User Tools

Site Tools


teesworks_-_keywords_-_demolition

{include:Teesworks - keywords - menu}

1911South-Tees-Master-Plan-Nov-19.2.pdf:17: 17. Plan for a progressive, optimally-phased delivery of demolition, site preparation and infrastructure across the

1911South-Tees-Master-Plan-Nov-19.2.pdf:24: plan period, to 2032. The Local Plan was informed decommissioning and demolition of the facilities spaces and a setting that is conducive to

1911South-Tees-Master-Plan-Nov-19.2.pdf:58:products of decommissioning and demolition. Utilising

1911South-Tees-Master-Plan-Nov-19.2.pdf:80:demolition and remediation – so this will need to be

1911South-Tees-Master-Plan-Nov-19.2.pdf:85:strategy to arrange end user site allocations to minimise zone is licensed to receive wastes from iron and steel in the programme. While demolition is proceeding across compatible end uses to minimise potential conflicts.

1911South-Tees-Master-Plan-Nov-19.2.pdf:85: off-site disposal. With the abundance of land elsewhere • Areas that don’t require major demolition.

1911South-Tees-Master-Plan-Nov-19.2.pdf:86:imperative that the plan for redevelopment is structured under STDC ownership. UK Government has already the site is free of any significant demolition demands and (Greybull Capital) ownership, South Gare/Coatham Sands,

1911South-Tees-Master-Plan-Nov-19.2.pdf:86:there is little to no demolition required; ground conditions buildings requiring demolition. Included within the Master up of large land parcels, totalling to around 700 acres

1911South-Tees-Master-Plan-Nov-19.2.pdf:86: Tees Dock Road, this site is to be for commercial uses. complexity of the demolition and remediation to be

1911South-Tees-Master-Plan-Nov-19.2.pdf:157: • Collection of construction, demolition and

1911South-Tees-Master-Plan-Nov-19.2.pdf:162:centrally, via Tees Dock Road. The scale of the STDC arising from demolition and site remediation operations and open spaces strategy. Subject to determining iron and steel works, whether operational or non-operational,

1911South-Tees-Master-Plan-Nov-19.2.pdf:162:and iconic architectural features, in the form of sculptured rectangular landform upon completion. The strategy will demolition programme for development purposes, would

1911South-Tees-Master-Plan-Nov-19.2.pdf:166:the implementation of any essential demolition, site Purchase Order (CPO) under the Localism Act powers expansion, provide the right conditions for exploring a

1911South-Tees-Master-Plan-Nov-19.2.pdf:166: • Demolition and Salvage the Combined Authority, RCBC and UK Government

1911South-Tees-Master-Plan-Nov-19.2.pdf:166: plant and facilities would be planned for demolition.

1911South-Tees-Master-Plan-Nov-19.2.pdf:166: their demolition, a thorough market testing exercise will be

1911South-Tees-Master-Plan-Nov-19.2.pdf:166: date, restricted the opportunity to fully test the market and deferred, pending completion of demolition works (e.g.,

1911South-Tees-Master-Plan-Nov-19.2.pdf:173:basis, making Tier 3 interventions as necessary time, ultimately extending to demolition activities and addressing COMAH impacts.

R-2021-0674-NM-63262_01 - Teesworks S96A Cover Letter - 04.08.21(1).PDF:1:‘Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0674-NM-63262_01 - Teesworks S96A Cover Letter - 04.08.21(1).PDF:1:prior to any works on site, including demolition.

R-2021-0674-NM-Officer Report 0674.pdf:2:R/2020/0684/ESM Demolition of existing redundant quay structures, capital

R-2021-0674-NM-Officer Report 0674.pdf:2:commencing on site, including demolition. It is proposed through the

R-2021-0674-NM-Officer Report 0674.pdf:2:such as demolition to take place in advance of the discharge of the condition.

R-2021-0674-NM-ApplicationFormRedacted.pdf:2:Non-material amendment to vary condition 5 (surface water management) of application R/2020/0684/ESM for Demolition of existing redundant quay

R-2021-0674-NM-DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2021-0674-NM-DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:1: • demolition of existing infrastructure including the dilapidated South Bank wharf, 3

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3:22. Demolition works are assessed to cause localised disturbance of the bed, of low magnitude and

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:1:dredge of the channel and berth pocket, the demolition of existing infrastructure and the placement of rock

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:1: Description of The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material, placement of rock in the

MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf:2: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor at the extreme

MLA202000506 and MLA202000507 Draft HRA (2).pdf:1:Description of The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material, placement of rock in the

MLA202000506 and MLA202000507 Draft HRA (2).pdf:2: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor at the extreme

MLA202000506 and MLA202000507 Draft HRA (2).pdf:21:New cinema development Demolition of existing cinema and replacement with a new Although the proposed schemes are geographically

MLA202000506 and MLA202000507 Draft HRA (2).pdf:22:South Industrial Zone Outline planning application for demolition of existing structures The South Industrial scheme is Immediately adjacent

MLA202000506 and MLA202000507 Draft HRA (2).pdf:24: demolition of the existing jetties, produced during construction (including

MLA202000506 and MLA202000507 Draft HRA (2).pdf:25: part of the estuary and are similar displaced from the site during demolition

MLA202000506 and MLA202000507 Draft HRA (2).pdf:29:New cinema development Demolition of existing cinema and replacement with a LSE could not be ruled out for redshank, knot, ringed

MLA202000506 and MLA202000507 Draft HRA (2).pdf:29:South Industrial Zone development Outline planning application for demolition of existing The South Industrial scheme is immediately adjacent

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

EA MLA_2020_00506 v2 29 June 2021 OFFICIAL.pdf:1:SOUTH BANK QUAY - PHASE 1 WORKS COMPRISING OF DEMOLITION, CAPITAL

EA MLA_2020_00506 22 February 2021 OFFICIAL.pdf:1:SOUTH BANK QUAY - PHASE 1 WORKS COMPRISING OF DEMOLITION, CAPITAL

MLA-2020-00506.pdf:1: used. Timings have been provided for all activities except for demolition, as this is the first

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:1:7. The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works:

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works are limited to the dilapidated wharf, three jetties downstream of the wharf (with the

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:8:anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:1:6. The proposed scheme will comprise the following works: demolition, capital dredging, offshore

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:13: 1. Demolition of the existing wharf (approx. 750 m length), three jetties downstream the wharf, live

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:1: storage/distribution activities. The proposed scheme comprises demolition of the existing

MLA202000506 and MLA202000507 Draft HRA.pdf:1:Description of The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material, placement of rock in the

MLA202000506 and MLA202000507 Draft HRA.pdf:2: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor at the extreme

MLA202000506 and MLA202000507 Draft HRA.pdf:21:New cinema development Demolition of existing cinema and replacement with a new Although the proposed schemes are geographically

MLA202000506 and MLA202000507 Draft HRA.pdf:22: South Industrial Zone Outline planning application for demolition of existing structures The South Industrial scheme is Immediately adjacent

MLA202000506 and MLA202000507 Draft HRA.pdf:23: demolition of the existing jetties, produced during construction (including

MLA202000506 and MLA202000507 Draft HRA.pdf:24: part of the estuary and are similar displaced from the site during demolition

MLA202000506 and MLA202000507 Draft HRA.pdf:28:New cinema development Demolition of existing cinema and replacement with a LSE could not be ruled out for redshank, knot, ringed

MLA202000506 and MLA202000507 Draft HRA.pdf:28:South Industrial Zone development Outline planning application for demolition of existing The South Industrial scheme is immediately adjacent

20210603 MLA2020005067 Tees South Bank Quay Supplementary Report Review Fisheries advice MG GE + JP.pdf:1: at South Bank in the Tees estuary. In summary, the proposed works comprises demolition, capital

20220608 MLA2020005061 L20121003331 Cefas advice Final.pdf:1:7. This application is for the variation of the licence (L/2021/00333/1) that allows for demolition,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:3:3.3 Demolition 7

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:3.3 Demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:comprise the demolition of:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:has confirmed that demolition of such infrastructure can commence without planning permission, and works

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:15:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:27: Demolition - - 12 months

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:27: • Demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:namely demolition of existing infrastructure and construction of the proposed quay require planning

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:148: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:200: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:271: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:334: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:344: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:345: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:351: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:353: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:354: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:367: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:385: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:388: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:390: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:393:Measures specific to demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:395: Demolition 3 52

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:523: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:525: station and demolition of substation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:555: dredging, excavation and demolition works.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf:5:the demolition of the existing wharf and the construction of a 1,035m long quay on the South Bank of

MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf:5: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf:5: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

MLA_2020_00506-Returns-56.pdf:1: Reference Deadline Name Demolition due to commence on 21st March

MLA_2020_00506-Returns-56.pdf:1: MLA/2020/00506/R2 No less than 24 Agents / contractors / sub-contractors Demolition Subcontractor – Foyle and Marine

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:5:proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:7: ( Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:19: ) Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:24:The magnitude of all relevant construction phase impacts (namely direct loss of habitat due to demolition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:32: Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:36: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay construction,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:42:demolition works (i.e. that within which the proposed new quay is located) is of low importance to non-breeding waterbirds, especially when compared

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:202:requested to assess the potential impacts associated with demolition of these structures as part of the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1134-L.2021.00333 South Bank Quay Marine Licence Variation Request 2-62.pdf:1:included activities for the demolition of existing structures, capital dredging of a new turning circle, capital

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.3 Demolition 7

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:3.3 Demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:comprise the demolition of:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:has confirmed that demolition of such infrastructure can commence without planning permission, and works

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: Demolition - - 12 months

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: • Demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:namely demolition of existing infrastructure and construction of the proposed quay require planning

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:148: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:200: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:271: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:334: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:344: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:345: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:351: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:353: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:354: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:367: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:385: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:388: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:390: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393:Measures specific to demolition

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395: Demolition 3 52

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:523: Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525: station and demolition of substation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: dredging, excavation and demolition works.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00506-Marine Coordinate Schedules-55.pdf:7:Demolition area

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:1:included activities for the demolition of existing structures, capital dredging of a new turning circle, capital

MLA_2020_00506-Licence Document (Marine)-45.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Site 4 - Demolition area

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Site location Demolition area.

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Activity 4.1 - Demolition of existing infrastructure

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Activity location Demolition area, see coordinate schedule 4.

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Description A programme of demolition works is required in advance of

MLA_2020_00506-Licence Document (Marine)-45.pdf:8:Methodology Demolition will require the use of both land and marine

MLA_2020_00506-Licence Document (Marine)-45.pdf:8: up using a long reach excavator with hydraulic demolition

MLA_2020_00506-Licence Document (Marine)-45.pdf:8: The demolition may include cutting sections of the deck

MLA_2020_00506-Licence Document (Marine)-45.pdf:9: The demolition of the substation will be undertaken using

MLA_2020_00506-Licence Document (Marine)-45.pdf:9: diverted in advance of demolition commencing so that

MLA_2020_00506-Licence Document (Marine)-45.pdf:9:Programme of works Demolition works to take approximately 12 months for

MLA_2020_00506-Licence Document (Marine)-45.pdf:9: separately to Phase 2, demolition for Phase 1 is

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:4:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:4:demolition works for the proposed scheme, are addressed through the onshore WSI.

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:5: STRUCTURES FOR DEMOLITION

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:5: STRUCTURES FOR DEMOLITION

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:10:demolition of existing infrastructure within the landward part of the proposed scheme footprint (with the

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:10:preservation). Prior to demolition, historic building recording (e.g. photogrammetry) of the wharf and jetties

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:25: Archaeological material excavated/brought to the surface by shore based plant, involved in demolition

MLA_2020_00506-APPLICATION-FORM.pdf:2:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00506-APPLICATION-FORM.pdf:11:Demolition area

MLA_2020_00506-APPLICATION-FORM.pdf:11:Demolition of Demolition area Other removals

MLA_2020_00506-APPLICATION-FORM.pdf:21:Demolition area - Demolition of existing infrastructure

MLA_2020_00506-APPLICATION-FORM.pdf:22:Demolition of existing infrastructure

MLA_2020_00506-APPLICATION-FORM.pdf:22:A programme of demolition works is required in advance of construction works

MLA_2020_00506-APPLICATION-FORM.pdf:22:The proposed demolition methodology is detailed in Section 3.3 of the EIA Report.

MLA_2020_00506-APPLICATION-FORM.pdf:22:However, in summary it is envisaged that demolition would require the use of both land

MLA_2020_00506-APPLICATION-FORM.pdf:22:demolition attachments, working from the shore (and supported by a jack-up barge,

MLA_2020_00506-APPLICATION-FORM.pdf:22:slave barge and safety/workboat). Alternatively, the demolition may include cutting

MLA_2020_00506-APPLICATION-FORM.pdf:22:Demolition works are anticipated to take approximately 12 months for Phase 1 and 2

MLA_2020_00506-APPLICATION-FORM.pdf:22:combined. Should Phase 1 be implemented separately to Phase 2, demolition for Phase

MLA_2020_00506-APPLICATION-FORM.pdf:22:undertaken 24 hours a day, seven days a week. The specific months when demolition is

MLA_2020_00506-Licence Document (Marine)-58.pdf:5:In summary, the scheme comprises demolition, capital dredging, offshore disposal

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Site 4 - Demolition area

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Site location Demolition area.

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Activity 4.1 - Demolition of existing infrastructure

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Activity location Demolition area, see coordinate schedule 4.

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Description A programme of demolition works is required in advance of

MLA_2020_00506-Licence Document (Marine)-58.pdf:8:Methodology Demolition will require the use of both land and marine

MLA_2020_00506-Licence Document (Marine)-58.pdf:8: up using a long reach excavator with hydraulic demolition

MLA_2020_00506-Licence Document (Marine)-58.pdf:8: The demolition may include cutting sections of the deck

MLA_2020_00506-Licence Document (Marine)-58.pdf:9: The demolition of the substation will be undertaken using

MLA_2020_00506-Licence Document (Marine)-58.pdf:9: diverted in advance of demolition commencing so that

MLA_2020_00506-Licence Document (Marine)-58.pdf:9:Programme of works Demolition works to take approximately 12 months for

MLA_2020_00506-Licence Document (Marine)-58.pdf:9: separately to Phase 2, demolition for Phase 1 is

MLA_2020_00506-PC1084-RHD-ZZ-XX-NT-Z-0001 MLA.2020.00506.1 Response to Further Information Request-53.pdf:1:South Tees Developments Limited (SDTL) has applied to vary its marine licence for demolition, capital

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

MLA_2020_00506-Marine Coordinate Schedules-44.pdf:7:Demolition area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:and demolition waste is subjected to material recovery.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:demolition waste.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:11:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: have had prior approval for demolition (see below).

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:comprise the demolition of:

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: demolition can proceed without planning permission).

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:28:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition by competent specialists and disposed as hazardous waste.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:“Outline planning application for demolition of existing structures on site and the development of up to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:79:Thank you for your enquiry on the demolition of an existing timber wharf and two

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: • demolition of the existing timber wharf and jetties,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:85:please find the attached figures. In summary, the proposed scheme comprises demolition of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of various buildings and structures on the riverbank and hinterland.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:257:It is understood that demolition of some of the existing above ground infrastructure on site (namely the heavy

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:285:The proposed scheme will include demolition of some existing on site structures (with others removed in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:133: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139:The proposed development will include the demolition of the existing wharf and the construction of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:144: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:145:Demolition of the existing infrastructure will last for approximately 56 weeks. On completion, the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:271:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:272: Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:280: Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:282: Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: Demolition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: demolition process prior to construction of the quay.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Marine demolition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:different for each of the four categories of construction activities outlined by the IAQM (demolition,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: Demolition metal cladding or timber)

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities <10m above

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities 10 - 20m • Demolition activities >20m above

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition during wetter months

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:Table A18.6 Risk of dust impacts - demolition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350: • demolition of the existing infrastructure;

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:384:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: up using a long reach excavator with hydraulic demolition attachments, working from the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: the demolition may include cutting sections of the deck and lifting them onto the land for

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: into the Tees is minimised. Should any debris fall into the river channel during demolition,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: boat. As with the concrete deck, best practice demolition techniques would be adopted to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386: during the demolition works but these are only expected to be localised to the working area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:5:proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:7: ( Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:19: ) Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:24:The magnitude of all relevant construction phase impacts (namely direct loss of habitat due to demolition

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:32: Proposed Demolition Area

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:36: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay construction,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:42:demolition works (i.e. that within which the proposed new quay is located) is of low importance to non-breeding waterbirds, especially when compared

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:202:requested to assess the potential impacts associated with demolition of these structures as part of the

R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: OOM Tees demolition of existing structures on

R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0830-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0830-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0830-CD-ApplicationFormRedacted.pdf:1:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0830-CD-ApplicationFormRedacted.pdf:2:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: OOM Tees demolition of existing structures on

R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0830-CD-DECISION NOTICE 0684.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2021-0830-CD-DECISION NOTICE 0684.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0830-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:Planning consultation: Discharge of Condition 7 of R/2020/0684/ESM for demolition of

R-2021-0830-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:for outline application for demolition of existing structures on site the development of up to

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: OOM Tees demolition of existing structures on

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf:1: LEVELS (mAOD) No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf:1:LEVELS (mAOD) 1:750 No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf:1: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-COMPLIANCE OFFICER REPORT.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2021-1096-CD-COMPLIANCE OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-1096-CD-COMPLIANCE DECISION NOTICE.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-1096-CD-COMPLIANCE DECISION NOTICE.pdf:2: APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf:1: Tank No. Construction Risk Maintenance Risk Demolition Risk

R-2021-1096-CD-61586 Covering Letter 22.12.21.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:5:undergoing redevelopment which requires demolition of a number of buildings and vegetation and

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:7:demolition and construction – Recommendations’, to provide a written report of the findings. The

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:10:the demolition/construction activity and must remain in situ and intact until completion. The

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:13:Following guidance as set out in BS5837:2012 ‘Trees in relation to design, demolition and

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:11:• Landscape Demolition and Protection Plan (ref: STDC_HWY-ATK-LDC-SHPR-DR-CH-000042),

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:5:undergoing redevelopment which requires demolition of a number of buildings and vegetation and

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:7:demolition and construction – Recommendations’, to provide a written report of the findings. The

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:10:the demolition/construction activity and must remain in situ and intact until completion. The

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey.pdf:13:Following guidance as set out in BS5837:2012 ‘Trees in relation to design, demolition and

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000045_C01.pdf:1: 3. Site is under active and continuous demolition/change, info on this

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000045_C01.pdf:1: 5. Areas for retention,demolition and re-grading are subject to further

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000041_C01.pdf:1: 6. Site is under active and continuous demolition/change, info on this

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: 6. Site is under active and continuous demolition/change, info on this

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: Demolition and protection for the proposed drainage route LIMERICK R

R-2022-0816-FFM-STDC_HWY-ATK-LDC-SHPR-DR-CH-000042_C01.pdf:1: LANDSCAPE DEMOLITION

R-2022-0816-FFM-ApplicationFormRedacted.pdf:9:make clear on its website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition

R-2022-0816-FFM-ApplicationFormRedacted.pdf:12: Gross internal floorspace to be lost by change of use or demolition (square metres):

R-2022-0816-FFM-ApplicationFormRedacted.pdf:12: Gross internal floorspace to be lost by change of use or demolition (square metres):

R-2022-0816-FFM-ApplicationFormRedacted.pdf:12: Gross internal floorspace to be lost by change of use or demolition (square metres):

R-2022-0816-FFM-ApplicationFormRedacted.pdf:12: internal floorspace by change of use or demolition proposed (including changes of use) floorspace following development

R-2022-0515-CD-COMPLIANCE DECISION NOTICE.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0515-CD-COMPLIANCE DECISION NOTICE.pdf:2: R/2020/0357/OOM FOR DEMOLITION OF EXISTING STRUCTURES

R-2022-0515-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0515-CD-COMPLIANCE OFFICER REPORT.pdf:1: FOR DEMOLITION OF EXISTING

R-2022-0515-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0515-CD-61586 Discharge Condition 17 09.06.22(1).pdf:1:Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0515-CD-EP CL.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF EXISTING

R-2021-0754-FFM-Officer Report 0754.pdf:2:R/2020/0357/OOM - Outline planning application for demolition of existing

R-2021-0754-FFM-Officer Report 0754.pdf:6:surrounding area, with on-going works relating to demolition and remediation

R-2021-0754-FFM-Officer Report 0754.pdf:9:application R/2020/0357/OOM which proposed the demolition of existing

R-2021-0754-FFM-Decision Notice 0754.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0754-FFM-INCA2021-67 South Bank access road - Ecology report.pdf:3:the demolition of existing structures and redevelopment of the site. The ecological impacts of that

R-2021-0754-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0754-FFM-63455 01 LM Wind Access Road - Cover Letter 18.08.21.pdf:1:• R/2020/0357/OOM - Outline planning application for demolition of existing structures on site and the

R-2021-0754-FFM-63455 01 LM Wind Access Road - Cover Letter 18.08.21.pdf:3:R/2020/0357/OOM which proposed the demolition of existing structures and redevelopment of

Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context(2).pdf:3: - PPG 6 Working at construction and demolition sites;

Environmental Statement, Chapter G Water Management and Flooding Section 2 Policy Context.pdf:3: - PPG 6 Working at construction and demolition sites;

Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:1: 1 Demolition of legacy structures and ground preparation operations including removal of

Environmental Statement, Chapter H Ground Conditions and Remediation Section 6 Mitigation.pdf:1: should be noted that the demolition of existing structures within the development site has

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:3:7.3.3 Demolition of Existing Redundant Quay and Development of New Quay

TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf:22:7.3.3 Demolition of Existing Redundant Quay and Development of New Quay

MLA_2022_00248-APPLICATION-FORM.pdf:2:(SIZ) development which has received outline approval for the demolition of existing

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:22: demolition arising, crushed concrete or imported fill.

R-2021-0422-CD-Compliance Decision Notice 0422.pdf:1: PLANNING PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2021-0422-CD-Compliance Decision Notice 0422.pdf:2: PLANNING PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2021-0422-CD-Decision Notice (1).pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0422-CD-Decision Notice (1).pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0422-CD-61586_01 - RCBC - DoC Cover Letter - 19.05.21.PDF:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0422-CD-0422.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0422-CD-ApplicationFormRedacted.pdf:2:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0422-CD-Officer Report 0422.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0422-CD-Officer Report 0422.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0610-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0610-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0610-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0610-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0610-PND-Officer Report 0610.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0610-PND-Officer Report 0610.pdf:1:The application seeks prior approval for the demolition of obsolete south bank

R-2021-0610-PND-Officer Report 0610.pdf:1:The application seeks prior approval for the demolition of obsolete south bank

R-2021-0610-PND-Officer Report 0610.pdf:1:regard to the demolition process. Within this a summary of the general scope

R-2021-0610-PND-Officer Report 0610.pdf:2: Identification of demolition options considered to be practicable for

R-2021-0610-PND-Officer Report 0610.pdf:2: demolition in accordance with established industry standards and

R-2021-0610-PND-Officer Report 0610.pdf:2: Plant and Buildings to establish the safest practicable demolition

R-2021-0610-PND-Officer Report 0610.pdf:2:before being taken off site. The demolition works will remove all buildings

R-2021-0610-PND-Officer Report 0610.pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0610-PND-Officer Report 0610.pdf:2:It is considered that through the demolition method statement and the

R-2021-0610-PND-Officer Report 0610.pdf:2:mitigation measures that the proposed demolition works would not result in

R-2021-0610-PND-Officer Report 0610.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2021-0610-PND-Officer Report 0610.pdf:3:surrounded other industrial buildings and structures. While the demolition and

R-2021-0610-PND-Officer Report 0610.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2021-0610-PND-Decision Notice 0610.pdf:1:Details: PRIOR NOTIFICATION FOR DEMOLITION OF OBSOLETE SOUTH BANK COKE

R-2021-0610-PND-Decision Notice 0610.pdf:1:demolition of the above premises is not required.

R-2021-0610-PND-SITE NOTICE.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0610-PND-SITE NOTICE.pdf:1:Demolition is due to begin on: 2 August 2021

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:1: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:1: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:2: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:2: Following the safe demolition of the Ammonia Plant, Keltbray

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:2: 3. Identification of demolition options considered to be

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:2: Structures in advance of demolition in accordance with established

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:2: demolition methodology.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:3:By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:4:By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:5:By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6:Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6:Keltbray Decommissioning will carry out all demolition works strictly in accordance with the requirements of BS6187:2011 Code of Practice for Full

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6:and Partial Demolition. Key demolition activities that will be subject to Keltbray standards include:

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6:• Where practicable, Hazardous Materials will be removed in advance of demolition.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:6:• Where this is not possible, the demolition methodology will be developed to reduce risk to levels ALARP.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:7: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:7:• All demolition personnel to be CAT B trained and have non-licenced asbestos medicals.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:7:• On completion of demolition, a visual inspection of the exclusion zone will be carried out by an UKAS accredited analyst and the KES site

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:8: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:Demolition Methodology – Safety Hierarchy

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:Based on analysis of accidents and incidents, backed up by Comparative Risk Assessments of demolition methods considered practicable for

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9: Safest ● Machine Demolition ● Working at Height

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9: ● Piece Small Demolition ● Moving Plant

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:Demolition Methodology – SBCO

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:Planning Stage analysis and assessment has confirmed the following safety based Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:● Gas Holder Controlled Explosive Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:● All Others Machine DEmolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:10: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:10:Case Study – Machine Demolition - Ammonia Washers Vessels

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:10:placement for the demolition. The images below show the modelled sequence and actual machine working on the Ammonia Washers Vessels.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:11: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:11:Case Study – Machine Demolition – Petrochemical Plant, Teesside

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:11:Keltbray Decommissioning has recently completed demolition and site clearance on a live Teesside COMAH Petrochemical Plant.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:11:Works involved primarily Machine demolition with no hot cutting permitted on site. The image above shows Super Long Reach machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:11:demolition of a 62 metre high Cooling Tower.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:12: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:12:Case Study – Machine Demolition – Petrochemical Plant, Teesside

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:12:Keltbray Decommissioning has recently completed demolition and site clearance on a live Teesside COMAH Petrochemical Plant.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:12:Works involved primarily Machine demolition with no hot cutting permitted on site. The image above shows Heavy Medium Reach machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:12:demolition of heavy steel plant.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:13: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:13:Case Study – Controlled Explosive Demolition – Various Projects

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:13:Controlled Explosive Demolition is a highly efficient and safety proven method for demolition of large structures. The Keltbray Decommissioning

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:14: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:14:Demolition Sequence

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:14:The following images provide an overview of the SBCO demolition works sequence, with all works carried out mainly by heavy machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:14:demolition, with the exception of controlled explosive demolition on the Gasholder.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:15: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:15:Demolition Stage 1 Benzoyl Tank Loading Area

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:15: Methodology - Heavy Demolition Machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:16: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:16:Demolition Stage 2 Effluent and L&M Tanks

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:16: Methodology - Heavy Demolition Machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:17: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:17:Demolition Stage 3 Furnace Brick Storage Building

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:17: Methodology - Heavy Demolition Machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:18: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:18:Demolition Stage 4 Equipment Store, Primary and Secondary Cooling Towers

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:18: Methodology - Heavy Demolition Machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:19: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:19:Demolition Stage 5 Boilerhouse Gasholder

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:19: Methodology - Heavy Demolition Machine Methodology – Controlled Explosive Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:20: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:20:Demolition Stage 6 Workshops and Conveyor Gantry Plant

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:20: Methodology - Heavy Demolition Machine

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:21: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:21:Demolition Stage 7 Offices and Ancillary Storage Buildings

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:21: Methodology – Heavy Machine Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:22: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:22:Demolition Stage 8 Area of highest potential risk of explosive atmosphere to be carried out as final phase of the works.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:22: Methodology – Heavy Machine Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:23: By Products and Ancillary Buildings Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:23:Site End State The demolition works are down to slab level, with the site being left ‘at grade’. Any hazardous materials will be

R-2021-0610-PND-SBCO (Phase 2) Demolition.pdf:1: DECOMMISSIONING/DEMOLITION

R-2021-0610-PND-SBCO (Phase 2) Demolition.pdf:1: SOUTH TEES DEMOLITION

R-2021-0610-PND-SBCO (Phase 2) Demolition.pdf:1: PRIOR APPROVAL DEMOLITIONS

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf:1: Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0200-S3-P01-Knitting_Wife_Cross_Sections_Sheet_1_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf:1: Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0300-S3-P01-Holme_Beck_Details_Sheet_1_of_2.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf:1: Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-00-DR-C-0001-S3-P01-Key_Plan.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0003-S3-P01-Knitting_Wife_Beck_Northern_Reach_GA.pdf:1: OF BANK Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0202-S3-P01-Knitting_Wife_Cross_Sections_Sheet_3_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-Decision Notice 2020 0318.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0201-S3-P01-Knitting_Wife_Cross_Sections_Sheet_2_of_3.pdf:1: LOW MAINTENANCE WILDFLOWER No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0002-S3-P01-Knitting_Wife_Beck_Eastern_Reach_GA.pdf:1: 0200 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0103-S3-P01-Knitting_Wife_Long_Sections_Sheet_4_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0301-S3-P01-Holme_Beck_Details_Sheet_2_of_2.pdf:1: 10.00 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0100-S3-P01-Holme_Beck_Sections.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0002-S3-P01-Holme_Beck_GA.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C03-South_Bank_General_Arrangement_Inter_Tidal_Channel.pdf:1: Tank No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0231-FF-Covering Letter.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf:1:LEVELS (mAOD) 1:750 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0231-FF-DECISION NOTICE.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0231-FF-ApplicationFormRedacted.pdf:6:make clear on its website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition

R-2019-0629-CD-Discon (10) cover letter.pdf:1:“Demolition of structures and engineering operations associated with ground preparation and temporary

R-2019-0629-CD-ApplicationFormRedacted.pdf:2:DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND PREPARATION AND TEMPORARY STORAGE OF

R-2019-0629-CD-201931 Reptile Mitigation Strategy Rev A.pdf:2:Application Number: R/2019/0427/FFM, which is for “DEMOLITION OF STRUCTURES AND

R-2019-0629-CD-Compliance Decision Notice_R20190629CD.pdf:1: R/2019/0427/FFM FOR DEMOLITION OF STRUCTURES AND

R-2019-0629-CD-Compliance Decision Notice_R20190629CD.pdf:2: R/2019/0427/FFM FOR DEMOLITION OF STRUCTURES AND

R-2022-0342-CD-EP NU.pdf:1: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0342-CD-COMPLIANCE DECISION NOTICE.pdf:1: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF EXISTING

R-2022-0342-CD-COMPLIANCE DECISION NOTICE.pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:8:• Backfill of excavations to leave the site safe and level, with validated made ground, certified demolition

R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0342-CD-COMPLIANCE OFFICER REPORT.pdf:1: FOR DEMOLITION OF EXISTING

R-2022-0342-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0342-CD-61586 Conditions 21 and 25 Covering Letter 07-04-22(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0342-CD-EP CL.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF EXISTING

R-2022-0342-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf:1: Decommissioning / Demolition

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf:1: Decommissioning / Demolition

R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf:1: Decommissioning / Demolition

R-2021-0296-NM-Decision 0270.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0354-CD-Archaeological Recording WSI.pdf:3: (R/2020/0357/OOM) for demolition of existing structures on site and the development of up to

R-2022-0354-CD-0354 Decision.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0354-CD-0354 Decision.pdf:2: R/2020/0357/OOM FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0354-CD-61586_01 Cover Letter(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0354-CD-0354 Officer Report.pdf:1: FOR DEMOLITION OF EXISTING

R-2022-0354-CD-0354 Officer Report.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0354-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2020-0302-PND-OFFICER REPORT.pdf:1:PROPOSAL: PRIOR APPROVAL FOR DEMOLITION OF

R-2020-0302-PND-OFFICER REPORT.pdf:1:for demolition that are all located away from public access.

R-2020-0302-PND-OFFICER REPORT.pdf:2:All demolition works shall be carried out in accordance with the BS Code of

R-2020-0302-PND-OFFICER REPORT.pdf:2:Practice for Demolition BS6187. All work shall confirm with all relevant

R-2020-0302-PND-OFFICER REPORT.pdf:2:As set out in the accompanying Demolition Method Statement, the outline

R-2020-0302-PND-OFFICER REPORT.pdf:2:  A refurbishment and demolition asbestos survey will be carried out to

R-2020-0302-PND-OFFICER REPORT.pdf:2:  The first stage of demolition will involve the clearance of low-level

R-2020-0302-PND-OFFICER REPORT.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0302-PND-OFFICER REPORT.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0302-PND-OFFICER REPORT.pdf:3:relating to the proposed demolition works within the supporting letter.

R-2020-0302-PND-OFFICER REPORT.pdf:3:  Prior to any demolition works commencing, an ecological survey is to

R-2020-0302-PND-OFFICER REPORT.pdf:3:  Dust suppression will be used at all times during the demolition of any

R-2020-0302-PND-OFFICER REPORT.pdf:3:demolition is not considered to result in significant environmental effects, due

R-2020-0302-PND-OFFICER REPORT.pdf:4:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0302-PND-OFFICER REPORT.pdf:4:structures. While the demolition and clearance of the site will leave an empty

R-2020-0302-PND-OFFICER REPORT.pdf:4:The proposed method of demolition and restoration of the site thereafter is

R-2020-0302-PND-STDC-SIZ-SB-EWO-0001 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: structural demolition including

R-2020-0302-PND-STDC-SIZ-SB-EWO-0001 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: South facing elevations of former ferro manganese crushing plant North facing elevation of former ferro manganese crushing plant disconnected and demolition

R-2020-0302-PND-STDC-SIZ-SB-EWO-0001 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: advance of demolition works

R-2020-0302-PND-STDC-SIZ-SB-EWO-0001 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: PRIOR APPROVAL DEMOLITIONS

R-2020-0302-PND-STDC-SIZ-SB-EWO-0003 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: TE RECOVERY Existing structures for demolition

R-2020-0302-PND-STDC-SIZ-SB-EWO-0003 South Bank Enabling Works - Prior Approval Demoliti....PDF:1: PARK SD total plan area = 2,720m² Enabling Works - Demolitions

R-2020-0302-PND-60722 South Bank Site Notice June 2020.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0302-PND-60722 South Bank Site Notice June 2020.pdf:1:Demolition is due to begin on: 20 July 2020 (estimated)

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:1:South Bank Site – Demolition of Minor Buildings

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:2:Document title: South Bank Site – Demolition of Minor Buildings Outline Method Statement

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 1.4. Demolition Works Scope 5

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 2. Demolition Methods 6

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 2.1. General Demolition Approach 6

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 2.3. Typical Steel Framed Building Demolition Methodology 7

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 2.4. Typical Brick and Concrete Building Demolition Methodology 8

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3: 2.5. Firefighting Water Tank Demolition Methodology 8

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3:Appendix A – STDC South Bank Site Enabling Works – Demolitions Site Location Plan

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:3:Appendix B – STDC South Bank Site Enabling Works – Prior Approval Demolitions

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:The purpose of this document is to present an outline method statement for the demolition of

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:works. It should be recognised that the responsibility of demolition works shall lie with them

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:regulations and comply with BS6187:2011 Code of Practice for Full & Partial Demolition,

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:Demolitions Site Location Plan is contained in Appendix A.

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:The actual buildings that are being considered for demolition consist of a number of

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:4:The STDC South Bank Site Enabling Works – Prior Approval Demolitions drawing is

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5:Each of the buildings identified within this method statement for demolition will undergo a

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5:1.4. Demolition Works Scope

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5:The following scope of works is anticipated as part of the demolition works;

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5: • General soft strip of offices and buildings, where required, followed by demolition to

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5: • Demolition of the firefighting water tank structure to top of base/foundation slab.

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5: • Exterior cladding strip and then demolition of frame to the larger steel framed

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5: • Crushing of demolition rubble to Class 6F2 specification and infill of voids where

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:5:for demolition under this outline method statement and can be broken down and described

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:6:2. Demolition Methods

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:6:2.1. General Demolition Approach

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:6:Prior to any works commencing, a refurbishment and demolition (R&D) asbestos survey will

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:6:The first stage of the demolition will be ensuring the site is safe. The working area will be

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:demolition works mobilising).

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:2.3. Typical Steel Framed Building Demolition Methodology

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:7:Once all roof sheets have been safety removed the steelwork demolition will be carried out

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:8:2.4. Typical Brick and Concrete Building Demolition Methodology

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:8:Dust suppression will be used at all times during the demolition of any brickwork or concrete

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:8:2.5. Firefighting Water Tank Demolition Methodology

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:8:Prior to any demolition works commencing an ecological survey is to be undertaken to

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:9:proceed to prevent flooding and any accidental spillage. Upon completion of demolition

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:9: • 45 & 20 tonne demolition specification excavator with various attachments (selector

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:9:and around the boundary perimeter fence of the site. The boundary of each demolition site is

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:9:demolition boundary.

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:9:A site compound area will be located centrally to each of the demolition sites and will contain

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:10:have undertaken both demolition activities and Asbestos Cat B training.

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:10:experience undertaking demolition activities. All persons required to work on site will

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:12:STDC South Bank Site Enabling Works – Demolitions Site Location Plan

R-2020-0302-PND-South Bank Wharf Minor Buildings Demolition V1.0.pdf:13:STDC South Bank Site Enabling Works – Prior Approval Demolitions

R-2020-0302-PND-DECISION NOTICE.pdf:1:Details: PRIOR APPROVAL FOR DEMOLITION OF BUILDINGS

R-2020-0302-PND-DECISION NOTICE.pdf:1:demolition of the above premises is not required.

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:17:Construction and Demolition Activity’ (2003) will be applied to the construction areas within the

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:17:demolition material within Made Ground at the site in only one case. Asbestos fibres in shallow

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:19: • demolition;

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:19:Code of practice for noise control on construction and demolition sites:

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:23:demolition material within Made Ground at the site in only one case. Asbestos fibres in shallow

R-2021-0832-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0832-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: OOM Tees demolition of existing structures on

R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-ApplicationFormRedacted.pdf:1:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0832-CD-DECISION NOTICE 0318.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: OOM Tees demolition of existing structures on

R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: OOM Tees demolition of existing structures on

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0832-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:Planning consultation: Discharge of Condition 7 of R/2020/0684/ESM for demolition of

R-2021-0832-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:for outline application for demolition of existing structures on site the development of up to

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:1: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:namely demolition of existing infrastructure and construction of the proposed quay require planning

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:4:and berth pocket as well as material to be generated from proposed demolition activities) have been

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:6: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:10:“Noise from construction and demolition sites should not exceed the level at which conversation in the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:12: • Demolition of the existing South Bank Wharf;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:13: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

R-2020-0685-ESM-ApplicationFormRedacted.pdf:2:Demolition of existing redundant quay structures, capital dredging and development of new quay and associated works (Phase 2).

R-2020-0685-ESM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:7: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:13: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26: (demolition of derelict structures and rock blanket)

R-2020-0685-ESM-EA R_2020_0685_ESM 4 March 2021 OFFICIAL.pdf:1:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:2: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:3: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4: station and demolition of substation.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4:including ensuring debris from demolition activities is captured when working close to water and removed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:8:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:12: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0685-ESM-Response from applicant.PDF:1:Ports noted that, given the overlapping nature of the developments and the phased approach to demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:3: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:4:support vessels required during demolition and construction). Construction activity will be focused on the

R-2020-0685-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-OFFICER REPORT.pdf:1:PROPOSAL: DEMOLITION OF EXISTING REDUNDANT

R-2020-0685-ESM-OFFICER REPORT.pdf:1:Permission is sought for the demolition of existing redundant quay structures,

R-2020-0685-ESM-OFFICER REPORT.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and

R-2020-0685-ESM-OFFICER REPORT.pdf:3:R/2020/0357/ESM OUTLINE PLANNING APPLICATION FOR DEMOLITION

R-2020-0685-ESM-OFFICER REPORT.pdf:11:recording before demolition of any early (20th century ?) structures on site

R-2020-0685-ESM-OFFICER REPORT.pdf:14:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0685-ESM-OFFICER REPORT.pdf:14:incorporated during the demolition and construction phase.

R-2020-0685-ESM-OFFICER REPORT.pdf:14:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0685-ESM-OFFICER REPORT.pdf:15:The proposed development can be broadly summarised as the demolition,

R-2020-0685-ESM-OFFICER REPORT.pdf:18:  Demolition of the existing wharf and jetties

R-2020-0685-ESM-OFFICER REPORT.pdf:30:due to demolition of existing structures and dredging, effects of increased

R-2020-0685-ESM-OFFICER REPORT.pdf:30:Demolition of existing structures including the wharf and jetties has the

R-2020-0685-ESM-OFFICER REPORT.pdf:32:including the demolition of existing structures have the potential to result in

R-2020-0685-ESM-OFFICER REPORT.pdf:38:the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0685-ESM-OFFICER REPORT.pdf:42:supporting habitat due to dredging / excavation and demolition works, impacts

R-2020-0685-ESM-OFFICER REPORT.pdf:42:With regard to loss of supporting habitat during dredging and demolition works

R-2020-0685-ESM-OFFICER REPORT.pdf:42:The ES states that the area which is to be subject to demolition and

R-2020-0685-ESM-OFFICER REPORT.pdf:44:undertaken prior to any demolition works taking place. It is considered that

R-2020-0685-ESM-OFFICER REPORT.pdf:59:The proposed development will result in the demolition of the dilapidated

R-2020-0685-ESM-OFFICER REPORT.pdf:59:utilities as part of the demolition process along with the removal of the

R-2020-0685-ESM-OFFICER REPORT.pdf:60:With regard to the demolition and removal of the dilapidated remains of the

R-2020-0685-ESM-OFFICER REPORT.pdf:61:footage of the wharf and jetties prior to their demolition. This is to then be

R-2020-0685-ESM-OFFICER REPORT.pdf:61:photographic recording before demolition of any early 20th century structures

R-2020-0685-ESM-OFFICER REPORT.pdf:63:  Demolition of the existing South Bank Wharf;

R-2020-0685-ESM-OFFICER REPORT.pdf:67:  Dust emissions generated by demolition, excavation, construction and

R-2020-0685-ESM-OFFICER REPORT.pdf:69:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0685-ESM-OFFICER REPORT.pdf:69:incorporated during the demolition and construction phase.

R-2020-0685-ESM-OFFICER REPORT.pdf:69:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0685-ESM-OFFICER REPORT.pdf:79:The proposed development will also involve demolition of existing structures,

R-2020-0685-ESM-OFFICER REPORT.pdf:83:during demolition, quay construction, excavation and dredging phases.

R-2020-0685-ESM-OFFICER REPORT.pdf:96:The application for demolition of existing redundant quay structures, capital

R-2020-0685-ESM-61586 Quay Design and Access Statement November 2020.PDF:1: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0685-ESM-61586 Quay Design and Access Statement November 2020.PDF:2: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0685-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1:different for each of the four categories of construction activities outlined by the IAQM (demolition,

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1: Demolition metal cladding or timber)

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities <10m above

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities 10 - 20m • Demolition activities >20m above

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition during wetter months

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:4:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

R-2020-0685-ESM-Appendix 11_Air quality assessment method.pdf:4:Table A18.6 Risk of dust impacts - demolition

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:1:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:2: up using a long reach excavator with hydraulic demolition attachments, working from the

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:2: the demolition may include cutting sections of the deck and lifting them onto the land for

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:2: into the Tees is minimised. Should any debris fall into the river channel during demolition,

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:2: boat. As with the concrete deck, best practice demolition techniques would be adopted to

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:3: during the demolition works but these are only expected to be localised to the working area

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:3:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:16:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:16: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:16: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf:16: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:19:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:10: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1.1 Demolition of existing structures

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

R-2020-0685-ESM-PN 685.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0685-ESM-PN 685.pdf:1:• Demolition of the existing South Bank Wharf; • Installation of tubular king piles and

R-2020-0685-ESM-PN 685.pdf:2:The site is potentially contaminated and any earthworks, construction or demolition

R-2020-0685-ESM-PN 685.pdf:2: proposed development for construction and demolition activities.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:and demolition waste is subjected to material recovery.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:demolition waste.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:10:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: have had prior approval for demolition (see below).

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:comprise the demolition of:

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: demolition can proceed without planning permission).

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:27:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition by competent specialists and disposed as hazardous waste.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:3: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:9:The proposed development will include the demolition of the existing wharf and the construction of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:14: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:15:Demolition of the existing infrastructure will last for approximately 56 weeks. On completion, the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:6.5.1 Demolition of the existing wharf and jetties

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:sedimentary regime arising from the demolition works is very low.

