitats or species where the maintenance
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: or improvement of the status of water is an important factor in the protection of the
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: Cleveland Coast Special Protection Area (SPA) and Ramsar site due to the
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:48: protection use; modifications will compound and impact on the physical
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:48: estuary as a port/harbour or flood protection.
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:66: Special Protection Area (SPA), Site of Special Scientific Interest (SSSI) and Ramsar
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:68: banks. These were possible flood protection banks made from earth taken from
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: Sites with statutory designations receive varying degrees of legal protection under
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: • Special Areas of Conservation (SAC) and Special Protection Area (SPA)
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: Non-statutory sites are afforded no statutory legal protection, but are normally
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: nature conservation value. The protection afforded to such sites is usually
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: Otters also receive protection under the Wildlife and Countryside Act 1981 (as
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: The Salmon and Freshwater Fisheries Act (1975) affords protection to fish and to the
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: Approximately 70 species of invertebrate species receive legal protection through
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: various levels of protection according to the rarity of the species. Offences include
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: protection
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: / protection
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: protection
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: Species with full protection under the Act include the Marsh Fritillary Euphydryas
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: Protection Act 1990 and must be disposed of properly (i.e. Japanese Knotweed and
CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:87:increased protection, probably reactionary
TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:4:SPA Special Protection Area
TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:7: known as the 'Habitats Regulations', provide legal protection to habitats and species of
TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:7: protection as SACs and SPAs.
TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:11: Special Protection Area (SPA) within and immediately adjacent to the project site at
TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:29:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at:
MLA_2022_00248-APPLICATION-FORM.pdf:3:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any
MLA_2022_00248-APPLICATION-FORM.pdf:9:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:8: Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside,
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:8: First Phase Reporting of the Site Protection and Monitoring Programme 31 prepared by
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:21: Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:26:Asset Protection and Optimisation teams (ASPRO) is required to determine permitting requirements,
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:27: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:33:CPEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2021-0422-CD-Decision Notice (1).pdf:3: for environmental protection.
R-2021-0422-CD-Decision Notice (1).pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2021-0422-CD-0422.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0422-CD-Officer Report 0422.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0422-CD-Officer Report 0422.pdf:3:Protection team. Discussions have taken place between the EHO and the applicants
R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0300-S3-P01-Holme_Beck_Details_Sheet_1_of_2.pdf:1: PROTECTION TO MITIGATE 3 Deep excavations
R-2022-0049-CD-Decision Notice 2020 0318.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2022-0049-CD-Decision Notice 2020 0318.pdf:3: (v) Protection during development, followed by consolidation and
R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0301-S3-P01-Holme_Beck_Details_Sheet_2_of_2.pdf:1: CHANNEL BANK INDUSTRIAL EFFLUENT PUMP EDGE PROTECTION CONTINUES EXTENT OF REINFORCED
R-2022-0342-CD-EP NU.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0342-CD-COMPLIANCE DECISION NOTICE.pdf:2: Any protection measures or gas mitigation will be complied with thereafter,
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:32:hazard potential), where no protection measures are required.
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:40:adequate protection against heave / differential settlement by utilising a suitably stiff and reinforced slab to
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:42:no gas protection measures are required.
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:672: GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:673: GAC based on US Environmental Protection Agency (USEPA) Regional Screening
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:676: GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at
R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:677: GAC based on US Environmental Protection Agency (USEPA) Regional Screening
R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2022-0342-CD-COMPLIANCE OFFICER REPORT.pdf:2:protection measures or gas mitigation will be complied with thereafter, unless
R-2022-0342-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0342-CD-COMPLIANCE OFFICER REPORT.pdf:5: protection team.
R-2022-0342-CD-61586 Conditions 21 and 25 Covering Letter 07-04-22(1).pdf:2:prior to the occupation of each building on site. Any protection measures or gas mitigation will be
R-2022-0342-CD-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:6: and Cleveland Coast Special Protection Area (SPA) and Ramsar, North York
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:6:1.3 The NSN sites receive statutory protection under the Conservation of
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:6: Habitats Regulations afford a high level of protection to sites supporting
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7:2.1 Special Protection Areas (SPAs) and Special Areas of Conservation (SACs)
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7: receive statutory protection under the Habitats Regulations. The most recent
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7: Habitats Regulations afford a high level of protection to sites classified as
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7: also afford the same level of high protection to tracts of land supporting
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7:2.2 SACs and SPAs form part of a network of nature protection areas within the
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7: legislative protection to SPAs and SACs. Government has issued policy
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:7: same protection to Ramsar sites as that afforded to SPAs and SACs through
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:30: for the protection of vegetation and ecosystems is set at 30μg/m3. The NOx
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:30: 75 μg/m3 for the protection of vegetation and ecosystems. Further
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:30: protection of higher plants with the development in operation.
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:30: exceed the critical level set for the protection of sensitive lichen communities
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:37: annual mean critical level of 3 μg/m3 for the protection of higher plants with
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:41: the critical level of 30μg/m3 set for the protection of habitats and
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:41: critical levels of 10 μg/m3 for SO2 and 1 μg/m3 for NH3 for the protection of
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:50: relevant critical level set for the protection of higher plants. However the
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:50: ammonia will still be below the critical level set for the protection of higher
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:51: concentration of NOx remains below the 30 μg/m3 set for the protection of
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:55: Special Protection Area
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:60: Special Protection Area
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:65: behaviour of hen harriers breeding in Special Protection Areas in Scotland.
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:66: potential Special Protection Area (pSPA) and Ramsar. Brief version 11.2.
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:69: Special Protection Area (SPA)
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:69:The Teesmouth and Cleveland Coast Special Protection Area is a wetland of European
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:70:1) Teesmouth and Cleveland Coast was classified as a Special Protection Area on 15 August
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:77: Special Protection Area (SPA) +
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:78:Wetlands Trust, the Royal Society for the Protection of Birds and the Joint Nature Conservation
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:79: and important species. Poyser, London, for Nature Conservancy Council and Royal Society for the Protection of Birds
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:79: counts. British Trust for Ornithology, Wildfowl and Wetlands Trust, Royal Society for the Protection of Birds & Joint
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:79: Trust, Royal Society for the Protection of Birds & Joint Nature Conservation Committee, Slimbridge.
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:80: Special Protection Area (SPA)
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:80:been recommended has a Special Protection Area because of the site’s European Ornithological
R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:80:North York Moors was classified as a Special Protection Area on 12 May 2000.
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:5: • provide preliminary recommendations for the protection and enhancement of the site’s
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:6: Various legislation and planning policies refer to the protection of wildlife. These are summarised in
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:8: of Conservation (SAC), Special Protection Areas (SPA), National Nature Reserves (NNR),
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:23: designated under the Habitats Directive and Special Protection Areas (SPA) designated under the
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:23: the protection and management of species and habitats of European importance, including
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:23: In addition to providing for the designation and protection of Natura 2000 sites, the Habitats
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:23: Regulations provide strict protection for plant and animal species as European Protected Species.
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:24: SACs and Special Protection Areas (SPAs) in the UK no longer form part of the EU’s Natura 2000
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:24: • fulfil the commitment made by government to maintain environmental protections
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: system, bringing into force stronger protection for both wildlife and the countryside.
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: • Part III – Nature Conservation and Wildlife Protection: The Act details measures to promote
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: and enhance wildlife conservation. These measures include improving protection for Sites of
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: Furthermore, the Act affords statutory protection to Ramsar Sites which are wetlands
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: wildlife protection in the UK. Part I deals with the protection of plants, birds and other animals
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: • Wildlife – listing endangered or rare species in need of protection and creating offences for
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: during breeding season is also noted as an offence, with further protection for species listed
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: Protection of Badgers Act 1992
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: The Protection of Badgers Act 199220 consolidated previous legislation relating specifically to
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:25: Her Majesty’s Stationery Office (HMSO), 1992. Protection of Badgers Act 1992. HMSO.
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:26: Wild Mammals (Protection) Act 1996
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:26: The Wild Mammals (Protection) Act 199621 makes it an offense for any person to mutilate, kick,
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:26: networks and the protection and recovery of priority species; and identify and pursue
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:26: Her Majesty’s Stationary Office (HMSO), Wild Mammals (Protection) Act 1996. HMSO.
R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:27: protection and recovery of priority species; and identify and pursue opportunities for securing
R-2023-0246-RMM-TV_ERF_Interim_Travel_Plan.pdf:14: northern side with barrier protection. A shared footway/ cycleway is provided along the
R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:1: • Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar Site
R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:2: the Teesmouth & Cleveland Coast Special Protection Area (SPA) and Ramsar site is now
R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:4:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:4:on soil protection for site restoration and aftercare is available on Gov.uk website. Detailed guidance on
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:10:2.11 The Teesmouth and Cleveland Coast Special Protection Area (SPA), pSPA,
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:22: Protection Association (NFPA) recommended practice for fire protection for
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:33:3.119 The ERF will be equipped with comprehensive fire protection and detection
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:33: systems which will comply with the requirements of the National Fire Protection
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:33: Association’s recommended practice for fire protection for electricity generating
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:34: ongoing occupational health protection dust level checks will be carried out on a
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:39: Environmental protection measures during construction
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:42: Special Protection Areas (SPA) in the UK no longer form part of the EU’s Natura
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:43: protections
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:67: the use of CCTV, security fencing, protection of the staff and visitor car park and
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:106: Area B (Archaeology Area) to be covered with existing site won topsoil to Protection of Area B no longer required. Ecological
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:110: Protection no longer required for Area B (all archaeological
R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:110: and Cultural Protection no longer required for Area B.
R-2023-0246-RMM-HSL-230405090356-321-FinalOutcome.pdf:1:which specifically includes provisions for the protection of the public. However, the possibility remains that a
R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:13:2.12 The Teesmouth and Cleveland Coast Special Protection Area (SPA), pSPA,
R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:21:4.37 Landscape as a reserved matter includes the improvement or protection of the
R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:30:5.47. The policy prioritises the protection of internationally important sites and requires
R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:40: (v) Protection during development, followed by consolidation and
R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:46: (v) Protection during development, followed by consolidation and
R-2023-0246-RMM-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:4: The advice from health specialists such as the Health Protection Agency (HPA) is that the damage
R-2023-0246-RMM-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:8: to calculate a cancer risk, using the United States Environment Protection Agency’s (USEPA)’s
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:6: Standards and objectives for the protection of sensitive ecosystems and habitats are also contained
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: Table 3: Critical Levels for the Protection of Vegetation and Ecosystems
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: For the protection of lichens Guidance / APIS
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: For the protection of lichens
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:19: • Special Protection Areas (SPAs), Special Areas of Conservation (SACs), or Ramsar sites within
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:29: understand how the Environment Agency’s approach can provide adequate protection.”
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:49: In addition to the Critical Levels for the protection of ecosystems, habitat specific Critical Loads for
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:52: ammonia for the protection of lichens and bryophytes have been applied at the North York
R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:52: out is 2.0 µg/m³, or 66.7% of the Critical Level of 3 µg/m³ set for the protection of higher plants.
R-2023-0246-RMM-MGE05034 Contaminated Land(1).pdf:1:Environmental Protection Planning Consultation Response
R-2023-0246-RMM-EA_R20230246RMM_OFFICIAL_200423.pdf:1:applicant wishes to contribute to the restoration and protection of the Tees estuary, the
R-2023-0246-RMM-TV_ERF_Transport_Statement.pdf:13: side with barrier protection. A shared footway/cycleway is provided along the southern side up to
R-2023-0246-RMM-MGE05035 Nuisance.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:11: A response was received from Mick Gent, Contaminated Land Officer in the Environmental Protection
R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:33: Environmental Protection Team
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:8: holistic approach to protection of the water environment than had previously been in place,
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:16: Teesmouth and Cleveland Coast which is designated as a Special Protection Area (SPA) and Ramsar
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:16: Special Protection Area (SPA) 1.8 km northwest
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:16: Potential Special Protection Area (pSPA) Teesmouth and Cleveland Coast 1.8 km northwest
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: SPA: Special Protection Area
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: pSPA: Potential Special Protection Area
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:22: further protection to designated waterbodies. No significant deterioration in water body
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:30:Ground contamination and protection of controlled waters – Advice to
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:30:can be found on gov.uk and include Groundwater Protection, EA Approach to
R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:30:Groundwater Protection, Land Contamination Risk Management and the Guiding
R-2023-0246-RMM-TV_ERF_Flood_Risk_Assessment.pdf:10: The site is not situated within a groundwater Source Protection Zone (SPZ).
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:9: include environmental protection and mitigation measures and emergency preparedness
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:16: section 34 of the Environmental Protection Act 1990.
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:17:5.18.1 There is an active archaeological brief in place for the protection of potential cultural heritage
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:19: to the protection of the environment will be kept and displayed within the site cabin. Key
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:27:(SAC) and Special Protection Area (SPA), Durham Coast SAC and the
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available:
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. Northumberland Marine Special Protection Area Information Sheet. Available:
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. North York Moors Special Protection Area. https://jncc.gov.uk/jncc-assets/SPA-
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:35: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available:
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:37:development, including three Special Protection Areas (SPA), two Special Areas
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:37:18 Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:61: Special Protection Areas Contains OS data © Crown Copyright and database right (2020)
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:66:site. These comprise of the Teesmouth and Cleveland Coast Special Protection
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:74: as Special Areas of Conservation (SAC) and Special Protection Areas
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:81: Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:128:The Regulations offer protection to a number of ‘European Protected Species’
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:128:allow an otherwise unlawful act. The species protection provisions of the Habitats
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:129:(SSSI). It confers differing levels of protection on species themselves, their
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:129:Species offered protection by the Act are listed in a series of schedules. These
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:131:enhancement of priority habitats, ecological networks and the protection and
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:132:development process, with appropriate protection and enhancement measures
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:132:Environmental Protection and Enhancement) stating: ‘…Net environmental gains
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:133: contributes to habitat protection and long-term sustainability, and that
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:133:habitat protection, safeguards biodiversity and enhances green Infrastructure,
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:133:focuses on the enhancement and protection of the natural environment. Therefore,
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:133:STDC 7 outlines the need for a coordinated approach to environmental protection
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:136:levels of species protection and the processes linked to protection regimes are
R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:149: Special Protection Areas
R-2020-0800-CD-Decision Notice.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2020-0800-CD-R 20 0800 nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2020-0800-CD-officer report.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of
R-2020-0800-CD-officer report.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf:1: - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf:1: PROTECTION TO BE PROVIDED AT SAFETY, HEALTH AND ENVIRONMENTAL
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf:1: - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf:1: EXISTING 225Ømm PIPE TO BE DIVERTED AT LENGTH OF STONE SCOUR PROTECTION TO 150Ømm GROUNDWATER - PROPOSED BOUNDARY FENCE & MAINTENANCE
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf:1: WITH HYDROBRAKE AND - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf:1: PROTECTION TO BE PROVIDED AT
R-2021-0296-NM-Decision 0270.pdf:3: protection of sites of ecological value in accordance with policies SD4 and N4
R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2020-0302-PND-OFFICER REPORT.pdf:2:places of work, hazardous substance and protection of species.
R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4: • Environmental Protection Act 1990
R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:carried out via a MEWP/cherry picker to enable access to high level. Edge protection will be
R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:provided around the perimeter of roofs to ensure safety and fall protection from all areas of
R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:the roof. With the edge protection in place, safety netting will be installed to the underside of
R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:10: • Light eye protection (LEP)
R-2022-0779-CD-COMPLIANCE OFFICER REPORT.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of
R-2022-0779-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)
R-2022-0779-CD-COMPLIANCE OFFICER REPORT.pdf:3:protection team, Council’s engineers and LLFA and Natural England. No objection
R-2022-0779-CD-MGE04912 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:5:protection of the environment to include the prevention of pollution. In order to facilitate this, the
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:11: wide protection bund (5m in height) for a number of environmental reasons.
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:15:Removal project have been identified and the Environmental protection measures required to
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:17: • Protection bund to prevent Surface Water leaving storage area site or entering water
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:17: • Protection of Water courses:
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:18:Noise and vibration statutory nuisance are controlled under the Environmental Protection Act 1990.
R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:20:Teesmouth and Cleveland Coast (T&CC) Special Protection Area (SPA), Ramsar site and SSSI.
R-2022-0779-CD-COMPLIANCE DECISION NOTICE.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of
R-2022-0779-CD-DOC (CEMP) Covering Letter September 2022.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0832-CD-DECISION NOTICE 0318.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2021-0832-CD-DECISION NOTICE 0318.pdf:3: (v) Protection during development, followed by consolidation and
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: and legislation in respect of biodiversity protection and enhancement by:
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:11: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:6: • Provide high standards of protection for the natural environment.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:1:Environmental Protection Act 1990
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:1:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected.
R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area (SPA)
R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:The existing riverbank comprises a tidal defence, providing protection during a tidal event within the Tees
R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:riverbank providing a revised defence line and continued protection during an extreme event, both now and
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:3: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:4:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:2:landscapes within the member states and encourages their protection, management and planning. The UK
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:3:and local level will be afforded additional protection commensurate with their status. Wherever possible,
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:the South Tees Area. These include the protection of heritage assets and the historic environment and the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:protection and enhancement of landscape character.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:9:Special Protection Area Yes Yes
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:12: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve;
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:2: Special Protection Area (SPA) Tees Legend
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: Yes (Coastal Protection, Flood
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: Heavily modified water body and for Yes (Flood Protection, Navigation Ports
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: protection, Navigation, Ports and
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential
R-2020-0685-ESM-OFFICER REPORT.pdf:7:Special Protection Area (SPA) https://designatedsites.naturalengland.org.uk/.
R-2020-0685-ESM-OFFICER REPORT.pdf:13:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0685-ESM-OFFICER REPORT.pdf:14:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0685-ESM-OFFICER REPORT.pdf:40:Special Protection Area (SPA) and/or damage or destroy the interest features
R-2020-0685-ESM-OFFICER REPORT.pdf:46:Special Protection Area (SPA) and/or damage or destroy the interest features
R-2020-0685-ESM-OFFICER REPORT.pdf:75: Impacts to coastal / tidal protection and flood defence.
R-2020-0685-ESM-OFFICER REPORT.pdf:78:is to be constructed at a level of 5.84m AOD, providing suitable protection
R-2020-0685-ESM-OFFICER REPORT.pdf:79:AOD. Given this design standard, the level of protection is considered to be
R-2020-0685-ESM-OFFICER REPORT.pdf:79:required to be given to the protection of construction workers. It is considered
R-2020-0685-ESM-OFFICER REPORT.pdf:79:necessary for this protection to be built into the proposed CEMP in the form of
R-2020-0685-ESM-OFFICER REPORT.pdf:79:and therefore existing flood protection measures for the site. It is considered
R-2020-0685-ESM-OFFICER REPORT.pdf:79:of protection afforded to the sit is maintained. A planning condition is
R-2020-0685-ESM-OFFICER REPORT.pdf:84:d Support the expansion and protection of the port and logistics sector;
R-2020-0685-ESM-OFFICER REPORT.pdf:101: quay) such that a continued standard of protection will be provided
R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1:Scientific Interest (SSSI), Special Areas of Conservation (SAC) and Special Protection Areas (SPA),
R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:5:Special Protection Area (SPA) and Ramsar site are currently being considered by
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2: under Part IIA of the Environmental Protection Act
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:regulatory controls for the protection of water resources, including the quality standards expected for
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:5: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990:
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:5: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:6: Details of aquifers, Source Protection Zones
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:11: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:11: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008);
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:13:protection.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990).
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:The Town Country Planning Act and the Environmental Protection Act do not consider future uses.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:1: • Impacts to coastal / tidal protection and flood defence.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:6:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:12:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:13:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:14:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:16:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:1: Protection Areas (SPA) and potential SPAs, Ramsar sites,
R-2020-0685-ESM-PN 685.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8:2.2.3 Environmental Protection Act 1990 Part II – Controlled Waste and Duty of
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8:Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance with
R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:50:The majority of risk controls are aimed at the protection third party property such as overhead cables
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:3: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4.
R-2020-0685-ESM-cil_questions phase 2.pdf:1:requirements relating to information security and data protection of the information you have provided.
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8:Protection Zone5.
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8: DEFRA Magic Map. Online. Source Protection Zones: Available at: https://magic.defra.gov.uk/MagicMap.aspx
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:19: • support the expansion and protection of the port and logistics sector.
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:31:proposed quay would provide suitable protection against the 0.5% (1 in 200) and 0.1% (1 in 1,000) annual
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:32:Whilst the proposed quay wall will provide protection throughout the lifetime of the proposed scheme it is
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:33:upstream within the tidal estuary, it will receive a greater level of protection from tidal inundation than the
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:34:Whilst the finished quay wall and hardstanding levels provide protection from an extreme tidal event (e.g. 1
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:35: ensures that the proposed quay provides continued protection against the 1 in 200-year and 1 in
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:38: the definition of “personal data” under the Data Protection Act 1998
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:40:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:2: Special Protection Area (SPA): Teesmouth and
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:5:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:36:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the
R-2020-0685-ESM-CON LAND 685.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0685-ESM-CON LAND 685.pdf:2:• Consideration should be given to protection of potable water supply pipes following
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:6: • Protection of Badgers Act 1992;
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:7:value, secondary or supporting value, social value, economic value, legal protection and multi-functional
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:14: LWS 4.7 km This is afforded protection as an Ancient Woodland.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:23:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and
R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:14: • support the expansion and protection of the port and logistics sector;
R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:17: • Provide high standards of protection for the natural environment.
R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:25:5.26 The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection
R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:29:5.61 The existing riverbank comprises a tidal defence, providing protection during a tidal event
R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:29: protection during an extreme event, both now and in the future.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:3: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: loads for ecosystem protection from atmospheric
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: consultation Environmental Protection department to discuss
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Protection
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Scoping Protection department at
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: received August Protection
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: RCBC The environmental protection department
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Protection set out in this Section is acceptable.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:1: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Legislation Level of protection Species included Details
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Conservation of Small protection of specific areas, monitoring, research,
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: the Protection of the Marine species and declining species in the north-east Atlantic. These
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Phocoena on the conservation and protection of marine
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:3: Legislation Level of protection Species included Details
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:6:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:provide the same level of protection for more than 12nm offshore.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:and necessary legislative and administrative measures to ensure the protection of seal species. The
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:protection was afforded to protect harbour and grey seal year-round along the east coast of England.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:3: • support the expansion and protection of the port and logistics sector;
R-2020-0685-ESM-DECISION NOTICE.pdf:5: such that a continued standard of protection will be provided throughout
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:3:3.2.2 Groundwater Source Protection Zones 10
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:3:5.2 CORUS UK LTD. First phase reporting of the site protection and monitoring
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:5:Secondary B Aquifer. The site does not lay on a Source Protection Zone (SPZ) and there are no
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Part 2A of The Environmental Protection Act (1990); and,
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Defra ‘Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance’,
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Environment Agency (EA) GP3 ‘Groundwater Protection: Policy and Practice’ and,
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:9: • CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:9: • CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring Programme;
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:13:reported within ‘Teesside Works Site Protection and Monitoring Programme (‘SPMP’)’ by Corus 2008. The
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:protection measures (described in BRE, 2001) in the construction of new buildings, conversions or
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:estimated to be at or above the Action Level). Therefore, radon protection measures are not required within
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:3.2.2 Groundwater Source Protection Zones
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:Groundwater Source Protection Zones (SPZs) are defined around abstraction boreholes used for potable
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:Cleveland Coast Special Protection Area (SPA), Ramsar site and Site of Special Scientific Interest (SSSI).
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:25:5.2 CORUS UK LTD. First phase reporting of the site protection and
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:40: • Consideration should be given to protection of potable water supply pipes following UK Water
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:41: 11 CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:41: 13 CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring
R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720: Protection Act 1990, ecosystems environment
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130.
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:5:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control:
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:8:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL:
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:good reference material for protection of water courses when working in and around water. STDC would
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:15: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:15:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’
R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:9: would meet the HSE’s land use planning advice criteria in regard to public protection.
R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:10: Protection
R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:12:seabirds (i.e. the site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Site
R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:4:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:4:Redcar and Cleveland Borough Council Environmental Protection Contamination
R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:11:reply to it public if asked to under the Freedom of Information Act, Data Protection Act or for
R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:11:Protection Act or for litigation. Email messages and attachments sent to or from any
R-2020-0685-ESM-RCBC scoping opinion.pdf:5:HSE's land use planning advice criteria in regard to public protection, then we suggest you
R-2020-0685-ESM-RCBC scoping opinion.pdf:9:European sites (e.g. designated Special Areas of Conservation and Special Protection
R-2020-0685-ESM-RCBC scoping opinion.pdf:9:that potential Special Protection Areas, possible Special Areas of Conservation, listed or
R-2020-0685-ESM-RCBC scoping opinion.pdf:10:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites)
R-2020-0685-ESM-RCBC scoping opinion.pdf:10: Teesmouth and Cleveland Coast potential Special Protection Area, which is designated in
R-2020-0685-ESM-RCBC scoping opinion.pdf:13:critical loads for ecosystem protection from atmospheric nitrogen deposition (England
R-2020-0685-ESM-RCBC scoping opinion.pdf:14:delivering redevelopment in a way that reduces pollution, contributes to habitat protection
R-2020-0685-ESM-RCBC scoping opinion.pdf:15:With reference to the protection of the railway, Network Rail would require that any
R-2020-0685-ESM-RCBC scoping opinion.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
R-2020-0685-ESM-RCBC scoping opinion.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance)
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:3: protection of these species during critical migration periods. This assessment of consequent impacts on
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:5:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:6:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4).
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:6:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:8:require protection and guides the OSPAR Commission in setting priorities for future conservation and
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:8:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:9:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial
R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:17:that all crashed aircraft in military service are automatically protected under the Protection of Military
R-2020-0685-ESM-336540 R_2020_0685_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 2.pdf:1: Protection Area (SPA) https://designatedsites.naturalengland.org.uk/.
R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but
R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:Asset Protection
R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:developer liaise with our Asset Protection Team (details below) prior to any work commencing on site. This is to
R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:Protection of existing railway drainage assets within a clearance area
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement,
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:permanent alterations to the mutual boundary the applicant must contact Network Rail’s Asset Protection
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:Method statements may require to be submitted to Network Rail’s Asset Protection Project Manager at the below
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:an asset protection agreement will have to be entered into. Where any works cannot be carried out in a “fail-safe”
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:which must be booked via Network Rail’s Asset Protection Project Manager and are subject to a minimum prior notice
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any
R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:statement. Approval of the method statement must be obtained from Network Rail’s Asset Protection Project
R-2019-0427-FFM-Consultee response - Network Rail.pdf:3:the applicant require access to Network Rail land then must seek approval from the Network Rail Asset Protection
R-2019-0427-FFM-Consultee response - Network Rail.pdf:3:Asset Protection Project Manager
R-2019-0427-FFM-Consultee response - Network Rail.pdf:3:Email: assetprotectionlneem@networkrail.co.uk
R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:18: enhance the borough’s biodiversity and geological resources. It prioritises the protection of
R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:19: • Development Principle STDC7: Natural Environmental Protection and
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:8:6c. Hydrogeology – Source Protection Zones and Potable Water Abstraction Licences 30
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:8:6d. Hydrogeology – Source Protection Zones within confined aquifer 31
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:8: 6.6 Source Protection Zones…………………………………………………………………………………………………………………………… 35
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:8: 6.7 Source Protection Zones within Confined Aquifer……………………………………………………………………………………. 35
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:8: 8.4 Records of Special Protection Areas (SPA) within 2000m of the study site:…………………………………………….45
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:9: 9.2.2 Radon Protection…………………………………………………………………………………………………………………………………………………50
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:11: 6.6 Source Protection Zones (within 500m of the study site) 0 0 0 0 Not searched Not searched
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:11: 6.7 Source Protection Zones within Confined Aquifer 0 0 0 0 Not searched Not searched
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:12: 8.4 Records of Special Protection Areas (SPA) 0 0 0 0 2 1
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:13: Health Protection Agency (HPA) and if so what percentage of are above the Action Level.
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:13: 9.2.2 Is the property in an area where Radon Protection are
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:14: Source Protection Zones (SPZs) and river quality. These searches are conducted using radii of up to 2000m.
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:14: Areas of Conservation (SAC), Special Protection Areas (SPA), Ramsar sites, Local Nature Reserves (LNR), Areas of
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:69:Records of sites determined as contaminated land under Section 78R of the Environmental Protection Act
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:89: Protection Zones and Potable
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:90: Protection Zones within confined
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92:From 1 April 2010, the Environment Agency/Natural Resources Wales's Groundwater Protection Policy
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:92:From 1 April 2010, the Environment Agency/Natural Resources Wales's Groundwater Protection Policy
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:6.6 Source Protection Zones
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:Source Protection Zones within 500m of the study site None identified
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:6.7 Source Protection Zones within Confined Aquifer
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:Source Protection Zones within the Confined Aquifer within 500m of the study site None identified
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:Historically, Source Protection Zone maps have been focused on regulation of activities which occur at or
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:93:cooling requires protection zones for confined sources to be marked on SPZ maps where this has not
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:115:breach by considering their location, type, condition and standard of protection.
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:120: 8.4 Records of Special Protection Areas (SPA) within 2000m of the study site:
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:120: The following Special Protection Area (SPA) records provided by Natural England/Natural Resources
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:124:Is the property in a Radon Affected Area as defined by the Health Protection Agency (HPA) and if so what
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:124:9.2.2 Radon Protection
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:124:Is the property in an area where Radon Protection are required for new properties or extensions to
R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:127:Acknowledgements: Site of Special Scientific Interest, National Nature Reserve, Ramsar Site, Special Protection Area, Special Area of
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:8:6c. Hydrogeology – Source Protection Zones and Potable Water Abstraction Licences 63
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:8:6d. Hydrogeology – Source Protection Zones within confined aquifer 64
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:8: 6.6 Source Protection Zones…………………………………………………………………………………………………………………………… 67
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:8: 6.7 Source Protection Zones within Confined Aquifer……………………………………………………………………………………. 68
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:8: 8.4 Records of Special Protection Areas (SPA) within 2000m of the study site:…………………………………………….81
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:9: 9.2.2 Radon Protection…………………………………………………………………………………………………………………………………………………86
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:11: 6.6 Source Protection Zones (within 500m of the study site) 0 0 0 0 Not searched Not searched
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:11: 6.7 Source Protection Zones within Confined Aquifer 0 0 0 0 Not searched Not searched
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:12: 8.4 Records of Special Protection Areas (SPA) 0 0 0 0 0 0
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:13: Health Protection Agency (HPA) and if so what percentage of are above the Action Level.
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:13: 9.2.2 Is the property in an area where Radon Protection are
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:14: Source Protection Zones (SPZs) and river quality. These searches are conducted using radii of up to 2000m.
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:14: Areas of Conservation (SAC), Special Protection Areas (SPA), Ramsar sites, Local Nature Reserves (LNR), Areas of
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:46:Records of sites determined as contaminated land under Section 78R of the Environmental Protection Act
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:67: Protection Zones and Potable
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:68: Protection Zones within confined
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70:From 1 April 2010, the Environment Agency/Natural Resources Wales's Groundwater Protection Policy
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:70:From 1 April 2010, the Environment Agency/Natural Resources Wales's Groundwater Protection Policy
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:71: 6.6 Source Protection Zones
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:71: Source Protection Zones within 500m of the study site None identified
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:72: 6.7 Source Protection Zones within Confined Aquifer
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:72: Source Protection Zones within the Confined Aquifer within 500m of the study site None identified
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:72: Historically, Source Protection Zone maps have been focused on regulation of activities which occur at or
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:72: cooling requires protection zones for confined sources to be marked on SPZ maps where this has not
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:82:breach by considering their location, type, condition and standard of protection.
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:85:8.4 Records of Special Protection Areas (SPA) within 2000m of the study site:
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:90:Is the property in a Radon Affected Area as defined by the Health Protection Agency (HPA) and if so what
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:90:9.2.2 Radon Protection
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:90:Is the property in an area where Radon Protection are required for new properties or extensions to
R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF:93:Acknowledgements: Site of Special Scientific Interest, National Nature Reserve, Ramsar Site, Special Protection Area, Special Area of
R-2019-0427-FFM-MGE03867.pdf:1:Environmental Protection Planning Consultation Response
R-2019-0427-FFM-Officer report _R20190427FFM.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2019-0427-FFM-Officer report _R20190427FFM.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2019-0427-FFM-Officer report _R20190427FFM.pdf:9:protection section who have raised no objection subject to suitable conditions.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:6: contaminated land under Part 2A of the Environmental Protection Act 1990; and
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:6:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:8: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:8: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:8: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:13: sensitivity1 source protection zones (SPZ) within 1km of the area.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:21: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:25: Design of a Site Protection
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:25: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:27:protection measures appropriate to protect buildings from landfill gas migration.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:38: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:42: design sulphate class DS-2, indicating that that protection to buried concrete would be required.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:42: protection measure to new buildings.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:43: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:45: sensitivity6 source protection zones (SPZ) within 1km of the area.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:54: PROTECTION
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:54: This set out the required site protection and monitoring plan Part of Area 6 on the current area
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:55:protection measures appropriate to protect buildings from landfill gas migration.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:93:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:96: CL4 hard surfacing to break pathway Protection against aggressive soils will be health.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:96: A clean service run area may be required Relatively easily incorporated into the Protection of in ground workers and
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:97:To enable the protection of the remediation capping layer during both the construction and full site
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:99:To enable the protection of the remediation capping layer during both the construction and full site
R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and
R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:1:have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area and
R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:3: Guidance on soil protection is available in the Defra Construction Code of Practice for the
R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf:3:Protection Department for advice on generic aspects of land contamination management.
R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf:3:environmental protection of controlled waters is considered alongside any human health
R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf:3:protection requirements. This approach is supported by paragraph 170 of the National
R-2019-0427-FFM-MGE03868.pdf:1:Environmental Protection Planning Consultation Response
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:5: 3.2 Radon Protection………………………………………………………………………………………………………………………………………………………………………………24
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:8: Protection Agency (HPA) and if so what percentage of homes are Area, as less than 1% of properties are
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:8: 3.2Radon Protection
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:25:Is the property in a Radon Affected Area as defined by the Health Protection Agency (HPA) and if so what
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:25:3.2 Radon Protection
R-2019-0427-FFM-2 Appendix D2 Geo Insight Report.PDF:25:Is the property in an area where Radon Protection are required for new properties or extensions to
R-2019-0427-FFM-201920 Ecology report final.pdf:4:2018, both the new areas and the additional species are given the same legal protection as the
R-2019-0427-FFM-201920 Ecology report final.pdf:9:special protection under Schedule 1 of the Wildlife and Countryside Act 1981 (as amended). No
R-2019-0427-FFM-201920 Ecology report final.pdf:12:To ensure a necessary habitat protection, mitigation and/or compensation during the final use of the
R-2019-0427-FFM-201920 Ecology report final.pdf:23:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its
R-2019-0427-FFM-201920 Ecology report final.pdf:23:both the new areas and the additional species are given the same legal protection as if the existing
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:6: contaminated land under Part 2A of the Environmental Protection Act 1990; and
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:6:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:7: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:8: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:8: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:11: sensitivity1 source protection zones (SPZ) within 1km of the area.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:19: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:23: Design Of A Site Protection
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:23: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:25:protection measures appropriate to protect buildings from landfill gas migration.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:36: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:40: design sulphate class DS-2, indicating that that protection to buried concrete would be required.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:40: protection measure to new buildings.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:41: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:43: sensitivity6 source protection zones (SPZ) within 1km of the area.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:52: PROTECTION
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:52: This set out the required site protection and monitoring plan Part of Area 6 on the current area
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:53:protection measures appropriate to protect buildings from landfill gas migration.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:91:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:94: CL4 hard surfacing to break pathway Protection against aggressive soils will be health.
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:94: A clean service run area may be required Relatively easily incorporated into the Protection of in ground workers and
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:95:To enable the protection of the remediation capping layer during both the construction and full site
R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:97:To enable the protection of the remediation capping layer during both the construction and full site
R-2021-0473-ESM-Officer Report 0473.pdf:3:European sites - Teesmouth and Cleveland Coast Special Protection Area
R-2021-0473-ESM-Officer Report 0473.pdf:3:Cleveland Coast Special Protection Area and Ramsar site and has no
R-2021-0473-ESM-Officer Report 0473.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0473-ESM-Officer Report 0473.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0473-ESM-Officer Report 0473.pdf:10:considered by the Council’s Environmental Protection Team who raised no
R-2021-0473-ESM-Officer Report 0473.pdf:10:Protection Area (SPA) and Ramsar site and Teesmouth and Cleveland Coast
R-2021-0473-ESM-EA R_2021_0473_ESM 8 July 2021 OFFICIAL.pdf:2:any gas protection measures are required. . It is pleasing to note that the LPA have
R-2021-0473-ESM-EA R_2021_0473_ESM 8 July 2021 OFFICIAL.pdf:2:protection measures. This is important as the adjacent landfill site ('High Tip') is unlined.
R-2021-0473-ESM-NETWORK RAIL 0473.pdf:1:applicant contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a
R-2021-0473-ESM-NETWORK RAIL 0473.pdf:1:Asset Protection Eastern
R-2021-0473-ESM-NETWORK RAIL 0473.pdf:1:assetprotectioneastern@networkrail.co.uk.
R-2021-0473-ESM-LM Wind Reserved Matters Application Form(1).pdf:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2021-0473-ESM-356921 - R_2021_0473_ESM Reserved Matters for 76200sqm floor space at Land East of Smiths Dock Rd and West of Tees Dock Rd Tees South Bank - No Objections.pdf:1:European sites - Teesmouth and Cleveland Coast Special Protection Area and Ramsar site
R-2021-0473-ESM-356921 - R_2021_0473_ESM Reserved Matters for 76200sqm floor space at Land East of Smiths Dock Rd and West of Tees Dock Rd Tees South Bank - No Objections.pdf:1:have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area and
R-2021-0473-ESM-MGE04477 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0676-FF-SembcorpObjectionLetter_FINAL.PDF:14:17 Flood risk of the tunnel: What management and protection Sembcorp 06/07/2021 not specif
R-2021-0676-FF-CWI01511 Cont Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0676-FF-210518_Bravo10 Ecology report_ RevA_INCA.pdf:4:Cleveland Coast Special Protection Area (SPA) and the Teesmouth and Cleveland Coast Ramsar site.
R-2021-0676-FF-R 2021 0676 FF NWL.pdf:1:assets and ensure any necessary diversion, relocation or protection measures required prior to the
R-2021-0676-FF-0676.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0624-NM-Decision Notice 0357.pdf:3: for environmental protection.
R-2021-0624-NM-Decision Notice 0357.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2023-0300-DCO-0300 Nuisance.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:2:Environmental Protection (Nuisance)
R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:2:Environmental Protection (Air Quality)
R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:3:Environmental Protection (Contamination)
R-2023-0300-DCO-CON LAND 0300.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0300-DCO-0300 EP.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0534-FF-MGE04481 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0534-FF-OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0534-FF-OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0534-FF-MGE04480 Contaminated Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-1046-CD-Decision Notice.pdf:2: (v) Protection during development, followed by consolidation and
R-2021-1046-CD-Officer Report.pdf:1:(v) Protection during development, followed by consolidation and preservation
R-2022-0242-FF-MGE04724 Cont Land.pdf:1: Environmental Protection Planning Consultation Response
R-2022-0242-FF-0242 Off Rep.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: EDGE PROTECTION CONTINUES EXTENT OF REINFORCED EDINBURGH
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: PROTECTION 1.1m HIGH 1m HIGH POST &
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: PROTECTION 1.1m HIGH Details 1 of 4
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf:1: 1.2m HIGH EDGE PROTECTION
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: 8.00 1m HIGH EDGE PROTECTION TO CONSIST OF BOX CULVERT
R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: 3.5m WIDE VEHICULAR ACCESS TRACK GABION BASKET RETAINING WALL KEE KLAMP HANDRAIL EDGE PROTECTION
R-2021-0166-FFM-Archaeology - DBA.pdf:25:A statement setting out current Government policy on the identification, protection, conservation and
R-2021-0166-FFM-Archaeology - DBA.pdf:28: 1979; and Protection of Wrecks Act 1973);
R-2021-0166-FFM-NWL.pdf:1:diversion, relocation or protection measures required prior to the commencement of the
R-2021-0166-FFM-Application Form 0166.pdf:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2021-0166-FFM-Environmental Risk Assessment.pdf:8:The site is not in a groundwater Source Protection Zone (SPZ).
R-2021-0166-FFM-Environmental Risk Assessment.pdf:13: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0166-FFM-Environmental Risk Assessment.pdf:20:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2021-0166-FFM-Environmental Risk Assessment.pdf:37:HSE. (1991). Protection of Workers and the General Public during the Development of Contaminated Land.
R-2021-0166-FFM-Environmental Risk Assessment.pdf:37:USEPA. (2018, May 15). United States Environmental Protection Agency (USEPA). Retrieved from Risk
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39: Part IIA of the Environmental Protection Act (1990);
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39:Part IIA of the Environmental Protection Act 1990
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2021-0166-FFM-Environmental Risk Assessment.pdf:39:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2021-0166-FFM-Environmental Risk Assessment.pdf:40: Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2021-0166-FFM-Environmental Risk Assessment.pdf:41: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2021-0166-FFM-Officer Report 0166.pdf:3:relocation or protection measures required prior to the commencement of the
R-2021-0166-FFM-Officer Report 0166.pdf:4:protection measures (such as silt fences) as necessary to ensure the site, the
R-2021-0166-FFM-Officer Report 0166.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0166-FFM-Officer Report 0166.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0166-FFM-Officer Report 0166.pdf:8:protection section with regard to both contamination and nuisance.