R-2020-0685-ESM-cil_questions phase 2.pdf:1: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2020-0685-ESM-cil_questions phase 2.pdf:4: demolition (square metres) ancillary buildings) (square metres)

R-2020-0685-ESM-cil_questions phase 2.pdf:5:c) Does the development proposal include the retention, demolition or partial demolition of any whole buildings which people do not

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8: • demolition of the existing infrastructure;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:2: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:15: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:30:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:33:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:otherwise be affected will have been displaced from the site during demolition of existing features and

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:5:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: Demolition

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: demolition process prior to construction of the quay.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Marine demolition

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:1: phased approach to demolition and construction, please accept the comments below to be applicable

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:2:Estate. Prior to any proposed demolition works commencing within the vicinity of hazardous cargo

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:2:of the demolition and construction. It is considered essential that a scheme of maintenance works for

R-2020-0685-ESM-21 02 05 - Quayside Application.pdf:2:infrastructure) to the proposed demolition and development of a new quay at South Bank, then this

R-2020-0685-ESM-CON LAND 685.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:5: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: prior approval from RCBC for the demolition of the majority of existing buildings within the

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: landward part of the proposed scheme footprint and as such the demolition of this

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:24:5.14 Predicted construction phase impacts are linked to habitat loss from the demolition of existing

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: and it is recommended that a suitable record of the structures be prepared prior to demolition,

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: suitability of this record will be confirmed in advance of demolition being undertaken with

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:30:5.65 Other impacts such as demolition and removal of existing structures and construction of the

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:32:6.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:32: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6: Guidance on the Assessment of Dust from Demolition and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6:2) Separately for demolition, earthworks, construction and trackout:

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:8: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:10: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:11: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:construction activities has been categorised as large for demolition, earthworks and construction and small

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:13: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:15:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16:Measures specific to demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Soft strip inside any buildings or structures before demolition.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Bag and remove any biological debris or damp down such material before demolition.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18: Demolition 3 52

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:1:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:23:although the proposed demolition activities would take place in the marine environment, these would be

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:The proposed dredging and other underwater activities (namely demolition and removal of existing

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.3 Demolition 7

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:18:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

R-2020-0685-ESM-HSL-210211151351-321-FinalOutcome.pdf:1:Comments: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND

R-2020-0685-ESM-DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0685-ESM-DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of various buildings and structures on the riverbank and hinterland.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:11:It is understood that demolition of some of the existing above ground infrastructure on site (namely the heavy

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:39:The proposed scheme will include demolition of some existing on site structures (with others removed in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:3.3 Demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:comprise the demolition of:

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:has confirmed that demolition of such infrastructure can commence without planning permission, and works

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition of this building has been incorporated into the landside EIA and associated planning application

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:commencing. The assumed approach to demolition of these assets is detailed below.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:The demolition of the substation will be undertaken using land-based plant. The building materials are

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted in advance of demolition commencing so that works could be undertaken safely.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:11:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: Demolition - - 12 months

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:3.11 Summary of plant to be used during demolition and construction

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: • Demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:In addition to the above, best practice working methods would be adopted during demolition / excavation

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:3: Outline planning application for demolition of existing structures on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:8: Demolition of structures and engineering operations associated with

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:17:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: dredging, excavation and demolition works.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: • Sand and shingle • Water quality reductions from demolition and dredging

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:11: Outline planning application for demolition of existing structures on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:16: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:18: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:19: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:20: • Airborne noise disturbance to waterbirds due to demolition and construction works.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:Effects on estuarine processes due to demolition activities

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:23:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26: • Airborne noise disturbance to birds during demolition, construction and operation.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:Airborne noise disturbance to birds during construction (including demolition) and operation

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:birds that may otherwise be affected will have been displaced from the site during demolition of existing

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:30:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:31:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:33:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:6:Thank you for your enquiry on the demolition of an existing timber wharf and two

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:7: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:8: • demolition of the existing timber wharf and jetties,

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:12:please find the attached figures. In summary, the proposed scheme comprises demolition of

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:7:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:9:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

R-2020-0685-ESM-2020 12 17 South Bank Wharf 2 RecNOnDet .pdf:1:A19/A66/A174/A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:vessels to be used during demolition and construction) and the construction work in the intertidal could

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:6: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:7: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:13: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:15: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:16: Proposed Demolition Area

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

R-2020-0685-ESM-336540 R_2020_0685_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 2.pdf:1:Planning consultation: Demolition of existing redundant quay structures, capital dredging

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:1:Subject: Ref Appns R/2020/0684/ESM & R/2020/0685/ESM Phases 1 & 2 (resp) Demolition of old

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:3:A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:7:including Environmental Statements for the demolition of existing redundant quay structures, capital dredging and

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:10: • Demolition of the existing wharf, jetties and other minor infrastructure;

R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:Subject: Ref R/2019/0427/FFM - demolition of structures and engineering works, Former

R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:Proposal – Demolition of structures and engineering operations associated with ground preparation and

R-2019-0427-FFM-Consultee response - Network Rail.pdf:1:Water must not be caused to pond on or near railway land either during or after any demolition or construction-related

R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works

R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:Demolition

R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:Any demolition or refurbishment works must not be carried out on the development site that may endanger the safe

R-2019-0427-FFM-Consultee response - Network Rail.pdf:2:operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or other

R-2019-0427-FFM-Decision Notice_R20190427FFM.pdf:1:Details: DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS

R-2019-0427-FFM-Decision Notice_R20190427FFM.pdf:4: v) Methods of demolition of any structures to be demolished in order to form

R-2019-0427-FFM-Decision Notice_R20190427FFM.pdf:4: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2019-0427-FFM-Decision Notice_R20190427FFM.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf:5: “Demolition of structures and engineering operations associated with ground preparation and

R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF:74: comprises of demolition and

R-2019-0427-FFM-MGE03867.pdf:1: Proposal: DEMOLITION OF STRUCTURES AND ENGINEERING

R-2019-0427-FFM-MGE03867.pdf:1:application which includes enabling activities such as demolition of structures and

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:1:PROPOSAL: DEMOLITION OF STRUCTURES AND

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:1:Permission is sought for the demolition of structures and engineering

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:3:this application which includes enabling activities such as demolition of

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:5:this application which includes enabling activities such as demolition of

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:5:v) Methods of demolition;

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:5:vii) A scheme for recycling/disposing of waste resulting from demolition and

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:13: v) Methods of demolition of any structures to be demolished in order to

R-2019-0427-FFM-Officer report _R20190427FFM.pdf:13: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:6:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:21: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:36: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:37: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:37: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:39: demolition rubble.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:52: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:53: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:69: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:73: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:82: ‐ demolition rubble

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:85: - demolition rubble

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:89: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:92:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:99:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:1:Planning consultation: Demolition of structures and engineering operations associated with

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf:11:The activities proposed include the demolition of structures and engineering operations associated with the

R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf:1:DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED

R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf:2: decontamination operations should be completed prior to any demolition or longer

R-2019-0427-FFM-MGE03868.pdf:1: Proposal: DEMOLITION OF STRUCTURES AND ENGINEERING

R-2019-0427-FFM-MGE03868.pdf:1:application which includes enabling activities such as demolition of structures and

R-2019-0427-FFM-MGE03868.pdf:2: v) Methods of demolition;

R-2019-0427-FFM-MGE03868.pdf:2: vii) A scheme for recycling/disposing of waste resulting from demolition and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:6:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:19: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:34: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:35: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:35: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:37: demolition rubble.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:50: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:51: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:67: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:71: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:80: ‐ demolition rubble

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:83: - demolition rubble

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:87: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:90:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:97:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2021-0473-ESM-Officer Report 0473.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0473-ESM-Officer Report 0473.pdf:5:for the demolition of existing structures on site and the development of up to

R-2021-0473-ESM-Officer Report 0473.pdf:7:surrounding area, with on-going works relating to demolition and remediation

R-2021-0473-ESM-Decision Notice 0473.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0473-ESM-LM Wind Reserved Matters Application Form(1).pdf:2: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM (GROSS) OF GENERAL

R-2021-0473-ESM-LM Wind ES Compliance Statement 26.05.21.pdf:7:2.1 On 3 December 2020 outline planning application was granted at South Bank for the demolition

R-2021-0473-ESM-LM Wind ES Compliance Statement 26.05.21.pdf:9: to the demolition of the former South Bank Coke Oven Battery Plant which occupies part of the

R-2021-0473-ESM-63455 LM Wind RM Covering Letter.pdf:1:“Demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2021-0473-ESM-63455 LM Wind RM Covering Letter.pdf:2:demolition of the former South Bank Coke Oven Battery Plant which occupies part of the southern section of

R-2021-0676-FF-SembcorpObjectionLetter_FINAL.PDF:5:  the demolition of the existing pipe bridge;

R-2021-0676-FF-SembcorpObjectionLetter_FINAL.PDF:13:11 No mention in the planning application for the demolition of Sembcorp 06.07.21 - Sect 80 t

R-2021-0676-FF-Covering Letter 09.07.21.pdf:1:application was granted at South Bank for the demolition of existing structures on site and the development

R-2021-0676-FF-Covering Letter 09.07.21.pdf:2:general demolition rubble such a brick, concrete and metal associated with steel work activities. The Made

R-2021-0676-FF-ApplicationFormRedacted.pdf:3:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0676-FF-21 09 09 - PLANNING APPLICATION - R-2021-0676-FF.pdf:1:associated with the demolition of the existing pipe bridge structure will be likely to require access and

R-2021-0624-NM-61586 Teesworks_LM - s96a Condition 8 covering letter.pdf:1:‘Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0624-NM-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2021-0624-NM-Officer Report.pdf:3:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0624-NM-Decision Notice 0357.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0624-NM-Decision Notice 0357.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0534-FF-DECISION NOTICE.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0534-FF-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0534-FF-ApplicationFormRedacted.pdf:5: demolition (square changes of use) development (square

R-2022-0475-NM-64764 RCBC s96A 25-05-22.pdf:1:Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0475-NM-ApplicationFormRedacted.pdf:6: Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:2: degree of historical value to some of the features however the demolition works saw the

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:2: been revisited and the changes to the views resulting from these demolitions have been

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:2: Table 1 Changes to baseline views resulting from demolition works

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:2: No. View Location Change to original view as result of demolitions

R-2022-0475-NM-Officer report.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2022-0242-FF-0242 Decision.pdf:3:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0242-FF-ApplicationFormRedacted.pdf:6:make clear on its website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition

R-2022-0242-FF-ApplicationFormRedacted.pdf:9: Gross internal floorspace to be lost by change of use or demolition (square metres):

R-2022-0242-FF-ApplicationFormRedacted.pdf:9: floorspace (square by change of use or demolition proposed (including changes of use) floorspace following development

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf:1: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-61586 Discharge of Condition 13, Southbank 24.02.22.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf:1: LEVELS (mAOD) No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf:1:LEVELS (mAOD) 1:750 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf:1: Tank No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-COMPLIANCE OFFICER REPORT.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2022-0186-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf:1: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0186-CD-ApplicationFormRedacted.pdf:4: Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry

R-2022-0186-CD-COMPLIANCE DECISION NOTICE.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0186-CD-COMPLIANCE DECISION NOTICE.pdf:2: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0166-FFM-Application Form 0166.pdf:5:design, demolition and construction - Recommendations'.

R-2021-0166-FFM-Application Form 0166.pdf:7: floorspace use or demolition (including change of following development

R-2021-0166-FFM-Application Form 0166.pdf:7: class applicable of use or demolition changes of use)

R-2021-0166-FFM-Application Form 0166.pdf:8:Recycling facilities construction, demolition

R-2021-0166-FFM-Application Form 0166.pdf:8: Construction, demolition and excavation

R-2021-0166-FFM-Environmental Risk Assessment.pdf:20:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0166-FFM-Officer Report 0166.pdf:1:are no longer required and an application for their demolition was submitted to

R-2021-0166-FFM-Officer Report 0166.pdf:1:required for the demolition of the buildings.

R-2021-0166-FFM-Officer Report 0166.pdf:5:v) Methods of demolition.

R-2021-0166-FFM-Officer Report 0166.pdf:5:vii) A scheme for recycling/disposing of waste resulting from demolition and

R-2021-0166-FFM-Ecological Assessment.pdf:13:8.3The proposed development does not include the demolition of buildings or structures on the site,

R-2021-0166-FFM-HRA Grangetown Prairie Phase 4.pdf:2:former Torpedo Ladle Workshop (the demolition of which does not form part of this application).

R-2021-0166-FFM-Phase 4 covering letter.pdf:2:fundamentally obsolete and are no longer required and an application for their demolition was submitted to

R-2021-0166-FFM-Phase 4 covering letter.pdf:2:decided that Prior Approval was not required for the demolition of the buildings.

R-2021-0166-FFM-Phase 4 covering letter.pdf:4:• That don’t require major demolition.

R-2021-0166-FFM-Decision Notice 0166.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:8:generally included granular material with varying amounts of slag, brick demolition rubble and coal ash. Across

R-2021-0166-FFM-Geotechnical Risk Assessment .pdf:8:including refractory bricks, demolition wastes and cohesive made ground. 15 of the 27 trial pits excavated in

R-2021-0166-FFM-Ground Remediation Options Report.pdf:20: • Backfill of excavations to leave the site safe and level, with validated made ground, certified demolition

R-2021-0166-FFM-EP NU.pdf:1:v) Methods of demolition.

R-2021-0166-FFM-EP NU.pdf:2:vii) A scheme for recycling/disposing of waste resulting from demolition and

R-2022-0494-FFM-NETWORK RAIL.pdf:3:Demolition

R-2022-0494-FFM-NETWORK RAIL.pdf:3:Any demolition or refurbishment works must not be carried out on the development site that may

R-2022-0494-FFM-NETWORK RAIL.pdf:3:structures. The demolition of buildings or other structures near to the operational railway infrastructure

R-2022-0494-FFM-DECISION NOTICE.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0494-FFM-19293141_1.pdf:33: ponding are frequent typically related to the demolition of industrial buildings.

R-2022-0494-FFM-19293141_1.pdf:33: ponding are frequent typically related to the demolition of industrial buildings

R-2022-0494-FFM-21089271_1.pdf:11: demolition rubble, with varying amounts of waste materials including

R-2022-0494-FFM-Covering Letter.pdf:6: iv That don’t require major demolition.

R-2022-0494-FFM-ApplicationFormRedacted.pdf:6:make clear on its website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition

R-2022-0048-NM-Decision Notice.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0855-CD-ApplicationFormRedacted.pdf:2:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2021-0855-CD-MGE04603 Contaminated Land.pdf:1:condition 4 of planning permission R/2020/0684/ESM for demolition of existing

R-2021-0855-CD-61586_01 - Covering Leter - 05.10.21.PDF:1:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0855-CD-Decision Notice.pdf:1: PLANNING PERMISSION R/2020/0684/ESM FOR DEMOLITION OF

R-2021-0855-CD-Decision Notice.pdf:2: PLANNING PERMISSION R/2020/0684/ESM FOR DEMOLITION OF

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:10:has been submitted for “demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf:11:Planning has also been granted for “Demolition of structures and engineering operations associated with

R-2021-0855-CD-Officer report.pdf:1: DEMOLITION OF EXISTING REDUNDANT

R-2021-0855-CD-Officer report.pdf:1:The planning permission sought consent for demolition of existing redundant quay

R-2021-0855-CD-Officer report.pdf:2:condition 4 of planning permission R/2020/0684/ESM for demolition of existing

R-2020-0281-PND-R-2020-0281-PND-60722_Old Wharf site notice _June 2020.PDF:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0281-PND-R-2020-0281-PND-60722_Old Wharf site notice _June 2020.PDF:1:Demolition is due to begin on: 19 October 2020

R-2020-0281-PND-Decision.pdf:1: PROPOSAL: PRIOR APPROVAL FOR PROPOSED DEMOLITION OF 5 QUAYSIDE HEAVY

R-2020-0281-PND-Decision.pdf:1:application it is the determination of the Local Planning Authority that prior approval for demolition

R-2020-0281-PND-officer report 0281.pdf:1: DEMOLITION OF 5 QUAYSIDE HEAVY DUTY

R-2020-0281-PND-officer report 0281.pdf:1:The buildings proposed for demolition are located within the Prairie site and

R-2020-0281-PND-officer report 0281.pdf:1:The application seeks prior approval for the demolition of buildings and

R-2020-0281-PND-officer report 0281.pdf:1:All demolition works shall be carried out in accordance with the BS Code of

R-2020-0281-PND-officer report 0281.pdf:1:Practice for Demolition BS6187. All work shall conform with all relevant

R-2020-0281-PND-officer report 0281.pdf:1:As set out in the accompanying demolition method statement, the outline

R-2020-0281-PND-officer report 0281.pdf:2:• General soft strip of boiler houses and offices followed by demolition of top

R-2020-0281-PND-officer report 0281.pdf:2:• Demolition of five HFO tanks, pipelines existing structures to top of slab;

R-2020-0281-PND-officer report 0281.pdf:2:• Crushing of demolition rubble to 6f2 specification and infill of voids;

R-2020-0281-PND-officer report 0281.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0281-PND-officer report 0281.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0281-PND-officer report 0281.pdf:2:relating to the proposed demolition works within the supporting letter.

R-2020-0281-PND-officer report 0281.pdf:2:4 As far as reasonably practicable any physical demolition will be carried out

R-2020-0281-PND-officer report 0281.pdf:2:7 The demolition plant to be used shall comprise a mixture of track-mounted

R-2020-0281-PND-officer report 0281.pdf:2:place to control dust migration are suitable. Demolition dust will typically be

R-2020-0281-PND-officer report 0281.pdf:2:14 That there is a control of the hours of demolition of hours, proposed to be

R-2020-0281-PND-officer report 0281.pdf:3:demolition is not considered to result in significant environmental effects, due

R-2020-0281-PND-officer report 0281.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0281-PND-officer report 0281.pdf:3:While the demolition and clearance of the site will leave an empty part to the

R-2020-0281-PND-officer report 0281.pdf:3:the ecology from the demolition. Advice has been given that based on the

R-2020-0281-PND-officer report 0281.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:1:Demolition of Heavy Fuel Oil Tanks

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:2:Development Corporation and use in relation to the Demolition of Heavy Fuel Oil Tanks

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:2: Project Demolition of Heavy Fuel Oil Tanks

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:3:1.6. Demolition Works Scope 5

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:3:3.4. Mechanical demolition of all buildings & structures within project the site boundary 11

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:4:The purpose of this document is to present an outline method statement for the demolition of the heavy fuel oil

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:4:responsibility of demolition works shall lie with them. Atkins Limited assumes no responsibility to this regard, this

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:4:6187:2011 Code of Practice for Full & Partial Demolition, including the below mentioned regulations:

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:4:supplemented with internal double clipped Heras style fence required to form an Active Demolition zone (ADZ)

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:As part of the works the local Heavy Fuel Oil (HFO) pipelines are to be decontaminated prior to any demolition

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:A Refurbishment & Demolition (R&D) Asbestos Survey is still to be carried out at the time of writing this document.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:All asbestos will be removed prior to commencing demolition of the structure. Asbestos identified at this stage

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:demolition.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:1.6. Demolition Works Scope

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:The following scope of works is anticipated as part of the tanks demolition;

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5: demolition commencing.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:  General soft strip of boiler houses and offices followed by demolition to top of slab.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:  Demolition of five HFO tanks, pipelines existing structures to top of slab.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:5:  Crushing of demolition rubble to Class 6F2 specification and infill of voids.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7:The scope of works covered within this method statement consists of the above ground demolition of all structures

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7:within the demolition zone hatched in green site boundary and associated plant and equipment.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7: Demolition of structures and process/clear arisings

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7: Decontamination Contract timescales 16 weeks – to be undertaken prior to demolition commencing

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7: Demolition Contract timescale: 6 weeks

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:7: 45 & 20 tonne demolition specification excavator with various attachments (selector grab, shear, buckets)

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:the site and the maintenance of the fence line surrounding the demolition works shall be the responsibility of the

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:Prior to any demolition works commencing an ecological survey is to be carried out to confirm any presence of

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:Demolition dust will typically be controlled by applying water spray manually and remotely using a (MOTFOG 100

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:Demolition arisings are to be sorted and segregated on site into designated 40-yard skips, these will be collected

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:Prior to demolition works commencing nearby boreholes shall be sampled and monitored to establish current

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:boreholes shall also be monitored and sampled during the demolition works to monitor any effect the works may

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:subcontractors operatives are to hold a CSCS card minimum and have undertaken both demolition activities and

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:8:demolition activities. All persons required to work on site will undertake a full site induction prior to commencing

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:10:(Non-Licensable only – Licensed Material to be removed by specialist subcontractor prior to demolition works

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:11:3.4. Mechanical demolition of all buildings & structures within project

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:11:Tank demolition

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: All demolition activities to be carried out in accordance with BS 6187:2011 Code of Practice for Full & Partial

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: Demolition.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: The methodology and sequence of demolition is determined by the site manager to ensure a safe and

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: A suitable exclusion zone (ADZ) to be barriered off prior to any mechanical demolition commencing and all

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: Demolition will be carried out top-down and on a bay-by-bay basis and materials stockpiled in waste streams

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:12: Waste will be segregated at the demolition workface and loaded directly into 40Yd recycling bins.

R-2020-0281-PND-R-2020-0281-PND-STDC-HFO Tank Method Statement FOR ISSUE (003).PDF:13: - Demolition exclusion

R-2022-0205-SC-Screening Opinion Response.pdf:1: PROPOSAL: SCREENING OPINION FOR DEMOLITION OF A JETTY AND ASSOCIATED

R-2022-0205-SC-Screening Opinion Response.pdf:1: The Proposed Development includes the demolition and removal of the following

R-2022-0205-SC-Screening Opinion Response.pdf:3:Goods Vehicles (HGVs) associated with the demolition works.

R-2022-0205-SC-Screening Opinion Response.pdf:3:Demolition of Onshore Facilities

R-2022-0205-SC-Screening Opinion Response.pdf:3:3.2.18 Prior to the demolition of onshore assets, final cleaning and purging of the tanks

R-2022-0205-SC-Screening Opinion Response.pdf:3:3.2.20 Prior to demolition of the Pump House any remaining services would be stripped

R-2022-0205-SC-Screening Opinion Response.pdf:3:House will be removed by the high reach excavator with demolition shear attachments.

R-2022-0205-SC-Screening Opinion Response.pdf:3:3.2.1 Working behind the principal demolition excavator, a small excavator would move

R-2022-0205-SC-Screening Opinion Response.pdf:3:processing. At the height of the onshore demolition works, it is anticipated that up to 4

R-2022-0205-SC-Screening Opinion Response.pdf:3:demolition progresses.

R-2022-0205-SC-Screening Opinion Response.pdf:4:generated following the demolition activities:

R-2022-0205-SC-Screening Opinion Response.pdf:5:on the public highway during the demolition process. It is however considered that the

R-2022-0205-SC-Screening Opinion Response.pdf:5:demolition of the jetty in particular to make way for the construction of these port

R-2022-0205-SC-Screening Opinion Report.pdf:1:Application for: SCREENING OPINION FOR DEMOLITION OF A JETTY AND

R-2022-0205-SC-Screening Opinion Report.pdf:2:The Proposed Development includes the demolition and removal of the following

R-2022-0205-SC-Screening Opinion Report.pdf:3:Vehicles (HGVs) associated with the demolition works.

R-2022-0205-SC-Screening Opinion Report.pdf:3:Demolition of Onshore Facilities

R-2022-0205-SC-Screening Opinion Report.pdf:3:3.2.18 Prior to the demolition of onshore assets, final cleaning and purging of the tanks

R-2022-0205-SC-Screening Opinion Report.pdf:4:3.2.20 Prior to demolition of the Pump House any remaining services would be stripped

R-2022-0205-SC-Screening Opinion Report.pdf:4:House will be removed by the high reach excavator with demolition shear attachments.

R-2022-0205-SC-Screening Opinion Report.pdf:4:3.2.1 Working behind the principal demolition excavator, a small excavator would move

R-2022-0205-SC-Screening Opinion Report.pdf:4:processing. At the height of the onshore demolition works, it is anticipated that up to 4 no.

R-2022-0205-SC-Screening Opinion Report.pdf:4:demolition progresses.

R-2022-0205-SC-Screening Opinion Report.pdf:4:generated following the demolition activities:

R-2022-0205-SC-Screening Opinion Report.pdf:5:the public highway during the demolition process. It is however considered that the level

R-2022-0205-SC-Screening Opinion Report.pdf:6:the York Potash Harbour Facilities DCO. However, as the DCO proposes the demolition of

R-2022-0205-SC-Screening Opinion Report.pdf:6:The Proposed Development includes the demolition and removal of the following

R-2022-0205-SC-Screening Opinion Report.pdf:7:Vehicles (HGVs) associated with the demolition works.

R-2022-0205-SC-Screening Opinion Report.pdf:8:Demolition of Onshore Facilities

R-2022-0205-SC-Screening Opinion Report.pdf:8:3.2.18 Prior to the demolition of onshore assets, final cleaning and purging of the tanks

R-2022-0205-SC-Screening Opinion Report.pdf:8:3.2.20 Prior to demolition of the Pump House any remaining services would be stripped

R-2022-0205-SC-Screening Opinion Report.pdf:8:House will be removed by the high reach excavator with demolition shear attachments.

R-2022-0205-SC-Screening Opinion Report.pdf:8:3.2.1 Working behind the principal demolition excavator, a small excavator would move

R-2022-0205-SC-Screening Opinion Report.pdf:8:processing. At the height of the onshore demolition works, it is anticipated that up to 4 no.

R-2022-0205-SC-Screening Opinion Report.pdf:8:demolition progresses.

R-2022-0205-SC-Screening Opinion Report.pdf:8:generated following the demolition activities:

R-2022-0205-SC-Screening Opinion Report.pdf:9:the public highway during the demolition process. It is however considered that the level

R-2022-0205-SC-Screening Opinion Report.pdf:10:the York Potash Harbour Facilities DCO. However, as the DCO proposes the demolition of

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:1:Brans Sands Jetty Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:3:has been prepared to determine whether the demolition of a jetty and associated buildings at

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:7: near Redcar (see Figure 1 within Appendix A). The demolition and removal of the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:7: falls within the footprint of the proposals. Demolition of the jetty structure will therefore

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8: description of the physical characteristics and, where relevant demolition works

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8:  Should a negative Screening Opinion be received, consent for demolition of the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8: Application for Prior Notification of Proposed Demolition to RCBC under the terms of

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:9: the application and a Demolition and Restoration Method Statement would be

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:11: does not involve ‘construction’, instead proposing demolition works, it is acknowledged

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:11: that effects arising from demolition works are not dissimilar to those arising from

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:13: 3.1.1 The Proposed Development includes the demolition and removal of the following

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:14: 3.2.2 The maximum extent of the marine demolition activities (including anchor spreads, spud

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:14: vessel. A demolition of the full extent of the access jetty is likely to be limited by water-

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:17: Vehicles (HGVs) associated with the demolition works.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:17:Demolition of Onshore Facilities

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:17: 3.2.18 Prior to the demolition of onshore assets, final cleaning and purging of the tanks and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: 3.2.20 Prior to demolition of the Pump House any remaining services would be stripped out.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: House will be removed by the high reach excavator with demolition shear attachments.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: 3.2.1 Working behind the principal demolition excavator, a small excavator would move and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: processing. At the height of the onshore demolition works, it is anticipated that up to 4

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: demolition progresses.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:18: generated following the demolition activities:

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:19: 3.3.1 It is estimated that the demolition programme, including mobilisation and de-

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:19: working day, 7 days per week. The onshore demolition works would be scheduled to tie-

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:20: Onshore Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:20: 2. The Onshore Demolition Programme (red) is currently scheduled to tie-in with the marine removal of the Access Jetty (weeks 18-22).

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:24: material of its buildings. The buildings identified for demolition consist of metal storage

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:31: environment focusing on the demolition of the onshore assets and shoreside removal of

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:33: 5.4.1 During the demolition period various types of wastes and discharges may be generated

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: demolition and reinstatement works. The Proposed Development is located within an

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: opportunity for any potential contaminants to be released / exposed. The demolition of

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: demolition works, a contaminated land specialist will be consulted for advice and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: demolition works in accordance with best practice.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:34: demolition works. The SWMP will details measures to minimise the disposal and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: 5.7.1 During the demolition of the onshore assets, including the landward removal aspects of

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: onshore demolition activities of approximately an additional 28 movements per day,

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: during the demolition of the onshore assets.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: ecological and ornithological receptors and staff employed on the proposed demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35: works. The nature of any demolition project harnesses an inherent potential to generate

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:35:  Noise and vibration arising from demolition activities (e.g. from the dismantling of the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:36: 5.8.4 The demolition activities can be suitably managed through the adoption of best practice

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:36: mitigated. Demolition methodologies, compliance with appropriate working hours and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:36: appropriately, will ensure the impacts of noise and vibration over the demolition period

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:36: are anticipated from the onshore demolition activities. Any residual impacts due to the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: distances from the pipelines and specific activities, and anchor points for demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: 5.10.2 The approach to demolition as well as any mitigation measures (e.g. to employ specific

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: required and a safe approach for demolition may need to be agreed with the regulatory

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: 5.10.4 The Contractor undertaking the demolition and removal activities associated with the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: a major accident occurring. However, based on the approach proposed, the demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:39: Potash Harbour Facilities DCO. However, as the DCO proposes the demolition of the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:48: demolition works in accordance with best practice.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:48: demolition works. The SWMP will details measures to minimise the disposal and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:51: receptors due to disturbance caused during the removal and demolition activities;

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:51: Prior Notification of Demolition will be submitted to RCBC. The application will be

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:51: accompanied by a Demolition and Restoration Statement, which will draw on the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:51: undertaken and the measures to be employed to minimise the impact of the demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:55: BRAN SANDS JETTY DEMOLITION

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:56: S BRAN SANDS JETTY DEMOLITION

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:57: BRAN SANDS JETTY DEMOLITION

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:58:N:\data\Projects\806994 Bran Sands Jetty Demolition\Deliver Stage\D Design_Technical\Drawings\ArcGIS\MXD\806994-WOOD-XX-XX-FG-OE-00007_S0_P01.1.mxd Originator: gwenda.pannu

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:59: BRAN SANDS JETTY DEMOLITION

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:60: E BRAN SANDS JETTY DEMOLITION

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:67:demolition of an existing jetty and associated buildings and infrastructure at Bran Sands on

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:67:on the southern bank of the estuarine River Tees near Redcar. The demolition of the jetty and associated

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:67:In summary, the demolition currently proposed for the Bran Sands Jetty and associated assets includes the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:67:The demolition and site re-instatement of the Site is planned to start in March 2022 with the demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:68:jetty demolition that was provided to NWG in January 2021 2and associated scheme information provided by

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:68:2 Wood (2021). Bran Sands ETW and RSTC – Jetty Demolition: Wood – Statement of Capability. Technical note prepared

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:69:\\GOS-FS80\shared\data\Projects\806994 Bran Sands Jetty Demolition\Deliver Stage\D Design_Technical\Drawings\ArcGIS\MXD\806994-WOOD-XX-XX-FG-OE-00002_S0_P01.01.mxd Originator: tom.suter

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:69: Bran Sands Jetty Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:79:\\GOS-FS80\shared\data\Projects\806994 Bran Sands Jetty Demolition\Deliver Stage\D Design_Technical\Drawings\ArcGIS\MXD\806994-WOOD-XX-XX-FG-OE-00003_S0_P01.01.mxd Originator: tom.suter

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:79: Eston Pumping Bran Sands Jetty Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:80:\\GOS-FS80\shared\data\Projects\806994 Bran Sands Jetty Demolition\Deliver Stage\D Design_Technical\Drawings\ArcGIS\MXD\806994-WOOD-XX-XX-FG-OE-00004_S0_P01.01.mxd Originator: tom.suter

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:80: Bran Sands Jetty Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:83:  The coastal grassland immediately surrounding the buildings proposed for demolition;

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:83:  The buildings proposed for demolition.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:86: tunnel top of the building with potential internal access; however, this vent has a continuously planned for demolition and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:86: house of missing mortar in some of the brickwork which may provide limited opportunities any proposed demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:90:\\GOS-FS80\shared\data\Projects\806994 Bran Sands Jetty Demolition\Deliver Stage\D Design_Technical\Drawings\ArcGIS\MXD\806994-WOOD-XX-XX-FG-OE-00001_S0_P01.02.mxd Originator: tom.suter

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:90: D Bran Sands Jetty Demolition

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:91: impacted by the demolition including any vegetation removal and the removal of waste piles within the

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:91: The lagoon is in close proximity to the demolition works, approximately 15m northeast of the Site.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:91: demolition.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:92: demolition and sedimental disruption.

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:105:  Kukadia V, Upton S & Hall D (2003) Control of dust from construction and demolition

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:12:closely resembles natural deposits. The 1970 layout remains largely unchanged except for the demolition of

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:12:occasionally layers of fused slag, locally mixed with reworked natural sands, demolition rubble etc. Other

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:17: and gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:17: of sand, gravel and cobbles. Gravel and cobbles include brick, concrete and other demolition

R-2021-1048-FFM-Teesworks demolition.pdf:1:regarding demolition works, under the Town and Country Planning Act 1990.

R-2021-1048-FFM-Teesworks demolition.pdf:1:the premises that border the site of the proposed demolition.

R-2021-1048-FFM-Teesworks demolition.pdf:1:Love, is also copied into any correspondence relating to the demolition as he will need to

R-2021-1048-FFM-Decision Notice 1048(1).pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-1048-FFM-EN010103-001132-NZT DCO 6.4.43 ES Vol III Appendix 18B Cultural Heritage Gazetter.PDF:39:4426 Monument SALT HOLME Former site of a medieval farmstead. The site is now waste ground and littered with demolition debris Medieval

R-2021-1048-FFM-Officer Report 1048.pdf:3:maintained for the premises that border the site of the proposed demolition.

R-2021-1048-FFM-Officer Report 1048.pdf:5:appropriately investigate areas which are currently undergoing demolition.

R-2021-1048-FFM-Officer Report 1048.pdf:8:inaccessible owing to ongoing demolition works.

R-2021-1048-FFM-Officer Report 1048.pdf:11:ongoing demolition works were occurring at the time, and therefore visible

R-2021-1048-FFM-Officer Report 1048.pdf:11:ground investigation be carried out in these areas once demolition/clearance

R-2021-1048-FFM-Officer Report 1048.pdf:20:include the demolition of buildings or structures on the site therefore, there

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:10:structures and demolition activities, we understand that it is now possible to

R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf:36:CL:AIRE DoW CoP. Some of the proposed materials are Brick and concrete won on site from the demolition of buildings, structures above and below ground will be

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:4: •Section 2.1 refers to demolition activities currently Demolition works are not relevant to this planning

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:4: submitted what the exact methodology is for demolition in the provided remedial strategy Section 2.13 and

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:4: which have not been investigated. We would welcome areas due to existing structures and demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:12: • Section 2.1 refers to demolition activities currently occurring on site. It is

R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf:12: demolition activity, particularly whether underground structures are to

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:2:The method of demolition of existing buildings within the application site has been assessed previously by

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 2015 demolition of the pellet plant in the early 2000’s.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:14:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:23:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:24:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:126: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:127: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:324:Demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:337: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:337: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:4: • Section 2.1 refers to demolition activities currently occurring on site. It is

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf:4: demolition activity, particularly whether underground structures are to

R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf:2:appropriately investigate areas which are currently undergoing demolition. The

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:22:maps suggest the east stockyard was used for pellet storage and later, after the demolition of the pellet

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:28:Plans of the site show that following the demolition of the pellet plant the pellet stock area was used for

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:35:raw materials, process waste (i.e. slag and coke), demolition rubble, railway sleepers and general waste.

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:39:Further investigation in to Pellet Plant demolition and likelihood of buried structures. Any information

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:34: ponding are frequent typically related to the demolition of industrial buildings.

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:34: ponding are frequent typically related to the demolition of industrial buildings

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:10:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:10:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:10:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:10:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:11: and demolition).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:12: furnace complex. The site is served by estate roads and rail infrastructure and demolition).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:12: 1981-2015 relatively unchanged other than demolition of the pellet plant in the early pellet plants.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:12: 2000’s. Demolition material-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:13:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:22:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:23:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:28:The likely main risks associated with the proposed demolition is potential from poor ground conditions related

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:28:An asbestos consultant should be engaged to carry out a refurbishment/demolition survey before any

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:28:demolition works are carried out.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:28:If the site is to be divested post demolition, the client may wish to carry out a limited ground investigation to

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:118: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:119: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:316:Demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:329: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:329: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:11:The site infrastructure was undergoing demolition at the time of writing.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:13: cobbles and gravel. Gravel and cobbles include brick, concrete and other demolition materials,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:13: demolition materials, slag was not the dominant constituent although often still present within

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:14:stock house. This area is understood to currently be inaccessible owing to ongoing demolition works.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf:24: demolition arising, crushed concrete or imported fill.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:17: gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not the dominant

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:36:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:133: slightly clayey. Demolition Rubble?

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf:205: From 0.5m: More like demolition than trial pitting.

R-2021-1048-FFM-EN010103-001131-NZT DCO 6.4.42 ES Vol III Appendix 18A Cultural Heritage Baseline Report.PDF:28:18.8.4 The North East of England has seen extensive demolition of steel and

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:38: • The controlled demolition of 1 x projectile at South Gare, Redcar (situated approximately

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:38: • The controlled demolition of 1 x Royal Air Force (RAF) flash-flare, found by a member of the

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:45: construction/demolition work on the UXO risk, is the degree of post-WWII disturbed ground present

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:46: In addition to the post-WWII construction and infill work, it is also not clear if the demolition of

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:46: stage of high level analysis, to quantify the degree to which demolition work may or may not have

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:52: • The extent and locations of post-WWII of demolitions, grubbing-up or other intrusive works.

R-2021-1048-FFM-ApplicationFormRedacted.pdf:3:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:15:Sinter plant. Following demolition/clearance works, limited ground investigation in these areas is planned to

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:17: gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not the dominant

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:38:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:141: slightly clayey. Demolition Rubble?

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf:213: From 0.5m: More like demolition than trial pitting.

R-2021-1048-FFM-EMAIL.pdf:2:  Demolition works within 15m of low/medium pressure mains and 150m of intermediate and

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:25:During the 1970s the existing Steel Works was constructed resulting in the demolition of the previously

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:45:place as a result of the demolitions works is also considered likely and will require appropriate

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:47:Undertake a detailed review and schedule of existing structures on the site in order to aid demolition

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:47:Review of Asbestos Registers for the site and commissioning (if not already available) demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:16: gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not the dominant

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf:32:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-1048-FFM-CON LAND 1048.pdf:2:inaccessible owing to ongoing demolition works.

R-2021-1048-FFM-MGE04767 Cont Land Response.pdf:1:demolition works were occurring at the time, and therefore visible inspection was

R-2021-1048-FFM-MGE04767 Cont Land Response.pdf:2:in these areas once demolition/clearance works have been completed.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11: and demolition).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: furnace complex. The site is served by estate roads and rail infrastructure and demolition).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 1981-2015 relatively unchanged other than demolition of the pellet plant in the early pellet plants.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 2000’s. Demolition material-

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:13:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:22:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:23:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:The likely main risks associated with the proposed demolition is potential from poor ground conditions related

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:An asbestos consultant should be engaged to carry out a refurbishment/demolition survey before any

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:demolition works are carried out.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:If the site is to be divested post demolition, the client may wish to carry out a limited ground investigation to

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:118: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:119: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:316:Demolition

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2021-1048-FFM-Factual Report SSI 1.pdf:8: slightly clayey. Demolition Rubble?

R-2021-1048-FFM-Factual Report SSI 1.pdf:266: From 0.5m: More like demolition than trial pitting.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:11:The site infrastructure was undergoing demolition at the time of writing.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:13: cobbles and gravel. Gravel and cobbles include brick, concrete and other demolition materials,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:13: demolition materials, slag was not the dominant constituent although often still present within

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:14:stock house. This area is understood to currently be inaccessible owing to ongoing demolition works.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf:24: demolition arising, crushed concrete or imported fill.

R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:17:9.2 The proposed development does not include the demolition of buildings or structures on the site

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:106: slightly clayey. Demolition Rubble?

R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf:364: From 0.5m: More like demolition than trial pitting.

R-2021-0878-ESM-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2021-0878-ESM-Decision Notice 0878.pdf:3:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0878-ESM-Officer Report 0878.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0878-ESM-Officer Report 0878.pdf:5:surrounding area, with on-going works relating to demolition and remediation

R-2021-0878-ESM-61586_01 - LM Hardstading Cover Letter - 19.10.21.PDF:1:“Demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2021-0269-CD-officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0269-CD-61586 Teesworks Note of Phases_conditions March 21(1).pdf:1: Outline planning application for demolition of existing structures on site and the development

R-2021-0269-CD-61586 Teesworks - Phasing Note - Version 2 - July 2021 .pdf:1: Outline planning application for demolition of existing structures on site and the development

R-2021-0269-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0269-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0269-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

Phase II ESA.pdf:13: Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

Phase II ESA.pdf:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

Phase II ESA.pdf:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

Phase II ESA.pdf:18: sandy and or gravelly clay with demolition materials within the matrix.

Phase II ESA.pdf:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

Phase II ESA.pdf:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:22: demolition materials.

STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:22: Ground and sand constituents within clay and demolition materials.

10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:Prairie’. This report was submitted as part of the 2019 planning application for the ‘demolition of structures and

R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf:10:Prairie’. This report was submitted as part of the 2019 planning application for the ‘demolition of structures and

R-2021-0100-CD-Phase II ESA.pdf:13: Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

R-2021-0100-CD-Phase II ESA.pdf:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

R-2021-0100-CD-Phase II ESA.pdf:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

R-2021-0100-CD-Phase II ESA.pdf:18: sandy and or gravelly clay with demolition materials within the matrix.

R-2021-0100-CD-Phase II ESA.pdf:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

R-2021-0100-CD-Phase II ESA.pdf:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:22: demolition materials.

R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf:22: Ground and sand constituents within clay and demolition materials.

R-2021-0067-CD-ApplicationFormRedacted.pdf:2:Demolition of existing buildings/structures and engineering operations associated with ground remediation and preparation of land for development

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:4:In general, this project is the demolition of existing buildings/structures and engineering operations

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:17:Construction and Demolition Activity’ (2003) will be applied to the construction areas within the

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:18:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:20: • demolition;

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:20:Code of practice for noise control on construction and demolition sites:

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:25:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2021-0067-CD-Compliance Decision Notice_R20210067CD.pdf:1: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2021-0067-CD-Compliance Decision Notice_R20210067CD.pdf:2: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2021-0067-CD-Compliance Officer report _R20210067CD.pdf:1: DEMOLITION OF EXISTING

R-2021-0067-CD-Compliance Officer report _R20210067CD.pdf:1:The planning permission sought consent for demolition of existing

R-2021-0067-CD-MGE04258 Nuisance.pdf:1: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2022-0050-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2022-0050-FFM-0050 Dec.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0050-FFM-0050 Off Rep.pdf:5:surrounding area, with on-going works relating to demolition and remediation

R-2021-0753-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0753-FFM-Officer Report 0753.pdf:5:surrounding area, with on-going works relating to demolition and remediation

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:18: demolition arising, crushed concrete or imported fill.

R-2021-0753-FFM-Decision Notice 0753.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:11:The activities proposed include the demolition of structures and engineering operations associated with the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:8:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:23: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:38: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:39: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:39: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:41: demolition rubble.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:54: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:55: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:71: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:75: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:84: ‐ demolition rubble

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:87: - demolition rubble

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:91: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:94:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:101:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:119:DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:120: decontamination operations should be completed prior to any demolition or longer

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:365:demolition and was used to house the water tank for the firefighting system for the SBCO and By‐

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:380:may have been disposed on site, and may be within any remaining demolition rubble.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:382:demolition and clearance works.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:383:demolition rubble. Localised hydrocarbon contamination may also be encountered as a result of

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:388:remaining demolition rubble.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:404: ‐ demolition rubble

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:418:comprised a mixture of waste raw materials, process waste (i.e. slag and coke), demolition rubble,

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank (1).pdf:1:Planning consultation: Outline planning application for demolition of existing structures on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:15: previous demolition and reclamation works undertaken at the Site but it is assumed that all

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:15: relevant legislative requirements regarding the demolition works and possible presence of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:15: asbestos were adhered to. Arcadis understands that demolition of the Heavy Fuel Oil (HFO)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:18: Works Site a large undefined rectangular 1992 and 1993. Demolition of infrastructure

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:27: slag, together with supplementary Made Ground deposits comprising ash and demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:29: demolition rubble giving rise to a range of contaminants including heavy metals, hydrocarbons,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:33: 1 Demolition of legacy structures and ground preparation operations including removal of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:33: should be noted that the demolition of existing structures within the development site has

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:12: 2 Land at Former South R/2019/0427/FFM Full Granted, 25.05.2017 Demolition of structures and engineering operations On site and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:14: apparatus, Pipe Bridge, Swale and the demolition of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:15: 17 Regent Cinema R/2020/0075/F3M Full Awaiting Demolition of existing cinema and replace with new 5.8km (north east)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:19: quality. The proposal for the South Bank Works is understood to entail the demolition of

R-2020-0357-OOM-2020 10 27 South Bank STDC No Obj.pdf:1:A174/A1053/A19/A66 OUTLINE PLANNING APPLICATION FOR DEMOLITION

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:4: from demolition that cannot be re-used on site will be transported to the Highfield Landfill

R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508(1).pdf:6:PA OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:9: demolition of existing structures, earthworks, construction of new structures and trackout.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:20: demolition quantities have been made. Details of these are provided in the construction dust

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:27: of this EIA that any material resulting from demolition will either not be taken off site, or it will

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:27:F5.5 The proposed development will require construction, earthworks, demolition and associated

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:27: site, which will provide a conservative assessment approach. The demolition volumes have been

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:27: provided by the client team, and include all demolition across the site, although it should be

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:27: noted that some of these demolition activities will be assessed in full in separate future detailed

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:28: development site. As such construction, demolition and earthworks will not be considered

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:28: within 350m for which to consider earthworks, construction or demolition activities. All

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:28: Demolition Large

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:29: Demolition N/A N/A Medium Risk

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:35: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: Measures Specific to Demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: for demolition where medium risk impacts have been identified.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: 1 Soft strip inside buildings before demolition (retaining walls and windows in the rest of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: 2 Ensure effective water suppression is used during demolition operations. Handheld sprays

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: 4 Bag and remove any biological debris or damp down such material before demolition.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:42: 4 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction (Version

R-2020-0357-OOM-POLICY.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE

R-2020-0357-OOM-0357 Nuisance.pdf:1: Proposal: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:7: - PPG 6 Working at construction and demolition sites;

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:18: • Demolition and Salvage;

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:18: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:19: “Prior approval for proposed demolition of 5 quayside heavy duty oil tanks and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:19: This application seeks prior approval for the demolition of some of the on-site structures at the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:19: submitting other prior approval applications for the demolition of other built structures on site.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:19: would enable the demolition of other on-site structures. STDC is committed to implementing

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:19: removed from this site prior to demolition, all demolition works associated with all existing

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:20: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:25: EIA it is anticipated that the level of demolition material will be greater than 50,000m3. Once

R-2020-0357-OOM-Energy and Utilities Strategy.pdf:5: Redcar. An outline planning application for the demolition of existing structures

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:12: groundworks and demolition works associated with the construction phase of the development.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:18: the site preparation works, demolition and the creation of development flatforms. On this basis,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:21: prior to demolition.

R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf:1:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf:7:dangerous substances. Demolition or removal of any installation (as defined by the

R-2020-0357-OOM-Decision letter 200392RCON_.pdf:1: Description: Outline planning for demolition of existing structures on site and

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:3: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:7: submitted to RCBC for their demolition, however to assess the ‘worst case’ scenario their

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:7: demolition has been included within this EIA assessment and is considered as part of the

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:8: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:10: • Enabling and ground works: demolition of existing structures (where relevant), site levelling

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:14: associated with demolition, excavation and construction activities. It is anticipated that the

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:14: also relate to demolition activities. These measures will include the use of quiet plants and their

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:14: • Any material resulting from demolition will either not be taken offsite or it will go the

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:15:7.7 The construction phase of the development will include demolition, excavation and construction

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:19:11.4 The construction phase (which includes demolition and excavation) of the development will

R-2020-0357-OOM-MGE04079a Nuisance.pdf:1: Proposal: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2020-0357-OOM-NETWORK RAIL.pdf:1:Proposal – Demolition of existing structures on site and development of up to 418,000SQM of general industry

R-2020-0357-OOM-NETWORK RAIL.pdf:3:method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any

R-2020-0357-OOM-NETWORK RAIL.pdf:3:Demolition

R-2020-0357-OOM-NETWORK RAIL.pdf:3:Any demolition or refurbishment works must not be carried out on the development site that may endanger the

R-2020-0357-OOM-NETWORK RAIL.pdf:3:safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or

R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:1:construction, excavations, demolition, installation of public utilities and other services including

R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:4: The designated zones shall also apply to any decommissioning, demolition or maintenance

R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf:6: demolition or basement construction

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:2: During Demolition and Construction 16

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:7: Demolition and construction activity noise

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:7:E3.2 For some of the sources of noise that will arise from demolition of any existing structures and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:7: Demolition and construction traffic noise

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:7: Demolition and construction vibration

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:9: Demolition and construction noise

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:9:E3.24 Direct, temporary effects of noise are associated with demolition and construction. Impact

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:10: Table E3.1: Thresholds of potential significant effects of demolition and construction noise at residential buildings (from BS 5228-

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:18: During Demolition and Construction

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:18: Demolition and Construction noise

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:24:E6.1 Demolition and construction works will be undertaken using the principles of BPM as set out in

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:24:E6.2 The development will implement a Demolition and Construction Environmental Management

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:26: Table E8.1: Potential effect summary for demolition, construction and operation

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:3: Demolition

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:3: • demolition activities • demolition activities • demolition activities >20m

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:3: • demolition during wetter

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:5: Demolition

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:21: (IAQM) guidance for the assessment of dust from demolition and construction will be

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:4: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:9: submitted to RCBC for their demolition, however to assess the ‘worst case’ scenario their

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:9: demolition has been included within this EIA assessment and is considered as part of the

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:10: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:12: • Enabling and ground works: demolition of existing structures (where relevant), site levelling

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:16: associated with demolition, excavation and construction activities. It is anticipated that the

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:16: also relate to demolition activities. These measures will include the use of quiet plants and their

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:17: • Any material resulting from demolition will either not be taken offsite or it will go the

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:17:7.7 The construction phase of the development will include demolition, excavation and construction

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:21:11.4 The construction phase (which includes demolition and excavation) of the development will

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:23: recorded prior to demolition.

R-2020-0357-OOM-0357 MGent AirQual comments.pdf:1: Proposal: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2020-0357-OOM-0357 MGent AirQual comments.pdf:1:activities could be affected from dust emissions during demolition and construction

R-2020-0357-OOM-Archaeological Advice - Business Park and Warehousing Tees Dock RD R-2020-0357-OOM.pdf:1:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2020-0357-OOM-Archaeological Advice - Business Park and Warehousing Tees Dock RD R-2020-0357-OOM.pdf:2:removed “through the site preparation works, demolition and the creation of development

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:4: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:7: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:8: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:8:J2.25 The target of 80% of construction and demolition waste to be used as an alternative mineral for

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:10: demolition and disposal) phases.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:10: which will be generated during both the construction (including excavation and demolition) and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:10: a Waste generated by demolition activities:

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:11: i Demolition of the railway bridge in the north western portion of the site

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:11: b Demolition wastes are likely to include but not limited to concrete, inert material,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:11: timber, and metals (WRAP, Overview of Demolition Waste in the UK, 2009)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:11:J3.8 Estimations/ assumptions of both demolition and excavation waste arising within the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:15: construction and demolition stages of development.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:15:J3.31 Demolition quantities have been based on an understanding of the existing buildings on site. As

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:16: during the development from earthworks and the demolition of existing assets. Site-won and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18: this assessment, the construction phase is considered to include demolition (as describe in the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18: Demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18:J5.6 Demolition activities are expected to generate approximately 50,000 m3 (60,000 tonnes

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18:J5.7 Waste arising from demolition activities is expected to be predominantly inert/ non-hazardous

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18: worst-case scenario which assumes demolition waste will be disposed of in any regional landfill

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:18:J5.8 Demolition arisings from the proposed development will utilise 0.26% of the remaining regional

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:19:J5.9 These calculations assume all demolition waste will be disposed of within the same year, as a

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:19:J5.10 Therefore, the magnitude of the impact of demolition waste is considered to be negligible (<1%).

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:19: benchmarks are based on construction works only and do not include demolition, excavation or

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:23: * Excludes plasterboard from demolition.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:23: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:25:J7.1 The recovery target for construction, demolition and excavation waste for the Tees Valley is 80%

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:25:J7.4 As demolition works are expected to take place prior to construction works starting, the annual

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:25: recovery rate was applied to demolition waste (60,000 tonnes), it would reduce demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: waste, and 60,000 tonnes of demolition waste in the construction phase (assumed to be 5

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: whilst demolition waste would account for 0.26% (neutral or slight impact) and excavation

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: waste requiring disposal may be reduced by at least 80% for construction, demolition, and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: year (construction waste) and 12,000 tonnes (demolition waste). Operational phase waste could

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: waste), 0.0005% (demolition waste), and 0.005% (operational waste) of regional landfill

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:27: capacity (demolition) Appropriate arisings for the project equate to

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:28: Demolition waste the project, the volume of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:28: applied to demolition waste, it would

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:29: iii C&D – Construction & demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:29: iv CD&E – Construction, demolition, & excavation

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:30: x Waste and Resources Action Programme, Overview of Demolition Waste in the UK

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:51: ponding are frequent typically related to the demolition of industrial buildings.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:51: ponding are frequent typically related to the demolition of industrial buildings

R-2020-0357-OOM-Planning Statement - July 2020.pdf:3: “Outline planning application for the demolition of existing structures on site and

R-2020-0357-OOM-Planning Statement - July 2020.pdf:10: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0357-OOM-Planning Statement - July 2020.pdf:11: “Prior approval for proposed demolition of 5 quayside heavy duty oil tanks and associated

R-2020-0357-OOM-Planning Statement - July 2020.pdf:11:2.34 STDC will be seeking further approvals for the demolition of other existing structures on the

R-2020-0357-OOM-Planning Statement - July 2020.pdf:11: would enable the demolition of other on-site structures. STDC is committed to implementing

R-2020-0357-OOM-Planning Statement - July 2020.pdf:12: “Outline planning application for the demolition of existing structures on site and development

R-2020-0357-OOM-Planning Statement - July 2020.pdf:38: consider the effects of construction, demolition, trackout (dust deposited or resuspended by

R-2020-0357-OOM-Planning Statement - July 2020.pdf:41: phases of development, including hours of construction, demolition and construction

R-2020-0357-OOM-Planning Statement - July 2020.pdf:44: comprising ash and demolition rubble giving rise to a range of contaminants including heavy

R-2020-0357-OOM-Planning Statement - July 2020.pdf:46: wastes by 2030. The recovery target for construction, demolition and excavation waste for the

R-2020-0357-OOM-Planning Statement - July 2020.pdf:46: demolition) and operational phases of the proposed development, and by considering its

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: construction waste, and 60,000 tonnes of demolition waste in the construction phase).

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: for 0.10% of the regional landfill capacity whilst demolition waste would account for 0.26%.

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: waste requiring disposal may be reduced by at least 80% for construction, demolition and

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: 4,916tonnes per year (construction waste) and 12,000 tonnes (demolition waste). Operational

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: 0.0002% (construction waste), 0.0005% (demolition waste), and 0.005% (operational waste) of

R-2020-0357-OOM-Planning Statement - July 2020.pdf:47: associated environmental impacts. In this context demolition, construction and operational

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix B - July 2020.pdf:5: demolition

R-2020-0357-OOM-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2020-0357-OOM-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0357-OOM-0357 Contam Land.pdf:1: Proposal: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2020-0357-OOM-0357 Contam Land.pdf:1:1 Demolition of legacy structures and ground preparation operations including

R-2020-0357-OOM-2020 08 07 South Bank RecNOnDet_.pdf:1:A1053, OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2020-0357-OOM-HSE Advice_P_2020_0357_OOM.pdf:1:Proposal: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:3: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:7: phase includes the potential demolition of on-site structures. An assessment has also been

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:14: 2 Land at R/2019/04 Full Granted, Demolition of structures and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:16: Swale and the demolition of old plant

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:17: 17 Regent R/2020/00 R Awaiting Demolition of existing cinema and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:20: construction phase includes the demolition of on-site structures.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:23: development, including, where relevant, requisite demolition

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:24: including, where relevant, demolition works;

R-2020-0357-OOM-Officer report.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2020-0357-OOM-Officer report.pdf:1:Permission is sought for outline planning application for demolition of existing

R-2020-0357-OOM-Officer report.pdf:13:of COMAH inventory of dangerous substances. Demolition or removal of any

R-2020-0357-OOM-Officer report.pdf:23:demolition, lighting and building work or any works to be carried out on site

R-2020-0357-OOM-Officer report.pdf:23:Demolition

R-2020-0357-OOM-Officer report.pdf:23:Any demolition or refurbishment works must not be carried out on the

R-2020-0357-OOM-Officer report.pdf:23:stability of the adjoining Network Rail structures. The demolition of buildings

R-2020-0357-OOM-Officer report.pdf:31:1 Demolition of legacy structures and ground preparation operations including

R-2020-0357-OOM-Officer report.pdf:35:demolition and construction works.

R-2020-0357-OOM-Officer report.pdf:57:During Demolition and Construction

R-2020-0357-OOM-Officer report.pdf:59:It is proposed that demolition and construction works will be undertaken using

R-2020-0357-OOM-Officer report.pdf:59:In order to deliver the suitable mitigation a Demolition and Construction

R-2020-0357-OOM-Officer report.pdf:64:resulting from demolition will either not be taken off site, or it will go to the

R-2020-0357-OOM-Officer report.pdf:64:earthworks, demolition and associated trackout.

R-2020-0357-OOM-Officer report.pdf:64:whole development site to facilitate development. The demolition volumes

R-2020-0357-OOM-Officer report.pdf:64:have been provided by the client team, and include all demolition across the

R-2020-0357-OOM-Officer report.pdf:64:site, although it is accepted that some of these demolition activities will be

R-2020-0357-OOM-Officer report.pdf:65:development site and therefore construction, demolition and earthworks

R-2020-0357-OOM-Officer report.pdf:65:Demolition N/A N/A Medium Risk

R-2020-0357-OOM-Officer report.pdf:66:  Measures Specific to Demolition

R-2020-0357-OOM-Officer report.pdf:68:demolition and construction works.

R-2020-0357-OOM-Officer report.pdf:75:  Demolition of legacy structures and ground preparation operations

R-2020-0357-OOM-Officer report.pdf:76: demolition of existing structures within the development site has been

R-2020-0357-OOM-Officer report.pdf:86:development from earthworks and the demolition of existing assets

R-2020-0357-OOM-Officer report.pdf:87:considered to include demolition (as describe in the above sections of this

R-2020-0357-OOM-Officer report.pdf:89:The recovery target for construction, demolition and excavation waste for the

R-2020-0357-OOM-Officer report.pdf:89:Demolition works are expected to take place prior to construction works at the

R-2020-0357-OOM-Officer report.pdf:89:the assumption that the same recovery rate was applied to demolition waste

R-2020-0357-OOM-Officer report.pdf:89:(60,000 tonnes), this would also reduce demolition waste sent to landfill to

R-2020-0357-OOM-Officer report.pdf:101:be removed through the site preparation works, demolition and the creation of

R-2020-0357-OOM-Officer report.pdf:102:would be recorded prior to demolition.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:22: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:26: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:8: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:8: The proposed development life is 50 years. Full deconstruction/demolition of the proposed

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:11: It is known that there are some demolition activities

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:14: Estimates of demolition materials are not known at this time and have been excluded

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:14: from the GHG assessment. Once demolition quantities and waste management strategy

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank.pdf:1:Planning consultation: Outline planning application for demolition of existing structures on

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:9: “Outline planning application for demolition of existing structures on site and the development

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:11: Materials Handling Area, R/2020/0465/FFM Awaiting determination Demolition of existing

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:52: commercial receptors due to construction or demolition. The commercial properties

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:69: removed through the site preparation works, demolition and the creation of development

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:71: recorded prior to demolition.

R-2020-0357-OOM-Habitats Regulation Assessment.pdf:12:“Outline planning application for the demolition of existing structures on site and

R-2020-0357-OOM-Habitats Regulation Assessment.pdf:39: Land at Former R/2019/0427 Full Granted, Demolition of

R-2020-0357-OOM-Habitats Regulation Assessment.pdf:40:works, cut and fill, removal of hazardous waste, demolition of a railway bridge,

R-2020-0357-OOM-ApplicationFormRedacted.pdf:2:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2020-0357-OOM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0357-OOM-ApplicationFormRedacted.pdf:5: demolition (square changes of use) development (square

R-2020-0357-OOM-NATIONAL_GRID_XX_GS2C_3NWP_025590_1_6508.pdf:6:PA OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 1).PDF:3:Land at Former South R/2019/0427/FFM Granted, 25.05.2017 Demolition of structures and engineering

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 1).PDF:4: demolition of old plant and buildings.

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 1).PDF:5:Regent Cinema R/2020/0075/F3M Granted, 06.08.2020 Demolition of existing cinema and replace with

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:36: • Demolition work and removal of existing services;

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:120: • PPG 6 Working at construction and demolition sites;

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:174: be of lesser evidential value as their demolition and subsequent redevelopment of the site

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:174: the site. The demolition of the visible structures of the site has severed its connection to

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:175: ground level significantly and then subsequently the creation and demolition of the iron

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: Guidance on the Assessment of Dust from Demolition and Construction

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: of dust from demolition and construction. This document provides a risk-based

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: methodology for assessing construction impacts, including demolition and earthworks

2019s0951 - Energy Recovery Facility Environmental Statement.pdf:237: Description Demolition of structures and engineering operations associated

ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

Chapter 6 HRA Screening Report(1).pdf:5:5.4.2 Demolition of South Bank Works Temporary Storage Facility

Chapter 6 HRA Screening Report(1).pdf:28:5.4.2 Demolition of South Bank Works Temporary Storage Facility

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15: 2.4.1 Guidance on the Assessment of Dust from Demolition and Construction 11

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15:The Institute of Air Quality Management (IAQM) produced guidance on the assessment of dust from demolition

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15:demolition and earthworks where appropriate.

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:17:impacts. As the current site is undeveloped there will be no demolition required. The activities for assessment

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:19:The IAQM guidance11 on the assessment of dust from demolition and construction states that the primary aim

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:71: IAQM, 2016, Guidance on the assessment of dust from demolition and construction v1.1

REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:76: development using the IAQM document ‘Assessment of dust from demolition and construction’ June

Chapter 6 HRA Screening Report.pdf:5:5.4.2 Demolition of South Bank Works Temporary Storage Facility

Chapter 6 HRA Screening Report.pdf:28:5.4.2 Demolition of South Bank Works Temporary Storage Facility

BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:6:5.4.2 Demolition of South Bank Works Temporary Storage Facility

BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:29:5.4.2 Demolition of South Bank Works Temporary Storage Facility

MGE 04020.pdf:2: washing facilities; vi Methods of demolition; vii) Measures to control the

MGE 04020.pdf:2: scheme for recycling/disposing of waste resulting from demolition and

Decision Notice_R20190767OOM(4).pdf:12:Prior to commencing work on any development which entails the demolition of part, or all of a

Chapter 10 Desk Based Assessment.pdf:5:Figure 11: Extract from British Steel Demolition Survey of Site, 1983

Chapter 10 Desk Based Assessment.pdf:15:ground level significantly and the subsequent creation and demolition of iron and

Chapter 10 Desk Based Assessment.pdf:16:remains that survive on site. The demolition of the visible structures of the site has

Chapter 10 Desk Based Assessment.pdf:20: - Primary documentary source, comprising the 1983 demolition plan, provided

Chapter 10 Desk Based Assessment.pdf:29:DEMOLITION 1994 REMAKE : https://www.youtube.com/watch?v=7DnXcPouT0k

Chapter 10 Desk Based Assessment.pdf:40:Figure 11: Extract from British Steel Demolition Survey of Site, 1983

officer report.pdf:59: The demolition of the visible structures of the site has severed its

R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:5:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-Chapter 6 HRA Screening Report(1).pdf:28:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:36: • Demolition work and removal of existing services;

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:120: • PPG 6 Working at construction and demolition sites;

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:174: be of lesser evidential value as their demolition and subsequent redevelopment of the site

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:174: the site. The demolition of the visible structures of the site has severed its connection to

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:175: ground level significantly and then subsequently the creation and demolition of the iron

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: Guidance on the Assessment of Dust from Demolition and Construction

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: of dust from demolition and construction. This document provides a risk-based

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:202: methodology for assessing construction impacts, including demolition and earthworks

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:237: Description Demolition of structures and engineering operations associated

R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:5:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-Chapter 6 HRA Screening Report.pdf:28:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15: 2.4.1 Guidance on the Assessment of Dust from Demolition and Construction 11

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15:The Institute of Air Quality Management (IAQM) produced guidance on the assessment of dust from demolition

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:15:demolition and earthworks where appropriate.

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:17:impacts. As the current site is undeveloped there will be no demolition required. The activities for assessment

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:19:The IAQM guidance11 on the assessment of dust from demolition and construction states that the primary aim

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:71: IAQM, 2016, Guidance on the assessment of dust from demolition and construction v1.1

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:76: development using the IAQM document ‘Assessment of dust from demolition and construction’ June

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:5:Figure 11: Extract from British Steel Demolition Survey of Site, 1983

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:15:ground level significantly and the subsequent creation and demolition of iron and

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:16:remains that survive on site. The demolition of the visible structures of the site has

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:20: - Primary documentary source, comprising the 1983 demolition plan, provided

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:29:DEMOLITION 1994 REMAKE : https://www.youtube.com/watch?v=7DnXcPouT0k

R-2019-0767-OOM-Chapter 10 Desk Based Assessment.pdf:40:Figure 11: Extract from British Steel Demolition Survey of Site, 1983

R-2019-0767-OOM-ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:6:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-BPM-JBAU-XX-00-RP-EN-0001-S3-P01.01-HRA Report_Issued_2020303.pdf:29:5.4.2 Demolition of South Bank Works Temporary Storage Facility

R-2019-0767-OOM-officer report.pdf:59: The demolition of the visible structures of the site has severed its

R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:12:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2019-0767-OOM-MGE 04020.pdf:2: washing facilities; vi Methods of demolition; vii) Measures to control the

R-2019-0767-OOM-MGE 04020.pdf:2: scheme for recycling/disposing of waste resulting from demolition and

R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: OOM Tees demolition of existing structures on

R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0831-CD-63262 - Covering Letter - 29.09.21.pdf:2:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0831-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:Planning consultation: Discharge of Condition 7 of R/2020/0684/ESM for demolition of

R-2021-0831-CD-370819 393380 393440 R_2021_0830_CD R_2021_0831_CD R_2021_0832_CD - Discharge of conditoins relating to Environment and Biodiversity Strategy Teesworks Redcar_.pdf:1:for outline application for demolition of existing structures on site the development of up to

R-2021-0831-CD-DECISION NOTICE 0357.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0831-CD-DECISION NOTICE 0357.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: OOM Tees demolition of existing structures on

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:12: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: OOM Tees demolition of existing structures on

R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0684/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:11: R/2020/0685/ Land at South Demolition of existing redundant 19/03/2021 19/03/2022

R-2021-0831-CD-ApplicationFormRedacted.pdf:1:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0831-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:3: 3.4.3 Demolition and crushing …………………………………………………………………………………………………….. 11

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:11:Referring to visible dust, it is imperative to prevent statutory nuisance arising from the demolition,

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:12:3.4.3 Demolition and crushing (Pile head)

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:12: • During demolition activities, water will be used for the suppression of dust.

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:12: • Demolition material will be segregated and stockpiled on site and removed regularly to avoid large

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:12:Where there is evidence of airborne dust from the building construction/demolition activities the site, the

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A.pdf:29:IAQM Guidance on the Assessment of Dust from Construction and Demolition 2014

R-2022-0454-CD-EA_R20220454CD_OFFICIAL_080622.pdf:1:FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0454-CD-COMPLIANCE OFFICER REPORT.pdf:1: APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0454-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0454-CD-EA_R20220454CD_OFFICIAL_300622.pdf:1:FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0454-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:3: 3.4.3 Demolition and crushing …………………………………………………………………………………………………….. 11

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:11:Referring to visible dust, it is imperative to prevent statutory nuisance arising from the demolition,

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:12:3.4.3 Demolition and crushing (Pile head)

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:12: • During demolition activities, water will be used for the suppression of dust.

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:12: • Demolition material will be segregated and stockpiled on site and removed regularly to avoid large

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:12:Where there is evidence of airborne dust from the building construction/demolition activities the site, the

R-2022-0454-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev A(1).pdf:29:IAQM Guidance on the Assessment of Dust from Construction and Demolition 2014

R-2022-0454-CD-COMPLIANCE DECISION NOTICE.pdf:1: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0454-CD-COMPLIANCE DECISION NOTICE.pdf:2: APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2022-0454-CD-61586_01 Covering Letter May 2022.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2021-0057-VC-Decision Notice_R20210057VC.pdf:1: R/2019/0427/FFM (DEMOLITION OF STRUCTURES AND

R-2021-0057-VC-Decision Notice_R20210057VC.pdf:5: v) Methods of demolition of any structures to be demolished in order to form

R-2021-0057-VC-Decision Notice_R20210057VC.pdf:5: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2021-0057-VC-Decision Notice_R20210057VC.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0057-VC-ApplicationFormRedacted.pdf:2:Demolition of structures and engineering operations associated with ground preparation and temporary storage of soils and its final use in the remediation and

R-2021-0057-VC-email.pdf:10:outriggers, crossing with vehicles, hand digging or machine digging, ditching, demolition, drainage

R-2021-0057-VC-Officer report _R20210057VC.pdf:1: PERMISSION R/2019/0427/FFM (DEMOLITION

R-2021-0057-VC-Officer report _R20210057VC.pdf:2:R/2019/0427/FFM Demolition of structures and engineering operations

R-2021-0057-VC-Officer report _R20210057VC.pdf:11: v) Methods of demolition of any structures to be demolished in order to

R-2021-0057-VC-Officer report _R20210057VC.pdf:11: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2021-0057-VC-60686_S.73 cover letter_Jan 2021.PDF:1:“Demolition of structures and engineering operations associated with ground preparation and temporary

R-2021-0057-VC-NGN.pdf:6:  Demolition works within 15m of low/medium pressure mains and 150m of intermediate and

R-2021-0725-CD-HOLME BECK WATERCOURSE MANHOLE SCHEMATICS AND TYPICAL (STDC_HWY-ATK-HDG-PR-DE-CD-000001_C02).pdf:1: Ø3.000 R3.100 COMPLETE DEMOLITION AND RE-BUILD USING APPROVED - CONSTRUCTION A3

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 5 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000006_C01.pdf:1: Decommissioning / Demolition

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf:1: Decommissioning / Demolition

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 8 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000009_C01.pdf:1: Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 1 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000002_C01.pdf:1: GROUP Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 7 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000008_C01.pdf:1: Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf:1: Decommissioning / Demolition

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 6 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000007_C01.pdf:1: Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 4 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000005_C01.pdf:1: Decommissioning / Demolition

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 9 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000010_C01.pdf:1: Decommissioning / Demolition PROPOSED DRAINAGE LAYOUT

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 2 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000003_C01.pdf:1: Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf:1: Decommissioning / Demolition

R-2021-0725-CD-PROPOSED DRAINAGE LAYOUT SHEET 3 OF 9 - STDC_HWY-ATK-HDG-PR-DR-CD-000004_C01.pdf:1: Decommissioning / Demolition LOCAL FLOOD AUTHORITY (RCBC) AGREED DIMENSIONS.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:7:“Demolition of existing buildings/ structures and engineering operations associated with ground

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:11: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:21:samples from MPA_AUK_TP101 and MPA_AUK_TP130 are noted to be within deposits containing demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:21:Asbestos fibres were identified in two samples, however only one of these contained obvious demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:21:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:27:This was associated with obvious demolition material within Made Ground at the site in only one case.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:27:The proposed planning application “Demolition of existing buildings/ structures and engineering operations

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:28: 1. The proposed planning permission is for ““Demolition of existing buildings/ structures and engineering

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:7:“Demolition of existing buildings/ structures and engineering operations associated with ground

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:11: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:21:samples from MPA_AUK_TP101 and MPA_AUK_TP130 are noted to be within deposits containing demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:21:Asbestos fibres were identified in two samples, however only one of these contained obvious demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:21:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:27:This was associated with obvious demolition material within Made Ground at the site in only one case.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:27:The proposed planning application “Demolition of existing buildings/ structures and engineering operations

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:28: 1. The proposed planning permission is for ““Demolition of existing buildings/ structures and engineering

R-2020-0743-CD-COMPLIANCE DECISION NOTICE.pdf:1: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2020-0743-CD-COMPLIANCE DECISION NOTICE.pdf:2: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2020-0743-CD-CON LAND 743.pdf:1: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2020-0743-CD-ApplicationFormRedacted.pdf:2:Demolition of existing buildings/structures and engineering operations associated with ground remediation and preparation of land for development

R-2020-0743-CD-MGE04198 Cont Land.pdf:1: R/2020/0465/FFM FOR DEMOLITION OF EXISTING

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:7:application (R/2020/0465/FFM) for “Demolition of existing buildings/ structures and engineering

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:7:approval R/2019/0427/FFM is also in place covering the site, this is for “Demolition of structures and

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:11: The gravel and cobbles included brick, concrete, wood and other demolition materials, slag was

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:12:MPA_AUK_TP130 are noted to be within deposits containing demolition material, whilst the sample

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:23:The planning application R/2020/0465/FFM “Demolition of existing buildings/ structures and

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:24: demolition arising, crushed concrete or imported fill.

R-2020-0743-CD-COMPLIANCE OFFICER REPORT.pdf:1: DEMOLITION OF EXISTING

R-2020-0743-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing

R-2020-0743-CD-COMPLIANCE OFFICER REPORT.pdf:2:The application relates to the recently approved application for the demolition of

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:7:“Demolition of existing buildings/ structures and engineering operations associated with ground remediation

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:28:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0316-VC-Officer report _R20210316VC.pdf:2:R/2019/0427/FFM Demolition of structures and engineering operations

R-2021-0316-VC-Officer report _R20210316VC.pdf:2:R/2019/0427/FFM (demolition of structures and engineering operations

R-2021-0316-VC-Officer report _R20210316VC.pdf:10: v) Methods of demolition of any structures to be demolished in order to

R-2021-0316-VC-Officer report _R20210316VC.pdf:10: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2021-0316-VC-Metals Recovery Area Cover letter.pdf:1:“Variation of condition 2 of planning permission R/2019/0427/FFM (Demolition of structures and

R-2021-0316-VC-Decision Notice_R20210316VC.pdf:5: v) Methods of demolition of any structures to be demolished in order to form

R-2021-0316-VC-Decision Notice_R20210316VC.pdf:5: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2021-0316-VC-Decision Notice_R20210316VC.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0316-VC-1400007002.pdf:6: • Demolition works within 15m of low/medium pressure mains and 150m of intermediate and

R-2021-0316-VC-CAT-PPI-PRC-019.pdf:7:outriggers, crossing with vehicles, hand digging or machine digging, ditching, demolition, drainage

R-2021-0316-VC-ApplicationFormRedacted.pdf:2:Variation of condition 2 of planning permission R/2019/0427/FFM (Demolition of structures and engineering operations associated with ground preparation and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:11: Table D3.1: Thresholds of potential significant effects of demolition and construction noise at residential buildings (adapted from

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:12: “Noise from construction and demolition sites should not exceed the level at which

R-2020-0820-ESM-Application Form(1).pdf:3: demolition (square changes of use) development (square

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:25: commences. Further guidance is provided by IAQM on monitoring during demolition,

R-2020-0820-ESM-Network Rail 820.pdf:3:method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any

R-2020-0820-ESM-Network Rail 820.pdf:3:Demolition

R-2020-0820-ESM-Network Rail 820.pdf:3:Any demolition or refurbishment works must not be carried out on the development site that may endanger the

R-2020-0820-ESM-Network Rail 820.pdf:3:safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or

R-2020-0820-ESM-MGE04279 Contaminated Land 0820.pdf:2:There are still areas of the site that need demolition and therefore there are currently

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:23: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:28: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:46: and the demolition of these structures and their replacement would not result in significant

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:49: development will involve the demolition and replacement of large form buildings.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:17: demolition under a separate consenting process which will include a Demolition Method

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:17: Statement and specification for the appropriate infilling of voids such as basements. Demolition

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:31: COMAH related risks would be removed during the demolition of the site. The main aspects are

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1431:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1504: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1504: sand, gravel and cobbles. Gravel and cobbles include brick, concrete and other demolition materials,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1504:In addition to the large boulders of slag and demolition rubble which presented issues with progression of a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1505:In addition to the large boulders of slag and demolition rubble which presented issues with progression of a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1522:this report, and further surveys should eb carried out ahead of any refurbishment or demolition works.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1591:generally included granular material with varying amounts of slag, brick demolition rubble and coal ash. Across

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1591:including refractory bricks, demolition wastes and cohesive made ground. 15 of the 27 trial pits excavated in

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1665:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1680: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1695: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1696: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1696: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1698: demolition rubble.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1711: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1712: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1728: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1732: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1741: ‐ demolition rubble

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1744: - demolition rubble

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1748: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1751:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1758:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1880:DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1881: Proposal: DEMOLITION OF STRUCTURES AND ENGINEERING

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1881:application which includes enabling activities such as demolition of structures and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1884: decontamination operations should be completed prior to any demolition or longer

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:9: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:9: EIA, the demolition of all other on-site infrastructure will be subject to separate consents. Other

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:9: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:12:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:15:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:18:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:20: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:25:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:26: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:27:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:27:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor infrastructure along

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:27:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:28:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:28:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:59: ponding are frequent typically related to the demolition of industrial buildings.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:59: ponding are frequent typically related to the demolition of industrial buildings

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:13: demolition of these structures will be obtained through a separate consenting process and does

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:25: major demolition in this first instance. There is also recognition that areas which require more

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:35:5.24 The proposed development does not include the demolition of buildings or structures on the

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:39: 9 No works associated with demolition shall be undertaken to below ground infrastructure

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:39: culvert, including diversions, will be undertaken via demolition consents.

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:45: phases of development, including hours of construction, demolition and construction

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:51: wastes by 2030. The recovery target for construction, demolition and excavation waste for the

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:51: demolition) and operational phases of the proposed development, and by considering its

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:52: this context demolition, construction and operational waste from the proposed development are

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:5: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:8: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:9: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:11: (deconstruction, demounting, demolition and disposal) phases.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:11: demolition) and operational phases of the proposed development, and by considering its

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:16:K3.29 The demolition of the existing buildings on site are subject to separate consents and as such

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:16: waste arising from demolition has not been assessed in this chapter. The demolition assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:19:K5.4 Phasing is not relevant to waste and materials as demolition will be complete prior to the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:20: demolition, excavation or groundworks waste.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:24: * Excludes plasterboard from demolition.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:24: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:30: 3 C&D – Construction & demolition

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:30: 4 CD&E – Construction, demolition, & excavation

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:10: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:11: The proposed development life is a minimum of 50 years. Full deconstruction/demolition of the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:14: It is known that there are some demolition activities

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:14: demolition activities are undertaking a separate

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:14: associated with the planned demolition activities.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:17: waste will be removed from site. The GHG emissions associated with demolition are not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:18:I4.6 Arup has been advised by the client that engineering, demolition and ground works activities

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:18: the emissions arising from demolition activities, and the transport and disposal of waste, are not

R-2020-0820-ESM-1401-Lackenby DAS.pdf:8: structures are now disused and scheduled for demolition and remediation.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:19: demolition of old plant and buildings.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:20: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace Granted, At the request of th

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:20: STDC planning 357/OO demolition of existing structures on site STDC in July 2020 a

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties Decision pending. This application wa

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:21: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures Pending decision, This application ha

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:26: development, including, where relevant, requisite demolition

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:27: including, where relevant, demolition works;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:32: demolition works will be subject to a separate consenting process. Permission is therefore not

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:32: sought for the demolition of buildings and structures and the effects of demolition will therefore

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter I - Climate Change - Dec 2020.pdf:10:I1.13 No data is available regarding the quantity of demolition material that will be removed from the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter E - Air Quality - Dec 2020.pdf:14: assessment of dust from demolition and construction into the CEMP from the outset,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:15: • Demolition and Salvage;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:18: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:19: • Demolitions: The site, and indeed other sites in the Teesworks area, contain a number of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:19: ahead. It is envisaged that consent for their demolition will mostly be obtained by way of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:19: Prior Approval process, where the method of demolition and site restoration would be fully

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:19: Regulations and Environmental Impact Assessments relating to those demolition schemes.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:27: arrangements, the environmental context of the site and the status of demolition works on site.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:28:B7.9 Demolition of those buildings and structures on site will be carried out prior to construction of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.19 As above, this stage of the development may include the demolition of any existing on site

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.22 All demolition works will be subject of a separate consenting process and therefore existing

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:29: buildings and structures on site that will require demolition will not be assessed as part of this

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:32: Assessment of Dust from Demolition and Construction will be employed at the proposed

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:32: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0820-ESM-Decision Notice 0820.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:15: assessment of dust from demolition and construction will be followed;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:9: - PPG 6 Working at construction and demolition sites;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:25:F3.16 No works associated with demolition shall be undertaken to below ground infrastructure until

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:25: including diversions, will be undertaken via demolition consents.

R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:15:9.2 The proposed development does not include the demolition of buildings or structures on the site,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:19: Pipe Bridge, Swale and the demolition of old plant and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:19: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace with new Granted, At the request of the Officer.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:19: 21 South Bank Site, Outline R/2020/0 Outline planning application for demolition of existing Decision pending This application was submitted by

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:20: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures and Pending decision, This application has been

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:22: A Land at Former Full R/2019/0427/FF Demolition of structures and engineering operations Granted, Development

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:22: the demolition

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:24: C Land associated Prior N/A Demolition of existing structures and buildings Not yet submitted All 5 STDC Tier 1

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:24: until the demolition

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:24: demolition phases

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:25: demolition works

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:25: D Steel House Full R/2020/0598/FF Retrospective demolition of existing gatehouse; Pending decision, This development

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:28: 3 Where demolition is required to ‘clear’ the Dorman Point, Lackenby or Foundry sites, it is

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:28: assumed that this demolition will take place ahead of construction commencing on that

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:73: 6 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction

R-2020-0270-FFM-NUISANCE 0270.pdf:1: washing facilities; vi Methods of demolition; vii) Measures to control the

R-2020-0270-FFM-NUISANCE 0270.pdf:1: scheme for recycling/disposing of waste resulting from demolition and

R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:5:design, demolition and construction - Recommendations'.

R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:7: floorspace use or demolition (including change of following development

R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:7: class applicable of use or demolition changes of use)

R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:8:Recycling facilities construction, demolition

R-2020-0270-FFM-60722_FINAL Application Form_29.05.2020(1).PDF:8: Construction, demolition and excavation

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:43: demolition rubble.

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:90: ‐ demolition rubble

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:93: - demolition rubble

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0270-FFM-DLX-JBAU-00-00-DR-C-0003-S3-P01-Holme_Beck_Plan_&_Section_2_of_3.PDF:1: ESTON ROAD EXTENSION DESIGNED BY OTHERS NEW REINFORCED CONCRETE CULVERT No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-b) Important Safety Guidance (002).pdf:1: • Demolition works within 15m of low/medium pressure mains and 150m of intermediate and

R-2020-0270-FFM-DLX-JBAU-00-00-DR-C-0001-S3-P01-Eston_Road_Drainage_Key_Plan.PDF:1: MAINTENANCE AREA No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-Officer Report 0270.pdf:6: demolition; vii) Measures to control the emission of noise dust and

R-2020-0270-FFM-Officer Report 0270.pdf:6: recycling/disposing of waste resulting from demolition and

R-2020-0270-FFM-DLX-JBAU-00-00-DR-C-0004-S3-P01-Holme_Beck_Plan_&_Section_3_of_3.PDF:1: SIDE SLOPES TO VARY TO CREATE A No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:46: MAINTENANCE AREA No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:47: CHANNEL ARMOURED FOR A LENGTH OF No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:48: ESTON ROAD EXTENSION DESIGNED BY OTHERS NEW REINFORCED CONCRETE CULVERT No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF:49: SIDE SLOPES TO VARY TO CREATE A No. Construction Risk Maintenance Risk Demolition Risk

R-2020-0270-FFM-Decision 0270.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0270-FFM-DLX-JBAU-00-00-DR-C-0002-S3-P01-Holme_Beck_Plan_&_Section_1_of_3.PDF:1: CHANNEL ARMOURED FOR A LENGTH OF No. Construction Risk Maintenance Risk Demolition Risk

R-2021-0432-FFM-Decision.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0432-FFM-5203829-HPV-DR-C-0701.PDF:1: Decommissioning / Demolition

R-2021-0432-FFM-19736928_1.PDF:8:demolition wastes and cohesive made ground.

R-2021-0432-FFM-19736928_1.PDF:14:Since the demolition of the former steel works, run-off from the Site primarily flows over the ground surface,

R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:5:design, demolition and construction - Recommendations'.

R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:7: floorspace use or demolition (including change of following development

R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:7: class applicable of use or demolition changes of use)

R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:8:Recycling facilities construction, demolition

R-2021-0432-FFM-Application Form - 24.05.21(1).pdf:8: Construction, demolition and excavation

R-2021-0432-FFM-5203829-HPV-DR-C-0702.PDF:1: Decommissioning / Demolition

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:19: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:19: sand, gravel and cobbles. Gravel and cobbles include brick, concrete and other demolition materials,

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:19:In addition to the large boulders of slag and demolition rubble which presented issues with progression of a

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:20:In addition to the large boulders of slag and demolition rubble which presented issues with progression of a

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:37:this report, and further surveys should eb carried out ahead of any refurbishment or demolition works.

R-2020-0724-PND-R 20 724 Decision.pdf:1:Details: PRIOR NOTIFICATION FOR DEMOLITION OF VARIOUS OBSOLETE

R-2020-0724-PND-R 20 724 Decision.pdf:1:approval for the demolition of the above premises is not required.

R-2020-0724-PND-STDC-ATK-EPD-ZZ-DR-Z-0001 Demolition location Plan.PDF:1: N DEMOLITION ARE FURTHER SSI

R-2020-0724-PND-STDC-ATK-EPD-ZZ-DR-Z-0001 Demolition location Plan.PDF:1: AREA 9 EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-ATK-EPD-ZZ-DR-Z-0001 Demolition location Plan.PDF:1: AREA 9 DEMOLITION LOCATION PLAN

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:Demolition of various buildings: Application for Prior Notification of

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:Demolition at former Redcar Steel Works, Redcar

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:pleased to enclose a prior notification application relating to the demolition of former buildings associated

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:1:prior approval of the authority will be required as to the method of demolition and any proposed restoration

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:2:The Scope of the Proposed Demolition Works

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:2:The application seeks prior approval for the demolition and deconstruction of the following:

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:2:As set out in the accompanying demolition method statement, the outline sequence of works to be

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:2:• Demolition of superstructures down to ground level;

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:2:• Crushing of demolition rubble to Class 6F2 specification and infill of voids;

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Reason for Demolition

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Method of Demolition

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:The accompanying Demolition Method Statement prepared by Atkins sets out in detail the proposed scheme

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:of demolition works.

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Consideration of the proposed demolition has been given in relation to the Town and Country Planning (

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Environmental Impact Assessment) Regulations 2017. Planning practice guidance states that demolition

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:The techniques to be adopted in the demolition process are not unusually complex. The works are localised

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:compliance with the submitted demolition method statement.

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:The demolition method statement enclosed with this application demonstrates that the scheme would not

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:• The prior notification of demolition form;

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:1: Demolition of Buildings

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2:5. Proposed Demolition Works

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2:Please state why demolition needs to take place:

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2:Please describe the proposed method of demolition:

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2: Please see accompanying cover letter and demolition method statement.

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2: Please see accompanying cover letter and demolition method statement.

R-2020-0724-PND-Application - Demolition of Buildings - 26.11.20(1).PDF:2: Please see accompanying cover letter and demolition method statement.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:1:Early Phase Demolition

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:2:Development Corporation and use in relation to items forming part of the Early Phase Demolition Schedule.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:2: Project Early Phase Demolition

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:3:1.2. Demolition Schedule 4

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:3:1.8. Demolition Works Scope 7

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:3:3.4. Mechanical demolition of all buildings & structures within project area boundaries 14

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:the Early Phase Demolition. These include, as presented on the drawings contained within Appendix A, Areas

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:80 Demolition Notice, to present the key works and considerations in advance of any site demolition activities

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:responsibility for the demolition works shall lie with them. Atkins Limited assumes no responsibility to this regard

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:6187:2011 Code of Practice for Full & Partial Demolition, including the below mentioned regulations:

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:1.2. Demolition Schedule

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:The works are to include all demolition and deconstruction of structures presented in the Contract Drawings

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:4:Table 1 – Demolition Schedule Summary

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:6:supplemented with internal double clipped Heras style fence required to form an Active Demolition zone (ADZ)

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:6:As part of the works the oil tank(s) are to be decontaminated prior to any demolition works.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:6:Refurbishment & Demolition (R&D) Asbestos Surveys have been completed for each area, these will be made

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:7:All asbestos will be removed prior to commencing demolition of any structure. Asbestos identified at this stage

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:7:demolition.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:7:1.8. Demolition Works Scope

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:7:  Demolition of superstructures down to ground level

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:7:  Crushing of demolition rubble to Class 6F2 specification and infill of voids.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:9:The scope of works covered within this method statement consists of the above ground demolition of all structures

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:9:within each site area, with the demolition zones delineated onsite by the PC. This will include any associated

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:9:  Demolition of structures and process/clear arisings

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:9: Demolition Contract timescale - 15 weeks

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:9:  1no. 45 & 2no. 20 tonne demolition specification excavators with various attachments (selector grab,

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:10:  1no. 45 & 1no. 20 tonne demolition specification excavators with various attachments (selector grab,

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:10:  1no. 20 tonne & 1no. 40 tonne demolition specification excavators with various attachments (selector

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:10:  2no. 45 & 1no. 20 tonne demolition specification excavators with various attachments (selector grab,

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:  1 x Full-time Site Manager overseeing the entire demolition schedule of works

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:Prior to any demolition works commencing an ecological survey is to be carried out to confirm any presence of

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:Demolition dust will typically be controlled by applying water spray manually and remotely using a (MOTFOG 100

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:reducing fume or dust release. During the crushing and demolition of the brick structures it is envisaged expected

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:Demolition arisings are to be processed and segregated on site and loaded into the required transport to be

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:11:Prior to demolition works commencing nearby boreholes shall be sampled and monitored to establish current

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:12:boreholes shall also be monitored and sampled during the demolition works to monitor any effect the works may

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:12:subcontractors’ operatives are to hold a CSCS card minimum and have undertaken both demolition activities and

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:12:demolition activities. All persons required to work on site will undertake a full site induction prior to commencing

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:13:Non-Licensable only – Licensed Material shall have been removed by specialist subcontractor prior to demolition

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:14:3.4. Mechanical demolition of all buildings & structures within project

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:14:The following table outlines the mechanical demolition activities associated with each area.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15:Table 2 – Mechanical Demolition

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: 1&3 All access restrictions to the structure are to be put in place prior to demolition Area 1 – Ariel Imagery

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: determine it is safe to commence demolition operations.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: A motofog dust suppression unit will be positioned outside the demolition exclusion

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: each individual bay is demolished down to ground level, the demolition debris will

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: machine commences the next bay in sequence. The demolition excavators will

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: The basement within Area 3 is to be infilled with processed demolition arisings

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:15: created from the demolition of Area 1. This will demolition plant to access and to

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:17: the demolition boundary (ADZ) and secure the site.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:17: distance away, the 20T (or 45T) 360 demolition excavator will be pull out / complete

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:17: At ground level the demolition arising/debris will be processed via 360 45T

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: All demolition activities to be carried out in accordance with BS 6187:2011 Code of Practice for Full & Partial

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: Demolition.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: The methodology and sequence of demolition is determined by the site manager to ensure a safe and

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: A suitable exclusion zone (ADZ) to be barriered off prior to any mechanical demolition commencing and all

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: Demolition will typically be carried out top-down and on a bay-by-bay basis and materials stockpiled in waste

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:18: Waste will be segregated at the demolition workface and loaded directly into 40 yard recycling bins.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:19: - Active Demolition Zone

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-001 Demolition Location Plan

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-002 Demolition Layout Plan Area 1

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-003 Demolition Layout Plan Area 3

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-004 Demolition Layout Plan Area 8

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-005 Demolition Layout Plan Area 9

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:21: STDC-ATK-EPD-ZZ-DR-Z-006 Demolition Layout Plan Area 10

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:22: N DEMOLITION ARE FURTHER SSI

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:22: AREA 9 EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:22: AREA 9 DEMOLITION LOCATION PLAN

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:23: AFFECTED BY THE DEMOLITION WORKS.

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:23: E CESS DEMOLITION COMPLETION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:23: EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:23: DEMOLITION LAYOUT PLAN

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:24: ARE AFFECTED BY THE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:24: DEMOLITION COMPLETION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:24: EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:24: DEMOLITION LAYOUT PLAN

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:25: ARE AFFECTED BY THE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:25: NPG NPG EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:25: DEMOLITION LAYOUT PLAN

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:26: BT BT BT BT BT ARE AFFECTED BY THE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:26: EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:26: DEMOLITION LAYOUT PLAN

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:27: ARE AFFECTED BY THE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:27: LIGHTING TOWER TO REMAIN EARLY PHASE DEMOLITION

R-2020-0724-PND-STDC-Early Phase Demolition Outline MS_For Issue.PDF:27: DEMOLITION LAYOUT PLAN

R-2020-0724-PND-Officer Report.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2020-0724-PND-Officer Report.pdf:1:The application seeks prior approval for the demolition of various obsolete

R-2020-0724-PND-Officer Report.pdf:1:The application seeks prior approval for the demolition and deconstruction of

R-2020-0724-PND-Officer Report.pdf:1:As set out in the accompanying demolition method statement, the outline

R-2020-0724-PND-Officer Report.pdf:2:  Demolition of superstructures down to ground level;

R-2020-0724-PND-Officer Report.pdf:2:  Crushing of demolition rubble to Class 6F2 specification and infill of

R-2020-0724-PND-Officer Report.pdf:2:The application has been supported by an Outline Demolition Method

R-2020-0724-PND-Officer Report.pdf:2:demolition scheme.

R-2020-0724-PND-Officer Report.pdf:2:demolition activities is to be crushed to a Class 6F2 specification and used to

R-2020-0724-PND-Officer Report.pdf:2:(Environmental Impact Assessment) Regulations 2017, but the demolition is

R-2020-0724-PND-Officer Report.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0724-PND-Officer Report.pdf:2:While the demolition and clearance of the site will leave an empty part to the

R-2020-0724-PND-Officer Report.pdf:2:impacts on the ecology from demolition of buildings of this scale in

R-2020-0724-PND-Officer Report.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2022-0145-CD-61586 Covering Letter.pdf:1:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2022-0145-CD-Riverside Ph1 WB WSIv3.pdf:4: c) Watching brief during remediation / demolition / construction works

R-2022-0145-CD-ApplicationFormRedacted.pdf:4: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2022-0145-CD-Decision Notice(1).pdf:1: R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT QUAY

R-2022-0145-CD-Decision Notice(1).pdf:2: R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT

R-2022-0145-CD-Officer report.pdf:1: DEMOLITION OF EXISTING REDUNDANT

R-2022-0145-CD-Officer report.pdf:1:The planning permission sought consent for demolition of existing redundant quay

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:22: demolition arising, crushed concrete or imported fill.

R-2022-0355-FFM-20857612_1.pdf:7:“Demolition of existing redundant quay structures, capital dredging and development of new quay

R-2022-0355-FFM-Decision Notice.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0355-FFM-CFB03707 Nuisance.pdf:2:- The working hours for all construction and demolition activities on this site are

R-2022-0355-FFM-CFB03707 Nuisance.pdf:2: Methods of demolition; vii) Measures to control the emission of noise dust and

R-2022-0355-FFM-CFB03707 Nuisance.pdf:2: waste resulting from demolition and construction works.

R-2022-0355-FFM-ApplicationFormRedacted.pdf:7:make clear on its website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition

R-2022-0355-FFM-ApplicationFormRedacted.pdf:9: Gross internal floorspace to be lost by change of use or demolition (square metres):

R-2022-0355-FFM-ApplicationFormRedacted.pdf:10: internal floorspace by change of use or demolition proposed (including changes of use) floorspace following development

R-2022-0355-FFM-64764 SeAH Detailed Application Covering Letter March 2022(1).pdf:1:On 3 December 2020 outline planning application was granted at South Bank for the demolition of existing

R-2022-0355-FFM-Officer report.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2022-0355-FFM-Officer report.pdf:7:- The working hours for all construction and demolition activities on this site

R-2022-0355-FFM-Officer report.pdf:7: vi) Methods of demolition;

R-2022-0355-FFM-Officer report.pdf:7: viii) A scheme for recycling/disposing of waste resulting from demolition

R-2022-0355-FFM-Officer report.pdf:9:surrounding area, with on-going works relating to demolition and remediation

R-2022-0355-FFM-ARCHAEOLOGIST.pdf:4: (R/2020/0357/OOM) for demolition of existing structures on site and the development of up to

R-2022-0355-FFM-Application Form.pdf:5:design, demolition and construction - Recommendations'.

R-2022-0355-FFM-Application Form.pdf:7: floorspace use or demolition (including change of following development

R-2022-0355-FFM-Application Form.pdf:7: class applicable of use or demolition changes of use)

R-2022-0355-FFM-Application Form.pdf:8:Recycling facilities construction, demolition

R-2022-0355-FFM-Application Form.pdf:8: Construction, demolition and excavation

R-2021-0846-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:18: demolition arising, crushed concrete or imported fill.

R-2021-0846-FFM-DECISION NOTICE.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0846-FFM-OFFICER REPORT.pdf:4:surrounding area, with on-going works relating to demolition and remediation

R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf:11:The activities proposed include the demolition of structures and engineering operations associated with the

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13:• Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: sandy and or gravelly clay with demolition materials within the matrix.

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0439-CD-officer report.pdf:1: APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0439-CD-officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0439-CD-Decision Notice.pdf:1: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0439-CD-Decision Notice.pdf:2: APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0439-CD-0439 Contam .pdf:1: PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:20: ground, certified demolition arising, crushed concrete or imported fill.

R-2021-0439-CD-ApplicationFormRedacted.pdf:2:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0943-CD-EA_R20210943CD_OFFICIAL_060422.pdf:1:R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT QUAY

R-2021-0943-CD-OFFICER REPORT.pdf:1: FOR DEMOLITION OF EXISTING REDUNDANT

R-2021-0943-CD-OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing redundant quay

R-2021-0943-CD-DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2021-0943-CD-DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0943-CD-PN 943.pdf:1: PERMISSION R/2020/0684/ESM FOR DEMOLITION OF

R-2021-0943-CD-Natural England.pdf:1:R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:3:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:5:11.3 Loss of assets due to demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:7: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:15: demolition and construction works, with visits scheduled according to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:21: “relevant demolition” in Authority)

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:28:Predicted construction phase impacts are linked to habitat loss from the demolition of existing

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:30:• All site operatives will be made aware of the possibility of finding bats during demolition of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:34:demolition and other construction-phase works, if undertaken during the breeding season (March to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:46: • Human receptors including demolition and construction workers.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:49:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:51: The demolition of South Bank Wharf and jetties will have only minor, localised and temporary effects

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:52: Other impacts such as demolition and removal of existing structures and construction of the new

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:52:Best practice working methods will be adopted during demolition / excavation adjacent to the Tees

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:52:debris fall into the river channel during demolition, this would be removed as early as practicable. Task

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:62:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:62:Best practice working methods will be adopted during demolition adjacent to the Tees estuary to ensure

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:62:placed under the section of the structures being demolished to capture demolition material. Should any

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:62:debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:65: • Demolition, excavation

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:68:DEMOLITION

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:68: • Soft strip inside any buildings or structures before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:68: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:68: • Bag and remove any biological debris or damp down such material before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:72: • Demolition of the existing South Bank Wharf;

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:76: • Sufficient clear signage will be utilised to ensure that demolition and construction

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:84: • Demolition of the dilapidated wharf, three jetties downstream of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:88: Tonnes of Construction and Demolition waste generated per £1M

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:88: demolition and waste diversion (Target D)

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Gypsum (plasterboard) 17 08 02 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Inert Concrete, bricks, tiles and ceramics 17 01 07 On-site reuse 1,000

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Wood Timber materials – demolished roof/doors/window frames 17 02 01 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Metals Mixed metals – building cladding/pipework/cables 17 04 07 1,500

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Insulation Floor/Wall/Roof Insulation 17 06 04 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Plastics DPC/ Pipework / Coverings 17 02 03 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:90: Demolition Glass Glass/ Windows 17 02 02 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:97: 43110 Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:99: demolition containing hazardous components (including cables and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:101:containing coal tar Demolition 43.11

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:104: Demolition and site Hardcore, spoil, timber, Type A Subcontractor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:107: • Record ALL construction, demolition and excavation wastes – including that generated by

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:112: 11.3 Loss of Assets Due to Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:113:11.3 Loss of Assets Due to Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:113:suitable record of the structures will be prepared prior to demolition, anticipated to comprise a

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:113:confirmed in advance of demolition with RCBC and submitted to the RCBC HER.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:156:storage/distribution activities. In summary, the scheme comprises demolition, capital dredging, offshore

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:162: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:170: Demolition of As the barnacle was found in virtually all scrape samples recovered

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:183: falling into the Tees estuary during demolition / excavation adjacent to the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:183: during demolition Tees estuary to ensure that transport of debris

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:183: demolition, this would be removed as early as

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:192: supporting habitat due to prior to demolition and other construction-phase

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:192: demolition works (March to August). In the event that nests are

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:193: demolition demolished (South Bank wharf and the three Contractor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:193: demolition, anticipated to comprise a

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:194: advance of demolition with RCBC and submitted

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:197: Measures specific to demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:197: before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:197: during demolition operations. Hand held

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:197: down such material before demolition.