R-2021-0166-FFM-Officer Report 0166.pdf:9:Coast Special Protection Area (SPA), Ramsar site, National Nature Reserve
R-2021-0166-FFM-Officer Report 0166.pdf:13: protection of sites of ecological value in accordance with policies SD4
R-2021-0166-FFM-Ecological Assessment.pdf:5:and Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and Cleveland Coast Ramsar
R-2021-0166-FFM-Ecological Assessment.pdf:5:but which are afforded the same level of protection in policy terms in respect of new development as
R-2021-0166-FFM-HRA Grangetown Prairie Phase 4.pdf:3:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its
R-2021-0166-FFM-CON LAND 0166.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:1:the potential to affect its interest features. European sites are afforded protection und er the
R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:1:The application site is in close proximity to the Teesmouth and Cleveland Coast Special Protection
R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:1:a matter of Government policy. Paragraph 118 of the National Planning Policy Framework applies the same protection
R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:2:Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site
R-2021-0166-FFM-Phase 4 covering letter.pdf:5:appropriate protection and enhancement measures incorporated into the design of development proposals,
R-2021-0166-FFM-Phase 4 covering letter.pdf:5:The approach is similarly echoed in Development Principle STDC 7 (Natural Environmental Protection and
R-2021-0166-FFM-Phase 4 covering letter.pdf:5:Coast Special Protection Area (SPA) and the Teesmouth and Cleveland Coast Ramsar site; the North York
R-2021-0166-FFM-Decision Notice 0166.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:22: Factor 1: Protection of human health and protection of the environment;
R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:25:concentration of 0.2% (v/v). While the number of sampling locations is limited, this suggests that gas protection
R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:25:Measures (APMs) to be used. This can include the provision of surface protection, sacrificial layers and/or
R-2021-0166-FFM-EA R_2020_0166_FFM 13 April 2021 OFFICIAL.pdf:1:Ground contamination and protection of controlled waters – Advice to
R-2021-0166-FFM-EA R_2020_0166_FFM 13 April 2021 OFFICIAL.pdf:2:found on gov.uk and include Groundwater Protection, EA Approach to Groundwater
R-2021-0166-FFM-EA R_2020_0166_FFM 13 April 2021 OFFICIAL.pdf:2:Protection, Land Contamination Risk Management and the Guiding Principles of Land
R-2021-0166-FFM-Ground Remediation Options Report.pdf:12:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2021-0166-FFM-Ground Remediation Options Report.pdf:24: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0166-FFM-Ground Remediation Options Report.pdf:27:provide temporary drainage facilities and protection measures (such as silt fences) as necessary to ensure the
R-2021-0166-FFM-EP NU.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0166-FFM-LLFA 0166.pdf:1:temporary drainage facilities and protection measures (such as silt fences) as necessary to ensure the site, the
R-2022-0494-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0494-FFM-Shadow Habitats Regulation Assessment.pdf:4: • Special Protection Areas (SPAs). These are designated under Article 3 (2) of the Birds
R-2022-0494-FFM-Shadow Habitats Regulation Assessment.pdf:6:6.4 The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for
R-2022-0494-FFM-Shadow Habitats Regulation Assessment.pdf:10:Redcar & Cleveland Teesmouth and Cleveland Coast Special Protection Area Recreation
R-2022-0494-FFM-Desk Based Heritage Assessment.pdf:29:A statement setting out current Government policy on the identification, protection, conservation and
R-2022-0494-FFM-Desk Based Heritage Assessment.pdf:32: 1979; and Protection of Wrecks Act 1973);
R-2022-0494-FFM-OFFICER REPORT.pdf:3: Cleveland Coast Special Protection Area (SPA) and Ramsar site
R-2022-0494-FFM-OFFICER REPORT.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0494-FFM-OFFICER REPORT.pdf:6:Special Protection Area (‘SPA’) buffer zone (Policy N4).
R-2022-0494-FFM-OFFICER REPORT.pdf:7:also located within the 6km Special Protection Area (‘SPA’) buffer zone
R-2022-0494-FFM-OFFICER REPORT.pdf:9:protection section with regard to both contamination and nuisance.
R-2022-0494-FFM-OFFICER REPORT.pdf:10:Coast Special Protection Area (SPA), Ramsar site, National Nature Reserve
R-2022-0494-FFM-OFFICER REPORT.pdf:13: protection of sites of ecological value in accordance with policies SD4
R-2022-0494-FFM-395561 - R_2022_0494_FFM - Engineering operations - removal of mounds - Land north of Teesworks area Redcar.pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/.
R-2022-0494-FFM-395561 - R_2022_0494_FFM - Engineering operations - removal of mounds - Land north of Teesworks area Redcar.pdf:3: Guidance on soil protection is available in the Defra Construction Code of Practice for the
R-2022-0494-FFM-395561 - R_2022_0494_FFM - Engineering operations - removal of mounds - Land north of Teesworks area Redcar.pdf:3: separate guidance on soil protection for site restoration and aftercare is available
R-2022-0494-FFM-NETWORK RAIL.pdf:1:Development Construction Phase and Asset Protection
R-2022-0494-FFM-NETWORK RAIL.pdf:1:developer liaise with our Asset Protection Team (contact details below) prior to any work taking place on site to
R-2022-0494-FFM-NETWORK RAIL.pdf:1:Basic Asset Protection Agreement (BAPA) with Network Rail to ensure the safety of the operational railway during
R-2022-0494-FFM-NETWORK RAIL.pdf:1:the Local Authority. The construction methodology shall demonstrate consultation with the Asset Protection Project
R-2022-0494-FFM-NETWORK RAIL.pdf:2:Contact details for Asset Protection are supplied below and we would draw the developers’ attention to the
R-2022-0494-FFM-NETWORK RAIL.pdf:2:Asset Protection Eastern
R-2022-0494-FFM-NETWORK RAIL.pdf:2:assetprotectioneastern@networkrail.co.uk.
R-2022-0494-FFM-NETWORK RAIL.pdf:3:capacity etc. which needs to be agreed by the Asset Protection Project Manager prior to
R-2022-0494-FFM-NETWORK RAIL.pdf:3:approved details. Where development may affect the railway, consultation with the Asset Protection
R-2022-0494-FFM-NETWORK RAIL.pdf:3:Rail’s Asset Protection Project Manager.
R-2022-0494-FFM-NETWORK RAIL.pdf:3:statement must be obtained from Network Rail’s Asset Protection Project Manager before the
R-2022-0494-FFM-NETWORK RAIL.pdf:3:bridges cause significant disruption and delay to rail users. Consultation with the Asset Protection
R-2022-0494-FFM-NETWORK RAIL.pdf:4:fit bridge protection barriers which may be at the developer’s expense.
R-2022-0494-FFM-NETWORK RAIL.pdf:4:Rail assets. Network Rail would request that the applicant contact our Asset Protection Project
R-2022-0494-FFM-NETWORK RAIL.pdf:4:provision and costs of railway look-out protection, supervision and other facilities necessary
R-2022-0494-FFM-NETWORK RAIL.pdf:4:Protection Team. Any unauthorised access to Network Rail land or airspace is an act of trespass and
R-2022-0494-FFM-DECISION NOTICE.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:3:Protection Department for advice on generic aspects of land contamination
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:3:recommend that the environmental protection of controlled waters is considered
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:3:alongside any human health protection requirements. This approach is supported
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:4:your Environmental Health/Environmental Protection Department who will be able
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:4:to integrate any requirements for human health protection with those for
R-2022-0494-FFM-EA_R20220494FFM_OFFICIAL_130722.pdf:4:protection of the water environment. This approach is supported by paragraph
R-2022-0494-FFM-19293141_1.pdf:4:3.2 Asset Design and Protection 35
R-2022-0494-FFM-19293141_1.pdf:12: part of the Teesmouth and Cleveland Special Protection Area (SPA) designated for
R-2022-0494-FFM-19293141_1.pdf:20: • Medium: areas that offer some groundwater protection. Intermediate between
R-2022-0494-FFM-19293141_1.pdf:23: the protection offered by the existing sand dunes system and historic railway
R-2022-0494-FFM-19293141_1.pdf:36:3.2 Asset Design and Protection
R-2022-0494-FFM-19293141_1.pdf:36: Rise Allowance to 2100 design scenario. It is assumed that this level will provide protection
R-2022-0494-FFM-Ecological Impact Assessment.pdf:3:are included in the Teesmouth and Cleveland Coast (T&CC) Special Protection Area (SPA),
R-2022-0494-FFM-Ecological Impact Assessment.pdf:6:Convention on Wetlands but which are afforded the same level of protection in policy terms
R-2022-0494-FFM-21089271_1.pdf:11:within a Groundwater Source Protection Zone.
R-2022-0494-FFM-21089271_1.pdf:17: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2022-0494-FFM-21089271_1.pdf:128:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional
R-2022-0494-FFM-21089271_1.pdf:129:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening
R-2022-0494-FFM-21089271_1.pdf:130:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening
R-2022-0494-FFM-Covering Letter.pdf:3: Corporation Area (Policy LS4/ED6). It is also within the 6km Special Protection Area (‘SPA’) buffer
R-2022-0494-FFM-Covering Letter.pdf:4: Corporation Area (Policy LS4/ED6); it is also located within the 6km Special Protection Area
R-2022-0494-FFM-Covering Letter.pdf:6: STDC 7 (Natural Environmental Protection and Enhancement) which requires development
R-2022-0494-FFM-Covering Letter.pdf:7:appropriate protection and enhancement measures incorporated into the design of development
R-2022-0494-FFM-Covering Letter.pdf:7:The approach is similarly echoed in Development Principle STDC 7 (Natural Environmental Protection
R-2022-0494-FFM-Covering Letter.pdf:8:Cleveland Coast Special Protection Area (SPA) and the Teesmouth and Cleveland Coast Ramsar site; the
R-2021-0855-CD-MGE04603 Contaminated Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:4: Previous Environmental were measured exceeding the GAC in soil for the protection of human health. It was
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:5: Special Protection Area (SPA).
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:17:site, Site of Special Scientific Interest (SSSI) and a Special Protection Area (SPA).
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:17:protection of human health in groundwater. Non aqueous phase liquid (NAPL) and tar were identified primarily
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:21:protection of estuarine surface water (River Tees) as of primary concern.
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:34:SSAC defined for the protection of the identified water resource receptors have been derived in line with the
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:42:The SSAC defined to offer protection to the identified water resource receptors are based on current best
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:44:Environment Agency, 2017. Groundwater Protection Land contamination groundwater compliance points:
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:82:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations
R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:83:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations
R-2021-0855-CD-Officer report.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0855-CD-Officer report.pdf:3:Environmental Protection Section with regard to the partial discharge of condition 4.
R-2020-0281-PND-officer report 0281.pdf:1:access, safe places of work, hazardous substances and protection of species.
R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:4: Environmental Protection Act 1990
R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:9: Light eye protection (LEP)
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:11: 2.2.5 A ‘sensitive area’ includes the UK’s National ‘European Sites’ Network (Special Protection
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:22: The Site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA)
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: Use of Personal Protection Equipment (PPE).
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:43:(CSQG) for the Protection of Aquatic Life (Canadian Council of Ministers of the Environment (CCME), 2002).
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:71: classified Special Protection Area (SPA); any candidate SAC (cSAC). The term ‘European site’ is term is also
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:72: Legal Protection
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:72: Many species of animal and plant receive some degree of legal protection. For the purposes of this report, legal
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:72: protection refers to:
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:72: • Badgers, which are protected under the Protection of Badgers Act 1992.
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:75: Species No. of Closest record Protection Other
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:76: Species No. of Closest record Protection Other
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:77: Species No. of Closest record Protection Other
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:79: Special Protection Areas (SPA)
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:87:any small voids or crevices that provide protection. This can include under concrete slabs, within fissures in
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:96: or receiving policy protection at a national or local level (such as being a considered in
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:96: Protected species Species which receive legal protection in England, notably those species which are legally
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:96: Wild Birds (79/409/EEC) 2009; and the Protection of Badgers Act 1992.
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:97: pSPA Possible Special Protection Area
R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:97: SPA Special Protection Area
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:9:Special Scientific Interest (SSSI), and the Teesmouth and Cleveland Coast Special protection Area (SPA).
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:19:AOD. The site is not located within a Groundwater Source Protection Zone. Groundwater levels recorded
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:34:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:34:protection. At this site, the underlying geology comprises Tidal Flat Deposits classified as a Secondary A
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39: Part IIA of the Environmental Protection Act (1990);
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39:Part IIA of the Environmental Protection Act 1990
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:39:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:40: Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:41: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:98:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:114:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:132:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-Decision Notice 1048(1).pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2021-1048-FFM-Decision Notice 1048(1).pdf:4: groundwater protection’.
R-2021-1048-FFM-Officer Report 1048.pdf:7: to groundwater protection’.
R-2021-1048-FFM-Officer Report 1048.pdf:7:Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/.
R-2021-1048-FFM-Officer Report 1048.pdf:7:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-1048-FFM-Officer Report 1048.pdf:13:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-1048-FFM-Officer Report 1048.pdf:16:protection section with regard to both contamination and nuisance. Detailed
R-2021-1048-FFM-Officer Report 1048.pdf:18:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and the
R-2021-1048-FFM-Officer Report 1048.pdf:22: protection of sites of ecological value in accordance with policies SD4
R-2021-1048-FFM-Officer Report 1048.pdf:24: groundwater protection’.
R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:15:The Environment Agency’s approach to groundwater protection’ (pre-
R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:15:statements in ‘The Environment Agency’s approach to groundwater protection’,
R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:3: As such, remediation for the protection of controlled
R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:18:The Environment Agency’s approach to groundwater protection’ (pre-
R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:18:statements in ‘The Environment Agency’s approach to groundwater protection’,
R-2021-1048-FFM-MGE04717 Cont Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:4:appropriate protection and enhancement measures incorporated into the design of development proposals,
R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:4:The approach is similarly echoed in Development Principle STDC7 (Natural Environmental Protection and
R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:5:Requirement (no.4) of the draft DCO, to ensure landscaping and biodiversity protection, management and
R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:5:The site is located within a 6km buffer zone of the Teesmouth and Cleveland Coast Special Protection Area
R-2021-1048-FFM-Earthworks Specification.pdf:33: USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:4:4.2.1 Source Protection Zones …………………………………………………………………………………………………… 13
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:15: • Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:4.2.1 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:The site is not located with a Groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:20: • Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:20:protection measures in new buildings. This is not considered significant for the proposed enabling works
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:27:The site is not located within a groundwater source protection zone, and due to the industrial history of the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:47:61 5.9 Source Protection Zones 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:47:62 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:48:74 10.4 Special Protection Areas (SPA) 0 1 0 0 7
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:49:78 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:92:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:95:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:96:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:96:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:102: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:105: Abstractions and Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:105:5.9 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:105:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:106:5.10 Source Protection Zones (confined aquifer)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:106:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:116: Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:116:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:116:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:118:10.4 Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:122:10.14 Potential Special Protection Areas (pSPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:122:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:122:Directive for the protection of nationally and internationally important populations of wild birds. Those sites
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:136:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:136:regulation and protection. There are likely to be restrictions to some developments within these areas.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:137:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:143:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:143:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:176: Location Estimated properties affected Radon Protection Measures required
R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:10:The Environment Agency’s approach to groundwater protection’ (pre-
R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:10:statements in ‘The Environment Agency’s approach to groundwater protection’,
R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf:4: groundwater protection’.
R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf:4:The Environment Agency’s Approach to Groundwater Protection’ (pre-
R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf:4:statements in ‘The Environment Agency’s approach to groundwater protection’,
R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:7:EPA16 16 priority PAHs as identified by the USA’s Environmental Protection Agency
R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:15: Design of Site Protection and Corus UK Ltd Site Protection and Monitoring Plan Corus SPMP
R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:21:The site was not located in a Groundwater Source Protection Zone.
R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:30:Protection Act 1990 (EPA) and the subsequent and updated Contaminated Land Statutory Guidance
R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:77: Environment Protection Act 1990, Part IIA. Short Major spillage of contaminants from site
R-2021-1048-FFM-377862 - R_2021_1048_FFM Ground remediation works at Former Redcar Steelworks Site - No Objection Subject to Mitigation.pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/.
R-2021-1048-FFM-377862 - R_2021_1048_FFM Ground remediation works at Former Redcar Steelworks Site - No Objection Subject to Mitigation.pdf:4:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:4:3.2 Asset Design and Protection 31
R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:12: part of the Teesmouth and Cleveland Special Protection Area (SPA) designated for
R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:24: the protection offered by the existing sand dunes system and historic railway
R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:37:3.2 Asset Design and Protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:4:4.2.1 Source protection zones …………………………………………………………………………………………………….13
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:15: Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:19:4.2.1 Source protection zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:19:The site is not located with a Groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:19:protection measures in new buildings. This is not considered significant for the proposed enabling works, but
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:25:The site is not located within a groundwater source protection zone, and due to the industrial history of the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:39:61 5.9 Source Protection Zones 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:39:62 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:40:74 10.4 Special Protection Areas (SPA) 0 1 0 0 7
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:41:78 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:84:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:87:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:89:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:94: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:97: Abstractions and Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:97:5.9 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:97:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:98:5.10 Source Protection Zones (confined aquifer)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:98:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:100:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:108: Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:108:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:108:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:110:10.4 Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:114:10.14 Potential Special Protection Areas (pSPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:114:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:114:Directive for the protection of nationally and internationally important populations of wild birds. Those sites
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:128:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:128:regulation and protection. There are likely to be restrictions to some developments within these areas.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:129:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:135:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:135:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:168: Location Estimated properties affected Radon Protection Measures required
R-2021-1048-FFM-CON LAND 1048(1).pdf:1:Environmental Protection Planning Consultation Response
R-2021-1048-FFM-Appendix5 - Screening criteria.pdf:2:particularly Part IIA of the Environmental Protection Act 1990 and development control under the Town
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:14:(SSSI), and the Teesmouth and Cleveland Coast is designated as a Special Protection Area (SPA).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:21: • Factor 1 – Protection of human health and the environment – in all cases measures to protect
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:23:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:29: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:34:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:5: within a Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:5: Protection Area (SPA).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:24:2.4.7 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:24:The Site is not located within a groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:25: • Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:26:Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:28:provide protection to off-Site commercial/industrial workers, provided that any remedial measures, if undertaken,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:28:Glacial Till (and where present, Glaciolacustrine Deposits) are considered to offer a degree of protection to this
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:36:publication entitled “Protection of Workers and the General Public during the Development of Contaminated
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:52:where present, is providing a degree of protection to the vertical movement of CoC downwards into the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:53:a degree of protection to the underlying Secondary Undifferentiated and Secondary B Aquifers associated with
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:56:SSAC defined for the protection of the identified water resource and ecological receptors have been derived
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:59:although ensuring any physical receptors, such as the North Sea, are afforded protection.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:60:theoretical compliance point of 50m but rather protection of the physical receptors present, namely the North
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:61:The SSAC defined to offer protection to the identified receptors are based on current best practice and are
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:64:Environment Agency, 1999. The Fuel Additive MTBE – a Groundwater Protection Issue. National Groundwater
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:64:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points:
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:437: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:438: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:439: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:440: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:441: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:442: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:443: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:444: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:445: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:458: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:459: 14.70 - 16.20 178 100 No (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:460: (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:461: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:462: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:463: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:464: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:465: 35.50 - 36.15 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:466: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:479: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:480: (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:481: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:482: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:483: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:484: 26.80 - 27.40 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:485: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:495: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:496: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:497: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:498: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:499: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:500: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:501: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:511: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:512: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:513: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:514: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:515: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:516: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:517: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:527: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:528: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:529: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:530: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:531: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:532: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:533: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:544: 7.20 - 8.70 178 100 Yes Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:545: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:546: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:547: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:548: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:549: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:550: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:551: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:552: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:564: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:565: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:566: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:567: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:568: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:569: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:570: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:571: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:572: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:584: Client instructions. (6) Aquifer protection installed prior
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:585: Client instructions. (6) Aquifer protection installed prior
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:586: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:587: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:588: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:589: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:599: 5.70 - 7.20 178 100 Yes Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:600: Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:601: 18.50 - 20.00 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:602: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:603: 26.30 - 27.50 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:604: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:605: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:606: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:619:14/06/2021 4.20 4.20 178 Dry 5.70 - 7.20 178 100 Yes the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:620: the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:621: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:622: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:623: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:624: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:625: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:626: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:637: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:638: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:639: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:640: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:641: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:642: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:643: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:644: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:656: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:657: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:658: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:659: 20.40 - 21.70 Water 100 protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:660: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:661: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:662: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:663: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:675: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:676: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:677: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:678: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:679: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:687: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:688: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:689: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:690: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:691: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:834:fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters
R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf:725:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:11:first cohesive layer was determined. Aquifer protection was installed, comprising a bentonite pellet seal, was
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:34: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:35: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:36: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:37: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:38: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:39: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:40: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:41: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:42: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:55: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:56: 14.70 - 16.20 178 100 No (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:57: (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:58: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:59: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:60: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:61: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:62: 35.50 - 36.15 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:63: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:76: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:77: (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:78: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:79: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:80: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:81: 26.80 - 27.40 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:82: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:92: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:93: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:94: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:95: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:96: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:97: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:98: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:108: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:109: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:110: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:111: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:112: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:113: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:114: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:124: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:125: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:126: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:127: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:128: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:129: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:130: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:141: 7.20 - 8.70 178 100 Yes Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:142: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:143: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:144: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:145: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:146: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:147: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:148: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:149: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:161: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:162: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:163: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:164: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:165: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:166: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:167: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:168: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:169: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:181: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:182: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:183: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:184: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:185: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:186: (6) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:196: 5.70 - 7.20 178 100 Yes Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:197: Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:198: 18.50 - 20.00 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:199: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:200: 26.30 - 27.50 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:201: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:202: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:203: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:216:14/06/2021 4.20 4.20 178 Dry 5.70 - 7.20 178 100 Yes the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:217: the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:218: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:219: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:220: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:221: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:222: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:223: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:234: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:235: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:236: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:237: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:238: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:239: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:240: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:241: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:253: (5) Aquifer protection installed between 14.90-16.65m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:254: (5) Aquifer protection installed between 14.90-16.65m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:255: (5) Aquifer protection installed between 14.90-16.65m
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:256: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:257: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:258: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:259: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:260: (5) Aquifer protection installed between
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:272: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:273: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:274: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:275: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:276: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:284: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:285: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:286: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:287: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:288: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-4339 Preliminary Onshore GI for NZT (Draft Report).pdf:1417:the EIU, which introduces some protection and distributes the power to a number of outlets, including
R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:41: effects of blast and fragmentation by adding protection to operators’ cabs or by using ‘long-arm’
R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:96: • Safety – personnel safety will assume the highest priority for the project. The protection and
R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:97: Kunreuther, H., 1995, Protection against low probability high consequence events.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:5: within a Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:5: Protection Area (SPA).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:25:2.4.7 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:25:The Site is not located within a groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:26: Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:27:Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:30:provide protection to off-Site commercial/industrial workers, provided that any remedial measures, if undertaken,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:30:Glacial Till (and where present, Glaciolacustrine Deposits) are considered to offer a degree of protection to this
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:38:publication entitled “Protection of Workers and the General Public during the Development of Contaminated
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:54:where present, is providing a degree of protection to the vertical movement of CoC downwards into the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:55:a degree of protection to the underlying Secondary Undifferentiated and Secondary B Aquifers associated with
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:58:SSAC defined for the protection of the identified water resource and ecological receptors have been derived
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:61:although ensuring any physical receptors, such as the North Sea, are afforded protection.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:62:theoretical compliance point of 50m but rather protection of the physical receptors present, namely the North
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:63:The SSAC defined to offer protection to the identified receptors are based on current best practice and are
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:66:Environment Agency, 1999. The Fuel Additive MTBE – a Groundwater Protection Issue. National Groundwater
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:66:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points:
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:445: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:446: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:447: (5) Aquifer protection installed between 16.75-15.60m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:448: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:449: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:450: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:451: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:452: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:453: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:466: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:467: 14.70 - 16.20 178 100 No (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:468: (5) Aquifer protection installed between 16.85-14.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:469: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:470: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:471: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:472: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:473: 35.50 - 36.15 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:474: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:487: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:488: (5) Aquifer protection installed between 12.15-10.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:489: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:490: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:491: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:492: 26.80 - 27.40 Water 100 (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:493: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:503: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:504: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:505: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:506: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:507: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:508: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:509: per the Client instructions. (6) Aquifer protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:519: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:520: (5) Aquifer protection installed between 13.75-11.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:521: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:522: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:523: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:524: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:525: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:535: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:536: (5) Aquifer protection installed between 14.70-12.50m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:537: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:538: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:539: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:540: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:541: (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:552: 7.20 - 8.70 178 100 Yes Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:553: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:554: Aquifer protection installed between 16.20-13.40m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:555: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:556: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:557: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:558: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:559: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:560: protection installed between 16.20-13.40m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:572: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:573: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:574: instructions. (6) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:575: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:576: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:577: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:578: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:579: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:580: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:592: Client instructions. (6) Aquifer protection installed prior
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:593: Client instructions. (6) Aquifer protection installed prior
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:594: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:595: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:596: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:597: Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:607: 5.70 - 7.20 178 100 Yes Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:608: Aquifer protection installed between 15.15-13.70m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:609: 18.50 - 20.00 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:610: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:611: 26.30 - 27.50 Water 100 Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:612: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:613: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:614: Client instructions. (5) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:627:14/06/2021 4.20 4.20 178 Dry 5.70 - 7.20 178 100 Yes the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:628: the Client instructions. (6) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:629: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:630: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:631: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:632: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:633: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:634: protection installed between 12.15-10.15m prior to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:645: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:646: Client instructions. (8) Aquifer protection installed
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:647: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:648: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:649: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:650: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:651: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:652: Aquifer protection installed between 14.60-13.00m
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:664: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:665: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:666: instructions. (5) Aquifer protection installed between
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:667: 20.40 - 21.70 Water 100 protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:668: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:669: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:670: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:671: protection installed between 14.90-16.65m BGL
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:683: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:684: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:685: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:686: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:687: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:695: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:696: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:697: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:698: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:699: (5) Aquifer protection installed prior to commencing
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:964:of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water)
R-2021-1048-FFM-EMAIL.pdf:4: may affect a cover or protection.
R-2021-1048-FFM-2021-81 HRA NZT remediation.PDF:3:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:7:EPA Environmental Protection Act
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:7:EPA16 A list of 16 priority PAHs as identified by the USA’s Environmental Protection Agency
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:8:and Cleveland Coast Special Protection Area and Ramsar Site and South Gare and Coatham Sands Site of
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:13: o Groundwater abstraction and protection
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:17: 2016 Environmental Protection Part 2A of the
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:17: Team People Services Environmental Protection
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:18: Protection Act 1990.
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:25:The EA interactive groundwater map defines Groundwater Source Protection Zones for wells, boreholes
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:25:Groundwater Source Protection Zone.
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:30:Teesmouth and Cleveland Coast Special Protection Area (SPA), South Gare and Coatham Sands Site of
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:38:Protection Act 1990 (EPA) and the subsequent and updated Contaminated Land Statutory Guidance
R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:77: Environment Protection Act 1990, Part IIA. Short Major spillage of contaminants from site
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:5: designated as Secondary B Aquifers. The Site is not located within a Source Protection
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:5: Protection Area (SPA).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:22:2.4.7 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:22:The Site is not located within a groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:23: Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:24:Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:25:provide protection to off-Site commercial/industrial workers, provided that any remedial measures, if undertaken,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:25:Glacial Till (and where present, Glaciolacustrine Deposits) are considered to offer a degree of protection to this
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:32:publication entitled “Protection of Workers and the General Public during the Development of Contaminated
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:47:where present, is providing a degree of protection to the vertical movement of CoC downwards into the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:48:a degree of protection to the underlying Secondary Undifferentiated and Secondary B Aquifers associated with
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:51:SSAC defined for the protection of the identified water resource and ecological receptors have been derived
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:53:although ensuring any physical receptors, such as the North Sea, are afforded protection.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:54:theoretical compliance point of 50m but rather protection of the physical receptors present, namely the North
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:56:The SSAC defined to offer protection to the identified receptors are based on current best practice and are
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:59:Environment Agency, 1999. The Fuel Additive MTBE – a Groundwater Protection Issue. National Groundwater
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:59:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points:
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:165:fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters
R-2021-1048-FFM-CON LAND 1048.pdf:1:Environmental Protection Planning Consultation Response
R-2021-1048-FFM-Appendix1.pdf:10: vest or jacket, hard hat and eye protection must be worn at all times.
R-2021-1048-FFM-Appendix1.pdf:18:Eye protection is to be available and worn on instruction from the Safety Co-
R-2021-1048-FFM-Appendix1.pdf:18:Ear protection will also be available and worn when working in noisy environments
R-2021-1048-FFM-Appendix1.pdf:22:Ear protection will also be available and worn when working in noisy environments
R-2021-1048-FFM-MGE04767 Cont Land Response.pdf:1:Environmental Protection Planning Consultation Response
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:4:4.2.1 Source protection zones …………………………………………………………………………………………………….13
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:15: Special Protection Area
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:4.2.1 Source protection zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:The site is not located with a Groundwater Source Protection Zone (SPZ).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:protection measures in new buildings. This is not considered significant for the proposed enabling works, but
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:25:The site is not located within a groundwater source protection zone, and due to the industrial history of the
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:61 5.9 Source Protection Zones 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:62 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 -
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:40:74 10.4 Special Protection Areas (SPA) 0 1 0 0 7
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:41:78 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:84:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:87:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:89:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:94: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97: Abstractions and Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97:5.9 Source Protection Zones
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98:5.10 Source Protection Zones (confined aquifer)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:100:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries,
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108: Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:110:10.4 Special Protection Areas (SPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:10.14 Potential Special Protection Areas (pSPA)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:Directive for the protection of nationally and internationally important populations of wild birds. Those sites
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:128:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:128:regulation and protection. There are likely to be restrictions to some developments within these areas.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:129:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:135:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:135:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:168: Location Estimated properties affected Radon Protection Measures required
R-2021-1048-FFM-PN 1048.pdf:1:Environmental Protection Planning Consultation Response
R-2021-1048-FFM-Factual Report SSI 1.pdf:679:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:14:(SSSI), and the Teesmouth and Cleveland Coast is designated as a Special Protection Area (SPA).
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:21: • Factor 1 – Protection of human health and the environment – in all cases measures to protect
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:23:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions.
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:29: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:35:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:47:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL).
R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:5: Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and Cleveland Coast Ramsar site).
R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:5: level of protection in policy terms in respect of new development as European sites. The Teesmouth
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:3: 6.2 Protection measures …………………………………………………………………………………….. 6‐2
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:7:The results of gas monitoring within areas C and D suggest that gas protection measures are
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:7:Proof Membrane and underfloor venting. Further detail protection measures for industrial and
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:38:6.2 Protection measures
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:38:the following protection measures:
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:38:Further detail on levels of protection required for industrial and for commercial buildings is given in
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:54:The results of gas monitoring within areas C and D suggest that gas protection measures are
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:79:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:97:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:777:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-0878-ESM-EP NU.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0878-ESM-Natural England.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2021-0878-ESM-EP CL.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0878-ESM-Officer Report 0878.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0878-ESM-Officer Report 0878.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0878-ESM-Officer Report 0878.pdf:7:considered by the Council’s Environmental Protection Team who raised no
R-2021-0878-ESM-Officer Report 0878.pdf:8:Protection Area (SPA) and Ramsar site and Teesmouth and Cleveland Coast
R-2021-0269-CD-Decision Notice.pdf:3: for environmental protection.
R-2021-0269-CD-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf:3:located with 1km of an Source Protection Zone and the potential for periodic saline
R-2021-0100-CD-MGE04321 Cont Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0100-CD-MGE04321 Cont Land.pdf:2: located with 1km of an Source Protection Zone and the potential for periodic saline
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:4:4.2.3 Aquifer Protection …………………………………………………………………………………………………………….. 11
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:11:as a Secondary B Aquifer. The site is not located within a Source Protection Zone (SPZ) and there are no SPZ
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:11:Cleveland Coast Site of Special Scientific Interest (SSSI) which is also designated as a Special Protection
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:12:type of water supply pipes or the long-term protection of water supply as part of the redevelopment.
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:17:4.2.3 Aquifer Protection
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:The soil and groundwater SSAC defined for the protection of human health are presented in the Appendix B
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:The risk assessment defined to offer protection to the identified receptors is based on current best practice and
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:42:DEFRA, 2012. Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance.
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:43:Environmental Protection Agency (Washington DC).
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:49:USEPA (IRIS) (No. EPA/635/R-08/016F). US Environmental Protection Agency (Washington DC)
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:16: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1413:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-0100-CD-Phase II ESA.pdf:19:0.5m and 2.5m bgl (Enviros 2008, MD2 2011). The site is not located within a Groundwater Source Protection
R-2021-0100-CD-Phase II ESA.pdf:34:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2021-0100-CD-Phase II ESA.pdf:34:protection. At this site, the underlying geology comprises Tidal Flat Deposits which are classified as a
R-2021-0100-CD-Phase II ESA.pdf:38: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0100-CD-Phase II ESA.pdf:41:of TPH and BTEX compounds have not been identified above the GAC derived for the protection of human
R-2021-0100-CD-Phase II ESA.pdf:43:identified above the GAC derived for the protection of human health and as such, a significant risk to human
R-2021-0100-CD-Phase II ESA.pdf:43:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2021-0100-CD-Phase II ESA.pdf:53:excess of the GAC for the protection of water resources, further assessment is needed.
R-2021-0100-CD-Phase II ESA.pdf:56:assessment. Concentrations of contaminants were not measured above the GAC derived for the protection
R-2021-0100-CD-Phase II ESA.pdf:731:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at https://www.epa.gov/risk/regional-
R-2021-0100-CD-Phase II ESA.pdf:732:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2021-0100-CD-Phase II ESA.pdf:733: Protection industry standards
R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:10:The site is not located within a groundwater source protection zone and there are no abstractions within 1km of
R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:16: via preferential pathways. the site is not within a groundwater source protection zone.
R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:55:35 Defra, “Environmental Protection Act 1990: Part2A, Contaminated Land Statutory Guidance,” 2012.
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:5: 1.3 Site Boundary and Protection Bunds
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:6:protection of the environment to include the prevention of pollution. In order to facilitate this, the
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:12: wide protection bund (5m in height) for a number of environmental reasons.
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:16:Recovery Processing Area project have been identified and the Environmental protection
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:18:delineated and protected with a 20m wide protection bund (5m in height) for a number of
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:18: • 20m wide protection bund (5m in height) to prevent Surface Water leaving site or entering
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:18: • Protection of Water courses:
R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:19:Noise and vibration statutory nuisance are controlled under the Environmental Protection Act 1990.
R-2021-0067-CD-Compliance Decision Notice_R20210067CD.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2021-0067-CD-Compliance Officer report _R20210067CD.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of
R-2021-0067-CD-Compliance Officer report _R20210067CD.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)
R-2021-0067-CD-Compliance Officer report _R20210067CD.pdf:2:Environment protection teams with regard to their individual areas. Neither have
R-2021-0067-CD-MGE04258 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2022-0050-FFM-0050 nusiance.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0050-FFM-0050 Dec.pdf:3: contaminated land under Part 2A of the Environmental Protection Act 1990 in
R-2022-0050-FFM-0050.pdf:1:https://eur01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.securedbydesign.com%2F&data=0
R-2022-0050-FFM-0050 Off Rep.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0050-FFM-0050 Off Rep.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0050-FFM-0050 Off Rep.pdf:6:protection team with regard to contamination and nuisance.
R-2022-0050-FFM-0050 Off Rep.pdf:10:Environmental Protection Act 1990 in relation to the intended use of the
R-2022-0050-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0753-FFM-NWL.pdf:1:diversion, relocation or protection measures required prior to the commencement of the
R-2021-0753-FFM-Officer Report 0753.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0753-FFM-Officer Report 0753.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0753-FFM-Officer Report 0753.pdf:6:environmental protection officers who have raised no objection to the principle
R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:17:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions.
R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:23: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:28:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2021-0753-FFM-Teesworks Freeport - Cover Letter 18.08.21.pdf:2:and helping support the expansion and long-term protection of the port and logistics sector. The Freeport
R-2021-0753-FFM-Consultee Response - EPT Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0753-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:8: contaminated land under Part 2A of the Environmental Protection Act 1990; and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:8:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:10: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:10: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:10: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:15: sensitivity1 source protection zones (SPZ) within 1km of the area.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:23: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:27: Design of a Site Protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:27: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:29:protection measures appropriate to protect buildings from landfill gas migration.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:40: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:44: design sulphate class DS-2, indicating that that protection to buried concrete would be required.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:44: protection measure to new buildings.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:45: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:47: sensitivity6 source protection zones (SPZ) within 1km of the area.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:56: PROTECTION
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:56: This set out the required site protection and monitoring plan Part of Area 6 on the current area
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:57:protection measures appropriate to protect buildings from landfill gas migration.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:95:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:98: CL4 hard surfacing to break pathway Protection against aggressive soils will be health.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:98: A clean service run area may be required Relatively easily incorporated into the Protection of in ground workers and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:99:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:101:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:121:Protection Department for advice on generic aspects of land contamination management.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:121:environmental protection of controlled waters is considered alongside any human health
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:121:protection requirements. This approach is supported by paragraph 170 of the National
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:354:The site is not located within a Groundwater Source Protection Zone, nor within a surface water,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:372:being a Site of Special Scientific Interest (SSSI); and a RAMSAR site and Special Area of Protection (SPA).
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:379:for insulation and fire/heat protection, and therefore although the works has long since been
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:379:Asbestos may have been used for insulation and fire/heat protection, and therefore may even persist
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:381:on site contained PCBs. Asbestos may also be present where fire‐protection measures were required.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:381:as cleaning and painting. Asbestos may also be present where fire protection or insulating measures
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:383:Given the age of the buildings it is considered likely that asbestos may have been used for fire protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:384:may also be present where fire protection or insulating measures were required.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:404: ‐ asbestos for fire protection and Coal and coal ash Elevated pH
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:405: ‐ asbestos for fire protection and metalloids
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:405: protection etc metalloids
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:405: protection, cladding etc
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:406: protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:406: ‐ asbestos for fire protection, Elevated pH Acids
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:407: ‐ asbestos for fire protection and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:407: ‐ asbestos for fire protection and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:408: protection etc.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:408: protection etc.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:422: levels; potentially an explosive and/or Include ground gas protection measures within
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:469: Environment Protection Act 1990, Part IIA. Short Major spillage of contaminants from site into
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:484: Site Protection and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:485: First Phase Reporting of the Site Protection and Monitoring
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:489:First Phase Reporting of the Site Protection and Monitoring Programme
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:489:Site Protection and Monitoring Programme (‘SPMP’). Reference Data has been collected for
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:491:First Phase Reporting of the Site Protection and Monitoring Programme
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:491:Site Protection and Monitoring Programme (‘SPMP’). The design SPMP’s (Ref. 1, 2 and 3)
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:501: 1. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:501: 2. Design of a Site Protection and Monitoring Programme for Lackenby Works,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:501: 3. Design of a Site Protection and Monitoring Programme for Redcar Works, Teesside,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:501: 6. Revised Site Protection and Monitoring Programme for Cleveland and Redcar Works,
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:591: Appendix H8: Design of a Site Protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:592:DESIGN OF A SITE PROTECTION AND MONITORING
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:595:This document represents the design Site Protection and Monitoring Programme (SPMP) for Cleveland
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:612:The methods and procedures for assessing monitoring data as a result of operating the Site Protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:613:3. Technical Guidance Note IPPC H7. Guidance on the Protection of Land Under the PPC Regime;
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:613: Application Site Report and Site Protection and Monitoring Programme. August 2003.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:648: • Hydrogeology : Source Protection Zones, Groundwater Vulnerability, aquifer
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:652: 3.3.5 The Redcar Works are not situated within a groundwater Source Protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:654: and Special Protection Area. The site is designated due to the coastal sands
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:706: 4.3.5 The Lackenby Works are not within a groundwater Source Protection Zone
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:727: 5.3.5 The Cleveland Works are not within a groundwater S ource Protection Zone
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:821: likely to be of relatively low permeability and thereby provide protection to deeper
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:861: deposits classed protection from downward migration afforded by low permeability
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:867: deposits classed s a n ds offer little protection from downward migration of
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:880: classed as Minor some protection from downward migration.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:881: Aquifer) protection from downward migration. Possible migration toward
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:882: Marine Alluvium Mild Clay may provide some protection from downward migration.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:884: classed as Minor protection to downward migration of contaminants.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:884: by Corus) Mild protection to downward migration of contaminants. Likely migration
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:885: classed as Minor protection from downward migration.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:886: classed as Minor Boulder Clay may provide some protection from downward
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:887: classed as Minor Boulder Clay may provide some protection from downward
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:888: Marine Alluvium Mild provide some protection from downward migration. Possible
R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank (1).pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/.