R-2021-0943-CD-CON LAND 943.pdf:1: PERMISSION R/2020/0684/ESM FOR DEMOLITION OF

R-2021-0943-CD-ApplicationFormRedacted.pdf:2:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2021-0943-CD-COMPLIANCE DECISION NOTICE.pdf:1: R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT QUAY

R-2021-0943-CD-COMPLIANCE DECISION NOTICE.pdf:2: R/2020/0684/ESM FOR DEMOLITION OF EXISTING REDUNDANT

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:3:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:5:11.3 Loss of assets due to demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:7: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:15: demolition and construction works, with visits scheduled according to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:21: “relevant demolition” in Authority)

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:28:Predicted construction phase impacts are linked to habitat loss from the demolition of existing

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:30:• All site operatives will be made aware of the possibility of finding bats during demolition of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:34:demolition and other construction-phase works, if undertaken during the breeding season (March to

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:46: • Human receptors including demolition and construction workers.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:49:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:51: The demolition of South Bank Wharf and jetties will have only minor, localised and temporary effects

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:52: Other impacts such as demolition and removal of existing structures and construction of the new

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:52:Best practice working methods will be adopted during demolition / excavation adjacent to the Tees

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:52:debris fall into the river channel during demolition, this would be removed as early as practicable. Task

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:62:5.16 Control Measures for Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:62:Best practice working methods will be adopted during demolition adjacent to the Tees estuary to ensure

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:62:placed under the section of the structures being demolished to capture demolition material. Should any

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:62:debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:65: • Demolition, excavation

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:68:DEMOLITION

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:68: • Soft strip inside any buildings or structures before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:68: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:68: • Bag and remove any biological debris or damp down such material before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:72: • Demolition of the existing South Bank Wharf;

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:76: • Sufficient clear signage will be utilised to ensure that demolition and construction

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:84: • Demolition of the dilapidated wharf, three jetties downstream of

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:88: Tonnes of Construction and Demolition waste generated per £1M

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:88: demolition and waste diversion (Target D)

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Gypsum (plasterboard) 17 08 02 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Inert Concrete, bricks, tiles and ceramics 17 01 07 On-site reuse 1,000

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Wood Timber materials – demolished roof/doors/window frames 17 02 01 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Metals Mixed metals – building cladding/pipework/cables 17 04 07 1,500

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Insulation Floor/Wall/Roof Insulation 17 06 04 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Plastics DPC/ Pipework / Coverings 17 02 03 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:90: Demolition Glass Glass/ Windows 17 02 02 Choose an item.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:97: 43110 Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:99: demolition containing hazardous components (including cables and

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:101:containing coal tar Demolition 43.11

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:104: Demolition and site Hardcore, spoil, timber, Type A Subcontractor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:107: • Record ALL construction, demolition and excavation wastes – including that generated by

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:112: 11.3 Loss of Assets Due to Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:113:11.3 Loss of Assets Due to Demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:113:suitable record of the structures will be prepared prior to demolition, anticipated to comprise a

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:113:confirmed in advance of demolition with RCBC and submitted to the RCBC HER.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:155: falling into the Tees estuary during demolition / excavation adjacent to the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:155: during demolition Tees estuary to ensure that transport of debris

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:155: demolition, this would be removed as early as

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:164: supporting habitat due to prior to demolition and other construction-phase

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:164: demolition works (March to August). In the event that nests are

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:165: demolition demolished (South Bank wharf and the three Contractor

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:165: demolition, anticipated to comprise a

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:166: advance of demolition with RCBC and submitted

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:169: Measures specific to demolition

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:169: before demolition.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:169: during demolition operations. Hand held

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:169: down such material before demolition.

R-2021-0943-CD-61568_01 - Covering Letter DoC 3 and 9 - 10.11.21.PDF:1:“Demolition of existing redundant quay structures, capital dredging and development of new quay and

R-2021-0397-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0397-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0397-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0397-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0397-PND-63262_Notice v2_May 2021.PDF:1:demolition and any proposed restoration of the site)

R-2021-0397-PND-63262_Notice v2_May 2021.PDF:1:Demolition is due to begin on: 1 June 2021

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:Demolition of South Bank Coke Ovens: Application for Prior Notification of

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:Demolition

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:demolition of the former South Bank Coke Oven Battery Plant, Redcar.

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:2:The Scope of the Proposed Demolition Works

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:2:The application seeks prior approval for the demolition of the South Bank Coke Oven Battery Plant. This

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:2:All demolition works shall be carried out in accordance with the BS Code of Practice for Demolition BS6187.

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:Reason for Demolition

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:Method of Demolition

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:works. Given the number of different structures, the method of demolition varies and therefore the Method

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:For robustness and ahead of pursuing a ‘prior approval’ for the demolition works, we have given

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:consideration as to whether the proposed demolition project could be considered to be EIA development.

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:“demolition works are capable of constituting a ‘project’ within the meaning of the Environmental Impact

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:authorities will need to consider whether demolition projects are likely to have significant environmental

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:that the demolition of the Coke Works could fall under paragraph 13 b) of Schedule 2 on the grounds that it

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:environment”. Whilst the development as changed by demolition (e.g. a cleared site) would not have

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:potentially have significant effects and the demolition works could therefore be considered to be Schedule 2

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:In this case we have considered whether the demolition would give rise to significant effects and note the

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:The Demolition Method Statement which has been prepared and accompanied the Prior Approval

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3: 1. Measures to ensure the safety of demolition workers and humans in the surrounding area, including

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: In addition to the mitigation set out in the Demolition Method Statement and set out above, the

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: 5. Requirement to demolish the buildings outwith the breeding bird season or if demolition to occur

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: identify an exclusion zone around any nesting birds, where demolition will not be acceptable until

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4:• Demolition traffic would be limited, particularly, in the context of existing traffic flows and therefore no

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: are likely from demolition traffic;

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4:• For the duration of the demolition works there is potential for some adverse landscape and visual effects,

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: however, given the location of the demolition works relative to visual receptors and the temporary nature

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: as a result of the proposed demolition; and

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4:• None of the buildings to be demolished are listed and the demolition site is not within a Conservation

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: demolition of the buildings. Furthermore, the development of the original buildings is likely to have

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4: removed any potential archaeological remains. Therefore the demolition works, including the removal of

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4:• The prior notification of demolition form;

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:4:• A Demolition Method Statement, prepared by Thompsons of Prudhoe, which is to be read alongside the

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:6: Appointments: • Demolition Supervisor - TBC

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:8: • Demolition hand tools (pry-bar, hammer, saw, shovel)

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:8: • Demolition specification 360o excavator machine (equipped with choice

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:8: of demolition attachments)

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:9: proximity to the structures marked for demolition.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: of demolition, the location of demolition equipment, storage, stockpile and lay-

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: demolition debris from entering and protected using a steel plates.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: During demolition works, a demolition exclusion zone will be put into place

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: exclusion zone during active demolitions will be permitted to essential persons

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:10: only. Demolition plant to person interface will be strictly controlled and will be

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:11: Working at Access to heights (for asbestos removal, soft strip, demolition works etc) will be

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: During the demolition phase of the works Thompsons will minimize dust

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: Thompsons will use water to dampen the demolition workface as works progress

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: and the arisings produced during the demolition works. Care will be taken not to

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: distance from demolition operations and will be positioned outside of the

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:14: demolition technique. High impact works will be strictly minimised. Thompsons

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:15: and dampening mechanisms in the demolition plant. Annual health surveillance

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:16: of demolition works.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:16: At certain stages on the demolition works, if at any point a temporary partial or

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:19: • Instability of structure during demolition

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:19: • Prior to the commencement of demolition works, Thompsons will appoint the services of an

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:20: The fixtures / fittings will then be processed (using demolition hand tools) into small and hand

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22:Remote Demolition of the Wilputte Quench Tower, Wilputte Battery, Simons Quench Tower & Simons

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: mechanical means, using a combination high reach demolition spec 360o excavator machine

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: by an additional demolition spec 360o excavator machines, for low-level demolition, material

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: • Following the demolition of the Wilputte Battery down to slab level, this will allow the

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22:Remote Demolition or Explosive Demolition of the Battery Bunker, Battery Chimney & Associated

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: machine or explosive demolition activities.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: contacted and informed of the proposed method of demolition.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23:Remote Demolition of the Battery Welfare Block, West Coke 440V Substation, Wilputte Substation

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: demolition spec 360o excavator machine equipped with shear / grab attachment.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23:Remote Demolition of the Triple Flare Stack & Lighting Towers

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: • Following the demolition of the Stack / Tower, both will be processed via 360° excavator

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23:Remote Demolition of the Low Level Pipebridges

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: by remote mechanical means, using a demolition spec 360o excavator machine equipped with

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:23: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:24: • Following the completion of the demolition works, the processing and removal of all arisings

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:30: DEMOLITION WORKS

R-2021-0397-PND-Decision.pdf:1:Details: PRIOR NOTIFICATION FOR DEMOLITION OF SOUTH BANK COKE OVENS

R-2021-0397-PND-Decision.pdf:1:demolition of the above premises is not required.

R-2021-0397-PND-officer report.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0397-PND-officer report.pdf:1:The application seeks prior approval for the demolition of South Bank Coke

R-2021-0397-PND-officer report.pdf:1:The application seeks prior approval for the demolition and deconstruction of

R-2021-0397-PND-officer report.pdf:2:specifically referenced as being excluded from the demolition project and the

R-2021-0397-PND-officer report.pdf:2:demolition of the Dorman Long Tower.

R-2021-0397-PND-officer report.pdf:2:regard to the demolition process. Within this a summary of the general scope

R-2021-0397-PND-officer report.pdf:2:as; following the completion of the demolition works, the processing and

R-2021-0397-PND-officer report.pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0397-PND-officer report.pdf:2:The Demolition Method Statement which has been prepared and

R-2021-0397-PND-officer report.pdf:2:1. Measures to ensure the safety of demolition workers and humans in the

R-2021-0397-PND-officer report.pdf:3:In addition to the mitigation set out in the Demolition Method Statement and

R-2021-0397-PND-officer report.pdf:3:if demolition to occur within breeding bird season, there will be a need for an

R-2021-0397-PND-officer report.pdf:3:around any nesting birds, where demolition will not be acceptable until agreed

R-2021-0397-PND-officer report.pdf:3:• Demolition traffic would be limited, particularly, in the context of existing

R-2021-0397-PND-officer report.pdf:3:demolition traffic;

R-2021-0397-PND-officer report.pdf:3:• For the duration of the demolition works there is potential for some adverse

R-2021-0397-PND-officer report.pdf:3:landscape and visual effects, however, given the location of the demolition

R-2021-0397-PND-officer report.pdf:3:proposed demolition; and

R-2021-0397-PND-officer report.pdf:3:• None of the buildings to be demolished are listed and the demolition site is

R-2021-0397-PND-officer report.pdf:3:significant cultural heritage effects arising from the demolition of the buildings.

R-2021-0397-PND-officer report.pdf:3:removed any potential archaeological remains. Therefore the demolition

R-2021-0397-PND-officer report.pdf:3:It is considered that through the demolition method statement and the

R-2021-0397-PND-officer report.pdf:3:mitigation measures that fall outside of this that the proposed demolition

R-2021-0397-PND-officer report.pdf:4:Prior Approval for demolition deals only with the method of demolition and the

R-2021-0397-PND-officer report.pdf:4:surrounded other industrial buildings and structures. While the demolition and

R-2021-0397-PND-officer report.pdf:4:impacts on the ecology from demolition of buildings of this scale in

R-2021-0397-PND-officer report.pdf:4:The proposed method of demolition and retention of the site thereafter is

R-2021-0397-PND-SBCO-ATK-SBK-ZZ-DR-C-0001_Prior Approval (002).PDF:1: TRIPLE DECOMMISSIONING/DEMOLITION

R-2021-0397-PND-SBCO-ATK-SBK-ZZ-DR-C-0001_Prior Approval (002).PDF:1: SOUTH TEES DEMOLITION

R-2021-0397-PND-SBCO-ATK-SBK-ZZ-DR-C-0001_Prior Approval (002).PDF:1: PRIOR APPROVAL DEMOLITIONS

R-2020-0598-FF-0598 nuisance.pdf:1:Proposal: RETROSPECTIVE DEMOLITION OF EXISTING GATEHOUSE;

R-2020-0598-FF-Officer report _R20200598FF.pdf:1:PROPOSAL: RETROSPECTIVE DEMOLITION OF EXISTING

R-2020-0598-FF-Officer report _R20200598FF.pdf:1:Permission is sought retrospectively for the demolition of existing gatehouse;

R-2020-0598-FF-0598 con land.pdf:1:Proposal: RETROSPECTIVE DEMOLITION OF EXISTING GATEHOUSE;

R-2020-0598-FF-R20200598FF RBC Planning Response.pdf:1:retrospective demolition of the existing gatehouse and redevelopment of site to provide new single

R-2020-0598-FF-email.pdf:8:outriggers, crossing with vehicles, hand digging or machine digging, ditching, demolition, drainage

R-2020-0598-FF-Decision Notice_R20200598FF.pdf:1:Details: RETROSPECTIVE DEMOLITION OF EXISTING GATEHOUSE;

R-2020-0598-FF-Decision Notice_R20200598FF.pdf:3:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0598-FF-Application Form(2).pdf:5:design, demolition and construction - Recommendations'.

R-2020-0598-FF-Application Form(2).pdf:7: floorspace use or demolition (including change of following development

R-2020-0598-FF-Application Form(2).pdf:7: class Type of use applicable of use or demolition changes of use)

R-2020-0598-FF-Application Form(2).pdf:8:Recycling facilities construction, demolition

R-2020-0598-FF-Application Form(2).pdf:8: Construction, demolition and excavation

R-2020-0598-FF-Northern Gas.pdf:6:  Demolition works within 15m of low/medium pressure mains and 150m of intermediate and

R-2022-0411-CD-ApplicationFormRedacted.pdf:4: Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry

R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0411-CD-Decision Notice.pdf:1: PLANNING PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0411-CD-Decision Notice.pdf:2: PLANNING PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0411-CD-61586 Condition 18 (SeAH) covering letter.pdf:1:Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0411-CD-Officer report.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0411-CD-Officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:6: • Section 60 and Section 61 of the CoPA provide the main legislation regarding demolition and

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:11: The measurement period coincided with the start of the enabling works and demolition related

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:11: To assess the potential for likely significant effects of noise from demolition and construction works

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:12: The demolition and construction programme is anticipated to be undertaken over the course of

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:12: scheduling of construction and demolition works, some assumptions have been made to account

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:13: proposed construction and demolition works is predicted to be well below levels at which there is a

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:16: • the use of inherently quieter construction and demolition methods where appropriate,

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:16: • informing all nearby noise-sensitive receptors in advance of any construction or demolition

R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf:16: • appropriate phasing of construction and demolition works.

R-2021-1077-CD-ApplicationFormRedacted.pdf:2:Outline planning application for demolition of existing structures on site and the development of p to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-1077-CD-EA_R20211077CD_OFFICIAL_030322.pdf:1:DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-1077-CD-21156 FHA v1.PDF:15: • Demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-1077-CD-Discharge Condition 7 Cover Letter.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf:10:Prairie’. This report was submitted as part of the 2019 planning application for the ‘demolition of structures and

R-2020-0318-FFM-Decision Notice.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0318-FFM-Neighbour comments - Titan Trailers(1).pdf:1:Our site adjoins onto the old Steelworks railway sidings along our western boundary, their demolition forms part of

R-2020-0318-FFM-Neighbour comments - Titan Trailers(1).pdf:1:security and condition of our site during these works? Not only during demolition but thereafter once the works will

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:43: demolition rubble.

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:90: ‐ demolition rubble

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:93: - demolition rubble

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0318-FFM-Phase II ESA.PDF:13: Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

R-2020-0318-FFM-Phase II ESA.PDF:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

R-2020-0318-FFM-Phase II ESA.PDF:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

R-2020-0318-FFM-Phase II ESA.PDF:18: sandy and or gravelly clay with demolition materials within the matrix.

R-2020-0318-FFM-Phase II ESA.PDF:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

R-2020-0318-FFM-Phase II ESA.PDF:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0318-FFM-officer report.pdf:3: during demolition but thereafter once the works will be complete.

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:10: Gravel and cobbles include brick (including refractory), concrete and other demolition materials,

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:10: comprising a sandy and or gravelly clay with demolition materials within the matrix.

R-2020-0318-FFM-ROA and Remediation Strategy.PDF:31: demolition arising, crushed concrete or imported fill.

R-2021-0924-CD-Decision Notice.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0924-CD-Decision Notice.pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0924-CD-Decision Notice 0357.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0924-CD-Decision Notice 0357.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0924-CD-Officer report.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0924-CD-Officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0924-CD-EA_R_2021_0924_CD_OFFICIAL_221221.pdf:1:DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0924-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2021-0924-CD-Condition 9 Discharge Cover Letter.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0944-AD-Decision Notice.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0729-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0729-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0729-CD-COMPLIANCE OFFICER REPORT.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0729-CD-COMPLIANCE OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0729-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2021-0729-CD-South Bank Condition 6 Covering Letter 19.08.21.pdf:1: “Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0729-CD-COMPLIANCE DECISION NOTICE.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0729-CD-COMPLIANCE DECISION NOTICE.pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2021-0729-CD-365770 R_2021_0729_CD - Discharge of Condition 6 for outline permission R_2020_0357_OOM, South Industrial Zone, REdcar .pdf:1:R/2020/0357/OOM for demolition of existing structures on site and the development of up to

R-2021-0905-CD-0905.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0905-CD-0905.pdf:2: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF EXISTING

R-2021-0905-CD-ApplicationFormRedacted.pdf:2:Outline planning application for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2)

R-2021-0905-CD-Teesworks Discharge of Conditions 32 Cover Letter(2).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0905-CD-Officer Report.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF

R-2021-0905-CD-Officer Report.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2021-0905-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0905-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:16:Construction and Demolition Activity’ (2003) will be applied to the construction areas within the

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:18: • demolition;

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:18:Code of practice for noise control on construction and demolition sites:

R-2020-0799-CD-Decision Notice R 2020 0318.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:3: 3.4.3 Demolition and crushing ……………………………………………………………………………………………………… 11

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:11:Referring to visible dust, it is imperative to prevent statutory nuisance arising from the demolition,

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:12:3.4.3 Demolition and crushing (Pile head)

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:12: • During demolition activities, water will be used for the suppression of dust.

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:12: • Demolition material will be segregated and stockpiled on site and removed regularly to avoid large

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:12:Where there is evidence of airborne dust from the building construction/demolition activities the site, the

R-2022-0746-CD-SeAH Monopile Facility_Construction Environmental Management Plan Rev B.pdf:30:IAQM Guidance on the Assessment of Dust from Construction and Demolition 2014

R-2022-0746-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0746-CD-406263 response.pdf:1:R/2020/0357/OOM For Demolition Of Existing Structures On Site And The Development Of Up To

R-2022-0746-CD-Decision Notice (4).pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0746-CD-Decision Notice (4).pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0746-CD-0746 Off rep.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0746-CD-0746 Off rep.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2022-0746-CD-0746 Dec.pdf:1: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF EXISTING

R-2022-0746-CD-0746 Dec.pdf:2: PLANNING PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0746-CD-61586 Covering Letter - Discharge of Condition 5 08.09.2022.PDF:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:10:present in the southern section of the site, these assets are undergoing demolition at the time of writing.

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:13:possible below the SBCO structures themselves until demolition works are complete. Arcadis considers

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:23: demolition arising, crushed concrete or imported fill.

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:10:has been submitted for “demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf:11:Planning has also been granted for “Demolition of structures and engineering operations associated with

R-2022-0096-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0096-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0096-CD-ApplicationFormRedacted.pdf:4: Outline planning application for the demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:10:has been submitted for “demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf:11:Planning has also been granted for “Demolition of structures and engineering operations associated with

R-2022-0096-CD-61586-01 Cover Letter.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0096-CD-con land.pdf:1: APPROVAL FOR THE DEMOLITION OF EXISTING

R-2022-0096-CD-COMPLIANCE OFFICER REPORT.pdf:1: APPROVAL FOR THE DEMOLITION OF

R-2022-0096-CD-COMPLIANCE OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0096-CD-COMPLIANCE DECISION NOTICE.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0096-CD-COMPLIANCE DECISION NOTICE.pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0237-CD-Decision Notice R 2021 0166 FFM.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:10: brick, concrete and other demolition materials, slag was not the dominant constituent although often

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:22:associated with the demolition of the former substation, it is recommended that the contamination is removed.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:22:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:18: demolition arising, crushed concrete or imported fill.

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:11:has been submitted for “demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf:11:Planning has also been granted for “Demolition of structures and engineering operations associated with

R-2021-0713-CD-COMPLIANCE OFFICER REPORT.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON

R-2021-0713-CD-COMPLIANCE OFFICER REPORT.pdf:1:The planning permission sought consent for demolition of existing structures on site

R-2021-0713-CD-Contam Land.pdf:1: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND

R-2021-0713-CD-Cover letter.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0713-CD-COMPLIANCE DECISION NOTICE.pdf:1: APPLICATION R/2020/0357/OOM OF PHASE 2 FOR DEMOLITION OF

R-2021-0713-CD-COMPLIANCE DECISION NOTICE.pdf:2: APPLICATION R/2020/0357/OOM OF PHASE 2 FOR DEMOLITION OF

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:10:has been submitted for “demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf:11:Planning has also been granted for “Demolition of structures and engineering operations associated with

R-2021-0713-CD-ApplicationFormRedacted.pdf:2:OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:1:Application for Prior Notification - Demolition of Buildings and Structures at

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:1:demolition of various buildings and structures at the former Redcar Steel Works site (referred to as the

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:The Scope of the Proposed Demolition Works

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:The application seeks prior approval for the demolition at the Foundry site. This includes the following:

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:All demolition works shall be carried out in accordance with the BS Code of Practice for Demolition BS6187.

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:Reason for Demolition

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:Method of Demolition

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0608-PND-63262 Teesworks - Foundry demolition covering letter.pdf:2:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0608-PND-Officer Report 0608.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0608-PND-Officer Report 0608.pdf:1:The application seeks prior approval for the demolition of various buildings

R-2021-0608-PND-Officer Report 0608.pdf:2:regard to the demolition process. Within this a summary of the general scope

R-2021-0608-PND-Officer Report 0608.pdf:2:as; Following the completion of the demolition works, the processing and

R-2021-0608-PND-Officer Report 0608.pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0608-PND-Officer Report 0608.pdf:3:nature due to the project being for demolition, while any impacts are also only

R-2021-0608-PND-Officer Report 0608.pdf:3:It is considered that through the demolition method statement and the

R-2021-0608-PND-Officer Report 0608.pdf:3:mitigation measures that the proposed demolition works would not result in

R-2021-0608-PND-Officer Report 0608.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2021-0608-PND-Officer Report 0608.pdf:3:surrounded other industrial buildings and structures. While the demolition and

R-2021-0608-PND-Officer Report 0608.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2021-0608-PND-Decision Notice R 2021 0608 PND.pdf:1:Description: PRIOR NOTIFICATION FOR DEMOLITION OF OBSOLETE COKE

R-2021-0608-PND-hra.pdf:1: Demolitions

R-2021-0608-PND-hra.pdf:2: 7. HRA Stage 1 screening assessment for Foundry Site demolitions project……………………… 6

R-2021-0608-PND-hra.pdf:2: 8. HRA Stage 2 Appropriate Assessment for Foundry Site demolitions project………………. 10

R-2021-0608-PND-hra.pdf:2: Figure 2. Distance from demolition site to main N2K roosts. ……………………………………… 13

R-2021-0608-PND-hra.pdf:3:behalf of Teesworks to support a ‘prior approval’ planning applications for demolition works

R-2021-0608-PND-hra.pdf:3:2.1 The project is named the Teesworks Foundry Site demolitions (hereafter demolitions

R-2021-0608-PND-hra.pdf:3:project). The demolitions project works are included in the RCBC (2018) South Tees Area

R-2021-0608-PND-hra.pdf:3:3.1 The demolitions project involves the demolition of defunct industrial structures on

R-2021-0608-PND-hra.pdf:6:7. HRA Stage 1 screening assessment for Foundry Site demolitions project

R-2021-0608-PND-hra.pdf:6:The demolitions project is not necessary for the conservation management of any European

R-2021-0608-PND-hra.pdf:6:the closest point of the demolitions project site to the closest point of the European Site.

R-2021-0608-PND-hra.pdf:6:7.3 Two European sites are within 10km of the proposed demolitions project site:

R-2021-0608-PND-hra.pdf:7: the SPA includes a marine component) and they are adjacent to the demolitions project site.

R-2021-0608-PND-hra.pdf:7: designated for the same suite of species. The demolitions project has the potential to cause

R-2021-0608-PND-hra.pdf:9:demolitions project and their pathway to the European Sites (referred to as N2K in the

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Direct Destruction or degradation of N

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Destruction or degradation of Y

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Demolition noise (including Y

R-2021-0608-PND-hra.pdf:9:demolition noise

R-2021-0608-PND-hra.pdf:9:Demolition works creating Indirect Ground and air vibrations Y

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Various polluting materials Y

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Tall infrastructure causing a N

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Airborne particulates or Y

R-2021-0608-PND-hra.pdf:9:Demolition works leading to Indirect Pollution of N2K habitats and Y

R-2021-0608-PND-hra.pdf:10:Changes to flight lines or sight lines The demolitions project will demolish structures

R-2021-0608-PND-hra.pdf:10:8. HRA Stage 2 Appropriate Assessment for Foundry Site demolitions project

R-2021-0608-PND-hra.pdf:10: demolitions project site is assessed as not being

R-2021-0608-PND-hra.pdf:10:demolition noise the demolitions project site (Figure 2).

R-2021-0608-PND-hra.pdf:10: linked to demolition would not lead to AEoI, due to

R-2021-0608-PND-hra.pdf:11:N2K species by in the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11: the selection of demolition technique. High impact

R-2021-0608-PND-hra.pdf:11:N2K sites by in the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11:Contamination of The demolition process proposes to use water No AEoI

R-2021-0608-PND-hra.pdf:11: demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11: During the demolition phase of the works Thompsons

R-2021-0608-PND-hra.pdf:11: demolition workface as works progress and the

R-2021-0608-PND-hra.pdf:11: arisings produced during the demolition works. Care

R-2021-0608-PND-hra.pdf:12: proposed demolition operations will, likewise, filter

R-2021-0608-PND-hra.pdf:12: The demolition process proposes to use water

R-2021-0608-PND-hra.pdf:12: the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:12: using sandbags to prevent demolition debris from

R-2021-0608-PND-hra.pdf:12:N2K species by Sands) is 0.6km from the demolition site, although

R-2021-0608-PND-hra.pdf:12: the proposed demolition site (Figure 2).

R-2021-0608-PND-hra.pdf:12: demolition site, likely disturbance is assessed as nil.

R-2021-0608-PND-hra.pdf:12: nested within the demolitions project site. This

R-2021-0608-PND-hra.pdf:13:Figure 2. Distance from demolition site to main N2K roosts.

R-2021-0608-PND-hra.pdf:13:from the Foundry Site demolitions project on the T&CC European Sites.

R-2021-0608-PND-hra.pdf:14:within the whole Teesworks zone will not lead to AEoI, this demolitions project HRA

R-2021-0608-PND-hra.pdf:14:10.1 The proposed Foundry Site demolitions project will not cause adverse effect to the

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:1: Demolitions

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3: • Demolition works are proposed in the area referred to as the Foundry Site.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3: determining whether the demolition works constitute EIA development for Ecology.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3:behalf of Teesworks to support a ‘prior approval’ planning applications for demolition works

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3:The project involves the demolition of defunct industrial structures on previously developed

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:4:by the proposed demolition works. The following VERs have been considered in this

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:8: During the demolition phase of the works Thompsons will minimize dust

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:8: present; Thompsons will use water to dampen the demolition workface as works

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9: progress and the arisings produced during the demolition works. Care will be

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9:contamination demolition debris from entering and protected using a steel plates.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9: demolition technique. High impact works will be strictly minimised.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:10: Biodiversity Strategy. suitability of demolitions sites

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:11: • Demolition works are proposed in the Teesworks area referred to as the Foundry

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:11: determining whether the demolition works constitute EIA development for Ecology.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:13:There are two nationally designated sites within a 5km radius of the proposed demolition

R-2021-0608-PND-363937 - R_2021_0608_PND Prior Notification for demolition of structures at Former Redcar Steel Works Site (Teesworks), Redcar.pdf:1:Planning consultation: Prior Notification for demolition of obsolete coke ovens & battery;

R-2021-0608-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-SITE NOTICE.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0608-PND-SITE NOTICE.pdf:1:Demolition is due to begin on: 6 August 2021

R-2021-0608-PND-19931629_1.pdf:6: Appointments: • Demolition Supervisor - TBC

R-2021-0608-PND-19931629_1.pdf:8: • Demolition hand tools (pry-bar, hammer, saw, shovel)

R-2021-0608-PND-19931629_1.pdf:8: • Demolition specification 360o excavator machine (equipped with choice

R-2021-0608-PND-19931629_1.pdf:8: of demolition attachments)

R-2021-0608-PND-19931629_1.pdf:9: proximity to the structures marked for demolition.

R-2021-0608-PND-19931629_1.pdf:10: of demolition, the location of demolition equipment, storage, stockpile and lay-

R-2021-0608-PND-19931629_1.pdf:10: demolition debris from entering and protected using a steel plates.

R-2021-0608-PND-19931629_1.pdf:10: During demolition works, a demolition exclusion zone will be put into place

R-2021-0608-PND-19931629_1.pdf:10: exclusion zone during active demolitions will be permitted to essential persons

R-2021-0608-PND-19931629_1.pdf:10: only. Demolition plant to person interface will be strictly controlled and will be

R-2021-0608-PND-19931629_1.pdf:11: Working at Access to heights (for asbestos removal, soft strip, demolition works etc) will be

R-2021-0608-PND-19931629_1.pdf:14: During the demolition phase of the works Thompsons will minimize dust

R-2021-0608-PND-19931629_1.pdf:14: Thompsons will use water to dampen the demolition workface as works progress

R-2021-0608-PND-19931629_1.pdf:14: and the arisings produced during the demolition works. Care will be taken not to

R-2021-0608-PND-19931629_1.pdf:14: distance from demolition operations and will be positioned outside of the

R-2021-0608-PND-19931629_1.pdf:15: demolition technique. High impact works will be strictly minimised. Thompsons

R-2021-0608-PND-19931629_1.pdf:15: and dampening mechanisms in the demolition plant. Annual health surveillance

R-2021-0608-PND-19931629_1.pdf:16: of demolition works.

R-2021-0608-PND-19931629_1.pdf:16: At certain stages on the demolition works, if at any point a temporary partial or

R-2021-0608-PND-19931629_1.pdf:19: • Instability of structure during demolition

R-2021-0608-PND-19931629_1.pdf:20: • Prior to the commencement of demolition works, Thompsons will appoint the services of an

R-2021-0608-PND-19931629_1.pdf:21: The fixtures / fittings will then be processed (using demolition hand tools) into small and hand

R-2021-0608-PND-19931629_1.pdf:22:Remote Demolition of the Redcar Coke Ovens & Battery, Redcar HFO Tanks, Redcar Power Station

R-2021-0608-PND-19931629_1.pdf:22: will be demolished by remote mechanical means, using a combination of high reach demolition

R-2021-0608-PND-19931629_1.pdf:22: The high reach and 100te machines will be assisted by an additional demolition spec 360o

R-2021-0608-PND-19931629_1.pdf:22: excavator machines, for low-level demolition, material processing, sorting and segregation.

R-2021-0608-PND-19931629_1.pdf:22: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0608-PND-19931629_1.pdf:22: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0608-PND-19931629_1.pdf:22: • Following the completion of the demolition works, the processing and removal of all arisings

R-2021-0608-PND-19931629_1.pdf:28: DEMOLITION WORKS

R-2021-0608-PND-19931630_1.pdf:1: DECOMMISSIONING/DEMOLITION

R-2021-0608-PND-19931630_1.pdf:1: PRIOR APPROVAL DEMOLITIONS

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf:1:SOUTH BANK QUAY - PHASE 2 WORKS COMPRISING OF DEMOLITION, CAPITAL

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:1: • demolition of existing infrastructure including the dilapidated South Bank wharf, 3

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3:22. Demolition works are assessed to cause localised disturbance of the bed, of low magnitude and

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:1:6. The proposed scheme will comprise the following works: demolition, capital dredging, offshore

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:13: 1. Demolition of the existing wharf (approx. 750 m length), three jetties downstream the wharf, live

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:1:7. The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works:

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works are limited to the dilapidated wharf, three jetties downstream of the wharf (with the

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:8:anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA-2020-00507.pdf:1: used. Timings have been provided for all activities except for demolition, as this is the first

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:1: storage/distribution activities. The proposed scheme comprises demolition of the existing

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:3:3.3 Demolition 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:3.3 Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:comprise the demolition of:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:has confirmed that demolition of such infrastructure can commence without planning permission, and works

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27: Demolition - - 12 months

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27: • Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:namely demolition of existing infrastructure and construction of the proposed quay require planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:148: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:200: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:271: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:334: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:344: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:345: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:351: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:353: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:354: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:367: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:385: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:388: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:390: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393:Measures specific to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:395: Demolition 3 52

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:523: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:525: station and demolition of substation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:555: dredging, excavation and demolition works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:and demolition waste is subjected to material recovery.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:demolition waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:11:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: have had prior approval for demolition (see below).

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:comprise the demolition of:

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: demolition can proceed without planning permission).

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:28:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition by competent specialists and disposed as hazardous waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:“Outline planning application for demolition of existing structures on site and the development of up to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:79:Thank you for your enquiry on the demolition of an existing timber wharf and two

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: • demolition of the existing timber wharf and jetties,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:85:please find the attached figures. In summary, the proposed scheme comprises demolition of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of various buildings and structures on the riverbank and hinterland.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:257:It is understood that demolition of some of the existing above ground infrastructure on site (namely the heavy

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:285:The proposed scheme will include demolition of some existing on site structures (with others removed in

MLA_2020_00507-Marine Coordinate Schedules-13.pdf:2:Demolition area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.3 Demolition 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:3.3 Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:comprise the demolition of:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:has confirmed that demolition of such infrastructure can commence without planning permission, and works

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: Demolition - - 12 months

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: • Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:namely demolition of existing infrastructure and construction of the proposed quay require planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:148: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:200: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:271: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:334: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:344: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:345: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:351: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:353: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:354: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:367: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:385: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:388: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:390: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393:Measures specific to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395: Demolition 3 52

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:523: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525: station and demolition of substation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: dredging, excavation and demolition works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:133: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139:The proposed development will include the demolition of the existing wharf and the construction of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:144: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:145:Demolition of the existing infrastructure will last for approximately 56 weeks. On completion, the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:271:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:272: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:280: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:282: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: demolition process prior to construction of the quay.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Marine demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:different for each of the four categories of construction activities outlined by the IAQM (demolition,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: Demolition metal cladding or timber)

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities <10m above

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities 10 - 20m • Demolition activities >20m above

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition during wetter months

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:Table A18.6 Risk of dust impacts - demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350: • demolition of the existing infrastructure;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:384:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: up using a long reach excavator with hydraulic demolition attachments, working from the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: the demolition may include cutting sections of the deck and lifting them onto the land for

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: into the Tees is minimised. Should any debris fall into the river channel during demolition,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: boat. As with the concrete deck, best practice demolition techniques would be adopted to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386: during the demolition works but these are only expected to be localised to the working area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00507-APPLICATION-FORM.pdf:2:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00507-APPLICATION-FORM.pdf:10:Demolition area

MLA_2020_00507-APPLICATION-FORM.pdf:11:Demolition of Demolition area Other removals

MLA_2020_00507-APPLICATION-FORM.pdf:15:Demolition area - Demolition of existing infrastructure

MLA_2020_00507-APPLICATION-FORM.pdf:15:Demolition of existing infrastructure

MLA_2020_00507-APPLICATION-FORM.pdf:15:A programme of demolition works is required in advance of construction works

MLA_2020_00507-APPLICATION-FORM.pdf:16:The proposed demolition methodology is detailed in Section 3.3 of the EIA Report.

MLA_2020_00507-APPLICATION-FORM.pdf:16:However, in summary it is envisaged that demolition would require the use of both land

MLA_2020_00507-APPLICATION-FORM.pdf:16:either broken up using a long reach excavator with hydraulic demolition attachments,

MLA_2020_00507-APPLICATION-FORM.pdf:16:safety/workboat). Alternatively, the demolition may include cutting sections of the deck

MLA_2020_00507-APPLICATION-FORM.pdf:16:Demolition works are anticipated to take approximately 12 months for Phase 1 and 2

MLA_2020_00507-APPLICATION-FORM.pdf:16:combined. Should Phase 2 be implemented separately to Phase 1, demolition for Phase

MLA_2020_00507-APPLICATION-FORM.pdf:16:undertaken 24 hours a day, seven days a week. The specific months when demolition is

MLA_2020_00507-Licence Document (Marine)-14.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Site 2 - Demolition area

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Site location Demolition area.

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Activity 2.1 - Demolition of existing infrastructure

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Activity location Demolition area, see coordinate schedule 2.

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Description A programme of demolition works is required in advance

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Methodology Demolition will require the use of both land and marine

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: be broken up using excavators with hydraulic demolition

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: and a safety boat). Alternatively, the demolition may

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Programme of works Demolition works to take approximately 12 months for

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: separately to Phase 1, demolition for Phase 2 is

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: anticipated to take approximately eight months. Demolition

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: works may take place alongside phase 1 demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:3:3.3 Demolition 7

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:3.3 Demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:comprise the demolition of:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:has confirmed that demolition of such infrastructure can commence without planning permission, and works

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:17: STRUCTURES FOR DEMOLITION

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:17: STRUCTURES FOR DEMOLITION

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27: Demolition - - 12 months

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27:3.11 Summary of plant to be used during demolition and construction

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27: • Demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:namely demolition of existing infrastructure and construction of the proposed quay require planning

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:6.5.1 Demolition of the existing wharf and jetties

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:sedimentary regime arising from the demolition works is very low.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:148: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167: (demolition of derelict structures and rock blanket)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:200: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:9.5.1.1 Demolition of existing structures

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:271: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:334: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:344: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:345: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:351: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:353: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:354: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:367: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:373: • Demolition of the existing South Bank Wharf;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:383: Guidance on the Assessment of Dust from Demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:385: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:388: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:390: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: Demolition Earthworks Construction Trackout

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: Demolition Earthworks Construction Trackout

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393:Measures specific to demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Soft strip inside any buildings or structures before demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:395: Demolition 3 52

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:492: Outline planning application for demolition of existing structures on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:497: Demolition of structures and engineering operations associated with

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:523: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:525: station and demolition of substation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:555: dredging, excavation and demolition works.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:561: Outline planning application for demolition of existing structures on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:Effects on estuarine processes due to demolition activities

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:5:Demolition of existing timber wharf and jetties

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:2:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf:1:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:vessels to be used during demolition and construction) and the construction work in the intertidal could

R-2020-0684-ESM-Response from applicant.PDF:1:Ports noted that, given the overlapping nature of the developments and the phased approach to demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:5:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: Demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: demolition process prior to construction of the quay.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Marine demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:10: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1.1 Demolition of existing structures

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

R-2020-0684-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

R-2020-0684-ESM-2020 12 17 South Bank Wharf 1 RecNOnDet .pdf:1:A19/A66/A174/A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:3: Outline planning application for demolition of existing structures on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:8: Demolition of structures and engineering operations associated with

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:17:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

R-2020-0684-ESM-DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0684-ESM-DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.3 Demolition 7

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:18:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

R-2020-0684-ESM-ApplicationFormRedacted.pdf:2:Demolition of existing redundant quay structures, capital dredging and development of new quay and associated works (Phase 1).

R-2020-0684-ESM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:1:Subject: Ref Appns R/2020/0684/ESM & R/2020/0685/ESM Phases 1 & 2 (resp) Demolition of old

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:3:A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:7:including Environmental Statements for the demolition of existing redundant quay structures, capital dredging and

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:10: • Demolition of the existing wharf, jetties and other minor infrastructure;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:19:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: phased approach to demolition and construction, please accept the comments below to be applicable

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:Estate. Prior to any proposed demolition works commencing within the vicinity of hazardous cargo

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:of the demolition and construction. It is considered essential that a scheme of maintenance works for

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:infrastructure) to the proposed demolition and development of a new quay at South Bank, then this

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:1: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:2: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:and demolition waste is subjected to material recovery.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:demolition waste.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:10:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: have had prior approval for demolition (see below).

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:comprise the demolition of:

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: demolition can proceed without planning permission).

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:27:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition by competent specialists and disposed as hazardous waste.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:6: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:10:“Noise from construction and demolition sites should not exceed the level at which conversation in the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:12: • Demolition of the existing South Bank Wharf;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:13: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

R-2020-0684-ESM-EP CL.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:1: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:namely demolition of existing infrastructure and construction of the proposed quay require planning

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:4:and berth pocket as well as material to be generated from proposed demolition activities) have been

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:3: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9:The proposed development will include the demolition of the existing wharf and the construction of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:14: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:15:Demolition of the existing infrastructure will last for approximately 56 weeks. On completion, the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:7:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:9:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

R-2020-0684-ESM-Officer Report 0684.pdf:1:PROPOSAL: DEMOLITION OF EXISTING REDUNDANT

R-2020-0684-ESM-Officer Report 0684.pdf:1:Permission is sought for the demolition of existing redundant quay structures,

R-2020-0684-ESM-Officer Report 0684.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and

R-2020-0684-ESM-Officer Report 0684.pdf:3:R/2020/0357/ESM OUTLINE PLANNING APPLICATION FOR DEMOLITION

R-2020-0684-ESM-Officer Report 0684.pdf:11:recording before demolition of any early (20th century ?) structures on site

R-2020-0684-ESM-Officer Report 0684.pdf:14:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0684-ESM-Officer Report 0684.pdf:14:incorporated during the demolition and construction phase.

R-2020-0684-ESM-Officer Report 0684.pdf:14:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0684-ESM-Officer Report 0684.pdf:15:The proposed development can be broadly summarised as the demolition,

R-2020-0684-ESM-Officer Report 0684.pdf:18: Demolition of the existing wharf and jetties

R-2020-0684-ESM-Officer Report 0684.pdf:29:due to demolition of existing structures and dredging, effects of increased

R-2020-0684-ESM-Officer Report 0684.pdf:30:Demolition of existing structures including the wharf and jetties has the

R-2020-0684-ESM-Officer Report 0684.pdf:32:including the demolition of existing structures have the potential to result in

R-2020-0684-ESM-Officer Report 0684.pdf:37:the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0684-ESM-Officer Report 0684.pdf:42:supporting habitat due to dredging / excavation and demolition works, impacts

R-2020-0684-ESM-Officer Report 0684.pdf:42:With regard to loss of supporting habitat during dredging and demolition works

R-2020-0684-ESM-Officer Report 0684.pdf:42:The ES states that the area which is to be subject to demolition and

R-2020-0684-ESM-Officer Report 0684.pdf:44:undertaken prior to any demolition works taking place. It is considered that

R-2020-0684-ESM-Officer Report 0684.pdf:59:The proposed development will result in the demolition of the dilapidated

R-2020-0684-ESM-Officer Report 0684.pdf:59:utilities as part of the demolition process along with the removal of the

R-2020-0684-ESM-Officer Report 0684.pdf:60:With regard to the demolition and removal of the dilapidated remains of the

R-2020-0684-ESM-Officer Report 0684.pdf:60:footage of the wharf and jetties prior to their demolition. This is to then be

R-2020-0684-ESM-Officer Report 0684.pdf:61:photographic recording before demolition of any early 20th century structures

R-2020-0684-ESM-Officer Report 0684.pdf:63: Demolition of the existing South Bank Wharf;

R-2020-0684-ESM-Officer Report 0684.pdf:67: Dust emissions generated by demolition, excavation, construction and

R-2020-0684-ESM-Officer Report 0684.pdf:69:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0684-ESM-Officer Report 0684.pdf:69:incorporated during the demolition and construction phase.

R-2020-0684-ESM-Officer Report 0684.pdf:69:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0684-ESM-Officer Report 0684.pdf:79:The proposed development will also involve demolition of existing structures,

R-2020-0684-ESM-Officer Report 0684.pdf:83:during demolition, quay construction, excavation and dredging phases.

R-2020-0684-ESM-Officer Report 0684.pdf:96:The application for demolition of existing redundant quay structures, capital

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:3: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:4:support vessels required during demolition and construction). Construction activity will be focused on the

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1:different for each of the four categories of construction activities outlined by the IAQM (demolition,

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: Demolition metal cladding or timber)

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities <10m above

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities 10 - 20m • Demolition activities >20m above

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition during wetter months

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:4:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:4:Table A18.6 Risk of dust impacts - demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:7: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:13: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26: (demolition of derelict structures and rock blanket)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: dredging, excavation and demolition works.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: • Sand and shingle • Water quality reductions from demolition and dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:11: Outline planning application for demolition of existing structures on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:16: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:18: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:19: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:20: • Airborne noise disturbance to waterbirds due to demolition and construction works.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:Effects on estuarine processes due to demolition activities

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:23:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26: • Airborne noise disturbance to birds during demolition, construction and operation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:Airborne noise disturbance to birds during construction (including demolition) and operation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:birds that may otherwise be affected will have been displaced from the site during demolition of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:30:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:31:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:33:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8: • demolition of the existing infrastructure;

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:1:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: up using a long reach excavator with hydraulic demolition attachments, working from the

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: the demolition may include cutting sections of the deck and lifting them onto the land for

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: into the Tees is minimised. Should any debris fall into the river channel during demolition,

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: boat. As with the concrete deck, best practice demolition techniques would be adopted to

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3: during the demolition works but these are only expected to be localised to the working area

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:2: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:3: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4: station and demolition of substation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4:including ensuring debris from demolition activities is captured when working close to water and removed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:8:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:12: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:6:Thank you for your enquiry on the demolition of an existing timber wharf and two

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:7: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:8: • demolition of the existing timber wharf and jetties,

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:12:please find the attached figures. In summary, the proposed scheme comprises demolition of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:2: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:15: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:30:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:33:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:otherwise be affected will have been displaced from the site during demolition of existing features and

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of various buildings and structures on the riverbank and hinterland.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:11:It is understood that demolition of some of the existing above ground infrastructure on site (namely the heavy

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:39:The proposed scheme will include demolition of some existing on site structures (with others removed in

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:5: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: prior approval from RCBC for the demolition of the majority of existing buildings within the

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: landward part of the proposed scheme footprint and as such the demolition of this

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24:5.14 Predicted construction phase impacts are linked to habitat loss from the demolition of existing

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: and it is recommended that a suitable record of the structures be prepared prior to demolition,

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: suitability of this record will be confirmed in advance of demolition being undertaken with

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30:5.65 Other impacts such as demolition and removal of existing structures and construction of the

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:32:6.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:32: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and other minor infrastructure

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:3.3 Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:comprise the demolition of:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:Although the demolition of the above infrastructure is proposed as enabling works to be undertaken in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:has confirmed that demolition of such infrastructure can commence without planning permission, and works

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:to demolish such infrastructure has started. As a result, there is no requirement for the demolition of that

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition of this building has been incorporated into the landside EIA and associated planning application

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:commencing. The assumed approach to demolition of these assets is detailed below.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:The demolition of the substation will be undertaken using land-based plant. The building materials are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted in advance of demolition commencing so that works could be undertaken safely.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:11:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: Demolition - - 12 months

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:3.11 Summary of plant to be used during demolition and construction

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: • Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:In addition to the above, best practice working methods would be adopted during demolition / excavation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:6: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:7: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:13: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:15: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:16: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

R-2020-0684-ESM-cil_questions phase 1.pdf:1: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2020-0684-ESM-cil_questions phase 1.pdf:4: demolition (square metres) ancillary buildings) (square metres)

R-2020-0684-ESM-cil_questions phase 1.pdf:5:c) Does the development proposal include the retention, demolition or partial demolition of any whole buildings which people do not

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:1:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:23:although the proposed demolition activities would take place in the marine environment, these would be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:The proposed dredging and other underwater activities (namely demolition and removal of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:6.5.1 Demolition of the existing wharf and jetties

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:sedimentary regime arising from the demolition works is very low.