R-2020-0357-OOM-MGE04078 Contaminated Land.pdf:1: Environmental Protection Planning Consultation Response
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:3: 7 Appendix H7: First Phase Reporting of the Site Protection and Monitoring Programme,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:3: 8 Appendix H8: Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:5: 1 Environmental Protection Act 1990 Part II;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:5: 24 Environment Agency, Groundwater protection technical guidance, 2017;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:5: 25 Environment Agency, The Environment Agency’s approach to groundwater protection,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:6: 36 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:6: determined as contaminated land under Part IIA of the Environmental Protection Act
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:8: 5 First Phase Reporting of the Site Protection and Monitoring Programme, prepared by Corus
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:8: 6 Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:9: 4 Nearby Sites of Nature Conservation Interest (SNCIs), Special Protection Areas (SPAs),
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:11: protection zone, surface waters of good or Hazardous Waste where the
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:13: and should incorporate any necessary protection measures appropriate to protect buildings
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:23:H4.47 The site is not located within a Groundwater Source Protection Zone, nor within a surface water,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:26: protection measures appropriate to protect buildings and future site users from landfill gas
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:31: engineering fill, of approximately 0.5m, may be required to enable the protection of the
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:35: gas protection measures;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:36: 2 EA, Groundwater protection technical guidance, 2017 (ref 9.45);
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:36: 3 EA, The Environment Agency’s approach to groundwater protection, 2018 (ref 9.46);
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:37: protection measures appropriate to protect buildings and future site users from landfill gas
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:37: accumulation of ground gas in confined spaces. The ground gas protection measures would be
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:38: relation to the protection of buried concrete against sulphate attack.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:41: assessed, and appropriate gas protection
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:44: 1 Environmental Protection Act 1990 Part II;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:44: 24 Environment Agency, Groundwater protection technical guidance, 2017;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:44: 25 Environment Agency, The Environment Agency’s approach to groundwater protection,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:45: 36 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:45: 9 First Phase Reporting of the Site Protection and Monitoring Programme, prepared by Corus
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:45: 10 Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:26: 10 SPA Special Protection Areas
R-2020-0357-OOM-NWL 0357.pdf:2:necessary diversion, relocation or protection measures required prior to the commencement of the
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf:39:A statement setting out current Government policy on the identification, protection, conservation and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf:42: 1979; and Protection of Wrecks Act 1973);
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:7: remediation and/or gas protection measures;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:9: nesting and breeding birds and the legal protection they are
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:10: incorporate any necessary protection measures appropriate to
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:16: 6 Gas Risk Assessment, this should incorporate any necessary protection measures
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:19: 12 SPA Special Protection Area
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1: Plant Protection
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1: E-mail: plantprotection@cadentgas.com
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1:Can you please inform Plant Protection, as soon as possible, the decision your authority is likely
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1:Please let us know whether Plant Protection can provide you with technical or other information that may be of
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1:referred your enquiry/consultation to our Asset Protection team for further detailed
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:1:date of this response. Please contact us at assetprotection@nationalgrid.com if you have not had a
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:2:should contact Plant Protection before any works are carried out to ensure the apparatus is not affected by
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:2: any such restrictions from the landowner in the first instance and if in doubt contact Plant Protection.
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:2:If you require further assistance please contact the Plant Protection team via e-mail (click here) or via the
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:2:Plant Protection Team
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:3: Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:6: Environmental Protection UK (EPUK) and the IAQM provides a framework for professionals
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:14: and the Special Protection Area (SPA)/Ramsar site Teesmouth and Cleveland Coast. The SSSI
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:18: protection of human health are based on NO2 rather than total NOx or NO.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:40: 16 EPUK: Environmental Protection UK
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:41: 37 SPA: Special Protection Area
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:42: https://www.redcar-cleveland.gov.uk/resident/environmental-protection/air-
R-2020-0357-OOM-0357 Nuisance.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:4: drainage, SuDS, Flood Protection Schemes, Flood Risk Assessment,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:6: bodies, water impoundment and protection of water resources.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:7: • Environment Agency ('EA') Principles and Practice for the Protection of Groundwater
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:10: Plan to ensure the protection and improvement in quality of the water environment.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:16: Natural England website (2020) Special Protection Areas (SPAs).
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:16: EA Source Protection Zones and 2009 River Basin
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:32:G4.34 Source Protection Zones ('SPZ') (inner, outer and total catchment) are defined around
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:32: Groundwater Protection Policy (GP3) to set up pollution prevention measures and monitor the
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:39: Environment Agency (EA) Principles and Practice for the Protection of Groundwater
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:44: Protection Act 1990.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:52: the Environmental Protection Act 1990.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:53: the Environmental Protection Act 1990.
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:15: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Site of Special Scientific
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:28: e support the expansion and protection of the port and logistics sector;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:38: 22 SPA Special Protection Area
R-2020-0357-OOM-Energy and Utilities Strategy.pdf:10: to habitat protection and long-term sustainability, and that encourages
R-2020-0357-OOM-Energy and Utilities Strategy.pdf:29: contributes to habitat protection and long-term sustainability, and that
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:4:M2.2 A statement setting out current Government policy on the identification, protection,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:7: Archaeological Areas Act 1979; and Protection of Wrecks Act 1973);
R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf:6:found on gov.uk and include Groundwater Protection, EA Approach to Groundwater
R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf:6:Protection, Land Contamination
R-2020-0357-OOM-Design and Access Statement.pdf:26: Fall Protection solutions and Kingspan Roof
R-2020-0357-OOM-Design and Access Statement.pdf:26: performance within the building resulting in reduced running costs in Fall Protection Systems
R-2020-0357-OOM-Design and Access Statement.pdf:26: personal and collective fall protection when
R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:8: Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site and Teesmouth and Cleveland
R-2020-0357-OOM-MGE04079a Nuisance.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0357-OOM-NETWORK RAIL.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but
R-2020-0357-OOM-NETWORK RAIL.pdf:2:Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any
R-2020-0357-OOM-NETWORK RAIL.pdf:2:permanent alterations to the mutual boundary the applicant must contact Network Rail’s Asset Protection
R-2020-0357-OOM-NETWORK RAIL.pdf:2:Method statements may require to be submitted to Network Rail’s Asset Protection Project Manager at the below
R-2020-0357-OOM-NETWORK RAIL.pdf:2:Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried
R-2020-0357-OOM-NETWORK RAIL.pdf:2:traffic i.e. “possession” which must be booked via Network Rail’s Asset Protection Project Manager and are subject
R-2020-0357-OOM-NETWORK RAIL.pdf:2:and agreement with our Asset Protection Team and the developer entering into a Basic Asset Protection
R-2020-0357-OOM-NETWORK RAIL.pdf:2:Agreement (where appropriate). We would advise that the developer discuss the proposals with Asset Protection
R-2020-0357-OOM-NETWORK RAIL.pdf:2:prior to applying for the discharge of condition. Contact details for Asset Protection are below.
R-2020-0357-OOM-NETWORK RAIL.pdf:3:Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any
R-2020-0357-OOM-NETWORK RAIL.pdf:3:method statement. Approval of the method statement must be obtained from Network Rail’s Asset Protection
R-2020-0357-OOM-NETWORK RAIL.pdf:3:disruption and delay to rail users. Consultation with the Asset Protection Project Manager is necessary to
R-2020-0357-OOM-NETWORK RAIL.pdf:3:understand if there is a problem. If required there may be a need to fit bridge protection barriers which may be at
R-2020-0357-OOM-NETWORK RAIL.pdf:3:contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a strategy to
R-2020-0357-OOM-NETWORK RAIL.pdf:3:to be agreed by the Asset Protection Project Manager prior to implementation.
R-2020-0357-OOM-NETWORK RAIL.pdf:3:Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would
R-2020-0357-OOM-NETWORK RAIL.pdf:4:Asset Protection Project Manager
R-2020-0357-OOM-NETWORK RAIL.pdf:4:Email: assetprotectioneastern@networkrail.co.uk
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:1:6 NATIONAL GRID ASSET PROTECTION AGREEMENT AND RECOVERING ‘REASONABLE
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:1:Grid Plant Protection and further contact information can be found in Appendix A.
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:9: - requests for access should be directed through National Grid Plant Protection in the first
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:9:6 NATIONAL GRID ASSET PROTECTION AGREEMENT AND RECOVERING
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:9: covers the protection of the NG asset(s) and also the reimbursement of reasonable costs
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:9: Protection Agreement (APA) and/or a Supply of Consultancy Services (SCS) contract.
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:9: NG use a standard template for Asset Protection Agreements (including staff rates) which
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:10: Protection Team
R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:10: NG Plant Protection March 2018 Damien Culley
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:21: relevant to hearing protection zones in the working environment 19. It is considered to be the
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:14:Environmental Protection Team
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:19:Environmental Protection Team
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:19:Environmental Protection Team
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:20:From: Environmental Protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:20:To: Environmental Protection Environmental.Protection@redcar-cleveland.gov.uk
R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:10: Cleveland Coast Special Protection Area (‘SPA’) and Ramsar Site and Teesmouth and Cleveland
R-2020-0357-OOM-0357 MGent AirQual comments.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:5: and Special Protection Areas (SPA) within 20km of the proposed development site;
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:34: development should be aware of the potential presence of nesting birds and the legal protection
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:35: of nesting birds. Legal protection is afforded to all breeding bird species, their nests, their eggs,
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:52: 32 pSPA proposed Special Protection Area
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:53: 37 SPA Special Protection Area
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:55:24 Gilbert G, Gibbons DW, Evans J (1998) Bird Monitoring Methods. Royal Society for the Protection of Birds
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:55:27 Natural England (2019) Teesmouth and Cleveland Coast potential Special Protection Area (pSPA) and
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:5: Environmental Protection Act 1990 (c. 43)
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:5:J2.5 The Environmental Protection Act 1990 (c. 43) as amended in 1996 and 1999 implements
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:5: Environmental Protection (Duty of Care) Regulations 1991
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:8: d support the expansion and protection of the port and logistics sector;
R-2020-0357-OOM-NATIONAL GRID(1).pdf:1: Asset Protection Assistant
R-2020-0357-OOM-NATIONAL GRID(1).pdf:1: E-mail: Plantprotection@nationalgrid.com
R-2020-0357-OOM-NATIONAL GRID(1).pdf:2:Asset Protection Assistant
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:12:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:18: Meet the groundwater protection criteria set out on GOV.UK What other environmental issues will you consider with my planning
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:19: rivers and streams. Some areas (source protection zones and aquifers) are Your development should ensure that an 8m strip of land (planted with
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:19: groundwater protection can be found on GOV.UK construction and maintenance.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:25:3.2 Asset design and protection 31
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:39: • Medium: areas that offer some groundwater protection. Intermediate between
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:42: the protection offered by the existing sand dunes system and historic railway
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:53:3.2 Asset design and protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:3: Scientific Interest (SSSI). It confers differing levels of protection on species themselves, their
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:3:1.2 Species offered protection by the Act are listed in a series of schedules. These schedules are
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:3: v. Disturb a bat while it is occupying a structure or place used for shelter or protection;
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:4: protection;
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:4: v. Obstruct access to a holt or other structure or place otters use for shelter or protection
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:4: protection.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:5: ii. Damage, destroy or block access to their places of shelter or protection (on purpose or
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:5: iii. Disturb them in a place of shelter or protection (on purpose or by not taking enough
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:5: protection (e.g. a breeding pond or hibernation site);
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:5:1.21 All of the reptile species found naturally in the UK are given limited protection under the WCA.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:5:1.23 Sand lizard and smooth snake are afforded additional protection under the Habitat Regulations
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:6: protection (e.g. a breeding pond or hibernation site);
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:7: ecological networks and the protection and recovery of priority species; and identify and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:8: process, with appropriate protection and enhancement measures incorporated into the design
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:8: Environmental Protection and Enhancement) stating: ‘…Net environmental gains should be
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:8: the historic environment, contributes to habitat protection, safeguards biodiversity and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:8: enhancement and protection of the natural environment. Therefore, all development proposals
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:8:1.47 STDC 7 outlines the need for a coordinated approach to environmental protection and
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:9: habitat protection and long-term sustainability, and that encourages biodiversity.
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:25: different habitats. The metric does not change existing levels of species protection and the
R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix D - July 2020.pdf:25: processes linked to protection regimes are outside the scope of the metric.
R-2020-0357-OOM-Planning Statement - July 2020.pdf:17: • 6km Special Protection Areas (‘SPA’) buffer zone (Policy N4) (represented by the brown
R-2020-0357-OOM-Planning Statement - July 2020.pdf:18: • support the expansion and protection of the port and logistics sector;
R-2020-0357-OOM-Planning Statement - July 2020.pdf:35: to ensure the protection and improvement in quality of the water environment. This is also
R-2020-0357-OOM-Planning Statement - July 2020.pdf:39: • N1 Landscape - supports the protection and enhancement of the Borough’s landscape based
R-2020-0357-OOM-Planning Statement - July 2020.pdf:39: • N4 Biodiversity and Geological Conservation - supports the protection and enhancement of
R-2020-0357-OOM-Planning Statement - July 2020.pdf:41: supports the protection and enhancement of the Borough’s landscape and restricts any
R-2020-0357-OOM-Planning Statement - July 2020.pdf:41: protection of amenity.
R-2020-0357-OOM-Planning Statement - July 2020.pdf:44: Protection Act, Building Regulations or Environmental Permitting Regulations.
R-2020-0357-OOM-Decision Notice.pdf:3: for environmental protection.
R-2020-0357-OOM-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2020-0357-OOM-0357 Contam Land.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0357-OOM-0357 Contam Land.pdf:2:remediation and/or gas protection measures;
R-2020-0357-OOM-HSE Advice_P_2020_0357_OOM.pdf:2: Safety at Work etc Act 1974, which specifically includes provisions for the protection of
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:9: Protection Area would be
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:9: Environmental Protection Team, Correspondence by email was Chapter E (Noise and Vibration)
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:10: Environmental Protection Team, Correspondence by email was Chapter F (Air Quality) and
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:22: Protection and Monitoring Programme, prepared
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:22: Appendix H8: Design of a Site Protection and
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:24: protection objectives established at Union or Member State
R-2020-0357-OOM-Officer report.pdf:4: Coast Special Protection Area (SPA) and Ramsar site
R-2020-0357-OOM-Officer report.pdf:6: Coast Special Protection Area (SPA) and Ramsar site
R-2020-0357-OOM-Officer report.pdf:12:which can be found on gov.uk and include Groundwater Protection, EA
R-2020-0357-OOM-Officer report.pdf:12:Approach to Groundwater Protection, Land Contamination
R-2020-0357-OOM-Officer report.pdf:16:protection of the public. However, the possibility remains that a major accident
R-2020-0357-OOM-Officer report.pdf:20:With reference to the protection of the railway, Network Rail has no objection
R-2020-0357-OOM-Officer report.pdf:21:Asset Protection Project Manager should be undertaken. Network Rail will not
R-2020-0357-OOM-Officer report.pdf:22:applicant must contact Network Rail’s Asset Protection Project Manager.
R-2020-0357-OOM-Officer report.pdf:22:Protection Project Manager at the below address for approval prior to works
R-2020-0357-OOM-Officer report.pdf:22:management plan. Where appropriate an asset protection agreement will
R-2020-0357-OOM-Officer report.pdf:22:Network Rail’s Asset Protection Project Manager and are subject to a
R-2020-0357-OOM-Officer report.pdf:22:condition without direct discussion and agreement with our Asset Protection
R-2020-0357-OOM-Officer report.pdf:22:Team and the developer entering into a Basic Asset Protection Agreement
R-2020-0357-OOM-Officer report.pdf:22:proposals with Asset Protection prior to applying for the discharge of
R-2020-0357-OOM-Officer report.pdf:22:condition. Contact details for Asset Protection are below.
R-2020-0357-OOM-Officer report.pdf:23:works commencing on site the Asset Protection Project Manager (OPE)
R-2020-0357-OOM-Officer report.pdf:23:method statement must be obtained from Network Rail’s Asset Protection
R-2020-0357-OOM-Officer report.pdf:23:disruption and delay to rail users. Consultation with the Asset Protection
R-2020-0357-OOM-Officer report.pdf:23:there may be a need to fit bridge protection barriers which may be at the
R-2020-0357-OOM-Officer report.pdf:23:would request that the applicant contact our Asset Protection Project Manager
R-2020-0357-OOM-Officer report.pdf:24:needs to be agreed by the Asset Protection Project Manager prior to
R-2020-0357-OOM-Officer report.pdf:24:must seek approval from the Network Rail Asset Protection Team. Any
R-2020-0357-OOM-Officer report.pdf:31:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0357-OOM-Officer report.pdf:32:requirements for remediation and/or gas protection measures;
R-2020-0357-OOM-Officer report.pdf:33:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0357-OOM-Officer report.pdf:34:Redcar and Cleveland Borough Council (Environmental Protection) (Air
R-2020-0357-OOM-Officer report.pdf:58: level of 85dBA, which is relevant to hearing protection zones in the
R-2020-0357-OOM-Officer report.pdf:73:Appendix H7: First Phase Reporting of the Site Protection and Monitoring
R-2020-0357-OOM-Officer report.pdf:73:Appendix H8: Design of a Site Protection and Monitoring Programme for
R-2020-0357-OOM-Officer report.pdf:76:that should be included relate to the protection of human health receptors and
R-2020-0357-OOM-Officer report.pdf:85:d Support the expansion and protection of the port and logistics sector;
R-2020-0357-OOM-Officer report.pdf:112: identify the need for environmental protection.
R-2020-0357-OOM-Officer report.pdf:117: site. Any protection measures or gas mitigation will be complied with
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:4: the protection and conservation of landscape within the study area. Current planning policy and
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:4: Plans, planning positively for the creation, protection, enhancement and management of
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:5: 1 N1 Landscape - supports the protection and enhancement of the Borough’s landscape based
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:5: 2 N4 Biodiversity and Geological Conservation - supports the protection and enhancement of
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:5: 1 Development Principle STDC7: Natural Environmental Protection and Enhancement states
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:30: peninsula Special protection Area (SPA) and Ramsar site, and also
R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:48:L5.25 The sensitivity of this LCZ is Medium, as this area is designated as having Special Protection
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:2:Asset protection agreements………………………………………………………………… 12
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:3:Transmission assets. Plant protection
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:3:basic safety and the location of our assets – the Plant Protection team online, by email, such as a cable strike, coming
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:3:does not authorise or agree safe systems Email: plantprotection@nationalgrid.com
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:3:of towers and cables. We also work with National Grid Plant Protection 30m of a National Grid asset,
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:6:contact Plant Protection: to the conductors. Available clearances will be which provides advice on how to avoid danger
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:6:Email: plantprotection@nationalgrid.com are carrying out work near overhead lines you
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:12: Asset protection agreements
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:12:assets, we will insist on an asset protection agreement being put in place. The cost of
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:12:electricity line, do not approach it, even at ground level. plantprotection@nationalgrid.com
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:12:• Call our 24-hour electricity emergency number: Call Plant Protection for free on:
R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:12: tower number of an adjacent pylon National Grid Plant Protection,
R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank.pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/.
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:18: Protection acknowledges sensitive receptors defined as this SES
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:18: Protection planning application and the design of future these matters is
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:18: Protection submitted in the ES (July 2020) covers the are ongoing and
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:30: (Tringa totanus), a qualifying feature of the Teesmouth and Cleveland Coast Special Protection
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:35: of nesting birds. Legal protection is afforded to all breeding bird species, their nests, their eggs,
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:60: guidance document 4 produced by Environmental Protection UK (EPUK) and the IAQM.
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:64: (SSSI) (which also has geological interest) and the Special Protection Area (SPA)/Ramsar site
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:78: 27 EPUK Environmental Protection UK
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:79: 59 pSPA proposed Special Protection Area
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:79: 64 SPA Special Protection Area
R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:81: https://www.redcar-cleveland.gov.uk/resident/environmental-protection/air-
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:6:Special Area of Conservation (SAC) and Special Protection Area (SPA), Durham
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:9:Wild Flora and Fauna provides legal protection for habitats and species of
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:10:Offshore Marine SACs and Special Protection Areas (SPAs). However, it is
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:16: NE (2018) Departmental Brief: Teesmouth and Cleveland Coast potential Special Protection
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:16: JNCC. North York Moors Special Protection Area Information Sheet. Available:
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:16: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available:
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:16: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available:
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:19:development, including three Special Protection Areas (SPA), three SACs, and
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:19:13 Natural England (2019) Teesmouth and Cleveland Coast potential Special Protection Area
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:25:Protection Area Site Code: UK9006161. Available at:
R-2020-0357-OOM-Habitats Regulation Assessment.pdf:52: of Protection
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1: Plant Protection
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1: E-mail: plantprotection@cadentgas.com
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1:Can you please inform Plant Protection, as soon as possible, the decision your authority is likely
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1:Please let us know whether Plant Protection can provide you with technical or other information that may be of
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1:referred your enquiry/consultation to our Asset Protection team for further detailed
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:1:date of this response. Please contact us at assetprotection@nationalgrid.com if you have not had a
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:2:should contact Plant Protection before any works are carried out to ensure the apparatus is not affected by
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:2: any such restrictions from the landowner in the first instance and if in doubt contact Plant Protection.
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:2:If you require further assistance please contact the Plant Protection team via e-mail (click here) or via the
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:2:Plant Protection Team
R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:3: Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:7:pSPA Potential Special Protection Area
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:7:SPA Special Protection Area
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:9: • Planning for the Protection of European Sites: Guidance for Regional Spatial
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:12: protection of ‘European sites’, the protection of ‘European protected species’, and the
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:12: adaptation of planning and other control for the protection of European sites” (JNCC, 2010).
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:12: guidance “Planning for the Protection of European Sites: Appropriate Assessment”. These
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:35:Department for Communities and Local Government (2006) Planning for the Protection of European
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:35:Special Protection Area (pSPA) and Ramsar. Online Available at:
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:36:Special Protection Area and potential Special Protection Area. Site Code: UK9006061. Online
R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:36:Protection Area. Site Code: UK9006161. Online Available at:
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:13:SEPA Scottish Environment Protection Agency
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:13:SPA Special Protection Area, protected under the EU Habitats Directive
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:23: • the protection of the environment and natural resources;
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:35: Fire Fighting Water Tank - A fire protection water storage tank will be provided on
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:39: conditions may provide protection for migratory fish and eels, and may limit
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:40: Network Rail In relation to the protection of the railway, any Environmental Impact
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:44: vulnerability or rarity, its level of statutory or non-statutory protection, special
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: controls. Generally, the priority for the protection of designated sites is as follows:
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: and Wales. The Regulations provide for the designation and protection of 'European
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: protection of European Sites.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: to ensure better protection and management of SSSIs and safeguard their existence
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: The protection afforded to sites by local authority designations, such as County Wildlife
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: avoiding development in these areas, there is no statutory protection process.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:49: protection through international, European and national law. The Conservation of
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:50: The Wildlife and Countryside Act 1981 (as amended) affords various levels of protection
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:50: conservation. For example, the Badger is afforded protection under the Protection of
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:51: Protection Area/Ramsar and European Marine Site, and the
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:51: North York Moors Special Protection Area and Special Area
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:55: Protection Area (SPA) and Ramsar site and is located 1.6km north west, at its closest
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:56: Common Name Scientific Name Status / Protection Most recent
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:57: afforded full protection under Schedule 5 of the Wildlife and Countryside Act (1981).
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:57: of which are afforded protection under Section 41 of the NERC Act (2006). Several
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:57: Common Scientific Name Status / Protection Most recent
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:94: • STDC7: Natural Environmental Protection and Enhancement
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:95: Cleveland Coast Special Protection Area (SPA), Teesmouth and Cleveland Coast
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:95: Protection Areas.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:96: Cleveland Coast Special Protection Area (SPA), Teesmouth and Cleveland Coast
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:96: Protection Areas.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:101: Protection Area (SPA), Ramsar Site and Teesmouth National Nature Reserve;
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:102: inherent natural value of the landscape by ensuring its continued protection and
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:118: mitigation) with respect to the protection of the water environment in Section 8.5. The
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:119: Framework Directive (WFD) protection and sustainable use of the water environment on a
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:119: impoundment and protection of water resources. Elements of
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:120: • Environment Agency (EA) Principles and Practice for the Protection of
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:127: Special Protection Areas (SPAs).
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:127: EA Source Protection Zones and 2009 River Basin
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:132: Source Protection Zones (SPZs) (inner, outer and total catchment) are defined around
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:132: with the EA’s Groundwater Protection Policy (GP3) to set up pollution prevention
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:141: the Environmental Protection Act 1990.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:145: Environmental Protection Act 1990.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:145: Environmental Protection Act 1990.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:148: into account the legislative protection afforded to water resources, through relevant
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:150: • A floodplain or flood storage area with limited or no flood protection
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:166:Abstraction from a Adverse impact Medium Minor - moderate • Protection for migratory fish and eels, and
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:167: protection for built heritage. In considering whether to grant planning permission for a
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:167: the protection and enhancement of the historic environment in plan-making and decision
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:175: the remediation works (protection and fencing) by STDC it is proposed that a retained area
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:193: • The staff and visitor car park should have the same level of protection as the rest
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:200: Environmental Protection Act (1990). The Act defines nuisance as:
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:201: contributes to habitat protection, safeguards biodiversity and enhances green
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:201: protection and encourage biodiversity and long term sustainability;”
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: Protection of Nature Conservation Sites
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: provided environmental protection from developments, including from emissions to air.
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: Similarly, the Countryside and Rights of Way (CRoW) Act 2000 provides protection to
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:203: Guidance produced by Environmental Protection UK (EPUK), and IAQM in January 2017
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:203: “Compliance with the limit values directed at the protection of human health shall not
R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:204: as protection is covered by Health and Safety at Work
R-2019-0767-OOM-Memo Style.pdf:1:Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files.
R-2019-0767-OOM-EA R_2019_0767_OOM 29 Jan 2020 OFFICIAL.pdf:1:The Environmental Protection (Duty of Care) Regulations 1991 for dealing with waste
R-2019-0767-OOM-MGE04027.pdf:1:Environmental Protection Planning Consultation Response
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:7:pSPA Potential Special Protection Area
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:7:SPA Special Protection Area
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:9: • Planning for the Protection of European Sites: Guidance for Regional Spatial
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:12: protection of ‘European sites’, the protection of ‘European protected species’, and the
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:12: adaptation of planning and other control for the protection of European sites” (JNCC, 2010).
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:12: guidance “Planning for the Protection of European Sites: Appropriate Assessment”. These
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:35:Department for Communities and Local Government (2006) Planning for the Protection of European
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:35:Special Protection Area (pSPA) and Ramsar. Online Available at:
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:36:Special Protection Area and potential Special Protection Area. Site Code: UK9006061. Online
R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:36:Protection Area. Site Code: UK9006161. Online Available at:
R-2019-0767-OOM-Figure 6-1 Designated Sites.pdf:1: Potential Special Protection Areas
R-2019-0767-OOM-Figure 6-1 Designated Sites.pdf:1: Special Protection Areas
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:10:– Ramsar, Special Area of Conservation (SAC) and Special Protection Area (SPA) sites within 5 km of the site
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:13:environment, protects the historic environment, contributes to habitat protection, safeguards biodiversity and
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:13:“To reduce pollution, contribute to sustainable flood risk management and habitat protection and encourage
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:14: 2.2.4 Protection of Nature Conservation Sites
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:14:protection from development, including from emissions to air.
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:14:Similarly, the Countryside and Rights of Way (CRoW) Act 2000 provides protection to Sites of Special Scientific
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15:Guidance produced by Environmental Protection UK (EPUK) and the IAQM in January 2017 entitled ‘Land-Use
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:16:“Compliance with the limit values directed at the protection of human health shall not be assessed at the following
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:17:The officer from the Environmental Protection (Contaminated Land) and (Nuisance) team at the Council stated:
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:69:EPUK Environmental Protection UK
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:69:SPA Special Protection Area
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:72:range of measures for the protection of habitats and species, which was transposed into law in England and
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:72:and maintenance of a register of European sites, to include SACs and Special Protection Areas (SPAs), with these
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:73:The Regulations primarily provide measures for the protection of European Sites and European Protected
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:73:Wildlife and Countryside Act (1981). Improved provisions for the protection and management of SSSIs (in England
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:73:consulted. The CROW act also provides protection to local nature conservation sites, which can be particularly
R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:81:Environmental Protection Agency (EPA) guidance (2018) and associated with the different land uses in the 2018
R-2019-0767-OOM-312932 R_2019_0767_OOM - Further info for Energy from Waste facility, John Boyle Rd, Grangetown, Redcar.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar
R-2019-0767-OOM-312932 R_2019_0767_OOM - Further info for Energy from Waste facility, John Boyle Rd, Grangetown, Redcar.pdf:1:have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area (SPA)
R-2019-0767-OOM-Environmental Statement ES Volume 2.pdf:7:SEPA Scottish Environment Protection Agency
R-2019-0767-OOM-Environmental Statement ES Volume 2.pdf:7:SPA Special Protection Area, protected under the EU Habitats Directive
R-2019-0767-OOM-Appendix D Landscape and Visual Impact Tables.pdf:1: protection of blast furnaces on site.
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:6:SPA Special Protection Area
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:15: • Fire Fighting Water Tank - A fire protection water storage tank will be
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:19: The WFD specifies that areas requiring special protection under other EC Directive and
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:19: to the Teesmouth and Cleveland Coast which is designated as a Special Protection Area
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:30: Tees Diffuse Pollution Physical modification – Flood Protection Use. Navigation,
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:30: Creation. The proposal is not related to Flood Protection
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:30: Tees Coastal Physical modification Physical modification – Flood Protection Use. Navigation,
R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:30: ports and harbours use. Coast protection use. There are
R-2019-0767-OOM-R-2019-0767-OOM-Archaeological Advice - Grangetown ERF R-2019-0767-OOM.pdf:5: - Protection during development, followed by consolidation and preservation of high value remains left
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:7:SPA Special Protection Area
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:11: Fire Fighting Water Tank - A fire protection water storage tank will be provided on site.
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:20: • the protection of the environment and natural resources;
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:26: Section 16 outlines policies for the protection and enhancement of the historic environment in plan-
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:31: STDC7: Natural Environmental Protection and Enhancement requires the Council in
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:34: Special Protection Area (SPA) and Ramsar and the underlying Teesmouth and Cleveland Coast Site
R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:35: potential Special Protection Area (pSPA) and proposed Ramsar site (HBC, 2019a). These
R-2019-0767-OOM-Appendix B Scoping Response.pdf:3:conditions may provide protection for migratory fish and eels, and may limit the periods when
R-2019-0767-OOM-Appendix B Scoping Response.pdf:5:In relation to the protection of the railway, any Environmental Impact Assessment for the site should
R-2019-0767-OOM-Appendix B Scoping Response.pdf:8:Environmental Protection (Contaminated Land) and (Nuisance) 26
R-2019-0767-OOM-Appendix B Scoping Response.pdf:9:In terms of environmental considerations and adjacent special protection areas, I would support fully,
R-2019-0767-OOM-NETWORK RAIL.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but
R-2019-0767-OOM-NETWORK RAIL.pdf:1:Asset Protection
R-2019-0767-OOM-NETWORK RAIL.pdf:1:railway boundary, they should consult with our Asset Protection Team (details below) to ensure that there will be no
R-2019-0767-OOM-NETWORK RAIL.pdf:1:Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement,
R-2019-0767-OOM-NETWORK RAIL.pdf:2:to be agreed by the Asset Protection Project Manager prior to implementation.
R-2019-0767-OOM-NETWORK RAIL.pdf:2:Our Asset Protection Team can be contacted as follows if required during these works:
R-2019-0767-OOM-NETWORK RAIL.pdf:2:Asset Protection Project Manager
R-2019-0767-OOM-NETWORK RAIL.pdf:2:Email: assetprotectionlneem@networkrail.co.uk
R-2019-0767-OOM-Non Technical Summary_Final.pdf:6:Fire Fighting Water Tank - A fire protection water storage tank will be provided on site.
R-2019-0767-OOM-Non Technical Summary_Final.pdf:11:SPA Special Protection Area for birds, protected under the EU Habitats Directive
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:7:pSPA Potential Special Protection Area
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:7:SPA Special Protection Area
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:9: • Planning for the Protection of European Sites: Guidance for Regional Spatial
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:12: protection of ‘European sites’, the protection of ‘European protected species’, and the
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:12: adaptation of planning and other control for the protection of European sites” (JNCC, 2010).
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:12: guidance “Planning for the Protection of European Sites: Appropriate Assessment”. These
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:40:Department for Communities and Local Government (2006) Planning for the Protection of European
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:40:Special Protection Area (pSPA) and Ramsar. Online Available at:
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:41:Special Protection Area and potential Special Protection Area. Site Code: UK9006061. Online
R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:41:Protection Area. Site Code: UK9006161. Online Available at:
R-2019-0767-OOM-MGE04028.pdf:1:Environmental Protection Planning Consultation Response
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:46:conditions may provide protection for migratory fish and eels, and may limit the periods when
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:48:In relation to the protection of the railway, any Environmental Impact Assessment for the site should
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:50:sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall within the
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:50:Protection Areas, possible Special Areas of Conservation, listed or proposed Ramsar sites, and any
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:50:Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites)
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:54:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra
R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:58:14. Environmental Protection (Contaminated Land) and (Nuisance) 30 October 2019
R-2019-0767-OOM-officer report.pdf:3:With reference to the protection of the railway, Network Rail has no objection
R-2019-0767-OOM-officer report.pdf:3:Asset Protection
R-2019-0767-OOM-officer report.pdf:3:with our Asset Protection Team (details below) to ensure that there will be no
R-2019-0767-OOM-officer report.pdf:3:Asset Protection Project Manager should be undertaken. Network Rail will not
R-2019-0767-OOM-officer report.pdf:4:needs to be agreed by the Asset Protection Project Manager prior to
R-2019-0767-OOM-officer report.pdf:5:Teesmouth and Cleveland Coast Special Protection Area (SPA) proposed
R-2019-0767-OOM-officer report.pdf:6:European sites – Teesmouth and Cleveland Coast Special Protection
R-2019-0767-OOM-officer report.pdf:6:Cleveland Coast Special Protection Area (SPA) and Ramsar site and has no
R-2019-0767-OOM-officer report.pdf:8:the energy recovery process. The Environmental Protection (Duty of Care)
R-2019-0767-OOM-officer report.pdf:12:Redcar and Cleveland Borough Council (Environmental Protection)
R-2019-0767-OOM-officer report.pdf:12:Redcar and Cleveland Borough Council (Environmental Protection)
R-2019-0767-OOM-officer report.pdf:20: - Protection during development, followed by consolidation and
R-2019-0767-OOM-officer report.pdf:31: level of statutory or non-statutory protection, special expertise, views of
R-2019-0767-OOM-officer report.pdf:35: protection under Section 41 of the NERC Act (2006). Several records
R-2019-0767-OOM-officer report.pdf:66: • Ramsar, Special Area of Conservation (SAC) and Special Protection
R-2019-0767-OOM-officer report.pdf:79: v. Protection during development, followed by consolidation and
R-2019-0767-OOM-officer report.pdf:83:Asset Protection
R-2019-0767-OOM-officer report.pdf:83:with our Asset Protection Team (details below) to ensure that there will be no
R-2019-0767-OOM-officer report.pdf:84:Asset Protection Project Manager should be undertaken. Network Rail will not
R-2019-0767-OOM-officer report.pdf:84:needs to be agreed by the Asset Protection Project Manager prior to
R-2019-0767-OOM-officer report.pdf:85:The Environmental Protection (Duty of Care) Regulations 1991 for dealing
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:3: (v) Protection during development, followed by consolidation and
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:7: Asset Protection
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:7: consult with our Asset Protection Team (details below) to ensure that there
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:7: affect the railway, consultation with the Asset Protection Project Manager
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:8: needs to be agreed by the Asset Protection Project Manager prior to
R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:8: The Environmental Protection (Duty of Care) Regulations 1991 for dealing
R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf:4:Protection Area (SPA) and Ramsar Site. The HRA will be screened and, as
R-2019-0767-OOM-MGE 04020.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0831-CD-393340-R_2021_0831_CD-NE_Response.pdf:2:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2021-0831-CD-DECISION NOTICE 0357.pdf:3: for environmental protection.
R-2021-0831-CD-DECISION NOTICE 0357.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: and legislation in respect of biodiversity protection and enhancement by:
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:10: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:11: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4:1.1 There is an increasing focus on habitat protection and biodiversity enhancement in the UK.
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: and emerging legislation in respect of biodiversity protection and enhancement by:
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:4: benefits including protection of habitats and addressing any significant impacts of development
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:7: The decontamination and reuse of the land would contribute to the protection and
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: enhance the borough’s biodiversity and geological resources and prioritises the protection of
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: protection of designated SPAs on-site within the Teesworks area (i.e. at South Gare/ Coatham
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:9: process, with appropriate protection and enhancement measures incorporated into the design
R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:10: area. Development Principle STDC7: Natural Environmental Protection and Enhancement
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:13:is aware of their responsibilities under the Control of Pollution Act and the Environmental Protection Act.
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:16:Compliance with all aspects of the Duty of Care (Environmental Protection Act 1990) will be achieved during
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:29:The Construction (Head Protection) Regulations 1989
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:29:Environmental Protection Act 1990
R-2022-0454-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:13:is aware of their responsibilities under the Control of Pollution Act and the Environmental Protection Act.
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:16:Compliance with all aspects of the Duty of Care (Environmental Protection Act 1990) will be achieved during
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:29:The Construction (Head Protection) Regulations 1989
R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:29:Environmental Protection Act 1990
R-2022-0454-CD-PN 0454.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0454-CD-CON LAND 0454.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0057-VC-CON LAND 0057.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0057-VC-email.pdf:3:information contained in correspondence. For more information on our privacy practices and your data protection
R-2021-0057-VC-email.pdf:12:whether a repair is required or to reinstate the corrosion protection coating system. Please note
R-2021-0057-VC-email.pdf:15: Installation of HV cabling near wayleave (cathodic protection interference) YES NO
R-2021-0057-VC-Officer report _R20210057VC.pdf:3:liaise with our Asset Protection Team
R-2021-0057-VC-Officer report _R20210057VC.pdf:3:(assetprotectioneastern@networkrail.co.uk) for the construction of such
R-2021-0057-VC-Officer report _R20210057VC.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0057-VC-Officer report _R20210057VC.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0057-VC-Officer report _R20210057VC.pdf:7:environmental protection section who have raised no objection subject to
R-2021-0057-VC-PN 0057.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0057-VC-0817 network rail.pdf:1:condition. However, we would remind the developer that they should liaise with our Asset Protection Team
R-2021-0057-VC-0817 network rail.pdf:1:(assetprotectioneastern@networkrail.co.uk) for the construction of such mounds at the other sites shown on the
R-2021-0057-VC-NGN.pdf:4: may affect a cover or protection.
R-2021-0725-CD-HOLME BECK PIPED CULVERT NORTH SECTION CH 675.000 TO 773.000 - STDC_HWY-ATK-HDG-PR-DR-CH-000002_C02.pdf:1: PROTECTION
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf:1: - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf:1: EXISTING 225Ømm PIPE TO BE DIVERTED AT LENGTH OF STONE SCOUR PROTECTION TO 150Ømm GROUNDWATER - PROPOSED BOUNDARY FENCE & MAINTENANCE
R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT KEY AND NOTES (STDC_HWY-ATK-HDG-PR-DR-CD-000001_C01).pdf:1: DRAWINGS THE DESIGN ENGINEER SHOULD BE INFORMED PRIOR HOLME BECK SYSTEM - PROPOSED SCOUR PROTECTION ALLOWANCE SHOULD BE MADE FOR GRADIENT OF
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf:1: WITH HYDROBRAKE AND - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf:1: PROTECTION TO BE PROVIDED AT
R-2021-0725-CD-HOLME BECK PIPED CULVERT SOUTH SECTION CH 0.000 TO 25.000 - STDC_HWY-ATK-HDG-PR-DR-CH-000001_C02.pdf:1: PROTECTION
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf:1: - SCOUR PROTECTION AT HEADWALL LOCATIONS
R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf:1: PROTECTION TO BE PROVIDED AT SAFETY, HEALTH AND ENVIRONMENTAL
R-2021-0725-CD-HOLME BECK WATERCOURSE DITCH AND DETENTION BASIN (STDC_HWY-ATK-HDG-PR-DE-CD-000002_C02).pdf:1: HOLME BECK SCOUR PROTECTION DETAIL
R-2021-0725-CD-HOLME BECK WATERCOURSE DITCH AND DETENTION BASIN (STDC_HWY-ATK-HDG-PR-DE-CD-000002_C02).pdf:1: HOLME BECK DITCH TO PROVIDE SCOUR PROTECTION Drawing Suitability Status
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:11:contours indicating a flow to the north. The site is not located within a Groundwater Source Protection Zone
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:16:groundwater receptors at the site. It is noted that the site is not located within a Source Protection Zone (SPZ)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:20: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:22:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:11:contours indicating a flow to the north. The site is not located within a Groundwater Source Protection Zone
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:16:groundwater receptors at the site. It is noted that the site is not located within a Source Protection Zone (SPZ)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:20: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:22:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:370:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:372:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:373:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:374: Protection industry standards
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:89:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:91:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:92:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf:93: Protection industry standards
R-2020-0743-CD-Re-use of Iron Steel Slag Response Letter FINAL.pdf:2:• Factor 1: Protection of Human Health and Protection of the Environment
R-2020-0743-CD-CON LAND 743.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0743-CD-MGE04198 Cont Land.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:12:Groundwater Source Protection Zone and given the proximity to the Tees Estuary groundwater is likely
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:17:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:18:for managing potentially aggressive ground conditions and management / protection for ground gas are
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:28: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:31:to provide temporary drainage facilities and protection measures (such as silt fences) as necessary to
R-2020-0743-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0743-CD-COMPLIANCE OFFICER REPORT.pdf:2:The submission has been considered by the Councils environmental protection
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:12:The site is not located within a Groundwater Source Protection Zone and given the proximity to the Tees
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:22:groundwater receptors at the site. It is noted that the site is not located within a Source Protection Zone (SPZ)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:26: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:28:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:190:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:205:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:207:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at https://www.epa.gov/risk/regional-screening-levels-rsls-generic-
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:208:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:209:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2023-0224-CD-50134151_1_CPP.pdf:4:5.31 Fire Prevention and Protection ………………………………………………………………………………….. 57
R-2023-0224-CD-50134151_1_CPP.pdf:12: RPE (respiratory protection equipment to be appropriate for the task)
R-2023-0224-CD-50134151_1_CPP.pdf:13: All Contractors must provide suitable hearing protection at the first
R-2023-0224-CD-50134151_1_CPP.pdf:13: Designated hearing protection zones with appropriate signage
R-2023-0224-CD-50134151_1_CPP.pdf:13:Exposure to Sun Burn All operatives shall wear full body protection at all times whilst on site.
R-2023-0224-CD-50134151_1_CPP.pdf:21: To constantly guide Contractor workers, to implement the required HSE protection measures required
R-2023-0224-CD-50134151_1_CPP.pdf:35:Drivers operating plant with windows open must wear eye protection when in the cab of the machine.
R-2023-0224-CD-50134151_1_CPP.pdf:36: warning/audible alarm, seat belts; whenever possible roll-over protection and reversing cameras
R-2023-0224-CD-50134151_1_CPP.pdf:37: Footwear: Safety boots (no trainers or shoes) with toe and mid-sole protection approved to 200 joule
R-2023-0224-CD-50134151_1_CPP.pdf:37: Eye Protection: Clear safety glasses (to EN 166 or equivalent) shall be worn at all times on the
R-2023-0224-CD-50134151_1_CPP.pdf:37: o Adequate face protection must be worn in addition to suitable eye protection when grinding,
R-2023-0224-CD-50134151_1_CPP.pdf:38: Hearing protection must be available and worn as indicated by risk assessment or when noise levels
R-2023-0224-CD-50134151_1_CPP.pdf:38: protection must be worn where noise levels are above 85 (dB). Hearing protection shall meet the
R-2023-0224-CD-50134151_1_CPP.pdf:38: Respiratory Protection Equipment (RPE) shall be suitable for the hazard identified through risk
R-2023-0224-CD-50134151_1_CPP.pdf:38: used). The type and protection factor of the RPE shall be detailed in the RAMS and will comply with the
R-2023-0224-CD-50134151_1_CPP.pdf:38: effective physical fall protection cannot be provided to the workers.
R-2023-0224-CD-50134151_1_CPP.pdf:38:Working at Height with fall personal protection system, excavation, pressure tests, radiography tests,
R-2023-0224-CD-50134151_1_CPP.pdf:41:height using non-metalling hangers/fixing tools or protected by possible crashing with adequate protections.
R-2023-0224-CD-50134151_1_CPP.pdf:41:Temporary distribution boards shall be provided with the right protection against water and dust and secured
R-2023-0224-CD-50134151_1_CPP.pdf:41:The cables should be properly terminated and be provided with efficient circuit protection.
R-2023-0224-CD-50134151_1_CPP.pdf:41:cables should be treated with care and given the same supervision and protection as other cables.
R-2023-0224-CD-50134151_1_CPP.pdf:45:manner that they provide adequate protection.
R-2023-0224-CD-50134151_1_CPP.pdf:45:do not offer adequate protection from falls.
R-2023-0224-CD-50134151_1_CPP.pdf:46:All floor/roof openings not afforded standard rail system protection shall be covered with substantial covers.
R-2023-0224-CD-50134151_1_CPP.pdf:46:All floor and wall opening protection, either handrails or covers, shall be tagged with signs: ‘DANGER - RISK
R-2023-0224-CD-50134151_1_CPP.pdf:46: In the cases where the installation of a standard handrail system is not feasible, other fall protection
R-2023-0224-CD-50134151_1_CPP.pdf:49:with safety gloves with the appropriate cut protection.
R-2023-0224-CD-50134151_1_CPP.pdf:52:of fixed scaffold tubing which is subject to weekly inspection. For temporary edge protection barriers (in
R-2023-0224-CD-50134151_1_CPP.pdf:52:Fall protection equipment, full body harnesses, lanyards, lifelines and inertia reel or any other types of fall
R-2023-0224-CD-50134151_1_CPP.pdf:52:protection equipment, shall be used where staging, scaffolding or other safe means of access is not
R-2023-0224-CD-50134151_1_CPP.pdf:52:platforms, scaffold erection. Fall protection must be maintained 100% of the time when exposed to a fall.
R-2023-0224-CD-50134151_1_CPP.pdf:52:or of fall prevention or protection must be subject to formal regular inspection by the Contractor. All defective
R-2023-0224-CD-50134151_1_CPP.pdf:52:or non-inspected equipment that is or could be used for Work at Height or for fall prevention or protection
R-2023-0224-CD-50134151_1_CPP.pdf:57:of more than 3 metres vertical rise shall provide platform stages and/or fall protection.
R-2023-0224-CD-50134151_1_CPP.pdf:57:5.31 Fire Prevention and Protection
R-2023-0224-CD-50134151_1_CPP.pdf:58:of galvanised fittings is to be avoided, but when required, respiratory protection must be worn, subject to risk
R-2023-0224-CD-50134151_1_CPP.pdf:58: Face and eye protection with correct grade of filter. This includes light eye protection under welding hood
R-2023-0224-CD-50134151_1_CPP.pdf:58: Neck protection as applicable
R-2023-0224-CD-50134151_1_CPP.pdf:60: Providing suitable hearing protection at the first action level (80 dB(A)), and introducing controls at the
R-2023-0224-CD-50134151_1_CPP.pdf:60: Designated hearing protection zones with appropriate signage.
R-2023-0224-CD-50134151_1_CPP.pdf:60: Radiography work must be supervised by a Qualified Radiation Protection Supervisor. Such
R-2023-0224-CD-50134151_1_CPP.pdf:61:All operatives shall wear full body protection at all times while on site. Sunblock shall be supplied by
R-2023-0224-CD-50134151_1_CPP.pdf:65:that they will implement on site for protection against the virus for their own workers and other site workers.
R-2023-0224-CD-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf:12: use of surplus wood to fabricate site storage boxes and protection of permanent
R-2023-0224-CD-50134216_1_CEMP.pdf:16: Environmental Protection Act 1990; and
R-2023-0224-CD-50134216_1_CEMP.pdf:30:The Executive Board of Hitachi Zosen lnova are committed to ensuring that the protection of
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:8:2.3 The Conservation of Habitats and Species Regulations 2017 (as amended) provide for the protection
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:8: network’ includes Special Areas of Conservation (SACs) and Special Protection Areas (SPAs) that
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:28: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:74: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:74: Protection Area (pSPA) and Ramsar.
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:74: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:76: Special Protection Area (SPA)
R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:5.9 Water Quality Protection
R-2023-0224-CD-GrasscreteBrochure.pdf:3: • Fire and emergency access • Slope protection
R-2023-0224-CD-GrasscreteBrochure.pdf:4: slope protection works.
R-2023-0224-CD-GrasscreteBrochure.pdf:8: slope protection
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.5. Air Quality Standards for the Protection of Human Health 12
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.6. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems - Critical Levels 15
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.7. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems - Critical Loads 16
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen 101
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Sulphur Dioxide 103
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Ammonia 104
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride 106
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen 145
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Sulphur Dioxide 147
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Ammonia 148
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride 150
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:5:Table 3: Air Quality Standards for the Protection of Human Health 13
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:5:Table 4: Assessment Criteria for the Protection of Sensitive Habitats and Ecosystems 16
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:8:EPUK Environmental Protection UK
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:9:SEPA Scottish Environment Protection Agency
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:9:SPA Special Protection Areas
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:11: set for the protection of Ecosystems.
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:12: Protection of Ecosystems or Vegetation detailed in the Environment Agency’s online
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:17: • Special Protection Areas (“SPAs”) and potential SPAs designated under the EC Birds
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:21:2.5. Air Quality Standards for the Protection of Human Health
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:21: Values and EALs - are intended to be used as guidelines for the protection of human health
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:22: Table 3: Air Quality Standards for the Protection of Human Health
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:23: Table 3: Air Quality Standards for the Protection of Human Health (Cont.)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24: Table 3: Air Quality Standards for the Protection of Human Health (Cont.)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24:2.6. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24:2.6.2. The 2008 Air Quality Directive 13 set limit values for the protection of vegetation and
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:25: Table 4: Assessment Criteria for the Protection of Sensitive Habitats and
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:25:2.7. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:71: ambient air for the protection of human health, May 2009).
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:83: 90m will provide slightly greater environmental protection (compared to stack heights of
R-2023-0224-CD-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:10: conservation, restoration and re-creation of priority habitats, ecological networks and the protection
R-2023-0224-CD-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:10: be considered at an early stage in the development process, with appropriate protection and
R-2023-0224-CD-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:24: Special Protection Area (SPA)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:3: Department Health Protection Healthcare Quality
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:3: Environmental Protection Team
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:3: Environmental.protection@redcar-
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:7:The Environmental Protection Team participated in National Clean Air Day 2019 by
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:8:2019 events theme was Clean Air. The Environmental Protection Team were able to
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:8:The Environmental Protection Team continue to provide advice to a range of internal
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:8:burning stoves. The Environmental Protection Team began a publicity campaign
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:8:Environmental Protection Team can be found using the link below:
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:9:protection/Pages/environmental-protection.aspx
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:15: The annual South Tees Health Protection Conference held on 20th
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:15: Environmental Protection Team attended the festival and were approached by
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:21:1980’s which remain in place today. The Environmental Protection Team has noted a
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:62:2.3 The Conservation of Habitats and Species Regulations 2017 (as amended) provide for the protection
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:62: network’ includes Special Areas of Conservation (SACs) and Special Protection Areas (SPAs) that
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:82: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:129: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:156: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:156: Protection Area (pSPA) and Ramsar.
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:156: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:158: Special Protection Area (SPA)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:170: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:170: Protection Area (pSPA) and Ramsar.
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:170: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:172: Special Protection Area (SPA)
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:181:Cleveland Coast Special Protection Area (SPA) and Ramsar site, either individually or in
R-2023-0224-CD-PN 0224.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:12: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: Protection Area (pSPA) and Ramsar.
R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:41: Special Protection Area (SPA)
R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:9: hearing protection meeting the requirements of EN 352 or equivalent must be
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:3: (v) Protection during development, followed by consolidation and
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:7: Asset Protection
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:7: consult with our Asset Protection Team (details below) to ensure that there
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:7: affect the railway, consultation with the Asset Protection Project Manager
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:8: needs to be agreed by the Asset Protection Project Manager prior to
R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:8: The Environmental Protection (Duty of Care) Regulations 1991 for dealing
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:18: Critical Levels for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:20: Critical Levels for the Protection of Vegetation and Ecosystems - Sulphur Dioxide
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:21: Critical Levels for the Protection of Vegetation and Ecosystems - Ammonia
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:23: Critical Levels for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:62: Critical Levels for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:64: Critical Levels for the Protection of Vegetation and Ecosystems - Sulphur Dioxide
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:65: Critical Levels for the Protection of Vegetation and Ecosystems - Ammonia
R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:67: Critical Levels for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride
R-2023-0224-CD-CON LAND 0224.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:16: Protection Area (SPA), Ramsar Site and Teesmouth National Nature Reserve;
R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:45: opportunities for species migration to more suitable habitats and the protection of
R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:47: considerations. In such cases appropriate mitigation will be required. Protection will
R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:69: Special Protection Area
R-2023-0247-OOM-428285 - R_2023_0247_OOM Outline application for bottom ash facility Grangetown Prairie Land East of John Boyle Road - No Objection subject to mitigation.pdf:1: Protection Area and Ramsar Site, https://designatedsites.naturalengland.org.uk/.
R-2023-0247-OOM-428285 - R_2023_0247_OOM Outline application for bottom ash facility Grangetown Prairie Land East of John Boyle Road - No Objection subject to mitigation.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2023-0247-OOM-428285 - R_2023_0247_OOM Outline application for bottom ash facility Grangetown Prairie Land East of John Boyle Road - No Objection subject to mitigation.pdf:3:on soil protection for site restoration and aftercare is available on Gov.uk website. Detailed guidance on
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:14: There are no groundwater Source Protection Zones recorded within 1 km of the site. There are no
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:19: structures (e.g. concrete walls and base) will provide protection against ingress of ground gases.
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:29: • United States Environmental Protection Agency (US EPA) Regional Screening Levels (RSLs).
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:49: for the protection of controlled waters and thus it is not currently possible to confirm the
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:49: protection of investigation and assessment.
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:50: protection remediation). A ground gas assessment demonstrating that the ground gas regime at the
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:50: required (if site correlates to CS1 conditions (or that suitable ground gas protection has been selected
R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:57:Protection Act 1990 (EPA), as inserted by S.57 of The Environment Act 1995 and came into effect in
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:7:2.11 The Teesmouth and Cleveland Coast Special Protection Area (SPA), potential
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:14:4.24 The BA Facility site is not situated within a groundwater source protection zone.
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:39: Special Protection Area and
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:50:2.11 The Teesmouth and Cleveland Coast Special Protection Area (SPA), pSPA,
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:62: Protection Association (NFPA) recommended practice for fire protection for
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:73:3.119 The ERF will be equipped with comprehensive fire protection and detection
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:73: systems which will comply with the requirements of the National Fire Protection
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:73: Association’s recommended practice for fire protection for electricity generating
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:74: ongoing occupational health protection dust level checks will be carried out on a
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:79: Environmental protection measures during construction
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:82: Special Protection Areas (SPA) in the UK no longer form part of the EU’s Natura
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:83: protections
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:107: the use of CCTV, security fencing, protection of the staff and visitor car park and
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:146: Area B (Archaeology Area) to be covered with existing site won topsoil to Protection of Area B no longer required. Ecological
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:150: Protection no longer required for Area B (all archaeological
R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:150: and Cultural Protection no longer required for Area B.
R-2023-0247-OOM-EP CL.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0247-OOM-EP CL.pdf:3:determined as contaminated land under Part IIA of the Environmental Protection Act
R-2023-0247-OOM-TV_BAF_Flood_Risk_Assessment_and_Drainage_Strategy_Part_1of3.pdf:11: The site is not situated within a groundwater Source Protection Zone (SPZ).
R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:31: order to ensure a high level of protection for the environment and public health.
R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:39: Cleveland Coast Special Protection Area (SPA) and Ramsar and the underlying
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:6: application site to the Teesmouth and Cleveland Coast Special Protection
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:6:1.3 NSN sites receive statutory protection under the Conservation of Habitats
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:6: Regulations afford a high level of protection to sites supporting habitats or
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7:2.1 Special Protection Areas (SPAs) and Special Areas of Conservation (SACs)
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7: receive statutory protection under the Habitats Regulations. The most recent
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7: Habitats Regulations afford a high level of protection to sites classified as
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7: also afford the same level of high protection to tracts of land supporting
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7:2.2 SACs and SPAs form part of a network of nature protection areas within the
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7: legislative protection to SPAs and SACs. Government has issued policy
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:7: same protection to Ramsar sites as that afforded to SPAs and SACs through
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:30: Coast Special Protection Area
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:31: Coast Special Protection Area
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:32: potential Special Protection Area (pSPA) and Ramsar. Brief version 11.2.
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:34: Special Protection Area (SPA)
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:34:The Teesmouth and Cleveland Coast Special Protection Area is a wetland of European
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:35:1) Teesmouth and Cleveland Coast was classified as a Special Protection Area on 15 August
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:42: Special Protection Area (SPA) +
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:43:Wetlands Trust, the Royal Society for the Protection of Birds and the Joint Nature Conservation
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:44: and important species. Poyser, London, for Nature Conservancy Council and Royal Society for the Protection of Birds
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:44: counts. British Trust for Ornithology, Wildfowl and Wetlands Trust, Royal Society for the Protection of Birds & Joint
R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf:44: Trust, Royal Society for the Protection of Birds & Joint Nature Conservation Committee, Slimbridge.
R-2023-0247-OOM-TV_BAF_Transport_Statement.pdf:11: northern side with barrier protection. A shared footway/cycleway is provided along the
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:6: Various legislation and planning policies refer to the protection of wildlife. These are summarised
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:10: Areas of Conservation (SAC), Special Protection Areas (SPA), National Nature Reserves
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:22: habitats, ecological networks and the protection and recovery of priority species.
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28: designated under the Habitats Directive and Special Protection Areas (SPA) designated under the
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28: the protection and management of species and habitats of European importance, including
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28: In addition to providing for the designation and protection of Natura 2000 sites, the Habitats
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28: Regulations provide strict protection for plant and animal species as European Protected Species.
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:29: SACs and Special Protection Areas (SPAs) in the UK no longer form part of the EU’s Natura 2000
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:29: • fulfil the commitment made by government to maintain environmental protections
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: system, bringing into force stronger protection for both wildlife and the countryside.
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: • Part III – Nature Conservation and Wildlife Protection: The Act details measures to
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: promote and enhance wildlife conservation. These measures include improving protection
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: damage to SSSIs. Furthermore, the Act affords statutory protection to Ramsar Sites
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: wildlife protection in the UK. Part I deals with the protection of plants, birds and other animals
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: • Wildlife – listing endangered or rare species in need of protection and creating offences
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: bird during breeding season is also noted as an offence, with further protection for
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30: Protection of Badgers Act 1992
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31: The Protection of Badgers Act 199221 consolidated previous legislation relating specifically to
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31: Wild Mammals (Protection) Act 1996
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31: The Wild Mammals (Protection) Act 199622 makes it an offense for any person to mutilate, kick,
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31: 21 Her Majesty’s Stationery Office (HMSO), 1992. Protection of Badgers Act 1992. HMSO.
R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31: 22 Her Majesty’s Stationary Office (HMSO), Wild Mammals (Protection) Act 1996. HMSO.
R-2023-0247-OOM-PN 0247.pdf:1:Environmental Protection Planning Consultation Response
R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:9: are those provided in Section 80 of Part III of the Environmental Protection Act (1990). The Act
R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:31: include workers occupationally exposed to PM10, as protection is covered by
R-2021-0316-VC-CON LAND 0316.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0316-VC-Officer report _R20210316VC.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0316-VC-Officer report _R20210316VC.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0316-VC-Officer report _R20210316VC.pdf:6:environmental protection section who have raised no objection subject to
R-2021-0316-VC-CAT-PPI-FRM-001 (3).pdf:2: Installation of HV cabling near wayleave (cathodic protection interference) YES NO
R-2021-0316-VC-PN 0316.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0316-VC-Consultee Response - Woodgroup CATS.pdf:3:information contained in correspondence. For more information on our privacy practices and your data protection
R-2021-0316-VC-1400007002.pdf:4: may affect a cover or protection.
R-2021-0316-VC-CAT-PPI-PRC-019.pdf:9:whether a repair is required or to reinstate the corrosion protection coating system. Please note
R-2021-0316-VC-Consultee Response - CATS.pdf:3:information contained in correspondence. For more information on our privacy practices and your data protection
R-2020-0820-ESM-NWL.pdf:2:necessary diversion, relocation or protection measures required prior to the commencement of the
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:17: hearing protection zones in the working environment so unlikely to be routinely exceeded;
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:8: deposition. Under provisions in the Environmental Protection Act 1990, dust nuisance is
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:9: Environmental Protection UK (‘EPUK’) and the IAQM provides a framework for professionals
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:14: geological interest) and the Special Protection Area (‘SPA’)/Ramsar site Teesmouth and
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:18: protection of human health are based on NO2 rather than total NOx or NO.
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:36: 17 EPUK: Environmental Protection UK
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:37: 40 SPA: Special Protection Area
R-2020-0820-ESM-Network Rail 820.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but
R-2020-0820-ESM-Network Rail 820.pdf:2:Protection of existing railway drainage assets within a clearance area
R-2020-0820-ESM-Network Rail 820.pdf:2:Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any
R-2020-0820-ESM-Network Rail 820.pdf:2:permanent alterations to the mutual boundary the applicant must contact Network Rail’s Asset Protection
R-2020-0820-ESM-Network Rail 820.pdf:3:Method statements may require to be submitted to Network Rail’s Asset Protection Project Manager at the below
R-2020-0820-ESM-Network Rail 820.pdf:3:Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried
R-2020-0820-ESM-Network Rail 820.pdf:3:traffic i.e. “possession” which must be booked via Network Rail’s Asset Protection Project Manager and are subject
R-2020-0820-ESM-Network Rail 820.pdf:3:and agreement with our Asset Protection Team and the developer entering into a Basic Asset Protection
R-2020-0820-ESM-Network Rail 820.pdf:3:Agreement (where appropriate). We would advise that the developer discuss the proposals with Asset Protection
R-2020-0820-ESM-Network Rail 820.pdf:3:prior to applying for the discharge of condition. Contact details for Asset Protection are below.
R-2020-0820-ESM-Network Rail 820.pdf:3:Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any
R-2020-0820-ESM-Network Rail 820.pdf:3:method statement. Approval of the method statement must be obtained from Network Rail’s Asset Protection
R-2020-0820-ESM-Network Rail 820.pdf:3:to be agreed by the Asset Protection Project Manager prior to implementation.
R-2020-0820-ESM-Network Rail 820.pdf:3:applicant’s land, thus reducing the probability of provision and costs of railway look-out protection,
R-2020-0820-ESM-Network Rail 820.pdf:4:Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would
R-2020-0820-ESM-Network Rail 820.pdf:5:Asset Protection Project Manager
R-2020-0820-ESM-Network Rail 820.pdf:5:Email: assetprotectioneastern@networkrail.co.uk
R-2020-0820-ESM-MGE04279 Contaminated Land 0820.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0820-ESM-MGE04279 Contaminated Land 0820.pdf:2:necessary protection measures incorporated into the design of the proposed
R-2020-0820-ESM-MGE04279 Contaminated Land 0820.pdf:2: as contaminated land under Part IIA of the Environmental Protection Act 1990; and
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:5: the protection and conservation of landscape within the study area. Current planning policy and
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:5: Plans, planning positively for the creation, protection, enhancement and management of
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:6: 1 N1 Landscape - supports the protection and enhancement of the Borough’s landscape based
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:6: 2 N4 Biodiversity and Geological Conservation - supports the protection and enhancement of
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:6: 1 Development Principle STDC7: Natural Environmental Protection and Enhancement states
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:32: Special Protection Area (SPA) and Ramsar site, and also
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:42:J5.26 The sensitivity of this LCZ is Medium, as this area is designated as having Special Protection
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:8: 1 Environmental Protection Act 1990 Part II (Ref 1);
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:8: 23 Environment Agency, Groundwater protection technical guidance, 2017 (Ref 23);
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:8: 24 Environment Agency, The Environment Agency’s approach to groundwater protection,
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:9: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:10: determined as contaminated land under Part IIA of the Environmental Protection Act 1990;
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:12: 4 Nearby Sites of Nature Conservation Interest (SNCIs), Special Protection Areas (SPAs),
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:12: appropriate gas protection measures, if required, based on specific development proposals.
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:12: The required gas protection measures would be incorporated into the buildings during
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:15: protection zone, surface waters of good or Hazardous Waste where the
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:22: and an associated Gas Risk Assessment should be undertaken, and the necessary protection
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:25:G4.46 The site is not located within a Groundwater Source Protection Zone, nor within a surface water,
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:41: 1 Environmental Protection Act 1990 Part II
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:41: 23 Environment Agency, Groundwater protection technical guidance, 2017
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:41: 24 Environment Agency, The Environment Agency’s approach to groundwater protection,
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:42: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:19: • Hydrogeology : Source Protection Zones, Groundwater Vulnerability, aquifer
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:23: 3.3.5 The Redcar Works are not situated within a groundwater Source Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:25: and Special Protection Area. The site is designated due to the coastal sands
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:77: 4.3.5 The Lackenby Works are not within a groundwater Source Protection Zone
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:98: 5.3.5 The Cleveland Works are not within a groundwater S ource Protection Zone
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:193: likely to be of relatively low permeability and thereby provide protection to deeper
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:233: deposits classed protection from downward migration afforded by low permeability
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:239: deposits classed s a n ds offer little protection from downward migration of
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:252: classed as Minor some protection from downward migration.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:253: Aquifer) protection from downward migration. Possible migration toward
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:254: Marine Alluvium Mild Clay may provide some protection from downward migration.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:256: classed as Minor protection to downward migration of contaminants.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:256: by Corus) Mild protection to downward migration of contaminants. Likely migration
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:257: classed as Minor protection from downward migration.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:258: classed as Minor Boulder Clay may provide some protection from downward
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:259: classed as Minor Boulder Clay may provide some protection from downward
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:260: Marine Alluvium Mild provide some protection from downward migration. Possible
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:292:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1052:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1419:The site is not in a groundwater Source Protection Zone (SPZ).
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1424: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1431:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1448:HSE. (1991). Protection of Workers and the General Public during the Development of Contaminated Land.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1448:USEPA. (2018, May 15). United States Environmental Protection Agency (USEPA). Retrieved from Risk
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450: Part IIA of the Environmental Protection Act (1990);
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450:Part IIA of the Environmental Protection Act 1990
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1450:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1451: Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1452: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1505:0.8m and 5.0m bgl (Enviros, 2004 and 2008). The site is not located within a Groundwater Source Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1518:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1518:protection. At this site, the underlying geology comprises Glacial Till and Glaciolacustrine Deposits which are
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1529:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1530:protection. At this site, the underlying geology comprises Glacial Till and Glaciolacustrine Deposits which are
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:• Part IIA of the Environmental Protection Act (1990);
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:Part IIA of the Environmental Protection Act 1990
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1535:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1536:• Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1537: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1605: Factor 1: Protection of human health and protection of the environment;
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1608:concentration of 0.2% (v/v). While the number of sampling locations is limited, this suggests that gas protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1608:Measures (APMs) to be used. This can include the provision of surface protection, sacrificial layers and/or
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1629: Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1629: Installation of ground gas protection measures (if required);
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1638: Provision of surface protection;
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644: Part IIA of the Environmental Protection Act (1990);
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644:Part IIA of the Environmental Protection Act 1990
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1644:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1646: Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1646: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1665: contaminated land under Part 2A of the Environmental Protection Act 1990; and
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1665:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1667: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1667: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1667: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1672: sensitivity1 source protection zones (SPZ) within 1km of the area.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1680: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1684: Design of a Site Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1684: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1686:protection measures appropriate to protect buildings from landfill gas migration.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1697: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1701: design sulphate class DS-2, indicating that that protection to buried concrete would be required.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1701: protection measure to new buildings.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1702: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1704: sensitivity6 source protection zones (SPZ) within 1km of the area.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1713: PROTECTION
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1713: This set out the required site protection and monitoring plan Part of Area 6 on the current area
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1714:protection measures appropriate to protect buildings from landfill gas migration.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1752:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1755: CL4 hard surfacing to break pathway Protection against aggressive soils will be health.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1755: A clean service run area may be required Relatively easily incorporated into the Protection of in ground workers and
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1756:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1758:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1876:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1881:Environmental Protection Planning Consultation Response
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1885:Protection Department for advice on generic aspects of land contamination management.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1885:environmental protection of controlled waters is considered alongside any human health
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1885:protection requirements. This approach is supported by paragraph 170 of the National
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1890:85 5.9 Source Protection Zones 0 0 0 0 -
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1890:85 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 -
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1891:96 10.4 Special Protection Areas (SPA) 0 0 0 0 1
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1892:99 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1950:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1960:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1961:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1961:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1962:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1967: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Abstractions and Source Protection Zones
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 1
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 2
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 3
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 4
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 1c
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 2c
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1970: Source Protection Zone 3c
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1971:Features are displayed on the Abstractions and Source Protection Zones map on page 83
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1972:5.9 Source Protection Zones
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1972:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1972:5.10 Source Protection Zones (confined aquifer)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1972:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1975:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries,
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1982: Special Protection Areas (SPA)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1982:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1982:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1983:10.4 Special Protection Areas (SPA)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1986:10.14 Potential Special Protection Areas (pSPA)
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1986:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1986:Directive for the protection of nationally and internationally important populations of wild birds. Those sites
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1990:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1990:regulation and protection. There are likely to be restrictions to some developments within these areas.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1991:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1996:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1996:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:2030: Location Estimated properties affected Radon Protection Measures required
R-2020-0820-ESM-341100 R_2020_0820_ESM - Natural England.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:19:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:25: Meet the groundwater protection criteria set out on GOV.UK What other environmental issues will you consider with my planning
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:26: rivers and streams. Some areas (source protection zones and aquifers) are Your development should ensure that an 8m strip of land (planted with
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:26: groundwater protection can be found on GOV.UK construction and maintenance.
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:32:3.2 Asset Design and Protection 32
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:46: • Medium: areas that offer some groundwater protection. Intermediate between
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:49: the protection offered by the existing sand dunes system and historic railway
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:61:3.2 Asset Design and Protection
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:10: d support the expansion and protection of the port and logistics sector;
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:18: • 6km Special Protection Areas (‘SPA’) buffer zone (Policy N4);
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:19: • support the expansion and protection of the port and logistics sector;
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:34: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:34: under the Ramsar Convention on Wetlands but which are afforded the same level of protection
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:38: to ensure the protection and improvement in quality of the water environment. This is also
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:41: Pollution Act 1974 (CoPA) and Environmental Protection Act 1990 (EPA). BPM will be applied
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:42: Special Scientific Interest (‘SSSI’) and the Special Protection Area (‘SPA’) / Ramsar site
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:43: • N1 Landscape - supports the protection and enhancement of the Borough’s landscape based
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:43: • N4 Biodiversity and Geological Conservation - supports the protection and enhancement of
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:44: supports the protection and enhancement of the Borough’s landscape and restricts any
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:45: protection of residential amenity.
R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:48: Protection Act, Building Regulations or Environmental Permitting Regulations.
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:6: Environmental Protection Act 1990 (c. 43) (Ref 3)
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:6:K2.5 The Environmental Protection Act 1990 (c. 43) as amended in 1996 and 1999 implements
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:6: Environmental Protection (Duty of Care) Regulations 1991 (Ref 4)
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:31: 3 Environmental Protection Act 1990
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:31: 4 Environmental Protection (Duty of Care) Regulations 1991
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1: Plant Protection
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1: E-mail: plantprotection@cadentgas.com
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1:Can you please inform Plant Protection, as soon as possible, the decision your authority is likely
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1:Please let us know whether Plant Protection can provide you with technical or other information that may be of
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1:referred your enquiry/consultation to our Asset Protection team for further detailed
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:1:date of this response. Please contact us at assetprotection@nationalgrid.com if you have not had a
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:2:should contact Plant Protection before any works are carried out to ensure the apparatus is not affected by
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:2: any such restrictions from the landowner in the first instance and if in doubt contact Plant Protection.
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:2:If you require further assistance please contact the Plant Protection team via e-mail (click here) or via the
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:2:Plant Protection Team
R-2020-0820-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027708_1_14256.pdf:3: Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity
R-2020-0820-ESM-MGE04280 Nuisance 0820.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:7: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’)
R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:13: Special Scientific Interest (‘SSSI’) and the Special Protection Area (‘SPA’) / Ramsar site
R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:14: site is low and the site does not lie within a defined groundwater Source Protection Zone (SPZ).
R-2020-0820-ESM-1401-Lackenby DAS.pdf:25: Fall Protection solutions and Kingspan Roof
R-2020-0820-ESM-1401-Lackenby DAS.pdf:25: performance within the building resulting in reduced running costs in Fall Protection Systems
R-2020-0820-ESM-1401-Lackenby DAS.pdf:25: personal and collective fall protection when
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:12: identify appropriate gas protection measures, if required, based on specific
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:12: development proposals. The required gas protection measures would be
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:27: protection objectives established at Union or Member State
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter E - Air Quality - Dec 2020.pdf:12:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter E - Air Quality - Dec 2020.pdf:13:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:12: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Site of Special Scientific
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:20: e. support the expansion and protection of the port and logistics sector;
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:22: • STDC 7 (Natural Environmental Protection and Enhancement): requires development
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:22: • STDC8 (Preserving Heritage Assets): provides protection for retention of assets of heritage
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:34: i EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31);
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:45: 36 SPA Special Protection Area
R-2020-0820-ESM-Lackenby HRA Rev A(1).PDF:5:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its
R-2020-0820-ESM-Decision Notice 0820.pdf:11: Any protection measures or gas mitigation will be complied with thereafter,
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:4:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:6:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:7:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:13:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:13:Environmental Protection Team
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:14:From: Environmental Protection
R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:14:To: Environmental Protection Environmental.Protection@redcar-cleveland.gov.uk
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:8: bodies, water impoundment and protection of water resources.
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:9: • EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31);
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:12: Plan(RBMP) (Ref 36) to ensure the protection and improvement in quality of the water
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:18: Natural England website (Ref 47) Special Protection Areas (SPAs).
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:18: EA Source Protection Zones and 2009 River Basin
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:34:F4.38 Source Protection Zones (SPZs) (inner, outer and total catchment) are defined around
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:39: i EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31);
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:63: 31 GOV.UK (2013). Groundwater protection:Principles and practice (GP3). online GOV.UK.
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:63: Available at: <https://www.gov.uk/government/publications/groundwater-protection-
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:63: (2017). Groundwater protection. online GOV.UK. Available at:
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:63: <https://www.gov.uk/government/collections/groundwater-protection> [Accessed 1st
R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:6:Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and Cleveland Coast Ramsar site;
R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:6:but which are afforded the same level of protection in policy terms in respect of new development as
R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:14:protection whereby it is an offence to intentionally or recklessly disturb adults and their young at, on
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:8: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’)
R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:72: 23 SPA – Special Protection Area
R-2020-0270-FFM-NWL 0270.pdf:1:location of our assets and ensure any necessary diversion, relocation or protection measures
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:4:site. These comprise of the Teesmouth and Cleveland Coast Special Protection
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:5:As retention and protection of any habitats within the proposed development site
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:12: Special Areas of Conservation (SAC) and Special Protection Areas (SPA)17;
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:17:site. These comprise of one Special Protection Area (SPA), one Ramsar site, one
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:18: Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:34:As retention and protection of any habitats during within the proposed
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:48:The Regulations offer protection to a number of ‘European Protected Species’
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:48:allow an otherwise unlawful act. The species protection provisions of the Habitats
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:49:(SSSI). It confers differing levels of protection on species themselves, their
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:49:Species offered protection by the Act are listed in a series of schedules. These
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:51:enhancement of priority habitats, ecological networks and the protection and
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:53: contributes to habitat protection and long-term sustainability, and that
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:53:habitat protection, safeguards biodiversity and enhances green Infrastructure,
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:53:focuses on the enhancement and protection of the natural environment. Therefore,
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:53:STDC 7 outlines the need for a coordinated approach to environmental protection
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:56:levels of species protection and the processes linked to protection regimes are
R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:71: Proposed Development Site Boundary Grangetown Prairie Area Special Protection Areas (SPA) - Eston Road Highway Scheme
R-2020-0270-FFM-NUISANCE 0270.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0270-FFM-a) Stay safe near our pipes.pdf:2: may affect a cover or protection.
R-2020-0270-FFM-319577 Response Letter.pdf:4:provides the highest status of protection for the landscape and scenic beauty of National Parks and
R-2020-0270-FFM-319577 Response Letter.pdf:4:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2020-0270-FFM-CON LAND 0270.pdf:1: Environmental Protection Planning Consultation Response
R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7: contaminated land under Part 2A of the Environmental Protection Act 1990; and
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:8: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works,
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:13: sensitivity1 source protection zones (SPZ) within 1km of the area.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Design Of A Site Protection
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:27:Gas Risk Assessment and should incorporate any necessary protection measures appropriate to protect
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: design sulphate class DS-2, indicating that that protection to buried concrete would be required.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: protection measure to new buildings.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:47: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:49: sensitivity6 source protection zones (SPZ) within 1km of the area.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:101:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: CL4 hard surfacing to break pathway Protection against aggressive soils will be health.
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: Relatively easily incorporated into the Protection of in ground workers and
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:105:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:To enable the protection of the remediation capping layer during both the construction and full site
R-2020-0270-FFM-Officer Report 0270.pdf:3:of our assets and ensure any necessary diversion, relocation or protection
R-2020-0270-FFM-Officer Report 0270.pdf:6:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0270-FFM-Officer Report 0270.pdf:6:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0270-FFM-Officer Report 0270.pdf:11:Coast Special Protection Area (SPA), Ramsar site, National Nature Reserve
R-2020-0270-FFM-Officer Report 0270.pdf:18:protection (EP) section with regard to the generation of nuisance and
R-2020-0270-FFM-Officer Report 0270.pdf:22: protection of sites of ecological value in accordance with policies SD4
R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:26: CPRE ………………………… Council for the Protection of Rural England
R-2020-0270-FFM-Decision 0270.pdf:3: protection of sites of ecological value in accordance with policies SD4 and N4
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:4:(SAC) and Special Protection Area (SPA), Durham Coast SAC and the
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:12: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available:
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:12: JNCC. Northumberland Marine Special Protection Area Information Sheet. Available:
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:12: JNCC. North York Moors Special Protection Area. https://jncc.gov.uk/jncc-assets/SPA-
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:12: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available:
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:14:development, including three Special Protection Areas (SPA), two Special Areas
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:14:18 Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection
R-2020-0270-FFM-2020_05_28_STDC Eston Road HRA_Issue.PDF:36: Development Prairie Area of Protection
R-2021-0432-FFM-EP CL.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:5:8.9 Groundwater and surface water protection …………………………………………………………………………. 13
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:8:Boundary monitoring points have been selected to provide protection to the potential receptors identified in
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:9:the Teesmouth and Cleveland Coast SPA (Special Protection Area). The designated site has not been
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:18:It is also noted that a number of earth bunds and mature tree planting exist that provided noise protection
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:19:8.9 Groundwater and surface water protection
R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf:21: required – ear protection for Arcadis staff will be mandatory.
R-2021-0432-FFM-Off Rep.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0432-FFM-Off Rep.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0432-FFM-Off Rep.pdf:8:protection section with regard to both contamination and nuisance.
R-2021-0432-FFM-19736928_1.PDF:9:According to Environment Agency mapping, the Site is not located within any groundwater Source Protection
R-2021-0432-FFM-19736928_1.PDF:22:message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act or for
R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf:5: • Weather Protection: The treatment system and all associated Infrastructure and pipework
R-2021-0432-FFM-EP NU.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:5: Protection of hazards arising from process fluids should be taken. As well as
R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:23: H level protection.
R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf:24: H-H level protection.
R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF:759:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf:2:Protection Department for advice on generic aspects of land contamination management.
R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf:2:environmental protection of controlled waters is considered alongside any human health
R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf:2:protection requirements. This approach is supported by paragraph 170 of the National
R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf:2: ENVIRONMENTAL PROTECTION ACT 1990
R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf:8: 1995, the Environmental Protection Act 1990, the Water Industry Act 1991, Water
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:20:0.8m and 5.0m bgl (Enviros, 2004 and 2008). The site is not located within a Groundwater Source Protection
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:33:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:33:protection. At this site, the underlying geology comprises Glacial Till and Glaciolacustrine Deposits which are
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:44:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:45:protection. At this site, the underlying geology comprises Glacial Till and Glaciolacustrine Deposits which are
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:• Part IIA of the Environmental Protection Act (1990);
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:Part IIA of the Environmental Protection Act 1990
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:Part IIA of the Environmental Protection Act 1990 (which was inserted by Section 57 of the Environment
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:of the Environmental Protection Act 1990 defines contaminated land for the purposes of Part IIA as:
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:Harm is defined under section 78A of the Environmental Protection Act as meaning ‘harm to the health of living
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:50:served under the contaminated land regime introduced under Part IIA of the Environmental Protection
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:51:• Groundwater Protection: Policy and Practice, Environment Agency GP3 Parts 1-4.
R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:52: England and Wales, 2006) developed in consultation with the Scottish Environment Protection
R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4: Environmental Protection Act 1990; and,
R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:13: Light eye protection (LEP)
R-2023-0339-CD-JER10061_Redcar Energy Centre_V01_230314_Report Final V3.pdf:4:development itself such as surface cover systems, gas protection systems, etc. If unexpected contamination
R-2023-0339-CD-JER10061_Redcar Energy Centre_V01_230314_Report Final V3.pdf:5:contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of
R-2023-0339-CD-JER10061_Redcar Energy Centre_V01_230314_Report Final V3.pdf:5:by the development itself such as surface cover systems, gas protection systems, etc. The Local Planning
R-2023-0339-CD-JER10061_Redcar Energy Centre_V01_230314_Report Final V3.pdf:13:With respects to protection of controlled waters it is considered that the removal of any observable free
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:5:The Application Site is not indicated to be located in a groundwater Source Protection Zone (SPZ) and there
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:8: • Environmental Protection Act (EPA) 1990 (as amended);
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:8: • Defra Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:13: Source Protection Zone (SPZ).