R-2020-0684-ESM-PN 0684.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0684-ESM-PN 0684.pdf:2:soiling impacts during the construction phase as ‘high risk’ for demolition and

R-2020-0684-ESM-PN 0684.pdf:2:during the demolition and construction phase.

R-2020-0684-ESM-PN 0684.pdf:2:Prior to commencement of construction/demolition, a CEMP shall be submitted to

R-2020-0684-ESM-336521 R_2020_0684_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 1.pdf:1:Planning consultation: Demolition of existing redundant quay structures, capital dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6: Guidance on the Assessment of Dust from Demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6:2) Separately for demolition, earthworks, construction and trackout:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:8: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:10: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:11: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:construction activities has been categorised as large for demolition, earthworks and construction and small

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:13: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:15:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16:Measures specific to demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Soft strip inside any buildings or structures before demolition.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Bag and remove any biological debris or damp down such material before demolition.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18: Demolition 3 52

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

R-2021-0405-FFM-63262_01 - Application Form.PDF:5:design, demolition and construction - Recommendations'.

R-2021-0405-FFM-63262_01 - Application Form.PDF:7: floorspace use or demolition (including change of following development

R-2021-0405-FFM-63262_01 - Application Form.PDF:7: class applicable of use or demolition changes of use)

R-2021-0405-FFM-63262_01 - Application Form.PDF:8:Recycling facilities construction, demolition

R-2021-0405-FFM-63262_01 - Application Form.PDF:8: Construction, demolition and excavation

R-2021-0405-FFM-DECISION NOTICE.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0405-FFM-OFFICER REPORT.pdf:3:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:5:• That don’t require major demolition.

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:not required for the demolition of the building and structures associated with the Riverside Pumping Station

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:demolition.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:20: ground, certified demolition arising, crushed concrete or imported fill.

R-2021-0268-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0268-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0268-CD-Teesworks Southbank Condtion16 Covering letter 2.pdf:1: “Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0268-CD-OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0526-CD-MGE04803 EP.pdf:1: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0526-CD-Covering Letter June 2022(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0526-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0526-CD-AQIA_FINAL.pdf:3:2.3.4. Guidance on the Assessment of Dust from Demolition and Construction ………………………………….. 8

R-2022-0526-CD-AQIA_FINAL.pdf:5: risk of dust soiling and fugitive PM10 emissions during the demolition, earthworks, construction

R-2022-0526-CD-AQIA_FINAL.pdf:6: the ‘demolition of existing structures on site and the development of up to 418,000 sqm (gross) of

R-2022-0526-CD-AQIA_FINAL.pdf:12:2.3.4. Guidance on the Assessment of Dust from Demolition and Construction

R-2022-0526-CD-AQIA_FINAL.pdf:13: demolition; earthworks; construction; and trackout. The potential for dust emissions from each

R-2022-0526-CD-AQIA_FINAL.pdf:14: Demolition • Total building volume • Total building volume • Total building volume

R-2022-0526-CD-AQIA_FINAL.pdf:14: dust release (e.g. metal • Demolition activities 10- concrete)

R-2022-0526-CD-AQIA_FINAL.pdf:14: • Demolition activities screening

R-2022-0526-CD-AQIA_FINAL.pdf:14: <10m above ground level • Demolition activities >20m

R-2022-0526-CD-AQIA_FINAL.pdf:14: • Demolition during wetter above ground level

R-2022-0526-CD-AQIA_FINAL.pdf:17: (demolition, earthworks, construction and trackout) following the matrix in Table 3.6.

R-2022-0526-CD-AQIA_FINAL.pdf:17: High Demolition High Risk Medium Risk Medium Risk

R-2022-0526-CD-AQIA_FINAL.pdf:17: Medium Demolition High Risk Medium Risk Low Risk

R-2022-0526-CD-AQIA_FINAL.pdf:17: Low Demolition Medium Risk Low Risk Negligible

R-2022-0526-CD-AQIA_FINAL.pdf:29: Demolition of parts of the site have been undertaken as part of

R-2022-0526-CD-AQIA_FINAL.pdf:29: Demolition Medium

R-2022-0526-CD-AQIA_FINAL.pdf:29: require demolition on the site. The total building volume

R-2022-0526-CD-AQIA_FINAL.pdf:29: remaining for demolition is considered likely to be under 50,000

R-2022-0526-CD-AQIA_FINAL.pdf:31: Demolition Earthworks Construction Trackout

R-2022-0526-CD-AQIA_FINAL.pdf:31: Demolition M Earthworks L Construction M Trackout L

R-2022-0526-CD-AQIA_FINAL.pdf:35: by IAQM on monitoring during demolition, earthworks and construction.

R-2022-0526-CD-AQIA_FINAL.pdf:38: risk of dust soiling and fugitive PM10 emissions during the demolition, earthworks, construction

R-2022-0526-CD-AQIA_FINAL.pdf:39:Trackout The transport of dust and dirt from the construction/demolition site onto the

R-2022-0526-CD-AQIA_FINAL.pdf:39: the construction/ demolition site with dusty materials, which may then spill

R-2022-0526-CD-AQIA_FINAL.pdf:52: Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition and

R-2022-0526-CD-COMPLIANCE DECISION NOTICE.pdf:1: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0526-CD-COMPLIANCE DECISION NOTICE.pdf:2: R/2020/0357/OOM FOR DEMOLITION OF EXISTING STRUCTURES

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2019-0468-FF-ApplicationFormNoPersonalData.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2019-0468-FF-Decision Notice_R20190468FF.pdf:3:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0539-PND-Decision Notice_R20200539PND.pdf:1:Details: PRIOR NOTIFICATION OF PROPOSED DEMOLITION OF 1. RIVERSIDE

R-2020-0539-PND-Decision Notice_R20200539PND.pdf:1:approval for the demolition of the above premises is not required.

R-2020-0539-PND-60722_Site notice former pumphouses_September 2020.PDF:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0539-PND-60722_Site notice former pumphouses_September 2020.PDF:1:Demolition is due to begin on: 1 November 2020

R-2020-0539-PND-Officer report _R20200539PND.pdf:1: DEMOLITION OF 1. RIVERSIDE

R-2020-0539-PND-Officer report _R20200539PND.pdf:1:The application seeks prior approval for the demolition of buildings and

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:relating to the proposed demolition works within the supporting letter.

R-2020-0539-PND-Officer report _R20200539PND.pdf:3: • General soft strip of buildings, where required, followed by demolition

R-2020-0539-PND-Officer report _R20200539PND.pdf:3: • Crushing of demolition rubble to Class 6FA specification and infill of

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:(Environmental Impact Assessment) Regulations 2017, but the demolition is

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:While the demolition and clearance of the site will leave an empty part to the

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:impacts on the ecology from demolition of buildings of this scale in

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:1:South Bank Site – Demolition of Riverside Buildings

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:2:Document title: South Bank Site – Demolition of Riverside Buildings Outline Method

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 1.4. Demolition Works Scope 5

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2. Demolition Methods 6

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2.1. General Demolition Approach 6

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2.4. Typical Brick and Concrete Building Demolition Methodology 7

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3:Appendix A – Teesworks South Bank Site Enabling Works – Demolitions Riverside

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:The purpose of this document is to present an outline method statement for the demolition of

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:works. It should be recognised that the responsibility of demolition works shall lie with them

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:regulations and comply with BS6187:2011 Code of Practice for Full & Partial Demolition,

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:Enabling Works – Demolitions Riverside Structures is contained in Appendix A and indicates

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:The buildings that are proposed for demolition within this permission consist of four adjacent

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:Each of the buildings identified for demolition within this method statement will undergo a

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:1.4. Demolition Works Scope

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:The following scope of works is anticipated as part of the demolition works;

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:  General soft strip of buildings, where required, followed by demolition to top of floor

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:  Crushing of demolition rubble to Class 6F2 specification and infill of voids where

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:demolition under this outline method statement and can be broken down and described as

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:2. Demolition Methods

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:2.1. General Demolition Approach

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:Prior to any works commencing, a refurbishment and demolition (R&D) asbestos survey will

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:The first stage of the demolition will be ensuring the site is safe. The working area will be

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:demolition works mobilising).

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:proceed to prevent flooding and any accidental spillage. Upon completion of demolition

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:2.4. Typical Brick and Concrete Building Demolition Methodology

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:Dust suppression will be used at all times during the demolition of any brickwork or concrete

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:  45 & 20 tonne demolition specification excavator with various attachments (selector

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:demolition site is anticipated to be formed using a double clipped Heras style fence required

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:to form a secure demolition boundary.

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:A site compound area will be located centrally to each of the demolition sites and will contain

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:9:have undertaken both demolition activities and Asbestos Cat B training.

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:9:experience undertaking demolition activities. All persons required to work on site will

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:11:STDC South Bank Site Enabling Works – Demolitions Riverside Structures

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: structural demolition to floor slab

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: disconnected and demolition

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: Tee advance of demolition works

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: Park ENABLING WORKS DEMOLITIONS

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Demolition of South Bank Pumphouses: Application for Prior Notification of

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:pleased to enclose a prior notification application relating to the demolition of pumphouses on the south

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:The Scope of the Proposed Demolition Works

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:The application seeks prior approval for the demolition of buildings and structures comprising the old

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:As set out in the accompanying demolition method statement, the outline sequence of works to be

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:• General soft strip of buildings, where required, followed by demolition to top of floor slab;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:• Crushing of demolition rubble to Class 6FA specification and infill of voids where necessary;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Reason for Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Method of Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Planning practice guidance states that demolition works are capable of constituting a ‘project’ within the

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The techniques to be adopted in the demolition process are not unusually complex. The works are localised

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:compliance with the submitted demolition method statement.

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The demolition method statement enclosed with this application demonstrates that the scheme would not

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:• The prior notification of demolition form;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:4:• A Demolition Statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:'HVFULSWLRQ Agreement that a prior approval for demolition

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:Please see accompanying cover letter and demolition method statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:Please see accompanying cover letter and demolition method statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2: Please see accompanying cover letter and demolition method statement.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:13: 2015 demolition of the pellet plant in the early 2000’s.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:15:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:24:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:25:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:29:The site is currently a disused steelworks undergoing demolition.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:34: demolition activities

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:34: structures and demolition activities

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:136: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:137: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:334:Demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11: and demolition).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: furnace complex. The site is served by estate roads and rail infrastructure and demolition).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 1981-2015 relatively unchanged other than demolition of the pellet plant in the early pellet plants.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 2000’s. Demolition material-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:13:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:22:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:23:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:The likely main risks associated with the proposed demolition is potential from poor ground conditions related

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:An asbestos consultant should be engaged to carry out a refurbishment/demolition survey before any

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:demolition works are carried out.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:If the site is to be divested post demolition, the client may wish to carry out a limited ground investigation to

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:118: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:119: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:316:Demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:4:In general, this project is the demolition of existing buildings/structures and engineering operations

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:17:Construction and Demolition Activity’ (2003) will be applied to the construction areas within the

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:18:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:19:  demolition;

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:19:Code of practice for noise control on construction and demolition sites:

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:24:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:17:Sinter plant. Following demolition/clearance works, limited ground investigation in these areas is planned to

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:19: gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not the dominant

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:40:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:152: slightly clayey. Demolition Rubble?

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:224: From 0.5m: More like demolition than trial pitting.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:12:The site infrastructure was undergoing demolition at the time of writing.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:14: cobbles and gravel. Gravel and cobbles include brick, concrete and other demolition materials,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:14: demolition materials, slag was not the dominant constituent although often still present within

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:stock house. This area is understood to currently be inaccessible owing to ongoing demolition works.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:25: demolition arising, crushed concrete or imported fill.

R-2022-0435-CD-Compliance Officer Report 0435.pdf:1: APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0435-CD-Compliance Officer Report 0435.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0435-CD-Compliance Decision Notice 0435(1).pdf:1: FOR OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2022-0435-CD-Compliance Decision Notice 0435(1).pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:1:PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-391845-R20220435CD.pdf:1:PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-INCA2022-12 HRA - SeAH South Bank Rev 1.pdf:7:“Demolition of existing redundant quay structures, capital dredging and development of new quay

R-2022-0435-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0435-CD-64764_01 Covering Letter 03.05.2022(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:1:Title: Loco shed and Gas Works demolition

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:1:The overall works involve the safe demolition of the former Locomotive Repair Shed, the oxygen plant and

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: Demolition Excavator Plant operatives

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: Tipper wagons Demolition operatives

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2:3.0 Demolition Method

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: The first stage of the demolition will be ensuring the site is safe. The whole work area will be

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: Loco Shed demolition works.

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: The steel work demolition will be done using a mounted shear attachment for the excavator. The

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: Dust suppression will be used at all times during the demolition of any brickwork or concrete

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: method as outlined above using a demolition specific excavator. The brickwork sections will be

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:5: voids back filled with the brick demolition material in the short term. The remaining foundations

R-2020-0283-PND-Officer report.pdf:1:PROPOSAL: PRIOR APPROVAL FOR DEMOLITION OF

R-2020-0283-PND-Officer report.pdf:1:The buildings proposed for demolition are located within the Prairie site and

R-2020-0283-PND-Officer report.pdf:1:All demolition works shall be carried out in accordance with the BS Code of

R-2020-0283-PND-Officer report.pdf:1:Practice for Demolition BS6187.

R-2020-0283-PND-Officer report.pdf:1:As set out in the accompanying Demolition Method Statement, the outline

R-2020-0283-PND-Officer report.pdf:2:• Demolition of the former locomotive repair shed;

R-2020-0283-PND-Officer report.pdf:2:• Removal of the tanks and demolition of the supporting structure and the

R-2020-0283-PND-Officer report.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0283-PND-Officer report.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0283-PND-Officer report.pdf:2:relating to the proposed demolition works within the supporting letter.

R-2020-0283-PND-Officer report.pdf:2:2. Steel work demolition work will be done using a mounted shear attachment

R-2020-0283-PND-Officer report.pdf:2:4. Dust suppression will be used at all times during the demolition of any

R-2020-0283-PND-Officer report.pdf:2:demolition is not considered to result in significant environmental effects, due

R-2020-0283-PND-Officer report.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0283-PND-Officer report.pdf:2:While the demolition and clearance of the site will leave an empty part to the

R-2020-0283-PND-Officer report.pdf:3:the ecology from the demolition. Advice has been given that based on the

R-2020-0283-PND-Officer report.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2020-0283-PND-STDC-SIZ-GP-EWO-0011 Prairie Phase 1 - Proposed Demolitions - Site Location Plan A1.PDF:1: Existing structures for demolition

R-2020-0283-PND-STDC-SIZ-GP-EWO-0011 Prairie Phase 1 - Proposed Demolitions - Site Location Plan A1.PDF:1: Proposed Demolitions

R-2020-0283-PND-Decision 0283.pdf:1:Details: PRIOR APPROVAL FOR DEMOLITION OF LOCOMOTIVE REPAIR SHED;

R-2020-0283-PND-Decision 0283.pdf:1:demolition of the above premises is not required.

R-2020-0283-PND-60722 Prairies Site Notice June 2020.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0283-PND-60722 Prairies Site Notice June 2020.pdf:1:Demolition is due to begin on: 1 August 2020 (estimated)

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: structural demolition including

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: disconnected and demolition

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: advance of demolition works

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: Proposed Demolitions

R-2021-1058-NM-STDC_HWY-ATK-HKF-PR-DR-CH-000006_C02.pdf:1: Decommissioning / Demolition

R-2021-1058-NM-Decision 0270.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-1058-NM-STDC_HWY-ATK-HMK-PR-DR-CH-000006_C02.pdf:1: Decommissioning / Demolition

R-2021-1058-NM-STDC_HWY-ATK-HLG-PR-DR-EO-000006_C03.pdf:1: Decommissioning / Demolition

R-2020-0679-PND-R 20 0679 Decision.pdf:1:Details: PRIOR NOTIFICATION OF PROPOSED DEMOLITION OR FORMER TOPEDO

R-2020-0679-PND-R 20 0679 Decision.pdf:1:approval for the demolition of the above premises is not required.

R-2020-0679-PND-Officer Report.pdf:1: DEMOLITION OR FORMER TOPEDO LADLE

R-2020-0679-PND-Officer Report.pdf:1:The application seeks prior approval for the demolition of the Torpedo Repair

R-2020-0679-PND-Officer Report.pdf:1:As set out in the accompanying demolition method statement, the outline

R-2020-0679-PND-Officer Report.pdf:1:• Demolition of the Boiler House adjoining the main workshop to the north;

R-2020-0679-PND-Officer Report.pdf:1:• Demolition of the steel superstructure and frame;

R-2020-0679-PND-Officer Report.pdf:1:• Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-Officer Report.pdf:2:The application has been supported by an Outline Demolition Method

R-2020-0679-PND-Officer Report.pdf:2:demolition scheme.

R-2020-0679-PND-Officer Report.pdf:2:demolition activities is to be crushed to a Class 6F2 specification and used to

R-2020-0679-PND-Officer Report.pdf:2:Impact Assessment) Regulations 2017, but the demolition is not considered to

R-2020-0679-PND-Officer Report.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0679-PND-Officer Report.pdf:2:south of the site. While the demolition and clearance of the site will leave an

R-2020-0679-PND-Officer Report.pdf:2:impacts on the ecology from demolition of buildings of this scale in

R-2020-0679-PND-Officer Report.pdf:2:The proposed method of demolition and retention of the site thereafter is

R-2020-0679-PND-TSWK-STDC-DMP-ZZ-DR-C-0001 Torpedo Shed Demolition Plan AMENDED.PDF:1: DEMOLITION PLAN

R-2020-0679-PND-60722_Site Notice torpedo building_26 Nov 2020.PDF:1:demolition and any proposed restoration of the site)

R-2020-0679-PND-60722_Site Notice torpedo building_26 Nov 2020.PDF:1:Demolition is due to begin on: 21 December 2020

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Demolition of Torpedo Ladle Repair Workshop building: Application for

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Prior Notification of Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:pleased to enclose a prior notification application relating to the demolition of the former Torpedo Ladle

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The Scope of the Proposed Demolition Works

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The application seeks prior approval for the demolition of the former Torpedo Ladle Repair workshop. As set

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:out in the accompanying demolition method statement, the outline sequence of works to be undertaken by

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Demolition of the Boiler House adjoining the main workshop to the north;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Demolition of the steel superstructure and frame;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:Reason for Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:Method of Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:Planning practice guidance states that demolition works are capable of constituting a ‘project’ within the

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:The techniques to be adopted in the demolition process are not unusually complex. The works are localised

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:compliance with the submitted demolition method statement.

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:The demolition method statement enclosed with this application demonstrates that the scheme would not

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:• The prior notification of demolition form;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:• A Demolition Statement.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:1:Demolition of Torpedo Ladle Repair

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:2:Development Corporation and use in relation to the Demolition of the Torpedo Ladle repair workshop

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:2: Project Demolition of Torpedo Ladle Repair Workshop

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:1.7. Demolition Works Scope 6

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:3.4. Mechanical Demolition of Buildings 14

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:Table 1 – Mechanical Demolition Method 14

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:The purpose of this document is to present an outline method statement for the demolition of the former Torpedo

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:responsibility for the demolition works shall lie with them. Atkins Limited assumes no responsibility to this regard

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:6187:2011 Code of Practice for Full & Partial Demolition, including the below mentioned regulations:

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:supplemented with internal double clipped Heras style fence required to form an Active Demolition zone (ADZ)

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:5:A Refurbishment & Demolition (R&D) Asbestos Survey is still to be carried out at the time of writing this document.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:All asbestos will be removed prior to commencing demolition of the structure. Asbestos materials identified at

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:works prior to demolition.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:1.7. Demolition Works Scope

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:The following scope of works is anticipated as part of the structure demolition;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Demolition of the Boiler House adjoin the main workshop to the north;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Demolition of the steel superstructure and frame;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:bison roofs. This is allowing for access through into the main structure. Prior to the main demolition these low

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:The scope of works covered within this method statement consists of the above ground demolition of all structures

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:within the demolition zone hatched in green site boundary and associated plant and equipment.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:  Demolition of structures and process/clear arisings

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:9:  Demolition Contract timescales – 16 weeks

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:9:  2 no. 50 tonne & 2 no. 30 tonne, demolition specification excavator with various attachments (selector

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:working hours, the security of the site and the maintenance of the fence line surrounding the demolition works

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Prior to any demolition works commencing an ecological survey is to be carried out to confirm any presence of

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Demolition dust will typically be controlled by applying water spray manually and remotely using a (MOTFOG 100

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:and during the crushing and demolition of the brick structures it is expected that water and dust control will be in

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Demolition arisings are to be processed and segregated on site and loaded into the required transport to be

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Prior to demolition works commencing any nearby boreholes shall be sampled and monitored to establish current

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:boreholes shall also be monitored and sampled during the demolition works to monitor any effect the works may

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:11:subcontractors’ operatives are to hold a CCDO or CSCS card minimum and have undertaken both demolition

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:11:demolition activities. All persons required to work on site will undertake a full site induction prior to commencing

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:12:Non-Licensable only – Licensed Material shall have been removed by specialist subcontractor prior to demolition

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:3.4. Mechanical Demolition of Buildings

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:Table 1 below outlines the mechanical demolition activities with annotated photographs to provide clarity. The sequencing below is indicative only and is to be confirmed

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:Table 1 – Mechanical Demolition Method

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14: will then be sheared to grade, working bay by bay to allow the demolition activities

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:15: equipment to provide safe access routes for demolition works. Any

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  All demolition activities to be carried out in accordance with BS 6187:2011 Code of Practice for Full & Partial Demolition;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  The methodology and sequence of demolition is determined by the PC to ensure a safe and controlled process and avoidance of any uncontrolled collapse of

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  A suitable exclusion zone (ADZ) to be barriered off prior to any mechanical demolition commencing and all operatives briefed on activities;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  Demolition will be carried out top-down and on a bay-by-bay basis and materials stockpiled in waste streams away from the workface as works progress;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:18:  Waste will be segregated at the demolition workface and loaded directly into 40 yard recycling bins.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:19: - Active Demolition Zone

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:21: TSWK-STDC-DMP-ZZ-DR-C-0001 Dorman Point Torpedo Shed Demolition Plan

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:22: DEMOLITION PLAN

R-2022-0366-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-Decision Notice.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0366-CD-Decision Notice.pdf:2: APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2022-0366-CD-61586 Conditions 12, 13 and 32 Covering Letter 14-04-22.PDF:1:Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0366-CD-Officer report.pdf:1: PLANNING APPLICATION FOR DEMOLITION

R-2022-0366-CD-Officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:10: Gravel and cobbles include brick (including refractory), concrete and other demolition materials,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:10: comprising a sandy and or gravelly clay with demolition materials within the matrix.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:31: demolition arising, crushed concrete or imported fill.

R-2021-0879-FF-Officer report.pdf:6:surrounding area, with on-going works relating to demolition and remediation

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:22: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:43: demolition rubble.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:90: demolition rubble

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:93: - demolition rubble

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13:• Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: sandy and or gravelly clay with demolition materials within the matrix.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0879-FF-Decision Notice.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0879-FF-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0879-FF-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:7:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2021-0589-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0589-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-63262_Notice_July 2021.PDF:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0589-PND-63262_Notice_July 2021.PDF:1:Demolition is due to begin on: 2 August 2021

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:6: Appointments: • Demolition Supervisor - TBC

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: • Demolition hand tools (pry-bar, hammer, saw, shovel)

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: • Demolition specification 360o excavator machine (equipped with choice

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: of demolition attachments)

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:9: proximity to the structures marked for demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: of demolition, the location of demolition equipment, storage, stockpile and lay-

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: demolition debris from entering and protected using a steel plates.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: During demolition works, a demolition exclusion zone will be put into place

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: exclusion zone during active demolitions will be permitted to essential persons

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: only. Demolition plant to person interface will be strictly controlled and will be

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:11: Working at Access to heights (for asbestos removal, soft strip, demolition works etc) will be

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: During the demolition phase of the works Thompsons will minimize dust

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: Thompsons will use water to dampen the demolition workface as works progress

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: and the arisings produced during the demolition works. Care will be taken not to

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: distance from demolition operations and will be positioned outside of the

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: demolition technique. High impact works will be strictly minimised. Thompsons

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: and dampening mechanisms in the demolition plant. Annual health surveillance

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:16: of demolition works.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:16: At certain stages on the demolition works, if at any point a temporary partial or

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:19: • Instability of structure during demolition

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:20: • Prior to the commencement of demolition works, Thompsons will appoint the services of an

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:21: The fixtures / fittings will then be processed (using demolition hand tools) into small and hand

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22:Remote & Explosive Demolition of the BOS Plant

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: explosive demolition activities.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: informed of the proposed method of demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • The super high reach will be assisted by an additional demolition spec 360o excavator

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: machines, for low-level demolition, material processing, sorting and segregation.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: ground floor level to assist with the explosive demolition of the main building.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • Prior to the explosive demolition, a series of structured pre-weakening cut will be made using

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: hot works to the support column to aid the explosive demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • Following the completion of the demolition works, the processing and removal of all arisings

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:28: DEMOLITION WORKS

R-2021-0589-PND-Decision-Notice.pdf:1:Details: PRIOR NOTIFICATION FOR DEMOLITION OF OBSOLETE BUILDINGS AND

R-2021-0589-PND-Decision-Notice.pdf:1:demolition of the above buildings and structures is not required.

R-2021-0589-PND-Officer Report 0589.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0589-PND-Officer Report 0589.pdf:1:The application seeks prior approval for the demolition of obsolete buildings

R-2021-0589-PND-Officer Report 0589.pdf:1:The application seeks prior approval for the demolition of the BOS Plant. This

R-2021-0589-PND-Officer Report 0589.pdf:1:regard to the demolition process. Within this a summary of the general scope

R-2021-0589-PND-Officer Report 0589.pdf:2:as; Following the completion of the demolition works, the processing and

R-2021-0589-PND-Officer Report 0589.pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0589-PND-Officer Report 0589.pdf:2:In this case we have considered whether the demolition would give rise to

R-2021-0589-PND-Officer Report 0589.pdf:2:1 Measures to ensure the safety of demolition works and humans in the

R-2021-0589-PND-Officer Report 0589.pdf:2:None of the buildings to be demolished are listed and the demolition site is not

R-2021-0589-PND-Officer Report 0589.pdf:2:cultural heritage effects arising from the demolition of the buildings.

R-2021-0589-PND-Officer Report 0589.pdf:3:removed any potential archaeological remains. Therefore the demolition

R-2021-0589-PND-Officer Report 0589.pdf:3:It is considered that through the demolition method statement and the

R-2021-0589-PND-Officer Report 0589.pdf:3:mitigation measures that the proposed demolition works would not result in

R-2021-0589-PND-Officer Report 0589.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2021-0589-PND-Officer Report 0589.pdf:3:surrounded other industrial buildings and structures. While the demolition and

R-2021-0589-PND-Officer Report 0589.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Demolition of BOS Plant, Teesworks: Application for Prior Notification of

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:demolition of the former BOS Plant, Redcar.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:The Scope of the Proposed Demolition Works

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:The application seeks prior approval for the demolition of the BOS Plant. This includes the following:

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:All demolition works shall be carried out in accordance with the BS Code of Practice for Demolition BS6187.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:Reason for Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Method of Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:works. Given the number of different structures, the method of demolition varies and therefore the Method

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:For robustness and ahead of pursuing a ‘prior approval’ for the demolition works, we have given

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:consideration as to whether the proposed demolition project could be considered to be EIA development.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:“demolition works are capable of constituting a ‘project’ within the meaning of the Environmental Impact

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:authorities will need to consider whether demolition projects are likely to have significant environmental

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:demolition of the BOS Plant could fall under paragraph 13 b) of Schedule 2 on the grounds that it relates to a

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:changed by demolition (e.g a cleared site) would not have significant effects, the process of demolishing the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:buildings associated with the BOS Plant could potentially have significant effects and the demolition works

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:In this case we have considered whether the demolition would give rise to significant effects and note the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:1 Measures to ensure the safety of demolition works and humans in the surrounding area, including from

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:None of the buildings to be demolished are listed and the demolition site is not within a Conservation Area.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:There are therefore unlikely to be any significant cultural heritage effects arising from the demolition of the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:archaeological remains. Therefore the demolition works, including the removal of building foundations is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:• The prior notification of demolition form;

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:• A Demolition Method Statement, prepared by Thompsons of Prudhoe.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:1: Demolition & Site Clearance

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:2: demolition) are asbestos trained and experienced. Works will be

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:2: If suspect materials are identified during the demolition phase of

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4: services marked for demolition will be carried out by STDC.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4:demolition c. Live pipe buildings. Prior to commencement Thompsons will liaise with

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4: demolition area and that liaison is undertaken with the appropriate

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6:machine plant The working area will be controlled as a demolition exclusion zone

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6: third parties Demolition Supervisor and with banksmen present.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9:demolition third parties

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: demolition

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: technique Demolition Supervisor.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: Demolition works and site finishes will be in accordance with the

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: contract specification. All demolition methodology will comply

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: All works will be undertaken within a demolition exclusion zone

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:13: b. Timber STDC operations generated from the demolition within buildings,

R-2021-0589-PND-STDC-ATK-NZT-ZZ-DR-S-0002-Layout1 002.PDF:1: DECOMMISSIONING/DEMOLITION

R-2021-0589-PND-STDC-ATK-NZT-ZZ-DR-S-0002-Layout1 002.PDF:1: PRIOR APPROVAL DEMOLITIONS

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:6: demolition of existing structures on site and the development of up to 418,000 sqm (gross)

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:7: relating to the demolition of the former South Bank Coke Oven Battery Plant which

R-2022-0343-ESM-Officer report 0343.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2022-0343-ESM-Officer report 0343.pdf:5:for the demolition of existing structures on site and the development of up to

R-2022-0343-ESM-Officer report 0343.pdf:7:surrounding area, with on-going works relating to demolition and remediation

R-2022-0343-ESM-ARCHAEOLOGIST.pdf:4: (R/2020/0357/OOM) for demolition of existing structures on site and the development of up to

R-2022-0343-ESM-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:6: demolition of existing structures on site and the development of up to 418,000 sqm (gross)

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:7: relating to the demolition of the former South Bank Coke Oven Battery Plant which

R-2022-0343-ESM-Decision Notice.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0343-ESM-64764 SeAH RM Covering Letter March 2022(1).pdf:1:“Demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2020-0599-AD-Decision Notice_R20200599AD.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0599-AD-Officer report _R20200599AD.pdf:1:R/2020/0598/FF Retrospective demolition of existing gatehouse;

R-2020-0599-AD-Application Form(1).PDF:2: Demolition of existing gatehouse and redevelopment of site to provide new single storey gatehouse with associated car paking and

R-2020-0599-AD-Application Form(1).PDF:5:design, demolition and construction - Recommendations'.

R-2020-0599-AD-Application Form(1).PDF:7: floorspace use or demolition (including change of following development

R-2020-0599-AD-Application Form(1).PDF:7: class Type of use applicable of use or demolition changes of use)

R-2020-0599-AD-Application Form(1).PDF:8:Recycling facilities construction, demolition

R-2020-0599-AD-Application Form(1).PDF:8: Construction, demolition and excavation

R-2020-0411-FFM-Decision 0411.pdf:7: (k) Measures for recycling/disposing of waste resulting from demolition and

R-2020-0411-FFM-Decision 0411.pdf:10:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:4: relevant, requisite demolition works, and the land-use requirements during the construction

R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:4: a. the construction and existence of the development, including, where relevant, demolition

R-2020-0411-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0411-FFM-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:11: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:11:4.2.4 The enabling works may involve demolition and clearing of pre-existing structures and hard

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:12: Potential impacts during the demolition phase

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:13:4.2.15 During decommissioning/ demolition, the use of heavy vehicles and the removal of the infrastructure

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:13: demolition phases of the proposed development. The potential risks to each of the key receptor

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:16: potential impacts to water quality may exist during the construction, operation and demolition phases

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19: Demolition phase impacts and proposed mitigation

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19:4.4.21 During decommissioning/ demolition, the use of heavy vehicles and the removal of the infrastructure

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:2: • by 2020, the preparing for re-use, recycling and other recovery of construction and demolition

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: Demolition

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: Development involving the demolition of buildings or structures in a conservation area will only be

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: In the exceptional cases where any demolition is approved, the Council will require that detailed

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: including a schedule of works, before demolition takes place.

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: will only be acceptable where the proposal does not involve the demolition or alteration of existing

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:26: demolition waste recycled per year for use as an alternative mineral from 38% in 2005 to at least

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:27: c) for the recycling of at least 700,000 tonnes of construction and demolition waste per year from

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10:11.2.38 The IAQM Guidance on the assessment of dust from demolition and construction (IAQM, 2014)

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:15:11.2.69 The risk of dust impacts during the decommissioning phase, including demolition, would be the

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:16:11.2.75 Dust impact risk categories have been determined for demolition, earthworks, construction and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20:11.4.3 As summarised in Table 10.18, the predicted dust impact risk is classified as low for demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20: Table 11.15. The ‘highly recommended’ measures for low risk demolition, and medium risk

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20: during demolition, earthworks and construction (IAQM, 2012).

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: Low risk measures specific to demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: • Ensure effective water suppression is used during demolition operations. Hand held sprays are more

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: • Bag and remove any biological debris or damp down such material before demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: less than 20,000 m3 so the dust emission magnitude for the demolition phase is classified, using

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Table 11.16: Dust Emission Magnitude for Demolition, Earthworks, Construction and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Demolition Earthworks Construction Trackout

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Table 11.17: Sensitivity of the Surrounding Area for Demolition, Earthworks and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: the dust impact risk for demolition, earthworks, construction and trackout prior to the

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: Table 11.19: Dust Impact Risk for Demolition, Earthworks, Construction and Trackout –

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: Source Demolition Earthworks Construction Trackout

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:24: Measures specific to demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:24: • Soft strip inside buildings before demolition (retaining walls and windows in the rest of the building where

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:32: IAQM (2014) Guidance on the assessment of dust from demolition and construction

R-2020-0411-FFM-Chapter 2 Project Description.pdf:19: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Chapter 2 Project Description.pdf:19: stage in construction works would be the clearance and demolition of existing buildings on the

R-2020-0411-FFM-Chapter 2 Project Description.pdf:20: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Chapter 2 Project Description.pdf:21: Demolition, Site Clearance and Enabling Works

R-2020-0411-FFM-Chapter 2 Project Description.pdf:22: be reused on site and other demolition wastes will be recycled where possible. Other general

R-2020-0411-FFM-Chapter 2 Project Description.pdf:23: Guidelines – Working at Construction and Demolition Sites (Environment Agency,

R-2020-0411-FFM-Non Technical Summary.pdf:9: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Non Technical Summary.pdf:16:5.1.5 The effects of construction activity would be temporary with minimal demolition and releveling of

R-2020-0411-FFM-Non Technical Summary.pdf:18: the construction (and similarly during demolition), have been assessed. The impacts of noise,

R-2020-0411-FFM-Non Technical Summary.pdf:29: demolition and construction

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:17: – Working at Construction and Demolition Sites (Environment Agency, 2012) now withdrawn,

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:25: Environment Agency (2012) Pollution Prevention Guidelines 6. Construction and demolition sites:

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:27: demolition materials

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:29: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:29: stage in construction works would be the clearance and demolition of existing buildings on the

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:31: • demolition, site clearance and enabling works;

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:31: Demolition, Site Clearance and Enabling Works

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:33: be reused on site and other demolition wastes will be recycled where possible. Other general

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:50: • By 2020, the preparing for re-use, recycling and other recovery of construction and demolition

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:85: on human health, dust soiling, and ecology during demolition, earth works, construction and

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:2:Table 1.8: Risk of Dust Impacts – Demolition ……………………………………………………………………………………….5

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:1.1.1 The IAQM dust guidance gives examples of the dust emission magnitudes for demolition,

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building over 50,000 m3, potentially dusty construction material (e.g. concrete), on- Large

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:site crushing and screening, demolition activities > 20 m above ground level.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building between 20,000 to 50,000 m3, potentially dusty construction material and Medium

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:demolition activities 10 - 20 m above ground level.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building less than 20,000 m3, construction material with low potential for dust release Small

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:(e.g. metal cladding or timber), demolition activities < 10 m above ground, demolition during winter

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:5:• Special Area of Conservation (SAC) designated for acid heathlands adjacent to the demolition

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:6:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:6:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:7:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout and for each designated site.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:8:Table 1.8: Risk of Dust Impacts – Demolition

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:9:IAQM (2014) Guidance on the assessment of dust from demolition and construction

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:18: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:43: Demolition of structures and engineering operations

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: demolition of old plant and buildings.

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: Demolition of existing cinema and replace with new cinema

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: Demolition of vacant agricultural buildings and replace with 3

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:13: relevant, requisite demolition works, and the land-use requirements during the

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:14: a. The construction and existence of the development, including, where relevant, demolition

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:32: • construction workers during demolition and development works;

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:35:5.85 The risk of impacts from dust and emissions during demolition / construction of the proposed

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:35: ‘Guidance on the assessment of dust from demolition and construction’ (IAQM, 2014).

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:36: IAQM ‘Guidance on the assessment of dust from demolition and construction’.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:44:1 Ground R/2019/0427/FFM Demolition of structures and engineering operations associated 1.96 km Granted

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:46: and industrial apparatus, Pipe Bridge, Swale and the demolition

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: the demolition and decommissioning of the REC. The magnitude of impacts and therefore

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: is that it is assumed that the demolition of the REC by explosives or particularly noisy measures

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: Noise Demolition by explosives to be avoided during the

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34:Teesmouth and Cleveland (demolition) to noise disturbance is at its highest

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:35: Holman et al (2014). IAQM Guidance on the assessment of dust from demolition and construction,

R-2020-0411-FFM-Chapter 10 Transport.pdf:12: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:113: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:114: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:2:1 Ground R/2019/0427/FFM Demolition of structures and engineering operations associated with 1.96 km Granted 27/09/19

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3: demolition of old plant and buildings.

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3:11 Redcar & R/2020/0075/F3M Demolition of existing cinema and replace with new cinema including 4.16km Decision pending

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3:13 Mr Milen R/2020/0100/FFM Demolition of vacant agricultural buildings and replace with 3 blocks 3.22 km Application

R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:16:J3.6 Buildings 3,354 Site Demolition / Loss

R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:18:5.2.2 It is recommended that the buildings scheduled for demolition are removed prior to March 2021

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:26: Trees in Relation to Design, Demolition and Construction, before any construction commences.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:28:6.5.3 Overall, the construction phase of the project would result in the demolition existing structures, and

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:29:6.5.14 During the construction phase, construction activity including minor demolition works, the use of

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:38: could be retained and protected during demolition.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:38: Demolition of structures and engineering operations character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:40: Demolition of existing cinema and replace with new cinema Residential character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:40: Demolition of vacant agricultural buildings and replace with 3 character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:45: Negligible Direct effects; demolition and Temporary Medium Minor Adverse Not Significant

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:1: DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:1:The planning permission sought consent for demolition of structure and engineering

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2: vii) A scheme for recycling/disposing of waste resulting from demolition works

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:1:“Demolition of structures and engineering operations associated with ground preparation and temporary

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:2: v) Methods of demolition of any structures to be demolished in order to form the approved

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:2: vii) A scheme for recycling/disposing of waste from demolition works that are required to form the

R-2020-0247-CD-R-2020-0247-CD-PN 0247.pdf:1: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND ENGINEERING

R-2020-0247-CD-t.pdf:1: DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-t.pdf:1:The planning permission sought consent for demolition of structure and engineering

R-2020-0247-CD-t.pdf:2: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-t.pdf:2: vii) A scheme for recycling/disposing of waste resulting from demolition works

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:1:Details: DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:4: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:4: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0247-CD-ApplicationFormRedacted.pdf:2:Demolition of structure and engineering operations associated with the ground preparation and the temporary storage of soils and its final use in the

R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:21:Application Number: R/2019/0427/FFM, which is for “DEMOLITION OF STRUCTURES AND

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:1: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND ENGINEERING

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:2: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:2: v) Methods of demolition of any structures to be demolished in order to form the

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:3: vii) A scheme for recycling/disposing of waste resulting from demolition works that

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:5:Suppression of Dust and Dirt during Demolition and Construction

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:6:(6) The demolition of existing buildings and structures on the Site

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:6: period of demolition of existing buildings and structures on the

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8:Demolition, Construction and associated Noise

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8:(11) All activities associated with the demolition of existing buildings

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8: generated during the demolition of existing buildings and

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:9:(16) No demolition or construction work associated with the

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:9: over noise during demolition and construction activities.

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:17: approval in writing, a scheme for the demolition and removal of

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18: from the demolition;

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18: (iii) the phasing of the demolition and removal;

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18:(55) The demolition and removal of the Development (which shall

R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF:1: · demolition work. PREPARATION or drying winds are likely to occur or soil is frost bound, - Exclusions: Theft or malicious damage.

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0587-CD-61586_01 Covering Letter July 2022.pdf:1:“Demolition of existing redundant quay structures, capital dredging and development of new quay

R-2022-0587-CD-ApplicationFormRedacted.pdf:4: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND

R-2022-0587-CD-Officer report.pdf:1: R/2020/0684/ESM FOR DEMOLITION OF

R-2022-0587-CD-Officer report.pdf:1:The planning permission sought consent for demolition of existing redundant quay

R-2022-0587-CD-Decision Noitce.pdf:1: PERMIISSION R/2020/0684/ESM FOR DEMOLITION OF EXISTING

R-2022-0587-CD-Decision Noitce.pdf:2: PERMIISSION R/2020/0684/ESM FOR DEMOLITION OF EXISTING

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:4: • Demolition of the existing wharf, jetties and associated infrastructure

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:22: • Demolition of the existing wharf, jetties and associated infrastructure

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:76:Construction Dust Code of Practice for Demolition CIS36 - Construction dust

R-2021-0728-PND-Perry F.pdf:1:Re: Demolition Dorman Long Tower

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:from the taskforce? Why was planning application submitted, just for it to be ignored and demolition

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:transparent and used legal planning precedent to only apply for a Prior Notice of Demolition notice whereby

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:only the “method of demolition” and “any proposed restoration of the site” can be taken into consideration.

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:some of the current demolition of the former steelworks site, black dust has reached as far as Eston,

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:I am objecting to the demolition of Dorman Long Tower, which has been in situ since

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:Is the true cost of demolition worthwhile? Has cultural significance been considered

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:demolition work before the application is determined and their lack of vision at what

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:submitted, just for it to be ignored and demolition commence anyway, removing the

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:used legal planning precedent to only apply for a Prior Notice of Demolition notice

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:whereby only the “method of demolition” and “any proposed restoration of the site” can

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:that will send harmful dust into the air. During some of the current demolition of the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:Subject: R/2021/0728/PND PRIOR NOTIFICATION FOR THE DEMOLITION OF THE DORMAN

R-2021-0728-PND-CLLR JEFFREY.pdf:1:because of this ‘the matters to be considered are the “method of demolition” and “any proposed restoration of the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:should be taking steps to stop this demolition by immediately serving a Building Preservation order on the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:Tower. This will delay demolition for six months and allow time for the council to submit an application for listed

R-2021-0728-PND-CLLR JEFFREY.pdf:1:successful then the demolition will be subject to a full planning application and the associated consultation with

R-2021-0728-PND-CLLR JEFFREY.pdf:1:timescale for the Council to respond to the prior approvals of demolition where you have 28 days to determine the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:I would be grateful if you could let me know your response as soon as possible, given that this demolition is

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:I would like to object to the abhorrent demolition of this tower and also the manner it has been

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:demolition? Is the land the tower occupies really essential to redevelopment or is it being cleared

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:apply for a Prior Notice of Demolition notice whereby only the “method of demolition” and “any

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:impact. During some of the current demolition of the former steelworks site, black dust has

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:the railway line from demolition site is mentioned but to what height?

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:physical heritage of this area, highlighted by commencing demolition work before the application

R-2021-0728-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying covering letter, plans and demolition method statement for full details

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying covering letter and demolition method statement

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying demolition method statement

R-2021-0728-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0728-PND-ApplicationFormRedacted.pdf:3:Please see accompanying demolition method statement

R-2021-0728-PND-JEFFREY J.pdf:1:we object to the proposed further demolition of the Dorman Long Tower!

R-2021-0728-PND-JEFFREY J.pdf:1:damages, given the abrupt indications, with the arrival on the site of demolition experts,

R-2021-0728-PND-JEFFREY J.pdf:1:choice but demolition, we are being told

R-2021-0728-PND-TEESMOUTH BIRD CLUB.pdf:1:APPLICATION REF R/2021/0728/PND Demolition of Dorman long Tower

R-2021-0728-PND-TEESMOUTH BIRD CLUB.pdf:1:We have no view on the demolition per se but wish to point out that a pair of peregrine falcons (

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1: Demolition of Dorman Long Tower

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1: South Bank Coke Ovens Demolition Works

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Demolition Contractor: Thompsons of Prudhoe Ltd.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Explosives Engineers: Precision Demolition Company Ltd

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Produced by Precision Demolition Co Ltd for 1 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:2:Produced by Precision Demolition Co Ltd for 2 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:3:Produced by Precision Demolition Co Ltd for 3 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4: for the use of the controlled explosive demolition of the Dorman Long Tower

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4: in relation to the South Bank Coke Ovens Demolition Works, South Tees

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4:Produced by Precision Demolition Co Ltd for 4 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:5:Produced by Precision Demolition Co Ltd for 5 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:6:Produced by Precision Demolition Co Ltd for 6 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: demolition of similar structures.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7:Produced by Precision Demolition Co Ltd for 7 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:8:Produced by Precision Demolition Co Ltd for 8 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:9:Produced by Precision Demolition Co Ltd for 9 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:10:Produced by Precision Demolition Co Ltd for 10 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:11:Produced by Precision Demolition Co Ltd for 11 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12:3.8 Demolition Preparation

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12:Produced by Precision Demolition Co Ltd for 12 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13: demolition.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13:Produced by Precision Demolition Co Ltd for 13 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:14:Produced by Precision Demolition Co Ltd for 14 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:15:Produced by Precision Demolition Co Ltd for 15 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:16:Produced by Precision Demolition Co Ltd for 16 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:17:Produced by Precision Demolition Co Ltd for 17 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:18:Produced by Precision Demolition Co Ltd for 18 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19:Produced by Precision Demolition Co Ltd for 19 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20: 30 tonne 360º demolition excavator with attachments. This machine and an

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20:Produced by Precision Demolition Co Ltd for 20 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:21:Produced by Precision Demolition Co Ltd for 21 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22:Produced by Precision Demolition Co Ltd for 22 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23: demolition activities (3) (1) (3) operatives restrict entry to all but (3)

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23:Produced by Precision Demolition Co Ltd for 23 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24:Produced by Precision Demolition Co Ltd for 24 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:25:Produced by Precision Demolition Co Ltd for 25 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26:Produced by Precision Demolition Co Ltd for 26 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27: of 2 years’ experience of working within the explosives demolition

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27:Produced by Precision Demolition Co Ltd for 27 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Method Statement for the Controlled Explosive Demolition of Dorman Long

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Tower associated with the South Bank Coke Ovens Demolition Works, Redcar

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Produced by Precision Demolition Co Ltd for 28 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Officer Report(1).pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0728-PND-Officer Report(1).pdf:1:The application seeks prior approval for the demolition of Dorman Long

R-2021-0728-PND-Officer Report(1).pdf:1:Applications for Prior Approval for Demolition differ from that of a regular

R-2021-0728-PND-Officer Report(1).pdf:2: Demolition works have commenced before application determined

R-2021-0728-PND-Officer Report(1).pdf:2: Impact on climate from demolition

R-2021-0728-PND-Officer Report(1).pdf:2:Prior Notification applications, a description of the site, reason for demolition,

R-2021-0728-PND-Officer Report(1).pdf:2:demolition of the tower. This has been prepared by Precision Demolition

R-2021-0728-PND-Officer Report(1).pdf:2:Company Ltd who are the explosives engineers on behalf of the demolition

R-2021-0728-PND-Officer Report(1).pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0728-PND-Officer Report(1).pdf:3:to the project being for demolition, while any impacts are also only considered

R-2021-0728-PND-Officer Report(1).pdf:3:It is considered that through the demolition method statement and the

R-2021-0728-PND-Officer Report(1).pdf:3:mitigation measures that the proposed demolition works would not result in

R-2021-0728-PND-Officer Report(1).pdf:3:Applications for Prior Approval for Demolition differ from that of a regular

R-2021-0728-PND-Officer Report(1).pdf:3:planning applications in that demolition, while being classed as development

R-2021-0728-PND-Officer Report(1).pdf:3:prior approval of the authority will be required as to the method of demolition

R-2021-0728-PND-Officer Report(1).pdf:3:As stated above Prior Approval for demolition deals only with the method of

R-2021-0728-PND-Officer Report(1).pdf:3:demolition and the after care of the site and these issues are examined below.

R-2021-0728-PND-Officer Report(1).pdf:3:Method of Demolition

R-2021-0728-PND-Officer Report(1).pdf:3:The application has been supported by a method statement for the demolition

R-2021-0728-PND-Officer Report(1).pdf:4:demolition. The scope of works as set out within the method statement is as

R-2021-0728-PND-Officer Report(1).pdf:4:preparation works prior to demolition. The scope of these works as set out

R-2021-0728-PND-Officer Report(1).pdf:5:demolition.

R-2021-0728-PND-Officer Report(1).pdf:5:required operations for demolition, procedures should there be a misfire or

R-2021-0728-PND-Officer Report(1).pdf:5:objections to the proposed method of demolition that is to be carried out by

R-2021-0728-PND-Officer Report(1).pdf:6:the demolition and clearance remove a structure from within the existing

R-2021-0728-PND-Officer Report(1).pdf:6:The proposed method of demolition and retention of the site thereafter is

R-2021-0728-PND-Officer Report(1).pdf:6:consider the method of demolition and any proposed restoration/aftercare of

R-2021-0728-PND-Officer Report(1).pdf:6:the Local Planning Authority is not required for the proposed demolition.

R-2021-0728-PND-NETWORK RAIL.pdf:1:Proposal – Prior notification for demolition of Doman Long Tower

R-2021-0728-PND-HORNE C.pdf:1:I am writing to formally object to the undemocratic demolition of the Dorman Long tower.

R-2021-0728-PND-Stephenson L.pdf:1:I am writing to strongly object to the proposed demolition of Dorman Long.

R-2021-0728-PND-Stephenson L.pdf:1:I object to the demolition for the following reasons:

R-2021-0728-PND-Stephenson L.pdf:1:Bank Coke Oven supporting it's adaptation to enable alternative uses“. Demolition of Dorman Long would be

R-2021-0728-PND-Stephenson L.pdf:1:3) Given the climate emergency, I also object to the demolition on environmental grounds.

R-2021-0728-PND-Cover Letter.pdf:1:Demolition of Dorman Long Tower, Teesworks: Application for Prior

R-2021-0728-PND-Cover Letter.pdf:1:Notification of Demolition

R-2021-0728-PND-Cover Letter.pdf:1:demolition of Dorman Long Tower.

R-2021-0728-PND-Cover Letter.pdf:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0728-PND-Cover Letter.pdf:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0728-PND-Cover Letter.pdf:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0728-PND-Cover Letter.pdf:1:“method of demolition” and “any proposed restoration of the site”. It would not be appropriate from the

R-2021-0728-PND-Cover Letter.pdf:2:Reason for Demolition

R-2021-0728-PND-Cover Letter.pdf:2:Method of Demolition

R-2021-0728-PND-Cover Letter.pdf:2:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0728-PND-Cover Letter.pdf:2:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0728-PND-Cover Letter.pdf:2:For robustness and ahead of pursuing a ‘prior approval’ for the demolition works, we have given

R-2021-0728-PND-Cover Letter.pdf:2:consideration as to whether the proposed demolition project could be considered to be EIA development.

R-2021-0728-PND-Cover Letter.pdf:2:“demolition works are capable of constituting a ‘project’ within the meaning of the Environmental Impact

R-2021-0728-PND-Cover Letter.pdf:2:authorities will need to consider whether demolition projects are likely to have significant environmental

R-2021-0728-PND-Cover Letter.pdf:2:It is considered that the demolition of the Dorman Long Tower could fall under paragraph 13 b) of Schedule

R-2021-0728-PND-Cover Letter.pdf:2:environment”. Whilst the development as changed by demolition (e.g a cleared site) would not have

R-2021-0728-PND-Decision Notice 0728.pdf:1:Description: PRIOR NOTIFICATION FOR DEMOLITION OF DORMAN LONG

R-2021-0728-PND-Location Plan.pdf:1:Produced by Precision Demolition Co Ltd for 5 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition, but what amount of the population know where to find those physical documents and have the local

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:population been informed where to find those physical documents of the demolition, what percentage know exactly

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:on the demolition.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:4) Photographic evidence of Thompson of Prudhoe carrying out demolition before the comments period of the 9th

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:of September and demolition start date of the 15th of September. Those contractors had no right to be starting any

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition before the agreed date and certainly not before the comments date.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition of the Dorman Long tower.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:I am asking for all demolition work on the historic Dorman Long building to be stopped.

R-2021-0728-PND-0728(1).pdf:1: For what it is worth, I would like to object to the demolition of the Dorman Long Tower. I recognise this application

R-2021-0728-PND-0728.pdf:1:For what it is worth, I would like to object to the demolition of the Dorman Long Tower. I recognise this application

R-2021-0728-PND-DUMOULIN C.pdf:1:I wish to object to the demolition of the Dorman Long tower.

R-2021-0728-PND-DUMOULIN C.pdf:1:I would please ask that you do everything in your power to save this building from demolition.

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Subject: R/2021/0728/PND demolition of the Dorman Long Tower,

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Attachments: Dorman Long Tower demolition notice comments.docx

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Please find attached my objections to this application. I hope that the agent has instructed a halt to the demolition

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:the demolition of the Dorman Long Tower

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:I would like to object to the demolition of this tower and also the

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:the demolition? Is the land the tower occupies really essential to

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:planning precedent to only apply for a Prior Notice of Demolition

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:notice whereby only the “method of demolition” and “any

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: current demolition of the former steelworks site, black dust

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: demolition site is mentioned but to what height?

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:3:highlighted by commencing demolition work before the application

R-2021-0728-PND-Site Notice.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0728-PND-Site Notice.pdf:1:Demolition is due to begin on: 15 September 2021

R-2021-0728-PND-FIELD S.pdf:1:Subject: FW: Objection to demolition of Dorman Long building

R-2021-0728-PND-FIELD S.pdf:1:Subject: Objection to demolition of Dorman Long building

R-2021-0728-PND-FIELD S.pdf:1:I would like to register my objection to the proposed demolition of the iconic Dorman Long building, as laid out in

R-2021-0465-FFM-Officer Report 0465.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0465-FFM-Officer Report 0465.pdf:6:surrounding area, with on-going works relating to demolition and remediation

R-2021-0465-FFM-Decision Notice 0465.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0465-FFM-LM Wind Detailed Applicaiton Covering Letter 28.05.21.pdf:1:On 3 December 2020 outline planning application was granted at South Bank for the demolition of existing

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:22: demolition arising, crushed concrete or imported fill.

R-2021-0465-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0465-FFM-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:7:7.15 Following completion of the excavation and recording, demolition of the blast furnace bases can

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:8:7.19 Video footage of the structures, particularly during their demolition, may be a useful adjunct to the

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:8: from different viewpoints at different stages in their recording and demolition.

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:8:7.15 Following completion of the excavation and recording, any demolition of the blast furnace bases

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:9:7.19 Video footage of the structures, particularly during their demolition, may be a useful adjunct to the

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:9: from different viewpoints at different stages in their recording and demolition.

R-2023-0179-SCP-230306 - HyGreen - EIA Scoping Opinion Request Letter - Final.pdf:2: development, including its where relevant, of demolition works;

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:10: development, including its demolition works;

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:92: periods where known noisy activities are taking place in the area such as demolition

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:109: • Establishing the quantities of construction, demolition and excavation waste to

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:117: Proposed Development Site, primarily for demolition works and engineering

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: dust from demolition and construction V1.1 online. Available at:

R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf:8:outriggers, crossing with vehicles, hand digging or machine digging, ditching, demolition, drainage

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: demolition under a separate consenting process) which includ e a Demolition Method

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: Statement. For the purpose of this EIA, the demolition of all other on -site infrastructure will be

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: Approval applications. Demolition has not, therefore, been accounted for in this chapter.

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:18: previous demolition and reclamation works undertaken at the site but i t is assumed that all

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:18: relevant legislative requirements regarding the demolition works and possible presence of

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:25: Gravel and cobbles include brick (including refractory), concrete and other demolition

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:34: comprising of slag, ash and demolition rubble giving rise to a range of contaminants

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35:H4.88 Demolition of remaining buildings (small relic Oxygen Plant, former Loco Repair Shop and the

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: demolition works will be undertaken in accordance with all relevant permissions, guidance and

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:37: COMAH related risks would be removed during the demolition of the site. The main aspects are

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: EIA, the demolition of all other on-site infrastructure will be subject to separate consents. Other

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:12:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:15:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:18:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:20: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:25:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:26: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:28:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:28:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0819-ESM-Network Rail 819.pdf:3:method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any

R-2020-0819-ESM-Network Rail 819.pdf:3:Demolition

R-2020-0819-ESM-Network Rail 819.pdf:3:Any demolition or refurbishment works must not be carried out on the development site that may endanger the

R-2020-0819-ESM-Network Rail 819.pdf:3:safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: assessment of dust from demolition and construction will be followed;

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter J - Climate Change - Dec 2020.PDF:10:J1.13 No data is available regarding the quantity of demolition material that will be removed from the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: ponding are frequent typically related to the demolition of industrial buildings.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: ponding are frequent typically related to the demolition of industrial buildings

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:7: engineering operations and demolition of existing structures.

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:10: engineering operations and demolition of existing structures. In addition to this, RCBC

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:13: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: “Prior approval for demolition of locomotive repair shed; oxygen plant tanks and buildings”

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14:2.51 This application sought prior approval for the demolition of some of the on-site structures at the

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: plant tanks and buildings. RCBC confirmed that prior approval for the demolition of these

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: “Prior notification of proposed demolition of former torpedo ladle repair workshop building”

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14:2.53 This application seeks prior approval for the demolition of the torpedo ladle repair workshop

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:17: been issued for the demolition of most of these buildings and, where not, separate applications

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: recovery facilities, construction and demolition waste recycling, household waste recycling

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: Policy MWP10 (Construction and Demolition Waste Recycling)

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: development of facilities to recycle construction and demolition wastes. For the reasons set out

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:27: major demolition in this first instance. There is also recognition that areas which require more

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:35: materials recovery facilities, construction and demolition waste recycling, household waste

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:48: phases of development, including hours of construction, demolition and construction

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:52: significant Made Ground deposits comprising of slag, ash and demolition rubble giving rise to a

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:55: wastes by 2030. The recovery target for construction, demolition and excavation waste for the

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:55: demolition) and operational phases of the proposed development, and by considering its

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:14: assessment of dust from demolition and construction into the CEMP from the outset,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:8: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:9: The proposed development life is a minimum of 50 years. Full deconstruction/demolition of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: It is known that there are some demolition activities

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: demolition activities are undertaking a separate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: associated with the planned demolition activities.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:15: waste will be removed from site. The GHG emissions associated with demolition are not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:16:J4.6 Arup has been advised by the client that engineering, demolition and ground works activities

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:16: the emissions arising from demolition activities, and the transport and disposal of waste, are not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:26: commences. Further guidance is provided by IAQM on monitoring during demolition,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:i IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction (Version 1.1)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:15: • Demolition and Salvage;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: • Demolitions: The site, and indeed other sites in the Teesworks area, contain a number of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: ahead. It is envisaged that consent for their demolition will mostly be obtained by way of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: Prior Approval process, where the method of demolition and site restoration would be fully

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: Regulations and Environmental Impact Assessments relating to those demolition schemes.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: “Prior approval for demolition of locomotive repair shed; oxygen plant tanks and buildings”

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19:B4.29 This application sought prior approval for the demolition of some of the on-site structures at the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: prior approval for the demolition of these structures was not required on the 7 July 2020.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: “Prior notification of proposed demolition of former torpedo ladle repair workshop building”

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:20:B4.31 This application sought prior approval for the demolition of the torpedo ladle repair workshop

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:20: demolition of these buildings was not required on 17 December 2020.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:28: demolition works on site.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.9 Demolition of those buildings and structures on site will be carried out prior to construction of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.17 As above, this stage of the development may include the demolition of any existing on -site

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:30:B7.20 All demolition works are the subject of a separate consenting process and the works will be

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:30: demolition context at the site is described in Sections B4 and B7 of this ES Chapter.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:33: Assessment of Dust from Demolition and Construction will be employed at the proposed

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:33: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: EIA, the demolition of all other on-site infrastructure will be subject to separate consents. Other

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:13:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:16:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:19:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:26:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:29:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:29:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:28: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:8: • PPG 6 Working at construction and demolition sites;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: Table E3.1 Thresholds of potential significant effects of demolition and construction noise at residential buildings (adapted from

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:12:E3.30 “Noise from construction and demolition sites should not exceed the level at which

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:6: engineering operations and demolition of existing structures.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:5: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9:M2.25 The target of 80% of construction and demolition waste to be used as an alternative mineral for

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:11: (deconstruction, demounting, demolition and disposal) phases.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:11: demolition) and operational phases of the proposed development, and by considering its

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:16:M3.29 The demolition of the existing buildings on site are subject to separate consents and as such

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:16: waste arising from demolition has not been assessed in this chapter. The demolition assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:19:M5.4 Phasing is not relevant to waste and materials as demolition will be complete prior to the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:20: demolition, excavation or groundworks waste.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:24: * Excludes plasterboard from demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:24: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:30: 3 C&D – Construction & demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:30: 4 CD&E – Construction, demolition, & excavation

R-2020-0819-ESM-EP CL.pdf:2: There are still areas of the site that need demolition and further geochemical and

R-2020-0819-ESM-Decision Notice 0819.pdf:14:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: Pipe Bridge, Swale and the demolition of old plant and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace with new Granted, At the request of the Officer.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: 21 South Bank Site, Outline R/2020/0 Outline planning application for demolition of existing Decision pending This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:20: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures and Pending decision, This application has been

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:22: A Land at Former Full R/2019/0427/FF Demolition of structures and engineering operations Granted, Development

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:22: the demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: C Land associated Prior N/A Demolition of existing structures and buildings Not yet submitted All 5 STDC Tier 1

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: until the demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: demolition phases

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:25: demolition works

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:25: D Steel House Full R/2020/0598/FF Retrospective demolition of existing gatehouse; Pending decision, This development

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:28: 3 Where demolition is required to ‘clear’ the Dorman Point, Lackenby or Foundry sites, it is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:28: assumed that this demolition will take place ahead of construction commencing on that

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:76: 6 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction

R-2020-0819-ESM-Dorman Point HRA Rev B(1).PDF:3:Workshop is still present in the southern part of the site (the demolition of which is to be the subject

R-2020-0819-ESM-ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:17: demolition of old plant and buildings.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace Granted, At the request of the Officer.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: STDC planning 357/OO demolition of existing structures on site STDC in July 2020 and the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: 22 South Bank, Outline This Demolition of the existing wharf, jetties Decision pending. This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:19: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures Pending decision, This application has been

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:24: development, including, where relevant, requisite demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:25: including, where relevant, demolition works;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: in the iron and steel making process. Consent is in place for the demolition of some of these

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: demolition works will be subject to a separate consenting process. Permission is therefore not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: sought for the demolition of buildings and structures and the effects of demolition will,

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF:14: the demolition of the steel works and as such are not considered of more than regional

R-2021-0911-HD-63455_01 - RCBC - 08.09.21.PDF:1:submission of a planning application for development (Ref: R/2021/0465/FFM), and approved demolitions

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:5: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:8: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:9: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:11: (deconstruction, demounting, demolition and disposal) phases.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:11: demolition) and operational phases of the proposed development, and by considering its

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:16:M3.29 The demolition of the existing buildings on site are subject to separate consents and as such

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:16: waste arising from demolition has not been assessed in this chapter. The demolition assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:19:M5.4 Phasing is not relevant to waste and materials as demolition will be complete prior to the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:20: demolition, excavation or groundworks waste.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:24: * Excludes plasterboard from demolition.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:24: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:30: 3. C&D - Construction & demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:30: 4. CD&E - Construction, demolition, & excavation

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: Pipe Bridge, Swale and the demolition of old plant and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace with new Granted, At the request of the Officer.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: 21 South Bank Site, Outline R/2020/0 Outline planning application for demolition of existing Decision pending This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:22: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:22: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures and Pending decision, This application has been

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:24: A Land at Former Full R/2019/0427/FF Demolition of structures and engineering operations Granted, Development

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:24: the demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: C Land associated Prior N/A Demolition of existing structures and buildings Not yet submitted All 5 STDC Tier 1

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: until the demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: demolition phases

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: demolition works

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: D Steel House Full R/2020/0598/FF Retrospective demolition of existing gatehouse; Pending decision, This development

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:30: 3 Where demolition is required to ‘clear’ the Dorman Point, Lackenby or Foundry sites, it is

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:30: assumed that this demolition will take place ahead of construction commencing on that

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:79: 6 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:9: - PPG 6 Working at construction and demolition sites;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:23: made ground with demolition materials.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:31: COMAH related risks would be removed during the demolition of the site. The main aspects are

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: Table E3.1: Thresholds of potential significant effects of demolition and construction noise at residential buildings (adapted from

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:12:E3.30 “Noise from construction and demolition sites should not exceed the level at which

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:19: with demolition materials.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:14: assessment of dust from demolition and construction into the CEMP from the outset,

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: EIA, the demolition of all other on-site infrastructure will be subject to separate consents. Other

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:12:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:15:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:18:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:20: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:25:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:26: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor infrastructure along

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:28:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:28:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:28: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:19:the demolition of the buildings and appropriate mitigation.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:19:The main body of this report covers the results, recommended timing for demolition and the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:15: • Demolition and Salvage;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: • Demolitions: Some of the other sites in the Teesworks area, where outline planning

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: for their demolition will mostly be obtained by way of the Prior Approval process where the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: method of demolition and site restoration would be fully established, assessed, mitigated

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: Environmental Impact Assessments relating to those demolition schemes.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:32: Assessment of Dust from Demolition and Construction will be employed at the proposed

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:32: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:17: demolition of old plant and buildings.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace Granted, At the request of the Officer.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: STDC planning 357/OO demolition of existing structures on site STDC in July 2020 and the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: 22 South Bank, Outline This Demolition of the existing wharf, jetties Decision pending. This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:19: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures Pending decision, This application has been

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:24: development, including, where relevant, requisite demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:25: including, where relevant, demolition works;

R-2020-0822-ESM-ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: assessment of dust from demolition and construction will be followed;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:27: monitoring during demolition, earthworks and construction; and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:9 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction (Version 1.1)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:8: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:9: The proposed development life is a minimum of 50 years. Full deconstruction/demolition of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: It is known that there are some demolition activities

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: demolition activities are undertaking a separate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: associated with the planned demolition activities.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:15: waste will be removed from site. The GHG emissions associated with demolition are not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:17:J4.6 Arup has been advised by the client that engineering, demolition and ground works activities

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:17: the emissions arising from demolition activities, and the transport and disposal of waste, are not

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:1:PROPOSAL: DEMOLITION OF EXISTING

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:1:Permission is sought for the demolition of existing buildings/structures and

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:6:application made only in relation to demolition and remediation to create a

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:8:the site and demolition of structures across the site is acceptable and the

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:1:“Demolition of existing buildings/structures and engineering operations associated with ground

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:6:The proposed small-scale demolition works and engineering operations to level the MRA site are a key step

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:9:“Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:34: Land at Former R/2019/0427 Full Approved Demolition of

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:34: Land at South demolition of existing

R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:1:Details: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: construction of storage tanks and additional infrastructure between 1992 and 1993. Demolition of

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:43: demolition rubble.

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:90: ‐ demolition rubble

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:93: - demolition rubble

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0465-FFM-Archaeological Advice - R-2020- 0465-FFM, Land at metals recovery area .pdf:1:DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED

R-2020-0465-FFM-Archaeological Advice - R-2020- 0465-FFM, Land at metals recovery area .pdf:1:application made only in relation to demolition and remediation to create a development platform.

R-2020-0465-FFM-MRA Application Form Rev.pdf:5:design, demolition and construction - Recommendations'.

R-2020-0465-FFM-MRA Application Form Rev.pdf:7: floorspace use or demolition (including change of following development

R-2020-0465-FFM-MRA Application Form Rev.pdf:7: class Type of use applicable of use or demolition changes of use)

R-2020-0465-FFM-MRA Application Form Rev.pdf:8:Recycling facilities construction, demolition

R-2020-0465-FFM-MRA Application Form Rev.pdf:8: Construction, demolition and excavation

R-2020-0465-FFM-R 20 0465 nat eng.pdf:1:Planning consultation: Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-R 20 0465 Con Land.pdf:1: Proposal: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:4:A planning application is being submitted for ‘demolition of existing buildings/ structures and engineering

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:5: being submitted for ‘demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:5:2.1.2 Most recently the Site has been used for recovery of metals from demolition debris of the

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:7:“Demolition of existing buildings/ structures and engineering operations associated with ground

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:11: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:MPA_AUK_TP130 are noted to be within deposits containing demolition material, whilst the sample from

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:Asbestos fibres were identified in two samples, however only one of these contained obvious demolition

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:27:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in shallow soils

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:27:The proposed planning application “Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:28: 1. The proposed planning permission is for “Demolition of existing buildings/ structures and

R-2020-0465-FFM-R 20 0465 Nuisance.pdf:1: Proposal: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2022-0951-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0951-CD-64764 Covering Letter November 2022(1).pdf:1:“Outline planning application for the demolition of existing structures on site and the development of

171019South-Tees-Master-Plan-19-Nov-17.pdf:17: 17. Plan for a progressive, optimally-phased delivery of demolition, site preparation and infrastructure across the

171019South-Tees-Master-Plan-19-Nov-17.pdf:24: decommissioning and demolition of the facilities allocation over 30 years, to be included in the

171019South-Tees-Master-Plan-19-Nov-17.pdf:58:products of decommissioning and demolition. Utilising

171019South-Tees-Master-Plan-19-Nov-17.pdf:80:demolition and remediation – so this will need to be

171019South-Tees-Master-Plan-19-Nov-17.pdf:85:strategy to arrange end user site allocations to minimise a long time and the area will contain significant volumes in the programme. While demolition is proceeding across compatible end uses to minimise potential conflicts.

171019South-Tees-Master-Plan-19-Nov-17.pdf:85: retain the landfill zone as waste management facilities, • Areas that don’t require major demolition.

171019South-Tees-Master-Plan-19-Nov-17.pdf:86: Demolition

171019South-Tees-Master-Plan-19-Nov-17.pdf:153: land, for use by the telecom providers • Collection of construction, demolition and

171019South-Tees-Master-Plan-19-Nov-17.pdf:158:south and, centrally, via Tees Dock Road. The scale from demolition and site remediation operations elsewhere spaces strategy. iron and steel works, whether operational or non-operational,

171019South-Tees-Master-Plan-19-Nov-17.pdf:158: enables phased completion of discrete areas, releasing demolition programme for development purposes, would

171019South-Tees-Master-Plan-19-Nov-17.pdf:162:the implementation of any essential demolition, site in a timely and comprehensive manner, though a operations expansion, provide the right conditions for

171019South-Tees-Master-Plan-19-Nov-17.pdf:162: deferred, pending completion of demolition works (e.g., 13.07 Land Disposal Bank Wharf site; a large area of the Grangetown Prairie

171019South-Tees-Master-Plan-19-Nov-17.pdf:162:established. Exclusion of RBT from the land available plant and facilities would be planned for demolition. presents an opportunity for the management

171019South-Tees-Master-Plan-19-Nov-17.pdf:162: their demolition, a thorough market testing exercise will be Service charges will be levied on the developed estate

tion would not lead to AEoI, due to

R-2021-0608-PND-hra.pdf:11:N2K species by in the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11: the selection of demolition technique. High impact

R-2021-0608-PND-hra.pdf:11:N2K sites by in the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11:Contamination of The demolition process proposes to use water No AEoI

R-2021-0608-PND-hra.pdf:11: demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:11: During the demolition phase of the works Thompsons

R-2021-0608-PND-hra.pdf:11: demolition workface as works progress and the

R-2021-0608-PND-hra.pdf:11: arisings produced during the demolition works. Care

R-2021-0608-PND-hra.pdf:12: proposed demolition operations will, likewise, filter

R-2021-0608-PND-hra.pdf:12: The demolition process proposes to use water

R-2021-0608-PND-hra.pdf:12: the demolitions project Outline Method Statement

R-2021-0608-PND-hra.pdf:12: using sandbags to prevent demolition debris from

R-2021-0608-PND-hra.pdf:12:N2K species by Sands) is 0.6km from the demolition site, although

R-2021-0608-PND-hra.pdf:12: the proposed demolition site (Figure 2).

R-2021-0608-PND-hra.pdf:12: demolition site, likely disturbance is assessed as nil.

R-2021-0608-PND-hra.pdf:12: nested within the demolitions project site. This

R-2021-0608-PND-hra.pdf:13:Figure 2. Distance from demolition site to main N2K roosts.

R-2021-0608-PND-hra.pdf:13:from the Foundry Site demolitions project on the T&CC European Sites.

R-2021-0608-PND-hra.pdf:14:within the whole Teesworks zone will not lead to AEoI, this demolitions project HRA

R-2021-0608-PND-hra.pdf:14:10.1 The proposed Foundry Site demolitions project will not cause adverse effect to the

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:1: Demolitions

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3: • Demolition works are proposed in the area referred to as the Foundry Site.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3: determining whether the demolition works constitute EIA development for Ecology.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3:behalf of Teesworks to support a ‘prior approval’ planning applications for demolition works

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3:The project involves the demolition of defunct industrial structures on previously developed

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:4:by the proposed demolition works. The following VERs have been considered in this

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:8: During the demolition phase of the works Thompsons will minimize dust

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:8: present; Thompsons will use water to dampen the demolition workface as works

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9: progress and the arisings produced during the demolition works. Care will be

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9:contamination demolition debris from entering and protected using a steel plates.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:9: demolition technique. High impact works will be strictly minimised.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:10: Biodiversity Strategy. suitability of demolitions sites

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:11: • Demolition works are proposed in the Teesworks area referred to as the Foundry

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:11: determining whether the demolition works constitute EIA development for Ecology.

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:13:There are two nationally designated sites within a 5km radius of the proposed demolition

R-2021-0608-PND-363937 - R_2021_0608_PND Prior Notification for demolition of structures at Former Redcar Steel Works Site (Teesworks), Redcar.pdf:1:Planning consultation: Prior Notification for demolition of obsolete coke ovens & battery;

R-2021-0608-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0608-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0608-PND-SITE NOTICE.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0608-PND-SITE NOTICE.pdf:1:Demolition is due to begin on: 6 August 2021

R-2021-0608-PND-19931629_1.pdf:6: Appointments: • Demolition Supervisor - TBC

R-2021-0608-PND-19931629_1.pdf:8: • Demolition hand tools (pry-bar, hammer, saw, shovel)

R-2021-0608-PND-19931629_1.pdf:8: • Demolition specification 360o excavator machine (equipped with choice

R-2021-0608-PND-19931629_1.pdf:8: of demolition attachments)

R-2021-0608-PND-19931629_1.pdf:9: proximity to the structures marked for demolition.

R-2021-0608-PND-19931629_1.pdf:10: of demolition, the location of demolition equipment, storage, stockpile and lay-

R-2021-0608-PND-19931629_1.pdf:10: demolition debris from entering and protected using a steel plates.

R-2021-0608-PND-19931629_1.pdf:10: During demolition works, a demolition exclusion zone will be put into place

R-2021-0608-PND-19931629_1.pdf:10: exclusion zone during active demolitions will be permitted to essential persons

R-2021-0608-PND-19931629_1.pdf:10: only. Demolition plant to person interface will be strictly controlled and will be

R-2021-0608-PND-19931629_1.pdf:11: Working at Access to heights (for asbestos removal, soft strip, demolition works etc) will be

R-2021-0608-PND-19931629_1.pdf:14: During the demolition phase of the works Thompsons will minimize dust

R-2021-0608-PND-19931629_1.pdf:14: Thompsons will use water to dampen the demolition workface as works progress

R-2021-0608-PND-19931629_1.pdf:14: and the arisings produced during the demolition works. Care will be taken not to

R-2021-0608-PND-19931629_1.pdf:14: distance from demolition operations and will be positioned outside of the

R-2021-0608-PND-19931629_1.pdf:15: demolition technique. High impact works will be strictly minimised. Thompsons

R-2021-0608-PND-19931629_1.pdf:15: and dampening mechanisms in the demolition plant. Annual health surveillance

R-2021-0608-PND-19931629_1.pdf:16: of demolition works.

R-2021-0608-PND-19931629_1.pdf:16: At certain stages on the demolition works, if at any point a temporary partial or

R-2021-0608-PND-19931629_1.pdf:19: • Instability of structure during demolition

R-2021-0608-PND-19931629_1.pdf:20: • Prior to the commencement of demolition works, Thompsons will appoint the services of an

R-2021-0608-PND-19931629_1.pdf:21: The fixtures / fittings will then be processed (using demolition hand tools) into small and hand

R-2021-0608-PND-19931629_1.pdf:22:Remote Demolition of the Redcar Coke Ovens & Battery, Redcar HFO Tanks, Redcar Power Station

R-2021-0608-PND-19931629_1.pdf:22: will be demolished by remote mechanical means, using a combination of high reach demolition

R-2021-0608-PND-19931629_1.pdf:22: The high reach and 100te machines will be assisted by an additional demolition spec 360o

R-2021-0608-PND-19931629_1.pdf:22: excavator machines, for low-level demolition, material processing, sorting and segregation.

R-2021-0608-PND-19931629_1.pdf:22: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0608-PND-19931629_1.pdf:22: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0608-PND-19931629_1.pdf:22: • Following the completion of the demolition works, the processing and removal of all arisings

R-2021-0608-PND-19931629_1.pdf:28: DEMOLITION WORKS

R-2021-0608-PND-19931630_1.pdf:1: DECOMMISSIONING/DEMOLITION

R-2021-0608-PND-19931630_1.pdf:1: PRIOR APPROVAL DEMOLITIONS

20210128 MLA202000507 Tee south bank phase 2 shellfish advice + JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf:1:SOUTH BANK QUAY - PHASE 2 WORKS COMPRISING OF DEMOLITION, CAPITAL

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:1:8. In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:1: • demolition of existing Infrastructure including the dilapidated South Bank wharf, 3

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3:22. Demolition works are assessed to cause localised disturbance of the bed, of low magnitude and

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:1:6. The proposed scheme will comprise the following works: demolition, capital dredging, offshore

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:13: 1. Demolition of the existing wharf (approx. 750 m length), three jetties downstream the wharf, live

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:1:7. The proposed scheme comprises demolition, capital dredging, offshore disposal of dredged material

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works:

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:6:Demolition works are limited to the dilapidated wharf, three jetties downstream of the wharf (with the

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:8:anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA-2020-00507.pdf:1: used. Timings have been provided for all activities except for demolition, as this is the first

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:1: storage/distribution activities. The proposed scheme comprises demolition of the existing

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:6: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:3:3.3 Demolition 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:3.3 Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:comprise the demolition of:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:Although the demolition of the above Infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:has confirmed that demolition of such Infrastructure can commence without planning permission, and works

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:15:to demolish such Infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27: Demolition - - 12 months

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:27: • Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:namely demolition of existing Infrastructure and construction of the proposed quay require planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:148: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:200: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:271: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:334: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:344: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:345: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:351: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:353: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:354: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:367: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:385: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:388: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:390: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393:Measures specific to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:395: Demolition 3 52

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:523: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:525: station and demolition of substation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:555: dredging, excavation and demolition works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:and demolition waste is subjected to material recovery.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:7:demolition waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:9: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:11:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: have had prior approval for demolition (see below).

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14:comprise the demolition of:

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: demolition can proceed without planning permission).

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:14: STDC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:15: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:23: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:28:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:31:demolition by competent specialists and disposed as hazardous waste.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:“Outline planning application for demolition of existing structures on site and the development of up to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:79:Thank you for your enquiry on the demolition of an existing timber wharf and two

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: • demolition of the existing timber wharf and jetties,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:85:please find the attached figures. In summary, the proposed scheme comprises demolition of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: • Demolition of various buildings and structures on the riverbank and hinterland.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:257:It is understood that demolition of some of the existing above ground Infrastructure on site (namely the heavy

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:285:The proposed scheme will include demolition of some existing on site structures (with others removed in

MLA_2020_00507-Marine Coordinate Schedules-13.pdf:2:Demolition area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.3 Demolition 7

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:3.3 Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:comprise the demolition of:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:Although the demolition of the above Infrastructure is proposed as enabling works to be undertaken in

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:has confirmed that demolition of such Infrastructure can commence without planning permission, and works

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:15:to demolish such Infrastructure has started. As a result, there is no requirement for the demolition of that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:17: STRUCTURES FOR DEMOLITION

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: Demolition - - 12 months

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:3.11 Summary of plant to be used during demolition and construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:27: • Demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:namely demolition of existing Infrastructure and construction of the proposed quay require planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:6.5.1 Demolition of the existing wharf and jetties

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:90:sedimentary regime arising from the demolition works is very low.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:148: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:167: (demolition of derelict structures and rock blanket)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:200: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:9.5.1.1 Demolition of existing structures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:271: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:334: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:344: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:345: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:351: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:353: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:354: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:367: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:373: • Demolition of the existing South Bank Wharf;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383: Guidance on the Assessment of Dust from Demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:385: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:388: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:390: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391: Demolition Earthworks Construction Trackout

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393:Measures specific to demolition

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Soft strip inside any buildings or structures before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395: Demolition 3 52

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:492: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:497: Demolition of structures and engineering operations associated with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:523: Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525: station and demolition of substation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: dredging, excavation and demolition works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:561: Outline planning application for demolition of existing structures on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:Effects on estuarine processes due to demolition activities

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:133: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139:The proposed development will include the demolition of the existing wharf and the construction of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:139: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:144: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:145:Demolition of the existing Infrastructure will last for approximately 56 weeks. On completion, the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:271:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:272: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:280: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:282: Proposed Demolition Area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: Demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285: demolition process prior to construction of the quay.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:285:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Marine demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:287:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:different for each of the four categories of construction activities outlined by the IAQM (demolition,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: Demolition metal cladding or timber)

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities <10m above

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition activities 10 - 20m • Demolition activities >20m above

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:293: • Demolition during wetter months

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:296:Table A18.6 Risk of dust impacts - demolition

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350: • demolition of the existing Infrastructure;

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:384:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: up using a long reach excavator with hydraulic demolition attachments, working from the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: the demolition may include cutting sections of the deck and lifting them onto the land for

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: into the Tees is minimised. Should any debris fall into the river channel during demolition,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:385: boat. As with the concrete deck, best practice demolition techniques would be adopted to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386: during the demolition works but these are only expected to be localised to the working area

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:386:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:399: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

MLA_2020_00507-APPLICATION-FORM.pdf:2:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00507-APPLICATION-FORM.pdf:10:Demolition area

MLA_2020_00507-APPLICATION-FORM.pdf:11:Demolition of Demolition area Other removals

MLA_2020_00507-APPLICATION-FORM.pdf:15:Demolition area - Demolition of existing Infrastructure

MLA_2020_00507-APPLICATION-FORM.pdf:15:Demolition of existing Infrastructure

MLA_2020_00507-APPLICATION-FORM.pdf:15:A programme of demolition works is required in advance of construction works

MLA_2020_00507-APPLICATION-FORM.pdf:16:The proposed demolition methodology is detailed in Section 3.3 of the EIA Report.

MLA_2020_00507-APPLICATION-FORM.pdf:16:However, in summary it is envisaged that demolition would require the use of both land

MLA_2020_00507-APPLICATION-FORM.pdf:16:either broken up using a long reach excavator with hydraulic demolition attachments,

MLA_2020_00507-APPLICATION-FORM.pdf:16:safety/workboat). Alternatively, the demolition may include cutting sections of the deck

MLA_2020_00507-APPLICATION-FORM.pdf:16:Demolition works are anticipated to take approximately 12 months for Phase 1 and 2

MLA_2020_00507-APPLICATION-FORM.pdf:16:combined. Should Phase 2 be implemented separately to Phase 1, demolition for Phase

MLA_2020_00507-APPLICATION-FORM.pdf:16:undertaken 24 hours a day, seven days a week. The specific months when demolition is

MLA_2020_00507-Licence Document (Marine)-14.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Site 2 - Demolition area

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Site location Demolition area.

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Activity 2.1 - Demolition of existing Infrastructure

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Activity location Demolition area, see coordinate schedule 2.

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Description A programme of demolition works is required in advance

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Methodology Demolition will require the use of both land and marine

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: be broken up using excavators with hydraulic demolition

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: and a safety boat). Alternatively, the demolition may

MLA_2020_00507-Licence Document (Marine)-14.pdf:7:Programme of works Demolition works to take approximately 12 months for

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: separately to Phase 1, demolition for Phase 2 is

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: anticipated to take approximately eight months. Demolition

MLA_2020_00507-Licence Document (Marine)-14.pdf:7: works may take place alongside phase 1 demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:3:3.3 Demolition 7

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:3.3 Demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:comprise the demolition of:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:Although the demolition of the above Infrastructure is proposed as enabling works to be undertaken in

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:has confirmed that demolition of such Infrastructure can commence without planning permission, and works

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:15:to demolish such Infrastructure has started. As a result, there is no requirement for the demolition of that

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:demolition of this building has been incorporated into the landside EIA and associated planning application

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:commencing. The assumed approach to demolition of these assets is detailed below.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:The demolition of the substation will be undertaken using land-based plant. The building materials are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:16:diverted in advance of demolition commencing so that works could be undertaken safely.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:17: STRUCTURES FOR DEMOLITION

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:17: STRUCTURES FOR DEMOLITION

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:25:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27: Demolition - - 12 months

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27:3.11 Summary of plant to be used during demolition and construction

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:27: • Demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:28:In addition to the above, best practice working methods would be adopted during demolition / excavation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:28:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:35: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:namely demolition of existing Infrastructure and construction of the proposed quay require planning

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:38:and berth pocket as well as material to be generated from proposed demolition activities) have been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:6.5.1 Demolition of the existing wharf and jetties

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:90:sedimentary regime arising from the demolition works is very low.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:148: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:154: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:167: (demolition of derelict structures and rock blanket)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:187:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:200: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:9.5.1.1 Demolition of existing structures

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:207:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:217:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:239:although the proposed demolition activities would take place in the marine environment, these would be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:240:The proposed dredging and other underwater activities (namely demolition and removal of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:246: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:268:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:271: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:276: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:276:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:284: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:296:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:299:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:302:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:306:otherwise be affected will have been displaced from the site during demolition of existing features and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:329:vessels to be used during demolition and construction) and the construction work in the intertidal could

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:334: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:335:support vessels required during demolition and construction). Construction activity will be focused on the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:344: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:345: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:351: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:352:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:352:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:353: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:354: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:358:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:359:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:367: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:371:“Noise from construction and demolition sites should not exceed the level at which conversation in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:373: • Demolition of the existing South Bank Wharf;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:374: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:383: Guidance on the Assessment of Dust from Demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:383:2) Separately for demolition, earthworks, construction and trackout:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:385: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:387: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:388: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389:construction activities has been categorised as large for demolition, earthworks and construction and small

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:389: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:390: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: Demolition Earthworks Construction Trackout

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391: Demolition Earthworks Construction Trackout

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:391:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:392:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393:Measures specific to demolition

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Soft strip inside any buildings or structures before demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Bag and remove any biological debris or damp down such material before demolition.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:395: Demolition 3 52

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:395:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:454:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:466:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:468:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:492: Outline planning application for demolition of existing structures on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:497: Demolition of structures and engineering operations associated with

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:498: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:498: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:506:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:523: Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:524: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:525: station and demolition of substation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:525:including ensuring debris from demolition activities is captured when working close to water and removed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:528:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:529:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:533: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:555: dredging, excavation and demolition works.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:555: • Sand and shingle • Water quality reductions from demolition and dredging

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:561: Outline planning application for demolition of existing structures on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:566: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:568: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:569: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:570: • Airborne noise disturbance to waterbirds due to demolition and construction works.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:Effects on estuarine processes due to demolition activities

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:572:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:573:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576: • Airborne noise disturbance to birds during demolition, construction and operation.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576:Airborne noise disturbance to birds during construction (including demolition) and operation

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:576:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:birds that may otherwise be affected will have been displaced from the site during demolition of existing

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:578:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:580:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:581:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:583:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:588:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:593:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:5:Demolition of existing timber wharf and jetties

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:2:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf:1:DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:vessels to be used during demolition and construction) and the construction work in the intertidal could

R-2020-0684-ESM-Response from applicant.PDF:1:Ports noted that, given the overlapping nature of the developments and the phased approach to demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:5:1.1.3 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: Demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.2 Demolition works to be undertaken as part of the proposed scheme which is the subject of this TS

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19: demolition process prior to construction of the quay.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:19:4.2.3 During demolition, best practice demolition techniques and working methods would be adopted to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Marine demolition

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of tarmac and dolphin jetties 8 2 3,584 179 90 90

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 1) 12 3 7,872 394 131 131 131

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1112_Appendix 10_Transport Statement.pdf:21:Demolition of South Bank Wharf (Phase 2) 30 7.5 23,616 1,181 157 157 157 157 157 157 157 157

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:“Outline planning application for demolition of existing structures on site and the development of up to

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1: the ‘marine’ works comprise demolition of the existing timber wharf and jetties, capital dredging (to

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:has been produced solely with regard to the ‘marine’ works, namely demolition of the existing timber wharf

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:10: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1 Direct loss of habitat due to demolition of existing structures and dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:9.5.1.1 Demolition of existing structures

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:17:Prior to construction works commencing, a programme of demolition would be undertaken to remove the

R-2020-0684-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-SB-DN-DR-C-1380_P01.pdf:1: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5: • Demolition of the dilapidated wharf, three jetties downstream of the wharf (including the conveyor

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:6: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:11:During construction, the demolition of the wharf and jetties will have only minor, localised and temporary

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:12:Other impacts such as demolition and removal of existing structures and construction of the new quay wall

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:13:Predicted construction phase impacts are linked to habitat loss from the demolition of existing structures

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:suitable record of the structures be prepared prior to demolition, anticipated to comprise a photographic

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:17:demolition being undertaken with RCBC and submitted to the RCBC Historic Environment Record (HER).

R-2020-0684-ESM-2020 12 17 South Bank Wharf 1 RecNOnDet .pdf:1:A19/A66/A174/A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:3: Outline planning application for demolition of existing structures on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:8: Demolition of structures and engineering operations associated with

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:9: Engineering operations Demolition of existing buildings/structures and engineering No works are required within the estuary itself, with

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:17:All other potential effects such as discharge of surface water, demolition activities or accidental spills and

R-2020-0684-ESM-DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2020-0684-ESM-DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.3 Demolition 7

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:3.11 Summary of plant to be used during demolition and construction 19

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:In summary, the proposed scheme comprises demolition, capital dredging, offshore disposal of dredged

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:therefore defines the study area for the marine elements of the proposed scheme (namely the demolition,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_21_Socio-economics.pdf:18:occur during demolition, quay construction, excavation and dredging phases. Assuming a gradual ramping

R-2020-0684-ESM-ApplicationFormRedacted.pdf:2:Demolition of existing redundant quay structures, capital dredging and development of new quay and associated works (Phase 1).

R-2020-0684-ESM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:1:Subject: Ref Appns R/2020/0684/ESM & R/2020/0685/ESM Phases 1 & 2 (resp) Demolition of old

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:3:A1053 DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:7:including Environmental Statements for the demolition of existing redundant quay structures, capital dredging and

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:10: • Demolition of the existing wharf, jetties and other minor Infrastructure;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_8. Land quality and geology.pdf:19:potentially contaminated soils and demolition materials or by accidental spillage whilst handling, storage or

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: DEMOLITION OF EXISTING QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:1: phased approach to demolition and construction, please accept the comments below to be applicable

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:Estate. Prior to any proposed demolition works commencing within the vicinity of hazardous cargo

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:of the demolition and construction. It is considered essential that a scheme of maintenance works for

R-2020-0684-ESM-21 02 05 - Quayside Application.pdf:2:Infrastructure) to the proposed demolition and development of a new quay at South Bank, then this

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3: • British Standard 5837: 2012 – Trees in relation to design, demolition and construction;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:25:The proposed scheme requires the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:1: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:2: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Design and Access Statement November 2020.PDF:5:4.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:and demolition waste is subjected to material recovery.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:Note: The construction, demolition and excavation sector is the largest contributing sector to the total

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:(62%) was generated by construction, demolition and excavation activities. The recovery rate from non-

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:hazardous construction and demolition waste in the UK in 20166 was 91.0%. The UK is currently meeting,

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:6:demolition waste.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:8: 70% preparing for re-use, recycling and other recovery of construction and demolition waste.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:10:aggregate-type materials into a secondary aggregate product. Therefore, inert demolition material and other

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: have had prior approval for demolition (see below).

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13:comprise the demolition of:

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: demolition can proceed without planning permission).

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:13: STDC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14:In summary, the proposed scheme consists of demolition of the existing wharf and jetties, capital dredging

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of the existing wharf approximately 750m in length. It is proposed that the timber is

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of three jetties downstream of the wharf. It is assumed that the concrete decks could be

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:14: • Demolition of live substation. The building materials are proposed to be crushed and re-used on

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: structures (approximately ground) – 1,140,000m3 of soils and asbestos demolition survey will be

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:22: used on site as fill. – assumed to be re-used on site if contractor prior to demolition.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:27:Waste timber will arise from the demolition of the existing South Bank Wharf. The condition of any timber

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:An asbestos demolition / refurbishment survey will be carried out by the main works contractor prior to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition / refurbishment of buildings. If the survey identifies asbestos, this must be removed prior to

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:30:demolition by competent specialists and disposed as hazardous waste.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:6: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:10:“Noise from construction and demolition sites should not exceed the level at which conversation in the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:12: • Demolition of the existing South Bank Wharf;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:13: Demolition of existing South Jack up with crawler crane 1 C4.50 60 98.6

R-2020-0684-ESM-EP CL.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:1: • Removal / demolition of the existing timber wharf and concrete jetties (removal activity).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:namely demolition of existing Infrastructure and construction of the proposed quay require planning

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:4:and berth pocket as well as material to be generated from proposed demolition activities) have been

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:3: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9:The proposed development will include the demolition of the existing wharf and the construction of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 1: Partial demolition of the existing berth and construction of a new 450m berth; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:9: • Phase 2: Demolition of remaining berth and construction of an additional berth length of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:14: o Demolition of the existing wharf and construction of a new 1,035m long quay; and

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:15:Demolition of the existing Infrastructure will last for approximately 56 weeks. On completion, the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:7:from demolition works would be crushed on site and reused as fill as part of the proposed scheme. It is also

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:9:In addition to the workboats associated with demolition listed in Table 22.4, and dredgers and barges listed

R-2020-0684-ESM-Officer Report 0684.pdf:1:PROPOSAL: DEMOLITION OF EXISTING REDUNDANT

R-2020-0684-ESM-Officer Report 0684.pdf:1:Permission is sought for the demolition of existing redundant quay structures,

R-2020-0684-ESM-Officer Report 0684.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and

R-2020-0684-ESM-Officer Report 0684.pdf:3:R/2020/0357/ESM OUTLINE PLANNING APPLICATION FOR DEMOLITION

R-2020-0684-ESM-Officer Report 0684.pdf:11:recording before demolition of any early (20th century ?) structures on site

R-2020-0684-ESM-Officer Report 0684.pdf:14:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0684-ESM-Officer Report 0684.pdf:14:incorporated during the demolition and construction phase.