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:13: environmental receptors as defined within Table 1 of the DEFRA Environmental Protection Act
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:14: Cleveland Coast Special Protection Area (SPA), a habitat for rare and migratory birds. This Area is
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:14: Protection Agency (part of Public Health England) and the British Geological Survey, the
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17: Protection Act 1990. For a risk to exist (under Part 2A), all three of the following components must
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:29:Under Section 57 of the Environmental Act 1995, Part 2A was inserted into the Environmental Protection Act
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:50 5.9 Source Protection Zones 0 0 0 0 -
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:50 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 -
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:48:63 10.4 Special Protection Areas (SPA) 0 0 1 0 5
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:49:66 10.14 Potential Special Protection Areas (pSPA) 0 0 1 0 0
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:81:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:83:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:89: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Abstractions and Source Protection Zones
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 1
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 2
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 3
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 4
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 1c
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 2c
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 3c
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:93:Features are displayed on the Abstractions and Source Protection Zones map on page 48
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:5.9 Source Protection Zones
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:5.10 Source Protection Zones (confined aquifer)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:96:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries,
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104: Special Protection Areas (SPA)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104: Potential Special Protection Areas (pSPA)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:107:10.4 Special Protection Areas (SPA)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:10.14 Potential Special Protection Areas (pSPA)
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:Directive for the protection of nationally and internationally important populations of wild birds. Those sites
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:119:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:119:regulation and protection. There are likely to be restrictions to some developments within these areas.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:120:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings.
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:124:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:124:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to
R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:151: Location Estimated properties affected Radon Protection Measures required
R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:1:environmental.protection@redcar-cleveland.gov.uk
R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:2:of Special Scientific Interest (SSSI) on the northern site boundary; Special Protection Area (SPA) 78 m to the
R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:3:assessment criteria for the protection of human health for a commercial land use for Dibenzo(a,h)
R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:3:protection of human health. The data supports that contaminant concentrations are typically considerably
R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf:14:• Special Protection Area (SPA) – The Teesmouth and Cleveland Coast, located 78 m northwest of the
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:1: • Environmental Protection Act (EPA) 1990 (as amended);
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.2 The Water Resources Act (1991 as amended) principally relates to the protection of controlled
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.5 The Environment Act 1995 (Section 57) amends the Environmental Protection Act (1990) and
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:2: contaminated land within the UK. It includes measures for protection of the environment, including
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.6 Part 2A of the Environmental Protection Act is implemented by the Contaminated Land
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:3: • Defra Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:6: Protection Zones 1 and 2.
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:6: Protection Zone 3
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:10: a Groundwater Source Protection Zone (SPZ).
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:11: Cleveland Coast Special Protection Area (SPA), a habitat for rare and migratory birds. This area is
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:14: appropriate gas protection within the buildings based on the results of ground gas monitoring.
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.14 The site is not located in a Groundwater Source Protection Zone and is in an area of currently poor
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:17: adopted through the remediation strategy (eg. gas protection measures, specialist concrete and
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: Environmental Protection Act (EPA) 1990 (as amended)
R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Mobilisation of protection measures beneficial
R-2022-0355-FFM-SEAH-ASA-XX-XX.XX-A-A-0001-Design and Access Statement - 31.3.22.pdf:5:The proposal is to provide a single use site capable of handling the treatment to offer protection fro
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8: Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside,
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8: First Phase Reporting of the Site Protection and Monitoring Programme 31 prepared by
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:21: Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:26:Asset Protection and Optimisation teams (ASPRO) is required to determine permitting requirements,
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:27: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:33:CPEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2022-0355-FFM-20857612_1.pdf:4:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its
R-2022-0355-FFM-Decision Notice.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2022-0355-FFM-NETWORK RAIL.pdf:1:and delay to rail users. Consultation with the Asset Protection Project Manager is necessary to understand if there is
R-2022-0355-FFM-NETWORK RAIL.pdf:1:a problem. If required there may be a need to fit bridge protection barriers which may be at the developer’s expense.
R-2022-0355-FFM-NETWORK RAIL.pdf:1:applicant contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a
R-2022-0355-FFM-NETWORK RAIL.pdf:1:Asset Protection Eastern
R-2022-0355-FFM-NETWORK RAIL.pdf:2:assetprotectioneastern@networkrail.co.uk.
R-2022-0355-FFM-Consultee Response - Cleveland Police.pdf:1:https://eur01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.securedbydesign.com%2F&data=0
R-2022-0355-FFM-CFB03707 Nuisance.pdf:1:Environmental Protection Planning Consultation Response
R-2022-0355-FFM-Officer report.pdf:7:Redcar and Cleveland Borough Council (Environmental Protection)
R-2022-0355-FFM-Officer report.pdf:12:protection team.
R-2022-0355-FFM-Officer report.pdf:13:including Teesmouth and Cleveland Coast Special Protection Area (SPA) and
R-2022-0355-FFM-Officer report.pdf:15: protection of sites of ecological value in accordance with policies SD4
R-2022-0355-FFM-Application Form.pdf:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:1:From: .box.plantprotection plantprotection@cadentgas.com
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:1:assetprotection@nationalgrid.com
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:1:Plant Protection
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:1:plantprotection@cadentgas.com
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:1:To: .box.plantprotection plantprotection@cadentgas.com
R-2022-0355-FFM-Consultee Response - Northern Powergrid.pdf:2:Please ensure you have adequate virus protection before you open or detach any documents from this transmission.
R-2022-0355-FFM-390614 - Erection of Industrial Facility. Land at South Bank, Off Tees Dock Road, South Bank - No Objection.pdf:1:European sites - Teesmouth and Cleveland Coast Special Protection Area
R-2022-0355-FFM-390614 - Erection of Industrial Facility. Land at South Bank, Off Tees Dock Road, South Bank - No Objection.pdf:1:have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area and
R-2022-0355-FFM-390614 - Erection of Industrial Facility. Land at South Bank, Off Tees Dock Road, South Bank - No Objection.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2021-0846-FFM-SDMO Data Sheet .pdf:1: Forks and frame protection pads
R-2021-0846-FFM-SDMO Data Sheet .pdf:1: Differential protection and earthing rod Tank capacity (L) 220
R-2021-0846-FFM-SDMO Data Sheet .pdf:1: Heat hand protections (EC standards)
R-2021-0846-FFM-SDMO Data Sheet .pdf:3: Indication of protection IP 23 107
R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:17:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions.
R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:23: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:28:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as
R-2021-0846-FFM-MGE04606 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2021-0846-FFM-63455 01 Free Port - Cover Letter 05.10.21.pdf:2:long-term protection of the port and logistics sector. The Freeport will give the area a unique identity in
R-2021-0846-FFM-MGE04604 Cont Land.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0846-FFM-OFFICER REPORT.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0846-FFM-OFFICER REPORT.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0846-FFM-OFFICER REPORT.pdf:5:environmental protection officers who have raised no objection to the principle
R-2020-0730-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0730-CD-COMPLIANCE OFFICER REPORT.pdf:2:The submission has been considered by the Councils environmental protection
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:60:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at https://www.epa.gov/risk/regional-
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:62:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:63: Protection industry standards
R-2020-0730-CD-CON LAND 730.pdf:1:Environmental Protection Planning Consultation Response
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:16: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:19:0.5m and 2.5m bgl (Enviros 2008, MD2 2011). The site is not located within a Groundwater Source Protection
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:34:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:34:protection. At this site, the underlying geology comprises Tidal Flat Deposits which are classified as a
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:38: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:41:of TPH and BTEX compounds have not been identified above the GAC derived for the protection of human
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:identified above the GAC derived for the protection of human health and as such, a significant risk to human
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:53:excess of the GAC for the protection of water resources, further assessment is needed.
R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:56:assessment. Concentrations of contaminants were not measured above the GAC derived for the protection
R-2021-0439-CD-officer report.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0439-CD-officer report.pdf:4:Protection team. Discussions have taken place between the EHO and the applicants
R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2021-0439-CD-0439 Contam .pdf:1:Environmental Protection Planning Consultation Response
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:8: Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside,
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:8: First Phase Reporting of the Site Protection and Monitoring Programme 31 prepared by
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:19: such that a continued standard of protection will be provided throughout construction that is
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:19: Protection of sub surface structures and utilities from attack due to aggressive ground conditions;
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:20: line such that a continued standard of protection will be provided throughout construction that
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:28: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:33:component of the CPEMP to provide temporary drainage facilities and protection measures (such as
R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.5 Issue 2.pdf:9: hearing protection meeting the requirements of EN 352 or equivalent must be
R-2023-0253-RMM-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf:12: use of surplus wood to fabricate site storage boxes and protection of permanent
R-2023-0253-RMM-GrasscreteBrochure.pdf:3: • Fire and emergency access • Slope protection
R-2023-0253-RMM-GrasscreteBrochure.pdf:4: slope protection works.
R-2023-0253-RMM-GrasscreteBrochure.pdf:8: slope protection
R-2023-0253-RMM-Grangetown ERF - PS - RM - Mar 23.pdf:21: - Bollards will be incorporated as protection to the openings. (colour- Black / yellow chevrons);
R-2023-0253-RMM-Grangetown ERF - PS - RM - Mar 23.pdf:26: Teesmouth Special Protection Area). These effects are described in the appended Air Dispersal
R-2023-0253-RMM-EP NU.pdf:1: Environmental Protection Planning Consultation Response
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.5. Air Quality Standards for the Protection of Human Health 12
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.6. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems - Critical Levels 15
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:2: 2.7. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems - Critical Loads 16
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen 101
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Sulphur Dioxide 103
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Ammonia 104
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:3: for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride 106
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen 145
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Sulphur Dioxide 147
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Ammonia 148
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:4: for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride 150
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:5:Table 3: Air Quality Standards for the Protection of Human Health 13
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:5:Table 4: Assessment Criteria for the Protection of Sensitive Habitats and Ecosystems 16
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:8:EPUK Environmental Protection UK
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:9:SEPA Scottish Environment Protection Agency
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:9:SPA Special Protection Areas
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:11: set for the protection of Ecosystems.
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:12: Protection of Ecosystems or Vegetation detailed in the Environment Agency’s online
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:17: • Special Protection Areas (“SPAs”) and potential SPAs designated under the EC Birds
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:21:2.5. Air Quality Standards for the Protection of Human Health
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:21: Values and EALs - are intended to be used as guidelines for the protection of human health
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:22: Table 3: Air Quality Standards for the Protection of Human Health
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:23: Table 3: Air Quality Standards for the Protection of Human Health (Cont.)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24: Table 3: Air Quality Standards for the Protection of Human Health (Cont.)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24:2.6. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:24:2.6.2. The 2008 Air Quality Directive 13 set limit values for the protection of vegetation and
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:25: Table 4: Assessment Criteria for the Protection of Sensitive Habitats and
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:25:2.7. Assessment Criteria for the Protection of Sensitive Habitat Sites and Ecosystems
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:71: ambient air for the protection of human health, May 2009).
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:83: 90m will provide slightly greater environmental protection (compared to stack heights of
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:110: Critical Levels for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:112: Critical Levels for the Protection of Vegetation and Ecosystems - Sulphur Dioxide
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:113: Critical Levels for the Protection of Vegetation and Ecosystems - Ammonia
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:115: Critical Levels for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:154: Critical Levels for the Protection of Vegetation and Ecosystems - Oxides of Nitrogen
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:156: Critical Levels for the Protection of Vegetation and Ecosystems - Sulphur Dioxide
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:157: Critical Levels for the Protection of Vegetation and Ecosystems - Ammonia
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:159: Critical Levels for the Protection of Vegetation and Ecosystems - Hydrogen Fluoride
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:188: Department Health Protection Healthcare Quality
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:188: Environmental Protection Team
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:188: Environmental.protection@redcar-
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:192:The Environmental Protection Team participated in National Clean Air Day 2019 by
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:193:2019 events theme was Clean Air. The Environmental Protection Team were able to
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:193:The Environmental Protection Team continue to provide advice to a range of internal
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:193:burning stoves. The Environmental Protection Team began a publicity campaign
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:193:Environmental Protection Team can be found using the link below:
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:194:protection/Pages/environmental-protection.aspx
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:200: The annual South Tees Health Protection Conference held on 20th
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:200: Environmental Protection Team attended the festival and were approached by
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:206:1980’s which remain in place today. The Environmental Protection Team has noted a
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:247:2.3 The Conservation of Habitats and Species Regulations 2017 (as amended) provide for the protection
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:247: network’ includes Special Areas of Conservation (SACs) and Special Protection Areas (SPAs) that
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:267: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:314: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:341: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:341: Protection Area (pSPA) and Ramsar.
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:341: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:343: Special Protection Area (SPA)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:355: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:355: Protection Area (pSPA) and Ramsar.
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:355: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:357: Special Protection Area (SPA)
R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:366:Cleveland Coast Special Protection Area (SPA) and Ramsar site, either individually or in
R-2023-0253-RMM-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:10: conservation, restoration and re-creation of priority habitats, ecological networks and the protection
R-2023-0253-RMM-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:10: be considered at an early stage in the development process, with appropriate protection and
R-2023-0253-RMM-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:24: Special Protection Area (SPA)
R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf:14:5.9 Water Quality Protection
R-2023-0253-RMM-HSL-230331154925-321-FinalOutcome.pdf:1:which specifically includes provisions for the protection of the public. However, the possibility remains that a
R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:12: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: Protection Area (pSPA) and Ramsar.
R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:39: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:41: Special Protection Area (SPA)
R-2023-0253-RMM-MGE05027 Cont Land.pdf:1: Environmental Protection Planning Consultation Response
R-2023-0253-RMM-50134151_1_CPP.pdf:4:5.31 Fire Prevention and Protection ………………………………………………………………………………….. 57
R-2023-0253-RMM-50134151_1_CPP.pdf:12: RPE (respiratory protection equipment to be appropriate for the task)
R-2023-0253-RMM-50134151_1_CPP.pdf:13: All Contractors must provide suitable hearing protection at the first
R-2023-0253-RMM-50134151_1_CPP.pdf:13: Designated hearing protection zones with appropriate signage
R-2023-0253-RMM-50134151_1_CPP.pdf:13:Exposure to Sun Burn All operatives shall wear full body protection at all times whilst on site.
R-2023-0253-RMM-50134151_1_CPP.pdf:21: To constantly guide Contractor workers, to implement the required HSE protection measures required
R-2023-0253-RMM-50134151_1_CPP.pdf:35:Drivers operating plant with windows open must wear eye protection when in the cab of the machine.
R-2023-0253-RMM-50134151_1_CPP.pdf:36: warning/audible alarm, seat belts; whenever possible roll-over protection and reversing cameras
R-2023-0253-RMM-50134151_1_CPP.pdf:37: Footwear: Safety boots (no trainers or shoes) with toe and mid-sole protection approved to 200 joule
R-2023-0253-RMM-50134151_1_CPP.pdf:37: Eye Protection: Clear safety glasses (to EN 166 or equivalent) shall be worn at all times on the
R-2023-0253-RMM-50134151_1_CPP.pdf:37: o Adequate face protection must be worn in addition to suitable eye protection when grinding,
R-2023-0253-RMM-50134151_1_CPP.pdf:38: Hearing protection must be available and worn as indicated by risk assessment or when noise levels
R-2023-0253-RMM-50134151_1_CPP.pdf:38: protection must be worn where noise levels are above 85 (dB). Hearing protection shall meet the
R-2023-0253-RMM-50134151_1_CPP.pdf:38: Respiratory Protection Equipment (RPE) shall be suitable for the hazard identified through risk
R-2023-0253-RMM-50134151_1_CPP.pdf:38: used). The type and protection factor of the RPE shall be detailed in the RAMS and will comply with the
R-2023-0253-RMM-50134151_1_CPP.pdf:38: effective physical fall protection cannot be provided to the workers.
R-2023-0253-RMM-50134151_1_CPP.pdf:38:Working at Height with fall personal protection system, excavation, pressure tests, radiography tests,
R-2023-0253-RMM-50134151_1_CPP.pdf:41:height using non-metalling hangers/fixing tools or protected by possible crashing with adequate protections.
R-2023-0253-RMM-50134151_1_CPP.pdf:41:Temporary distribution boards shall be provided with the right protection against water and dust and secured
R-2023-0253-RMM-50134151_1_CPP.pdf:41:The cables should be properly terminated and be provided with efficient circuit protection.
R-2023-0253-RMM-50134151_1_CPP.pdf:41:cables should be treated with care and given the same supervision and protection as other cables.
R-2023-0253-RMM-50134151_1_CPP.pdf:45:manner that they provide adequate protection.
R-2023-0253-RMM-50134151_1_CPP.pdf:45:do not offer adequate protection from falls.
R-2023-0253-RMM-50134151_1_CPP.pdf:46:All floor/roof openings not afforded standard rail system protection shall be covered with substantial covers.
R-2023-0253-RMM-50134151_1_CPP.pdf:46:All floor and wall opening protection, either handrails or covers, shall be tagged with signs: ‘DANGER - RISK
R-2023-0253-RMM-50134151_1_CPP.pdf:46: In the cases where the installation of a standard handrail system is not feasible, other fall protection
R-2023-0253-RMM-50134151_1_CPP.pdf:49:with safety gloves with the appropriate cut protection.
R-2023-0253-RMM-50134151_1_CPP.pdf:52:of fixed scaffold tubing which is subject to weekly inspection. For temporary edge protection barriers (in
R-2023-0253-RMM-50134151_1_CPP.pdf:52:Fall protection equipment, full body harnesses, lanyards, lifelines and inertia reel or any other types of fall
R-2023-0253-RMM-50134151_1_CPP.pdf:52:protection equipment, shall be used where staging, scaffolding or other safe means of access is not
R-2023-0253-RMM-50134151_1_CPP.pdf:52:platforms, scaffold erection. Fall protection must be maintained 100% of the time when exposed to a fall.
R-2023-0253-RMM-50134151_1_CPP.pdf:52:or of fall prevention or protection must be subject to formal regular inspection by the Contractor. All defective
R-2023-0253-RMM-50134151_1_CPP.pdf:52:or non-inspected equipment that is or could be used for Work at Height or for fall prevention or protection
R-2023-0253-RMM-50134151_1_CPP.pdf:57:of more than 3 metres vertical rise shall provide platform stages and/or fall protection.
R-2023-0253-RMM-50134151_1_CPP.pdf:57:5.31 Fire Prevention and Protection
R-2023-0253-RMM-50134151_1_CPP.pdf:58:of galvanised fittings is to be avoided, but when required, respiratory protection must be worn, subject to risk
R-2023-0253-RMM-50134151_1_CPP.pdf:58: Face and eye protection with correct grade of filter. This includes light eye protection under welding hood
R-2023-0253-RMM-50134151_1_CPP.pdf:58: Neck protection as applicable
R-2023-0253-RMM-50134151_1_CPP.pdf:60: Providing suitable hearing protection at the first action level (80 dB(A)), and introducing controls at the
R-2023-0253-RMM-50134151_1_CPP.pdf:60: Designated hearing protection zones with appropriate signage.
R-2023-0253-RMM-50134151_1_CPP.pdf:60: Radiography work must be supervised by a Qualified Radiation Protection Supervisor. Such
R-2023-0253-RMM-50134151_1_CPP.pdf:61:All operatives shall wear full body protection at all times while on site. Sunblock shall be supplied by
R-2023-0253-RMM-50134151_1_CPP.pdf:65:that they will implement on site for protection against the virus for their own workers and other site workers.
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:8:2.3 The Conservation of Habitats and Species Regulations 2017 (as amended) provide for the protection
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:8: network’ includes Special Areas of Conservation (SACs) and Special Protection Areas (SPAs) that
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:28: hydrogen fluoride (HF) and ammonia (NH3) were compared with the Critical Levels for the Protection
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:74: to the Teesmouth and Cleveland Coast Special Protection Area.
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:74: Protection Area (pSPA) and Ramsar.
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:74: Natural England (2019). Teesmouth and Cleveland Coast potential Special Protection Area (pSPA)
R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:76: Special Protection Area (SPA)
R-2023-0253-RMM-428233 - R_2023_0253_RMM Reserved matters application following R20190767OOM - No Objection Subject to Mitigation.pdf:1: Protection Area and Ramsar Site, https://designatedsites.naturalengland.org.uk/.
R-2023-0253-RMM-428233 - R_2023_0253_RMM Reserved matters application following R20190767OOM - No Objection Subject to Mitigation.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2023-0253-RMM-428233 - R_2023_0253_RMM Reserved matters application following R20190767OOM - No Objection Subject to Mitigation.pdf:3:on soil protection for site restoration and aftercare is available on Gov.uk website. Detailed guidance on
R-2023-0253-RMM-50134216_1_CEMP.pdf:16: Environmental Protection Act 1990; and
R-2023-0253-RMM-50134216_1_CEMP.pdf:30:The Executive Board of Hitachi Zosen lnova are committed to ensuring that the protection of
R-2021-0943-CD-OFFICER REPORT.pdf:2:European sites – Teesmouth and Cleveland Coast Special Protection Area and
R-2021-0943-CD-OFFICER REPORT.pdf:2:Special Protection Area and Ramsar site, and has no objection to the proposed
R-2021-0943-CD-OFFICER REPORT.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)
R-2021-0943-CD-OFFICER REPORT.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection)
R-2021-0943-CD-DECISION NOTICE.pdf:5: such that a continued standard of protection will be provided throughout
R-2021-0943-CD-PN 943.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0943-CD-Natural England.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site
R-2021-0943-CD-Natural England.pdf:1:Coast Special Protection Area and Ramsar site, and has no objection to the proposed development.
R-2021-0943-CD-Natural England.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:3:5.13 Control Measures for Flood protection and coastal defences
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:12: PROTECTING THE and contribute towards the protection and biodiversity actions by 50% Undertake at least two Percentage increase from
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:45: in soil for the protection of human health. In relation to water resources, several exceedances
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:49:protection of water quality and water efficiency
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:49:5.13 Control Measures for Flood protection and coastal defences
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:52:ensure best practice with regard to the protection of water quality.
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:60:5.13 Control measures for Flood Protection and Coastal defence
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:61: defence line (i.e. quay) such that a continued standard of protection will be provided throughout
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:64:protection of air quality and dust prevention
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:65:Section 79 of the Environmental Protection Act 1990 defines a number of factors relating to dust and
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:75:which allows a reasonable level of noise to occur. This offers protection from any subsequent
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:75:Protection Act to impose further controls on noise from the site. It also allows the local authority
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:86: site is dealt with in accordance with the waste duty of care in section 34 of the Environmental Protection
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:86: Act 1990 and the Environmental Protection (Duty of Care) Regulations. All reasonable steps will also be
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90:Construction Plastics Hard Plastics/Pipe offcuts/ wrapping protection materials 17 02 03 1
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:159:The WFD aims “to establish a framework for the protection of inland surface waters (rivers and lakes),
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:200: quay) such that a continued standard of protection
R-2021-0943-CD-CON LAND 943.pdf:1:Environmental Protection Planning Consultation Response
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:3:5.13 Control Measures for Flood protection and coastal defences
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:12: PROTECTING THE and contribute towards the protection and biodiversity actions by 50% Undertake at least two Percentage increase from
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:45: in soil for the protection of human health. In relation to water resources, several exceedances
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:49:protection of water quality and water efficiency
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:49:5.13 Control Measures for Flood protection and coastal defences
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:52:ensure best practice with regard to the protection of water quality.
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:60:5.13 Control measures for Flood Protection and Coastal defence
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:61: defence line (i.e. quay) such that a continued standard of protection will be provided throughout
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:64:protection of air quality and dust prevention
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:65:Section 79 of the Environmental Protection Act 1990 defines a number of factors relating to dust and
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:75:which allows a reasonable level of noise to occur. This offers protection from any subsequent
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:75:Protection Act to impose further controls on noise from the site. It also allows the local authority
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:86: site is dealt with in accordance with the waste duty of care in section 34 of the Environmental Protection
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:86: Act 1990 and the Environmental Protection (Duty of Care) Regulations. All reasonable steps will also be
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90:Construction Plastics Hard Plastics/Pipe offcuts/ wrapping protection materials 17 02 03 1
R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:172: quay) such that a continued standard of protection
R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:2:safe access, safe places for work, hazardous substances and protection of species.
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:8: Equipment • Light Eye Protection – EN166F
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:8: • Hearing protection (earplugs BS352-2) – in addition
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:9: • Light eye protection (Safety Specs – BS EN166)
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:9: • Light eye protection (Safety Specs – BS EN166)
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: and Protection environment is located within the former British Steel / SSI site.
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: possible, suitable and adequate hearing protection will be worn by operatives.
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:15: the Environmental Protection Act 1990.
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:15: Environmental At all times site operations will be undertaken with the protection of local
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:15: controlled manner to ensure the protection of and to minimise disruption to local
R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:15: protection. Operatives will be provided with copies of the approved method
R-2020-0598-FF-0598 nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2020-0598-FF-Officer report _R20200598FF.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0598-FF-Officer report _R20200598FF.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection)
R-2020-0598-FF-0598 con land.pdf:1: Environmental Protection Planning Consultation Response
R-2020-0598-FF-email.pdf:10:whether a repair is required or to reinstate the corrosion protection coating system. Please note
R-2020-0598-FF-email.pdf:13: Installation of HV cabling near wayleave (cathodic protection interference) YES No
R-2020-0598-FF-email.pdf:15:information contained in correspondence. For more information on our privacy practices and your data protection
R-2020-0598-FF-Application Form(2).pdf:1:commercial requirements relating to information security and data protection of the information you have provided.
R-2020-0598-FF-Northern Gas.pdf:3: may affect a cover or protection.
R-2022-0411-CD-MGE04773 Nuisance.pdf:1: Environmental Protection Planning Consultation Response
R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2022-0411-CD-Officer report.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)
R-2022-0411-CD-Officer report.pdf:2:been considered by the Council’s environmental protection team. Based on the
R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:9: Consequently, if noise at these receptors are controlled to acceptable levels, adequate protection
R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection.
R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter,
R-2021-1077-CD-21156 FHA v1.PDF:17: status of protection in relation to these issues. The conservation and enhancement of wildlife and
R-2021-1077-CD-21156 FHA v1.PDF:18: protection and recovery of priority species; and identify and pursue opportunities for
R-2021-1077-CD-21156 FHA v1.PDF:19: 176 The following should be given the same protection as habitats sites:
R-2021-1077-CD-21156 FHA v1.PDF:19: a) potential Special Protection Areas and possible Special Areas of Conservation;
R-2021-1077-CD-21156 FHA v1.PDF:19: measures for adverse effects on habitats sites, potential Special Protection Areas,
R-2021-1077-CD-21156 FHA v1.PDF:19: Potential Special Protection Areas, possible Special Areas of Conservation and proposed Ramsar sites are sites
R-2021-1077-CD-21156 FHA v1.PDF:19: on which Government has initiated public consultation on the scientific case for designation as a Special Protection
R-2021-1077-CD-21156 FHA v1.PDF:21: European Habitats Directive and receive full protection under The Conservation of Species and
R-2021-1077-CD-21156 FHA v1.PDF:21: The Wildlife and Countryside Act 1981 (as amended) adds further protection by making it an
R-2021-1077-CD-21156 FHA v1.PDF:21: which it uses for shelter or protection, or to obstruct access to any structure or place the
R-2021-1077-CD-21156 FHA v1.PDF:21: species uses for shelter or protection.
R-2021-1077-CD-21156 FHA v1.PDF:21: Under the Countryside and Rights of Way Act 2000 (CROW Act) extended the protection to cover reckless damage
R-2021-1077-CD-21156 FHA v1.PDF:22: Species Legislation Level of Protection
R-2021-1077-CD-21156 FHA v1.PDF:22: amended) any structure or place used for shelter or protection
R-2021-1077-CD-21156 FHA v1.PDF:22: Wild Mammals for shelter or protection
R-2021-1077-CD-21156 FHA v1.PDF:22: (Protection) Act
R-2021-1077-CD-21156 FHA v1.PDF:22: 1996 Under the Wild Mammals (Protection) Act, water vole are protected from
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:4:4.2.3 Aquifer Protection …………………………………………………………………………………………………………….. 11
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:11:as a Secondary B Aquifer. The site is not located within a Source Protection Zone (SPZ) and there are no SPZ
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:11:Cleveland Coast Site of Special Scientific Interest (SSSI) which is also designated as a Special Protection
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:12:type of water supply pipes or the long-term protection of water supply as part of the redevelopment.
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:17:4.2.3 Aquifer Protection
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:The soil and groundwater SSAC defined for the protection of human health are presented in the Appendix B
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:The risk assessment defined to offer protection to the identified receptors is based on current best practice and
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:42:DEFRA, 2012. Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance.
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:43:Environmental Protection Agency (Washington DC).
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:49:USEPA (IRIS) (No. EPA/635/R-08/016F). US Environmental Protection Agency (Washington DC)
R-2020-0318-FFM-Decision Notice.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4
R-2020-0318-FFM-Decision Notice.pdf:3: (v) Protection during development, followed by consolidation and
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:16: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs)
R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf:1413:• the protection of slags by a reaction product at the oxide interface with the slag.