R-2020-0684-ESM-Officer Report 0684.pdf:14:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0684-ESM-Officer Report 0684.pdf:15:The proposed development can be broadly summarised as the demolition,

R-2020-0684-ESM-Officer Report 0684.pdf:18: Demolition of the existing wharf and jetties

R-2020-0684-ESM-Officer Report 0684.pdf:29:due to demolition of existing structures and dredging, effects of increased

R-2020-0684-ESM-Officer Report 0684.pdf:30:Demolition of existing structures including the wharf and jetties has the

R-2020-0684-ESM-Officer Report 0684.pdf:32:including the demolition of existing structures have the potential to result in

R-2020-0684-ESM-Officer Report 0684.pdf:37:the demolition of the dilapidated wharf, jetties, an electrical substation and

R-2020-0684-ESM-Officer Report 0684.pdf:42:supporting habitat due to dredging / excavation and demolition works, impacts

R-2020-0684-ESM-Officer Report 0684.pdf:42:With regard to loss of supporting habitat during dredging and demolition works

R-2020-0684-ESM-Officer Report 0684.pdf:42:The ES states that the area which is to be subject to demolition and

R-2020-0684-ESM-Officer Report 0684.pdf:44:undertaken prior to any demolition works taking place. It is considered that

R-2020-0684-ESM-Officer Report 0684.pdf:59:The proposed development will result in the demolition of the dilapidated

R-2020-0684-ESM-Officer Report 0684.pdf:59:utilities as part of the demolition process along with the removal of the

R-2020-0684-ESM-Officer Report 0684.pdf:60:With regard to the demolition and removal of the dilapidated remains of the

R-2020-0684-ESM-Officer Report 0684.pdf:60:footage of the wharf and jetties prior to their demolition. This is to then be

R-2020-0684-ESM-Officer Report 0684.pdf:61:photographic recording before demolition of any early 20th century structures

R-2020-0684-ESM-Officer Report 0684.pdf:63: Demolition of the existing South Bank Wharf;

R-2020-0684-ESM-Officer Report 0684.pdf:67: Dust emissions generated by demolition, excavation, construction and

R-2020-0684-ESM-Officer Report 0684.pdf:69:‘high risk’ for demolition and ‘medium risk’ for earthworks.

R-2020-0684-ESM-Officer Report 0684.pdf:69:incorporated during the demolition and construction phase.

R-2020-0684-ESM-Officer Report 0684.pdf:69:Prior to commencement of construction/demolition, a CEMP shall be

R-2020-0684-ESM-Officer Report 0684.pdf:79:The proposed development will also involve demolition of existing structures,

R-2020-0684-ESM-Officer Report 0684.pdf:83:during demolition, quay construction, excavation and dredging phases.

R-2020-0684-ESM-Officer Report 0684.pdf:96:The application for demolition of existing redundant quay structures, capital

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:3: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_14. Commercial and recreational navigation.pdf:4:support vessels required during demolition and construction). Construction activity will be focused on the

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1:different for each of the four categories of construction activities outlined by the IAQM (demolition,

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1:demolition, earthworks, construction and trackout. The dust emission magnitude is based on the scale of

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: Demolition metal cladding or timber)

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities <10m above

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition activities 10 - 20m • Demolition activities >20m above

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:1: • Demolition during wetter months

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:4:activity (demolition, earthworks, construction and trackout) before mitigation is applied should be determined

R-2020-0684-ESM-Appendix 11_Air quality assessment method.pdf:4:Table A18.6 Risk of dust impacts - demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:7: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:13: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf:26: (demolition of derelict structures and rock blanket)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: dredging, excavation and demolition works.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:5: • Sand and shingle • Water quality reductions from demolition and dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:11: Outline planning application for demolition of existing structures on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:16: Demolition of structures and engineering operations associated with environmental impacts were envisaged. Given the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:18: New cinema Demolition of existing cinema and replacement with a new cinema Approximately Planning permission assemblage during construction and operation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:19: Engineering operations Demolition of existing buildings/structures and engineering works are in close proximity to the proposed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:20: • Airborne noise disturbance to waterbirds due to demolition and construction works.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:Effects on estuarine processes due to demolition activities

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:22:During construction, the demolition of the existing wharf and jetties will have only minor, localised and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:23:intertidal habitat that would be lost during excavation / demolition would represent approximately 0.6% of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26: • Airborne noise disturbance to birds during demolition, construction and operation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:Airborne noise disturbance to birds during construction (including demolition) and operation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:26:The demolition, construction and operation phases of the proposed scheme will inevitably result in the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:Construction phase works (including demolition) are predicted to be undertaken 24 hours a day and,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:birds that may otherwise be affected will have been displaced from the site during demolition of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:28:demolition / construction plant and machinery to be present at South Bank, depending on the nature of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:30:It is anticipated that the very low number of SPA features that may be displaced by the demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:31:of intertidal to subtidal habitat, demolition of artificial structures and dredging of an area of approximately

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:33:Construction and operation activity at the site of the demolition, intertidal excavation and quay construction

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8: • demolition of the existing Infrastructure;

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:1:Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: up using a long reach excavator with hydraulic demolition attachments, working from the

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: the demolition may include cutting sections of the deck and lifting them onto the land for

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: into the Tees is minimised. Should any debris fall into the river channel during demolition,

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:2: boat. As with the concrete deck, best practice demolition techniques would be adopted to

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3: during the demolition works but these are only expected to be localised to the working area

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:3:through sediment disturbance or building works) demolition works but these are only expected to be localised to the working area and

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16:Table B1 Completed Scoping Tables for Activity: C1 Demolition of timber wharf and jetties

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Qualitative status Quantitative Dependent Surface Water Body Status No The proposed demolition would not impact on the groundwater body

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Chemical Chemical Dependent Surface Water Body Status No The proposed demolition of timber wharfs would not impact on the

R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf:16: Supporting Prevent and limit objectives No The proposed demolition of timber wharfs would not impact on the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:1:British Standard 5837: 2012 – Trees in relation to design, demolition and construction.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:6:Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:2: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:3: • C1 Demolition of the existing wharf and three jetties down-stream of the wharf.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4: station and demolition of substation.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:4:including ensuring debris from demolition activities is captured when working close to water and removed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:7:C1 Demolition of wharf of the structures would not threaten the No – small scale effects materials removed would

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:8:C1 Demolition of wharf and jetties No – demolition of the structures would not impact on the groundwater body

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf:12: TEES AT REDCAR JETTY Proposed Demolition Area

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:6:Thank you for your enquiry on the demolition of an existing timber wharf and two

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:7: 1.2. The ‘marine’ parts of the proposed scheme comprise demolition of an existing timber

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:8: • demolition of the existing timber wharf and jetties,

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:12:please find the attached figures. In summary, the proposed scheme comprises demolition of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:2: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7: • Sector 1: South Bank Wharf (i.e. the site of the timber quay demolition and new quay

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:7:downstream of the existing wharf (near to the jetty structures due for demolition). It should be noted that

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:15: the proposed channel dredge, berth pocket and wharf demolition footprint and includes the North

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:12.5.1 Loss of supporting habitat due to dredging / excavation and demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:individuals (see Section 12.4.3), suggest that the area which is to be subject to demolition and excavation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:demolition is low, and sensitivity of birds to loss of this habitat would be far lower than it would, for example,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:supporting habitats available to the comparatively low-value habitat to be lost through demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:27:should be undertaken to check for the presence of potential nesting habitat and nests prior to demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:30:from dredging and demolition works, represented as the day / night LAeq) at most receptor locations will be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:33:of disturbance. As a worst-case scenario, demolition works involving plant and personnel working at the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:37:otherwise be affected will have been displaced from the site during demolition of existing features and

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of the existing South Bank wharf and the three jetty structures downstream, including

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: • Demolition of various buildings and structures on the riverbank and hinterland.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:11:It is understood that demolition of some of the existing above ground Infrastructure on site (namely the heavy

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:39:The proposed scheme will include demolition of some existing on site structures (with others removed in

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:5: “Demolition of existing redundant quay structures, capital dredging and development of new

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10:3.2 Demolition works to be undertaken as part of the proposed scheme include the dilapidated

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: prior approval from RCBC for the demolition of the majority of existing buildings within the

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:10: landward part of the proposed scheme footprint and as such the demolition of this

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:24:5.14 Predicted construction phase impacts are linked to habitat loss from the demolition of existing

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: and it is recommended that a suitable record of the structures be prepared prior to demolition,

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:27: suitability of this record will be confirmed in advance of demolition being undertaken with

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:30:5.65 Other impacts such as demolition and removal of existing structures and construction of the

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:32:6.1 The proposed scheme comprises demolition of the existing wharf, jetties and other minor

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:32: • The Landward Works – these comprise the works above MLW involving the demolition of

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:The proposed scheme comprises demolition of the existing wharf, jetties and other minor Infrastructure

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:3.3 Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:STDC has submitted prior approval applications to RCBC for the demolition of the majority of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:comprise the demolition of:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: confirmed on 7 July 2020 that prior approval for such demolition is not required (meaning demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: on 10 July 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1: RCBC confirmed in October 2020 that prior approval for such demolition is not required.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:Although the demolition of the above Infrastructure is proposed as enabling works to be undertaken in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:for demolition had not been granted at the point the landside EIA was submitted. As noted above, RCBC

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:has confirmed that demolition of such Infrastructure can commence without planning permission, and works

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:1:to demolish such Infrastructure has started. As a result, there is no requirement for the demolition of that

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition of this building has been incorporated into the landside EIA and associated planning application

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:Demolition works to be undertaken as part of the proposed scheme which is the subject of this report are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted / capped as part of the demolition process prior to construction of the quay. It has also been

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:commencing. The assumed approach to demolition of these assets is detailed below.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:reach excavator with hydraulic demolition attachments, working from the shore (and supported by a jack-up

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:barge, slave barge and safety/workboat). Alternatively, the demolition may include cutting sections of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:demolition, this would be removed as early as practicable. It has been assumed that concrete would be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:best practice demolition techniques would be adopted to ensure transport of debris into the Tees is

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:The demolition of the substation will be undertaken using land-based plant. The building materials are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:2:diverted in advance of demolition commencing so that works could be undertaken safely.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:3: STRUCTURES FOR DEMOLITION

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:11:It is anticipated that the proposed works would be undertaken in the sequence set out above; i.e. demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: Demolition - - 12 months

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:3.11 Summary of plant to be used during demolition and construction

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13:It is envisaged that the demolition and construction phases would be undertaken using the following plant:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:13: • Demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:In addition to the above, best practice working methods would be adopted during demolition / excavation

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf:14:Should any debris fall into the river channel during demolition, this would be removed as early as practicable.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:6: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:7: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:13: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:jetties and various buildings and structures on the riverbank. As STDC has prior approval for the demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:14:application has been submitted to RCBC for the demolition of the pumping station in September 2020). Due

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:15: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:16: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:demolition, anticipated to comprise a photographic record and drone footage of the wharf and jetties. The

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:suitability of this record will be confirmed in advance of demolition with RCBC and submitted to the RCBC

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:grubbing out / excavation / diversion / capping of underground utilities as part of the demolition process

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:20:riverside pumping station will be recorded in advance of demolition in accordance with mitigation measures

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:21:design depths. During the demolition of the existing wharf and jetties, the spud legs of the jack-up barge,

R-2020-0684-ESM-cil_questions phase 1.pdf:1: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND ASSOCIATED

R-2020-0684-ESM-cil_questions phase 1.pdf:4: demolition (square metres) ancillary buildings) (square metres)

R-2020-0684-ESM-cil_questions phase 1.pdf:5:c) Does the development proposal include the retention, demolition or partial demolition of any whole buildings which people do not

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:1:maintenance dredging, movement of vessels (including vessels associated with the demolition of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:23:although the proposed demolition activities would take place in the marine environment, these would be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:24:The proposed dredging and other underwater activities (namely demolition and removal of existing

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:6.5.1 Demolition of the existing wharf and jetties

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:the demolition of the existing wharf and jetties. It is envisaged that the demolition works will take

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:40:sedimentary regime arising from the demolition works is very low.

R-2020-0684-ESM-PN 0684.pdf:1: Proposal: DEMOLITION OF EXISTING REDUNDANT QUAY

R-2020-0684-ESM-PN 0684.pdf:2:soiling impacts during the construction phase as ‘high risk’ for demolition and

R-2020-0684-ESM-PN 0684.pdf:2:during the demolition and construction phase.

R-2020-0684-ESM-PN 0684.pdf:2:Prior to commencement of construction/demolition, a CEMP shall be submitted to

R-2020-0684-ESM-336521 R_2020_0684_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 1.pdf:1:Planning consultation: Demolition of existing redundant quay structures, capital dredging

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6: Guidance on the Assessment of Dust from Demolition and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:6:2) Separately for demolition, earthworks, construction and trackout:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:8: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:10: • Dust emissions generated by demolition, excavation, construction and earthwork activities required

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:11: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:The IAQM guidance recommends that the dust emission magnitude is determined for demolition,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12:construction activities has been categorised as large for demolition, earthworks and construction and small

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:12: Demolition Large which is potentially dusty. It is proposed that all material (except timber) would

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:13: Proposed Demolition Area

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, earthworks and trackout activities during construction of the proposed scheme are detailed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: the only receptors within 350m are places of work which

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, construction and earthworks: receptors in adjacent places of work are considered to be

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: • Demolition, earthworks, construction and trackout: the proposed scheme is located within the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14: Demolition Earthworks Construction Trackout

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:14:demolition, ‘medium risk’ for earthworks and construction, and ‘negligible risk’ for trackout. The impacts on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:15:human health and ecological receptors were described as ‘medium risk’ for demolition, ‘low risk’ for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16:Measures specific to demolition

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Soft strip inside any buildings or structures before demolition.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Ensure effective water suppression is used during demolition operations. Hand held sprays are

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Bag and remove any biological debris or damp down such material before demolition.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18: Demolition 3 52

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:18:Demolition vessels would be in operation for a larger proportion of the year; however, given the low number

R-2021-0405-FFM-63262_01 - Application Form.PDF:5:design, demolition and construction - Recommendations'.

R-2021-0405-FFM-63262_01 - Application Form.PDF:7: floorspace use or demolition (including change of following development

R-2021-0405-FFM-63262_01 - Application Form.PDF:7: class applicable of use or demolition changes of use)

R-2021-0405-FFM-63262_01 - Application Form.PDF:8:Recycling facilities construction, demolition

R-2021-0405-FFM-63262_01 - Application Form.PDF:8: Construction, demolition and excavation

R-2021-0405-FFM-DECISION NOTICE.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0405-FFM-OFFICER REPORT.pdf:3:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:5:• That don’t require major demolition.

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:not required for the demolition of the building and structures associated with the Riverside Pumping Station

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:demolition.

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:20: ground, certified demolition arising, crushed concrete or imported fill.

R-2021-0268-CD-Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2021-0268-CD-Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0268-CD-Teesworks Southbank Condtion16 Covering letter 2.pdf:1: “Outline planning application for demolition of existing structures on site and the development of up to

R-2021-0268-CD-OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:1: R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0526-CD-MGE04803 EP.pdf:1: PERMISSION R/2020/0357/OOM FOR DEMOLITION OF

R-2022-0526-CD-Covering Letter June 2022(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:1:Details: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:13:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0526-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0526-CD-AQIA_FINAL.pdf:3:2.3.4. Guidance on the Assessment of Dust from Demolition and Construction ………………………………….. 8

R-2022-0526-CD-AQIA_FINAL.pdf:5: risk of dust soiling and fugitive PM10 emissions during the demolition, earthworks, construction

R-2022-0526-CD-AQIA_FINAL.pdf:6: the ‘demolition of existing structures on site and the development of up to 418,000 sqm (gross) of

R-2022-0526-CD-AQIA_FINAL.pdf:12:2.3.4. Guidance on the Assessment of Dust from Demolition and Construction

R-2022-0526-CD-AQIA_FINAL.pdf:13: demolition; earthworks; construction; and trackout. The potential for dust emissions from each

R-2022-0526-CD-AQIA_FINAL.pdf:14: Demolition • Total building volume • Total building volume • Total building volume

R-2022-0526-CD-AQIA_FINAL.pdf:14: dust release (e.g. metal • Demolition activities 10- concrete)

R-2022-0526-CD-AQIA_FINAL.pdf:14: • Demolition activities screening

R-2022-0526-CD-AQIA_FINAL.pdf:14: <10m above ground level • Demolition activities >20m

R-2022-0526-CD-AQIA_FINAL.pdf:14: • Demolition during wetter above ground level

R-2022-0526-CD-AQIA_FINAL.pdf:17: (demolition, earthworks, construction and trackout) following the matrix in Table 3.6.

R-2022-0526-CD-AQIA_FINAL.pdf:17: High Demolition High Risk Medium Risk Medium Risk

R-2022-0526-CD-AQIA_FINAL.pdf:17: Medium Demolition High Risk Medium Risk Low Risk

R-2022-0526-CD-AQIA_FINAL.pdf:17: Low Demolition Medium Risk Low Risk Negligible

R-2022-0526-CD-AQIA_FINAL.pdf:29: Demolition of parts of the site have been undertaken as part of

R-2022-0526-CD-AQIA_FINAL.pdf:29: Demolition Medium

R-2022-0526-CD-AQIA_FINAL.pdf:29: require demolition on the site. The total building volume

R-2022-0526-CD-AQIA_FINAL.pdf:29: remaining for demolition is considered likely to be under 50,000

R-2022-0526-CD-AQIA_FINAL.pdf:31: Demolition Earthworks Construction Trackout

R-2022-0526-CD-AQIA_FINAL.pdf:31: Demolition M Earthworks L Construction M Trackout L

R-2022-0526-CD-AQIA_FINAL.pdf:35: by IAQM on monitoring during demolition, earthworks and construction.

R-2022-0526-CD-AQIA_FINAL.pdf:38: risk of dust soiling and fugitive PM10 emissions during the demolition, earthworks, construction

R-2022-0526-CD-AQIA_FINAL.pdf:39:Trackout The transport of dust and dirt from the construction/demolition site onto the

R-2022-0526-CD-AQIA_FINAL.pdf:39: the construction/ demolition site with dusty materials, which may then spill

R-2022-0526-CD-AQIA_FINAL.pdf:52: Institute of Air Quality Management (IAQM) (2016). Guidance on the Assessment of Dust from Demolition and

R-2022-0526-CD-COMPLIANCE DECISION NOTICE.pdf:1: FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0526-CD-COMPLIANCE DECISION NOTICE.pdf:2: R/2020/0357/OOM FOR DEMOLITION OF EXISTING STRUCTURES

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2019-0468-FF-ApplicationFormNoPersonalData.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2019-0468-FF-Decision Notice_R20190468FF.pdf:3:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0539-PND-Decision Notice_R20200539PND.pdf:1:Details: PRIOR NOTIFICATION OF PROPOSED DEMOLITION OF 1. RIVERSIDE

R-2020-0539-PND-Decision Notice_R20200539PND.pdf:1:approval for the demolition of the above premises is not required.

R-2020-0539-PND-60722_Site notice former pumphouses_September 2020.PDF:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0539-PND-60722_Site notice former pumphouses_September 2020.PDF:1:Demolition is due to begin on: 1 November 2020

R-2020-0539-PND-Officer report _R20200539PND.pdf:1: DEMOLITION OF 1. RIVERSIDE

R-2020-0539-PND-Officer report _R20200539PND.pdf:1:The application seeks prior approval for the demolition of buildings and

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0539-PND-Officer report _R20200539PND.pdf:2:relating to the proposed demolition works within the supporting letter.

R-2020-0539-PND-Officer report _R20200539PND.pdf:3: • General soft strip of buildings, where required, followed by demolition

R-2020-0539-PND-Officer report _R20200539PND.pdf:3: • Crushing of demolition rubble to Class 6FA specification and infill of

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:(Environmental Impact Assessment) Regulations 2017, but the demolition is

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:While the demolition and clearance of the site will leave an empty part to the

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:impacts on the ecology from demolition of buildings of this scale in

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:1:South Bank Site – Demolition of Riverside Buildings

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:2:Document title: South Bank Site – Demolition of Riverside Buildings Outline Method

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 1.4. Demolition Works Scope 5

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2. Demolition Methods 6

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2.1. General Demolition Approach 6

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3: 2.4. Typical Brick and Concrete Building Demolition Methodology 7

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:3:Appendix A – Teesworks South Bank Site Enabling Works – Demolitions Riverside

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:The purpose of this document is to present an outline method statement for the demolition of

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:works. It should be recognised that the responsibility of demolition works shall lie with them

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:regulations and comply with BS6187:2011 Code of Practice for Full & Partial Demolition,

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:Enabling Works – Demolitions Riverside Structures is contained in Appendix A and indicates

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:4:The buildings that are proposed for demolition within this permission consist of four adjacent

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:Each of the buildings identified for demolition within this method statement will undergo a

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:1.4. Demolition Works Scope

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:The following scope of works is anticipated as part of the demolition works;

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:  General soft strip of buildings, where required, followed by demolition to top of floor

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:  Crushing of demolition rubble to Class 6F2 specification and infill of voids where

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:5:demolition under this outline method statement and can be broken down and described as

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:2. Demolition Methods

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:2.1. General Demolition Approach

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:Prior to any works commencing, a refurbishment and demolition (R&D) asbestos survey will

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:The first stage of the demolition will be ensuring the site is safe. The working area will be

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:6:demolition works mobilising).

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:proceed to prevent flooding and any accidental spillage. Upon completion of demolition

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:2.4. Typical Brick and Concrete Building Demolition Methodology

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:7:Dust suppression will be used at all times during the demolition of any brickwork or concrete

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:  45 & 20 tonne demolition specification excavator with various attachments (selector

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:demolition site is anticipated to be formed using a double clipped Heras style fence required

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:to form a secure demolition boundary.

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:8:A site compound area will be located centrally to each of the demolition sites and will contain

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:9:have undertaken both demolition activities and Asbestos Cat B training.

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:9:experience undertaking demolition activities. All persons required to work on site will

R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF:11:STDC South Bank Site Enabling Works – Demolitions Riverside Structures

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: structural demolition to floor slab

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: disconnected and demolition

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: Tee advance of demolition works

R-2020-0539-PND-STDC-SIZ-SB-EWO-0004 - South Bank Enabling Works - Riverside Structures (003).PDF:1: Park ENABLING WORKS DEMOLITIONS

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Demolition of South Bank Pumphouses: Application for Prior Notification of

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:pleased to enclose a prior notification application relating to the demolition of pumphouses on the south

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:The Scope of the Proposed Demolition Works

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:The application seeks prior approval for the demolition of buildings and structures comprising the old

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:As set out in the accompanying demolition method statement, the outline sequence of works to be

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:• General soft strip of buildings, where required, followed by demolition to top of floor slab;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:2:• Crushing of demolition rubble to Class 6FA specification and infill of voids where necessary;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Reason for Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Method of Demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Planning practice guidance states that demolition works are capable of constituting a ‘project’ within the

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The techniques to be adopted in the demolition process are not unusually complex. The works are localised

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:compliance with the submitted demolition method statement.

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:The demolition method statement enclosed with this application demonstrates that the scheme would not

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:• The prior notification of demolition form;

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:4:• A Demolition Statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:'HVFULSWLRQ Agreement that a prior approval for demolition

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:Please see accompanying cover letter and demolition method statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2:Please see accompanying cover letter and demolition method statement.

R-2020-0539-PND-Application Form Redcar and Cleveland Borough Council (002)(1).PDF:2: Please see accompanying cover letter and demolition method statement.

R-2023-0211-CD-64764_01 Covering Letter 24.01.23.PDF:1:“Outline planning application for the demolition of existing structures on site and the development of

R-2023-0211-CD-ApplicationFormRedacted.pdf:4: Outline planning application for the demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:12:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:13: 2015 demolition of the pellet plant in the early 2000’s.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:15:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:24:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:25:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:29:The site is currently a disused steelworks undergoing demolition.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:34: demolition activities

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:34: structures and demolition activities

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:136: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:137: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:334:Demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:Access to certain areas of the site was not possible at the time of the visit due to ongoing demolition works,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:The southernmost part of the site is occupied by the Redcar Sinter Plant (currently undergoing demolition) and

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:At the time of writing demolition works are ongoing to several large industrial structures on the site. Given the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:10:carried out in a controlled manner and it is anticipated that the current demolition operations do not pose a

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:11: and demolition).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: furnace complex. The site is served by estate roads and rail Infrastructure and demolition).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 1981-2015 relatively unchanged other than demolition of the pellet plant in the early pellet plants.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:12: 2000’s. Demolition material-

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:13:into the current layout as part of the integrated steelworks complex, following demolition of the earlier 20th

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:22:also located locally including tyres, conveyor belts and demolition type waste. Locally the made ground was

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:23:Limited additional ground investigation should be carried out in these areas once demolition/clearance works

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:The likely main risks associated with the proposed demolition is potential from poor ground conditions related

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:An asbestos consultant should be engaged to carry out a refurbishment/demolition survey before any

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:demolition works are carried out.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:28:If the site is to be divested post demolition, the client may wish to carry out a limited ground investigation to

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:118: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:119: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:316:Demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one projectile at South Gare, Redcar on the 25th June 2016;

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The controlled demolition of one Royal Air Force (RAF) flash-flare, found by a member of the public, at Redcar

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:4:In general, this project is the demolition of existing buildings/structures and engineering operations

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:17:Construction and Demolition Activity’ (2003) will be applied to the construction areas within the

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:18:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:19:  demolition;

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:19:Code of practice for noise control on construction and demolition sites:

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:24:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:17:Sinter plant. Following demolition/clearance works, limited ground investigation in these areas is planned to

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:19: gravel. Gravel and cobbles include brick, concrete and other demolition materials, slag was not the dominant

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:40:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:152: slightly clayey. Demolition Rubble?

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf:224: From 0.5m: More like demolition than trial pitting.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:12:The site Infrastructure was undergoing demolition at the time of writing.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:14: cobbles and gravel. Gravel and cobbles include brick, concrete and other demolition materials,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:14: demolition materials, slag was not the dominant constituent although often still present within

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:15:stock house. This area is understood to currently be inaccessible owing to ongoing demolition works.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf:25: demolition arising, crushed concrete or imported fill.

R-2022-0435-CD-Compliance Officer Report 0435.pdf:1: APPLICATION FOR DEMOLITION OF EXISTING

R-2022-0435-CD-Compliance Officer Report 0435.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2022-0435-CD-Compliance Decision Notice 0435(1).pdf:1: FOR OUTLINE PLANNING APPLICATION FOR DEMOLITION OF

R-2022-0435-CD-Compliance Decision Notice 0435(1).pdf:2: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:1:PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-391845-R20220435CD.pdf:1:PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0435-CD-INCA2022-12 HRA - SeAH South Bank Rev 1.pdf:7:“Demolition of existing redundant quay structures, capital dredging and development of new quay

R-2022-0435-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0435-CD-64764_01 Covering Letter 03.05.2022(1).pdf:1:“Outline planning application for demolition of existing structures on site and the development of up

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:1:Title: Loco shed and Gas Works demolition

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:1:The overall works involve the safe demolition of the former Locomotive Repair Shed, the oxygen plant and

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: Demolition Excavator Plant operatives

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: Tipper wagons Demolition operatives

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2:3.0 Demolition Method

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:2: The first stage of the demolition will be ensuring the site is safe. The whole work area will be

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:3: Loco Shed demolition works.

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: The steel work demolition will be done using a mounted shear attachment for the excavator. The

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: Dust suppression will be used at all times during the demolition of any brickwork or concrete

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:4: method as outlined above using a demolition specific excavator. The brickwork sections will be

R-2020-0283-PND-C1096 Prairie Method Statement Demolition works.pdf:5: voids back filled with the brick demolition material in the short term. The remaining foundations

R-2020-0283-PND-Officer report.pdf:1:PROPOSAL: PRIOR APPROVAL FOR DEMOLITION OF

R-2020-0283-PND-Officer report.pdf:1:The buildings proposed for demolition are located within the Prairie site and

R-2020-0283-PND-Officer report.pdf:1:All demolition works shall be carried out in accordance with the BS Code of

R-2020-0283-PND-Officer report.pdf:1:Practice for Demolition BS6187.

R-2020-0283-PND-Officer report.pdf:1:As set out in the accompanying Demolition Method Statement, the outline

R-2020-0283-PND-Officer report.pdf:2:• Demolition of the former locomotive repair shed;

R-2020-0283-PND-Officer report.pdf:2:• Removal of the tanks and demolition of the supporting structure and the

R-2020-0283-PND-Officer report.pdf:2:The application has been supported by Demolition Method Statement as

R-2020-0283-PND-Officer report.pdf:2:required by legislation which sets out the detail of the proposed demolition

R-2020-0283-PND-Officer report.pdf:2:relating to the proposed demolition works within the supporting letter.

R-2020-0283-PND-Officer report.pdf:2:2. Steel work demolition work will be done using a mounted shear attachment

R-2020-0283-PND-Officer report.pdf:2:4. Dust suppression will be used at all times during the demolition of any

R-2020-0283-PND-Officer report.pdf:2:demolition is not considered to result in significant environmental effects, due

R-2020-0283-PND-Officer report.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0283-PND-Officer report.pdf:2:While the demolition and clearance of the site will leave an empty part to the

R-2020-0283-PND-Officer report.pdf:3:the ecology from the demolition. Advice has been given that based on the

R-2020-0283-PND-Officer report.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2020-0283-PND-STDC-SIZ-GP-EWO-0011 Prairie Phase 1 - Proposed Demolitions - Site Location Plan A1.PDF:1: Existing structures for demolition

R-2020-0283-PND-STDC-SIZ-GP-EWO-0011 Prairie Phase 1 - Proposed Demolitions - Site Location Plan A1.PDF:1: Proposed Demolitions

R-2020-0283-PND-Decision 0283.pdf:1:Details: PRIOR APPROVAL FOR DEMOLITION OF LOCOMOTIVE REPAIR SHED;

R-2020-0283-PND-Decision 0283.pdf:1:demolition of the above premises is not required.

R-2020-0283-PND-60722 Prairies Site Notice June 2020.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2020-0283-PND-60722 Prairies Site Notice June 2020.pdf:1:Demolition is due to begin on: 1 August 2020 (estimated)

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: structural demolition including

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: disconnected and demolition

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: advance of demolition works

R-2020-0283-PND-STDC-SIZ-GP-EWO-0010 Prairie Site Phase 1 - Proposed Demolitions-A3.PDF:1: Proposed Demolitions

R-2021-1058-NM-STDC_HWY-ATK-HKF-PR-DR-CH-000006_C02.pdf:1: Decommissioning / Demolition

R-2021-1058-NM-Decision 0270.pdf:7:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-1058-NM-STDC_HWY-ATK-HMK-PR-DR-CH-000006_C02.pdf:1: Decommissioning / Demolition

R-2021-1058-NM-STDC_HWY-ATK-HLG-PR-DR-EO-000006_C03.pdf:1: Decommissioning / Demolition

R-2020-0679-PND-R 20 0679 Decision.pdf:1:Details: PRIOR NOTIFICATION OF PROPOSED DEMOLITION OR FORMER TOPEDO

R-2020-0679-PND-R 20 0679 Decision.pdf:1:approval for the demolition of the above premises is not required.

R-2020-0679-PND-Officer Report.pdf:1: DEMOLITION OR FORMER TOPEDO LADLE

R-2020-0679-PND-Officer Report.pdf:1:The application seeks prior approval for the demolition of the Torpedo Repair

R-2020-0679-PND-Officer Report.pdf:1:As set out in the accompanying demolition method statement, the outline

R-2020-0679-PND-Officer Report.pdf:1:• Demolition of the Boiler House adjoining the main workshop to the north;

R-2020-0679-PND-Officer Report.pdf:1:• Demolition of the steel superstructure and frame;

R-2020-0679-PND-Officer Report.pdf:1:• Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-Officer Report.pdf:2:The application has been supported by an Outline Demolition Method

R-2020-0679-PND-Officer Report.pdf:2:demolition scheme.

R-2020-0679-PND-Officer Report.pdf:2:demolition activities is to be crushed to a Class 6F2 specification and used to

R-2020-0679-PND-Officer Report.pdf:2:Impact Assessment) Regulations 2017, but the demolition is not considered to

R-2020-0679-PND-Officer Report.pdf:2:Prior Approval for demolition deals only with the method of demolition and the

R-2020-0679-PND-Officer Report.pdf:2:south of the site. While the demolition and clearance of the site will leave an

R-2020-0679-PND-Officer Report.pdf:2:impacts on the ecology from demolition of buildings of this scale in

R-2020-0679-PND-Officer Report.pdf:2:The proposed method of demolition and retention of the site thereafter is

R-2020-0679-PND-TSWK-STDC-DMP-ZZ-DR-C-0001 Torpedo Shed Demolition Plan AMENDED.PDF:1: DEMOLITION PLAN

R-2020-0679-PND-60722_Site Notice torpedo building_26 Nov 2020.PDF:1:demolition and any proposed restoration of the site)

R-2020-0679-PND-60722_Site Notice torpedo building_26 Nov 2020.PDF:1:Demolition is due to begin on: 21 December 2020

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Demolition of Torpedo Ladle Repair Workshop building: Application for

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Prior Notification of Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:pleased to enclose a prior notification application relating to the demolition of the former Torpedo Ladle

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The Scope of the Proposed Demolition Works

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The application seeks prior approval for the demolition of the former Torpedo Ladle Repair workshop. As set

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:out in the accompanying demolition method statement, the outline sequence of works to be undertaken by

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Demolition of the Boiler House adjoining the main workshop to the north;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Demolition of the steel superstructure and frame;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:• Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:Reason for Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:Method of Demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:2:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:Planning practice guidance states that demolition works are capable of constituting a ‘project’ within the

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:The techniques to be adopted in the demolition process are not unusually complex. The works are localised

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:compliance with the submitted demolition method statement.

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:The demolition method statement enclosed with this application demonstrates that the scheme would not

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:• The prior notification of demolition form;

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:• A Demolition Statement.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:1:Demolition of Torpedo Ladle Repair

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:2:Development Corporation and use in relation to the Demolition of the Torpedo Ladle repair workshop

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:2: Project Demolition of Torpedo Ladle Repair Workshop

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:1.7. Demolition Works Scope 6

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:3.4. Mechanical Demolition of Buildings 14

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:3:Table 1 – Mechanical Demolition Method 14

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:The purpose of this document is to present an outline method statement for the demolition of the former Torpedo

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:responsibility for the demolition works shall lie with them. Atkins Limited assumes no responsibility to this regard

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:6187:2011 Code of Practice for Full & Partial Demolition, including the below mentioned regulations:

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:4:supplemented with internal double clipped Heras style fence required to form an Active Demolition zone (ADZ)

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:5:A Refurbishment & Demolition (R&D) Asbestos Survey is still to be carried out at the time of writing this document.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:All asbestos will be removed prior to commencing demolition of the structure. Asbestos materials identified at

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:works prior to demolition.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:1.7. Demolition Works Scope

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:The following scope of works is anticipated as part of the structure demolition;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Demolition of the Boiler House adjoin the main workshop to the north;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Demolition of the steel superstructure and frame;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:  Crushing of demolition rubble to Class 6F2 fill material and infill of voids;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:6:bison roofs. This is allowing for access through into the main structure. Prior to the main demolition these low

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:The scope of works covered within this method statement consists of the above ground demolition of all structures

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:within the demolition zone hatched in green site boundary and associated plant and equipment.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:8:  Demolition of structures and process/clear arisings

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:9:  Demolition Contract timescales – 16 weeks

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:9:  2 no. 50 tonne & 2 no. 30 tonne, demolition specification excavator with various attachments (selector

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:working hours, the security of the site and the maintenance of the fence line surrounding the demolition works

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Prior to any demolition works commencing an ecological survey is to be carried out to confirm any presence of

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Demolition dust will typically be controlled by applying water spray manually and remotely using a (MOTFOG 100

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:and during the crushing and demolition of the brick structures it is expected that water and dust control will be in

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Demolition arisings are to be processed and segregated on site and loaded into the required transport to be

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:Prior to demolition works commencing any nearby boreholes shall be sampled and monitored to establish current

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:10:boreholes shall also be monitored and sampled during the demolition works to monitor any effect the works may

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:11:subcontractors’ operatives are to hold a CCDO or CSCS card minimum and have undertaken both demolition

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:11:demolition activities. All persons required to work on site will undertake a full site induction prior to commencing

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:12:Non-Licensable only – Licensed Material shall have been removed by specialist subcontractor prior to demolition

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:3.4. Mechanical Demolition of Buildings

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:Table 1 below outlines the mechanical demolition activities with annotated photographs to provide clarity. The sequencing below is indicative only and is to be confirmed

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14:Table 1 – Mechanical Demolition Method

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:14: will then be sheared to grade, working bay by bay to allow the demolition activities

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:15: equipment to provide safe access routes for demolition works. Any

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  All demolition activities to be carried out in accordance with BS 6187:2011 Code of Practice for Full & Partial Demolition;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  The methodology and sequence of demolition is determined by the PC to ensure a safe and controlled process and avoidance of any uncontrolled collapse of

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  A suitable exclusion zone (ADZ) to be barriered off prior to any mechanical demolition commencing and all operatives briefed on activities;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:17:  Demolition will be carried out top-down and on a bay-by-bay basis and materials stockpiled in waste streams away from the workface as works progress;

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:18:  Waste will be segregated at the demolition workface and loaded directly into 40 yard recycling bins.

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:19: - Active Demolition Zone

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:21: TSWK-STDC-DMP-ZZ-DR-C-0001 Dorman Point Torpedo Shed Demolition Plan

R-2020-0679-PND-STDC-Torpedo Workshop Demolition_Outline MS_For Issue.PDF:22: DEMOLITION PLAN

R-2022-0366-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:50: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:51: No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf:52: THROUGH CULVERT 0202 No. Construction Risk Maintenance Risk Demolition Risk

R-2022-0366-CD-Decision Notice.pdf:1: DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE

R-2022-0366-CD-Decision Notice.pdf:2: APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON

R-2022-0366-CD-61586 Conditions 12, 13 and 32 Covering Letter 14-04-22.PDF:1:Outline planning application for demolition of existing structures on site and the development of up to

R-2022-0366-CD-Officer report.pdf:1: PLANNING APPLICATION FOR DEMOLITION

R-2022-0366-CD-Officer report.pdf:1:demolition of existing structures on site and the development of up to 418,000 sqm

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:10: Gravel and cobbles include brick (including refractory), concrete and other demolition materials,

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:10: comprising a sandy and or gravelly clay with demolition materials within the matrix.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF:31: demolition arising, crushed concrete or imported fill.

R-2021-0879-FF-Officer report.pdf:6:surrounding area, with on-going works relating to demolition and remediation

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:22: construction of storage tanks and additional Infrastructure between 1992 and 1993. Demolition of

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:43: demolition rubble.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:90: demolition rubble

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:93: - demolition rubble

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13:• Mapping from the 1970’s to the 1990’s indicates progressive demolition of the majority of structures on the

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:13: following structure demolition. Plate 2 provided by STDC shows the Colliery Arch Plant prior to demolition

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: include brick (including refractory), concrete and other demolition materials, slag was not the dominant

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:18: sandy and or gravelly clay with demolition materials within the matrix.

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:19:In addition to the boulders of slag, occasional fused slag and demolition rubble which presented issues with

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:43:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2021-0879-FF-Decision Notice.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0879-FF-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0879-FF-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:7:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2021-0589-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement for full details

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-ApplicationFormRedacted.pdf:2:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0589-PND-ApplicationFormRedacted.pdf:3:Please see accompanying cover letter and demolition method statement

R-2021-0589-PND-63262_Notice_July 2021.PDF:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0589-PND-63262_Notice_July 2021.PDF:1:Demolition is due to begin on: 2 August 2021

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:6: Appointments: • Demolition Supervisor - TBC

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: • Demolition hand tools (pry-bar, hammer, saw, shovel)

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: • Demolition specification 360o excavator machine (equipped with choice

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:8: of demolition attachments)

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:9: proximity to the structures marked for demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: of demolition, the location of demolition equipment, storage, stockpile and lay-

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: demolition debris from entering and protected using a steel plates.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: During demolition works, a demolition exclusion zone will be put into place

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: exclusion zone during active demolitions will be permitted to essential persons

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:10: only. Demolition plant to person interface will be strictly controlled and will be

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:11: Working at Access to heights (for asbestos removal, soft strip, demolition works etc) will be

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: During the demolition phase of the works Thompsons will minimize dust

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: Thompsons will use water to dampen the demolition workface as works progress

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: and the arisings produced during the demolition works. Care will be taken not to

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:14: distance from demolition operations and will be positioned outside of the

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: demolition technique. High impact works will be strictly minimised. Thompsons

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:15: and dampening mechanisms in the demolition plant. Annual health surveillance

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:16: of demolition works.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:16: At certain stages on the demolition works, if at any point a temporary partial or

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:19: • Instability of structure during demolition

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:20: • Prior to the commencement of demolition works, Thompsons will appoint the services of an

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:21: The fixtures / fittings will then be processed (using demolition hand tools) into small and hand

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22:Remote & Explosive Demolition of the BOS Plant

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: explosive demolition activities.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: informed of the proposed method of demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • The super high reach will be assisted by an additional demolition spec 360o excavator

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: machines, for low-level demolition, material processing, sorting and segregation.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • During demolition works the perimeter of the site will be controlled as a demolition exclusion

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: zone, in accordance with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: ground floor level to assist with the explosive demolition of the main building.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • Prior to the explosive demolition, a series of structured pre-weakening cut will be made using

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: hot works to the support column to aid the explosive demolition.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • Following the completion of the demolition works, the processing and removal of all arisings

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:28: DEMOLITION WORKS

R-2021-0589-PND-Decision-Notice.pdf:1:Details: PRIOR NOTIFICATION FOR DEMOLITION OF OBSOLETE BUILDINGS AND

R-2021-0589-PND-Decision-Notice.pdf:1:demolition of the above buildings and structures is not required.

R-2021-0589-PND-Officer Report 0589.pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0589-PND-Officer Report 0589.pdf:1:The application seeks prior approval for the demolition of obsolete buildings

R-2021-0589-PND-Officer Report 0589.pdf:1:The application seeks prior approval for the demolition of the BOS Plant. This

R-2021-0589-PND-Officer Report 0589.pdf:1:regard to the demolition process. Within this a summary of the general scope

R-2021-0589-PND-Officer Report 0589.pdf:2:as; Following the completion of the demolition works, the processing and

R-2021-0589-PND-Officer Report 0589.pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0589-PND-Officer Report 0589.pdf:2:In this case we have considered whether the demolition would give rise to

R-2021-0589-PND-Officer Report 0589.pdf:2:1 Measures to ensure the safety of demolition works and humans in the

R-2021-0589-PND-Officer Report 0589.pdf:2:None of the buildings to be demolished are listed and the demolition site is not

R-2021-0589-PND-Officer Report 0589.pdf:2:cultural heritage effects arising from the demolition of the buildings.

R-2021-0589-PND-Officer Report 0589.pdf:3:removed any potential archaeological remains. Therefore the demolition

R-2021-0589-PND-Officer Report 0589.pdf:3:It is considered that through the demolition method statement and the

R-2021-0589-PND-Officer Report 0589.pdf:3:mitigation measures that the proposed demolition works would not result in

R-2021-0589-PND-Officer Report 0589.pdf:3:Prior Approval for demolition deals only with the method of demolition and the

R-2021-0589-PND-Officer Report 0589.pdf:3:surrounded other industrial buildings and structures. While the demolition and

R-2021-0589-PND-Officer Report 0589.pdf:3:The proposed method of demolition and retention of the site thereafter is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Demolition of BOS Plant, Teesworks: Application for Prior Notification of

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:demolition of the former BOS Plant, Redcar.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:The Scope of the Proposed Demolition Works

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:The application seeks prior approval for the demolition of the BOS Plant. This includes the following:

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:All demolition works shall be carried out in accordance with the BS Code of Practice for Demolition BS6187.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:2:Reason for Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Method of Demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:works. Given the number of different structures, the method of demolition varies and therefore the Method

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:For robustness and ahead of pursuing a ‘prior approval’ for the demolition works, we have given

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:consideration as to whether the proposed demolition project could be considered to be EIA development.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:“demolition works are capable of constituting a ‘project’ within the meaning of the Environmental Impact

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:authorities will need to consider whether demolition projects are likely to have significant environmental

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:demolition of the BOS Plant could fall under paragraph 13 b) of Schedule 2 on the grounds that it relates to a

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:changed by demolition (e.g a cleared site) would not have significant effects, the process of demolishing the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:buildings associated with the BOS Plant could potentially have significant effects and the demolition works

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:In this case we have considered whether the demolition would give rise to significant effects and note the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:1 Measures to ensure the safety of demolition works and humans in the surrounding area, including from

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:None of the buildings to be demolished are listed and the demolition site is not within a Conservation Area.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:There are therefore unlikely to be any significant cultural heritage effects arising from the demolition of the

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:archaeological remains. Therefore the demolition works, including the removal of building foundations is

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:• The prior notification of demolition form;

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:4:• A Demolition Method Statement, prepared by Thompsons of Prudhoe.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:1: Demolition & Site Clearance

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:2: demolition) are asbestos trained and experienced. Works will be

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:2: If suspect materials are identified during the demolition phase of

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4: services marked for demolition will be carried out by STDC.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4:demolition c. Live pipe buildings. Prior to commencement Thompsons will liaise with

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:4: demolition area and that liaison is undertaken with the appropriate

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6:machine plant The working area will be controlled as a demolition exclusion zone

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:6: third parties Demolition Supervisor and with banksmen present.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9:demolition third parties

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: demolition

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: technique Demolition Supervisor.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: Demolition works and site finishes will be in accordance with the

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: contract specification. All demolition methodology will comply

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: with BS6187:2011 Code of Practice for Demolition Operations.

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:9: All works will be undertaken within a demolition exclusion zone

R-2021-0589-PND-Outline Risk Assessment - BOS Plant - Rev0.PDF:13: b. Timber STDC operations generated from the demolition within buildings,

R-2021-0589-PND-STDC-ATK-NZT-ZZ-DR-S-0002-Layout1 002.PDF:1: DECOMMISSIONING/DEMOLITION

R-2021-0589-PND-STDC-ATK-NZT-ZZ-DR-S-0002-Layout1 002.PDF:1: PRIOR APPROVAL DEMOLITIONS

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:6: demolition of existing structures on site and the development of up to 418,000 sqm (gross)

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:7: relating to the demolition of the former South Bank Coke Oven Battery Plant which

R-2022-0343-ESM-Officer report 0343.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2022-0343-ESM-Officer report 0343.pdf:5:for the demolition of existing structures on site and the development of up to

R-2022-0343-ESM-Officer report 0343.pdf:7:surrounding area, with on-going works relating to demolition and remediation

R-2022-0343-ESM-ARCHAEOLOGIST.pdf:4: (R/2020/0357/OOM) for demolition of existing structures on site and the development of up to

R-2022-0343-ESM-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:6: demolition of existing structures on site and the development of up to 418,000 sqm (gross)

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:7: relating to the demolition of the former South Bank Coke Oven Battery Plant which

R-2022-0343-ESM-Decision Notice.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0343-ESM-64764 SeAH RM Covering Letter March 2022(1).pdf:1:“Demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general

R-2020-0599-AD-Decision Notice_R20200599AD.pdf:4:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0599-AD-Officer report _R20200599AD.pdf:1:R/2020/0598/FF Retrospective demolition of existing gatehouse;

R-2020-0599-AD-Application Form(1).PDF:2: Demolition of existing gatehouse and redevelopment of site to provide new single storey gatehouse with associated car paking and

R-2020-0599-AD-Application Form(1).PDF:5:design, demolition and construction - Recommendations'.