R-2020-0318-FFM-322582 R_2020_0318_FFM - Ground remediation works at Grangetown Prairie, STDC land, Redcar.pdf:1: Protection Area (SPA) and Ramsar sitehttps:designatedsites.naturalengland.org.uk/. R-2020-0318-FFM-R 2020 0318 FFM NWL.pdf:1:exact location of our assets and ensure any necessary diversion, relocation or protection measures R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:4:site. These comprise of the Teesmouth and Cleveland Coast Special Protection R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:12: as Special Areas of Conservation (SAC) and Special Protection Areas R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:19: Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:66:The Regulations offer protection to a number of ‘European Protected Species’ R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:66:allow an otherwise unlawful act. The species protection provisions of the Habitats R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:67:(SSSI). It confers differing levels of protection on species themselves, their R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:67:Species offered protection by the Act are listed in a series of schedules. These R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:69:enhancement of priority habitats, ecological networks and the protection and R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:70:development process, with appropriate protection and enhancement measures R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:70:Environmental Protection and Enhancement) stating: ‘…Net environmental gains R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:71: contributes to habitat protection and long-term sustainability, and that R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:71:habitat protection, safeguards biodiversity and enhances green Infrastructure, R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:71:focuses on the enhancement and protection of the natural environment. Therefore, R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:71:STDC 7 outlines the need for a coordinated approach to environmental protection R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:74:levels of species protection and the processes linked to protection regimes are R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:87: Special Protection Areas R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:4:(SAC) and Special Protection Area (SPA), Durham Coast SAC and the R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:12: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available: R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:12: JNCC. Northumberland Marine Special Protection Area Information Sheet. Available: R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:12: JNCC. North York Moors Special Protection Area. https://jncc.gov.uk/jncc-assets/SPA- R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:12: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available: R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:14:development, including three Special Protection Areas (SPA), two Special Areas R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:14:18 Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection R-2020-0318-FFM-Prairie Site Remediation HRA_Issue.PDF:38: Special Protection Areas Contains OS data © Crown Copyright and database right (2020) R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7: contaminated land under Part 2A of the Environmental Protection Act 1990; and R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:8: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works, R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31 R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:13: sensitivity1 source protection zones (SPZ) within 1km of the area. R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004 R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Design Of A Site Protection R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:27:Gas Risk Assessment and should incorporate any necessary protection measures appropriate to protect R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: design sulphate class DS-2, indicating that that protection to buried concrete would be required. R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: protection measure to new buildings. R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:47: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:49: sensitivity6 source protection zones (SPZ) within 1km of the area. R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:101:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: CL4 hard surfacing to break pathway Protection against aggressive soils will be health. R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: Relatively easily incorporated into the Protection of in ground workers and R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:105:To enable the protection of the remediation capping layer during both the construction and full site R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:To enable the protection of the remediation capping layer during both the construction and full site R-2020-0318-FFM-Prairie Site, Desk Based Heritage Assessment.PDF:34:A statement setting out current Government policy on the identification, protection, conservation and R-2020-0318-FFM-Prairie Site, Desk Based Heritage Assessment.PDF:37: 1979; and Protection of Wrecks Act 1973); R-2020-0318-FFM-Consultee Response - Network Rail.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but R-2020-0318-FFM-Consultee Response - Network Rail.pdf:1:Asset Protection R-2020-0318-FFM-Consultee Response - Network Rail.pdf:1:imperative that the developer liaise with our Asset Protection Team (details below) prior to any work commencing R-2020-0318-FFM-Consultee Response - Network Rail.pdf:1:Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:permanent alterations to the mutual boundary the applicant must contact Network Rail’s Asset Protection R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:Method statements may require to be submitted to Network Rail’s Asset Protection Project Manager at the below R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:traffic i.e. “possession” which must be booked via Network Rail’s Asset Protection Project Manager and are subject R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:and agreement with our Asset Protection Team and the developer entering into a Basic Asset Protection R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:Agreement (where appropriate). We would advise that the developer discuss the proposals with Asset Protection R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:prior to applying for the discharge of condition. Contact details for Asset Protection are below. R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would R-2020-0318-FFM-Consultee Response - Network Rail.pdf:2:I would advise that in particular the method statements/Asset Protection should be the subject of conditions, the R-2020-0318-FFM-Consultee Response - Network Rail.pdf:3:Asset Protection Project Manager R-2020-0318-FFM-Consultee Response - Network Rail.pdf:3:Email: assetprotectioneastern@networkrail.co.uk R-2020-0318-FFM-318 contam land.pdf:1:Environmental Protection Planning Consultation Response R-2020-0318-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response R-2020-0318-FFM-EP CL.pdf:1:These reports are limited to the protection of future commercial users and not for any R-2020-0318-FFM-Phase II ESA.PDF:19:0.5m and 2.5m bgl (Enviros 2008, MD2 2011). The site is not located within a Groundwater Source Protection R-2020-0318-FFM-Phase II ESA.PDF:34:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered R-2020-0318-FFM-Phase II ESA.PDF:34:protection. At this site, the underlying geology comprises Tidal Flat Deposits which are classified as a R-2020-0318-FFM-Phase II ESA.PDF:38: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2020-0318-FFM-Phase II ESA.PDF:41:of TPH and BTEX compounds have not been identified above the GAC derived for the protection of human R-2020-0318-FFM-Phase II ESA.PDF:43:identified above the GAC derived for the protection of human health and as such, a significant risk to human R-2020-0318-FFM-Phase II ESA.PDF:43:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General R-2020-0318-FFM-Phase II ESA.PDF:53:excess of the GAC for the protection of water resources, further assessment is needed. R-2020-0318-FFM-Phase II ESA.PDF:56:assessment. Concentrations of contaminants were not measured above the GAC derived for the protection R-2020-0318-FFM-Phase II ESA.PDF:731:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at https://www.epa.gov/risk/regional- R-2020-0318-FFM-Phase II ESA.PDF:732:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels R-2020-0318-FFM-Phase II ESA.PDF:733: Protection industry standards R-2020-0318-FFM-EP NUI.pdf:1: Environmental Protection Planning Consultation Response R-2020-0318-FFM-officer report.pdf:4: Special Protection Area (SPA) and Ramsar R-2020-0318-FFM-officer report.pdf:6:With reference to the protection of the railway, Network Rail has no objection R-2020-0318-FFM-officer report.pdf:6:- Protection during development, followed by consolidation and preservation R-2020-0318-FFM-officer report.pdf:8:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0318-FFM-officer report.pdf:8:These reports are limited to the protection of future commercial users and not R-2020-0318-FFM-officer report.pdf:11:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0318-FFM-officer report.pdf:13:protection section with regard to both contamination and nuisance. R-2020-0318-FFM-officer report.pdf:14:Coast Special Protection Area (SPA), Ramsar site, National Nature Reserve R-2020-0318-FFM-officer report.pdf:24: protection of sites of ecological value in accordance with policies SD4 R-2020-0318-FFM-officer report.pdf:25: (v) Protection during development, followed by consolidation and R-2020-0318-FFM-ROA and Remediation Strategy.PDF:13:remediation is required for the protection of groundwater resources. R-2020-0318-FFM-ROA and Remediation Strategy.PDF:15:species from the Teesmouth and Cleveland Coast SPA (Special Protection Area). R-2020-0318-FFM-ROA and Remediation Strategy.PDF:18:Concentrations of contaminants were not measured above the GAC derived for the protection of human R-2020-0318-FFM-ROA and Remediation Strategy.PDF:20: Protection of sub surface structures and utilities from attack due to aggressive ground conditions; R-2020-0318-FFM-ROA and Remediation Strategy.PDF:21:for managing potentially aggressive ground conditions and management / protection for ground gas are R-2020-0318-FFM-ROA and Remediation Strategy.PDF:36: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2020-0318-FFM-ROA and Remediation Strategy.PDF:40:to provide temporary drainage facilities and protection measures (such as silt fences) as necessary to R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf:4:Ground contamination and protection of controlled waters – Advice to R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf:4:can be found on gov.uk and include Groundwater Protection, EA Approach to R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf:4:Groundwater Protection, Land Contamination Risk Management and the Guiding R-2020-0318-FFM-R-2020-0318-FFM-Archaeological Advice - Prairie Site Grangetown R-2020-0318-FFM.pdf:3: - Protection during development, followed by consolidation and preservation of high R-2020-0318-FFM-R-2020-0318-FFM-Archaeological Advice - Prairie Site Grangetown R-2020-0318-FFM.pdf:8: - Protection during development, followed by consolidation and preservation of high value remains left R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:23: protection, ports, harbours and recreation are reducing available habitat R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:23: Listed physical modifications are coast and flood protection use; R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:24: WFD water stipulates that ecological protection should apply to R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: otherwise identified as requiring special protection under any EU instrument R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: providing for the protection of surface water and groundwater or for the R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:28: (i)areas designated for the protection of economically significant aquatic species R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: (iv)areas designated for the protection of habitats or species where the maintenance R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: or improvement of the status of water is an important factor in the protection of the R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:29: Cleveland Coast Special Protection Area (SPA) and Ramsar site due to the R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:48: protection use; modifications will compound and impact on the physical R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:48: estuary as a port/harbour or flood protection. R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:66: Special Protection Area (SPA), Site of Special Scientific Interest (SSSI) and Ramsar R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:68: banks. These were possible flood protection banks made from earth taken from R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: Sites with statutory designations receive varying degrees of legal protection under R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: • Special Areas of Conservation (SAC) and Special Protection Area (SPA) R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: Non-statutory sites are afforded no statutory legal protection, but are normally R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:74: nature conservation value. The protection afforded to such sites is usually R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: Otters also receive protection under the Wildlife and Countryside Act 1981 (as R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: The Salmon and Freshwater Fisheries Act (1975) affords protection to fish and to the R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: Approximately 70 species of invertebrate species receive legal protection through R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: various levels of protection according to the rarity of the species. Offences include R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:75: protection R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: / protection R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: protection R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: Species with full protection under the Act include the Marsh Fritillary Euphydryas R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:76: Protection Act 1990 and must be disposed of properly (i.e. Japanese Knotweed and R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:87:increased protection, probably reactionary R-2021-0924-CD-Decision Notice 0357.pdf:3: for environmental protection. R-2021-0924-CD-Decision Notice 0357.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2021-0729-CD-Decision Notice.pdf:3: for environmental protection. R-2021-0729-CD-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2021-0729-CD-COMPLIANCE OFFICER REPORT.pdf:2:Protection Area (SPA) and Ramsar site. R-2021-0729-CD-COMPLIANCE OFFICER REPORT.pdf:2:effect on the integrity of the Teesmouth and Cleveland Coast Special Protection R-2021-0729-CD-365770 R_2021_0729_CD - Discharge of Condition 6 for outline permission R_2020_0357_OOM, South Industrial Zone, REdcar .pdf:1:Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site. R-2021-0729-CD-INCA2021-59 HRA - South Bank reserved matters.pdf:3:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 9 (2)- Water.pdf:10:Developer Services (Asset Protection) R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 1 - EIA Screening Response.pdf:4:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 1 - EIA Screening Response.pdf:5:Redcar and Cleveland Borough Council Environmental Protection (Contamination) R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:3: • Environmental Protection Act (1990)(Ref 9.4): sets out a range of provisions for environmental R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:3: protection, including integrated pollution control for dangerous substances; R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:3: responsibility for environmental protection and enforcement of legislation. This Act introduced R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:3: measures to enhance protection of the environment including further powers for the prevention R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:5: • Review of the planning frameworks to identify specific plans and policies relating to the protection R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:5: Groundwater Source Protection Zone (SPZ) Zone I R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:9: Protection Zone (SPZ). R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:27:Ref 9.4: Environmental Protection Act 1990 (c. 43). London: Her Majesty’s Stationery Office. R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:4: Principal aquifer, which may be used for public water supply. Source Protection R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:4: Zone I – Inner Protection Zone and Zone II – Outer Protection Zone. R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:4: ecologically sensitive area, e.g., Special Protection Area (SPA)/Site of Scientific R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:5: Secondary aquifer, which is not used for public water supply. Source Protection R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:9: contaminated land under Part IIA of the Environmental Protection Act 1990”; and R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:9:14.25. Part 2A of the Environmental Protection Act 1990 (“Part 2A”) provides the legislative framework for the R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:9: Protection Act 1990. R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:10: implemented. Under the Environmental Protection Act 1990 the Council are legally obliged to inspect R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:16:14.53. The Site is not located in a groundwater source protection zone (SPZ) and there are no groundwater R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:18: (Defra), was queried (Ref. 14.8) to locate Sites of Special Scientific Interest (SSSI), Special Protection Areas R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:23:14.75. The regime for contaminated land was set out in Part 2A (ss.78A-78YC) of the Environmental Protection R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:27: for use’ in accordance with the requirements of Part IIA of the Environmental Protection Act, 1990 and R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:31:14.120. This will inform detailed design including foundation design and any required ground gas protection R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:34:Ref. 14.2: Department for Environment, Food and Rural Affairs (DEFRA) (2012), Environmental Protection Act R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:35:Ref. 14.16: Health and Safety Executive (HSE) (1991), HS(G)66 Protection of Workers and the General Public R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:12:Scientific Interest (SSSIs), Special Areas of Conservation (SACs), Special Protection Areas (SPAs) nor R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:31: Special Protection Areas (SPAs) nor Ramsar sites within the vicinity of the Facility (that are R-2023-0291-ESM-PD Teeside Heritage Statement 0323.pdf:5:2.03 The protection and enhancement of the built historic environment is an over-arching R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:4:10.14. N1 Landscape – This policy supports the protection and enhancement of the Borough’s landscape based R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:4:10.15. N4 Biodiversity and Geological Conservation – This policy supports the protection and enhancement of R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:5: • Development Principle STDC7: National Environmental Protection and Enhancement states R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:5:10.19. The Proposed Development will be compliant with ‘Policies STDC7 Natural Environment Protection and R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:7: • intentionally or recklessly damage, destroy or obstruct any place used for shelter or protection by any R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:7: for shelter or protection; R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:8:the protection of biodiversity and geological conservation in England through the planning system are set out. R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:9: the protection and recovery of priority species; and identify and pursue opportunities for securing R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:9:“The following should be given the same protection as habitats sites: R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:9: a) potential Special Protection Areas and possible Special Areas of Conservation; R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:10: Special Protection Areas, possible Special Areas of Conservation, and listed or proposed Ramsar sites. R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:10:should be considered at an early stage in the development process, with appropriate protection and R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 8 - Ecology.pdf:11:Coast Special Protection Area/Ramsar and European Marine Site, and the North York Moors Special Protection R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:65: protection measures (tank alarms, leak detection, runoff controls etc) have all been R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:65: looking at protection of valuable landscapes and the wider countryside. It identifies the wider benefits R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:65: protection. R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:72:5.26. A shadow Habitats Regulations Assessment has been carried out to ensure that protection of the R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:81:PROTECTION OF THE ENVIRONMENT R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:81: relevant to landscape. These include the protection of valued landscapes in a manner that is R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:81: status of protection in relation to these issues”. It also set out that “the scale and extent of development R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:83: 176. The following should be given the same protection as habitats sites: R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:83: a) potential Special Protection Areas and possible Special Areas of Conservation; R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:83: potential Special Protection Areas, possible Special Areas of Conservation, and listed or R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:84: high degree of environmental protection at all times. R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:85: national and local planning policies, regarding flood risk, drainage and protection of the water R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:5:68 5.9 Source Protection Zones 0 0 0 0 - R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:5:68 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 - R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:6:79 10.4 Special Protection Areas (SPA) 0 0 0 2 4 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:7:83 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:49:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:56:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances) R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:58:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:60:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:60:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:65: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Abstractions and Source Protection Zones R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 1 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 2 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 3 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 4 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 1c R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 2c R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:68: Source Protection Zone 3c R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:69:Features are displayed on the Abstractions and Source Protection Zones map on page 66 R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:70:5.9 Source Protection Zones R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:70:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:70:5.10 Source Protection Zones (confined aquifer) R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:70:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:72:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries, R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:80: Special Protection Areas (SPA) R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:80:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:80:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:81:10.4 Special Protection Areas (SPA) R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:85:10.14 Potential Special Protection Areas (pSPA) R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:85:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:85:Directive for the protection of nationally and internationally important populations of wild birds. Those sites R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:91:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:91:regulation and protection. There are likely to be restrictions to some developments within these areas. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:92:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings. R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:96:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:96:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:126: Location Estimated properties affected Radon Protection Measures required R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:5:a Source Protection Zone (SPZ) and there are no groundwater abstractions within 1km of site. R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:5:north of the site that is also a Special Protection Area (SPA) and a proposed Ramsar site. The site R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:10:land under Part IIA of the Environmental Protection Act 1990; and R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:10:Protection Act (EPA) 1990 (Part 2A). This does not include land that is already regulated through R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:26:As such the report recommends ground gas protection measures and further monitoring. R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:30:The Groundsure report reveals that site is not located within a Source Protection Zone (SPZ) and R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:30:6 https://www.ukhsa-protectionservices.org.uk/radon/information/ukmaps R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:31: Teesmouth and Cleveland Coast Special Protection Areas (SPAs) between R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 7 - Air Quality.pdf:4: Appendix 7.3 – Environmental Assessment Levels for the Protection R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 7 - Air Quality.pdf:4:The critical levels for the protection of vegetation and ecosystems that are relevant to the assessment are R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 7 - Air Quality.pdf:4: Table 7.3.1: Critical Levels for the Protection of Vegetation and Ecosystems R-2023-0291-ESM-Officer Letter_R20220675SCP.pdf:3:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2023-0291-ESM-Officer Letter_R20220675SCP.pdf:4:Redcar and Cleveland Borough Council Environmental Protection (Contamination) R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:2: Environmental Protection Act 1990. R-2023-0291-ESM-ES Vol 1 Chapter 11 Waste.pdf:4:11.17. The Environmental Protection Act 1990 also requires local authorities to contract out waste disposal. R-2023-0291-ESM-CON LAND 0291.pdf:1:Environmental Protection Planning Consultation Response R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:6: legal protection have been subject to detailed assessment. Effects on other ecological features are R-2023-0291-ESM-INCA 2023-11 HRA.pdf:3:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:10: SPA Special Protection Area R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:33: system is in line with the EA’s Groundwater Protection Policy (GP3) and the Water Framework Directive R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:33:2.24. The EA have defined Groundwater Source Protection Zones (SPZs) for 2,000 groundwater sources such R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:33:2.25. The purpose of SPZs is to provide additional protection to safeguard drinking water quality through R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:33:2.26. Zone 1: (Inner Protection Zone) - This zone is defined by a travel time of 50-days or less from any point R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:34:2.27. Zone 2: (Outer Protection Zone) - This zone is defined by the 400-day travel time from a point below the R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:47: management controls necessary for environmental protection during the construction works. This R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:53:4.65. Such measures should be carried out in accordance with the Protection of Workers and the General R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:54:Protection of Ecological Resources R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:54:4.70. Any necessary protection measures will be incorporated in the CEMP. R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:55:4.71. Should the site be required to undergo decommissioning and site closure, similar protection measures R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:75: and protection, to ensure that developments do not adversely affect them. If potential R-2023-0291-ESM-SOL_23_P016_GLR_DAS.pdf:18:connected to both shipping, rail lines and road access the following: open space, green belts, green wedges, carried out to ensure that protection of the integrity R-2023-0291-ESM-PN 0291.pdf:1:Environmental Protection Planning Consultation Response R-2023-0291-ESM-Green Lithium_BREEAM NC 2018 Pre-Assessment Report_1 (with Appendices).pdf:30:Mat 05 Designing for durability Designing for durability & adaptation One credit could be achieved where the design team ensure protection measures are specified to 16.02.2023: Assessor Comment R-2023-0291-ESM-Green Lithium_BREEAM NC 2018 Pre-Assessment Report_1 (with Appendices).pdf:48: advisory capacity to provide recommendations for ecological protection, enhancement and R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:2:7.5. Guidance is provided by the IAQM and Environmental Protection UK (EPUK) on indicative criteria for R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:3: Assessment Levels for the protection of health (Appendix 7.2 Volume 2 of the ES) and critical levels/ R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:3: loads for the protection of sensitive ecosystems and vegetation (Appendix 7.3 Volume 2 of the ES). R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:6: (d) Does not include worker exposure to PM10 as protection is covered by Health and Safety at Work legislation. Except R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:14: • Special Protection Areas (SPAs) and potential SPAs designated under the EC Birds Directive; and R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:16: critical levels and critical loads for the protection of sensitive ecosystems and vegetation (Appendix 7.3 R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:18: legally binding Europe-wide limit values for the protection of public health and sensitive habitats. The R-2023-0291-ESM-ES Vol 1 Chapter 7 Air Quality.pdf:21:7.74. Environmental Protection UK (EPUK) & Institute of Air Quality Management (IAQM) published the Land R-2023-0291-ESM-HSL-230413142132-321-FinalOutcome.pdf:1:which specifically includes provisions for the protection of the public. However, the possibility remains that a R-2021-0905-CD-Decision Notice.pdf:3: for environmental protection. R-2021-0905-CD-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:5:protection of the environment to include the prevention of pollution. In order to facilitate this, the R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:15:Environmental protection measures required to mitigate the significant impacts and risks are R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:17: • Protection of Water courses (Culverts). R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:18:Noise and vibration statutory nuisance are controlled under the Environmental Protection Act 1990. R-2020-0799-CD-Decision Notice.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2020-0799-CD-MGE04204 Nuisance.pdf:1: Environmental Protection Planning Consultation Response R-2020-0799-CD-Decision Notice R 2020 0318.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2020-0799-CD-Decision Notice R 2020 0318.pdf:3: (v) Protection during development, followed by consolidation and R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:9: include environmental protection and mitigation measures and emergency preparedness R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:16: section 34 of the Environmental Protection Act 1990. R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:17:5.18.1 There is an active archaeological brief in place for the protection of potential cultural heritage R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:19: to the protection of the environment will be kept and displayed within the site cabin. Key R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:27:(SAC) and Special Protection Area (SPA), Durham Coast SAC and the R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available: R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. Northumberland Marine Special Protection Area Information Sheet. Available: R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:35: JNCC. North York Moors Special Protection Area. https://jncc.gov.uk/jncc-assets/SPA- R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:35: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available: R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:37:development, including three Special Protection Areas (SPA), two Special Areas R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:37:18 Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:61: Special Protection Areas Contains OS data © Crown Copyright and database right (2020) R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:66:site. These comprise of the Teesmouth and Cleveland Coast Special Protection R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:74: as Special Areas of Conservation (SAC) and Special Protection Areas R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:81: Natural England (March 2019) Teesmouth and Cleveland Coast potential Special Protection R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:128:The Regulations offer protection to a number of ‘European Protected Species’ R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:128:allow an otherwise unlawful act. The species protection provisions of the Habitats R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:129:(SSSI). It confers differing levels of protection on species themselves, their R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:129:Species offered protection by the Act are listed in a series of schedules. These R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:131:enhancement of priority habitats, ecological networks and the protection and R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:132:development process, with appropriate protection and enhancement measures R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:132:Environmental Protection and Enhancement) stating: ‘…Net environmental gains R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:133: contributes to habitat protection and long-term sustainability, and that R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:133:habitat protection, safeguards biodiversity and enhances green Infrastructure, R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:133:focuses on the enhancement and protection of the natural environment. Therefore, R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:133:STDC 7 outlines the need for a coordinated approach to environmental protection R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:136:levels of species protection and the processes linked to protection regimes are R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:149: Special Protection Areas R-2020-0799-CD-officer report.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of R-2020-0799-CD-officer report.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance) R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:13:is aware of their responsibilities under the Control of Pollution Act and the Environmental Protection Act. R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:16:Compliance with all aspects of the Duty of Care (Environmental Protection Act 1990) will be achieved during R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:30:The Construction (Head Protection) Regulations 1989 R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:30:Environmental Protection Act 1990 R-2022-0746-CD-406263 response.pdf:2:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable Use R-2022-0746-CD-406263 response.pdf:2:including any planning conditions. For mineral working and landfilling separate guidance on soil protection R-2022-0746-CD-Decision Notice (4).pdf:3: for environmental protection. R-2022-0746-CD-Decision Notice (4).pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2022-0746-CD-PN 0746.pdf:1: Environmental Protection Planning Consultation Response R-2022-0746-CD-0746 Off rep.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:Ramsar site, Site of Special Scientific Interest (SSSI) and a Special Protection Area (SPA). R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:22: Protection of sub surface structures and utilities from attack due to aggressive ground conditions; R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:27:Asset Protection and Optimisation teams (ASPRO) is required to determine permitting requirements, R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:28: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:32:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:4: Previous Environmental were measured exceeding the GAC in soil for the protection of human health. It was R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:5: Special Protection Area (SPA). R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:17:site, Site of Special Scientific Interest (SSSI) and a Special Protection Area (SPA). R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:17:protection of human health in groundwater. Non aqueous phase liquid (NAPL) and tar were identified primarily R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:21:protection of estuarine surface water (River Tees) as of primary concern. R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:34:SSAC defined for the protection of the identified water resource receptors have been derived in line with the R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:42:The SSAC defined to offer protection to the identified water resource receptors are based on current best R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:44:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points: R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:82:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:83:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2022-0096-CD-Decision Notice.pdf:3: for environmental protection. R-2022-0096-CD-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:4: Previous Environmental were measured exceeding the GAC in soil for the protection of human health. It was R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:5: Special Protection Area (SPA). R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:17:site, Site of Special Scientific Interest (SSSI) and a Special Protection Area (SPA). R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:17:protection of human health in groundwater. Non aqueous phase liquid (NAPL) and tar were identified primarily R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:21:protection of estuarine surface water (River Tees) as of primary concern. R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:34:SSAC defined for the protection of the identified water resource receptors have been derived in line with the R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:42:The SSAC defined to offer protection to the identified water resource receptors are based on current best R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:44:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points: R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:82:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:83:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2022-0096-CD-con land.pdf:1:Environmental Protection Planning Consultation Response R-2022-0096-CD-con land.pdf:2:(PAHs) were measured exceeding the GAC in soil for the protection of human health. R-2022-0096-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2022-0096-CD-COMPLIANCE OFFICER REPORT.pdf:3:(PAHs) were measured exceeding the GAC in soil for the protection of human R-2022-0096-CD-COMPLIANCE OFFICER REPORT.pdf:3:Protection team. Discussions have taken place between the EHO and the applicants R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 14.pdf:15:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 14.pdf:17:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 14.pdf:19:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening R-2022-0237-CD-Decision Notice R 2021 0166 FFM.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:8: The site is not within a Groundwater Source Protection Zone. Groundwater is perched R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:16:protection. At this site, the Redcar Mudstone Formation is classified as a Secondary (undifferentiated) Aquifer R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:20: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:22:accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:33:USEPA. (2018, May 15). United States Environmental Protection Agency (USEPA). Retrieved from Risk R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:17:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions. R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:23: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:28:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:10:US EPA United States Environmental Protection Agency R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:15:the protection of human health in groundwater. NAPL and tar were identified primarily within the Made Ground R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:17:Coast is also a designated Ramsar site, Site of Special Scientific Interest (SSSI) and a Special Protection Area R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:17:assessing the risk to water resources, based on protection of surface water as of primary concern. R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:28:SSAC defined for the protection of the identified water resource receptors have been derived and are R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:30:The SSAC defined to offer protection to the identified water resource receptors are based on current best R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:61: Measured concentration exceeds the criteria defined for the protection of water R-2021-0713-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0713-CD-COMPLIANCE OFFICER REPORT.pdf:2:protection of human health in groundwater. R-2021-0713-CD-COMPLIANCE OFFICER REPORT.pdf:4:Protection team. Discussions have taken place between the EHO and the applicants R-2021-0713-CD-Contam Land.pdf:1:Environmental Protection Planning Consultation Response R-2021-0713-CD-Contam Land.pdf:2:protection of human health in groundwater. R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:4: were measured exceeding the GAC in soil for the protection of human health. It was R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:5: Special Protection Area (SPA). R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:17:site, Site of Special Scientific Interest (SSSI) and a Special Protection Area (SPA). R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:17:protection of human health in groundwater. Non aqueous phase liquid (NAPL) and tar were identified primarily R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:21:protection of estuarine surface water (River Tees) as of primary concern. R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:34:SSAC defined for the protection of the identified water resource receptors have been derived in line with the R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:39:The SSAC defined to offer protection to the identified water resource receptors are based on current best R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:41:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points: R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:67:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:68:#1:No UK EQS for total petroleum hydrocarbons (TPH), or speciated TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters (Abstraction for Drinking Water) Regulations R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:safe access, safe places for work, hazardous substances and protection of species. R-2021-0608-PND-Officer Report 0608.pdf:1:Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/. R-2021-0608-PND-hra.pdf:11: Environmental Protection Act 1990. R-2021-0608-PND-hra.pdf:13:Coast Special Protection Area Recreation Management Plan (RMP) and the other Strategies R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9: Control of Pollution Act 1974, and the Environmental Protection Act 1990. R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:12:Teesmouth and Cleveland Coast Special Protection Area (SPA) and the Teesmouth and R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:12:Convention on Wetlands but which are afforded the same level of protection in policy terms R-2021-0608-PND-363937 - R_2021_0608_PND Prior Notification for demolition of structures at Former Redcar Steel Works Site (Teesworks), Redcar.pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/. R-2021-0608-PND-19931629_1.pdf:8: Equipment • Light Eye Protection – EN166F R-2021-0608-PND-19931629_1.pdf:8: • Hearing protection (earplugs BS352-2) – in addition R-2021-0608-PND-19931629_1.pdf:9: • Light eye protection (Safety Specs – BS EN166) R-2021-0608-PND-19931629_1.pdf:9: • Light eye protection (Safety Specs – BS EN166) R-2021-0608-PND-19931629_1.pdf:10: and Protection environment is located within the former Teesworks site. R-2021-0608-PND-19931629_1.pdf:14: possible, suitable and adequate hearing protection will be worn by operatives. R-2021-0608-PND-19931629_1.pdf:15: the Environmental Protection Act 1990. R-2021-0608-PND-19931629_1.pdf:15: Environmental At all times site operations will be undertaken with the protection of local R-2021-0608-PND-19931629_1.pdf:15: controlled manner to ensure the protection of and to minimise disruption to local R-2021-0608-PND-19931629_1.pdf:15: protection. Operatives will be provided with copies of the approved method 20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:2: protection as Annex II species in the EU Habitats Directive. MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:14:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area (SPA) MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:The existing riverbank comprises a tidal defence, providing protection during a tidal event within the Tees MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:19:riverbank providing a revised defence line and continued protection during an extreme event, both now and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:28:good reference material for protection of water courses when working in and around water. STDC would MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:29: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:29:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’ MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:40: • Provide high standards of protection for the natural environment. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:53: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:144: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:145:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:170: under Part IIA of the Environmental Protection Act MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:170:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:170:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:172:regulatory controls for the protection of water resources, including the quality standards expected for MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:172:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:172:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:173: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990: MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:173: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:174: Details of aquifers, Source Protection Zones MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:179: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:179: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008); MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:181:protection. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:185:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:185:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:185:The Town Country Planning Act and the Environmental Protection Act do not consider future uses. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:191: Protection Areas (SPA) and potential SPAs, Ramsar sites, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:217: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:218: Legislation Level of protection Species included Details MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:218: Conservation of Small protection of specific areas, monitoring, research, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:218: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:218: the Protection of the Marine species and declining species in the north-east Atlantic. These MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:218: Phocoena on the conservation and protection of marine MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:219: Legislation Level of protection Species included Details MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:222:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:224:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:224:provide the same level of protection for more than 12nm offshore. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:224:and necessary legislative and administrative measures to ensure the protection of seal species. The MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:224:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:224:protection was afforded to protect harbour and grey seal year-round along the east coast of England. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:249: • Protection of Badgers Act 1992; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:250:value, secondary or supporting value, social value, economic value, legal protection and multi-functional MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:257: LWS 4.7 km This is afforded protection as an Ancient Woodland. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:266:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:271: Special Protection Area (SPA): Teesmouth and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:274:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:276:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:305:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:309: protection of these species during critical migration periods. This assessment of consequent impacts on MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:311:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:312:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4). MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:312:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:314:require protection and guides the OSPAR Commission in setting priorities for future conservation and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:314:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:315:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:329:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:355:that all crashed aircraft in military service are automatically protected under the Protection of Military MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:362:Environmental Protection Act 1990 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:362:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:370: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:380: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: loads for ecosystem protection from atmospheric MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: consultation Environmental Protection department to discuss MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: Protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: Scoping Protection department at MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: received August Protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: RCBC The environmental protection department MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382: Protection set out in this Section is acceptable. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:382:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:398:landscapes within the member states and encourages their protection, management and planning. The UK MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:399:and local level will be afforded additional protection commensurate with their status. Wherever possible, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:400:the South Tees Area. These include the protection of heritage assets and the historic environment and the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:400:protection and enhancement of landscape character. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:405:Special Protection Area Yes Yes MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:408: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:421: • Impacts to coastal / tidal protection and flood defence. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:426:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:432:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:433:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:434:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:436:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:439: • support the expansion and protection of the port and logistics sector; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:523: Special Protection Area (SPA) Tees Legend MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:526: Yes (Coastal Protection, Flood MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:526: Heavily modified water body and for Yes (Flood Protection, Navigation Ports MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:526: protection, Navigation, Ports and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:541:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:541:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:592:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:593:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control: MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:593:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:595:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL: MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9:2.2.3 Environmental Protection Act 1990 Part II – Controlled Waste and Duty of MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9:Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance with MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:59: would meet the HSE’s land use planning advice criteria in regard to public protection. MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:60: Protection MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:62:seabirds (i.e. the site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Site MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:Redcar and Cleveland Borough Council Environmental Protection Contamination MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:84:reply to it public if asked to under the Freedom of Information Act, Data Protection Act or for MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:84:Protection Act or for litigation. Email messages and attachments sent to or from any MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:249:3.2.2 Groundwater Source Protection Zones 10 MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:249:5.2 CORUS UK LTD. First phase reporting of the site protection and monitoring MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:251:Secondary B Aquifer. The site does not lay on a Source Protection Zone (SPZ) and there are no MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Part 2A of The Environmental Protection Act (1990); and, MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Defra ‘Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance’, MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:254: • Environment Agency (EA) GP3 ‘Groundwater Protection: Policy and Practice’ and, MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:255: • CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:255: • CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring Programme; MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:259:reported within ‘Teesside Works Site Protection and Monitoring Programme (‘SPMP’)’ by Corus 2008. The MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:protection measures (described in BRE, 2001) in the construction of new buildings, conversions or MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:261:estimated to be at or above the Action Level). Therefore, radon protection measures are not required within MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:3.2.2 Groundwater Source Protection Zones MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:Groundwater Source Protection Zones (SPZs) are defined around abstraction boreholes used for potable MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:262:Cleveland Coast Special Protection Area (SPA), Ramsar site and Site of Special Scientific Interest (SSSI). MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:271:5.2 CORUS UK LTD. First phase reporting of the site protection and MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:286: • Consideration should be given to protection of potable water supply pipes following UK Water MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:287: 11 CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:287: 13 CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:good reference material for protection of water courses when working in and around water. STDC would MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:29: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:29:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’ MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:40: • Provide high standards of protection for the natural environment. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:53: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:144: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:145:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170: under Part IIA of the Environmental Protection Act MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:170:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:regulatory controls for the protection of water resources, including the quality standards expected for MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:172:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:173: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990: MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:173: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:174: Details of aquifers, Source Protection Zones MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:179: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:179: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008); MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:181:protection. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:185:The Town Country Planning Act and the Environmental Protection Act do not consider future uses. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:191: Protection Areas (SPA) and potential SPAs, Ramsar sites, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:217: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Legislation Level of protection Species included Details MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Conservation of Small protection of specific areas, monitoring, research, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: the Protection of the Marine species and declining species in the north-east Atlantic. These MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:218: Phocoena on the conservation and protection of marine MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:219: Legislation Level of protection Species included Details MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:222:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:provide the same level of protection for more than 12nm offshore. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:and necessary legislative and administrative measures to ensure the protection of seal species. The MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:224:protection was afforded to protect harbour and grey seal year-round along the east coast of England. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:249: • Protection of Badgers Act 1992; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:250:value, secondary or supporting value, social value, economic value, legal protection and multi-functional MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:257: LWS 4.7 km This is afforded protection as an Ancient Woodland. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:266:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:271: Special Protection Area (SPA): Teesmouth and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:274:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:305:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:309: protection of these species during critical migration periods. This assessment of consequent impacts on MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:311:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:312:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4). MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:312:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:314:require protection and guides the OSPAR Commission in setting priorities for future conservation and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:314:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:315:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:355:that all crashed aircraft in military service are automatically protected under the Protection of Military MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:362:Environmental Protection Act 1990 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:362:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:380: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: loads for ecosystem protection from atmospheric MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: consultation Environmental Protection department to discuss MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Scoping Protection department at MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: received August Protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: RCBC The environmental protection department MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382: Protection set out in this Section is acceptable. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:382:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:398:landscapes within the member states and encourages their protection, management and planning. The UK MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:399:and local level will be afforded additional protection commensurate with their status. Wherever possible, MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:the South Tees Area. These include the protection of heritage assets and the historic environment and the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:protection and enhancement of landscape character. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:405:Special Protection Area Yes Yes MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:408: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:421: • Impacts to coastal / tidal protection and flood defence. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:426:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:432:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:433:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:434:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:436:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:439: • support the expansion and protection of the port and logistics sector; MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:523: Special Protection Area (SPA) Tees Legend MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: Yes (Coastal Protection, Flood MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: Heavily modified water body and for Yes (Flood Protection, Navigation Ports MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:526: protection, Navigation, Ports and MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:541:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:592:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703 MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control: MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:595:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL: MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:114: Protection Act 1990, ecosystems environment MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180:The majority of risk controls are aimed at the protection third party property such as overhead cables MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:Scientific Interest (SSSI), Special Areas of Conservation (SAC) and Special Protection Areas (SPA), MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350:Protection Zone5. MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350: DEFRA Magic Map. Online. Source Protection Zones: Available at: https://magic.defra.gov.uk/MagicMap.aspx MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:361: • support the expansion and protection of the port and logistics sector. MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:373:proposed quay would provide suitable protection against the 0.5% (1 in 200) and 0.1% (1 in 1,000) annual MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:374:Whilst the proposed quay wall will provide protection throughout the lifetime of the proposed scheme it is MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:375:upstream within the tidal estuary, it will receive a greater level of protection from tidal inundation than the MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:376:Whilst the finished quay wall and hardstanding levels provide protection from an extreme tidal event (e.g. 1 MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:377: ensures that the proposed quay provides continued protection against the 1 in 200-year and 1 in MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:380: the definition of “personal data” under the Data Protection Act 1998 MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:382:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act MLA_2020_00507-APPLICATION-FORM.pdf:3:This could include statutory powers of a coast protection authority, harbour authority or lighthouse authority or any MLA_2020_00507-APPLICATION-FORM.pdf:7:Cleveland Coast Special Protection Area (SPA) and Ramsar site. However, the effects MLA_2020_00507-APPLICATION-FORM.pdf:9:Emergency activities are those undertaken for the protection of life, property or the environment from an imminent R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2 R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:28:good reference material for protection of water courses when working in and around water. STDC would R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:29: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:29:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’ R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:40: • Provide high standards of protection for the natural environment. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:53: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:144: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:145:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:170: under Part IIA of the Environmental Protection Act R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:170:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:170:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:172:regulatory controls for the protection of water resources, including the quality standards expected for R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:172:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:172:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:173: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990: R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:173: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:174: Details of aquifers, Source Protection Zones R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:179: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:179: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008); R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:181:protection. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:185:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:185:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:185:The Town Country Planning Act and the Environmental Protection Act do not consider future uses. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:191: Protection Areas (SPA) and potential SPAs, Ramsar sites, R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:217: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:218: Legislation Level of protection Species included Details R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:218: Conservation of Small protection of specific areas, monitoring, research, R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:218: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:218: the Protection of the Marine species and declining species in the north-east Atlantic. These R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:218: Phocoena on the conservation and protection of marine R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:219: Legislation Level of protection Species included Details R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:222:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:224:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:224:provide the same level of protection for more than 12nm offshore. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:224:and necessary legislative and administrative measures to ensure the protection of seal species. The R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:224:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:224:protection was afforded to protect harbour and grey seal year-round along the east coast of England. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:249: • Protection of Badgers Act 1992; R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:250:value, secondary or supporting value, social value, economic value, legal protection and multi-functional R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:257: LWS 4.7 km This is afforded protection as an Ancient Woodland. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:266:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:271: Special Protection Area (SPA): Teesmouth and R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:274:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:276:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:305:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:309: protection of these species during critical migration periods. This assessment of consequent impacts on R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:311:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:312:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4). R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:312:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:314:require protection and guides the OSPAR Commission in setting priorities for future conservation and R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:314:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:315:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:329:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:355:that all crashed aircraft in military service are automatically protected under the Protection of Military R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:362:Environmental Protection Act 1990 R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:362:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:370: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:380: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: loads for ecosystem protection from atmospheric R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: consultation Environmental Protection department to discuss R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: Protection R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: Scoping Protection department at R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: received August Protection R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: RCBC The environmental protection department R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382: Protection set out in this Section is acceptable. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:382:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:398:landscapes within the member states and encourages their protection, management and planning. The UK R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:399:and local level will be afforded additional protection commensurate with their status. Wherever possible, R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:400:the South Tees Area. These include the protection of heritage assets and the historic environment and the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:400:protection and enhancement of landscape character. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:405:Special Protection Area Yes Yes R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:408: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve; R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:421: • Impacts to coastal / tidal protection and flood defence. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:426:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1 R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:432:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:433:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:434:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:436:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:439: • support the expansion and protection of the port and logistics sector; R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:523: Special Protection Area (SPA) Tees Legend R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:526: Yes (Coastal Protection, Flood R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:526: Heavily modified water body and for Yes (Flood Protection, Navigation Ports R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:526: protection, Navigation, Ports and R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:541:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:541:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:589:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:592:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703 R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:593:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control: R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:593:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:595:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL: R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:5:Lamprey, it is likely that dredging activity will need to take into account the protection of R-2020-0371-SCP-R 2020 0371 SCP NWL.pdf:1:necessary diversion, relocation or protection measures required prior to the commencement of the R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:9: would meet the HSE’s land use planning advice criteria in regard to public protection. R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:10: Protection R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:12:seabirds (i.e. the site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Site R-2020-0371-SCP-0371 EP Nuis.pdf:1: Environmental Protection Planning Consultation Response R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:2:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:3:Protection Areas, possible Special Areas of Conservation, listed or proposed Ramsar sites, and any R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:3:(Special Areas of Conservation, Special Protection Areas and Ramsar sites) R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:3: Teesmouth and Cleveland Coast Special Protection Area, which is designated in the vicinity R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:5:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:6:redevelopment in a way that reduces pollution, contributes to habitat protection and long term R-2020-0371-SCP-371 Ep Contam Land.pdf:1: Environmental Protection Planning Consultation Response R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:3: protection of these species during critical migration periods. This assessment of consequent impacts on R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:5:Pomatoschistus minutus is listed for protection in Appendix III to the Bern Convention (see Section R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:6:for protection in Appendix III to the Bern Convention (see Section 13.4.1.4). R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:6:lamprey and river lamprey afforded additional protection as Annex II species in the EU Habitats Directive R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:8:require protection and guides the OSPAR Commission in setting priorities for future conservation and R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:8:protection of marine biodiversity. Additionally, the statutory list of species of principal importance for the R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:9:Some migratory diadromous fish species are afforded additional protection since they are listed in Annex II R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:sites for small / juvenile fish, particularly in nursery sites. The wharf itself may offer protection from aerial R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:9: would meet the HSE’s land use planning advice criteria in regard to public protection. R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:10: Protection R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:12:seabirds (i.e. the site is within the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Site R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:1: Protection Areas (SPA) and potential SPAs, Ramsar sites, R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:14:The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection Area (SPA) R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:The existing riverbank comprises a tidal defence, providing protection during a tidal event within the Tees R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:19:riverbank providing a revised defence line and continued protection during an extreme event, both now and R-2020-0684-ESM-DECISION NOTICE.pdf:5: such that a continued standard of protection will be provided throughout R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site) shown in Figure 1.2 R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:3: • support the expansion and protection of the port and logistics sector; R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:1: • Impacts to coastal / tidal protection and flood defence. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:6:constructed at a level of 5.84m AOD, providing suitable protection against the 0.5% (1 in 200) and 0.1% (1 R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:12:The proposed quay would be constructed at a level 5.84m AOD, providing suitable protection against the R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:13:line (i.e. quay) such that a continued standard of protection will be provided throughout construction that is R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:14:at a level of 5.84m AOD, and therefore providing a standard of protection that is comparable with the existing R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_20. Flood risk and coastal defence.pdf:16:The proposed quay would be constructed at a level of 5.84m AOD, providing suitable protection against the R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:5:Special Protection Area (SPA) and Ramsar site are currently being considered by R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2: under Part IIA of the Environmental Protection Act R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2:Environmental Protection Act 1990 (Part 2A): Contaminated Land Statutory Guidance R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:2:The Environmental Protection Act 1990 makes provision for the improved control of pollution arising from R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:regulatory controls for the protection of water resources, including the quality standards expected for R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:environmental protection of controlled waters. This legislation is relevant to land quality as it will help aid R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:4:operational activities. It will also aid in the identification of suitable mitigation measures to provide protection R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:5: • Department for Environment, Food and Rural Affairs (Defra), Environmental Protection Act 1990: R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:5: • Environment Agency, The Environment Agency’s approach to groundwater protection, 2018. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:6: Details of aquifers, Source Protection Zones R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:11: • Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside (CORUS R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:11: • First Phase Reporting of the Site Protection and Monitoring Programme (CORUS UK LTD, 2008); R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:13:protection. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:Town Country Planning Act, 1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:Part 2A of the Environmental Protection Act requires local authorities to identify contaminated land and R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:17:The Town Country Planning Act and the Environmental Protection Act do not consider future uses. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: These Regulations provide protection for specific habitats listed in Annex I and species listed in Annex R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: The Conservation of II of the Habitats Directive. The Directive sets out decision making procedures for the protection of R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: Habitats and Species Special Areas of Conservation (SAC) and Special Protection Areas (SPA), implemented in the UK R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: Wildlife and and protects occupied and unoccupied places used for shelter or protection by such animals. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: The Protection of The Act makes it an offence to wilfully kill, injure or take, or attempt to kill, injure or take a badger R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: (Protection of Badgers The Act makes it an offence to intentionally or recklessly damage, destroy or obstruct a badger sett, or R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2: (CRoW)2000 (CRoW, and protection, as well as to the Wildlife and Countryside Act 1981, to strengthen the legal protection R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:6: • Protection of Badgers Act 1992; R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:7:value, secondary or supporting value, social value, economic value, legal protection and multi-functional R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:14: LWS 4.7 km This is afforded protection as an Ancient Woodland. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:23:prior to works commencing, to ensure the protection afforded to otters, the agreed mitigation measures and R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8:2.2.3 Environmental Protection Act 1990 Part II – Controlled Waste and Duty of R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8:Protection Act 1990, to ensure that producers and holders handle their waste safely and in compliance with R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:1:Environmental Protection Act 1990 R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:1:Section 79 of the Environmental Protection Act 1990 (‘the EPA 1990’) defines statutory nuisance with regard R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9: limited tolerance disturbance and a level of protection is required but a level of tolerance is expected. R-2020-0684-ESM-EP CL.pdf:1:Environmental Protection Planning Consultation Response R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:Protection Areas (SPA) and Special Areas of Conservation (SAC). Appropriate Assessment is also required R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:6: • Provide high standards of protection for the natural environment. R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:50:The majority of risk controls are aimed at the protection third party property such as overhead cables R-2020-0684-ESM-Officer Report 0684.pdf:7:Special Protection Area (SPA) https://designatedsites.naturalengland.org.uk/. R-2020-0684-ESM-Officer Report 0684.pdf:13:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0684-ESM-Officer Report 0684.pdf:14:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0684-ESM-Officer Report 0684.pdf:40:Special Protection Area (SPA) and/or damage or destroy the interest features R-2020-0684-ESM-Officer Report 0684.pdf:46:Special Protection Area (SPA) and/or damage or destroy the interest features R-2020-0684-ESM-Officer Report 0684.pdf:75: Impacts to coastal / tidal protection and flood defence. R-2020-0684-ESM-Officer Report 0684.pdf:78:is to be constructed at a level of 5.84m AOD, providing suitable protection R-2020-0684-ESM-Officer Report 0684.pdf:79:AOD. Given this design standard, the level of protection is considered to be R-2020-0684-ESM-Officer Report 0684.pdf:79:required to be given to the protection of construction workers. It is considered R-2020-0684-ESM-Officer Report 0684.pdf:79:necessary for this protection to be built into the proposed CEMP in the form of R-2020-0684-ESM-Officer Report 0684.pdf:79:and therefore existing flood protection measures for the site. It is considered R-2020-0684-ESM-Officer Report 0684.pdf:79:of protection afforded to the sit is maintained. A planning condition is R-2020-0684-ESM-Officer Report 0684.pdf:84:d Support the expansion and protection of the port and logistics sector; R-2020-0684-ESM-Officer Report 0684.pdf:101: quay) such that a continued standard of protection will be provided R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1:Scientific Interest (SSSI), Special Areas of Conservation (SAC) and Special Protection Areas (SPA), R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:3: • Canadian Sediment Quality Guidelines (CSQG) for the Protection of Aquatic Life (Canadian Council R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:4:specifically for Canada and are based on the protection of pristine environments. In the absence of suitable R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8:Protection Zone5. R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8: DEFRA Magic Map. Online. Source Protection Zones: Available at: https://magic.defra.gov.uk/MagicMap.aspx R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:19: • support the expansion and protection of the port and logistics sector. R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:31:proposed quay would provide suitable protection against the 0.5% (1 in 200) and 0.1% (1 in 1,000) annual R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:32:Whilst the proposed quay wall will provide protection throughout the lifetime of the proposed scheme it is R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:33:upstream within the tidal estuary, it will receive a greater level of protection from tidal inundation than the R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:34:Whilst the finished quay wall and hardstanding levels provide protection from an extreme tidal event (e.g. 1 R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:35: ensures that the proposed quay provides continued protection against the 1 in 200-year and 1 in R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:38: the definition of “personal data” under the Data Protection Act 1998 R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:40:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:extraction on seabirds. Marine Environment Protection Fund (MEPF) Project 09/P130. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:5:for the Protection of Birds. ISBN 10: 0903138700 ⁄ ISBN 13: 9780903138703 R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:IAQM and Environmental Protection UK (EPUK) (2017). Land-use Planning & Development Control: R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:JNCC, Natural England and CCW (2010). Draft EPS Guidance - The protection of marine European R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:8:Protection Area (pSPA) and Ramsar. Report to Defra, March 2018. Available at URL: R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:2: Special Protection Area (SPA) Tees Legend R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: Yes (Coastal Protection, Flood R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: Heavily modified water body and for Yes (Flood Protection, Navigation Ports R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:5: protection, Navigation, Ports and R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20:1990 but also by Part 2A of the Environmental Protection Act, 1990 (EPA,1990). Part 2A of the R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:20:Environmental Protection Act requires local authorities to identify contaminated land and ensure potential R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:4:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:4:Redcar and Cleveland Borough Council Environmental Protection Contamination R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:11:reply to it public if asked to under the Freedom of Information Act, Data Protection Act or for R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:11:Protection Act or for litigation. Email messages and attachments sent to or from any R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:2: Special Protection Area (SPA): Teesmouth and R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:5:for the Protection of Birds (RSPB) and the Joint Nature Conservation Council (JNCC) in association with R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7:Special Protection Area (SPA) and Ramsar” (Natural England, 2018a) and the site citations. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:36:Most of these areas are relatively exposed areas of intertidal, although some protection is afforded by the R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:3:3.2.2 Groundwater Source Protection Zones 10 R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:3:5.2 CORUS UK LTD. First phase reporting of the site protection and monitoring R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:5:Secondary B Aquifer. The site does not lay on a Source Protection Zone (SPZ) and there are no R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Part 2A of The Environmental Protection Act (1990); and, R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Defra ‘Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance’, R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:8: • Environment Agency (EA) GP3 ‘Groundwater Protection: Policy and Practice’ and, R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:9: • CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:9: • CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring Programme; R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:13:reported within ‘Teesside Works Site Protection and Monitoring Programme (‘SPMP’)’ by Corus 2008. The R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:protection measures (described in BRE, 2001) in the construction of new buildings, conversions or R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:15:estimated to be at or above the Action Level). Therefore, radon protection measures are not required within R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:3.2.2 Groundwater Source Protection Zones R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:Groundwater Source Protection Zones (SPZs) are defined around abstraction boreholes used for potable R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:16:Cleveland Coast Special Protection Area (SPA), Ramsar site and Site of Special Scientific Interest (SSSI). R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:25:5.2 CORUS UK LTD. First phase reporting of the site protection and R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:40: • Consideration should be given to protection of potable water supply pipes following UK Water R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:41: 11 CORUS UK LTD. (2004) Design of a Site Protection and Monitoring Programme for Cleveland R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:41: 13 CORUS UK LTD (2008). First Phase Reporting of the Site Protection and Monitoring R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:720: Protection Act 1990, ecosystems environment R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:14: • support the expansion and protection of the port and logistics sector; R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:17: • Provide high standards of protection for the natural environment. R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:25:5.26 The proposed scheme is located within the Teesmouth and Cleveland Coast Special Protection R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:29:5.61 The existing riverbank comprises a tidal defence, providing protection during a tidal event R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:29: protection during an extreme event, both now and in the future. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:good reference material for protection of water courses when working in and around water. STDC would R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:15: • Equipment, plant and personal protection equipment (PPE) brought to site would be clean and free R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:15:for soils to ensure protection of human health under a commercial land-use scenario. No ‘suitable for use’ R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:17:that all crashed aircraft in military service are automatically protected under the Protection of Military R-2020-0684-ESM-cil_questions phase 1.pdf:1:requirements relating to information security and data protection of the information you have provided. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:1: Protection Areas (SPA) and potential SPAs, Ramsar sites, and Section 29. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Legislation Level of protection Species included Details R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Conservation of Small protection of specific areas, monitoring, research, R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: The Berne Convention 1979 International All cetaceans, grey The Convention conveys special protection to R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: the Protection of the Marine species and declining species in the north-east Atlantic. These R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:2: Phocoena on the conservation and protection of marine R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:3: Legislation Level of protection Species included Details R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:6:are additionally listed under Annex II of the Habitats Directive and are afforded protection through the R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:protection. Both grey and harbour seal are listed under Annex II and Annex V of the Habitats Directive. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:provide the same level of protection for more than 12nm offshore. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:and necessary legislative and administrative measures to ensure the protection of seal species. The R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:Conservation of Seals Act 1970 provides protection for seals within the UK, where it is an offence to take or R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:8:protection was afforded to protect harbour and grey seal year-round along the east coast of England. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:2:landscapes within the member states and encourages their protection, management and planning. The UK R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:3:and local level will be afforded additional protection commensurate with their status. Wherever possible, R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:the South Tees Area. These include the protection of heritage assets and the historic environment and the R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:protection and enhancement of landscape character. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:9:Special Protection Area Yes Yes R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:12: Importance, Special Protection Area, Ramsar Site and Teesmouth National Nature Reserve; R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:3: • it is likely that dredging activity will need to take into account the protection of Section 6.6.4. R-2020-0684-ESM-PN 0684.pdf:1:Environmental Protection Planning Consultation Response R-2020-0684-ESM-336521 R_2020_0684_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 1.pdf:1: Protection Area (SPA) https://designatedsites.naturalengland.org.uk/. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:3: authority and, where appropriate, the Environment Agency (EA) Section 5.8.6 Protection department at R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: loads for ecosystem protection from atmospheric R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: consultation Environmental Protection department to discuss R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Protection R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Scoping Protection department at R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: received August Protection R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: RCBC The environmental protection department R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5: Protection set out in this Section is acceptable. R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:5:The assessment methodologies set out in this section were agreed with RCBC’s environmental protection R-2020-0684-ESM-RCBC scoping opinion.pdf:5:HSE's land use planning advice criteria in regard to public protection, then we suggest you R-2020-0684-ESM-RCBC scoping opinion.pdf:9:European sites (e.g. designated Special Areas of Conservation and Special Protection R-2020-0684-ESM-RCBC scoping opinion.pdf:9:that potential Special Protection Areas, possible Special Areas of Conservation, listed or R-2020-0684-ESM-RCBC scoping opinion.pdf:10:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites) R-2020-0684-ESM-RCBC scoping opinion.pdf:10: Teesmouth and Cleveland Coast potential Special Protection Area, which is designated in R-2020-0684-ESM-RCBC scoping opinion.pdf:13:critical loads for ecosystem protection from atmospheric nitrogen deposition (England R-2020-0684-ESM-RCBC scoping opinion.pdf:14:delivering redevelopment in a way that reduces pollution, contributes to habitat protection R-2020-0684-ESM-RCBC scoping opinion.pdf:15:With reference to the protection of the railway, Network Rail would require that any R-2020-0684-ESM-RCBC scoping opinion.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2020-0684-ESM-RCBC scoping opinion.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2021-0405-FFM-355679 - R_2021_0405_FFM Engineering operations associated with ground remediation and preparation at Land at South Bank South Industrial Zone Redcar - No Objs Sub Mit.pdf:1: Protection Area and Ramsar Site https://designatedsites.naturalengland.org.uk/. R-2021-0405-FFM-355679 - R_2021_0405_FFM Engineering operations associated with ground remediation and preparation at Land at South Bank South Industrial Zone Redcar - No Objs Sub Mit.pdf:2:the potential to affect its interest features. European sites are afforded protection under the R-2021-0405-FFM-355679 - R_2021_0405_FFM Engineering operations associated with ground remediation and preparation at Land at South Bank South Industrial Zone Redcar - No Objs Sub Mit.pdf:2:The application site is in close proximity to the Teesmouth and Cleveland Coast Special Protection R-2021-0405-FFM-355679 - R_2021_0405_FFM Engineering operations associated with ground remediation and preparation at Land at South Bank South Industrial Zone Redcar - No Objs Sub Mit.pdf:2:Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar Site R-2021-0405-FFM-355679 - R_2021_0405_FFM Engineering operations associated with ground remediation and preparation at Land at South Bank South Industrial Zone Redcar - No Objs Sub Mit.pdf:2:a matter of Government policy. Paragraph 118 of the National Planning Policy Framework applies the same protection R-2021-0405-FFM-R 2021 0405 FFM NWL.pdf:1:ensure any necessary diversion, relocation or protection measures required prior to the R-2021-0405-FFM-63262_01 - Application Form.PDF:1:commercial requirements relating to information security and data protection of the information you have provided. R-2021-0405-FFM-EA R_2021_0405_FFM 17 June 2021 OFFICIAL .pdf:2:found on gov.uk and include Groundwater Protection, EA Approach to Groundwater R-2021-0405-FFM-EA R_2021_0405_FFM 17 June 2021 OFFICIAL .pdf:2:Protection, Land Contamination R-2021-0405-FFM-DECISION NOTICE.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2021-0405-FFM-0405.pdf:1:Environmental Protection Planning Consultation Response R-2021-0405-FFM-0405.pdf:3: drainage facilities and protection measures (such as silt fences) as R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:6:Cleveland Coast Special Protection Area (SPA) and the Teesmouth and Cleveland Coast Ramsar site. R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:6:level of protection in policy terms in respect of new development as European sites. The Teesmouth R-2021-0405-FFM-OFFICER REPORT.pdf:4: Special Protection Area and Ramsar Site R-2021-0405-FFM-OFFICER REPORT.pdf:6:and protection measures (such as silt fences) as necessary to ensure the site, R-2021-0405-FFM-OFFICER REPORT.pdf:6:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0405-FFM-OFFICER REPORT.pdf:8:facilities and protection measures (such as silt fences) as necessary to ensure R-2021-0405-FFM-OFFICER REPORT.pdf:9:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0405-FFM-OFFICER REPORT.pdf:11:protection section with regard to both contamination and nuisance. R-2021-0405-FFM-OFFICER REPORT.pdf:12:the Teesmouth and Cleveland Coast Special Protection Area (SPA) and the R-2021-0405-FFM-OFFICER REPORT.pdf:16: protection of sites of ecological value in accordance with policies SD4 R-2021-0405-FFM-210512, HRA for South Bank Site Remediation_INCA_RevA Final.PDF:7:6.5 The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for R-2021-0405-FFM-210512, HRA for South Bank Site Remediation_INCA_RevA Final.PDF:10:Redcar & Cleveland Teesmouth and Cleveland Coast Special Protection Area Recreation R-2021-0405-FFM-TSWK-STDC-SBK-ZZ-DR-C-0013 - South Bank Quay Enabling Works - Access Route For Hanson.PDF:1: Protection Bund R-2021-0405-FFM-TSWK-STDC-SBK-ZZ-DR-C-0013 - South Bank Quay Enabling Works - Access Route For Hanson.PDF:1: Protection Bund Rev. Date Description By Chk'd App'd R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:4:e. support the expansion and protection of the port and logistics sector; R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:5:appropriate protection and enhancement measures incorporated into the design of development proposals, R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:5:The approach is similarly echoed in Development Principle STDC 7 (Natural Environmental Protection and R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:6:The site is located adjacent to the Teesmouth and Cleveland Coast Special Protection Area (SPA) and close to R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:8: Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside, R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:8: First Phase Reporting of the Site Protection and Monitoring Programme 31 prepared by R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:19: such that a continued standard of protection will be provided throughout construction that is R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:19: Protection of sub surface structures and utilities from attack due to aggressive ground conditions; R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:20: line such that a continued standard of protection will be provided throughout construction that R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:28: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:33:component of the CPEMP to provide temporary drainage facilities and protection measures (such as R-2021-0268-CD-10035117-AUK-XX-XX-CO-ZZ-0279-01-Railway_Bund_Memo.pdf:35:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels R-2021-0268-CD-10035117-AUK-XX-XX-CO-ZZ-0279-01-Railway_Bund_Memo.pdf:36:USEPA GAC based on US Environmental Protection Agency R-2021-0268-CD-Decision Notice.pdf:3: for environmental protection. R-2021-0268-CD-Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2021-0268-CD-OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0268-CD-OFFICER REPORT.pdf:2:Protection team. Discussions have taken place between the EHO and the applicants R-2021-0268-CD-0268 Con Land.pdf:1:Environmental Protection Planning Consultation Response R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:2:protection team. R-2022-0526-CD-MGE04803 EP.pdf:1:environmental Protection Planning Consultation Response R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:3: for environmental protection. R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:8: Any protection measures or gas mitigation will be complied with thereafter, R-2022-0526-CD-AQIA_FINAL.pdf:3:2.1.5. Environmental Protection Act ………………………………………………………………………………………………. 5 R-2022-0526-CD-AQIA_FINAL.pdf:8: The AQS sets standards and objectives for the listed pollutants for the protection of human health, R-2022-0526-CD-AQIA_FINAL.pdf:9:2.1.5. Environmental Protection Act R-2022-0526-CD-AQIA_FINAL.pdf:9: Section 79 of the Environmental Protection Act 1990 (as amended)7 makes provision for the R-2022-0526-CD-AQIA_FINAL.pdf:12: management and habitat protection and encourage biodiversity and long-term sustainability”. R-2022-0526-CD-AQIA_FINAL.pdf:12: Environmental Protection UK (EPUK) and the Institute of Air Quality Management (IAQM) have R-2022-0526-CD-AQIA_FINAL.pdf:22: Protection Area (SPA) and Site of Special Scientific Interest (SSSI). The SPA is designated for the R-2022-0526-CD-AQIA_FINAL.pdf:52: The Environmental Protection Act 1990. R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: 3.5m WIDE VEHICULAR ACCESS TRACK GABION BASKET RETAINING WALL KEE KLAMP HANDRAIL EDGE PROTECTION R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4: Environmental Protection Act 1990 R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:9: Light eye protection (LEP) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:4:4.2.1 Source Protection Zones …………………………………………………………………………………………………… 14 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:8: under Part IIA of the Environmental Protection Act 1990. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:8:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act (EPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:16: • Special Protection Area R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:20:4.2.1 Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:20:The site is not located with a Groundwater Source Protection Zone (SPZ). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:21: • Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:21:protection measures in new buildings. This is not considered significant for the proposed enabling works R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:28:The site is not located within a groundwater source protection zone, and due to the industrial history of the R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:57:61 5.9 Source Protection Zones 0 0 0 0 - R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:57:62 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 - R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:58:74 10.4 Special Protection Areas (SPA) 0 1 0 0 7 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:59:78 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:102:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:105:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:106:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:106:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:107:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:112: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:115: Abstractions and Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:115:5.9 Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:115:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:116:5.10 Source Protection Zones (confined aquifer) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:116:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:118:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries, R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:126: Special Protection Areas (SPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:126:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:126:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:128:10.4 Special Protection Areas (SPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:132:10.14 Potential Special Protection Areas (pSPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:132:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:132:Directive for the protection of nationally and internationally important populations of wild birds. Those sites R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:146:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:146:regulation and protection. There are likely to be restrictions to some developments within these areas. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:147:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:153:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:153:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:186: Location Estimated properties affected Radon Protection Measures required R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:4:4.2.1 Source protection zones …………………………………………………………………………………………………….13 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:15: Special Protection Area R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:4.2.1 Source protection zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:The site is not located with a Groundwater Source Protection Zone (SPZ). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:19:protection measures in new buildings. This is not considered significant for the proposed enabling works, but R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:25:The site is not located within a groundwater source protection zone, and due to the industrial history of the R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:61 5.9 Source Protection Zones 0 0 0 0 - R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:62 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 - R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:40:74 10.4 Special Protection Areas (SPA) 0 1 0 0 7 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:41:78 10.14 Potential Special Protection Areas (pSPA) 0 0 0 0 0 R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:84:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:87:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:88:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:89:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:94: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97: Abstractions and Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97:5.9 Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:97:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98:5.10 Source Protection Zones (confined aquifer) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:98:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:100:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries, R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108: Special Protection Areas (SPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:108:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:110:10.4 Special Protection Areas (SPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:10.14 Potential Special Protection Areas (pSPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:114:Directive for the protection of nationally and internationally important populations of wild birds. Those sites R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:128:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:128:regulation and protection. There are likely to be restrictions to some developments within these areas. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:129:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:135:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:135:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:168: Location Estimated properties affected Radon Protection Measures required R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:6:protection of the environment to include the prevention of pollution. In order to facilitate this, the R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:12: wide protection bund (5m in height) for a number of environmental reasons. R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:16:Recovery Processing Area project have been identified and the Environmental protection R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:18:delineated and protected with a 20m wide protection bund (5m in height) for a number of R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:18: 20m wide protection bund (5m in height) to prevent Surface Water leaving site or entering R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:18: Protection of Water courses: R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:19:Noise and vibration statutory nuisance are controlled under the Environmental Protection Act 1990. R-2022-0755-CD-63262 Covering Letter NZT DoC 13.09.22.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological R-2022-0755-CD-MGE04904 Contaminated Land.pdf:1: Environmental Protection Planning Consultation Response R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:5: within a Source Protection Zone (SPZ). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:5: Protection Area (SPA). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:13: under Part IIA of the Environmental Protection Act 1990. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:13:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act (EPA) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:27:2.4.7 Source Protection Zones R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:27:The Site is not located within a groundwater Source Protection Zone (SPZ). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:28: • Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:29:Special Protection Area R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:32:provide protection to off-Site commercial/industrial workers, provided that any remedial measures, if undertaken, R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:32:Glacial Till (and where present, Glaciolacustrine Deposits) are considered to offer a degree of protection to this R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:40:publication entitled “Protection of Workers and the General Public during the Development of Contaminated R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:56:where present, is providing a degree of protection to the vertical movement of CoC downwards into the R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:57:a degree of protection to the underlying Secondary Undifferentiated and Secondary B Aquifers associated with R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:60:SSAC defined for the protection of the identified water resource and ecological receptors have been derived R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:63:although ensuring any physical receptors, such as the North Sea, are afforded protection. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:64:theoretical compliance point of 50m but rather protection of the physical receptors present, namely the North R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:65:The SSAC defined to offer protection to the identified receptors are based on current best practice and are R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:68:Environment Agency, 1999. The Fuel Additive MTBE – a Groundwater Protection Issue. National Groundwater R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:68:Environment Agency, 2017. Groundwater Protection – Land contamination groundwater compliance points: R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:456: (5) Aquifer protection installed between 16.75-15.60m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:457: (5) Aquifer protection installed between 16.75-15.60m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:458: (5) Aquifer protection installed between 16.75-15.60m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:459: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:460: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:461: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:462: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:463: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:464: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:477: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 16.85-14.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:478: 14.70 - 16.20 178 100 No (5) Aquifer protection installed between 16.85-14.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:479: (5) Aquifer protection installed between 16.85-14.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:480: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:481: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:482: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:483: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:484: 35.50 - 36.15 Water 100 (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:485: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:498: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed between 12.15-10.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:499: (5) Aquifer protection installed between 12.15-10.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:500: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:501: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:502: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:503: 26.80 - 27.40 Water 100 (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:504: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:514: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:515: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:516: per the Client instructions. (6) Aquifer protection R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:517: per the Client instructions. (6) Aquifer protection R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:518: per the Client instructions. (6) Aquifer protection R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:519: per the Client instructions. (6) Aquifer protection R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:520: per the Client instructions. (6) Aquifer protection R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:530: (5) Aquifer protection installed between 13.75-11.70m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:531: (5) Aquifer protection installed between 13.75-11.70m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:532: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:533: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:534: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:535: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:536: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:546: (5) Aquifer protection installed between 14.70-12.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:547: (5) Aquifer protection installed between 14.70-12.50m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:548: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:549: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:550: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:551: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:552: (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:563: 7.20 - 8.70 178 100 Yes Aquifer protection installed between 16.20-13.40m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:564: Aquifer protection installed between 16.20-13.40m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:565: Aquifer protection installed between 16.20-13.40m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:566: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:567: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:568: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:569: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:570: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:571: protection installed between 16.20-13.40m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:583: instructions. (6) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:584: instructions. (6) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:585: instructions. (6) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:586: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:587: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:588: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:589: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:590: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:591: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:603: Client instructions. (6) Aquifer protection installed prior R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:604: Client instructions. (6) Aquifer protection installed prior R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:605: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:606: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:607: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:608: Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:618: 5.70 - 7.20 178 100 Yes Aquifer protection installed between 15.15-13.70m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:619: Aquifer protection installed between 15.15-13.70m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:620: 18.50 - 20.00 Water 100 Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:621: Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:622: 26.30 - 27.50 Water 100 Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:623: Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:624: Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:625: Client instructions. (5) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:638:14/06/2021 4.20 4.20 178 Dry 5.70 - 7.20 178 100 Yes the Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:639: the Client instructions. (6) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:640: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:641: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:642: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:643: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:644: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:645: protection installed between 12.15-10.15m prior to R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:656: Client instructions. (8) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:657: Client instructions. (8) Aquifer protection installed R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:658: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:659: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:660: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:661: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:662: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:663: Aquifer protection installed between 14.60-13.00m R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:675: instructions. (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:676: instructions. (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:677: instructions. (5) Aquifer protection installed between R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:678: 20.40 - 21.70 Water 100 protection installed between 14.90-16.65m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:679: protection installed between 14.90-16.65m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:680: protection installed between 14.90-16.65m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:681: protection installed between 14.90-16.65m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:682: protection installed between 14.90-16.65m BGL R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:694: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:695: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:696: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:697: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:698: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:706: 5.70 - 7.20 178 100 Yes (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:707: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:708: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:709: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:710: (5) Aquifer protection installed prior to commencing R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:975:TPH fractions. A value of 50 µg/l is adopted for sum TPH protection of surface water based on 50µg/l-1000µg/l (Surface Waters R-2022-0755-CD-COMPLIANCE OFFICER REPORT.pdf:2:REASON: In the interest of neighbour amenity, highways safety and protection of R-2022-0755-CD-COMPLIANCE OFFICER REPORT.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection) R-2022-0755-CD-COMPLIANCE OFFICER REPORT.pdf:3:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance) R-2022-0755-CD-COMPLIANCE OFFICER REPORT.pdf:3:protection team and the Council’s engineers. No objection has been received by any R-2022-0755-CD-COMPLIANCE OFFICER REPORT.pdf:3:Council’s environmental protection officers. Based on the information that has been R-2022-0755-CD-MGE04905 Nuisance.pdf:1: Environmental Protection Planning Consultation Response R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:8: land under Part IIA of the Environmental Protection Act 1990. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:8: Protection Act (EPA) 1990 (Part 2A). This does not include land that is already regulated through R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:(SSSI), and the Teesmouth and Cleveland Coast is designated as a Special Protection Area (SPA). R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:22: • Factor 1 – Protection of human health and the environment – in all cases measures to protect R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:24:• Protection of sub surface structures and utilities from attack due to aggressive ground conditions. R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:30: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:36:CEMP to provide temporary drainage facilities and protection measures (such as silt fences) as R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:55:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). R-2022-0435-CD-Compliance Officer Report 0435.pdf:2:effect on the integrity of the Teesmouth and Cleveland Coast Special Protection R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:3:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:3:on soil protection for site restoration and aftercare is available on Gov.uk website. Detailed guidance on R-2022-0435-CD-391845-R20220435CD.pdf:2:Guidance on soil protection is available in the Defra Construction Code of Practice for the Sustainable R-2022-0435-CD-INCA2022-12 HRA - SeAH South Bank Rev 1.pdf:4:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: transferred down to ground level for storage and then removal from site. Edge protection will be R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: provided at a height of 915mm to ensure safety and a fall protection from all areas of the roof, R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: With the edge protection in place, safety netting will be installed to the underside of the roof as R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: protection, Haki tower for access to the roof R-2020-0283-PND-Officer report.pdf:1:substances and protection of species. R-2021-1058-NM-Decision 0270.pdf:3: protection of sites of ecological value in accordance with policies SD4 and N4 R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:2:European sites (e.g. designated Special Areas of Conservation and Special Protection Areas) fall R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:3:Protection Areas, possible Special Areas of Conservation, listed or proposed Ramsar sites, and any R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:3:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites) R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:3: Teesmouth and Cleveland Coast potential Special Protection Area, which is designated in R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:5:for ecosystem protection from atmospheric nitrogen deposition (England Biodiversity Strategy, Defra R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:6:redevelopment in a way that reduces pollution, contributes to habitat protection and long term R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:5:HSE's land use planning advice criteria in regard to public protection, then we suggest you R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:9:European sites (e.g. designated Special Areas of Conservation and Special Protection R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:9:that potential Special Protection Areas, possible Special Areas of Conservation, listed or R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:10:(Special Areas of Conservation (SACs), Special Protection Areas (SPAs) and Ramsar sites) R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:10: Teesmouth and Cleveland Coast potential Special Protection Area, which is designated in R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:13:critical loads for ecosystem protection from atmospheric nitrogen deposition (England R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:14:delivering redevelopment in a way that reduces pollution, contributes to habitat protection R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:15:With reference to the protection of the railway, Network Rail would require that any R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:16:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2019-0331-SCP-MGE03810.pdf:1:Environmental Protection Planning Consultation Response R-2019-0331-SCP-HSE.pdf:1:advice criteria in regard to public protection, then we suggest you access HSE's Land use planning information and R-2019-0331-SCP-MGE03811.pdf:1: Environmental Protection Planning Consultation Response R-2019-0331-SCP-R 2019 0331 SCP.pdf:1:relocation or protection measures required prior to the commencement of the development. We R-2019-0331-SCP-Network Rail Comments.pdf:1:With reference to the protection of the railway, Network Rail would require that any application produced in respect of R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4: Environmental Protection Act 1990; and R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:11: Light eye protection (LEP) R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: 3.5m WIDE VEHICULAR ACCESS TRACK GABION BASKET RETAINING WALL KEE KLAMP HANDRAIL EDGE PROTECTION R-2021-0879-FF-PN 0879.pdf:1: Environmental Protection Planning Consultation Response R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:13:remediation is required for the protection of groundwater resources. R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:15:species from the Teesmouth and Cleveland Coast SPA (Special Protection Area). R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:18:Concentrations of contaminants were not measured above the GAC derived for the protection of human R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:20: Protection of sub surface structures and utilities from attack due to aggressive ground conditions; R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:21:for managing potentially aggressive ground conditions and management / protection for ground gas are R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:36: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:40:to provide temporary drainage facilities and protection measures (such as silt fences) as necessary to R-2021-0879-FF-Officer report.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0879-FF-Officer report.pdf:8:Coast Special Protection Area (SPA) and Ramsar site. R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:4:The site is located within a 6km buffer zone of the Teesmouth and Cleveland Coast Special Protection Area R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:7: contaminated land under Part 2A of the Environmental Protection Act 1990; and R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:7:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:8: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:9: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works, R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:9: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31 R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:13: sensitivity1 source protection zones (SPZ) within 1km of the area. R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:22: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004 R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:26: Design Of A Site Protection R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:26: Site Protection and Protection and Monitoring Programme (SPMP). Reference Data was collected for R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:27:Gas Risk Assessment and should incorporate any necessary protection measures appropriate to protect R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:42: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:46: design sulphate class DS-2, indicating that that protection to buried concrete would be required. R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:46: protection measure to new buildings. R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:47: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:49: sensitivity6 source protection zones (SPZ) within 1km of the area. R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:19:0.5m and 2.5m bgl (Enviros 2008, MD2 2011). The site is not located within a Groundwater Source Protection R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:34:With reference to Part 2a of the Environmental Protection Act (1990), the potential receptors to be considered R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:34:protection. At this site, the underlying geology comprises Tidal Flat Deposits which are classified as a R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:38: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:41:of TPH and BTEX compounds have not been identified above the GAC derived for the protection of human R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:identified above the GAC derived for the protection of human health and as such, a significant risk to human R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:53:excess of the GAC for the protection of water resources, further assessment is needed. R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:56:assessment. Concentrations of contaminants were not measured above the GAC derived for the protection R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF:16: • United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0879-FF-Prairie Site, Desk Based Heritage Assessment.PDF:34:A statement setting out current Government policy on the identification, protection, conservation and R-2021-0879-FF-Prairie Site, Desk Based Heritage Assessment.PDF:37: 1979; and Protection of Wrecks Act 1973); R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:1:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:4: development, a low permeability break Easily incorporated into the Suitable for use materials may need to be Protection of in-ground service/ R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:4: CL4 hard surfacing to break pathway Protection against aggressive soils will be health. cost is high to very high and not viable R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:4: Relatively easily incorporated into the Protection of in ground workers and assets Cost effective and sustainable when R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:5:To enable the protection of the remediation capping layer during both the construction and full site R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:7:To enable the protection of the remediation capping layer during both the construction and full site R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:60:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at https://www.epa.gov/risk/regional- R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:62:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF:63: Protection industry standards R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: Equipment • Light Eye Protection – EN166F R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: • Hearing protection (earplugs BS352-2) – in addition R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:9: • Light eye protection (Safety Specs – BS EN166) R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:9: • Light eye protection (Safety Specs – BS EN166) R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: and Protection environment is located within the former British Steel / SSI site. R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: possible, suitable and adequate hearing protection will be worn by operatives. R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: the Environmental Protection Act 1990. R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: Environmental At all times site operations will be undertaken with the protection of local R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: controlled manner to ensure the protection of and to minimise disruption to local R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: protection. Operatives will be provided with copies of the approved method R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:safe access, safe places for work, hazardous substances and protection of species. R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4: damaged in any way. Protection to services will be installed as R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6: e. Hand arm Operatives will be required to wear hearing protection during the R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:7: protection. R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:11:of hot cutting to operative and will require operatives to wear hearing protection (ear plugs). R-2022-0343-ESM-Consultee Response - POlice ALO.pdf:1:https://eur01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.securedbydesign.com%2F&data=0 R-2022-0343-ESM-0343.pdf:1:and delay to rail users. Consultation with the Asset Protection Project Manager is necessary to understand if there is R-2022-0343-ESM-0343.pdf:1:a problem. If required there may be a need to fit bridge protection barriers which may be at the developer’s expense. R-2022-0343-ESM-0343.pdf:1:applicant contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a R-2022-0343-ESM-0343.pdf:1:Asset Protection Eastern R-2022-0343-ESM-0343.pdf:1:assetprotectioneastern@networkrail.co.uk. R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:8: protection from the elements, combined with an array of full height curtain walling and R-2022-0343-ESM-Officer report 0343.pdf:10:considered by the Council’s Environmental Protection Team who raised no R-2022-0343-ESM-Officer report 0343.pdf:10:Protection Area (SPA) and Ramsar site and Teesmouth and Cleveland Coast R-2022-0343-ESM-SEAH-ASA-XX-XX.XX-A-A-0001-Design and Access Statement - 31.3.22.pdf:5:The proposal is to provide a single use site capable of handling the treatment to offer protection fro R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:8: protection from the elements, combined with an array of full height curtain walling and R-2020-0599-AD-Application Form(1).PDF:1:commercial requirements relating to information security and data protection of the information you have provided. R-2020-0411-FFM-Decision 0411.pdf:2: protection systems, etc. If unexpected contamination is found after R-2020-0411-FFM-Decision 0411.pdf:3: contaminated land under Part 2A of the Environmental Protection Act 1990 in R-2020-0411-FFM-Decision 0411.pdf:3: gas protection systems, etc. The Local Planning Authority must be given two R-2020-0411-FFM-Decision 0411.pdf:6: for flood protection and navigation, ports and harbours and therefore seeks R-2020-0411-FFM-Appendix 6.1 LVIA Planning Policy Context.pdf:5: status of protection in relation to these issues.” R-2020-0411-FFM-Appendix 6.1 LVIA Planning Policy Context.pdf:6: will be required. Protection will be commensurate to the status of the R-2020-0411-FFM-Appendix 6.1 LVIA Planning Policy Context.pdf:8: associated with the Teesmouth and Cleveland Coast Special Protection R-2020-0411-FFM-Appendix 11.5 - Air Quality Impacts on Designated Habitat Sites.pdf:3:1.1.2 The Teesmouth and Cleveland Special Protection Area (SPA) and Ramsar site are within 10 km of R-2020-0411-FFM-Appendix 11.5 - Air Quality Impacts on Designated Habitat Sites.pdf:3:1.1.4 Critical levels are maximum atmospheric concentrations of pollutants for the protection of R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:5: development. This description should take into account the environmental protection objectives R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:1: • Environmental Protection Act (EPA) 1990 (as amended); R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.2 The Water Resources Act (1991 as amended) principally relates to the protection of controlled R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.5 The Environment Act 1995 (Section 57) amends the Environmental Protection Act (1990) and R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:2: contaminated land within the UK. It includes measures for protection of the environment, including R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:2:9.2.6 Part 2A of the Environmental Protection Act is implemented by the Contaminated Land R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:3: • Defra Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:6: Protection Zones 1 and 2. R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:6: Protection Zone 3 R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:10: a Groundwater Source Protection Zone (SPZ). R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:11: Cleveland Coast Special Protection Area (SPA), a habitat for rare and migratory birds. This area is R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:14: appropriate gas protection within the buildings based on the results of ground gas monitoring. R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:15:9.5.14 The site is not located in a Groundwater Source Protection Zone and is in an area of currently poor R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:17: adopted through the remediation strategy (eg. gas protection measures, specialist concrete and R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:21: Environmental Protection Act (EPA) 1990 (as amended) R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:23: Mobilisation of protection measures beneficial R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:2:foreshore or provide any associate scour protection. We would require an assessment of R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:2:‘fail’. The water body is heavily modified for flood protection and navigation, ports and R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:2:enhancement of the outfall and any associated scour protection should be considered in R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:4:found on gov.uk and include Groundwater Protection, EA Approach to Groundwater R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:4:Protection, Land Contamination Risk Management and the Guiding Principles of Land R-2020-0411-FFM-EP CL.pdf:1:Environmental Protection Planning Consultation Response R-2020-0411-FFM-Appendix 8.3 WFD.pdf:2:SPA Special Protection Area R-2020-0411-FFM-Appendix 8.3 WFD.pdf:5: forms part of the Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar. R-2020-0411-FFM-Appendix 8.3 WFD.pdf:12: the site is not located in a Groundwater Source Protection Zone and is in an area of currently poor R-2020-0411-FFM-Appendix 8.3 WFD.pdf:14: the use of flood protection and navigation, ports and harbours. Since this water body is heavily R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19: Directive (2009/147/EC), Special Protection Areas (SPAs) are strictly protected sites classified for R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19: Special Protection Area and Ramsar site (Ref. No. 11068) classified on 15 August 1995 and R-2020-0411-FFM-Appendix 8.3 WFD.pdf:25: Heavily modified water body and for what use Yes- Flood protection and Navigation, ports and harbours R-2020-0411-FFM-Appendix 8.3 WFD.pdf:31: addition, the site is not located in a Groundwater Source Protection Zone R-2020-0411-FFM-Appendix 8.3 WFD.pdf:32: • special protection areas (SPA) • nutrient sensitive areas R-2020-0411-FFM-325067 R_2020_0411_FFM - Proposed Redcar Energy Centre, Land at Redcar Bulk Terminal, Redcar.pdf:1: Protection Area (SPA) and Ramsar site https://designatedsites.naturalengland.org.uk/. R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:2: Environmental Protection Act 1990, Part III R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:2:12.2.9 The Environmental Protection Act 1990 (EPA) deals with statutory nuisance, including noise. R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:7: • the Teesmouth and Cleveland Special Protection Area (SPA) and Ramsar site; R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:2: (Protection of Human Health and the environment). R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:8: contaminated land under Part IIA of the Environmental Protection Act 1990; and R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:10: “a. protection of water quality and resources and flood management…. R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:15: e. support the expansion and protection of the port and logistics sector; R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:19: landscape considerations. In such cases appropriate mitigation will be required. Protection will be R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:20: with appropriate protection and enhancement measures incorporated into the design of R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:20: Cleveland Coast Special Protection Area/Ramsar and European Marine Site, and the North York R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:20: Moors Special Protection Area and Special Area of Conservation. Development that is not directly R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:26: the integrity of the Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, and R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:27: integrity of the Teesmouth and Cleveland Coast Special Protection Area and Ramsar site, R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:28: Special Protection Area and Ramsar Site and any functional land required to support them. Where R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:32: protection, safeguards biodiversity and enhances green Infrastructure, open space and R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:33: • To reduce pollution, contribute to sustainable flood risk management and habitat protection R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:34: • To support the protection of heritage assets and the historic environment and the protection R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:35: Development Principle STDC7: Natural Environmental Protection and Enhancement R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:38: Statutory Instrument 2011 No. 988 Environmental Protection, England and Wales The Waste R-2020-0411-FFM-Chapter 11 Air Quality.pdf:7: high degree of protection of people and the environment taken as a whole. Indicative BAT R-2020-0411-FFM-Chapter 11 Air Quality.pdf:7: realistic. NPPG and Environmental Protection UK (EPUK) and Institute of Air Quality Management R-2020-0411-FFM-411 air quality.pdf:1:Environmental Protection Planning Consultation Response R-2020-0411-FFM-Chapter 2 Project Description.pdf:2: Special Protection Area (SPA) and Ramsar is located approximately 80 metres from the site R-2020-0411-FFM-Chapter 2 Project Description.pdf:3: • supporting the expansion and protection of the port and logistics sector; and R-2020-0411-FFM-Chapter 2 Project Description.pdf:23: Ornithology protection of the existing bund. Mitigation measures from the Hydrology and Flood R-2020-0411-FFM-Non Technical Summary.pdf:4: habitats. The Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar is R-2020-0411-FFM-Non Technical Summary.pdf:12: • Teesmouth and Cleveland Coast Special Protection Area and Ramsar which is located R-2020-0411-FFM-Non Technical Summary.pdf:17: Coast Special Protection Area/Ramsar site designated for the internationally important populations R-2020-0411-FFM-Non Technical Summary.pdf:18: the Teesmouth and Cleveland Coast Special Protection Area/Ramsar citation were recorded using R-2020-0411-FFM-Non Technical Summary.pdf:18: changes in air quality on the Teesmouth and Cleveland Coast Special Protection Area and R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:1: • Coast Protection Act 1949; R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:6: Protection Area (SPA) and Ramsar Site. R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:11: Site. The River Tees forms part of the Teesmouth and Cleveland Coast Special Protection Area R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:13: Protection Type Asset Type Description Condition Design Standard R-2020-0411-FFM-Figure 6.1_Planning Constraints Plan.pdf:1: Special Protection Areas R-2020-0411-FFM-Chapter 3 Needs and Alternatives - formatted.pdf:5: • The Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar which is R-2020-0411-FFM-Chapter 3 Needs and Alternatives - formatted.pdf:6: • supporting the expansion and protection of the port and logistics sector; and R-2020-0411-FFM-R 20 0411 NATS.pdf:1:Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:1: – Environmental Protection (Contaminated land); R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:1: – Environmental Protection (Nuisance); R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:13: Special Protection Area (SPA) and Ramsar is located approximately 80 metres from the site R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:36: the integrity of the Teesmouth and Cleveland Coast Special Protection Area and Ramsar Site, R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:38: • STDC7 Natural Environmental Protection and Enhancement R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:43: contaminated land under Part IIA of the Environmental Protection Act 1990; and R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:47: “a. protection of water quality and resources and flood management…. R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:50: (Protection of Human Health and the environment). R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:67: • the protection of the environment and natural resources; and R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:72: Cleveland Coast Special Protection Area/Ramsar and European Marine Site, and the North York R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:72: Moors Special Protection Area and Special Area of Conservation. Development that is not directly R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:92: Groundwater Source Protection Zone and is in an area of currently poor chemical groundwater R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:5: protection is covered by Health and Safety at Work legislation). R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:5: • Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:5: • Redcar and Cleveland Borough Council Environmental Protection Contamination R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:18:wider Special Protection Areas have been carefully assessed, and their sensitivity R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:6:SPA Special Protection Area R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:10: of the Teesmouth and Cleveland Special Protection Area (SPA) and Ramsar site. In addition, the R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:12: • supporting the expansion and protection of the port and logistics sector; and R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:14: development. This description should take into account the environmental protection objectives R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:31: located in a Source Protection Zone R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:31: • Environment Agency information on groundwater Source Protection Zones, environmental R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:36: Protection Area (SPA) and Ramsar. R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:54:Redcar and Cleveland Borough Council Environmental Protection (Nuisance) R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:54:Redcar and Cleveland Borough Council Environmental Protection Contamination R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:1: • The Protection of Badgers Act 1992 R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:2: Countryside Act 1981. Birds listed in Schedule 1 of the Act are subject to special protection. Wild R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:2: interactions with, all wild birds in Europe. Birds listed in Annex 1 are afforded special protection. R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:2:7.2.7 European sites (e.g. designated Special Areas of Conservation (SAC) and Special Protection R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:2: the Annexes to the Directive at a favourable conservation status, introducing robust protection for R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:2: measures to establish a system of strict protection for the animal species listed in Annex IV (a) and R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:4: with appropriate protection and enhancement measures incorporated into the design of the R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:4: is not affected. Policy N4 also supports the protection of nationally and locally designated R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:15: in the desk assessment are roe deer and weasel which are provided limited protection under the R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:26: low. In addition, the site is not located in a Groundwater Source Protection Zone and is in an area R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:35: British Trust for Ornithology, Royal Society for the Protection of Birds, Joint Nature Conservation R-2020-0411-FFM-411 nuisance.pdf:1:Environmental Protection Planning Consultation Response R-2020-0411-FFM-411 nuisance.pdf:1:operational noise and the protection of nesting birds R-2020-0411-FFM-Chapter 10 Transport.pdf:4: separation/protection from traffic. It encompasses the overall relationship between pedestrians R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:5:The Application Site is not indicated to be located in a groundwater Source Protection Zone (SPZ) and there R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:8: • Environmental Protection Act (EPA) 1990 (as amended); R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:8: • Defra Environmental Protection Act 1990: Part 2A Contaminated Land Statutory Guidance R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:13: Source Protection Zone (SPZ). R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:13: environmental receptors as defined within Table 1 of the DEFRA Environmental Protection Act R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:14: Cleveland Coast Special Protection Area (SPA), a habitat for rare and migratory birds. This Area is R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:14: Protection Agency (part of Public Health England) and the British Geological Survey, the R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:17: Protection Act 1990. For a risk to exist (under Part 2A), all three of the following components must R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:29:Under Section 57 of the Environmental Act 1995, Part 2A was inserted into the Environmental Protection Act R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:50 5.9 Source Protection Zones 0 0 0 0 - R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:50 5.10 Source Protection Zones (confined aquifer) 0 0 0 0 - R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:48:63 10.4 Special Protection Areas (SPA) 0 0 1 0 5 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:49:66 10.14 Potential Special Protection Areas (pSPA) 0 0 1 0 0 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:81:Contaminated Land Register of sites designated under Part 2a of the Environmental Protection Act 1990. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:83:Discharges of specified substances under the Environmental Protection (Prescribed Processes and Substances) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:85:This data is sourced from the Environment Agency and the Scottish Environment Protection Agency. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:89: Low - Areas that provide the greatest protection from pollution. They are likely to be characterised by low R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Abstractions and Source Protection Zones R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 1 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 2 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 3 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 4 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 1c R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 2c R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:92: Source Protection Zone 3c R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:93:Features are displayed on the Abstractions and Source Protection Zones map on page 48 R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:5.9 Source Protection Zones R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:Source Protection Zones define the sensitivity of an area around a potable abstraction site to contamination. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:5.10 Source Protection Zones (confined aquifer) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:94:Source Protection Zones in the confined aquifer define the sensitivity around a deep groundwater abstraction R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:96:The Water Framework Directive is an EU-led framework for the protection of inland surface waters, estuaries, R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104: Special Protection Areas (SPA) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104: Potential Special Protection Areas (pSPA) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104:Sites providing statutory protection for the best examples of UK flora, fauna, or geological or physiographical R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:104:notified under the Wildlife and Countryside Act 1981. Improved provisions for the protection and management R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:107:10.4 Special Protection Areas (SPA) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:10.14 Potential Special Protection Areas (pSPA) R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:Special Protection Areas (SPAs) are areas designated (or ‘classified’) under the European Union Wild Birds R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:110:Directive for the protection of nationally and internationally important populations of wild birds. Those sites R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:119:protection measures. World Heritage Sites are designated to meet the UK's commitments under the World R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:119:regulation and protection. There are likely to be restrictions to some developments within these areas. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:120:enhance. Designation of a conservation area gives broader protection than the listing of individual buildings. R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:124:which affords them some protection. In addition, Section 34 of the Wildlife and Countryside Act 1981 gave R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:124:them additional protection via the creation of Limestone Pavement Orders, which made it a criminal offence to R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:151: Location Estimated properties affected Radon Protection Measures required R-2020-0411-FFM-EA R_2020_0411_FFM 24 September 2020 OFFICIAL.pdf:2:water body is heavily modified for flood protection and navigation, ports and harbours R-2020-0411-FFM-EA R_2020_0411_FFM 24 September 2020 OFFICIAL.pdf:5:found on gov.uk and include Groundwater Protection, EA Approach to Groundwater R-2020-0411-FFM-EA R_2020_0411_FFM 24 September 2020 OFFICIAL.pdf:5:Protection, Land Contamination Risk Management and the Guiding Principles of Land R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:7: Sites of Special Scientific Interest (SSSIs), Special Protection Areas (SPAs), Special Area of R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:8: protection, appropriate conditions and/or suitable habitat. R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:8: shelter, protection, conditions and surrounding such as lines of trees and scrub or linked back R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:8: size, shelter, protection, conditions and surrounding woodland edge. R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:10: Protection Areas (SPA) and RAMSAR sites) are included in the list for completeness though these R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:10:Abbreviations used in Table 3.1: SAC: Special Area of Conservation; SPA: Special Protection Area; SSSI: Site of Special Scientific Interest; NR: Nature R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:23:The Wildlife and Countryside Act 1981 provides protection to a range of species and habitats. Section 9 of R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:23:the Act provides protection to certain animal species. Enhanced protection is provided for species listed in R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:24:listed on Schedule 1 of the Wildlife and Countryside Act 1981 (as amended), which receive extra protection, R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:24:The Protection of Badgers Act 1992 R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:24:Badgers are protected under the Protection of Badgers Act 1992. In is an offence to wilfully take, injure or kill R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:24:badger when it is occupying a sett. In addition, badgers are afforded protection from cruel ill-treatment. This R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:8: • reference to criteria, for example designations or protection status; R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:10: Interest (SSSI) to the north and the Teesmouth and Cleveland Coast Special Protection Area R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:16: Protection Area (SPA), Ramsar R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:18: Bran Sands Lagoon, STDC and Crown land; designated a Special Protection Area.” R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:19: which is also a Special Protection Area (SPA). The intertidal area of the SSSI is also a European R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:26: warrant an arboricultural survey or, tree protection fencing in accordance with BS BS5837:2012 R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2:engineers and environmental protection officer. R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2:No objection has been raised by the Council’s environmental protection officer. It is R-2020-0247-CD-R-2020-0247-CD-PN 0247.pdf:1: Environmental Protection Planning Consultation Response R-2020-0247-CD-t.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0247-CD-t.pdf:2:engineers and environmental protection officer. R-2020-0247-CD-t.pdf:2:No objection has been raised by the Council’s environmental protection officer. It is R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:3: 5.17 Protection of Common Lizard ………………………………………………………………………… 9 R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:8: include environmental protection and mitigation measures and emergency preparedness R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:9: Protection of common lizard R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:10: protection from poor weather to prevent soaking in the winter months. Mudstone bunds will R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:12: section 34 of the Environmental Protection Act 1990. R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:13:5.17 Protection of Common Lizard R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:15: to the protection of the environment will be kept and displayed within the site cabin. Key R-2022-0176-CD-2015-10 Section 36 Consent (Memo).pdf:1:suitable protection in respect of potentially contaminated land in connection with the R-2022-0176-CD-Officer report.pdf:2:Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance) R-2022-0176-CD-0176(1).pdf:1: Environmental Protection Planning Consultation Response R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:12:Flood Protection Measures R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:14:Protection and Mitigation For Birds R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:20:Protection and Mitigation for Protected Species R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF:1: · Number of copies: Two. Protection: R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:5: such that a continued standard of protection will be provided throughout R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:74:1 Edge Construction of Construction Not possible High Contractor to install edge protection along the Action by Principal Contractor Low Open R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:74: Protection drainage elements operatives length of the capping beam during the R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:106: protection 900 mm R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:6: 2.0 Exclusion Zone and Protection of Assets Within the R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7:2.1 Exclusion Zone and Protection of Assets R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: additional protection measures can reduce the exclusion zone further. R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: boundary. The protection measures that will be adopted in this instance is R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7:2.8 Thompsons of Prudhoe will install the protection measure as detailed in R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12:3.13 Prepare and make ready ‘at source’ blast protection. Steel containers can be R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: an increased exclusion zone due to loss of protection / explosive charge R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23: Provide localised protection to fingers R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26: • Light Eye Protection – EN166F R-2021-0728-PND-Officer Report(1).pdf:2: Impact on train line and are protection methods enough R-2021-0728-PND-Officer Report(1).pdf:3:methods for the protection of assets within that exclusion zone. The exclusion R-2021-0728-PND-Officer Report(1).pdf:3:to introduce protection measures for land to the south of the site including R-2021-0728-PND-Officer Report(1).pdf:4:Prepare and make ready ‘at source’ blast protection. Steel containers can be R-2021-0728-PND-Cover Letter.pdf:2:safe access, safe places for work, hazardous substances and protection of species. R-2021-0728-PND-mcque 728.pdf:3:understand your data protection rights, please take a look at our privacy policy. R-2021-0728-PND-COMMENTS Milne.pdf:2:I think at the very least a temporary protection order should be placed on the Dorman Long Tower so that R-2021-0465-FFM-356907 - R_2021_0465_FFM - Erection of 3396sqm of B2_B8 floorspace. Tees Dock Road. Grangetown.pdf:1: Cleveland Coast Special Protection Area (SPA) and Ramsar site. Natural England requires R-2021-0465-FFM-Officer Report 0465.pdf:3:Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar site. R-2021-0465-FFM-Officer Report 0465.pdf:5:the CPEMP to provide temporary drainage facilities and protection measures R-2021-0465-FFM-Officer Report 0465.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0465-FFM-Officer Report 0465.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection) R-2021-0465-FFM-Officer Report 0465.pdf:9:protection team with regard to contamination and nuisance. R-2021-0465-FFM-Officer Report 0465.pdf:9:including Teesmouth and Cleveland Coast Special Protection Area (SPA) and R-2021-0465-FFM-Officer Report 0465.pdf:12: protection of sites of ecological value in accordance with policies SD4 R-2021-0465-FFM-INCA 2021-30 HRA South Bank Quay enabling works.pdf:7:6.5 The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for R-2021-0465-FFM-INCA 2021-30 HRA South Bank Quay enabling works.pdf:10:Redcar & Cleveland Teesmouth and Cleveland Coast Special Protection Area Recreation R-2021-0465-FFM-Decision Notice 0465.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8: Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside, R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8: First Phase Reporting of the Site Protection and Monitoring Programme 31 prepared by R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:21: Protection of sub surface structures and utilities from attack due to aggressive ground conditions; R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:26:Asset Protection and Optimisation teams (ASPRO) is required to determine permitting requirements, R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:27: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:33:CPEMP to provide temporary drainage facilities and protection measures (such as silt fences) as R-2021-0465-FFM-MGE04476 Nuisance.pdf:1: Environmental Protection Planning Consultation Response R-2021-0465-FFM-LLFA 0465.pdf:1:management plan as a component of the CPEMP to provide temporary drainage facilities and protection measures R-2021-0465-FFM-INCA2021-56 HRA land at South Bank.pdf:3:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its R-2021-0465-FFM-363781 - R_2021_0465_FFM - Erection of 3396Sqm of B2 and B8 floorspace. Tees Dock Road Grangetown.pdf:1:European sites - Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar R-2021-0465-FFM-363781 - R_2021_0465_FFM - Erection of 3396Sqm of B2 and B8 floorspace. Tees Dock Road Grangetown.pdf:1:have likely significant effects on the Teesmouth and Cleveland Coast Special Protection Area and R-2021-0465-FFM-EA R_2021_0465_FFM 8 July 2021 OFFICIAL .pdf:1:any gas protection measures are required. R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:3: (v) Protection during development, followed by consolidation and preservation of high value R-2021-0152-CD-60722_Covering letter DOC Arch_Feb 2021.PDF:2: (v) Protection during development, followed by consolidation and preservation of high value remains left R-2021-0152-CD-Officer report _R20210152CD.pdf:3:protection, followed by preservation, of high value remains. R-2021-0152-CD-PN 0152.pdf:1: Environmental Protection Planning Consultation Response R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:4: (v) Protection during development, followed by consolidation and preservation of high value R-2021-0152-CD-Compliance Decision.pdf:3: (v) Protection during development, followed by consolidation and R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:3: • Teesmouth & Cleveland Coast Special Protection Area (SPA) & Ramsar Site R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:3:relevant. Habitat sites (Special Areas of Conservation (SAC) and Special Protection Areas (SPA) R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:4:SPAs, possible SACs and listed or proposed Ramsar sites have the same protection as classified R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:5: RSPB Royal Society for the Protection of Birds R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:5: SPA Special Protection Area R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:5: SPZ Source Protection Zone R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:16: • Two Special Protection Areas (SPAs): R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:17: designations are described in Section 6. There are no Source Protection Zones (SPZs), R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:36: given to the protection of internationally important sites such as the R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:37: Protection and development proposals will be required to comply with Local Plan Policy R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:67: • Teesmouth and Cleveland Coast Special Protection Area (SPA), 275 m to the north R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:71:conservation of their populations and wetland habitats. WeBS is a partnership between the BTO, the Royal Society for the Protection of Birds and the Joint Nature R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:77: environmental protection legislation during construction, e.g., prevention of R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:81: • Receptors to the west from Greatham, Saltholme (Royal Society for the Protection R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:88: Quality in the Tees Valley 2012 – 2015’ (Tees Valley Environmental Protection Group, R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:136: Cleveland Coast Special Protection Area/Ramsar – Evidence Pack online. R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:141: Special Protection Area (SPA) R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:150: lighting protection systems on buildings and structures are well established. Consequently, this category is R-2023-0179-SCP-Figure A-4 - Statutory Designated Ecological Sites within 10km of the Proposed Development Site Boundary.pdf:1: Special Protection Area (SPA) R-2023-0179-SCP-CON LAND 0179.pdf:1:Environmental Protection Planning Consultation Response R-2023-0179-SCP-PN 0179.pdf:1:Environmental Protection Planning Consultation Response R-2023-0179-SCP-PN 0179.pdf:1:will contact Environmental Protection to discuss sensitive receptors. R-2023-0179-SCP-Network Rail.pdf:1:With reference to the protection of the railway, the Environmental Statement should consider any impact of the R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:Environmental Protection (Nuisance) R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:will contact Environmental Protection to discuss sensitive receptors. R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:Environmental Protection (Contamination) R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:10:• Teesmouth & Cleveland Coast Special Protection Area (SPA) & Ramsar Site R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:10:relevant. Habitat sites (Special Areas of Conservation (SAC) and Special Protection Areas (SPA) R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:10:potential SPAs, possible SACs and listed or proposed Ramsar sites have the same protection as R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:19:With reference to the protection of the railway, the Environmental Statement should consider any R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf:10:whether a repair is required or to reinstate the corrosion protection coating system. Please note R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:7: 1 Environmental Protection Act 1990 Part II (Ref 1); R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:7: 23 Environment Agency, Groundwater protection technical g uidance, 2017 (Ref 23); R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:8: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:9: land under Part IIA of the Environmental Protection Act 1990; and © adequate site R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:12: Nearby Sites of Nature Conservation Interest (SNCIs), Special Protection Areas (SPAs), R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:12: appropriate gas protection measures, if required, b ased on specific development proposals. R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:12: The required gas protection measures would be incorporated into the buildings during R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:15: Aquifer, groundwater source protection zone, surface waters of disposal R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:28:H4.44 The site is not located within a Groundwater Source Protection Zone, nor within a surface water, R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:34: gas protection measures for new buildings. This assessment only relates to part of the site with R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:37: 4 Installation of a capping layer to provide short term protection from dust or direct contact R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:47: 1 Environmental Protection Act 1990 Part II; R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:47: 23 Environment Agency, Groundwater protection technical guidance, 2017; R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:48: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:48: 40 First Phase Reporting of the Site Protection and Monitoring Programme, prepared by Corus R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:48: 41 Design of a Site Protection and Monitoring Programme for Cleveland Works, Teesside, R-2020-0819-ESM-341083 R_2020_0819_ESM - Outline permission for development of general industrial, storage and distribution facilities at Dorman Point for Teesworks, Redcar.pdf:1:European sites – Teesmouth and Cleveland Coast Special Protection Area (SPA) and Ramsar R-2020-0819-ESM-Network Rail 819.pdf:1:With reference to the protection of the railway, Network Rail has no objection in principle to the development, but R-2020-0819-ESM-Network Rail 819.pdf:2:Protection of existing railway drainage assets within a clearance area R-2020-0819-ESM-Network Rail 819.pdf:2:Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any R-2020-0819-ESM-Network Rail 819.pdf:2:permanent alterations to the mutual boundary the applicant must contact Network Rail’s Asset Protection R-2020-0819-ESM-Network Rail 819.pdf:3:Method statements may require to be submitted to Network Rail’s Asset Protection Project Manager at the below R-2020-0819-ESM-Network Rail 819.pdf:3:Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried R-2020-0819-ESM-Network Rail 819.pdf:3:traffic i.e. “possession” which must be booked via Network Rail’s Asset Protection Project Manager and are subject R-2020-0819-ESM-Network Rail 819.pdf:3:and agreement with our Asset Protection Team and the developer entering into a Basic Asset Protection R-2020-0819-ESM-Network Rail 819.pdf:3:Agreement (where appropriate). We would advise that the developer discuss the proposals with Asset Protection R-2020-0819-ESM-Network Rail 819.pdf:3:prior to applying for the discharge of condition. Contact details for Asset Protection are below. R-2020-0819-ESM-Network Rail 819.pdf:3:Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any R-2020-0819-ESM-Network Rail 819.pdf:3:method statement. Approval of the method statement must be obtained from Network Rail’s Asset Protection R-2020-0819-ESM-Network Rail 819.pdf:3:to be agreed by the Asset Protection Project Manager prior to implementation. R-2020-0819-ESM-Network Rail 819.pdf:3:applicant’s land, thus reducing the probability of provision and costs of railway look-out protection, R-2020-0819-ESM-Network Rail 819.pdf:4:Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would R-2020-0819-ESM-Network Rail 819.pdf:5:Asset Protection Project Manager R-2020-0819-ESM-Network Rail 819.pdf:5:Email: assetprotectioneastern@networkrail.co.uk R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:4:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:6:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:7:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:13:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:13:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:14:From: Environmental Protection R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:14:To: Environmental Protection Environmental.Protection@redcar-cleveland.gov.uk R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1: Plant Protection R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1: E-mail: plantprotection@cadentgas.com R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1:Can you please inform Plant Protection, as soon as possible, the decision your authority is likely R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1:Please let us know whether Plant Protection can provide you with technical or other information that may be of R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1:referred your enquiry/consultation to our Asset Protection team for further detailed R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:1:date of this response. Please contact us at assetprotection@nationalgrid.com if you have not had a R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:2:should contact Plant Protection before any works are carried out to ensure the apparatus is not affected by R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:2: any such restrictions from the landowner in the first instance and if in doubt contact Plant Protection. R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:2:If you require further assistance please contact the Plant Protection team via e-mail (click here) or via the R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:2:Plant Protection Team R-2020-0819-ESM-NATIONAL_GRID_XX_GE1A_3NWP_027707_1_5632.pdf:3: Land and Development Asset Protection Team (High Pressure Gas Transmission and Electricity R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:19:make this message and any reply to it public if asked to under the Freedom of Information Act, Data Protection Act R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:25: Meet the groundwater protection criteria set out on GOV.UK What other environmental issues will you consider with my planning R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:26: rivers and streams. Some areas (source protection zones and aquifers) are Your development should ensure that an 8m strip of land (planted with R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:26: groundwater protection can be found on GOV.UK construction and maintenance. R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:32:3.2 Asset Design and Protection 31 R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:46: • Medium: areas that offer some groundwater protection. Intermediate between R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:49: the protection offered by the existing sand dunes system and historic railway R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:60:3.2 Asset Design and Protection R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:12: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Site of Special Scientific R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:21: • 6km Special Protection Areas (‘SPA’) buffer zone (Policy N4); R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:22: • support the expansion and protection of the port and logistics sector; R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:37: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:37: under the Ramsar Convention on Wetlands but which are afforded the same level of protection R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:42: to ensure the protection and improvement in quality of the water environment. This is also R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:46: • N1 Landscape - supports the protection and enhancement of the Borough’s landscape based R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:47: • N4 Biodiversity and Geological Conservation - supports the protection and enhancement of R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:48: supports the protection and enhancement of the Borough’s landscape and restricts any R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:48: protection of amenity. R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:51: Protection Act, Building Regulations or Environmental Permitting Regulations. R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:12:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:13:Environmental Protection Team R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:6:K2.2 A statement setting out current Government policy on the identification, protection, R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:9: Archaeological Areas Act 1979; and Protection of Wrecks Act 1973); R-2020-0819-ESM-EP NUI.pdf:1:Environmental Protection Planning Consultation Response R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:8: deposition. Under provisions in the Environmental Protection Act 1990, dust nuisance is R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:9: Environmental Protection UK (EPUK) and the IAQM provides a framework for professionals R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:14: geological interest) and the Special Protection Area (‘SPA’)/Ramsar site Teesmouth and R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:18: protection of human health are based on NO2 rather than total NOx or NO. R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:38: 17 EPUK: Environmental Protection UK R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:39: 40 SPA: Special Protection Area R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:https://www.redcar-cleveland.gov.uk/resident/environmental-protection/air-quality/Pages/Air-Quality-In- R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:https://www.middlesbrough.gov.uk/environment-and-public-protection/advice-and-information/air- R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:11: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and Site of Special Scientific R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:21: e. support the expansion and protection of the port and logistics sector; R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:23: • STDC 7 (Natural Environmental Protection and Enhancement): requires development R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:23: • STDC8 (Preserving Heritage Assets): provides protection for retention of assets of heritage R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:35: i EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 13); R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:46: 39 SPA Special Protection Area R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:47: 13 GOV.UK (2013). Groundwater protection: Principles and practice (GP3). online GOV.UK. R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:47: Available at: <https://www.gov.uk/government/publications/groundwater-protection- R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:47: (2017). Groundwater protection. online GOV.UK. Available at: R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:47: <https://www.gov.uk/government/collections/groundwater-protection> [Accessed 1st R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5: the protection and conservation of landscape within the study area. Current planning policy and R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5: Plans, planning positively for the creation, protection, enhancement and management of R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 1 N1 Landscape - supports the protection and enhancement of the Borough’s landscape based R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 2 N4 Biodiversity and Geological Conservation - supports the protection and enhancement of R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 1 Development Principle STDC7: Natural Environmental Protection and Enhancement states R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:31: peninsula Protection Area (SPA) and Ramsar site, and also South Gare and R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:41:L5.26 The sensitivity of this LCZ is Medium, as this area is designated as having Special Protection R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:7: discharge to water bodies, water impoundment and protection of R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:8: • EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31); R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:11: Plan.(RBMP) (Ref 36) to ensure the protection and improvement in quality of the water R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:18: Natural England website (Ref 47) Special Protection Areas (SPAs). R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:18: EA Source Protection Zones and 2009 River Basin R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:34:G4.38 Source Protection Zones (SPZs) (inner, outer and total catchment) are defined around R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:38: i EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31); R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:62: 31 GOV.UK (2013). Groundwater protection:Principles and practice (GP3). online GOV.UK. R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:62: Available at: <https://www.gov.uk/government/publications/groundwater-protection- R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:62: (2017). Groundwater protection. online GOV.UK. Available at: R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:62: <https://www.gov.uk/government/collections/groundwater-protection> [Accessed 1st R-2020-0819-ESM-1401-Dorman Point DAS.pdf:24: Fall Protection solutions and Kingspan Roof R-2020-0819-ESM-1401-Dorman Point DAS.pdf:24: performance within the building resulting in reduced running costs in Fall Protection Systems R-2020-0819-ESM-1401-Dorman Point DAS.pdf:24: personal and collective fall protection when R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:17: hearing protection zones in the working environment so unlikely to be routinely exceeded; R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:8: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:15: Special Scientific Interest (‘SSSI’) and the Special Protection Area (‘SPA’) / Ramsar site R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:16: site is low and the site does not lie within a defined Source Protection Zone (SPZ). There are no R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:6: Environmental Protection Act 1990 (c. 43) (Ref 3) R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:6:M2.5 The Environmental Protection Act 1990 (c. 43) as amended in 1996 and 1999 implements R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:6: Environmental Protection (Duty of Care) Regulations 1991 (Ref 4) R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:31: 3 Environmental Protection Act 1990 R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:31: 4 Environmental Protection (Duty of Care) Regulations 1991 R-2020-0819-ESM-0819 NWA.pdf:2:any necessary diversion, relocation or protection measures required prior to the commencement of R-2020-0819-ESM-EP CL.pdf:1:Environmental Protection Planning Consultation Response R-2020-0819-ESM-EP CL.pdf:2: as contaminated land under Part IIA of the Environmental Protection Act 1990; and R-2020-0819-ESM-Decision Notice 0819.pdf:7: protection measures or gas mitigation will be complied with thereafter, R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:9: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:74: 11 EPUK - Environmental Protection United Kingdom R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:74: 29 SPA - Special Protection Area R-2020-0819-ESM-Dorman Point HRA Rev B(1).PDF:4:The Teesmouth and Cleveland Coast Special Protection Area (SPA) was first classified in 1995 for its R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:10: conventions, including Special Protection Areas, Special Areas of Conservation and R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:13: Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) and the Teesmouth and R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:13: under the Ramsar Convention on Wetlands but which are afforded the same level of protection R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:32: protection and enhancement measures incorporated into the design of development proposals, R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:38: 18 SPA Special Protection Area R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:9: d support the expansion and protection of the port and logistics sector; R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:25: protection objectives established at Union or Member State R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF:38:A statement setting out current Government policy on the identification, protection, conservation and R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF:41: 1979; and Protection of Wrecks Act 1973); R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF:46: (v) Protection during development, followed by consolidation and preservation of high value R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:4: designated as Secondary B Aquifers. The Site is not located within a Source Protection R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:4: Protection Area (SPA). R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:9: under Part IIA of the Environmental Protection Act 1990. R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:9:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act (EPA) R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:17:2.4.3 Source Protection Zones R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:17:The Site is not located within a groundwater Source Protection Zone (SPZ). R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:18: • Special Protection Area (SPA) associated with the Teesmouth and Cleveland Coast; and R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:20:workers is considered to provide protection to off-Site commercial/industrial workers, provided that any remedial R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:20:Glacial Till (and where present, Glaciolacustrine Deposits) are considered to offer a degree of protection to this R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:45: protection of sites of ecological value in accordance with policies SD4 and N4 R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:47: groundwater protection’. R-2023-0277-CD-DECISION NOTICE.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2023-0277-CD-DECISION NOTICE.pdf:4: groundwater protection’. R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:5: • Weather Protection: The treatment system and all associated Infrastructure and R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:16: Protection of hazards arising from process fluids should be taken. As well as R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:34: H level protection. R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf:35: H-H level protection. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:6: Environmental Protection Act 1990 (c. 43) (Ref 3) R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:6:M2.5 The Environmental Protection Act 1990 (c. 43) as amended in 1996 and 1999 implements R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:6: Environmental Protection (Duty of Care) Regulations 1991 (Ref 4) R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:31: 3. Environmental Protection Act 1990 R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:31: 4. Environmental Protection (Duty of Care) Regulations 1991 R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:9: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:77: 10 EPUK - Environmental Protection United Kingdom R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:77: 28 SPA - Special Protection Area R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:8: bodies, water impoundment and protection of water resources. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:9: • EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31); R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:12: Plan (RBMP) (Ref 36) to ensure the protection and improvement in quality of the R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:19: Natural England website (Ref 47) Special Protection Areas (SPAs). R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:19: EA Source Protection Zones and 2009 River Basin R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:36:G4.48 Source Protection Zones (SPZs) (inner, outer and total catchment) are defined around R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:38: Teesmouth and Cleveland Special Protection Area (SPA) designated for ornithological R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:42: i EA Principles and Practice for the Protection of Groundwater (GP3) (Ref 31); R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: 33 GOV.UK (2013). Groundwater protection: Principles and practice (GP3). online R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: protection-principles-and-practice-gp3> Accessed 1st December 2020. Now R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: superseded by GOV.UK (2017). Groundwater protection. online GOV.UK. Available at: R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: <https://www.gov.uk/government/collections/groundwater-protection> [Accessed 1st R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:6: 1 Environmental Protection Act 1990 Part II (Ref 1); R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:6: 23 Environment Agency, Groundwater protection technical guidance, 2017 (Ref 23); R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:6: 24 Environment Agency, The Environment Agency’s approach to groundwater protection, R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:7: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:8: determined as contaminated land under Part IIA of the Environmental Protection Act R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:10: 4 Nearby Sites of Nature Conservation Interest (SNCIs), Special Protection Areas (SPAs), R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:10: appropriate gas protection measures, if required, based on specific development proposals. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:10: The required gas protection measures would be incorporated into the buildings during R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:13: protection zone, surface waters of good or Hazardous Waste where the R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:22: protection measures appropriate to protect buildings from gas migration. This should be R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25: pollution to groundwater. The site is not in a groundwater Source Protection Zone. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:25: Protection Area (SPA), along with the SSSI, sits approximately 165m to the east. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:41: 1 Environmental Protection Act 1990 Part II; R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:41: 23 Environment Agency, Groundwater protection technical guidance, 2017; R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:41: 24 Environment Agency, The Environment Agency’s approach to groundwater protection, R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:42: 35 DEFRA (2012) Environmental Protection Act 1990: Part 2A Contaminated Land Statutory R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:17: hearing protection zones in the working environment so unlikely to be routinely exceeded; R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:8: 2 Designated sites - including Teesmouth and Cleveland Coast Special Protection Area (‘SPA’) R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:15: Special Scientific Interest (‘SSSI’) and the Special Protection Area (‘SPA’) / Ramsar site R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: Protection Zone (SPZ). There are no abstractions or discharges near the site which are deemed R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:18: to the 2100 design scenario; protection of any harvested rainwater for re-use; avoidance of R-2020-0822-ESM-1401-Long Acres DAS.pdf:26: Fall Protection solutions and Kingspan Roof R-2020-0822-ESM-1401-Long Acres DAS.pdf:26: performance within the building resulting in reduced running costs in Fall Protection Systems R-2020-0822-ESM-1401-Long Acres DAS.pdf:26: personal and collective fall protection when R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:6:K2.2 A statement setting out current Government policy on the identification, protection, R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:9: Archaeological Areas Act 1979; and Protection of Wrecks Act 1973); R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:12:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:13:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5: the protection and conservation of landscape within the study area. Current planning policy and R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5: Plans, planning positively for the creation, protection, enhancement and management of R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 1 N1 Landscape - supports the protection and enhancement of the Borough’s landscape based R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 2 N4 Biodiversity and Geological Conservation - supports the protection and enhancement of R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:6: 1 Development Principle STDC7: Natural Environmental Protection and Enhancement states R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:31: peninsula Protection Area (SPA) and Ramsar site, and also South Gare and R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:40:L5.28 The sensitivity of this LCZ is Medium, as this area is designated as having Special Protection R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:9: d support the expansion and protection of the port and logistics sector; R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:11:widespread reptile species, such as Common Lizard, protection is limited to Section 9(1) whereby it R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:18:The Wildlife & Countryside Act 1981 (as amended) provides protection for barn owls and R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:18:The barn owl has further protection under Schedule 1 of the Wildlife & Countryside Act which R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:18:Roosting sites used by barn owls have no protection per se, other than that afforded by R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:20:All five buildings only have legal protection during the nesting period. If they are to be R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:20:The South Tees Regeneration Master Plan covers ‘Environmental Protection and R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:20:regeneration must provide appropriate protection for ecological interests. Comprehensive R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:20:environmental protection and enhancement therefore forms a key thematic strand of this R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:9: the Teesmouth and Cleveland Coast Special Protection Area (‘SPA’), Ramsar Site and Site of R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:19: Special Protection Area (‘SPA’) Ramsar site and SSSI, potential impacts to which are considered R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:19: e. support the expansion and protection of the port and logistics sector; R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:22: • STDC 7 (Natural Environmental Protection and Enhancement): requires development R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:22: • STDC8 (Preserving Heritage Assets): provides protection for retention of assets of heritage R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:43: 34 SPA Special Protection Area R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:25: protection objectives established at Union or Member State R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:4:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:6:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:7:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:13:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:13:Environmental Protection Team R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:14:From: Environmental Protection R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:14:To: Environmental Protection Environmental.Protection@redcar-cleveland.gov.uk R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:10: conventions, including Special Protection Areas, Special Areas of Conservation and R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:13: and Cleveland Coast Special Protection Area (SPA) and the Teesmouth and Cleveland Coast R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:13: are afforded the same level of protection in policy terms in respect of new development as R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:33: protection and enhancement measures incorporated into the design of development proposals, R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:41: 18 SPA Special Protection Area R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:8: deposition. Under provisions in the Environmental Protection Act 1990, dust nuisance is R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:9: Environmental Protection UK (‘EPUK’) and the IAQM provides a framework for professionals R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:14: geological interest) and the Special Protection Area (‘SPA’)/Ramsar site Teesmouth and R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:18: protection of human health are based on NO2 rather than total NOx or NO. R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:38: 17 EPUK: Environmental Protection UK R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:39: 40 SPA: Special Protection Area R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:https://www.redcar-cleveland.gov.uk/resident/environmental-protection/air-quality/Pages/Air-Quality-In- R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:https://www.middlesbrough.gov.uk/environment-and-public-protection/advice-and-information/air- R-2020-0465-FFM-Officer report _R20200465FFM.pdf:4:Protection Area (SPA) https://designatedsites.naturalengland.org.uk/. R-2020-0465-FFM-Officer report _R20200465FFM.pdf:4:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0465-FFM-Officer report _R20200465FFM.pdf:5:Redcar and Cleveland Borough Council (Environmental Protection) R-2020-0465-FFM-Officer report _R20200465FFM.pdf:9:protection section with regard to both contamination and nuisance. R-2020-0465-FFM-Officer report _R20200465FFM.pdf:11:Coast Special Protection Area (SPA), Ramsar site, National Nature Reserve R-2020-0465-FFM-Officer report _R20200465FFM.pdf:19: protection of sites of ecological value in accordance with policies SD4 R-2020-0465-FFM-Officer report _R20200465FFM.pdf:20: Special Protection Area (SPA) and does not damage or destroy the R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:3:e. support the expansion and protection of the port and logistics sector; R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:5:The site is located within a 6km buffer zone of the Teesmouth and Cleveland Coast Special Protection Area R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:5:additional recommendations for the protection of habitat including breeding birds (Shelduck). It calculates R-2020-0465-FFM-NWL 0465.pdf:1:diversion, relocation or protection measures required prior to the commencement of the R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:4:Special Area of Conservation (SAC) and Special Protection Area (SPA), Durham R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:7:Wild Flora and Fauna provides legal protection for habitats and species of R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:7:Offshore Marine SACs and Special Protection Areas (SPAs). However, it is R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:11: NE (2018) Departmental Brief: Teesmouth and Cleveland Coast potential Special Protection R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:11: JNCC. North York Moors Special Protection Area Information Sheet. Available: R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:11: JNCC. Northumbria Coast Special Protection Area Standard Data Form. Available: R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:11: NE. Designated Sites View: Northumbria Coast Special Protection Area. Available: R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:14:development, including three Special Protection Areas (SPA), three SACs, and R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:14:13 Natural England (2019) Teesmouth and Cleveland Coast potential Special Protection Area R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:21:Protection Area Site Code: UK9006161. Available at: R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:46: Special Protection Areas R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:2: protection of sites of ecological value in accordance with policies SD4 and N4 R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:3: Protection Area (SPA) and does not damage or destroy the interest features R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7: contaminated land under Part 2A of the Environmental Protection Act 1990; and R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:The statutory definition of contaminated land is given under Part 2A of the Environmental Protection Act R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:8: Health Protection Agency, 2010, HPA Contaminated Land Information Sheet, Risk Assessment R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. Design of a Site Protection and Monitoring Programme for Cleveland Works, R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:9: CORUS UK LTD. First Phase Reporting of the Site Protection and Monitoring Programme. 31 R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:13: sensitivity1 source protection zones (SPZ) within 1km of the area. R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: Corus UK LTD. Design of a Site Protection And Monitoring Programme For Cleveland Works, Teesside, October 2004 R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Design Of A Site Protection R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:26: Site Protection and Protection and Monitoring Programme (‘SPMP’). Reference Data was collected for R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:27:Gas Risk Assessment and should incorporate any necessary protection measures appropriate to protect R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:42: Site Protection and Monitoring programme (SPMP) submitted to the EA in pursuance of PPC R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: design sulphate class DS-2, indicating that that protection to buried concrete would be required. R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:46: protection measure to new buildings. R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:47: CS-1 (no gas protection measures required) and CS-2 locally (prudent to include protection to R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:49: sensitivity6 source protection zones (SPZ) within 1km of the area. R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:101:landfill sites should be supported by a Gas Risk Assessment and should incorporate any necessary protection R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: CL4 hard surfacing to break pathway Protection against aggressive soils will be health. R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:104: Relatively easily incorporated into the Protection of in ground workers and R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:105:To enable the protection of the remediation capping layer during both the construction and full site R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:To enable the protection of the remediation capping layer during both the construction and full site R-2020-0465-FFM-MRA Application Form Rev.pdf:1:commercial requirements relating to information security and data protection of the information you have provided. R-2020-0465-FFM-R 20 0465 nat eng.pdf:1: Protection Area (SPA) https://designatedsites.naturalengland.org.uk/. R-2020-0465-FFM-R 20 0465 Con Land.pdf:1:Environmental Protection Planning Consultation Response R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:31:A statement setting out current Government policy on the identification, protection, conservation and R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:34: 1979; and Protection of Wrecks Act 1973); R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:11:contours indicating a flow to the north. The site is not located within a Groundwater Source Protection Zone R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:16:groundwater receptors at the site. It is noted that the site is not located within a Source Protection Zone (SPZ) R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:20: United States Environmental Protection Agency (U.S. EPA) Regional Screening Levels (RSLs) R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:22:in accordance with the Health and Safety Executive publication entitled “Protection of Workers and the General R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:212:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels (RSL). Available at R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:213:USEPA GAC based on US Environmental Protection Agency (USEPA) Regional Screening Levels R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:216: Protection industry standards R-2020-0465-FFM-R 20 0465 Nuisance.pdf:1:Environmental Protection Planning Consultation Response R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:4:Teesmouth and Cleveland Coast Special Protection Area (SPA), Ramsar and Site R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:58:The Regulations offer protection to a number of ‘European Protected Species’ R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:58:allow an otherwise unlawful act. The species protection provisions of the Habitats R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:59:(SSSI). It confers differing levels of protection on species themselves, their R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:59:Species offered protection by the Act are listed in a series of schedules. These R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:60:enhancement of priority habitats, ecological networks and the protection and R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:61:development process, with appropriate protection and enhancement measures R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:61:Environmental Protection and Enhancement) stating: ‘…Net environmental gains R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:62: contributes to habitat protection and long-term sustainability, and that R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:62:habitat protection, safeguards biodiversity and enhances green Infrastructure, R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:62:focuses on the enhancement and protection of the natural environment. Therefore, R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:63:STDC 7 outlines the need for a coordinated approach to environmental protection R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:65: Special Protection Areas R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:67:levels of species protection and the processes linked to protection regimes are R-2023-0227-CD-MGE05028 Nuisance.pdf:1: Environmental Protection Planning Consultation Response R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:6: Standards and objectives for the protection of sensitive ecosystems and habitats are also contained R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: Table 3: Critical Levels for the Protection of Vegetation and Ecosystems R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: For the protection of lichens Guidance / APIS R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:8: For the protection of lichens R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:19: • Special Protection Areas (SPAs), Special Areas of Conservation (SACs), or Ramsar sites within R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:29: understand how the Environment Agency’s approach can provide adequate protection.” R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:49: In addition to the Critical Levels for the protection of ecosystems, habitat specific Critical Loads for R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:52: ammonia for the protection of lichens and bryophytes have been applied at the North York R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:52: out is 2.0 µg/m³, or 66.7% of the Critical Level of 3 µg/m³ set for the protection of higher plants. R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:3: (v) Protection during development, followed by consolidation and R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:7: Asset Protection R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:7: consult with our Asset Protection Team (details below) to ensure that there R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:7: affect the railway, consultation with the Asset Protection Project Manager R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:8: needs to be agreed by the Asset Protection Project Manager prior to R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:8: The Environmental Protection (Duty of Care) Regulations 1991 for dealing R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:5: and Cleveland Coast Special Protection Area (SPA) and Ramsar, North York R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:5:1.3 The NSN sites receive statutory protection under the Conservation of R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:5: Habitats Regulations afford a high level of protection to sites supporting R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6:2.1 Special Protection Areas (SPAs) and Special Areas of Conservation (SACs) R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6: receive statutory protection under the Habitats Regulations. The most recent R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6: Habitats Regulations afford a high level of protection to sites classified as R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6: also afford the same level of high protection to tracts of land supporting R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6:2.2 SACs and SPAs form part of a network of nature protection areas within the R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6: legislative protection to SPAs and SACs. Government has issued policy R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:6: same protection to Ramsar sites as that afforded to SPAs and SACs through R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:29: for the protection of vegetation and ecosystems is set at 30μg/m3. The NOx R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:29: 75 μg/m3 for the protection of vegetation and ecosystems. Further R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:29: protection of higher plants with the development in operation. R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:29: exceed the critical level set for the protection of sensitive lichen communities R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:36: annual mean critical level of 3 μg/m3 for the protection of higher plants with R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:40: the critical level of 30μg/m3 set for the protection of habitats and R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:40: critical levels of 10 μg/m3 for SO2 and 1 μg/m3 for NH3 for the protection of R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:49: relevant critical level set for the protection of higher plants. However the R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:49: ammonia will still be below the critical level set for the protection of higher R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:50: concentration of NOx remains below the 30 μg/m3 set for the protection of R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:54: Special Protection Area R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:59: Special Protection Area R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:64: behaviour of hen harriers breeding in Special Protection Areas in Scotland. R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:65: potential Special Protection Area (pSPA) and Ramsar. Brief version 11.2. R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:68: Special Protection Area (SPA) R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:68:The Teesmouth and Cleveland Coast Special Protection Area is a wetland of European R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:69:1) Teesmouth and Cleveland Coast was classified as a Special Protection Area on 15 August R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:76: Special Protection Area (SPA) + R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:77:Wetlands Trust, the Royal Society for the Protection of Birds and the Joint Nature Conservation R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:78: and important species. Poyser, London, for Nature Conservancy Council and Royal Society for the Protection of Birds R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:78: counts. British Trust for Ornithology, Wildfowl and Wetlands Trust, Royal Society for the Protection of Birds & Joint R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:78: Trust, Royal Society for the Protection of Birds & Joint Nature Conservation Committee, Slimbridge. R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:79: Special Protection Area (SPA) R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:79:been recommended has a Special Protection Area because of the site’s European Ornithological R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:79:North York Moors was classified as a Special Protection Area on 12 May 2000. R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:4: The advice from health specialists such as the Health Protection Agency (HPA) is that the damage R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf:8: to calculate a cancer risk, using the United States Environment Protection Agency’s (USEPA)’s 171019South-Tees-Master-Plan-19-Nov-17.pdf:32: and Redcar Blast Furnace complexes dominating. and Crown land designated a Special Protection Area. 171019South-Tees-Master-Plan-19-Nov-17.pdf:56:The Teesmouth and Cleveland Coast Special Protection and herring gull to use these areas for roosting and/or wintering birds and could support other species such 171019South-Tees-Master-Plan-19-Nov-17.pdf:62:processing, distribution and other employment • Flooding risk and flood protection 171019South-Tees-Master-Plan-19-Nov-17.pdf:68:such as Wilton International. The Master Plan will enable assessed energy demands of the densely developed, enhancement and protection of existing habitats, and, strategy. Smart, rather than expensive solutions should 171019South-Tees-Master-Plan-19-Nov-17.pdf:122:regulated manner, to ensure long term protection of environmental habitats. 171019South-Tees-Master-Plan-19-Nov-17.pdf:123:to ensure that new development does not adversely impact states that landscape work may take place outside while ensuring protection of environmentally vending, restrooms, shade structures, bird watching 171019South-Tees-Master-Plan-19-Nov-17.pdf:123:landscape and restoration landscape in the SPD. (Special Protection Area (SPA)/RAMSAR Site) STDC area to a terminus on South Gare environmental bodies and interest groups. 171019South-Tees-Master-Plan-19-Nov-17.pdf:152:collection and conveyance, detention and retention, and within the site that provides potable and fire protection The presence of the Northumbrian Water Bran Sands 171019South-Tees-Master-Plan-19-Nov-17.pdf:152:management system will provide a flood protection level of water supply strategy – for instance, recycling of grey The development of a wastewater and industrial 171019South-Tees-Master-Plan-19-Nov-17.pdf:152:service that meets regulatory standards for flood protection water. The potential for use of the existing Northumbrian effluent strategy for the redevelopment of the 171019South-Tees-Master-Plan-19-Nov-17.pdf:152:completely gravity operated system will be significantly cooling water; irrigation water; fire protection requirements; include monitoring and periodic reporting, as well as