R-2020-0599-AD-Application Form(1).PDF:7: floorspace use or demolition (including change of following development

R-2020-0599-AD-Application Form(1).PDF:7: class Type of use applicable of use or demolition changes of use)

R-2020-0599-AD-Application Form(1).PDF:8:Recycling facilities construction, demolition

R-2020-0599-AD-Application Form(1).PDF:8: Construction, demolition and excavation

R-2020-0411-FFM-Decision 0411.pdf:7: (k) Measures for recycling/disposing of waste resulting from demolition and

R-2020-0411-FFM-Decision 0411.pdf:10:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:4: relevant, requisite demolition works, and the land-use requirements during the construction

R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:4: a. the construction and existence of the development, including, where relevant, demolition

R-2020-0411-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2020-0411-FFM-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:11: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:11:4.2.4 The enabling works may involve demolition and clearing of pre-existing structures and hard

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:12: Potential impacts during the demolition phase

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:13:4.2.15 During decommissioning/ demolition, the use of heavy vehicles and the removal of the Infrastructure

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:13: demolition phases of the proposed development. The potential risks to each of the key receptor

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:16: potential impacts to water quality may exist during the construction, operation and demolition phases

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19: Demolition phase impacts and proposed mitigation

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:19:4.4.21 During decommissioning/ demolition, the use of heavy vehicles and the removal of the Infrastructure

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:2: • by 2020, the preparing for re-use, recycling and other recovery of construction and demolition

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: Demolition

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: Development involving the demolition of buildings or structures in a conservation area will only be

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: In the exceptional cases where any demolition is approved, the Council will require that detailed

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: including a schedule of works, before demolition takes place.

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:22: will only be acceptable where the proposal does not involve the demolition or alteration of existing

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:26: demolition waste recycled per year for use as an alternative mineral from 38% in 2005 to at least

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:27: c) for the recycling of at least 700,000 tonnes of construction and demolition waste per year from

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10:11.2.38 The IAQM Guidance on the assessment of dust from demolition and construction (IAQM, 2014)

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:15:11.2.69 The risk of dust impacts during the decommissioning phase, including demolition, would be the

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:16:11.2.75 Dust impact risk categories have been determined for demolition, earthworks, construction and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20:11.4.3 As summarised in Table 10.18, the predicted dust impact risk is classified as low for demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20: Table 11.15. The ‘highly recommended’ measures for low risk demolition, and medium risk

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:20: during demolition, earthworks and construction (IAQM, 2012).

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: Low risk measures specific to demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: • Ensure effective water suppression is used during demolition operations. Hand held sprays are more

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: • Bag and remove any biological debris or damp down such material before demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: less than 20,000 m3 so the dust emission magnitude for the demolition phase is classified, using

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Table 11.16: Dust Emission Magnitude for Demolition, Earthworks, Construction and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Demolition Earthworks Construction Trackout

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:22: Table 11.17: Sensitivity of the Surrounding Area for Demolition, Earthworks and

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: the dust impact risk for demolition, earthworks, construction and trackout prior to the

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: Table 11.19: Dust Impact Risk for Demolition, Earthworks, Construction and Trackout –

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:23: Source Demolition Earthworks Construction Trackout

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:24: Measures specific to demolition

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:24: • Soft strip inside buildings before demolition (retaining walls and windows in the rest of the building where

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:32: IAQM (2014) Guidance on the assessment of dust from demolition and construction

R-2020-0411-FFM-Chapter 2 Project Description.pdf:19: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Chapter 2 Project Description.pdf:19: stage in construction works would be the clearance and demolition of existing buildings on the

R-2020-0411-FFM-Chapter 2 Project Description.pdf:20: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Chapter 2 Project Description.pdf:21: Demolition, Site Clearance and Enabling Works

R-2020-0411-FFM-Chapter 2 Project Description.pdf:22: be reused on site and other demolition wastes will be recycled where possible. Other general

R-2020-0411-FFM-Chapter 2 Project Description.pdf:23: Guidelines – Working at Construction and Demolition Sites (Environment Agency,

R-2020-0411-FFM-Non Technical Summary.pdf:9: • demolition, site clearance and enabling works;

R-2020-0411-FFM-Non Technical Summary.pdf:16:5.1.5 The effects of construction activity would be temporary with minimal demolition and releveling of

R-2020-0411-FFM-Non Technical Summary.pdf:18: the construction (and similarly during demolition), have been assessed. The impacts of noise,

R-2020-0411-FFM-Non Technical Summary.pdf:29: demolition and construction

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:17: – Working at Construction and Demolition Sites (Environment Agency, 2012) now withdrawn,

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:25: Environment Agency (2012) Pollution Prevention Guidelines 6. Construction and demolition sites:

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:27: demolition materials

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:29: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:29: stage in construction works would be the clearance and demolition of existing buildings on the

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:31: • demolition, site clearance and enabling works;

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:31: Demolition, Site Clearance and Enabling Works

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:33: be reused on site and other demolition wastes will be recycled where possible. Other general

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:50: • By 2020, the preparing for re-use, recycling and other recovery of construction and demolition

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:85: on human health, dust soiling, and ecology during demolition, earth works, construction and

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:2:Table 1.8: Risk of Dust Impacts – Demolition ……………………………………………………………………………………….5

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:1.1.1 The IAQM dust guidance gives examples of the dust emission magnitudes for demolition,

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building over 50,000 m3, potentially dusty construction material (e.g. concrete), on- Large

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:site crushing and screening, demolition activities > 20 m above ground level.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building between 20,000 to 50,000 m3, potentially dusty construction material and Medium

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:demolition activities 10 - 20 m above ground level.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:Demolition - building less than 20,000 m3, construction material with low potential for dust release Small

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:3:(e.g. metal cladding or timber), demolition activities < 10 m above ground, demolition during winter

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:5:• Special Area of Conservation (SAC) designated for acid heathlands adjacent to the demolition

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:6:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:6:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:7:The sensitivity of the area has been derived for demolition, construction, earthworks and trackout and for each designated site.

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:8:Table 1.8: Risk of Dust Impacts – Demolition

R-2020-0411-FFM-Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdf:9:IAQM (2014) Guidance on the assessment of dust from demolition and construction

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:18: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:43: Demolition of structures and engineering operations

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: demolition of old plant and buildings.

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: Demolition of existing cinema and replace with new cinema

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:44: Demolition of vacant agricultural buildings and replace with 3

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:13: relevant, requisite demolition works, and the land-use requirements during the

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:14: a. The construction and existence of the development, including, where relevant, demolition

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:32: • construction workers during demolition and development works;

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:35:5.85 The risk of impacts from dust and emissions during demolition / construction of the proposed

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:35: ‘Guidance on the assessment of dust from demolition and construction’ (IAQM, 2014).

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:36: IAQM ‘Guidance on the assessment of dust from demolition and construction’.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:44:1 Ground R/2019/0427/FFM Demolition of structures and engineering operations associated 1.96 km Granted

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:46: and industrial apparatus, Pipe Bridge, Swale and the demolition

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: the demolition and decommissioning of the REC. The magnitude of impacts and therefore

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: is that it is assumed that the demolition of the REC by explosives or particularly noisy measures

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: Noise Demolition by explosives to be avoided during the

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34:Teesmouth and Cleveland (demolition) to noise disturbance is at its highest

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:35: Holman et al (2014). IAQM Guidance on the assessment of dust from demolition and construction,

R-2020-0411-FFM-Chapter 10 Transport.pdf:12: • Clearance and Demolition: 2nd Quarter 2021.

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:113: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:114: household civic amenity recycling facilities construction, demolition and excavation waste, other waste

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:2:1 Ground R/2019/0427/FFM Demolition of structures and engineering operations associated with 1.96 km Granted 27/09/19

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3: demolition of old plant and buildings.

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3:11 Redcar & R/2020/0075/F3M Demolition of existing cinema and replace with new cinema including 4.16km Decision pending

R-2020-0411-FFM-Appendix 4.2 List of Cumulative Developments.pdf:3:13 Mr Milen R/2020/0100/FFM Demolition of vacant agricultural buildings and replace with 3 blocks 3.22 km Application

R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:16:J3.6 Buildings 3,354 Site Demolition / Loss

R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:18:5.2.2 It is recommended that the buildings scheduled for demolition are removed prior to March 2021

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:26: Trees in Relation to Design, Demolition and Construction, before any construction commences.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:28:6.5.3 Overall, the construction phase of the project would result in the demolition existing structures, and

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:29:6.5.14 During the construction phase, construction activity including minor demolition works, the use of

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:38: could be retained and protected during demolition.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:38: Demolition of structures and engineering operations character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:40: Demolition of existing cinema and replace with new cinema Residential character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:40: Demolition of vacant agricultural buildings and replace with 3 character area.

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:45: Negligible Direct effects; demolition and Temporary Medium Minor Adverse Not Significant

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:1: DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:1:The planning permission sought consent for demolition of structure and engineering

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-Compliance Officer report _R20200247CD.pdf:2: vii) A scheme for recycling/disposing of waste resulting from demolition works

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:1:“Demolition of structures and engineering operations associated with ground preparation and temporary

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:2: v) Methods of demolition of any structures to be demolished in order to form the approved

R-2020-0247-CD-R-2020-0247-CD-60686_01 DOC 6 and 11 06.05.20.pdf:2: vii) A scheme for recycling/disposing of waste from demolition works that are required to form the

R-2020-0247-CD-R-2020-0247-CD-PN 0247.pdf:1: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND ENGINEERING

R-2020-0247-CD-t.pdf:1: DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-t.pdf:1:The planning permission sought consent for demolition of structure and engineering

R-2020-0247-CD-t.pdf:2: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-t.pdf:2: vii) A scheme for recycling/disposing of waste resulting from demolition works

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:1:Details: DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:4: v) Methods of demolition of any structures to be demolished in order to form

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:4: vii) A scheme for recycling/disposing of waste resulting from demolition

R-2020-0247-CD-Decision Notice_R20190427FFM.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0247-CD-ApplicationFormRedacted.pdf:2:Demolition of structure and engineering operations associated with the ground preparation and the temporary storage of soils and its final use in the

R-2020-0247-CD-Warrenby 3B Enabling Works - CEMP (Rev C).pdf:21:Application Number: R/2019/0427/FFM, which is for “DEMOLITION OF STRUCTURES AND

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:1: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND ENGINEERING

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:2: R/2019/0427/FFM - DEMOLITION OF STRUCTURE AND

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:2: v) Methods of demolition of any structures to be demolished in order to form the

R-2020-0247-CD-Compliance Decision Notice_R20200247CD.pdf:3: vii) A scheme for recycling/disposing of waste resulting from demolition works that

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:5:Suppression of Dust and Dirt during Demolition and Construction

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:6:(6) The demolition of existing buildings and structures on the Site

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:6: period of demolition of existing buildings and structures on the

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8:Demolition, Construction and associated Noise

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8:(11) All activities associated with the demolition of existing buildings

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:8: generated during the demolition of existing buildings and

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:9:(16) No demolition or construction work associated with the

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:9: over noise during demolition and construction activities.

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:17: approval in writing, a scheme for the demolition and removal of

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18: from the demolition;

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18: (iii) the phasing of the demolition and removal;

R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf:18:(55) The demolition and removal of the Development (which shall

R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF:1: · demolition work. PREPARATION or drying winds are likely to occur or soil is frost bound, - Exclusions: Theft or malicious damage.

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:1:Details: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES,

R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf:8:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2022-0587-CD-61586_01 Covering Letter July 2022.pdf:1:“Demolition of existing redundant quay structures, capital dredging and development of new quay

R-2022-0587-CD-ApplicationFormRedacted.pdf:4: DEMOLITION OF EXISTING REDUNDANT QUAY STRUCTURES, CAPITAL DREDGING AND DEVELOPMENT OF NEW QUAY AND

R-2022-0587-CD-Officer report.pdf:1: R/2020/0684/ESM FOR DEMOLITION OF

R-2022-0587-CD-Officer report.pdf:1:The planning permission sought consent for demolition of existing redundant quay

R-2022-0587-CD-Decision Noitce.pdf:1: PERMIISSION R/2020/0684/ESM FOR DEMOLITION OF EXISTING

R-2022-0587-CD-Decision Noitce.pdf:2: PERMIISSION R/2020/0684/ESM FOR DEMOLITION OF EXISTING

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:4: • Demolition of the existing wharf, jetties and associated Infrastructure

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:22: • Demolition of the existing wharf, jetties and associated Infrastructure

R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf:76:Construction Dust Code of Practice for Demolition CIS36 - Construction dust

R-2021-0728-PND-Perry F.pdf:1:Re: Demolition Dorman Long Tower

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:from the taskforce? Why was planning application submitted, just for it to be ignored and demolition

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:transparent and used legal planning precedent to only apply for a Prior Notice of Demolition notice whereby

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:only the “method of demolition” and “any proposed restoration of the site” can be taken into consideration.

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:some of the current demolition of the former steelworks site, black dust has reached as far as Eston,

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:I am objecting to the demolition of Dorman Long Tower, which has been in situ since

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:Is the true cost of demolition worthwhile? Has cultural significance been considered

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:demolition work before the application is determined and their lack of vision at what

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:submitted, just for it to be ignored and demolition commence anyway, removing the

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:used legal planning precedent to only apply for a Prior Notice of Demolition notice

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:whereby only the “method of demolition” and “any proposed restoration of the site” can

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:that will send harmful dust into the air. During some of the current demolition of the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:Subject: R/2021/0728/PND PRIOR NOTIFICATION FOR THE DEMOLITION OF THE DORMAN

R-2021-0728-PND-CLLR JEFFREY.pdf:1:because of this ‘the matters to be considered are the “method of demolition” and “any proposed restoration of the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:should be taking steps to stop this demolition by immediately serving a Building Preservation order on the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:Tower. This will delay demolition for six months and allow time for the council to submit an application for listed

R-2021-0728-PND-CLLR JEFFREY.pdf:1:successful then the demolition will be subject to a full planning application and the associated consultation with

R-2021-0728-PND-CLLR JEFFREY.pdf:1:timescale for the Council to respond to the prior approvals of demolition where you have 28 days to determine the

R-2021-0728-PND-CLLR JEFFREY.pdf:1:I would be grateful if you could let me know your response as soon as possible, given that this demolition is

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:I would like to object to the abhorrent demolition of this tower and also the manner it has been

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:demolition? Is the land the tower occupies really essential to redevelopment or is it being cleared

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:apply for a Prior Notice of Demolition notice whereby only the “method of demolition” and “any

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:impact. During some of the current demolition of the former steelworks site, black dust has

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:the railway line from demolition site is mentioned but to what height?

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:physical heritage of this area, highlighted by commencing demolition work before the application

R-2021-0728-PND-ApplicationFormRedacted.pdf:1: Application to determine if prior approval is required for a proposed: Demolition of Buildings.

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:4. Proposed Demolition Works

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying covering letter, plans and demolition method statement for full details

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please state the reasons why demolition needs to take place

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please describe the proposed method of demolition

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying covering letter and demolition method statement

R-2021-0728-PND-ApplicationFormRedacted.pdf:2:Please see accompanying demolition method statement

R-2021-0728-PND-ApplicationFormRedacted.pdf:3:4. Proposed Demolition Works

R-2021-0728-PND-ApplicationFormRedacted.pdf:3:Please see accompanying demolition method statement

R-2021-0728-PND-JEFFREY J.pdf:1:we object to the proposed further demolition of the Dorman Long Tower!

R-2021-0728-PND-JEFFREY J.pdf:1:damages, given the abrupt indications, with the arrival on the site of demolition experts,

R-2021-0728-PND-JEFFREY J.pdf:1:choice but demolition, we are being told

R-2021-0728-PND-TEESMOUTH BIRD CLUB.pdf:1:APPLICATION REF R/2021/0728/PND Demolition of Dorman long Tower

R-2021-0728-PND-TEESMOUTH BIRD CLUB.pdf:1:We have no view on the demolition per se but wish to point out that a pair of peregrine falcons (

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1: Demolition of Dorman Long Tower

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1: South Bank Coke Ovens Demolition Works

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Demolition Contractor: Thompsons of Prudhoe Ltd.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Explosives Engineers: Precision Demolition Company Ltd

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Produced by Precision Demolition Co Ltd for 1 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:2:Produced by Precision Demolition Co Ltd for 2 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:3:Produced by Precision Demolition Co Ltd for 3 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4: for the use of the controlled explosive demolition of the Dorman Long Tower

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4: in relation to the South Bank Coke Ovens Demolition Works, South Tees

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4:Produced by Precision Demolition Co Ltd for 4 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:5:Produced by Precision Demolition Co Ltd for 5 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:6:Produced by Precision Demolition Co Ltd for 6 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: demolition of similar structures.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7:Produced by Precision Demolition Co Ltd for 7 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:8:Produced by Precision Demolition Co Ltd for 8 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:9:Produced by Precision Demolition Co Ltd for 9 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:10:Produced by Precision Demolition Co Ltd for 10 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:11:Produced by Precision Demolition Co Ltd for 11 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12:3.8 Demolition Preparation

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12:Produced by Precision Demolition Co Ltd for 12 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13: demolition.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13:Produced by Precision Demolition Co Ltd for 13 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:14:Produced by Precision Demolition Co Ltd for 14 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:15:Produced by Precision Demolition Co Ltd for 15 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:16:Produced by Precision Demolition Co Ltd for 16 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:17:Produced by Precision Demolition Co Ltd for 17 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:18:Produced by Precision Demolition Co Ltd for 18 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19:Produced by Precision Demolition Co Ltd for 19 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20: 30 tonne 360º demolition excavator with attachments. This machine and an

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20:Produced by Precision Demolition Co Ltd for 20 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:21:Produced by Precision Demolition Co Ltd for 21 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22:Produced by Precision Demolition Co Ltd for 22 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23: demolition activities (3) (1) (3) operatives restrict entry to all but (3)

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23:Produced by Precision Demolition Co Ltd for 23 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24:Produced by Precision Demolition Co Ltd for 24 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:25:Produced by Precision Demolition Co Ltd for 25 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26:Produced by Precision Demolition Co Ltd for 26 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27: of 2 years’ experience of working within the explosives demolition

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27:Produced by Precision Demolition Co Ltd for 27 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Method Statement for the Controlled Explosive Demolition of Dorman Long

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Tower associated with the South Bank Coke Ovens Demolition Works, Redcar

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Produced by Precision Demolition Co Ltd for 28 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Officer Report(1).pdf:1:PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF

R-2021-0728-PND-Officer Report(1).pdf:1:The application seeks prior approval for the demolition of Dorman Long

R-2021-0728-PND-Officer Report(1).pdf:1:Applications for Prior Approval for Demolition differ from that of a regular

R-2021-0728-PND-Officer Report(1).pdf:2: Demolition works have commenced before application determined

R-2021-0728-PND-Officer Report(1).pdf:2: Impact on climate from demolition

R-2021-0728-PND-Officer Report(1).pdf:2:Prior Notification applications, a description of the site, reason for demolition,

R-2021-0728-PND-Officer Report(1).pdf:2:demolition of the tower. This has been prepared by Precision Demolition

R-2021-0728-PND-Officer Report(1).pdf:2:Company Ltd who are the explosives engineers on behalf of the demolition

R-2021-0728-PND-Officer Report(1).pdf:2:development with regard to whether the demolition would constitute EIA

R-2021-0728-PND-Officer Report(1).pdf:3:to the project being for demolition, while any impacts are also only considered

R-2021-0728-PND-Officer Report(1).pdf:3:It is considered that through the demolition method statement and the

R-2021-0728-PND-Officer Report(1).pdf:3:mitigation measures that the proposed demolition works would not result in

R-2021-0728-PND-Officer Report(1).pdf:3:Applications for Prior Approval for Demolition differ from that of a regular

R-2021-0728-PND-Officer Report(1).pdf:3:planning applications in that demolition, while being classed as development

R-2021-0728-PND-Officer Report(1).pdf:3:prior approval of the authority will be required as to the method of demolition

R-2021-0728-PND-Officer Report(1).pdf:3:As stated above Prior Approval for demolition deals only with the method of

R-2021-0728-PND-Officer Report(1).pdf:3:demolition and the after care of the site and these issues are examined below.

R-2021-0728-PND-Officer Report(1).pdf:3:Method of Demolition

R-2021-0728-PND-Officer Report(1).pdf:3:The application has been supported by a method statement for the demolition

R-2021-0728-PND-Officer Report(1).pdf:4:demolition. The scope of works as set out within the method statement is as

R-2021-0728-PND-Officer Report(1).pdf:4:preparation works prior to demolition. The scope of these works as set out

R-2021-0728-PND-Officer Report(1).pdf:5:demolition.

R-2021-0728-PND-Officer Report(1).pdf:5:required operations for demolition, procedures should there be a misfire or

R-2021-0728-PND-Officer Report(1).pdf:5:objections to the proposed method of demolition that is to be carried out by

R-2021-0728-PND-Officer Report(1).pdf:6:the demolition and clearance remove a structure from within the existing

R-2021-0728-PND-Officer Report(1).pdf:6:The proposed method of demolition and retention of the site thereafter is

R-2021-0728-PND-Officer Report(1).pdf:6:consider the method of demolition and any proposed restoration/aftercare of

R-2021-0728-PND-Officer Report(1).pdf:6:the Local Planning Authority is not required for the proposed demolition.

R-2021-0728-PND-NETWORK RAIL.pdf:1:Proposal – Prior notification for demolition of Doman Long Tower

R-2021-0728-PND-HORNE C.pdf:1:I am writing to formally object to the undemocratic demolition of the Dorman Long tower.

R-2021-0728-PND-Stephenson L.pdf:1:I am writing to strongly object to the proposed demolition of Dorman Long.

R-2021-0728-PND-Stephenson L.pdf:1:I object to the demolition for the following reasons:

R-2021-0728-PND-Stephenson L.pdf:1:Bank Coke Oven supporting it's adaptation to enable alternative uses”. Demolition of Dorman Long would be

R-2021-0728-PND-Stephenson L.pdf:1:3) Given the climate emergency, I also object to the demolition on environmental grounds.

R-2021-0728-PND-Cover Letter.pdf:1:Demolition of Dorman Long Tower, Teesworks: Application for Prior

R-2021-0728-PND-Cover Letter.pdf:1:Notification of Demolition

R-2021-0728-PND-Cover Letter.pdf:1:demolition of Dorman Long Tower.

R-2021-0728-PND-Cover Letter.pdf:1:Heritage) v Secretary of State for CLG and Lancaster City Council, the majority of demolition work now falls

R-2021-0728-PND-Cover Letter.pdf:1:Permitted Development rights relating to demolition are granted by virtue of part 11 (Class B) of Schedule 2

R-2021-0728-PND-Cover Letter.pdf:1:of the authority will be required as to the method of demolition and any proposed restoration of the site. In

R-2021-0728-PND-Cover Letter.pdf:1:“method of demolition” and “any proposed restoration of the site”. It would not be appropriate from the

R-2021-0728-PND-Cover Letter.pdf:2:Reason for Demolition

R-2021-0728-PND-Cover Letter.pdf:2:Method of Demolition

R-2021-0728-PND-Cover Letter.pdf:2:The accompanying Demolition Method Statement sets out in detail the proposed scheme of demolition

R-2021-0728-PND-Cover Letter.pdf:2:Following the completion of the demolition works, the processing and removal of all arisings and the area is

R-2021-0728-PND-Cover Letter.pdf:2:For robustness and ahead of pursuing a ‘prior approval’ for the demolition works, we have given

R-2021-0728-PND-Cover Letter.pdf:2:consideration as to whether the proposed demolition project could be considered to be EIA development.

R-2021-0728-PND-Cover Letter.pdf:2:“demolition works are capable of constituting a ‘project’ within the meaning of the Environmental Impact

R-2021-0728-PND-Cover Letter.pdf:2:authorities will need to consider whether demolition projects are likely to have significant environmental

R-2021-0728-PND-Cover Letter.pdf:2:It is considered that the demolition of the Dorman Long Tower could fall under paragraph 13 b) of Schedule

R-2021-0728-PND-Cover Letter.pdf:2:environment”. Whilst the development as changed by demolition (e.g a cleared site) would not have

R-2021-0728-PND-Decision Notice 0728.pdf:1:Description: PRIOR NOTIFICATION FOR DEMOLITION OF DORMAN LONG

R-2021-0728-PND-Location Plan.pdf:1:Produced by Precision Demolition Co Ltd for 5 of 28 PDC/SBCO/DL/RevA

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition, but what amount of the population know where to find those physical documents and have the local

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:population been informed where to find those physical documents of the demolition, what percentage know exactly

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:on the demolition.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:4) Photographic evidence of Thompson of Prudhoe carrying out demolition before the comments period of the 9th

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:of September and demolition start date of the 15th of September. Those contractors had no right to be starting any

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition before the agreed date and certainly not before the comments date.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:demolition of the Dorman Long tower.

R-2021-0728-PND-Neighbour Comments - Taylor N.pdf:2:I am asking for all demolition work on the historic Dorman Long building to be stopped.

R-2021-0728-PND-0728(1).pdf:1: For what it is worth, I would like to object to the demolition of the Dorman Long Tower. I recognise this application

R-2021-0728-PND-0728.pdf:1:For what it is worth, I would like to object to the demolition of the Dorman Long Tower. I recognise this application

R-2021-0728-PND-DUMOULIN C.pdf:1:I wish to object to the demolition of the Dorman Long tower.

R-2021-0728-PND-DUMOULIN C.pdf:1:I would please ask that you do everything in your power to save this building from demolition.

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Subject: R/2021/0728/PND demolition of the Dorman Long Tower,

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Attachments: Dorman Long Tower demolition notice comments.docx

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:1:Please find attached my objections to this application. I hope that the agent has instructed a halt to the demolition

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:the demolition of the Dorman Long Tower

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:I would like to object to the demolition of this tower and also the

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:the demolition? Is the land the tower occupies really essential to

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:planning precedent to only apply for a Prior Notice of Demolition

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2:notice whereby only the “method of demolition” and “any

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: current demolition of the former steelworks site, black dust

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: demolition site is mentioned but to what height?

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:3:highlighted by commencing demolition work before the application

R-2021-0728-PND-Site Notice.pdf:1:whether prior approval will be required for the method of demolition and any proposed

R-2021-0728-PND-Site Notice.pdf:1:Demolition is due to begin on: 15 September 2021

R-2021-0728-PND-FIELD S.pdf:1:Subject: FW: Objection to demolition of Dorman Long building

R-2021-0728-PND-FIELD S.pdf:1:Subject: Objection to demolition of Dorman Long building

R-2021-0728-PND-FIELD S.pdf:1:I would like to register my objection to the proposed demolition of the iconic Dorman Long building, as laid out in

R-2021-0465-FFM-Officer Report 0465.pdf:2:R/2020/0357/OOM Outline planning application for demolition of existing

R-2021-0465-FFM-Officer Report 0465.pdf:6:surrounding area, with on-going works relating to demolition and remediation

R-2021-0465-FFM-Decision Notice 0465.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0465-FFM-LM Wind Detailed Applicaiton Covering Letter 28.05.21.pdf:1:On 3 December 2020 outline planning application was granted at South Bank for the demolition of existing

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:22: demolition arising, crushed concrete or imported fill.

R-2021-0465-FFM-ApplicationFormRedacted.pdf:4:website what the survey should contain, in accordance with the current 'BS5837: Trees in relation to design, demolition and construction -

R-2021-0465-FFM-ApplicationFormRedacted.pdf:6: demolition (square changes of use) development (square

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:7:7.15 Following completion of the excavation and recording, demolition of the blast furnace bases can

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:8:7.19 Video footage of the structures, particularly during their demolition, may be a useful adjunct to the

R-2021-0152-CD-Blast furnace RecordingWSIv4.PDF:8: from different viewpoints at different stages in their recording and demolition.

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:8:7.15 Following completion of the excavation and recording, any demolition of the blast furnace bases

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:9:7.19 Video footage of the structures, particularly during their demolition, may be a useful adjunct to the

R-2021-0152-CD-Blast furnace RecordingWSI revMar21.pdf:9: from different viewpoints at different stages in their recording and demolition.

R-2023-0179-SCP-230306 - HyGreen - EIA Scoping Opinion Request Letter - Final.pdf:2: development, including its where relevant, of demolition works;

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:10: development, including its demolition works;

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:92: periods where known noisy activities are taking place in the area such as demolition

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:109: • Establishing the quantities of construction, demolition and excavation waste to

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:117: Proposed Development Site, primarily for demolition works and engineering

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: dust from demolition and construction V1.1 online. Available at:

R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf:8:outriggers, crossing with vehicles, hand digging or machine digging, ditching, demolition, drainage

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: demolition under a separate consenting process) which includ e a Demolition Method

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: Statement. For the purpose of this EIA, the demolition of all other on -site Infrastructure will be

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:17: Approval applications. Demolition has not, therefore, been accounted for in this chapter.

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:18: previous demolition and reclamation works undertaken at the site but i t is assumed that all

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:18: relevant legislative requirements regarding the demolition works and possible presence of

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:25: Gravel and cobbles include brick (including refractory), concrete and other demolition

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:34: comprising of slag, ash and demolition rubble giving rise to a range of contaminants

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35:H4.88 Demolition of remaining buildings (small relic Oxygen Plant, former Loco Repair Shop and the

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:35: demolition works will be undertaken in accordance with all relevant permissions, guidance and

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:37: COMAH related risks would be removed during the demolition of the site. The main aspects are

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: EIA, the demolition of all other on-site Infrastructure will be subject to separate consents. Other

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:9: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:12:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:15:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:18:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:20: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:25:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:26: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:27:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:28:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:28:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0819-ESM-Network Rail 819.pdf:3:method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any

R-2020-0819-ESM-Network Rail 819.pdf:3:Demolition

R-2020-0819-ESM-Network Rail 819.pdf:3:Any demolition or refurbishment works must not be carried out on the development site that may endanger the

R-2020-0819-ESM-Network Rail 819.pdf:3:safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: assessment of dust from demolition and construction will be followed;

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter J - Climate Change - Dec 2020.PDF:10:J1.13 No data is available regarding the quantity of demolition material that will be removed from the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: ponding are frequent typically related to the demolition of industrial buildings.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:58: ponding are frequent typically related to the demolition of industrial buildings

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:7: engineering operations and demolition of existing structures.

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:10: engineering operations and demolition of existing structures. In addition to this, RCBC

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:13: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: “Prior approval for demolition of locomotive repair shed; oxygen plant tanks and buildings”

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14:2.51 This application sought prior approval for the demolition of some of the on-site structures at the

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: plant tanks and buildings. RCBC confirmed that prior approval for the demolition of these

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14: “Prior notification of proposed demolition of former torpedo ladle repair workshop building”

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:14:2.53 This application seeks prior approval for the demolition of the torpedo ladle repair workshop

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:17: been issued for the demolition of most of these buildings and, where not, separate applications

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: recovery facilities, construction and demolition waste recycling, household waste recycling

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: Policy MWP10 (Construction and Demolition Waste Recycling)

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:24: development of facilities to recycle construction and demolition wastes. For the reasons set out

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:27: major demolition in this first instance. There is also recognition that areas which require more

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:35: materials recovery facilities, construction and demolition waste recycling, household waste

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:48: phases of development, including hours of construction, demolition and construction

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:52: significant Made Ground deposits comprising of slag, ash and demolition rubble giving rise to a

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:55: wastes by 2030. The recovery target for construction, demolition and excavation waste for the

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:55: demolition) and operational phases of the proposed development, and by considering its

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:14: assessment of dust from demolition and construction into the CEMP from the outset,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:8: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:9: The proposed development life is a minimum of 50 years. Full deconstruction/demolition of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: It is known that there are some demolition activities

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: demolition activities are undertaking a separate

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: associated with the planned demolition activities.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:15: waste will be removed from site. The GHG emissions associated with demolition are not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:16:J4.6 Arup has been advised by the client that engineering, demolition and ground works activities

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:16: the emissions arising from demolition activities, and the transport and disposal of waste, are not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:26: commences. Further guidance is provided by IAQM on monitoring during demolition,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:i IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction (Version 1.1)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:15: • Demolition and Salvage;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: • Demolitions: The site, and indeed other sites in the Teesworks area, contain a number of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: ahead. It is envisaged that consent for their demolition will mostly be obtained by way of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: Prior Approval process, where the method of demolition and site restoration would be fully

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: Regulations and Environmental Impact Assessments relating to those demolition schemes.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: “Prior approval for demolition of locomotive repair shed; oxygen plant tanks and buildings”

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19:B4.29 This application sought prior approval for the demolition of some of the on-site structures at the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: prior approval for the demolition of these structures was not required on the 7 July 2020.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:19: “Prior notification of proposed demolition of former torpedo ladle repair workshop building”

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:20:B4.31 This application sought prior approval for the demolition of the torpedo ladle repair workshop

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:20: demolition of these buildings was not required on 17 December 2020.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:28: demolition works on site.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.9 Demolition of those buildings and structures on site will be carried out prior to construction of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:29:B7.17 As above, this stage of the development may include the demolition of any existing on -site

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:30:B7.20 All demolition works are the subject of a separate consenting process and the works will be

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:30: demolition context at the site is described in Sections B4 and B7 of this ES Chapter.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:33: Assessment of Dust from Demolition and Construction will be employed at the proposed

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:33: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: EIA, the demolition of all other on-site Infrastructure will be subject to separate consents. Other

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:10: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:13:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:16:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:19:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:26:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:28:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:29:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:29:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:28: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:8: • PPG 6 Working at construction and demolition sites;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: Table E3.1 Thresholds of potential significant effects of demolition and construction noise at residential buildings (adapted from

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:12:E3.30 “Noise from construction and demolition sites should not exceed the level at which

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:6: engineering operations and demolition of existing structures.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:5: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:9:M2.25 The target of 80% of construction and demolition waste to be used as an alternative mineral for

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:11: (deconstruction, demounting, demolition and disposal) phases.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:11: demolition) and operational phases of the proposed development, and by considering its

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:16:M3.29 The demolition of the existing buildings on site are subject to separate consents and as such

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:16: waste arising from demolition has not been assessed in this chapter. The demolition assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:19:M5.4 Phasing is not relevant to waste and materials as demolition will be complete prior to the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:20: demolition, excavation or groundworks waste.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:24: * Excludes plasterboard from demolition.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:24: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:30: 3 C&D – Construction & demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:30: 4 CD&E – Construction, demolition, & excavation

R-2020-0819-ESM-EP CL.pdf:2: There are still areas of the site that need demolition and further geochemical and

R-2020-0819-ESM-Decision Notice 0819.pdf:14:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: Pipe Bridge, Swale and the demolition of old plant and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace with new Granted, At the request of the Officer.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:19: 21 South Bank Site, Outline R/2020/0 Outline planning application for demolition of existing Decision pending This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:20: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:20: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures and Pending decision, This application has been

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:22: A Land at Former Full R/2019/0427/FF Demolition of structures and engineering operations Granted, Development

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:22: the demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: C Land associated Prior N/A Demolition of existing structures and buildings Not yet submitted All 5 STDC Tier 1

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: until the demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:24: demolition phases

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:25: demolition works

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:25: D Steel House Full R/2020/0598/FF Retrospective demolition of existing gatehouse; Pending decision, This development

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:28: 3 Where demolition is required to ‘clear’ the Dorman Point, Lackenby or Foundry sites, it is

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:28: assumed that this demolition will take place ahead of construction commencing on that

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:76: 6 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction

R-2020-0819-ESM-Dorman Point HRA Rev B(1).PDF:3:Workshop is still present in the southern part of the site (the demolition of which is to be the subject

R-2020-0819-ESM-ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:17: demolition of old plant and buildings.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace Granted, At the request of the Officer.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: STDC planning 357/OO demolition of existing structures on site STDC in July 2020 and the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:18: 22 South Bank, Outline This Demolition of the existing wharf, jetties Decision pending. This application was submitted by

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:19: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures Pending decision, This application has been

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:24: development, including, where relevant, requisite demolition

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:25: including, where relevant, demolition works;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: in the iron and steel making process. Consent is in place for the demolition of some of these

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: demolition works will be subject to a separate consenting process. Permission is therefore not

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:30: sought for the demolition of buildings and structures and the effects of demolition will,

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF:14: the demolition of the steel works and as such are not considered of more than regional

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:3: implemented following demolition/clearance works in areas previously not accessible:

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:10:due to the presence of structures undergoing demolition which precluded access for ground investigation,

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:10:Following completion of demolition activities additional ground investigation has now been completed in the

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:13:have all been demolished to ground level 7-8m AOD (above ordnance datum). Prior to demolition the DGA

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:14: amounts of clay, cobbles and gravel. Gravel and cobbles include brick, concrete and other demolition

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:49:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2023-0277-CD-DECISION NOTICE.pdf:6:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2021-0911-HD-63455_01 - RCBC - 08.09.21.PDF:1:submission of a planning application for development (Ref: R/2021/0465/FFM), and approved demolitions

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:5: hazardous construction and demolition waste (defined in category 17) but excluding naturally

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:8: and demolition waste. The strategy states that the region has in place a 60% recycling target for

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:9: construction and demolition waste recycled per year for use as an alternative mineral

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:11: (deconstruction, demounting, demolition and disposal) phases.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:11: demolition) and operational phases of the proposed development, and by considering its

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:16:M3.29 The demolition of the existing buildings on site are subject to separate consents and as such

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:16: waste arising from demolition has not been assessed in this chapter. The demolition assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:19:M5.4 Phasing is not relevant to waste and materials as demolition will be complete prior to the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:20: demolition, excavation or groundworks waste.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:24: * Excludes plasterboard from demolition.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:24: for construction and demolition waste in the Tees Valley Joint Minerals and Waste Core

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:30: 3. C&D - Construction & demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:30: 4. CD&E - Construction, demolition, & excavation

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: Pipe Bridge, Swale and the demolition of old plant and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace with new Granted, At the request of the Officer.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:21: 21 South Bank Site, Outline R/2020/0 Outline planning application for demolition of existing Decision pending This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:22: 22 South Bank, Outline This Demolition of the existing wharf, jetties and other minor Decision pending. This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:22: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures and Pending decision, This application has been

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:24: A Land at Former Full R/2019/0427/FF Demolition of structures and engineering operations Granted, Development

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:24: the demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: C Land associated Prior N/A Demolition of existing structures and buildings Not yet submitted All 5 STDC Tier 1

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: until the demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:26: demolition phases

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: demolition works

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:27: D Steel House Full R/2020/0598/FF Retrospective demolition of existing gatehouse; Pending decision, This development

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:30: 3 Where demolition is required to ‘clear’ the Dorman Point, Lackenby or Foundry sites, it is

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:30: assumed that this demolition will take place ahead of construction commencing on that

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:79: 6 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:9: - PPG 6 Working at construction and demolition sites;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:23: made ground with demolition materials.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:31: COMAH related risks would be removed during the demolition of the site. The main aspects are

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: Table E3.1: Thresholds of potential significant effects of demolition and construction noise at residential buildings (adapted from

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:12:E3.30 “Noise from construction and demolition sites should not exceed the level at which

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:19: with demolition materials.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter F - Air Quality - Dec 2020.PDF:14: assessment of dust from demolition and construction into the CEMP from the outset,

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: application for its demolition (likely to be a Prior Approval application). For the purpose of this

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: EIA, the demolition of all other on-site Infrastructure will be subject to separate consents. Other

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:9: buildings on site have already been the subject of Prior Approval applications. Demolition

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:12:2.32 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:15:2.50 Demolition of existing structures will not be sought as part of this development. Demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:18:2.69 It is understood that there are no structures / buildings within the site requiring demolition.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:20: retrospective demolition of the existing gatehouse and redevelopment to provide a new single

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:25:2 Land at Former South Bank R/2019/0427/FFM Full Granted, Demolition of structures and engineering operations associated with ground

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:26: towers and industrial apparatus, Pipe Bridge, Swale and the demolition of old

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:17 Regent Cinema R/2020/0075/F3M Deemed Granted, Demolition of existing cinema and replace with new cinema including external

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:18 South Bank Site, STDC R/2020/0357/OOM Outline Decision pending Outline planning application for demolition of existing structures on site and

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:19 South Bank, marine side This application is yet Outline Decision pending. Demolition of the existing wharf, jetties and other minor Infrastructure along

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:27:22 Land at Metals Recovery R/2020/0465/FFM Full Pending decision, Demolition of existing buildings/structures and engineering operations

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:28:24 Land associated with outline N/A Prior approval Not yet submitted Demolition of existing structures and buildings associated with the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:28:25 Steel House R/2020/0598/FF Full Pending decision, Retrospective demolition of existing gatehouse; redevelopment of site to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:23: and reversibility whether the effect is permanent or temporary (demolition and construction

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:28: variety within the housing stock, but with a similar scale and height. Some demolition of

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:19:the demolition of the buildings and appropriate mitigation.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:19:The main body of this report covers the results, recommended timing for demolition and the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:15: • Demolition and Salvage;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:17: applications relating to the demolition of the existing wharf, jetties and other minor

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: • Demolitions: Some of the other sites in the Teesworks area, where outline planning

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: for their demolition will mostly be obtained by way of the Prior Approval process where the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: method of demolition and site restoration would be fully established, assessed, mitigated

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: Environmental Impact Assessments relating to those demolition schemes.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: “Demolition of structures and engineering operations associated with ground preparation and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:32: Assessment of Dust from Demolition and Construction will be employed at the proposed

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:32: Further guidance is provided by IAQM on monitoring during demolition, earthworks and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:17: demolition of old plant and buildings.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: 20 Regent Cinema Deemed R/2020/0 Demolition of existing cinema and replace Granted, At the request of the Officer.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: STDC planning 357/OO demolition of existing structures on site STDC in July 2020 and the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:18: 22 South Bank, Outline This Demolition of the existing wharf, jetties Decision pending. This application was submitted by

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:19: 23 Land at Metals Full R/2020/0 Demolition of existing buildings/structures Pending decision, This application has been

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:24: development, including, where relevant, requisite demolition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:25: including, where relevant, demolition works;

R-2020-0822-ESM-ApplicationFormRedacted.pdf:3: demolition (square changes of use) development (square

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:15: assessment of dust from demolition and construction will be followed;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:27: monitoring during demolition, earthworks and construction; and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:40:9 IAQM, 2016. Guidance on the Assessment of Dust from Demolition and Construction (Version 1.1)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:8: decommissioning, disassembly and demolition of the built asset, as well as the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:9: The proposed development life is a minimum of 50 years. Full deconstruction/demolition of the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: It is known that there are some demolition activities

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: demolition activities are undertaking a separate

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:12: associated with the planned demolition activities.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:15: waste will be removed from site. The GHG emissions associated with demolition are not

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:17:J4.6 Arup has been advised by the client that engineering, demolition and ground works activities

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:17: the emissions arising from demolition activities, and the transport and disposal of waste, are not

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:1:PROPOSAL: DEMOLITION OF EXISTING

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:1:Permission is sought for the demolition of existing buildings/structures and

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:6:application made only in relation to demolition and remediation to create a

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:8:the site and demolition of structures across the site is acceptable and the

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:1:“Demolition of existing buildings/structures and engineering operations associated with ground

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:6:The proposed small-scale demolition works and engineering operations to level the MRA site are a key step

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:9:“Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:34: Land at Former R/2019/0427 Full Approved Demolition of

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:34: Land at South demolition of existing

R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:1:Details: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2020-0465-FFM-Decision Notice_R20200465FFM.pdf:5:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: together with supplementary Made Ground deposits comprising ash and demolition rubble giving

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:7:enabling activities such as demolition of structures and engineering operations associated with the ground

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:11:typically comprises a mixture of slag, ash, pulverised fuel ash, clinker, coal, coke, lime and general demolition

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:22: construction of storage tanks and additional Infrastructure between 1992 and 1993. Demolition of

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:40: On-Site: Mapping indicates that there had been considerable demolition of site structures in the west and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: On-Site: Further demolition of on-site structures had been carried out. No buildings are present with the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:41: demolition of the works in the 1980s onwards. The site condition at the time of the report

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:43: demolition rubble.

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:57: Further demolition of structures associated with the former Cleveland Steel and Iron Works. Large areas of the

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:58: the area have been demolished. Further demolition of structures associated with the former Cleveland Steel and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:77: On-site: Further demolition and removal of buildings associated without historical Coatham Iron Works.

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:81: development and demolition. Between 1856 and 1893, significant industrialisation began in the northwest

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:90: ‐ demolition rubble

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:93: - demolition rubble

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:100:through the SPD that asset retention may well mitigate the burden and cost associated with demolition and

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:107:Initial enabling activities will comprise demolition of legacy structures and ground preparation operations

R-2020-0465-FFM-Archaeological Advice - R-2020- 0465-FFM, Land at metals recovery area .pdf:1:DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED

R-2020-0465-FFM-Archaeological Advice - R-2020- 0465-FFM, Land at metals recovery area .pdf:1:application made only in relation to demolition and remediation to create a development platform.

R-2020-0465-FFM-MRA Application Form Rev.pdf:5:design, demolition and construction - Recommendations'.

R-2020-0465-FFM-MRA Application Form Rev.pdf:7: floorspace use or demolition (including change of following development

R-2020-0465-FFM-MRA Application Form Rev.pdf:7: class Type of use applicable of use or demolition changes of use)

R-2020-0465-FFM-MRA Application Form Rev.pdf:8:Recycling facilities construction, demolition

R-2020-0465-FFM-MRA Application Form Rev.pdf:8: Construction, demolition and excavation

R-2020-0465-FFM-R 20 0465 nat eng.pdf:1:Planning consultation: Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-R 20 0465 Con Land.pdf:1: Proposal: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:4:A planning application is being submitted for ‘demolition of existing buildings/ structures and engineering

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:5: being submitted for ‘demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF:5:2.1.2 Most recently the Site has been used for recovery of metals from demolition debris of the

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:7:“Demolition of existing buildings/ structures and engineering operations associated with ground

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:11: demolition materials, slag was not the dominant constituent although often still present within the soil

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:MPA_AUK_TP130 are noted to be within deposits containing demolition material, whilst the sample from

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:Asbestos fibres were identified in two samples, however only one of these contained obvious demolition

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:21:Acute risks to construction workers arising from short-term contact with contaminated soils during demolition

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:27:obvious demolition material within Made Ground at the site in only one case. Asbestos fibres in shallow soils

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:27:The proposed planning application “Demolition of existing buildings/ structures and engineering operations

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:28: 1. The proposed planning permission is for “Demolition of existing buildings/ structures and

R-2020-0465-FFM-R 20 0465 Nuisance.pdf:1: Proposal: DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND

R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:12:Prior to commencing work on any development which entails the demolition of part, or all of a

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:20: dust from demolition and construction. The intention of the IAQM guidance

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:31: demolition and construction. The intention of the IAQM guidance is that

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:46: Warrenby area - demolition of structures and engineering operations

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:47: • Outline planning application for demolition of existing structures on site

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:47: and the demolition of old plant and buildings 19/2161/FUL.

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:48: environmental facility, South Bank – demolition of existing

R-2022-0951-CD-ApplicationFormRedacted.pdf:4: OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO

R-2022-0951-CD-64764 Covering Letter November 2022(1).pdf:1:“Outline planning application for the demolition of existing structures on site and the development of

171019South-Tees-Master-Plan-19-Nov-17.pdf:17: 17. Plan for a progressive, optimally-phased delivery of demolition, site preparation and Infrastructure across the

171019South-Tees-Master-Plan-19-Nov-17.pdf:24: decommissioning and demolition of the facilities allocation over 30 years, to be included in the

171019South-Tees-Master-Plan-19-Nov-17.pdf:58:products of decommissioning and demolition. Utilising

171019South-Tees-Master-Plan-19-Nov-17.pdf:80:demolition and remediation – so this will need to be

171019South-Tees-Master-Plan-19-Nov-17.pdf:85:strategy to arrange end user site allocations to minimise a long time and the area will contain significant volumes in the programme. While demolition is proceeding across compatible end uses to minimise potential conflicts.

171019South-Tees-Master-Plan-19-Nov-17.pdf:85: retain the landfill zone as waste management facilities, • Areas that don’t require major demolition.

171019South-Tees-Master-Plan-19-Nov-17.pdf:86: Demolition

171019South-Tees-Master-Plan-19-Nov-17.pdf:153: land, for use by the telecom providers • Collection of construction, demolition and

171019South-Tees-Master-Plan-19-Nov-17.pdf:158:south and, centrally, via Tees Dock Road. The scale from demolition and site remediation operations elsewhere spaces strategy. iron and steel works, whether operational or non-operational,

171019South-Tees-Master-Plan-19-Nov-17.pdf:158: enables phased completion of discrete areas, releasing demolition programme for development purposes, would

171019South-Tees-Master-Plan-19-Nov-17.pdf:162:the implementation of any essential demolition, site in a timely and comprehensive manner, though a operations expansion, provide the right conditions for

171019South-Tees-Master-Plan-19-Nov-17.pdf:162: deferred, pending completion of demolition works (e.g., 13.07 Land Disposal Bank Wharf site; a large area of the Grangetown Prairie

171019South-Tees-Master-Plan-19-Nov-17.pdf:162:established. Exclusion of RBT from the land available plant and facilities would be planned for demolition. presents an opportunity for the management

171019South-Tees-Master-Plan-19-Nov-17.pdf:162: their demolition, a thorough market testing exercise will be Service charges will be levied on the developed estate

teesworks_-_keywords_-_demolition.txt · Last modified: 2024/04/02 18:09 by 127.0.0.1